WO2017048640A1 - Mesh network routing based on availability of assets - Google Patents

Mesh network routing based on availability of assets Download PDF

Info

Publication number
WO2017048640A1
WO2017048640A1 PCT/US2016/051387 US2016051387W WO2017048640A1 WO 2017048640 A1 WO2017048640 A1 WO 2017048640A1 US 2016051387 W US2016051387 W US 2016051387W WO 2017048640 A1 WO2017048640 A1 WO 2017048640A1
Authority
WO
WIPO (PCT)
Prior art keywords
asset
given
data
assets
mesh network
Prior art date
Application number
PCT/US2016/051387
Other languages
French (fr)
Inventor
Brett Heliker
Brad Nicholas
Original Assignee
Uptake Technologies, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Uptake Technologies, Inc. filed Critical Uptake Technologies, Inc.
Priority to JP2018511273A priority Critical patent/JP2018528693A/en
Priority to CN201680059994.1A priority patent/CN108141473A/en
Priority to CA2998345A priority patent/CA2998345A1/en
Priority to EP16847112.6A priority patent/EP3350978A4/en
Priority to AU2016322513A priority patent/AU2016322513A1/en
Priority to KR1020187010351A priority patent/KR20180042444A/en
Publication of WO2017048640A1 publication Critical patent/WO2017048640A1/en
Priority to HK18114872.4A priority patent/HK1255721A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/079Root cause analysis, i.e. error or fault diagnosis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0706Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation the processing taking place on a specific hardware platform or in a specific software environment
    • G06F11/0748Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation the processing taking place on a specific hardware platform or in a specific software environment in a remote unit communicating with a single-box computer node experiencing an error/fault
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D3/00Indicating or recording apparatus with provision for the special purposes referred to in the subgroups
    • G01D3/08Indicating or recording apparatus with provision for the special purposes referred to in the subgroups with provision for safeguarding the apparatus, e.g. against abnormal operation, against breakdown
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/008Subject matter not provided for in other groups of this subclass by doing functionality tests
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0224Process history based detection method, e.g. whereby history implies the availability of large amounts of data
    • G05B23/024Quantitative history assessment, e.g. mathematical relationships between available data; Functions therefor; Principal component analysis [PCA]; Partial least square [PLS]; Statistical classifiers, e.g. Bayesian networks, linear regression or correlation analysis; Neural networks
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0243Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults model based detection method, e.g. first-principles knowledge model
    • G05B23/0254Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults model based detection method, e.g. first-principles knowledge model based on a quantitative model, e.g. mathematical relationships between inputs and outputs; functions: observer, Kalman filter, residual calculation, Neural Networks
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0275Fault isolation and identification, e.g. classify fault; estimate cause or root of failure
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/008Reliability or availability analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0706Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation the processing taking place on a specific hardware platform or in a specific software environment
    • G06F11/0709Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation the processing taking place on a specific hardware platform or in a specific software environment in a distributed system consisting of a plurality of standalone computer nodes, e.g. clusters, client-server systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0706Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation the processing taking place on a specific hardware platform or in a specific software environment
    • G06F11/0721Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation the processing taking place on a specific hardware platform or in a specific software environment within a central processing unit [CPU]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0751Error or fault detection not based on redundancy
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0751Error or fault detection not based on redundancy
    • G06F11/0754Error or fault detection not based on redundancy by exceeding limits
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0766Error or fault reporting or storing
    • G06F11/0772Means for error signaling, e.g. using interrupts, exception flags, dedicated error registers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0766Error or fault reporting or storing
    • G06F11/0787Storage of error reports, e.g. persistent data storage, storage using memory protection
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0793Remedial or corrective actions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/20Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
    • G06F11/2002Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where interconnections or communication control functionality are redundant
    • G06F11/2007Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where interconnections or communication control functionality are redundant using redundant communication media
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/26Functional testing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/26Functional testing
    • G06F11/263Generation of test inputs, e.g. test vectors, patterns or sequences ; with adaptation of the tested hardware for testability with external testers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N5/00Computing arrangements using knowledge-based models
    • G06N5/02Knowledge representation; Symbolic representation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N5/00Computing arrangements using knowledge-based models
    • G06N5/04Inference or reasoning models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N7/00Computing arrangements based on specific mathematical models
    • G06N7/01Probabilistic graphical models, e.g. probabilistic networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C5/00Registering or indicating the working of vehicles
    • G07C5/008Registering or indicating the working of vehicles communicating information to a remotely located station
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C5/00Registering or indicating the working of vehicles
    • G07C5/08Registering or indicating performance data other than driving, working, idle, or waiting time, with or without registering driving, working, idle or waiting time
    • G07C5/0808Diagnosing performance data
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C5/00Registering or indicating the working of vehicles
    • G07C5/08Registering or indicating performance data other than driving, working, idle, or waiting time, with or without registering driving, working, idle or waiting time
    • G07C5/0816Indicating performance data, e.g. occurrence of a malfunction
    • G07C5/0825Indicating performance data, e.g. occurrence of a malfunction using optical means
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/187Machine fault alarms
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/22Alternate routing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2201/00Indexing scheme relating to error detection, to error correction, and to monitoring
    • G06F2201/85Active fault masking without idle spares
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

Disclosed herein are systems, devices, and methods related to assets and predictive models and corresponding workflows that are related to updating a routing table. In particular, examples involve based on a predictive model, determining that a given asset of a plurality of assets in a mesh network is likely to be unavailable within a given period of time in the future and in response to the determining, causing a routing configuration for at least one other asset in the mesh network to be updated.

Description

Mesh Network Routing Based on Availability of Assets
CROSS REFERENCE TO RELATED APPLICATIONS
[1] This application claims priority to U.S. Non-Provisional Patent Application No. 14/853,189 filed on Sept. 14, 2015 and entitled "Mesh Network Routing Based on Availability of Assets," which is incorporated herein by reference in its entirety.
[2] Moreover, this application incorporates by reference U.S. Non-Provisional Patent Application No. 14/732,258, filed on June 5, 2015, entitled "Asset Health Score" and U.S. Non- Provisional Patent Application No. 14/744,352, filed on June 19, 2015, entitled "Aggregate Predictive Model & Workflow for Local Execution," each of which is incorporated in its entirety.
BACKGROUND
[3] Today, machines (also referred to herein as "assets") are ubiquitous in many industries. From locomotives that transfer cargo across countries to medical equipment that helps nurses and doctors to save lives, assets serve an important role in everyday life. Depending on the role that an asset serves, its complexity, and cost, may vary. For instance, some assets may include multiple subsystems that must operate in harmony for the asset to function properly (e.g., an engine, transmission, etc. of a locomotive).
[4] Because of the key role that assets play in everyday life, it is desirable for assets to be repairable with limited downtime. Accordingly, some have developed mechanisms to monitor and detect abnormal conditions within an asset to facilitate repairing the asset, perhaps with minimal downtime.
OVERVIEW
[5] The current approach for monitoring assets generally involves an on-asset computer that receives signals from various sensors distributed throughout an asset that monitor the operating conditions of the asset. As one representative example, if the asset is a locomotive, the sensors may monitor parameters such as temperatures, voltages, and speeds, among other examples. If sensor signals from one or more sensors reach certain values, the on-asset computer may then generate an abnormal-condition indicator, such as a "fault code," which is an indication that an abnormal condition has occurred within the asset.
[6] In general, an abnormal condition may be a defect at an asset or component thereof, which may lead to a failure of the asset and/or component. As such, an abnormal condition may be associated with a given failure, or perhaps multiple failures, in that the abnormal condition is symptomatic of the given failure or failures. In practice, a user typically defines the sensors and respective sensor values associated with each abnormal-condition indicator. That is, the user defines an asset's "normal" operating conditions (e.g., those that do not trigger fault codes) and "abnormal" operating conditions (e.g., those that trigger fault codes).
[7] After the on-asset computer generates an abnormal-condition indicator, the indicator and/or sensor signals may be passed to a remote location where a user may receive some indication of the abnormal condition and/or sensor signals and decide whether to take action. One action that the user might take is to assign a mechanic or the like to evaluate and potentially repair the asset. Once at the asset, the mechanic may connect a computing device to the asset and operate the computing device to cause the asset to utilize one or more local diagnostic tools to facilitate diagnosing the cause of the generated indicator.
[8] While current asset-monitoring systems are generally effective at triggering abnormal- condition indicators, such systems are typically reactionary. That is, by the time the asset-monitoring system triggers an indicator, a failure within the asset may have already occurred (or is right about to occur), which may lead to costly downtime, among other disadvantages. Additionally, due to the simplistic nature of on-asset abnormality-detection mechanisms in such asset-monitoring systems, current asset-monitoring approaches tend to involve a remote computing system performing monitoring computations for an asset and then transmitting instructions to the asset if a problem is detected. This may be disadvantageous due to network latency and/or infeasible when the asset moves outside of coverage of a communication network.
[9] Assets at a site may be formed into mesh networks for certain purposes. For example, a job construction site may include assets that communicate information with each other, such as location data, status data, etc. The mesh network may provide a cheap and reliable way to enable communication between the assets. Each asset in the mesh network may use a routing configuration to determine one or more paths for data to travel in the mesh network. For example, a first asset may determine whether to transmit data to a second asset or a third asset depending on various factors including a shortest latency, a shortest distance, a minimum travel time, a minimum energy expenditure, etc. The routing configuration may include different data structures for storing the one or more paths including a routing table.
[10] One or more assets in the mesh network may use a communication network to transmit the data outside the mesh network to a remote computing system. This asset may be known as a "gateway" because the asset provides the assets in the mesh network with access to additional network resources. [11] The assets in the mesh network include sensors that generate sensor data. The assets may transmit the sensor data to the remote computing system by accessing the communication network if the assets are gateways or by transmitting the sensor data to the gateway.
[12] The remote system defines a predictive model and corresponding workflow (referred to herein as a "model-workflow pair") that are related to the operation of the assets. The predictive model may be executed either at the remote system itself or can be executed locally by the assets. For example, the assets may be configured to receive the model-workflow pair and utilize a local analytics device to operate in accordance with the model-workflow pair.
[13] Generally, a model-workflow pair may cause an asset to monitor certain operating conditions and when certain conditions exist, modify a behavior that may help facilitate preventing an occurrence of a particular event. Specifically, a predictive model may receive as inputs sensor data from a particular set of asset sensors and output a likelihood that a given asset will be unavailable within a given period of time in the future. A workflow may involve one or more operations that are performed based on the likelihood of the one or more particular events that is output by the model.
[14] In practice, the remote computing system may define an aggregate, predictive model and corresponding workflows, individualized, predictive models and corresponding workflows, or some combination thereof. An "aggregate" model/workflow may refer to a model/workflow that is generic for a group of assets, while an "individualized" model/workflow may refer to a model/workflow that is tailored for a single asset or subgroup of assets from the group of assts.
[15] In accordance with this disclosure, one specific model -workflow pair can be a predictive failure model that triggers a workflow for causing the mesh network' s routing table to be updated. This model-workflow pair may be executed at the remote computing system (in which case the remote computing system will instruct the assets in the mesh to update their respective routing tables) or may be executed locally at an asset itself (in which case the asset would instruct the other assets in the mesh to update the tables).
[16] The predictive failure model may take various forms, one example of which is a health score model where the predictive failure model monitors the health of an asset and outputs a health metric (e.g., "health score") for an asset, which is a single, aggregated metric that indicates whether a failure will occur at a given asset (and thus whether the given asset will become unavailable) within a given timeframe into the future. In particular, a health metric may indicate a likelihood that no failures from a group of failures will occur at an asset within a given timeframe into the future, or a health metric may indicate a likelihood that at least one failure from a group of failures will occur at an asset within a given timeframe into the future. The workflow for causing the routing table to be updated may take various forms, one example of which is a workflow triggered when the heath score falls below a certain threshold.
[17] Once it is determined that a given asset is likely to be unavailable within a given time in the future, a routing configuration for at least one other asset in the mesh network is updated. For example, the remote computing system may transmit a determination that the given asset is likely to be unavailable within the given period of time in the future to one of the plurality of assets in the mesh network. That asset may then update its routing configuration and transmit the determination to another asset in the mesh network. In another example, the remote computing system may send to one or more assets in the mesh network a corresponding updated routing configuration.
[18] The example systems, devices, and methods disclosed herein seek to help address one or more of these issues. In example implementations, a network configuration may include a communication network that facilitates communications between assets and a remote computing system.
[19] One of ordinary skill in the art will appreciate these as well as numerous other aspects in reading the following disclosure.
BRIEF DESCRIPTION OF THE DRAWINGS
[20] Figure 1 depicts an example network configuration in which example embodiments may be implemented.
[21] Figure 2 depicts a simplified block diagram of an example asset.
[22] Figure 3 depicts a conceptual illustration of example abnormal-condition indicators and triggering criteria.
[23] Figure 4 depicts a conceptual illustration of a mesh network.
[24] Figure 5 depicts a simplified block diagram of an example analytics system.
[25] Figure 6 depicts an example flow diagram of a definition phase that may be used for defining model-workflow pairs.
[26] Figure 7 depicts an example flow diagram of a modeling phase that may be used for defining a predictive model that outputs a health metric.
[27] Figure 8 depicts an example method to update a routing configuration for a mesh network.
DETAILED DESCRIPTION
[28] The following disclosure makes reference to the accompanying figures and several exemplary scenarios. One of ordinary skill in the art will understand that such references are for the purpose of explanation only and are therefore not meant to be limiting. Part or all of the disclosed systems, devices, and methods may be rearranged, combined, added to, and/or removed in a variety of manners, each of which is contemplated herein.
I. EXAMPLE NETWORK CONFIGURATION
[29] Turning now to the figures, Figure 1 depicts an example network configuration 100 in which example embodiments may be implemented. As shown, the network configuration 100 includes at least three assets 102, 103, and 104 coupled in a mesh network 105, a communication network 106, a remote computing system 108 that may take the form of an analytics system, an output system 110, and a data source 112.
[30] The communication network 106 may communicatively connect each of the components in the network configuration 100. For instance, the assets 102, 103, and 104 may communicate with the analytics system 108 via the communication network 106. The assets 102, 103, and 104 may communicate with each other via the mesh network 105. The assets 102, 103, and 104 may also communicate with the analytics system 108 by communicating via the mesh network 105 and via the communication network 106. For example, asset 102 may transmit sensor data to asset 103, which transmits the sensor data to the analytics system 108 via the communication network. In addition, the mesh network 105 may be configured so that a subset of the assets 102, 103, and 104 communicate with the analytics system 108. For example, asset 103 may be the only asset that communicates with the analytics system 108 while assets 102, 103, and 104 communicate only with other assets 103 and 104 or 102 and 103, respectively, in the mesh network 105.
[31] In some cases, the assets 102, 103, and 104 may communicate with one or more intermediary systems, such as an asset gateway (not pictured), that in turn communicates with the analytics system 108. Likewise, the analytics system 108 may communicate with the output system 110 via the communication network 106. In some cases, the analytics system 108 may communicate with one or more intermediary systems, such as a host server (not pictured), that in turn communicates with the output system 110. Many other configurations are also possible.
[32] In general, the assets 102, 103, and 104 may take the form of any device configured to perform one or more operations (which may be defined based on the field) and may also include equipment configured to transmit data indicative of one or more operating conditions of the given asset. In some examples, an asset may include one or more subsystems configured to perform one or more respective operations. In practice, multiple subsystems may operate in parallel or sequentially in order for an asset to operate.
[33] Example assets may include transportation machines (e.g., locomotives, aircraft, semitrailer trucks, ships, etc.), industrial machines (e.g., mining equipment, construction equipment, processing equipment, assembly equipment, etc.), medical machines (e.g., medical imaging equipment, surgical equipment, medical monitoring systems, medical laboratory equipment, etc.), utility machines (e.g., turbines, solar farms, etc.), and unmanned aerial vehicles, among other examples. Those of ordinary skill in the art will appreciate that these are but a few examples of assets and that numerous others are possible and contemplated herein.
[34] In example implementations, the assets 102, 103, and 104 may each be of the same type (e.g., a fleet of locomotives or aircraft, a group of wind turbines, a pool of milling machines, or a set of magnetic resonance imagining (MRI) machines, among other examples) and perhaps may be of the same class (e.g., same equipment type, brand, and/or model). In other examples, the assets 102, 103, and 104 may differ by type, by brand, by model, etc. For example, assets 102, 103, and 104 may be different pieces of equipment at a job site (e.g., an excavation site) or a production facility, among numerous other examples. The assets are discussed in further detail below with reference to Figure 2.
[35] As shown, the assets 102, 103, and 104, and perhaps the data source 112, may communicate with the analytics system 108 via the communication network 106 and/or the mesh network 105. In general, the communication network 106 may include one or more computing systems and network infrastructure configured to facilitate transferring data between network components. The communication network 106 may be or may include one or more Wide- Area Networks (WANs) and/or Local-Area Networks (LANs), which may be wired and/or wireless and may feature varying degrees of bandwidth, power consumption, and/or latency characteristics. In some examples, the communication network 106 may include one or more cellular or satellite networks and/or the Internet, among other networks. The communication network 106 may operate according to one or more communication protocols, such as LTE, CDMA, GSM, WiFi, LPWAN, Bluetooth, Ethernet, HTTP/S, TCP, CoAP/DTLS and the like. Although the communication network 106 is shown as a single network, it should be understood that the communication network 106 may include multiple, distinct networks that are themselves communicatively linked. The communication network 106 could take other forms as well.
[36] In general, the mesh network 105 may take the form of a network topology where the assets 102, 103, and 104 (and potentially other network elements) serve as "nodes" that are configured to facilitate routing data from a source (e.g., the analytics system 108) to a destination (e.g., the asset 103). For example, the analytics system 108 may transmit data destined for the asset 103 via the asset 104 that relays the data to the asset 103. Similarly, the asset 103 may transmit data destined for the analytics system 108 via the asset 102 that relays the data to the analytics system 108 via the communication network 106. Other examples of data routing are also possible. Mesh networks are discussed in further detail below with respect to Figure 4.
[37] As noted above, the analytics system 108 may be configured to receive data from the assets
102, 103, and 104 and the data source 112. Broadly speaking, the analytics system 108 may include one or more computing systems, such as servers and databases, configured to receive, process, analyze, and output data. The analytics system 108 may be configured according to a given dataflow technology, such as TPL Dataflow or NiFi, among other examples. The analytics system 108 is discussed in further detail below with reference to Figure 3.
[38] As shown, the analytics system 108 may be configured to transmit data to the assets 102,
103, and 104 and/or to the output system 110. The particular data transmitted may take various forms and will be described in further detail below.
[39] In general, the output system 110 may take the form of a computing system or device configured to receive data and provide some form of output. The output system 110 may take various forms. In one example, the output system 110 may be or include an output device configured to receive data and provide an audible, visual, and/or tactile output in response to the data. In general, an output device may include one or more input interfaces configured to receive user input, and the output device may be configured to transmit data through the communication network 106 based on such user input. Examples of output devices include tablets, smartphones, laptop computers, other mobile computing devices, desktop computers, smart televisions, and the like.
[40] Another example of the output system 110 may take the form of a work-order system configured to output a request for a mechanic or the like to repair an asset. Yet another example of the output system 110 may take the form of a parts-ordering system configured to place an order for a part of an asset and output a receipt thereof. Numerous other output systems are also possible.
[41] The data source 112 may be configured to communicate with the analytics system 108. In general, the data source 112 may be or include one or more computing systems configured to collect, store, and/or provide to other systems, such as the analytics system 108, data that may be relevant to the functions performed by the analytics system 108. The data source 112 may be configured to generate and/or obtain data independently from the assets 102, 103, and 104. As such, the data provided by the data source 112 may be referred to herein as "external data." The data source 112 may be configured to provide current and/or historical data. In practice, the analytics system 108 may receive data from the data source 112 by "subscribing" to a service provided by the data source. However, the analytics system 108 may receive data from the data source 112 in other manners as well.
[42] Examples of the data source 112 include environment data sources, asset-management data sources, and other data sources. In general, environment data sources provide data indicating some characteristic of the environment in which assets are operated. Examples of environment data sources include weather-data servers, global navigation satellite systems (GNSS) servers, map- data servers, and topography-data servers that provide information regarding natural and artificial features of a given area, among other examples.
[43] In general, asset-management data sources provide data indicating events or statuses of entities (e.g., other assets) that may affect the operation or maintenance of assets (e.g., when and where an asset may operate or receive maintenance). Examples of asset-management data sources include traffic-data servers that provide information regarding air, water, and/or ground traffic, asset-schedule servers that provide information regarding expected routes and/or locations of assets on particular dates and/or at particular times, defect detector systems (also known as "hotbox" detectors) that provide information regarding one or more operating conditions of an asset that passes in proximity to the defect detector system, part-supplier servers that provide information regarding parts that particular suppliers have in stock and prices thereof, and repair- shop servers that provide information regarding repair shop capacity and the like, among other examples.
[44] Examples of other data sources include power-grid servers that provide information regarding electricity consumption and external databases that store historical operating data for assets, among other examples. One of ordinary skill in the art will appreciate that these are but a few examples of data sources and that numerous others are possible.
[45] It should be understood that the network configuration 100 is one example of a network in which embodiments described herein may be implemented. Numerous other arrangements are possible and contemplated herein. For instance, other network configurations may include additional components not pictured and/or more or less of the pictured components.
II. EXAMPLE ASSET
[46] Turning to Figure 2, a simplified block diagram of an example asset 200 is depicted. One or more of assets 102, 103, and 104 from Figure 1 may be configured like the asset 200. As shown, the asset 200 may include one or more subsystems 202, one or more sensors 204, one or more actuators 205, a central processing unit 206, data storage 208, a network interface 210, a user interface 212, and perhaps also a local analytics device 220, all of which may be communicatively linked by a system bus, network, or other connection mechanism. One of ordinary skill in the art will appreciate that the asset 200 may include additional components not shown and/or more or less of the depicted components.
[47] Broadly speaking, the asset 200 may include one or more electrical, mechanical, and/or electromechanical components configured to perform one or more operations. In some cases, one or more components may be grouped into a given subsystem 202.
[48] Generally, a subsystem 202 may include a group of related components that are part of the asset 200. A single subsystem 202 may independently perform one or more operations or the single subsystem 202 may operate along with one or more other subsystems to perform one or more operations. Typically, different types of assets, and even different classes of the same type of assets, may include different subsystems.
[49] For instance, in the context of transportation assets, examples of subsystems 202 may include engines, transmissions, drivetrains, fuel systems, battery systems, exhaust systems, braking systems, electrical systems, signal processing systems, generators, gear boxes, rotors, and hydraulic systems, among numerous other subsystems. In the context of a medical machine, examples of subsystems 202 may include scanning systems, motors, coil and/or magnet systems, signal processing systems, rotors, and electrical systems, among numerous other subsystems.
[50] As suggested above, the asset 200 may be outfitted with various sensors 204 that are configured to monitor operating conditions of the asset 200 and various actuators 205 that are configured to interact with the asset 200 or a component thereof and monitor operating conditions of the asset 200. In some cases, some of the sensors 204 and/or actuators 205 may be grouped based on a particular subsystem 202. In this way, the group of sensors 204 and/or actuators 205 may be configured to monitor operating conditions of the particular subsystem 202, and the actuators from that group may be configured to interact with the particular subsystem 202 in some way that may alter the subsystem's behavior based on those operating conditions.
[51] In general, a sensor 204 may be configured to detect a physical property, which may be indicative of one or more operating conditions of the asset 200, and provide an indication, such as an electrical signal, of the detected physical property. In operation, the sensors 204 may be configured to obtain measurements continuously, periodically (e.g., based on a sampling frequency), and/or in response to some triggering event. In some examples, the sensors 204 may be preconfigured with operating parameters for performing measurements and/or may perform measurements in accordance with operating parameters provided by the central processing unit 206 (e.g., sampling signals that instruct the sensors 204 to obtain measurements). In examples, different sensors 204 may have different operating parameters (e.g., some sensors may sample based on a first frequency, while other sensors sample based on a second, different frequency). In any event, the sensors 204 may be configured to transmit electrical signals indicative of a measured physical property to the central processing unit 206. The sensors 204 may continuously or periodically provide such signals to the central processing unit 206.
[52] For instance, sensors 204 may be configured to measure physical properties such as the location and/or movement of the asset 200, in which case the sensors may take the form of GNSS sensors, dead-reckoning-based sensors, accelerometers, gyroscopes, pedometers, magnetometers, or the like.
[53] Additionally, various sensors 204 may be configured to measure other operating conditions of the asset 200, examples of which may include temperatures, pressures, speeds, friction, power usages, fuel usages, fluid levels, runtimes, voltages and currents, magnetic fields, electric fields, and power generation, among other examples. One of ordinary skill in the art will appreciate that these are but a few example operating conditions that sensors may be configured to measure. Additional or fewer sensors may be used depending on the industrial application or specific asset.
[54] As suggested above, an actuator 205 may be configured similar in some respects to a sensor 204. Specifically, an actuator 205 may be configured to detect a physical property indicative of an operating condition of the asset 200 and provide an indication thereof in a manner similar to the sensor 204.
[55] Moreover, an actuator 205 may be configured to interact with the asset 200, one or more subsystems 202, and/or some component thereof. As such, an actuator 205 may include a motor or the like that is configured to move or otherwise control a component or system. In a particular example, an actuator may be configured to measure a fuel flow and alter the fuel flow (e.g., restrict the fuel flow), or an actuator may be configured to measure a hydraulic pressure and alter the hydraulic pressure (e.g., increase or decrease the hydraulic pressure). Numerous other example interactions of an actuator are also possible and contemplated herein.
[56] Generally, the central processing unit 206 may include one or more processors and/or controllers, which may take the form of a general- or special-purpose processor or controller. In particular, in example implementations, the central processing unit 206 may be or include microprocessors, microcontrollers, application specific integrated circuits, digital signal processors, and the like. In turn, the data storage 208 may be or include one or more non-transitory computer-readable storage media, such as optical, magnetic, organic, or flash memory, among other examples.
[57] The central processing unit 206 may be configured to store, access, and execute computer-readable program instructions stored in the data storage 208 to perform the operations of an asset 200 described herein. For instance, as suggested above, the central processing unit 206 may be configured to receive respective sensor signals from the sensors 204 and/or actuators 205. The central processing unit 206 may be configured to store sensor and/or actuator 205 data in and later access it from the data storage 208. The central processing unit 206 may also be configured to determine whether received sensor signals trigger any abnormal-condition indicators, such as fault codes. For instance, the central processing unit 206 may be configured to store in the data storage 208 abnormal-condition rules, each of which include a given abnormal-condition indicator representing a particular abnormal condition and respective sensor criteria that trigger the abnormal-condition indicator. That is, each abnormal-condition indicator corresponds with one or more sensor measurement values that must be satisfied before the abnormal-condition indicator is triggered. In practice, the asset 200 may be pre-programmed with the abnormal-condition rules and/or may receive new abnormal-condition rules or updates to existing rules from a computing system, such as the analytics system 108.
[58] In any event, the central processing unit 206 may be configured to determine whether received sensor signals trigger any abnormal-condition indicators. That is, the central processing unit 206 may determine whether received sensor signals satisfy any sensor criteria. When such a determination is affirmative, the central processing unit 206 may generate abnormal-condition data and may cause the asset's 200 network interface 210 to transmit the abnormal-condition data to the analytics system 108. The central processing unit 206 may generate abnormal-condition data and may also cause the asset's 200 user interface 212 to output an indication of the abnormal condition, such as a visual and/or audible alert. Additionally, the central processing unit 206 may log the occurrence of the abnormal-condition indicator being triggered in the data storage 208, perhaps with a timestamp.
[59] Figure 3 depicts a conceptual illustration of example abnormal-condition indicators and respective triggering criteria for an asset. In particular, Figure 3 depicts a conceptual illustration of example fault codes. As shown, table 300 includes columns 302, 304, and 306 that correspond to Sensor A, Actuator B, and Sensor C, respectively, and rows 308, 310, and 312 that correspond to Fault Codes 1, 2, and 3, respectively. Entries 314 then specify sensor criteria (e.g., sensor value thresholds) that correspond to the given fault codes.
[60] For example, Fault Code 1 will be triggered when Sensor A detects a rotational measurement greater than 135 revolutions per minute (RPM) and Sensor C detects a temperature measurement greater than 65° Celsius (C), Fault Code 2 will be triggered when Actuator B detects a voltage measurement greater than 1000 Volts (V) and Sensor C detects a temperature measurement less than 55°C, and Fault Code 3 will be triggered when Sensor A detects a rotational measurement greater than 100 RPM, Actuator B detects a voltage measurement greater than 750 V, and Sensor C detects a temperature measurement greater than 60°C. One of ordinary skill in the art will appreciate that Figure 3 is provided for purposes of example and explanation only and that numerous other fault codes and/or triggering criteria are possible and contemplated herein.
[61] Referring back to Figure 2, the central processing unit 206 may be configured to carry out various additional functions for managing and/or controlling operations of the asset 200 as well. For example, the central processing unit 206 may be configured to provide instruction signals to the subsystems 202 and/or the sensors 204 that cause the subsystems 202 and/or the sensors 204 to perform some operation, such as modifying a throttle position or a sensor-sampling rate. Moreover, the central processing unit 206 may be configured to receive signals from the subsystems 202, the sensors 204, the network interfaces 210, and/or the user interfaces 212 and based on such signals, cause an operation to occur. Further still, the central processing unit 206 may be configured to receive signals from a computing device, such as a diagnostic device, that cause the central processing unit 206 to execute one or more diagnostic tools in accordance with diagnostic rules stored in the data storage 208. Other functionalities of the central processing unit 206 are discussed below.
[62] In some implementations, the central processing unit 206 may be configured to receive a routing configuration or updates to the routing configuration from the analytics system 108 or another asset 200. The central processing unit 206 may cause the asset 200 to perform an operation based on the routing configuration or updates to the routing configuration.
[63] The network interface 210 may be configured to provide for communication between the asset 200 and various other network components. For example, the network interface 210 may be configured to facilitate communications to and from the communication network 106 and may thus take the form of an antenna structure and associated equipment for transmitting and receiving various over-the-air signals and/or may take the form of a wired network interface. The network interface 210 may also be configured to provide for communication between the asset 200 and various network components operating in the mesh network 105. For example, the network interface 210 may be configured to facilitate communications between assets 102, 103, and 104 in the mesh network. Other examples are possible as well. In practice, the network interface 210 may be configured according to a communication protocol, such as any of those described above.
[64] The user interface 212 may be configured to facilitate user interaction with the asset 200 and may also be configured to facilitate causing the asset 200 to perform an operation in response to user interaction. Examples of user interfaces 212 include touch-sensitive interfaces, mechanical interfaces (e.g., levers, buttons, wheels, dials, keyboards, etc.), and other input interfaces (e.g., microphones), among other examples. In some cases, the user interface 212 may include or provide connectivity to output components, such as display screens, speakers, headphone jacks, and the like.
[65] The local analytics device 220 may generally be configured to receive and analyze data and based on such analysis, cause one or more operations to occur at the asset 200. In particular, the local analytics device 220 may receive sensor data from the sensors 204 and based on such data, may provide instructions to the central processing unit 206 that cause the asset 200 to perform an operation. For example, in some implementations, the local analytics device 220 may determine that the asset is likely to be unavailable, for example, based on a predictive model and data from the sensors 204. In response, the local analytics device 200 may generating a routing configuration for a mesh network (e.g., mesh network 105) and instruct the central processing unit 206 to transmit data based on the routing configuration. The local analytics device 200 may instruct the storage 208 to store the routing configuration and/or updates to the routing configuration.
[66] In practice, the local analytics device 220 may enable the asset 200 to locally perform advanced analytics and associated operations, such as executing the predictive model, that may otherwise not be able to be performed with the other on-asset components. As such, the local analytics device 220 may help provide additional processing power and/or intelligence to the asset 200.
[67] As shown, the local analytics device 220 may include a processing unit 222, a data storage 224, and a network interface 226, all of which may be communicatively linked by a system bus, network, or other connection mechanism. The processing unit 222 may include one or more processors, which may take any of the processor forms discussed above. In turn, the data storage 224 may be or include one or more non-transitory computer-readable storage media, which may take any of the forms of computer-readable storage media discussed above. [68] The processing unit 222 may be configured to store, access, and execute computer-readable program instructions stored in the data storage 224 to perform the operations of a local analytics device described herein. For instance, the processing unit 222 may be configured to receive respective sensor signals from the sensors 204 and execute a predictive model -workflow pair based on such signals. Other functions are described below.
[69] The network interface 226 may be the same or similar to the network interfaces described above. In practice, the network interface 226 may facilitate communication between the asset 200 and the analytics system 108.
[70] One of ordinary skill in the art will appreciate that the asset 200 shown in Figure 2 is but one example of a simplified representation of an asset and that numerous others are also possible. For instance, other assets may include additional components not pictured and/or more or less of the pictured components.
III. EXAMPLE MESH NETWORK
[71] As mentioned above, the network configuration 100 may include a mesh network in which assets serve as nodes that cooperate to distribute data. In general, a mesh network includes a plurality of nodes that are configured to relay data from a source, perhaps that is located outside of the mesh network, through the mesh network to a destination in accordance with one or more routing protocols. The mesh network may be configured such that the nodes communicate with one another, as opposed to communicating directly with a central access point or the like, and may provide multiple possible paths by which data may travel from a source to a destination. Nodes may be dynamically added or removed helping to allow for a flexible communication network. Nodes may be mobile, in a fixed location, or some combination thereof.
[72] Figure 4 depicts a conceptual illustration of an example mesh network 400 that is communicatively coupled to another communication network (e.g., the communication network 106). As shown, the mesh network 400 includes a plurality of nodes 402, 404, 406, 408, 410, and 412. In this example, the nodes 404 and 406 are directly reachable by the node 402, while the nodes 408, 410, and 412 are not directly reachable by the node 402. As such, the mesh network 400 may be advantageous in that the nodes 404 and 406 extend the transmission range of the node 402, among other advantages.
[73] In example implementations, the node 402 may be configured to provide the mesh network 400 connectivity to the communication network 106 (e.g., and thus WANs). In this way, the node 402 allows the other nodes of the mesh network 400 to share a single connection back to the communication network 106. The node 402 may be communicatively coupled to the communication network 106 via a wired or wireless mechanism or some combination thereof. The node 402 may include, take the form of, or otherwise communicate with an access point, such as a wireless router or the like. In some implementations, the node 402 may take the form of an asset, such as the asset 200.
[74] The nodes 404-412 may take the form of assets, some of which may be all of the same type and/or class or may differ in some respects. In any event, each of the assets 404-412 serving as nodes may be configured to route data in accordance with one or more routing techniques. For example, each asset may include one or more network interfaces that allow the asset to receive and transmit data, such as any of network interfaces discussed above with reference to Figure 2. In some implementations, a given asset may be a "legacy" asset that does not itself include a communications interface but may be retrofitted with an external network interface that provides the given asset connectivity to the mesh network 400. Moreover, in example implementations, an asset may be configured to receive but not transmit data. For example, the asset 412 may be a data storage device that receives and stores data but does not transmit data to other nodes in the mesh network 400. Other examples are also possible.
[75] As suggested above, data may propagate through the mesh network 400 in accordance with one or more routing techniques. Generally, a given routing technique may provide multiple paths by which data from a source can reach a destination via intermediary nodes (i.e., nodes that are not the final destination for the data). And when the data is sent, the path that provides the quickest and/or most reliable route may be utilized. As an example, a given routing technique may provide two paths between the communication network 106 and the asset 408 (e.g., path 403 and path 405). As such, data that originates from the asset 408 (e.g., operating data) may travel to the communication network 106 via the path 403 (e.g., passing through intermediary nodes 404 and 402), while data that originates from the communication network 106 may travel to the asset 408 via the path 405 (e.g., passing through intermediary nodes 402 and 406), among other possibilities.
[76] Various routing techniques may be utilized, such as reactive routing techniques (e.g., ad- hoc on demand distance vector routing (AODV), dynamic source routing (DSR), etc.), proactive routing techniques (e.g., optimized link state routing (OLSR), better approach to mobile ad-hoc networking (BATMAN), destination sequenced distance- vector routing (DSDV), cluster head gateway switch routing (CGSR), etc.), and/or hybrid routing techniques (e.g., some combination of reactive and proactive routing techniques), among other routing techniques.
[77] Depending on the given routing technique, the paths by which data may propagate through the mesh network 400 may be determined in a variety of manners. Generally, the paths are determined by each node of the mesh network 400 exchanging, perhaps periodically, respective routing information (e.g., distance vectors, node metrics, etc.) with the other nodes to establish the possible routes from each node to the other in the mesh network 400. More specifically, the mesh network 400 may be established and paths may be determined based on the routing information of the nodes 402-412. The routing information of a given node may include or be based on various node metrics, such as a current load on the given node, radio frequency noise level, GPS coordinates of the given node, received signal strength indicator, signal-to-noise ratio, compass angle, remaining battery power of the given node, and/or remaining energy of the given node (e.g., an indication of the given node's data throughput and/or a number of hops), among other considerations.
[78] Each node may then store some or all of the routing information of the other nodes, such as in the form of a routing table, in accordance with a given routing technique. Generally, a given routing technique may cause the nodes to determine one or more "optimal" paths to distribute data based on the routing information. For instance, the nodes may optimize for the quickest data delivery (e.g., fewest number of hops, shortest overall distance, and/or shortest travel time), the most reliable data delivery, or the path that optimizes both quickness and reliability, among other examples. In any event, the nodes may configure their respective routing tables to reflect the optimized data delivery such that, when a given node receives data that is destined for a particular node, the given node can readily determine the node to which it should relay the data (e.g., the "next hop") to facilitate delivering the data in accordance with the given routing technique.
[79] In practice, the mesh network 400 may be dynamically updated as network conditions and/or node metrics change. For example, as network conditions change (e.g., as network latency increases or decreases), the nodes may determine that a given path is less optimal than another path and update their respective routing tables to reflect that a different path is now the most optimal path. In another example, as a given node's ability to server as router changes (e.g., as the given asset's health decreases, discussed in further detail below), the nodes may determine that a given path (e.g., one in which the given node is a link in the path) is less optimal than another path and update their respective route tables accordingly. Other examples of updating routing information are also possible.
IV. EXAMPLE ANALYTICS SYSTEM
[80] Referring now to Figure 5, a simplified block diagram of an example analytics system 500 is depicted. As suggested above, the analytics system 500 may include one or more computing systems communicatively linked and arranged to carry out various operations described herein. Specifically, as shown, the analytics system 500 may include a data intake system 502, a data science system 504, and one or more databases 506. These system components may be communicatively coupled via one or more wireless and/or wired connections.
[81] The data intake system 502 may generally function to receive and process data and output data to the data science system 504. As such, the data intake system 502 may include one or more network interfaces configured to receive data from various network components of the network configuration 100, such as the assets 102, 103, and 104, the output system 110, and/or the data source 112. Specifically, the data intake system 502 may be configured to receive analog signals, data streams, and/or network packets, among other examples. As such, the network interfaces may include one or more wired network interfaces, such as a port or the like, and/or wireless network interfaces, similar to those described above. In some examples, the data intake system 402 may be or include components configured according to a given dataflow technology, such as a NiFi receiver or the like.
[82] The data intake system 502 may include one or more processing components configured to perform one or more operations. Example operations may include compression and/or decompression, encryption and/or de-encryption, analog-to-digital and/or digital-to-analog conversion, filtration, and amplification, among other operations. Moreover, the data intake system 502 may be configured to parse, sort, organize, and/or route data based on data type and/or characteristics of the data. In some examples, the data intake system 502 may be configured to format, package, and/or route data based on one or more characteristics or operating parameters of the data science system 504.
[83] In general, the data received by the data intake system 502 may take various forms. For example, the payload of the data may include a single sensor measurement, multiple sensor measurements and/or one or more fault codes. Other examples are also possible.
[84] Moreover, the received data may include certain characteristics, such as a source identifier and a timestamp (e.g., a date and/or time at which the information was obtained). For instance, a unique identifier (e.g., a computer generated alphabetic, numeric, alphanumeric, or the like identifier) may be assigned to each asset, and perhaps to each sensor. Such identifiers may be operable to identify the asset, or sensor, from which data originates. In some cases, another characteristic may include the location (e.g., GPS coordinates) at which the information was obtained. Data characteristics may come in the form of signal signatures or metadata, among other examples. [85] The data science system 504 may generally function to receive (e.g., from the data intake system 502) and analyze data and based on such analysis, cause one or more operations to occur. As such, the data science system 504 may include one or more network interfaces 508, a processing unit 510, and data storage 512, all of which may be communicatively linked by a system bus, network, or other connection mechanism. In some cases, the data science system 404 may be configured to store and/or access one or more application program interfaces (APIs) that facilitate carrying out some of the functionality disclosed herein.
[86] The network interfaces 508 may be the same or similar to any network interface described above. In practice, the network interfaces 508 may facilitate communication between the data science system 504 and various other entities, such as the data intake system 502, the databases 506, the assets 102, 103, 104, the output system 110, etc.
[87] The processing unit 510 may include one or more processors, which may take any of the processor forms described above. In turn, the data storage 512 may be or include one or more non-transitory computer-readable storage media, which may take any of the forms of computer-readable storage media discussed above. The processing unit 510 may be configured to store, access, and execute computer-readable program instructions stored in the data storage 512 to perform the operations of an analytics system described herein.
[88] In general, the processing unit 510 may be configured to perform analytics on data received from the data intake system 502. To that end, the processing unit 510 may be configured to execute one or more modules, which may each take the form of one or more sets of program instructions that are stored in the data storage 512. The modules may be configured to facilitate causing an outcome to occur based on the execution of the respective program instructions. An example outcome from a given module may include outputting data into another module, updating the program instructions of the given module and/or of another module, and outputting data to a network interface 508 for transmission to an asset and/or the output system 110, among other examples.
[89] The databases 506 may generally function to receive (e.g., from the data science system 504) and store data. As such, each database 506 may include one or more non-transitory computer-readable storage media, such as any of the examples provided above. In practice, the databases 506 may be separate from or integrated with the data storage 512.
[90] The databases 506 may be configured to store numerous types of data, some of which is discussed below. In practice, some of the data stored in the databases 506 may include a timestamp indicating a date and time at which the data was generated or added to the database. Moreover, data may be stored in a number of manners in the databases 506. For instance, data may be stored in time sequence, in a tabular manner, and/or organized based on data source type (e.g., based on asset, asset type, sensor, or sensor type) or fault code, among other examples.
V. EXAMPLE OPERATIONS
[91] The operations of the example network configuration 100 depicted in Figure 1 will now be discussed in further detail below. To help describe some of these operations, flow diagrams may be referenced to describe combinations of operations that may be performed. In some cases, each block may represent a module or portion of program code that includes instructions that are executable by a processor to implement specific logical functions or steps in a process. The program code may be stored on any type of computer-readable medium, such as non-transitory computer-readable media. In other cases, each block may represent circuitry that is wired to perform specific logical functions or steps in a process. Moreover, the blocks shown in the flow diagrams may be rearranged into different orders, combined into fewer blocks, separated into additional blocks, and/or removed based upon the particular embodiment.
[92] The following description may reference examples where a single data source, such as an asset 102, provides data to the analytics system 108 that then performs one or more functions. It should be understood that this is done merely for sake of clarity and explanation and is not meant to be limiting. In practice, the analytics system 108 may receive data from multiple sources, such as assets 102, 103, and 104, perhaps simultaneously, and perform operations based on such aggregate received data.
A. GENERATING ROUTING TOPOLOGIES
[93] In example implementations, some or all of the assets 102, 103, and 104 may exchange setup messages to establish the mesh network 105 over which the assets and the analytics system 108 may transfer data. Specifically, the mesh network 105 may be established between the assets 102-104 in line with the above discussion with reference to Figure 4.
[94] In some implementations, the assets 102-104 may generate routing topologies (e.g., routing tables that reflect paths to transfer data) to facilitate optimizing the mesh network 105 according to desired optimization factors. For example, the routing topologies may indicate paths that are optimized for fewest number of assets (nodes) that relay data (e.g., hop minimization), shortest data delivery time (e.g., latency minimization), lowest energy expenditure (e.g., energy minimization), least amount of redundancy, some combination thereof, or any of the other examples provided above, among other examples. In example implementations, the assets 102- 104 may exchange routing information with one another and/or the analytics system 108. As network conditions and/or asset (node) metrics change, the routing topologies may be updated in accordance with the desired optimization factors.
B . COLLECTING OPERATING DATA
[95] As mentioned above, the representative asset 102 may take various forms and may be configured to perform a number of operations. In a non-limiting example, the asset 102 may take the form of a locomotive that is operable to transfer cargo across the United States. While in transit, the sensors of the asset 102 may obtain sensor data that reflects one or more operating conditions of the asset 102. The sensors may transmit the sensor data to a processing unit of the asset 102.
[96] The processing unit may be configured to receive sensor data from the sensors. In practice, the processing unit may receive sensor data from multiple sensors simultaneously or sequentially. As discussed above, while receiving the sensor data, the processing unit may also be configured to determine whether sensor data satisfies sensor criteria that trigger any abnormal-condition indicators, such as fault codes. In the event the processing unit determines that one or more abnormal-condition indicators are triggered, the processing unit may be configured to perform one or more local operations, such as outputting an indication of the triggered indicator via a user interface.
[97] The asset 102 may then transmit operating data to the analytics system 108 via a network interface of the asset 102 and the communication network 106. In operation, the asset 102 may transmit operating data to the analytics system 108 continuously, periodically, and/or in response to triggering events (e.g., abnormal conditions). Specifically, the asset 102 may transmit operating data periodically based on a particular frequency (e.g., daily, hourly, every fifteen minutes, once per minute, once per second, etc.), or the asset 102 may be configured to transmit a continuous, real-time feed of operating data. Additionally or alternatively, the asset 102 may be configured to transmit operating data based on certain triggers, such as when sensor measurements from its sensors satisfy sensor criteria for any abnormal-condition indicators. The asset 102 may transmit operating data in other manners as well.
[98] In practice, operating data for the asset 102 may include sensor data and/or abnormal- condition data. In some implementations, the asset 102 may be configured to provide the operating data in a single data stream, while in other implementations the asset 102 may be configured to provide the operating data in multiple, distinct data streams. For example, the asset 102 may provide to the analytics system 108 a first data stream of sensor data and a second data stream of abnormal-condition data. Other possibilities also exist. [99] Sensor data may take various forms. For example, at times, sensor data may include measurements obtained by each of the sensors of the asset 102. While at other times, sensor data may include measurements obtained by a subset of the sensors of the asset 102.
[100] Specifically, the sensor data may include measurements obtained by the sensors associated with a given triggered abnormal-condition indicator. For example, if a triggered fault code is Fault Code 1 from Figure 3, then the sensor data may include raw measurements obtained by Sensors A and C. Additionally or alternatively, the sensor data may include measurements obtained by one or more sensors not directly associated with the triggered fault code. Continuing off the last example, the sensor data may additionally include measurements obtained by Sensor B and/or other sensors. In some examples, the asset 102 may include particular sensor data in the operating data based on a fault-code rule or instruction provided by the analytics system 108, which may have, for example, determined that there is a correlation between that which Sensor B is measuring and that which caused the Fault Code 1 to be triggered in the first place. Other examples are also possible.
[101] Further still, the sensor data may include one or more sensor measurements from each sensor of interest based on a particular time of interest, which may be selected based on a number of factors. In some examples, the particular time of interest may be based on a sampling rate. In other examples, the particular time of interest may be based on the time at which an abnormal- condition indicator is triggered.
[102] In particular, based on the time at which an abnormal-condition indicator is triggered, the sensor data may include one or more respective sensor measurements from each sensor of interest (e.g., sensors directly and indirectly associated with the triggered indicator). The one or more sensor measurements may be based on a particular number of measurements or particular duration of time around the time of the triggered abnormal-condition indicator.
[103] For example, if a triggered fault code is Fault Code 2 from Figure 3, the sensors of interest might include Sensors B and C. The one or more sensor measurements may include the most recent respective measurements obtained by Sensors B and C prior to the triggering of the fault code (e.g., triggering measurements) or a respective set of measurements before, after, or about the triggering measurements. For example, a set of five measurements may include the five measurements before or after the triggering measurement (e.g., excluding the triggering measurement), the four measurements before or after the triggering measurement and the triggering measurement, or the two measurements before and the two after as well as the triggering measurement, among other possibilities. [104] Similar to sensor data, the abnormal-condition data may take various forms. In general, the abnormal-condition data may include or take the form of an indicator that is operable to uniquely identify a particular abnormal condition that occurred at the asset 102 from all other abnormal conditions that may occur at the asset 102. The abnormal-condition indicator may take the form of an alphabetic, numeric, or alphanumeric identifier, among other examples. Moreover, the abnormal-condition indicator may take the form of a string of words that is descriptive of the abnormal condition, such as "Overheated Engine" or "Out of Fuel", among other examples.
[105] The analytics system 108, and in particular, the data intake system of the analytics system 108, may be configured to receive operating data from one or more assets and/or data sources. The data intake system may be configured to perform one or more operations to the received data and then relay the data to the data science system of the analytics system 108. In turn, the data science system may analyze the received data and based on such analysis, perform one or more operations.
C. DEFINING PREDICTIVE MODELS & WORKFLOWS
[106] As one example, the analytics system 108 may be configured to define predictive models and corresponding workflows based on received operating data for one or more assets and/or received external data related to the one or more assets. The analytics system 108 may define model -workflow pairs based on various other data as well.
[107] In general, a model-workflow pair may include a set of program instructions that cause an asset to monitor certain operating conditions and carry out certain operations that help facilitate preventing the occurrence of a particular event suggested by the monitored operating conditions. Specifically, a predictive model may include one or more algorithms whose inputs are sensor data from one or more sensors of an asset and whose outputs are utilized to determine a probability that a particular event may occur at the asset within a particular period of time in the future. In turn, a workflow may include one or more triggers (e.g., model output values) and corresponding operations that the asset carries out based on the triggers.
[108] As suggested above, the analytics system 108 may be configured to define aggregate and/or individualized predictive models and/or workflows. An "aggregate" model/workflow may refer to a model/workflow that is generic for a group of assets and defined without taking into consideration particular characteristics of the assets to which the model/workflow is deployed. On the other hand, an "individualized" model/workflow may refer to a model/workflow that is specifically tailored for a single asset or a subgroup of assets from the group of assets and defined based on particular characteristics of the single asset or subgroup of assets to which the model/workflow is deployed.
[109] According to the present disclosure, one implementation of a model-workflow pair may take the form of a model for predicting that a given asset is likely to be unavailable within a given period of time in the future and a corresponding workflow for causing a routing table to be updated based on this predictive model. This model-workflow pair may take various forms.
1. Predictive Model for Asset Unavailability
[110] As noted above, the analytics system 108 may be configured to define a model for predicting that a given asset is likely to be unavailable within a given period of time in the future (i.e., an "unavailability model"). The analytics system 108 may carry out this step in various manners.
[Ill] Figure 6 is a flow diagram 600 depicting one possible example of a definition phase that may be used for defining the unavailability model. For purposes of illustration, the example definition phase is described as being carried out by the analytics system 108, but this definition phase may be carried out by other systems as well. One of ordinary skill in the art will appreciate that the flow diagram 600 is provided for sake of clarity and explanation and that numerous other combinations of operations may be utilized to define a model-workflow pair.
[112] As shown in Figure 6, at block 602, the analytics system 108 may begin by defining a set of data that forms the basis for a given unavailability model (e.g., the data of interest). The data of interest may derive from a number of sources, such as the assets 102, 103, and 104 and the data source 112, and may be stored in a database of the analytics system 108.
[113] The data of interest may include historical data for a particular set of assets from a group of assets or all of the assets from a group of assets (e.g., the assets of interest). Moreover, the data of interest may include measurements from a particular set of sensors and/or actuators from each of the assets of interest or from all of the sensors and/or actuators from each of the assets of interest. Further still, the data of interest may include data from a particular period of time in the past, such as two weeks' worth of historical data.
[114] The data of interest may include a variety of types data, which may depend on the given unavailability model. In some instances, the data of interest may include at least operating data indicating operating conditions of assets, where the operating data is as discussed above in the Collection of Operating Data section. Additionally, the data of interest may include environment data indicating environments in which assets are typically operated and/or scheduling data indicating planned dates and times during which assets are to carry out certain tasks. Other types of data may also be included in the data of interest.
[115] In practice, the data of interest may be defined in a number of manners. In one example, the data of interest may be user-defined. In particular, a user may operate an output system 110 that receives user inputs indicating a selection of certain data of interest, and the output system 110 may provide to the analytics system 108 data indicating such selections. Based on the received data, the analytics system 108 may then define the data of interest.
[116] In another example, the data of interest may be machine-defined. In particular, the analytics system 108 may perform various operations, such as simulations, to determine the data of interest that generates the most accurate predictive model. Other examples are also possible.
[117] Returning to Figure 6, at block 604, the analytics system 108 may be configured to, based on the data of interest, define an aggregate, predictive model that represents a relationship between operating conditions of an asset and a likelihood of the asset becoming unavailable within a given period of time in the future. Specifically, an aggregate, predictive model may receive as inputs sensor data from sensors of an asset and/or actuator data from actuators of the asset and may output a probability that the asset will become unavailable within a given period of time in the future.
[118] In general, defining the aggregate, predictive model may involve utilizing one or more modeling techniques to generate a model that returns a probability between zero and one, such as a random forest technique, logistic regression technique, or other regression technique, among other modeling techniques. However, other techniques are possible as well.
[119] In one particular example implementation, the unavailability model may take the form of a predictive model that monitors the health of an asset and outputs a health metric (e.g., "health score") for an asset, which is a single, aggregated metric that indicates whether a failure will occur at a given asset (and thus whether the given asset will become unavailable) within a given timeframe into the future. In particular, a health metric may indicate a likelihood that no failures from a group of failures will occur at an asset within a given timeframe into the future, or a health metric may indicate a likelihood that at least one failure from a group of failures will occur at an asset within a given timeframe into the future.
[120] Depending on the desired granularity of the health metric, the analytics system 108 may be configured to define different predictive models that output different levels of health metrics, each of which may be used as the unavailability model. For example, the analytics system 108 may define a predictive model that outputs a health metric for the asset as a whole (i.e., an asset- level health metric). As another example, the analytics system 108 may define a respective predictive model that outputs a respective health metric for one or more subsystems of the asset (i.e., subsystem-level health metrics). In some cases, the outputs of each subsystem-level predictive model may be combined to generate an asset-level health metric. Other examples are also possible.
[121] In general, defining a predictive model that outputs a health metric may be performed in a variety of manners. Figure 7 is a flow diagram 700 depicting one possible example of a modeling phase that may be used for defining a model that outputs a health metric. For purposes of illustration, the example modeling phase is described as being carried out by the analytics system 108, but this modeling phase may be carried out by other systems as well. One of ordinary skill in the art will appreciate that the flow diagram 700 is provided for sake of clarity and explanation and that numerous other combinations of operations may be utilized to determine a health metric.
[122] As shown in Figure 7, at block 702, the analytics system 108 may begin by defining a set of the one or more failures that form the basis for the health metric (i.e., the failures of interest). In practice, the one or more failures may be those failures that could render an asset (or a subsystem thereof) inoperable if they were to occur. Based on the defined set of failures, the analytics system 108 may take steps to define a model for predicting a likelihood of any of the failures occurring within a given timeframe in the future (e.g., the next two weeks).
[123] In particular, at block 704, the analytics system 108 may analyze historical operating data for a group of one or more assets to identify past occurrences of a given failure from the set of failures. At block 706, the analytics system 108 may identify a respective set of operating data that is associated with each identified past occurrence of the given failure (e.g., sensor and/or actuator data from a given timeframe prior to the occurrence of the given failure). At block 708, the analytics system 108 may analyze the identified sets of operating data associated with past occurrences of the given failure to define a relationship (e.g., a failure model) between (1) the values for a given set of operating metrics and (2) the likelihood of the given failure occurring within a given timeframe in the future (e.g., the next two weeks). Lastly, at block 710, the defined relationship for each failure in the defined set (e.g., the individual failure models) may then be combined into a model for predicting the overall likelihood of a failure occurring.
[124] As the analytics system 108 continues to receive updated operating data for the group of one or more assets, the analytics system 108 may also continue to refine the predictive model for the defined set of one or more failures by repeating steps 704-710 on the updated operating data.
[125] The functions of the example modeling phase illustrated in Figure 7 will now be described in further detail. Starting with block 702, as noted above, the analytics system 108 may begin by defining a set of the one or more failures that form the basis for the health metric. The analytics system 108 may perform this function in various manners.
[126] In one example, the set of the one or more failures may be based on one or more user inputs. Specifically, the analytics system 108 may receive from a computing system operated by a user, such as the output system 110, input data indicating a user selection of the one or more failures. As such, the set of one or more failures may be user-defined.
[127] In other examples, the set of the one or more failures may be based on a determination made by the analytics system 108 (e.g., machine-defined). In particular, the analytics system 108 may be configured to define the set of one or more failures, which may occur in a number of manners.
[128] For instance, the analytics system 108 may be configured to define the set of failures based on one or more characteristics of the asset 102. That is, certain failures may correspond to certain characteristics, such as asset type, class, etc., of an asset. For example, each type and/or class of asset may have respective failures of interest.
[129] In another instance, the analytics system 108 may be configured to define the set of failures based on historical data stored in the databases of the analytics system 108 and/or external data provided by the data source 112. For example, the analytics system 108 may utilize such data to determine which failures result in the longest repair-time and/or which failures are historically followed by additional failures, among other examples.
[130] In yet other examples, the set of one or more failures may be defined based on a combination of user inputs and determinations made by the analytics system 108. Other examples are also possible.
[131] At block 704, for each of the failures from the set of failures, the analytics system 108 may analyze historical operating data for a group of one or more assets (e.g., abnormal -behavior data) to identify past occurrences of a given failure. The group of the one or more assets may include a single asset, such as asset 102, or multiple assets of a same or similar type, such as fleet of assets that includes the assets 102, 103, and 104. The analytics system 108 may analyze a particular amount of historical operating data, such as a certain amount of time's worth of data (e.g., a month's worth) or a certain number of data-points (e.g., the most recent thousand data-points), among other examples.
[132] In practice, identifying past occurrences of the given failure may involve the analytics system 108 identifying the type of operating data, such as abnormal-condition data, that indicates the given failure. In general, a given failure may be associated with one or multiple abnormal- condition indicators, such as fault codes. That is, when the given failure occurs, one or multiple abnormal-condition indicators may be triggered. As such, abnormal-condition indicators may be reflective of an underlying symptom of a given failure.
[133] After identifying the type of operating data that indicates the given failure, the analytics system 108 may identify the past occurrences of the given failure in a number of manners. For instance, the analytics system 108 may locate, from historical operating data stored in the databases of the analytics system 108, abnormal-condition data corresponding to the abnormal-condition indicators associated with the given failure. Each located abnormal-condition data would indicate an occurrence of the given failure. Based on this located abnormal-condition data, the analytics system 108 may identify a time at which a past failure occurred.
[134] At block 706, the analytics system 108 may identify a respective set of operating data that is associated with each identified past occurrence of the given failure. In particular, the analytics system 108 may identify a set of sensor and/or actuator data from a certain timeframe around the time of the given occurrence of the given failure. For example, the set of data may be from a particular timeframe (e.g., two weeks) before, after, or around the given occurrence of the failure. In other cases, the set of data may be identified from a certain number of data-points before, after, or around the given occurrence of the failure.
[135] In example implementations, the set of operating data may include sensor and/or actuator data from some or all of the sensors and actuators of the asset 102. For example, the set of operating data may include data from sensors and/or actuators associated with an abnormal- condition indicator corresponding to the given failure.
[136] Returning to Figure 7, after the analytics system 108 identifies the set of operating data for the given occurrence of the given failure, the analytics system 108 may determine whether there are any remaining occurrences for which a set of operating data should be identified. In the event that there is a remaining occurrence, block 706 would be repeated for each remaining occurrence.
[137] Thereafter, at block 708, the analytics system 108 may analyze the identified sets of operating data associated with the past occurrences of the given failure to define a relationship (e.g., a failure model) between (1) a given set of operating metrics (e.g., a given set of sensor and/or actuator measurements) and (2) the likelihood of the given failure occurring within a given timeframe in the future (e.g., the next two weeks). That is, a given failure model may take as inputs sensor and/or actuator measurements from one or more sensors and/or actuators and output a probability that the given failure will occur within the given timeframe in the future. [138] In general, a failure model may define a relationship between operating conditions of the asset 102 and the likelihood of a failure occurring. In some implementations, in addition to raw data signals from sensors and/or actuators of the asset 102, a failure model may receive a number of other data inputs, also known as features, which are derived from the sensor and/or actuator signals. Such features may include an average or range of values that were historically measured when a failure occurred, an average or range of value gradients (e.g., a rate of change in measurements) that were historically measured prior to an occurrence of a failure, a duration of time between failures (e.g., an amount of time or number of data-points between a first occurrence of a failure and a second occurrence of a failure), and/or one or more failure patterns indicating sensor and/or actuator measurement trends around the occurrence of a failure. One of ordinary skill in the art will appreciate that these are but a few example features that can be derived from sensor and/or actuator signals and that numerous other features are possible.
[139] In practice, a failure model may be defined in a number of manners. In example implementations, the analytics system 108 may define a failure model by utilizing one or more modeling techniques that return a probability between zero and one, which may take the form of any modeling techniques described above.
[140] In a particular example, defining a failure model may involve the analytics system 108 generating a response variable based on the historical operating data identified at block 706. Specifically, the analytics system 108 may determine an associated response variable for each set of sensor and/or actuator measurements received at a particular point in time. As such, the response variable may take the form of a data set associated with the failure model.
[141] The response variable may indicate whether the given set of measurements is within any of the timeframes determined at block 706. That is, a response variable may reflect whether a given set of data is from a time of interest about the occurrence of a failure. The response variable may be a binary -valued response variable such that, if the given set of measurements is within any of determined timeframes, the associated response variable is assigned a value of one, and otherwise, the associated response variable is assigned a value of zero.
[142] Continuing in the particular example of defining a failure model based on a response variable, the analytics system 108 may train the failure model with the historical operating data identified at block 706 and the generated response variable. Based on this training process, the analytics system 108 may then define the failure model that receives as inputs various sensor and/or actuator data and outputs a probability between zero and one that a failure will occur within a period of time equivalent to the timeframe used to generate the response variable. [143] In some cases, training with the historical operating data identified at block 706 and the generated response variable may result in variable importance statistics for each sensor and/or actuator. A given variable importance statistic may indicate the sensor's or actuator's relative effect on the probability that a given failure will occur within the period of time into the future.
[144] Additionally or alternatively, the analytics system 108 may be configured to define a failure model based on one or more survival analysis techniques, such as a Cox proportional hazard technique. The analytics system 108 may utilize a survival analysis technique in a manner similar in some respects to the above-discussed modeling technique, but the analytics system 108 may determine a survival time-response variable that indicates an amount of time from the last failure to a next expected event. A next expected event may be either reception of senor and/or actuator measurements or an occurrence of a failure, whichever occurs first. This response variable may include a pair of values that are associated with each of the particular points in time at which measurements are received. The response variable may then be utilized to determine a probability that a failure will occur within the given timeframe in the future.
[145] In some example implementations, the failure model may be defined based in part on external data, such as weather data, and "hotbox" data, among other data. For instance, based on such data, the failure model may increase or decrease an output failure probability.
[146] In practice, external data may be observed at points in time that do not coincide with times at which asset sensors and/or actuators obtain measurements. For example, the times at which "hotbox" data is collected (e.g., times at which a locomotive passes along a section of railroad track that is outfitted with hot box sensors) may be in disagreement with sensor and/or actuator measurement times. In such cases, the analytics system 108 may be configured to perform one or more operations to determine external data observations that would have been observed at times that correspond to the sensor measurement times.
[147] Specifically, the analytics system 108 may utilize the times of the external data observations and times of the measurements to interpolate the external data observations to produce external data values for times corresponding to the measurement times. Interpolation of the external data may allow external data observations or features derived therefrom to be included as inputs into the failure model. In practice, various techniques may be used to interpolate the external data with the sensor and/or actuator data, such as nearest-neighbor interpolation, linear interpolation, polynomial interpolation, and spline interpolation, among other examples.
[148] Returning to Figure 7, after the analytics system 108 determines a failure model for a given failure from the set of failures defined at block 702, the analytics system 108 may determine whether there are any remaining failures for which a failure model should be determined. In the event that there remains a failure for which a failure model should be determined, the analytics system 108 may repeat the loop of blocks 704-708. In some implementations, the analytics system 108 may determine a single failure model that encompasses all of the failures defined at block 702. In other implementations, the analytics system 108 may determine a failure model for each subsystem of the asset 102, which may then be utilized to determine an asset-level failure model. Other examples are also possible.
[149] Lastly, at block 710, the defined relationship for each failure in the defined set (e.g., the individual failure models) may then be combined into the model (e.g., the health-metric model) for predicting the overall likelihood of a failure occurring within the given timeframe in the future (e.g., the next two weeks). That is, the model receives as inputs sensor and/or actuator measurements from one or more sensors and/or actuators and outputs a single probability that at least one failure from the set of failures will occur within the given timeframe in the future.
[150] The analytics system 108 may define the health-metric model in a number of manners, which may depend on the desired granularity of the health metric. That is, in instances where there are multiple failure models, the outcomes of the failure models may be utilized in a number of manners to obtain the output of the health-metric model. For example, the analytics system 108 may determine a maximum, median, or average from the multiple failure models and utilize that determined value as the output of the health-metric model.
[151] In other examples, determining the health-metric model may involve the analytics system 108 attributing a weight to individual probabilities output by the individual failure models. For instance, each failure from the set of failures may be considered equally undesirable, and so each probability may likewise be weighted the same in determining the health-metric model. In other instances, some failures may be considered more undesirable than others (e.g., more catastrophic or require longer repair time, etc.), and so those corresponding probabilities may be weighted more than others.
[152] In yet other examples, determining the health-metric model may involve the analytics system 108 utilizing one or more modeling techniques, such as a regression technique. An aggregate response variable may take the form of the logical disjunction (logical OR) of the response variables from each of the individual failure models. For example, aggregate response variables associated with any set of measurements that occur within any timeframe determined at block 706 may have a value of one, while aggregate response variables associated with sets of measurements that occur outside any of the timeframes may have a value of zero. Other manners of defining the health-metric model are also possible.
[153] In some implementations, block 710 may be unnecessary. For example, as discussed above, the analytics system 108 may determine a single failure model, in which case the health- metric model may be the single failure model.
[154] In practice, the analytics system 108 may be configured to update the individual failure models and/or the overall health-metric model. The analytics system 108 may update a model daily, weekly, monthly, etc. and may do so based on a new portion of historical operating data from the asset 102 or from other assets (e.g., from other assets in the same fleet as the asset 102). Other examples are also possible.
[155] The unavailability model may take various other forms as well. For example, the unavailability model may predict an asset's ability of the asset to communicate in a mesh network (e.g., based on the asset's operating data). In another example, the unavailability model may predict whether the asset is going off-line (e.g., based on time of day, battery life, scheduled maintenance, or the like).
[156] Returning back to Figure 6, the analytics system 108 may also be configured to define individualized predictive models for assets, which may involve utilizing the aggregate, predictive model as a baseline. The individualization may be based on certain characteristics of assets. In this way, the analytics system 108 may provide a given asset a more accurate and robust predictive model compared to the aggregate predictive model.
[157] In particular, at block 606, the analytics system 108 may be configured to decide whether to individualize the aggregate model defined at block 604 for a given asset, such as the asset 102. The analytics system 108 may carry out this decision in a number of manners.
[158] In some cases, the analytics system 108 may be configured to define individualized predictive models by default. In other cases, the analytics system 108 may be configured to decide whether to define an individualized predictive model based on certain characteristics of the asset 102. For example, in some cases, only assets of certain types or classes, or operated in certain environments, or that have certain health scores may receive an individualized predictive model. In yet other cases, a user may define whether an individualized model is defined for the asset 102. Other examples are also possible.
[159] In any event, if the analytics system 108 decides to define an individualized predictive model for the asset 102, the analytics system 108 may do so at block 608. Otherwise, the analytics system 108 may end the definition phase. [160] At block 608 the analytics system 108 may be configured to define an individualized predictive model in a number of manners. In example implementations, the analytics system 108 may define an individualized predictive model based at least in part on one or more characteristics of the asset 102.
[161] Before defining the individualized predictive model for the asset 102, the analytics system 108 may have determined one or more asset characteristics of interest that form the basis of individualized models. In practice, different predictive models may have different corresponding characteristics of interest.
[162] In general, the characteristics of interest may be characteristics that are related to the aggregate, predictive model. For instance, the characteristics of interest may be characteristics that the analytics system 108 has determined influence the accuracy of the aggregate, predictive model. Examples of such characteristics may include asset age, asset usage, asset capacity, asset load, asset health (perhaps indicated by an asset health metric, discussed below), asset class (e.g., brand and/or model), and environment in which an asset is operated, among other characteristics.
[163] The analytics system 108 may have determined the characteristics of interest in a number of manners. In one example, the analytics system 108 may have done so by performing one or more modeling simulations that facilitate identifying the characteristics of interest. In another example, the characteristics of interest may have been predefined and stored in the data storage of the analytics system 108. In yet another example, characteristics of interest may have been defined by a user and provided to the analytics system 108 via the output system 110. Other examples are also possible.
[164] In any event, after determining the characteristics of interest, the analytics system 108 may determine characteristics of the asset 102 that correspond to the determined characteristics of interest. That is, the analytics system 108 may determine a type, value, existence or lack thereof, etc. of the asset 102's characteristics that correspond to the characteristics of interest. The analytics system 108 may perform this operation in a number of manners.
[165] For example, the analytics system 108 may be configured to perform this operation based on data originating from the asset 102 and/or the data source 112. In particular, the analytics system 108 may utilize operating data for the asset 102 and/or external data from the data source 112 to determine one or more characteristics of the asset 102. Other examples are also possible.
[166] Based on the determined one or more characteristics of the asset 102, the analytics system 108 may define an individualized, predictive model by modifying the aggregate model. The aggregate model may be modified in a number of manners. For example, the aggregate model may be modified by changing (e.g., adding, removing, re-ordering, etc.) one or more model inputs, changing one or more sensor and/or actuator measurement ranges that correspond to asset- operating limits (e.g., changing operating limits that correspond to "leading indicator" events), changing one or more model calculations, weighting (or changing a weight of) a variable or output of a calculation, utilizing a modeling technique that differs from that which was utilized to define the aggregate model, and/or utilizing a response variable that differs from that which was utilized to define the aggregate model, among other examples.
[167] In practice, individualizing the aggregate model may depend on the one or more characteristics of the given asset. In particular, certain characteristics may affect the modification of the aggregate model differently than other characteristics. Further, the type, value, existence, or the like of a characteristic may affect the modification as well. For example, the asset age may affect a first part of the aggregate model, while an asset class may affect a second, different part of the aggregate model. And an asset age within a first range of ages may affect the first part of the aggregate model in a first manner, while an asset age within a second range of ages, different from the first range, may affect the first part of the aggregate model in a second, different manner. Other examples are also possible.
[168] In some implementations, individualizing the aggregate model may depend on considerations in addition to or alternatively to asset characteristics. For instance, the aggregate model may be individualized based on sensor and/or actuator readings of an asset when the asset is known to be in a relatively good operating state (e.g., as defined by a mechanic or the like). More particularly, in an example of a leading-indicator predictive model, the analytics system 108 may be configured to receive an indication that the asset is in a good operating state (e.g., from a computing device operated by a mechanic) along with operating data from the asset. Based at least on the operating data, the analytics system 108 may then individualize the leading -indicator predictive model for the asset by modifying respective operating limits corresponding to "leading indicator" events. Other examples are also possible.
[169] It should also be understood that, in some example implementations, the analytics system 108 may be configured to define an individualized predictive model for a given asset without first defining an aggregate predictive model. Other examples are also possible.
2. Workflow for Updating a Routing Table
[170] As noted above, the analytics system 108 may also be configured to define a workflow for causing a routing table to be updated based on an unavailability model. As described above, the analytics system 108 may execute an unavailability model to determine whether a given asset of a plurality of assets in a mesh network is likely to be unavailable within a given period of time in the future. The given asset may be unavailable based on a failure of the given asset, the given asset going off-line, a scheduled down time for the given asset, the given asset being unable to communicate over the mesh network, or the given asset otherwise being unable to function as a data relay in the mesh network, among other scenarios.
[171] In any event, a workflow that updates a routing table may cause an asset serving as a node within a mesh network to update its routing information to account for one or multiple other assets likely becoming unavailable in the future. In this way, the mesh network may be prospectively updated so as to utilize paths that do not rely on a node (asset) that is likely to become unavailable in the future.
[172] The analytics system 108 may define such a routing-table workflow so that it is triggered based on a variety of triggers. In general, such a trigger may indicate that a given asset is likely to be unavailable. In example implementations, a trigger may take the form of a health score of the given asset. Specifically, the routing-table workflow may be triggered based on the analytics system 108 (or perhaps a local analytics device of the given asset) determining that the given asset's health score meets, stays below, or exceeds an unavailability threshold (e.g., a health-score threshold value), which may depend on how the scoring is structured.
[173] Alternatively, the trigger may be based on the analytics system 108 determining that the given asset's health score meets, stays below, or exceeds an unavailability threshold for a given period of time. For example, it may not be enough for the given asset to be momentarily unavailable; the given asset may be deemed to be unavailable if it is determined that the given asset will likely be unavailable for a particular amount of time, such as 30 minutes, one or multiple hours, etc. In example implementations, the analytics system 108 may determine the period of time of unavailability that triggers the workflow based on a comparison of recent throughput of a given route being analyzed and a minimum time needed to transmit a given message (e.g., of particular size) through the given route assuming those throughput conditions are present. The period of time may be determined in other manners as well.
[174] In practice, the analytics system 108 may define the routing-table workflow with respect to all of the assets 102, 103, and 104 (e.g., an aggregate workflow). However, in some implementations, the analytics system 108 may individualize the workflow for one or more assets. For example, asset 102 may have a different unavailability threshold than that of asset 103.
[175] The analytics system 108 may decide whether to define an individualized workflow based on the individualized predictive model. In yet another implementation, the analytics system 108 may decide to define an individualized workflow if an individualized predictive model was defined. In another implementation, the analytics system 108 may use characteristics of interest that affect the efficacy of the aggregate workflow to determine different unavailability thresholds for different assets. Other examples are also possible.
[176] In operation, the analytics system 108 may transmit a signaling message to one or more of the assets 102-104 based on the executed workflow. That is, the signaling message may reflect the analytics system 108 determining that a given asset is likely to be unavailable within the given period of time in the future. The signaling message may instruct the asset to update its routing table to update the routing topology and may also instruct the asset to relay the update to other assets. For example, based on executing the unavailability model and determining that the asset 104 is likely to become unavailable, the analytics system 108 may transmit a signaling message to asset 102, which in turn updates its routing table. Asset 102 may subsequently transmit the signaling message to asset 103, which updates its routing table.
[177] Moreover, in some implementations, the signaling message may include instructions to remove the soon to be unavailable asset (e.g., the asset 104) from the routing topology. In another implementation, the analytics system 108 may update the routing topology for each asset in the mesh network 105 and transmit an indication of the updated routing topology to each asset (e.g., via transmitting respective routing tables to the assets).
D. EXECUTION OF THE MODEL-WORKFLOW PAIR
[178] Once the model -workflow pair disclosed above is defined by the analytics system 108, that model -workflow pair could then be executed by the analytics system 108 and/or could be sent to an asset for local execution (e.g., by a local analytics device).
[179] While executing an unavailability model, the analytics system 108 and/or a given asset may determine that the given asset is likely to become unavailable within a given period of time in the future. For instance, the analytics system 108 and/or a given asset may make this determination by comparing the output of the unavailability model to a threshold and thereby determining that the output has met or exceeded the threshold. In turn, the analytics system 108 and/or the given asset may execute the workflow for causing one or more routing tables to be updated. For instance, the analytics system 108 may transmit a signal message to one or more assets that includes a determination that a given asset is unlikely to be unavailable. In another example, the analytics system 108 may transmit a signal message to one or more assets that includes updates to a routing configuration for the respective asset. [180] As a result of executing this workflow, the soon-to-be unavailable asset may be removed from the routing table or the paths that include that asset may be disabled. For example, the routing table may be updated such that the other assets in the mesh network may route around the soon- to-be unavailable asset by presuming that it is unavailable.
[181] The model-workflow pair disclosed herein may also cause the routing table to later be updated again if it determines that the soon-to-be unavailable asset becomes available again.
[182] While the above discusses assets serving as nodes in a network, this is not intended to be limiting. In some example implementations, a sensor (e.g., an environmental sensor, industrial automation sensor, etc.) may serve as a node and above operations may be modified accordingly.
VI. EXAMPLE METHOD
[183] Figure 8 is a flow diagram 800 depicting an example method to update a routing table for a mesh network 105. For purposes of illustration, the example method is described as being carried out by the analytics system 108, but this definition phase may be carried out by other systems as well including a local analytics device 220 of one of the assets in the mesh network 105. One of ordinary skill in the art will appreciate that the flow diagram 500 is provided for sake of clarity and explanation and that numerous other combinations of operations may be utilized to update a routing table in a mesh network.
[184] As shown in Figure 8, at block 802, the analytics system 108 may begin by, based on a predictive model, determining that a given asset of a plurality of assets in a mesh network is likely to be unavailable within a given period of time in the future. In some implementations, the plurality of assets may include at least one of a transportation machine, an industrial machine, a medical machine, and a utility machine.
[185] In some implementations, the predictive model may be based on historical data received from sensors for multiple assets. The analytics system 108 may determine that the given asset is likely to be unavailable based on receiving sensor data from the given asset or from other assets, determining a health score for the given asset based on applying the predictive model to the sensor data, and determining that the health score for the given asset has met an unavailability likelihood threshold. In some other implementations, the predictive model may be based on information associated with the asset. For example, the given asset may be unavailable based on a failure of the asset, a scheduled down time for the asset (e.g., the asset going off-line), the asset powering down for the night, and the asset being unable to communicate over the mesh network. The predictive model may determine that the given asset is likely to be unavailable based on an age of the asset, a total time in operation, a time since a last maintenance event, etc. [186] At block 804, in response to the determining, causing a routing configuration for at least one other asset in the mesh network to be updated. The routing configuration may include paths for each of the assets in the mesh network to transmit data to or receive data from one or more other assets and to other entities in the system described above with reference to Figure 1.
[187] The routing configuration may include removing assets from a routing table that are likely to become unavailable. Alternatively or additionally, the analytics system 108 may keep those assets as part of the routing table but may update paths that include the assets that are likely to become unavailable until a state of those assets changes. For example, where assets are associated with a health score, the assets might be determined to be available if the health score increases or falls below the unavailability likelihood threshold. In some implementations where an asset 200 updates the routing table for the mesh network, the asset may communicate based on the updated routing table and transmit at least a portion of the updated routing table to another of the plurality of the assets.

Claims

1. A computer-implemented method comprising:
based on a predictive model, determining that a given asset of a plurality of assets in a mesh network is likely to be unavailable within a given period of time in the future; and
in response to the determining, causing a routing configuration for at least one other asset in the mesh network to be updated.
2. The computer-implemented method of claim 1, wherein determining that the given asset of the plurality of assets is likely to be unavailable comprises:
receiving sensor data from the given asset;
determining a health score for the given asset based on applying the predictive model to the sensor data; and
determining that the health score for the given asset has met an unavailability likelihood threshold.
3. The computer-implemented method of claim 2, wherein determining that the health score for the given asset has met the unavailability likelihood threshold comprises determining that the given asset has met the unavailability likelihood threshold for a certain period of time.
4. The computer-implemented method of claim 1, wherein the given asset is likely to be unavailable based on at least one of a failure of the given asset, the given asset going off-line, a scheduled down time for the given asset, or the given asset being unable to communicate over the mesh network.
5. The computer-implemented method of claim 1, wherein the plurality of assets comprises at least one of a transportation machine, an industrial machine, a medical machine, or a utility machine.
6 The computer-implemented method of claim 1, wherein causing the routing configuration for at least one other asset in the mesh network to be updated comprises:
transmitting a determination that the given asset is likely to be unavailable within the given period of time in the future to one of the plurality of assets in the mesh network, and wherein the one of the plurality of assets in the mesh network updates its routing configuration.
7. The computer-implemented method of claim 1, wherein causing the routing configuration for at least one other asset in the mesh network to be updated comprises transmitting a determination that the given asset is likely to be unavailable within the given period of time in the future to at least one other asset in the mesh network.
8. A non-transitory computer-readable medium having instructions stored thereon that are executable to cause a computing system to:
based on a predictive model, determine that a given asset of a plurality of assets in a mesh network is likely to be unavailable within a given period of time in the future; and
in response to the determining, cause a routing configuration for at least one other asset in the mesh network to be updated.
9. The computer-readable medium of claim 8, wherein determining that the given asset of the plurality of assets is likely to be unavailable comprises:
receiving sensor data from the given asset;
determining a health score for the given asset based on applying the predictive model to the sensor data; and
determining that the health score for the given asset has met an unavailability likelihood threshold.
10. The computer-readable medium of claim 9, wherein determining that the health score for the given asset has met the unavailability likelihood threshold comprises determining that the given asset has met the unavailability likelihood threshold for a certain period of time.
11. The computer-readable medium of claim 8, wherein the given asset is likely to be unavailable based on at least one of a failure of the given asset, the given asset going off-line, a scheduled down time for the given asset, or the given asset being unable to communicate over the mesh network.
12. The computer-readable medium of claim 8, wherein the plurality of assets comprises at least one of a transportation machine, an industrial machine, a medical machine, or a utility machine.
13. The computer-readable medium of claim 8, wherein causing the routing configuration for at least one other asset in the mesh network to be updated comprises:
transmitting a determination that the given asset is likely to be unavailable within the given period of time in the future to one of the plurality of assets in the mesh network, and
wherein the one of the plurality of assets in the mesh network updates its routing configuration.
14. The computer-readable medium of claim 8, wherein causing the routing configuration for at least one other asset in the mesh network to be updated comprises transmitting a determination that the given asset is likely to be unavailable within the given period of time in the future to at least one other asset in the mesh network.
15. A computing system comprising:
at least one processor;
a non-transitory computer-readable medium; and
program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor to cause the computing system to:
based on a predictive model, determine that a given asset of a plurality of assets in a mesh network is likely to be unavailable within a given period of time in the future; and
in response to the determining, cause a routing configuration for at least one other asset in the mesh network to be updated.
16. The computing system of claim 15, wherein determining that the given asset of the plurality of assets is likely to be unavailable comprises:
receiving sensor data from the given asset;
determining a health score for the given asset based on applying the predictive model to the sensor data; and determining that the health score for the given asset has met an unavailability likelihood threshold.
17. The computing system of claim 16, wherein determining that the health score for the given asset has met an unavailability likelihood threshold comprises determining that the given asset has met the unavailability likelihood threshold for a certain period of time
18. The computing system of claim 15, wherein the given asset is likely to be unavailable based on at least one of a failure of the given asset, the given asset going off-line, a scheduled down time for the given asset, or the given asset being unable to communicate over the mesh network.
19. The computing system of claim 15, wherein the plurality of assets include at least one of a transportation machine, an industrial machine, a medical machine, or a utility machine.
20. The computing system of claim 15, wherein causing the routing configuration for at least one other asset in the mesh network to be updated comprises:
transmitting a determination that the given asset is likely to be unavailable within the given period of time in the future to one of the plurality of assets in the mesh network, and
wherein the one of the plurality of assets in the mesh network updates its routing configuration.
PCT/US2016/051387 2014-12-01 2016-09-12 Mesh network routing based on availability of assets WO2017048640A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
JP2018511273A JP2018528693A (en) 2014-12-01 2016-09-12 Mesh network routing based on asset availability
CN201680059994.1A CN108141473A (en) 2014-12-01 2016-09-12 Mesh network routing based on asset availability
CA2998345A CA2998345A1 (en) 2014-12-01 2016-09-12 Mesh network routing based on availability of assets
EP16847112.6A EP3350978A4 (en) 2014-12-01 2016-09-12 Mesh network routing based on availability of assets
AU2016322513A AU2016322513A1 (en) 2014-12-01 2016-09-12 Mesh network routing based on availability of assets
KR1020187010351A KR20180042444A (en) 2015-09-14 2016-09-12 Mesh network routing based on availability of assets
HK18114872.4A HK1255721A1 (en) 2014-12-01 2018-11-21 Mesh network routing based on availability of assets

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
US201462086155P 2014-12-01 2014-12-01
US201462088651P 2014-12-07 2014-12-07
US14/732,258 US10417076B2 (en) 2014-12-01 2015-06-05 Asset health score
US14/744,352 US10261850B2 (en) 2014-12-01 2015-06-19 Aggregate predictive model and workflow for local execution
US14/853,189 2015-09-14
US14/853,189 US9842034B2 (en) 2014-12-01 2015-09-14 Mesh network routing based on availability of assets

Publications (1)

Publication Number Publication Date
WO2017048640A1 true WO2017048640A1 (en) 2017-03-23

Family

ID=56078998

Family Applications (4)

Application Number Title Priority Date Filing Date
PCT/US2015/063047 WO2016089792A1 (en) 2014-12-01 2015-11-30 Asset health scores and uses thereof
PCT/US2015/063052 WO2016089794A1 (en) 2014-12-01 2015-11-30 Adaptive handling of operating data
PCT/US2016/051387 WO2017048640A1 (en) 2014-12-01 2016-09-12 Mesh network routing based on availability of assets
PCT/US2016/065262 WO2017100245A1 (en) 2014-12-01 2016-12-07 Computer architecture and method for modifying data intake parameters based on a predictive model

Family Applications Before (2)

Application Number Title Priority Date Filing Date
PCT/US2015/063047 WO2016089792A1 (en) 2014-12-01 2015-11-30 Asset health scores and uses thereof
PCT/US2015/063052 WO2016089794A1 (en) 2014-12-01 2015-11-30 Adaptive handling of operating data

Family Applications After (1)

Application Number Title Priority Date Filing Date
PCT/US2016/065262 WO2017100245A1 (en) 2014-12-01 2016-12-07 Computer architecture and method for modifying data intake parameters based on a predictive model

Country Status (10)

Country Link
US (15) US10176032B2 (en)
EP (4) EP3227852A4 (en)
JP (4) JP6652247B2 (en)
KR (3) KR20170117377A (en)
CN (2) CN107408225B (en)
AU (4) AU2015355156A1 (en)
CA (5) CA2969455C (en)
HK (3) HK1244938A1 (en)
SG (3) SG11201708095WA (en)
WO (4) WO2016089792A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020073361A (en) * 2018-08-07 2020-05-14 ザ・ボーイング・カンパニーThe Boeing Company Methods and systems for identifying associated events in aircraft

Families Citing this family (232)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10518411B2 (en) * 2016-05-13 2019-12-31 General Electric Company Robotic repair or maintenance of an asset
US9772741B2 (en) * 2013-03-15 2017-09-26 Konstantinos (Constantin) F. Aliferis Data analysis computer system and method for organizing, presenting, and optimizing predictive modeling
US10599155B1 (en) 2014-05-20 2020-03-24 State Farm Mutual Automobile Insurance Company Autonomous vehicle operation feature monitoring and evaluation of effectiveness
US10176032B2 (en) 2014-12-01 2019-01-08 Uptake Technologies, Inc. Subsystem health score
US9882798B2 (en) * 2015-05-13 2018-01-30 Vmware, Inc. Method and system that analyzes operational characteristics of multi-tier applications
WO2016196775A1 (en) * 2015-06-04 2016-12-08 Fischer Block, Inc. Remaining-life and time-to-failure predictions of power assets
US10176279B2 (en) 2015-06-05 2019-01-08 Uptake Technologies, Inc. Dynamic execution of predictive models and workflows
US10848371B2 (en) * 2015-06-11 2020-11-24 Instana, Inc. User interface for an application performance management system
US10133443B2 (en) 2015-06-14 2018-11-20 Google Llc Systems and methods for smart home automation using a multifunction status and entry point icon
USD807376S1 (en) 2015-06-14 2018-01-09 Google Inc. Display screen with animated graphical user interface for smart home automation system having a multifunction status
USD796540S1 (en) 2015-06-14 2017-09-05 Google Inc. Display screen with graphical user interface for mobile camera history having event-specific activity notifications
USD797131S1 (en) 2015-06-14 2017-09-12 Google Inc. Display screen with user interface for mode selector icons
USD803241S1 (en) 2015-06-14 2017-11-21 Google Inc. Display screen with animated graphical user interface for an alert screen
USD812076S1 (en) 2015-06-14 2018-03-06 Google Llc Display screen with graphical user interface for monitoring remote video camera
USD809522S1 (en) 2015-06-14 2018-02-06 Google Inc. Display screen with animated graphical user interface for an alert screen
US9361011B1 (en) 2015-06-14 2016-06-07 Google Inc. Methods and systems for presenting multiple live video feeds in a user interface
US10878385B2 (en) 2015-06-19 2020-12-29 Uptake Technologies, Inc. Computer system and method for distributing execution of a predictive model
US10031815B2 (en) * 2015-06-29 2018-07-24 Ca, Inc. Tracking health status in software components
JP6458663B2 (en) * 2015-06-29 2019-01-30 株式会社リコー Information processing system and program
US10484257B1 (en) * 2015-07-15 2019-11-19 Amazon Technologies, Inc. Network event automatic remediation service
US10474566B2 (en) * 2015-08-05 2019-11-12 Equifax Inc. Model integration tool
US11107365B1 (en) 2015-08-28 2021-08-31 State Farm Mutual Automobile Insurance Company Vehicular driver evaluation
GB2542370B (en) * 2015-09-16 2020-05-27 Arm Ip Ltd A system for monitoring a plurality of distributed devices
JP6249003B2 (en) * 2015-09-30 2017-12-20 トヨタ自動車株式会社 Control device for hybrid vehicle
US9916194B2 (en) * 2015-10-01 2018-03-13 International Business Machines Corporation System component failure diagnosis
US10278014B2 (en) * 2015-11-04 2019-04-30 xAd, Inc. System and method for using geo-blocks and geo-fences to predict mobile device locations
US10455363B2 (en) 2015-11-04 2019-10-22 xAd, Inc. Systems and methods for using geo-blocks and geo-fences to discover lookalike mobile devices
US10547971B2 (en) 2015-11-04 2020-01-28 xAd, Inc. Systems and methods for creating and using geo-blocks for location-based information service
US20170161969A1 (en) * 2015-12-07 2017-06-08 The Boeing Company System and method for model-based optimization of subcomponent sensor communications
US10078571B2 (en) * 2015-12-09 2018-09-18 International Business Machines Corporation Rule-based adaptive monitoring of application performance
US20170183016A1 (en) * 2015-12-28 2017-06-29 General Electric Company Early warning system for locomotive bearings failures
US10733514B1 (en) 2015-12-28 2020-08-04 EMC IP Holding Company LLC Methods and apparatus for multi-site time series data analysis
US10860405B1 (en) * 2015-12-28 2020-12-08 EMC IP Holding Company LLC System operational analytics
US11242051B1 (en) 2016-01-22 2022-02-08 State Farm Mutual Automobile Insurance Company Autonomous vehicle action communications
US10824145B1 (en) 2016-01-22 2020-11-03 State Farm Mutual Automobile Insurance Company Autonomous vehicle component maintenance and repair
US11719545B2 (en) 2016-01-22 2023-08-08 Hyundai Motor Company Autonomous vehicle component damage and salvage assessment
US11441916B1 (en) 2016-01-22 2022-09-13 State Farm Mutual Automobile Insurance Company Autonomous vehicle trip routing
US10134278B1 (en) 2016-01-22 2018-11-20 State Farm Mutual Automobile Insurance Company Autonomous vehicle application
US10452467B2 (en) * 2016-01-28 2019-10-22 Intel Corporation Automatic model-based computing environment performance monitoring
US9718486B1 (en) * 2016-02-01 2017-08-01 Electro-Motive Diesel, Inc. System for analyzing health of train
US10510006B2 (en) * 2016-03-09 2019-12-17 Uptake Technologies, Inc. Handling of predictive models based on asset location
US10530705B2 (en) * 2016-03-10 2020-01-07 Ricoh Co., Ltd. Architecture customization at user application layer
US10318903B2 (en) 2016-05-06 2019-06-11 General Electric Company Constrained cash computing system to optimally schedule aircraft repair capacity with closed loop dynamic physical state and asset utilization attainment control
US11774944B2 (en) 2016-05-09 2023-10-03 Strong Force Iot Portfolio 2016, Llc Methods and systems for the industrial internet of things
WO2019028269A2 (en) 2017-08-02 2019-02-07 Strong Force Iot Portfolio 2016, Llc Methods and systems for detection in an industrial internet of things data collection environment with large data sets
US20180284758A1 (en) 2016-05-09 2018-10-04 StrongForce IoT Portfolio 2016, LLC Methods and systems for industrial internet of things data collection for equipment analysis in an upstream oil and gas environment
CN114625076A (en) 2016-05-09 2022-06-14 强力物联网投资组合2016有限公司 Method and system for industrial internet of things
US10983507B2 (en) 2016-05-09 2021-04-20 Strong Force Iot Portfolio 2016, Llc Method for data collection and frequency analysis with self-organization functionality
US11327475B2 (en) 2016-05-09 2022-05-10 Strong Force Iot Portfolio 2016, Llc Methods and systems for intelligent collection and analysis of vehicle data
US10102056B1 (en) * 2016-05-23 2018-10-16 Amazon Technologies, Inc. Anomaly detection using machine learning
US10901407B2 (en) * 2016-05-31 2021-01-26 Applied Materials, Inc. Semiconductor device search and classification
US10333775B2 (en) 2016-06-03 2019-06-25 Uptake Technologies, Inc. Facilitating the provisioning of a local analytics device
WO2017210496A1 (en) * 2016-06-03 2017-12-07 Uptake Technologies, Inc. Provisioning a local analytics device
AU2017285130B2 (en) 2016-06-13 2022-04-21 Xevo Inc. Method and system for providing auto space management using virtuous cycle
US11237546B2 (en) 2016-06-15 2022-02-01 Strong Force loT Portfolio 2016, LLC Method and system of modifying a data collection trajectory for vehicles
US10346239B1 (en) * 2016-06-27 2019-07-09 Amazon Technologies, Inc. Predictive failure of hardware components
US10416982B1 (en) * 2016-06-30 2019-09-17 EMC IP Holding Company LLC Automated analysis system and method
USD882583S1 (en) 2016-07-12 2020-04-28 Google Llc Display screen with graphical user interface
US10263802B2 (en) 2016-07-12 2019-04-16 Google Llc Methods and devices for establishing connections with remote cameras
US20180048713A1 (en) * 2016-08-09 2018-02-15 Sciemetric Instruments Inc. Modular data acquisition and control system
US10462026B1 (en) * 2016-08-23 2019-10-29 Vce Company, Llc Probabilistic classifying system and method for a distributed computing environment
WO2018052015A1 (en) * 2016-09-14 2018-03-22 日本電気株式会社 Analysis support device for system, analysis support method and program for system
US10606254B2 (en) * 2016-09-14 2020-03-31 Emerson Process Management Power & Water Solutions, Inc. Method for improving process/equipment fault diagnosis
US10152810B2 (en) * 2016-10-21 2018-12-11 Siemens Aktiengesellschaft Techniques for displaying data comprising time and angular values acquired from a technical or industrial process
US10127125B2 (en) * 2016-10-21 2018-11-13 Accenture Global Solutions Limited Application monitoring and failure prediction
US10257163B2 (en) 2016-10-24 2019-04-09 Fisher-Rosemount Systems, Inc. Secured process control communications
US10530748B2 (en) 2016-10-24 2020-01-07 Fisher-Rosemount Systems, Inc. Publishing data across a data diode for secured process control communications
US10619760B2 (en) * 2016-10-24 2020-04-14 Fisher Controls International Llc Time-series analytics for control valve health assessment
US10270745B2 (en) 2016-10-24 2019-04-23 Fisher-Rosemount Systems, Inc. Securely transporting data across a data diode for secured process control communications
US10877465B2 (en) * 2016-10-24 2020-12-29 Fisher-Rosemount Systems, Inc. Process device condition and performance monitoring
US10386999B2 (en) 2016-10-26 2019-08-20 Google Llc Timeline-video relationship presentation for alert events
USD843398S1 (en) 2016-10-26 2019-03-19 Google Llc Display screen with graphical user interface for a timeline-video relationship presentation for alert events
US11238290B2 (en) 2016-10-26 2022-02-01 Google Llc Timeline-video relationship processing for alert events
US11012461B2 (en) * 2016-10-27 2021-05-18 Accenture Global Solutions Limited Network device vulnerability prediction
US20180135456A1 (en) * 2016-11-17 2018-05-17 General Electric Company Modeling to detect gas turbine anomalies
US10943283B2 (en) * 2016-11-18 2021-03-09 Cummins Inc. Service location recommendation tailoring
CA2987670A1 (en) * 2016-12-05 2018-06-05 Aware360 Ltd. Integrated personal safety and equipment monitoring system
US10304263B2 (en) * 2016-12-13 2019-05-28 The Boeing Company Vehicle system prognosis device and method
CN106485036A (en) * 2016-12-21 2017-03-08 杜伯仁 Based on the method graded to asset securitization Assets Pool by Survival Models
US10950132B2 (en) * 2016-12-22 2021-03-16 Xevo Inc. Method and system for providing artificial intelligence analytic (AIA) services using operator fingerprints and cloud data
DE112017006715T5 (en) * 2017-01-03 2019-11-07 Intel Corporation SENSOR MANAGEMENT AND RELIABILITY
JP6706693B2 (en) * 2017-01-19 2020-06-10 株式会社日立製作所 Maintenance management system and maintenance management confirmation device used therefor
US10579961B2 (en) * 2017-01-26 2020-03-03 Uptake Technologies, Inc. Method and system of identifying environment features for use in analyzing asset operation
JP6879752B2 (en) * 2017-02-03 2021-06-02 株式会社日立システムズ Medical device monitoring system
US10318364B2 (en) * 2017-02-23 2019-06-11 Visual Process Limited Methods and systems for problem-alert aggregation
US11044329B2 (en) * 2017-02-27 2021-06-22 NCR Corportation Client application user experience tracking
CN106886481B (en) * 2017-02-28 2020-11-27 深圳市华傲数据技术有限公司 Static analysis and prediction method and device for system health degree
CN108595448B (en) * 2017-03-17 2022-03-04 北京京东尚科信息技术有限公司 Information pushing method and device
US10691516B2 (en) * 2017-04-05 2020-06-23 International Business Machines Corporation Measurement and visualization of resiliency in a hybrid IT infrastructure environment
WO2018188756A1 (en) * 2017-04-13 2018-10-18 Renesas Electronics Corporation Probabilistic metric for random hardware failure
US10671039B2 (en) 2017-05-03 2020-06-02 Uptake Technologies, Inc. Computer system and method for predicting an abnormal event at a wind turbine in a cluster
WO2018213617A1 (en) * 2017-05-18 2018-11-22 Uptake Technologies, Inc. Computing system and method for approximating predictive models and time-series values
US10972685B2 (en) 2017-05-25 2021-04-06 Google Llc Video camera assembly having an IR reflector
US10819921B2 (en) 2017-05-25 2020-10-27 Google Llc Camera assembly having a single-piece cover element
US10352496B2 (en) 2017-05-25 2019-07-16 Google Llc Stand assembly for an electronic device providing multiple degrees of freedom and built-in cables
US20180347843A1 (en) * 2017-05-30 2018-12-06 Mikros Systems Corporation Methods and systems for prognostic analysis in electromechanical and environmental control equipment in building management systems
JP6718415B2 (en) * 2017-06-26 2020-07-08 株式会社日立ビルシステム Parts replacement prediction device, parts replacement prediction system, parts replacement prediction method
US11014780B2 (en) 2017-07-06 2021-05-25 Otis Elevator Company Elevator sensor calibration
US10829344B2 (en) 2017-07-06 2020-11-10 Otis Elevator Company Elevator sensor system calibration
EP3655824A1 (en) 2017-07-21 2020-05-27 Johnson Controls Technology Company Building management system with dynamic work order generation with adaptive diagnostic task details
US10402192B2 (en) * 2017-07-25 2019-09-03 Aurora Labs Ltd. Constructing software delta updates for vehicle ECU software and abnormality detection based on toolchain
US11442445B2 (en) 2017-08-02 2022-09-13 Strong Force Iot Portfolio 2016, Llc Data collection systems and methods with alternate routing of input channels
US10313413B2 (en) 2017-08-28 2019-06-04 Banjo, Inc. Detecting events from ingested communication signals
US11025693B2 (en) * 2017-08-28 2021-06-01 Banjo, Inc. Event detection from signal data removing private information
KR102025145B1 (en) 2017-09-01 2019-09-25 두산중공업 주식회사 Apparatus and Method for Predicting Plant Data
US20190080258A1 (en) * 2017-09-13 2019-03-14 Intel Corporation Observation hub device and method
US10817152B2 (en) * 2017-09-17 2020-10-27 Ge Inspection Technologies, Lp Industrial asset intelligence
US11687048B2 (en) * 2017-09-18 2023-06-27 Johnson Controls Tyco IP Holdings LLP Method and apparatus for evaluation of temperature sensors
US10585774B2 (en) * 2017-09-27 2020-03-10 International Business Machines Corporation Detection of misbehaving components for large scale distributed systems
US11721195B2 (en) 2017-10-06 2023-08-08 Raven Telemetry Inc. Augmented industrial management
TWI663570B (en) * 2017-10-20 2019-06-21 財團法人資訊工業策進會 Power consumption analyzing server and power consumption analyzing method thereof
US10379982B2 (en) 2017-10-31 2019-08-13 Uptake Technologies, Inc. Computer system and method for performing a virtual load test
US10956843B2 (en) * 2017-11-07 2021-03-23 International Business Machines Corporation Determining optimal device refresh cycles and device repairs through cognitive analysis of unstructured data and device health scores
US11334854B2 (en) * 2017-11-10 2022-05-17 General Electric Company Systems and methods to generate an asset workscope
US20190304596A1 (en) * 2017-11-14 2019-10-03 Tagnos, Inc. Use Of Historic And Contemporary Tracking Data To Improve Healthcare Facility Operations
US10672204B2 (en) * 2017-11-15 2020-06-02 The Boeing Company Real time streaming analytics for flight data processing
CN107730893B (en) * 2017-11-30 2019-08-09 大连理工大学 A kind of shared bus website passenger flow forecasting based on passenger's trip multidimensional characteristic
CA3026837A1 (en) 2017-12-07 2019-06-07 Fifth Third Bancorp Geospatial market analytics
US11010233B1 (en) * 2018-01-18 2021-05-18 Pure Storage, Inc Hardware-based system monitoring
US11403160B2 (en) * 2018-01-19 2022-08-02 Hitachi, Ltd. Fault predicting system and fault prediction method
JP6996002B2 (en) * 2018-01-22 2022-01-17 株式会社日立ハイテクソリューションズ Protecting your system from harmful communications
EP3514555B1 (en) * 2018-01-22 2020-07-22 Siemens Aktiengesellschaft Apparatus for monitoring an actuator system, method for providing an apparatus for monitoring an actuator system and method for monitoring an actuator system
US10585724B2 (en) 2018-04-13 2020-03-10 Banjo, Inc. Notifying entities of relevant events
US20190266575A1 (en) * 2018-02-27 2019-08-29 Honeywell International, Inc. Modifying field workflows
US11080127B1 (en) * 2018-02-28 2021-08-03 Arizona Public Service Company Methods and apparatus for detection of process parameter anomalies
DE102018203179A1 (en) * 2018-03-02 2019-09-05 Robert Bosch Gmbh Device, in particular handheld power tool management device, and method for monitoring and / or managing a plurality of objects
US10169135B1 (en) 2018-03-02 2019-01-01 Uptake Technologies, Inc. Computer system and method of detecting manufacturing network anomalies
US10554518B1 (en) * 2018-03-02 2020-02-04 Uptake Technologies, Inc. Computer system and method for evaluating health of nodes in a manufacturing network
US10950345B2 (en) * 2018-03-23 2021-03-16 Siemens Healthcare Diagnostics Inc. Methods, apparatus, and systems for integration of diagnostic laboratory devices
US10354462B1 (en) * 2018-04-06 2019-07-16 Toyota Motor Engineering & Manufacturing North America, Inc. Fault diagnosis in power electronics using adaptive PCA
US11691755B2 (en) * 2018-04-16 2023-07-04 Wing Aviation Llc Multi-UAV management
US10635095B2 (en) 2018-04-24 2020-04-28 Uptake Technologies, Inc. Computer system and method for creating a supervised failure model
WO2019219756A1 (en) * 2018-05-16 2019-11-21 Siemens Ag Österreich Method and apparatus for diagnosis and monitoring of vehicles, vehicle components and routes
CN108648071B (en) 2018-05-17 2020-05-19 阿里巴巴集团控股有限公司 Resource value evaluation method and device based on block chain
WO2019226715A1 (en) * 2018-05-21 2019-11-28 Promptlink Communications, Inc. Techniques for assessing a customer premises equipment device
US10896114B2 (en) * 2018-05-23 2021-01-19 Seagate Technology Llc Machine learning error prediction in storage arrays
US11823274B2 (en) 2018-06-04 2023-11-21 Machine Cover, Inc. Parametric instruments and methods relating to business interruption
US11842407B2 (en) 2018-06-04 2023-12-12 Machine Cover, Inc. Parametric instruments and methods relating to geographical area business interruption
US20190378349A1 (en) * 2018-06-07 2019-12-12 GM Global Technology Operations LLC Vehicle remaining useful life prediction
DE102018209407A1 (en) * 2018-06-13 2019-12-19 Robert Bosch Gmbh Method and device for handling an anomaly in a communication network
KR102062097B1 (en) * 2018-06-27 2020-06-23 송암시스콤 주식회사 A Bus Information Terminal Having Dual Structure With Automatic Recovery Function
US20210350442A1 (en) * 2018-07-22 2021-11-11 Scott Amron Distributed inventory system
DE102018118437A1 (en) 2018-07-31 2020-02-06 Airbus Defence and Space GmbH System and method for monitoring the condition of an unmanned aircraft
US10349208B1 (en) 2018-08-17 2019-07-09 xAd, Inc. Systems and methods for real-time prediction of mobile device locations
US11146911B2 (en) 2018-08-17 2021-10-12 xAd, Inc. Systems and methods for pacing information campaigns based on predicted and observed location events
US11134359B2 (en) 2018-08-17 2021-09-28 xAd, Inc. Systems and methods for calibrated location prediction
US11172324B2 (en) 2018-08-17 2021-11-09 xAd, Inc. Systems and methods for predicting targeted location events
WO2020037608A1 (en) * 2018-08-23 2020-02-27 西门子股份公司 Artificial intelligence computing device, control method and apparatus, engineer station, and industrial automation system
AU2019336235A1 (en) * 2018-09-07 2021-04-29 Uptake Technologies, Inc. Computer system and method for recommending an operating mode of an asset
US20210373063A1 (en) * 2018-09-10 2021-12-02 3M Innovative Properties Company Method and system for monitoring a health of a power cable accessory based on machine learning
US20210192390A1 (en) * 2018-09-24 2021-06-24 Hewlett-Packard Development Company, L.P. Device status assessment
US11455223B2 (en) * 2018-10-11 2022-09-27 International Business Machines Corporation Using system errors and manufacturer defects in system components causing the system errors to determine a quality assessment value for the components
US11573879B2 (en) * 2018-10-22 2023-02-07 General Electric Company Active asset monitoring
US11200103B2 (en) * 2018-10-26 2021-12-14 International Business Machines Corporation Using a machine learning module to perform preemptive identification and reduction of risk of failure in computational systems
US11200142B2 (en) 2018-10-26 2021-12-14 International Business Machines Corporation Perform preemptive identification and reduction of risk of failure in computational systems by training a machine learning module
US10635360B1 (en) * 2018-10-29 2020-04-28 International Business Machines Corporation Adjusting data ingest based on compaction rate in a dispersed storage network
US11182596B2 (en) * 2018-11-08 2021-11-23 International Business Machines Corporation Identifying a deficiency of a facility
JP6531213B1 (en) * 2018-12-04 2019-06-12 Psp株式会社 Medical device failure prediction system, medical device failure prediction method, and program
US11062233B2 (en) * 2018-12-21 2021-07-13 The Nielsen Company (Us), Llc Methods and apparatus to analyze performance of watermark encoding devices
KR102124779B1 (en) * 2018-12-21 2020-06-19 한국수력원자력 주식회사 Early warning device of plant of start and stop using multi-predictive model
US11188691B2 (en) * 2018-12-21 2021-11-30 Utopus Insights, Inc. Scalable system and method for forecasting wind turbine failure using SCADA alarm and event logs
KR102152403B1 (en) * 2018-12-24 2020-09-04 아주대학교산학협력단 Apparatus and method for detecting abnormal behavior using data pattern analysis
US10984154B2 (en) * 2018-12-27 2021-04-20 Utopus Insights, Inc. System and method for evaluating models for predictive failure of renewable energy assets
CN109840312B (en) * 2019-01-22 2022-11-29 新奥数能科技有限公司 Abnormal value detection method and device for boiler load rate-energy efficiency curve
US11334057B2 (en) * 2019-01-25 2022-05-17 Waygate Technologies Usa, Lp Anomaly detection for predictive maintenance and deriving outcomes and workflows based on data quality
US11030067B2 (en) * 2019-01-29 2021-06-08 Uptake Technologies, Inc. Computer system and method for presenting asset insights at a graphical user interface
WO2020159680A1 (en) * 2019-01-31 2020-08-06 Exxonmobil Research And Engineering Company Monitoring and reporting operational performance of machinery
US11232368B2 (en) * 2019-02-20 2022-01-25 Accenture Global Solutions Limited System for predicting equipment failure events and optimizing manufacturing operations
US11084387B2 (en) * 2019-02-25 2021-08-10 Toyota Research Institute, Inc. Systems, methods, and storage media for arranging a plurality of cells in a vehicle battery pack
WO2020179704A1 (en) * 2019-03-01 2020-09-10 日本電気株式会社 Network management method, network system, intensive analysis device, terminal device, and program
SE543982C2 (en) * 2019-03-26 2021-10-12 Stoneridge Electronics Ab Method of processing vehicle data from multiple sources and controller therefor
JP7162560B2 (en) * 2019-03-28 2022-10-28 日立造船株式会社 Information processing device, information processing method, information processing program, and garbage incineration plant
CN113632027A (en) * 2019-04-01 2021-11-09 Abb瑞士股份有限公司 Asset condition monitoring method using automatic anomaly detection
JP7320368B2 (en) 2019-04-09 2023-08-03 ナブテスコ株式会社 FAILURE PREDICTION DEVICE, FAILURE PREDICTION METHOD AND COMPUTER PROGRAM
CA3042657A1 (en) * 2019-05-06 2020-11-06 Otr Wheel Safety, Inc. Integrated system for assessing integrity of wheels and rims of off the road vehicles
CN111846095B (en) * 2019-05-14 2022-05-17 北京骑胜科技有限公司 Fault detection device, electric power-assisted vehicle and fault detection method
CN110163387A (en) * 2019-05-17 2019-08-23 合肥帧讯软件有限公司 A kind of Design of Laboratory Management System
JP2022532791A (en) 2019-05-24 2022-07-19 バークレー ライツ,インコーポレイテッド Systems and methods for optimizing equipment system workflows
US11604934B2 (en) * 2019-05-29 2023-03-14 Nec Corporation Failure prediction using gradient-based sensor identification
WO2020256700A1 (en) * 2019-06-18 2020-12-24 Hewlett-Packard Development Company, L.P. Part re-order based on part-specific sensor data
US20200401904A1 (en) * 2019-06-24 2020-12-24 GE Precision Healthcare LLC Adaptive medical imaging device configuration using artificial intelligence
US11817212B2 (en) 2019-06-26 2023-11-14 Roche Diagnostics Operations, Inc. Maintenance method for a laboratory system
JP2022537937A (en) * 2019-07-02 2022-08-31 コヌクス ゲーエムベーハー Monitoring, Predicting, and Maintaining the Condition of Railroad Track Elements Using Digital Twins
GB201909762D0 (en) * 2019-07-08 2019-08-21 Edwards Vacuum Llc Vacuum system with diagnostic circuitry and a method and computer program for monitoring the health of such a vacuum system
FR3098938B1 (en) * 2019-07-15 2022-01-07 Bull Sas Method and device for determining an anomaly prediction performance index value in a computer infrastructure from performance indicator values
US20210019651A1 (en) * 2019-07-18 2021-01-21 Hitachi, Ltd. Method for integrating prediction result
US11334410B1 (en) * 2019-07-22 2022-05-17 Intuit Inc. Determining aberrant members of a homogenous cluster of systems using external monitors
US11374814B2 (en) 2019-08-01 2022-06-28 Hewlett Packard Enterprise Development Lp Network device configuration update using rank and health
US11086749B2 (en) * 2019-08-01 2021-08-10 International Business Machines Corporation Dynamically updating device health scores and weighting factors
US11010222B2 (en) 2019-08-29 2021-05-18 Sap Se Failure mode specific analytics using parametric models
FR3101164B1 (en) * 2019-09-25 2023-08-04 Mouafo Serge Romaric Tembo Method for real-time parsimonious predictive maintenance of a critical system, computer program product and associated device
US11088932B2 (en) * 2019-10-14 2021-08-10 International Business Machines Corporation Managing network system incidents
US11379694B2 (en) 2019-10-25 2022-07-05 Vmware, Inc. Scalable and dynamic data collection and processing
US11321115B2 (en) * 2019-10-25 2022-05-03 Vmware, Inc. Scalable and dynamic data collection and processing
EP3822725A1 (en) * 2019-11-15 2021-05-19 General Electric Company Systems, and methods for diagnosing an additive manufacturing device
CN112906900A (en) * 2019-11-19 2021-06-04 D.S.瑞德有限公司 Method and system for monitoring vehicle condition and for alerting anomalies/defects
US20210382992A1 (en) * 2019-11-22 2021-12-09 Pure Storage, Inc. Remote Analysis of Potentially Corrupt Data Written to a Storage System
US11941116B2 (en) 2019-11-22 2024-03-26 Pure Storage, Inc. Ransomware-based data protection parameter modification
US11921573B2 (en) * 2019-12-02 2024-03-05 Accenture Global Solutions Limited Systems and methods for predictive system failure monitoring
JP7335154B2 (en) * 2019-12-17 2023-08-29 株式会社東芝 Information processing device, information processing method, and program
US11509136B2 (en) * 2019-12-30 2022-11-22 Utopus Insights, Inc. Scalable systems and methods for assessing healthy condition scores in renewable asset management
GB2591772A (en) * 2020-02-06 2021-08-11 Roads & Transp Authority Asset maintenance management system and method
JP7418256B2 (en) * 2020-03-24 2024-01-19 東芝テック株式会社 Information processing equipment and programs
US11558767B2 (en) 2020-03-26 2023-01-17 Sony Group Corporation Electronic device and related methods for predicting initiation of establishment of a network with one or more other electronic devices
US11482341B2 (en) 2020-05-07 2022-10-25 Carrier Corporation System and a method for uniformly characterizing equipment category
US20210365449A1 (en) * 2020-05-20 2021-11-25 Caterpillar Inc. Callaborative system and method for validating equipment failure models in an analytics crowdsourcing environment
EP3923213A1 (en) * 2020-06-08 2021-12-15 ABB Power Grids Switzerland AG Method and computing system for performing a prognostic health analysis for an asset
US20230352159A1 (en) * 2020-06-12 2023-11-02 Roche Molecular Systems, Inc. Systems and methods for assessing bays on diagnostic devices
US11210160B1 (en) * 2020-08-13 2021-12-28 Servicenow, Inc. Computer information technology alert remediation selection based on alert similarity
US11188405B1 (en) 2020-08-25 2021-11-30 Servicenow, Inc. Similar alert identification based on application fingerprints
WO2022072908A1 (en) * 2020-10-02 2022-04-07 Tonkean, Inc. Systems and methods for data objects for asynchronou workflows
US20220114559A1 (en) * 2020-10-09 2022-04-14 ANI Technologies Private Limited Asset health management for vehicles
US11290343B1 (en) * 2020-12-10 2022-03-29 Hitachi, Ltd. System and method for asset and data management
US11675342B2 (en) * 2020-12-24 2023-06-13 Noodle Analytics, Inc. AI-based smart health surveillance system and method
CA3205716A1 (en) * 2021-01-22 2022-07-28 Xiang Liu Systems for infrastructure degradation modelling and methods of use thereof
US11633168B2 (en) * 2021-04-02 2023-04-25 AIX Scan, Inc. Fast 3D radiography with multiple pulsed X-ray sources by deflecting tube electron beam using electro-magnetic field
US20220358434A1 (en) * 2021-05-06 2022-11-10 Honeywell International Inc. Foundation applications as an accelerator providing well defined extensibility and collection of seeded templates for enhanced user experience and quicker turnaround
US11688059B2 (en) * 2021-05-27 2023-06-27 International Business Machines Corporation Asset maintenance prediction using infrared and regular images
US11500712B1 (en) * 2021-06-14 2022-11-15 EMC IP Holding Company LLC Method and system for intelligent proactive error log activation
TW202311961A (en) * 2021-09-02 2023-03-16 遠傳電信股份有限公司 Method and system for detecting an abnormal occurrence of an application program
US20230080981A1 (en) * 2021-09-13 2023-03-16 International Business Machines Corporation Predictive maintenance explanations based on user profile
US11789842B2 (en) * 2021-10-11 2023-10-17 Dell Products L.P. System and method for advanced detection of potential system impairment
US20230112875A1 (en) * 2021-10-13 2023-04-13 Honeywell International Inc. Alarm performance optimizer
US11797408B2 (en) 2021-12-30 2023-10-24 Juniper Networks, Inc. Dynamic prediction of system resource requirement of network software in a live network using data driven models
US20230221693A1 (en) * 2022-01-10 2023-07-13 General Electric Technology Gmbh Systems and methods for integrated condition monitoring for power system asset health scoring
US20230236922A1 (en) * 2022-01-24 2023-07-27 International Business Machines Corporation Failure Prediction Using Informational Logs and Golden Signals
US20230236892A1 (en) * 2022-01-25 2023-07-27 Poplar Technologies, Inc. Apparatus for resource enhacement
US20230259419A1 (en) * 2022-02-14 2023-08-17 Capital One Services, Llc Incident resolution system
US20230394888A1 (en) * 2022-06-01 2023-12-07 The Boeing Company Vehicle Health Management Using a Counterfactual Machine Learning Model
JP7292538B1 (en) 2022-06-17 2023-06-16 三菱電機株式会社 Soundness evaluation device, soundness evaluation method, and soundness evaluation program
US11929891B1 (en) 2023-01-10 2024-03-12 Dell Products L.P. System and method for distributed management of hardware through relationship management
US11907230B1 (en) * 2023-01-10 2024-02-20 Dell Products L.P. System and method for distributed management of hardware based on intent

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090146839A1 (en) * 2006-05-17 2009-06-11 Tanla Solutions Limited Automated meter reading system and method thereof
JP2013239827A (en) * 2012-05-14 2013-11-28 Secom Co Ltd Communication failure support system
US20140098658A1 (en) * 2006-01-31 2014-04-10 Sigma Designs, Inc. Node repair in a mesh network
US20140286301A1 (en) * 2003-07-17 2014-09-25 Sensicast Systems Method and apparatus for wireless communication in a mesh network using frequency schedule

Family Cites Families (254)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3026510A (en) 1959-10-02 1962-03-20 Bell Telephone Labor Inc Self timed pcm encoder
DE3816520A1 (en) * 1988-05-14 1989-11-23 Bosch Gmbh Robert CONTROL PROCESS AND DEVICE, IN PARTICULAR LAMBAR CONTROL
US5633800A (en) 1992-10-21 1997-05-27 General Electric Company Integrated model-based reasoning/expert system diagnosis for rotating machinery
US5363317A (en) 1992-10-29 1994-11-08 United Technologies Corporation Engine failure monitor for a multi-engine aircraft having partial engine failure and driveshaft failure detection
JP3287889B2 (en) * 1992-11-24 2002-06-04 トーヨーエイテック株式会社 Quality control equipment
US5566092A (en) 1993-12-30 1996-10-15 Caterpillar Inc. Machine fault diagnostics system and method
US5918222A (en) 1995-03-17 1999-06-29 Kabushiki Kaisha Toshiba Information disclosing apparatus and multi-modal information input/output system
JP3366837B2 (en) 1997-08-15 2003-01-14 株式会社小松製作所 Machine abnormality monitoring device and method
US6473659B1 (en) 1998-04-10 2002-10-29 General Electric Company System and method for integrating a plurality of diagnostic related information
US6115697A (en) 1999-02-19 2000-09-05 Dynamic Research Group Computerized system and method for optimizing after-tax proceeds
US6625500B1 (en) * 1999-03-16 2003-09-23 Chou H. Li Self-optimizing method and machine
US6336065B1 (en) 1999-10-28 2002-01-01 General Electric Company Method and system for analyzing fault and snapshot operational parameter data for diagnostics of machine malfunctions
US6622264B1 (en) 1999-10-28 2003-09-16 General Electric Company Process and system for analyzing fault log data from a machine so as to identify faults predictive of machine failures
US6947797B2 (en) 1999-04-02 2005-09-20 General Electric Company Method and system for diagnosing machine malfunctions
JP3892614B2 (en) 1999-04-30 2007-03-14 新日本製鐵株式会社 Equipment and product process abnormality diagnosis method and apparatus
US6353902B1 (en) * 1999-06-08 2002-03-05 Nortel Networks Limited Network fault prediction and proactive maintenance system
US20110208567A9 (en) * 1999-08-23 2011-08-25 Roddy Nicholas E System and method for managing a fleet of remote assets
US7783507B2 (en) * 1999-08-23 2010-08-24 General Electric Company System and method for managing a fleet of remote assets
US6442542B1 (en) 1999-10-08 2002-08-27 General Electric Company Diagnostic system with learning capabilities
US6615367B1 (en) 1999-10-28 2003-09-02 General Electric Company Method and apparatus for diagnosing difficult to diagnose faults in a complex system
US7020595B1 (en) 1999-11-26 2006-03-28 General Electric Company Methods and apparatus for model based diagnostics
US6650949B1 (en) 1999-12-30 2003-11-18 General Electric Company Method and system for sorting incident log data from a plurality of machines
US6634000B1 (en) 2000-02-01 2003-10-14 General Electric Company Analyzing fault logs and continuous data for diagnostics for a locomotive
US6725398B1 (en) 2000-02-11 2004-04-20 General Electric Company Method, system, and program product for analyzing a fault log of a malfunctioning machine
US20030126258A1 (en) 2000-02-22 2003-07-03 Conkright Gary W. Web based fault detection architecture
US6957172B2 (en) 2000-03-09 2005-10-18 Smartsignal Corporation Complex signal decomposition and modeling
US7739096B2 (en) 2000-03-09 2010-06-15 Smartsignal Corporation System for extraction of representative data for training of adaptive process monitoring equipment
WO2001067262A1 (en) 2000-03-09 2001-09-13 Smartsignal Corporation Generalized lensing angular similarity operator
US6952662B2 (en) 2000-03-30 2005-10-04 Smartsignal Corporation Signal differentiation system using improved non-linear operator
US6708156B1 (en) 2000-04-17 2004-03-16 Michael Von Gonten, Inc. System and method for projecting market penetration
US20020059075A1 (en) 2000-05-01 2002-05-16 Schick Louis A. Method and system for managing a land-based vehicle
US20160078695A1 (en) * 2000-05-01 2016-03-17 General Electric Company Method and system for managing a fleet of remote assets and/or ascertaining a repair for an asset
US6799154B1 (en) 2000-05-25 2004-09-28 General Electric Comapny System and method for predicting the timing of future service events of a product
EP1164550B1 (en) 2000-06-16 2008-12-03 Ntn Corporation Machine component monitoring, diagnosing and selling system
US6760631B1 (en) 2000-10-04 2004-07-06 General Electric Company Multivariable control method and system without detailed prediction model
US20020091972A1 (en) 2001-01-05 2002-07-11 Harris David P. Method for predicting machine or process faults and automated system for implementing same
US7233886B2 (en) 2001-01-19 2007-06-19 Smartsignal Corporation Adaptive modeling of changed states in predictive condition monitoring
US6859739B2 (en) 2001-01-19 2005-02-22 Smartsignal Corporation Global state change indicator for empirical modeling in condition based monitoring
US7373283B2 (en) 2001-02-22 2008-05-13 Smartsignal Corporation Monitoring and fault detection system and method using improved empirical model for range extrema
US7539597B2 (en) 2001-04-10 2009-05-26 Smartsignal Corporation Diagnostic systems and methods for predictive condition monitoring
US20020183971A1 (en) 2001-04-10 2002-12-05 Wegerich Stephan W. Diagnostic systems and methods for predictive condition monitoring
US6643600B2 (en) 2001-04-26 2003-11-04 General Electric Company Method and system for assessing adjustment factors in testing or monitoring process
US7079982B2 (en) 2001-05-08 2006-07-18 Hitachi Construction Machinery Co., Ltd. Working machine, trouble diagnosis system of working machine, and maintenance system of working machine
US7107491B2 (en) 2001-05-16 2006-09-12 General Electric Company System, method and computer product for performing automated predictive reliability
US6975962B2 (en) 2001-06-11 2005-12-13 Smartsignal Corporation Residual signal alert generation for condition monitoring using approximated SPRT distribution
US7120685B2 (en) * 2001-06-26 2006-10-10 International Business Machines Corporation Method and apparatus for dynamic configurable logging of activities in a distributed computing system
US7457732B2 (en) 2001-08-17 2008-11-25 General Electric Company System and method for measuring quality of baseline modeling techniques
US7428478B2 (en) 2001-08-17 2008-09-23 General Electric Company System and method for improving accuracy of baseline models
US8108249B2 (en) 2001-12-04 2012-01-31 Kimberly-Clark Worldwide, Inc. Business planner
CA2471013C (en) 2001-12-19 2011-07-26 David Helsper Method and system for analyzing and predicting the behavior of systems
JP2003256367A (en) 2002-03-06 2003-09-12 Seiko Epson Corp Information providing system concerning electronic equipment error and server for managing past error results of electric equipment
US6892163B1 (en) 2002-03-08 2005-05-10 Intellectual Assets Llc Surveillance system and method having an adaptive sequential probability fault detection test
US7660705B1 (en) 2002-03-19 2010-02-09 Microsoft Corporation Bayesian approach for learning regression decision graph models and regression models for time series analysis
US8176186B2 (en) 2002-10-30 2012-05-08 Riverbed Technology, Inc. Transaction accelerator for client-server communications systems
AU2003287487B2 (en) 2002-11-04 2009-03-26 Smartsignal Corporation System state monitoring using recurrent local learning machine
US6823253B2 (en) 2002-11-27 2004-11-23 General Electric Company Methods and apparatus for model predictive control of aircraft gas turbine engines
US8017411B2 (en) * 2002-12-18 2011-09-13 GlobalFoundries, Inc. Dynamic adaptive sampling rate for model prediction
JP4333331B2 (en) 2002-12-20 2009-09-16 セイコーエプソン株式会社 Failure prediction system, failure prediction program, and failure prediction method
US20040243636A1 (en) 2003-03-18 2004-12-02 Smartsignal Corporation Equipment health monitoring architecture for fleets of assets
US7634384B2 (en) 2003-03-18 2009-12-15 Fisher-Rosemount Systems, Inc. Asset optimization reporting in a process plant
GB0307406D0 (en) * 2003-03-31 2003-05-07 British Telecomm Data analysis system and method
US7054706B2 (en) 2003-06-30 2006-05-30 Intel Corporation Managing supply chains with model predictive control
WO2005008404A2 (en) 2003-07-11 2005-01-27 Computer Associates Think, Inc. Modeling of applications and business process services through auto discovery analysis
US7181370B2 (en) 2003-08-26 2007-02-20 Siemens Energy & Automation, Inc. System and method for remotely obtaining and managing machine data
DE10345440A1 (en) 2003-09-30 2005-05-12 Siemens Ag Method, computer program with program code means and computer program product for analyzing influencing variables on a burning process in a combustion chamber using a trainable, statistical model
US7127371B2 (en) 2003-10-08 2006-10-24 Ge Medical Systems Information Customized medical equipment preventative maintenance method and system
US7451210B2 (en) * 2003-11-24 2008-11-11 International Business Machines Corporation Hybrid method for event prediction and system control
EP1698117B1 (en) 2003-12-23 2013-04-17 TELEFONAKTIEBOLAGET LM ERICSSON (publ) Method and system for efficient routing in ad hoc networks
WO2005069203A2 (en) 2004-01-09 2005-07-28 United Parcel Service Of America, Inc. System, method and apparatus for capturing telematics data with an active rfid tag
CN1981446B (en) 2004-03-23 2010-10-06 加利福尼亚大学董事会 Apparatus and method for improving reliability of collected sensor data over a network
US7062370B2 (en) 2004-03-30 2006-06-13 Honeywell International Inc. Model-based detection, diagnosis of turbine engine faults
US7447666B2 (en) 2004-04-09 2008-11-04 The Boeing Company System and method for analyzing a pattern in a time-stamped event sequence
US7729789B2 (en) * 2004-05-04 2010-06-01 Fisher-Rosemount Systems, Inc. Process plant monitoring based on multivariate statistical analysis and on-line process simulation
US7412626B2 (en) 2004-05-21 2008-08-12 Sap Ag Method and system for intelligent and adaptive exception handling
JP2006072717A (en) 2004-09-02 2006-03-16 Hitachi Ltd Disk subsystem
US7570581B2 (en) * 2004-09-23 2009-08-04 Motorola, Inc. Dynamic reduction of route reconvergence time
US7280941B2 (en) 2004-12-29 2007-10-09 General Electric Company Method and apparatus for in-situ detection and isolation of aircraft engine faults
US7640145B2 (en) 2005-04-25 2009-12-29 Smartsignal Corporation Automated model configuration and deployment system for equipment health monitoring
US7536364B2 (en) 2005-04-28 2009-05-19 General Electric Company Method and system for performing model-based multi-objective asset optimization and decision-making
US9846479B1 (en) 2005-05-30 2017-12-19 Invent.Ly, Llc Smart security device with monitoring mode and communication mode
US20060293777A1 (en) 2005-06-07 2006-12-28 International Business Machines Corporation Automated and adaptive threshold setting
CN101263499B (en) 2005-07-11 2013-03-27 布鲁克斯自动化公司 Intelligent condition monitoring and fault diagnostic system
US20070174449A1 (en) * 2005-07-22 2007-07-26 Ankur Gupta Method and system for identifying potential adverse network conditions
US7333917B2 (en) * 2005-08-11 2008-02-19 The University Of North Carolina At Chapel Hill Novelty detection systems, methods and computer program products for real-time diagnostics/prognostics in complex physical systems
US7599762B2 (en) 2005-08-24 2009-10-06 Rockwell Automatino Technologies, Inc. Model-based control for crane control and underway replenishment
US7174233B1 (en) 2005-08-29 2007-02-06 International Business Machines Corporation Quality/reliability system and method in multilevel manufacturing environment
US7509235B2 (en) 2005-08-31 2009-03-24 General Electric Company Method and system for forecasting reliability of assets
US7714735B2 (en) * 2005-09-13 2010-05-11 Daniel Rockwell Monitoring electrical assets for fault and efficiency correction
JP4717579B2 (en) 2005-09-30 2011-07-06 株式会社小松製作所 Maintenance work management system for work machines
US20070088570A1 (en) * 2005-10-18 2007-04-19 Honeywell International, Inc. System and method for predicting device deterioration
US7484132B2 (en) * 2005-10-28 2009-01-27 International Business Machines Corporation Clustering process for software server failure prediction
US7869908B2 (en) 2006-01-20 2011-01-11 General Electric Company Method and system for data collection and analysis
US7509537B1 (en) 2006-02-02 2009-03-24 Rockwell Collins, Inc. Prognostic processor system for real-time failure analysis of line replaceable units
US7496798B2 (en) 2006-02-14 2009-02-24 Jaw Link Data-centric monitoring method
US7647131B1 (en) * 2006-03-09 2010-01-12 Rockwell Automation Technologies, Inc. Dynamic determination of sampling rates
US7693608B2 (en) 2006-04-12 2010-04-06 Edsa Micro Corporation Systems and methods for alarm filtering and management within a real-time data acquisition and monitoring environment
US7949436B2 (en) 2006-05-19 2011-05-24 Oracle America, Inc. Method and apparatus for automatically detecting and correcting misalignment of a semiconductor chip
US7558771B2 (en) * 2006-06-07 2009-07-07 Gm Global Technology Operations, Inc. System and method for selection of prediction tools
US20080040244A1 (en) * 2006-08-08 2008-02-14 Logcon Spec Ops, Inc. Tracking and Managing Assets
US20080097945A1 (en) 2006-08-09 2008-04-24 The University Of North Carolina At Chapel Hill Novelty detection systems, methods and computer program products for real-time diagnostics/prognostics in complex physical systems
US20080059120A1 (en) 2006-08-30 2008-03-06 Fei Xiao Using fault history to predict replacement parts
US20080059080A1 (en) 2006-08-31 2008-03-06 Caterpillar Inc. Method and system for selective, event-based communications
US8275577B2 (en) 2006-09-19 2012-09-25 Smartsignal Corporation Kernel-based method for detecting boiler tube leaks
JP2008117129A (en) 2006-11-02 2008-05-22 Nsk Ltd Data collection device for abnormality analysis and on-vehicle controller using the same
US7725293B2 (en) 2006-12-07 2010-05-25 General Electric Company System and method for equipment remaining life estimation
US8311774B2 (en) 2006-12-15 2012-11-13 Smartsignal Corporation Robust distance measures for on-line monitoring
US7661032B2 (en) * 2007-01-06 2010-02-09 International Business Machines Corporation Adjusting sliding window parameters in intelligent event archiving and failure analysis
JP4892367B2 (en) * 2007-02-02 2012-03-07 株式会社日立システムズ Abnormal sign detection system
US7548830B2 (en) 2007-02-23 2009-06-16 General Electric Company System and method for equipment remaining life estimation
US20080221834A1 (en) 2007-03-09 2008-09-11 General Electric Company Method and system for enhanced fault detection workflow
US7730364B2 (en) * 2007-04-05 2010-06-01 International Business Machines Corporation Systems and methods for predictive failure management
US20080255760A1 (en) * 2007-04-16 2008-10-16 Honeywell International, Inc. Forecasting system
US8145578B2 (en) 2007-04-17 2012-03-27 Eagel View Technologies, Inc. Aerial roof estimation system and method
US8229769B1 (en) 2007-06-13 2012-07-24 United Services Automobile Association Systems and methods for processing overhead imagery
US7949659B2 (en) * 2007-06-29 2011-05-24 Amazon Technologies, Inc. Recommendation system with multiple integrated recommenders
WO2009020861A1 (en) 2007-08-03 2009-02-12 Smartsignal Corporation Fuzzy classification approach to fault pattern matching
US8050800B2 (en) 2007-10-21 2011-11-01 Ge Intelligent Platforms, Inc. Method and system for meeting end conditions in a motion control system
US7919940B2 (en) 2007-10-21 2011-04-05 Ge Intelligent Platforms, Inc. System and method for jerk limited trajectory planning for a path planner
US8700550B1 (en) 2007-11-30 2014-04-15 Intellectual Assets Llc Adaptive model training system and method
US7962240B2 (en) 2007-12-20 2011-06-14 Ge Intelligent Platforms, Inc. Methods and systems for synchronizing a control signal of a slave follower with a master source
JP2009206850A (en) 2008-02-28 2009-09-10 Fuji Xerox Co Ltd Failure diagnosis device and program
US7756678B2 (en) 2008-05-29 2010-07-13 General Electric Company System and method for advanced condition monitoring of an asset system
US8352216B2 (en) 2008-05-29 2013-01-08 General Electric Company System and method for advanced condition monitoring of an asset system
US7822578B2 (en) 2008-06-17 2010-10-26 General Electric Company Systems and methods for predicting maintenance of intelligent electronic devices
US20090326890A1 (en) 2008-06-30 2009-12-31 Honeywell International Inc. System and method for predicting system events and deterioration
US8285402B2 (en) 2008-07-14 2012-10-09 Ge Intelligent Platforms, Inc. Method and system for safety monitored terminal block
GB0813561D0 (en) 2008-07-24 2008-09-03 Rolls Royce Plc Developments in or relating to power demand management
US8060274B2 (en) 2008-10-30 2011-11-15 International Business Machines Corporation Location-based vehicle maintenance scheduling
JP5058947B2 (en) * 2008-11-10 2012-10-24 株式会社日立製作所 Terminal, program, and inventory management method
US8369281B2 (en) 2008-11-24 2013-02-05 At&T Intellectual Property I, L.P. Cell-to-WiFi switcher
US8289150B2 (en) 2008-12-05 2012-10-16 Industrial Technology Research Institute Wireless sensor network and data sensing method thereof
KR101044074B1 (en) 2008-12-24 2011-06-27 동국대학교기술지주 주식회사 System and method for CAFM based on public concept of space ownership
KR20100076708A (en) 2008-12-26 2010-07-06 한국건설기술연구원 Asset management information system for social infrastructures
JP5108116B2 (en) 2009-01-14 2012-12-26 株式会社日立製作所 Device abnormality monitoring method and system
US8024069B2 (en) 2009-01-28 2011-09-20 Ge Intelligent Platforms, Inc. System and method for path planning
US8224765B2 (en) * 2009-02-05 2012-07-17 Honeywell International Inc. Method for computing the relative likelihood of failures
US8989887B2 (en) 2009-02-11 2015-03-24 Applied Materials, Inc. Use of prediction data in monitoring actual production targets
JP5370832B2 (en) 2009-07-01 2013-12-18 株式会社リコー State determination device and failure prediction system using the same
DE102009043091A1 (en) * 2009-09-25 2011-03-31 Wincor Nixdorf International Gmbh Device for handling notes of value
US9007896B2 (en) * 2009-10-07 2015-04-14 Verizon Patent And Licensing Inc. Congestion control based on call responses
CN102045181B (en) * 2009-10-10 2013-08-07 中国移动通信集团公司 Method and device for handling terminal offline fault
WO2011104760A1 (en) * 2010-02-26 2011-09-01 株式会社 日立製作所 Failure source diagnosis system and method
EP2375637A1 (en) 2010-03-22 2011-10-12 British Telecommunications Public Limited Company Network routing adaptation based on failure prediction
JP5416630B2 (en) * 2010-03-24 2014-02-12 株式会社日立製作所 Moving object abnormality judgment support system
WO2011135606A1 (en) * 2010-04-26 2011-11-03 株式会社 日立製作所 Time-series data diagnostic compression method
CN103003801B (en) 2010-05-14 2016-08-03 哈尼施费格尔技术公司 The forecast analysis monitored for remote machine
US8234420B2 (en) 2010-07-14 2012-07-31 Ge Intelligent Platforms, Inc. Method, system, and apparatus for communicating using multiple controllers
US8634314B2 (en) * 2010-07-30 2014-01-21 Cisco Technology, Inc. Reporting statistics on the health of a sensor node in a sensor network
JP5025776B2 (en) * 2010-09-28 2012-09-12 株式会社東芝 Abnormality diagnosis filter generator
US8532795B2 (en) 2010-10-04 2013-09-10 General Electric Company Method and system for offline code validation
JP2012133672A (en) 2010-12-22 2012-07-12 Mitsubishi Heavy Ind Ltd Design optimization device and design optimization method for welded structure
CN103502899B (en) 2011-01-26 2016-09-28 谷歌公司 Dynamic prediction Modeling Platform
US8825840B2 (en) * 2011-02-22 2014-09-02 Intuit Inc. Systems and methods for self-adjusting logging of log messages
US8682454B2 (en) * 2011-02-28 2014-03-25 United Technologies Corporation Method and system for controlling a multivariable system with limits
US8862938B2 (en) 2011-04-18 2014-10-14 General Electric Company System, method, and apparatus for resolving errors in a system
CA2833779A1 (en) 2011-04-20 2012-10-26 The Cleveland Clinic Foundation Predictive modeling
US8594982B2 (en) 2011-06-09 2013-11-26 Pulsar Informatics, Inc. Systems and methods for distributed calculation of fatigue-risk prediction and optimization
US8660980B2 (en) 2011-07-19 2014-02-25 Smartsignal Corporation Monitoring system using kernel regression modeling with pattern sequences
US8620853B2 (en) 2011-07-19 2013-12-31 Smartsignal Corporation Monitoring method using kernel regression modeling with pattern sequences
DE102011108019A1 (en) * 2011-07-19 2013-01-24 Daimler Ag Method for determining a quality of a reducing agent solution containing ammonia used for the reduction of nitrogen oxide
US9256224B2 (en) 2011-07-19 2016-02-09 GE Intelligent Platforms, Inc Method of sequential kernel regression modeling for forecasting and prognostics
GB2494416A (en) 2011-09-07 2013-03-13 Rolls Royce Plc Asset Condition Monitoring Using Internal Signals Of The Controller
US9477223B2 (en) * 2011-09-14 2016-10-25 General Electric Company Condition monitoring system and method
US9176819B2 (en) 2011-09-23 2015-11-03 Fujitsu Limited Detecting sensor malfunctions using compression analysis of binary decision diagrams
US8560494B1 (en) 2011-09-30 2013-10-15 Palantir Technologies, Inc. Visual data importer
JP2013092954A (en) * 2011-10-27 2013-05-16 Hitachi Ltd Management task support device, management task support method, and management task support system
CN103733181A (en) 2011-11-04 2014-04-16 惠普发展公司,有限责任合伙企业 Fault processing in a system
US8560165B2 (en) * 2012-01-17 2013-10-15 GM Global Technology Operations LLC Co-operative on-board and off-board component and system diagnosis and prognosis
US8825567B2 (en) * 2012-02-08 2014-09-02 General Electric Company Fault prediction of monitored assets
US9536361B2 (en) 2012-03-14 2017-01-03 Autoconnect Holdings Llc Universal vehicle notification system
US8626385B2 (en) 2012-03-15 2014-01-07 Caterpillar Inc. Systems and methods for analyzing machine performance
KR101728597B1 (en) * 2012-04-19 2017-04-19 에프. 호프만-라 로슈 아게 Method and device for determining an analyte concentration in blood
US9051945B2 (en) 2012-04-30 2015-06-09 Caterpillar Inc. System and method for identifying impending hydraulic pump failure
US8850000B2 (en) 2012-05-08 2014-09-30 Electro-Motive Diesel, Inc. Trigger-based data collection system
US9063856B2 (en) 2012-05-09 2015-06-23 Infosys Limited Method and system for detecting symptoms and determining an optimal remedy pattern for a faulty device
EP2850550B1 (en) * 2012-05-18 2018-08-01 Koninklijke Philips N.V. Method of rendering hemodynamic instability index indicator information
US20130325502A1 (en) 2012-06-05 2013-12-05 Ari Robicsek System and method for providing syndrome-specific, weighted-incidence treatment regimen recommendations
US9234750B2 (en) 2012-07-30 2016-01-12 Caterpillar Inc. System and method for operating a machine
US20140060030A1 (en) 2012-08-31 2014-03-06 Caterpillar Inc. Hydraulic accumulator health monitor
US9960929B2 (en) 2012-09-21 2018-05-01 Google Llc Environmental sensing with a doorbell at a smart-home
EP2898438A4 (en) 2012-09-24 2016-05-04 Caterpillar Inc Mining operation control and review
US20150205657A1 (en) * 2012-09-28 2015-07-23 Longsand Limited Predicting failure of a storage device
JPWO2014054274A1 (en) * 2012-10-02 2016-08-25 パナソニックIpマネジメント株式会社 Monitoring device and monitoring method
WO2014054051A1 (en) 2012-10-03 2014-04-10 Forbes Marshall Pvt. Ltd. Health monitoring system for a process plant and a method thereof
US9176183B2 (en) 2012-10-15 2015-11-03 GlobalFoundries, Inc. Method and system for wafer quality predictive modeling based on multi-source information with heterogeneous relatedness
US9613413B2 (en) 2012-10-17 2017-04-04 Caterpillar Inc. Methods and systems for determining part wear based on digital image of part
US9139188B2 (en) 2012-11-01 2015-09-22 Caterpillar Inc. Prediction control strategy for hybrid machinery
US9647906B2 (en) * 2012-11-02 2017-05-09 Rockwell Automation Technologies, Inc. Cloud based drive monitoring solution
EP2920658B1 (en) 2012-11-19 2019-03-27 Siemens Corporation Resilient optimization and control for distributed systems
US20140170617A1 (en) 2012-12-19 2014-06-19 Caterpillar Inc. Monitoring System for a Machine
US9151681B2 (en) 2012-12-19 2015-10-06 Progress Rail Services Corporation Temperature detector having different types of independent sensors
US20140184643A1 (en) 2012-12-27 2014-07-03 Caterpillar Inc. Augmented Reality Worksite
US20140188778A1 (en) 2012-12-27 2014-07-03 General Electric Company Computer-Implemented System for Detecting Anomaly Conditions in a Fleet of Assets and Method of Using the Same
US8918246B2 (en) 2012-12-27 2014-12-23 Caterpillar Inc. Augmented reality implement control
US9217999B2 (en) 2013-01-22 2015-12-22 General Electric Company Systems and methods for analyzing data in a non-destructive testing system
US10001518B2 (en) 2013-02-04 2018-06-19 Abb Schweiz Ag System and method for power transmission and distribution asset condition prediction and diagnosis
CN104021264B (en) * 2013-02-28 2017-06-20 华为技术有限公司 A kind of failure prediction method and device
US10909137B2 (en) * 2014-10-06 2021-02-02 Fisher-Rosemount Systems, Inc. Streaming data for analytics in process control systems
CA2896470C (en) 2013-03-13 2020-09-22 Rolls-Royce North American Technologies, Inc. Engine health monitoring and power allocation control for a turbine engine using electric generators
US9262255B2 (en) * 2013-03-14 2016-02-16 International Business Machines Corporation Multi-stage failure analysis and prediction
US8937619B2 (en) 2013-03-15 2015-01-20 Palantir Technologies Inc. Generating an object time series from data objects
WO2014145977A1 (en) 2013-03-15 2014-09-18 Bates Alexander B System and methods for automated plant asset failure detection
US8909656B2 (en) 2013-03-15 2014-12-09 Palantir Technologies Inc. Filter chains with associated multipath views for exploring large data sets
US8917274B2 (en) 2013-03-15 2014-12-23 Palantir Technologies Inc. Event matrix based on integrated data
CA2908825C (en) 2013-04-08 2021-06-08 Reciprocating Network Solutions, Llc Reciprocating machinery monitoring system and method
JP5768834B2 (en) 2013-04-12 2015-08-26 横河電機株式会社 Plant model management apparatus and method
US20140330747A1 (en) 2013-05-01 2014-11-06 International Business Machines Corporation Asset lifecycle management
US20140330609A1 (en) 2013-05-01 2014-11-06 International Business Machines Corporation Performance Driven Municipal Asset Needs and Sustainability Analysis
US8799799B1 (en) 2013-05-07 2014-08-05 Palantir Technologies Inc. Interactive geospatial map
US9438648B2 (en) * 2013-05-09 2016-09-06 Rockwell Automation Technologies, Inc. Industrial data analytics in a cloud platform
US9665843B2 (en) 2013-06-03 2017-05-30 Abb Schweiz Ag Industrial asset health profile
WO2014197497A2 (en) 2013-06-03 2014-12-11 The Morey Corporation Geospatial asset tracking systems, methods and apparatus for acquiring, manipulating and presenting telematic metadata
US10534361B2 (en) * 2013-06-10 2020-01-14 Abb Schweiz Ag Industrial asset health model update
US11055450B2 (en) * 2013-06-10 2021-07-06 Abb Power Grids Switzerland Ag Industrial asset health model update
US8886601B1 (en) 2013-06-20 2014-11-11 Palantir Technologies, Inc. System and method for incrementally replicating investigative analysis data
AU2014302024A1 (en) 2013-06-26 2016-02-11 Climate Risk Pty Ltd Computer implemented frameworks and methodologies for enabling climate change related risk analysis
US10018997B2 (en) 2013-06-28 2018-07-10 Fisher-Rosemount Systems, Inc. Non-intrusive data analytics in a process control system
US8713467B1 (en) 2013-08-09 2014-04-29 Palantir Technologies, Inc. Context-sensitive views
US9319905B2 (en) * 2013-08-30 2016-04-19 Google Inc. Re-tasking balloons in a balloon network based on expected failure modes of balloons
US9535774B2 (en) * 2013-09-09 2017-01-03 International Business Machines Corporation Methods, apparatus and system for notification of predictable memory failure
US8689108B1 (en) 2013-09-24 2014-04-01 Palantir Technologies, Inc. Presentation and analysis of user interaction data
US8938686B1 (en) 2013-10-03 2015-01-20 Palantir Technologies Inc. Systems and methods for analyzing performance of an entity
US8812960B1 (en) 2013-10-07 2014-08-19 Palantir Technologies Inc. Cohort-based presentation of user interaction data
US8786605B1 (en) 2013-10-24 2014-07-22 Palantir Technologies Inc. Systems and methods for distance and congestion-aware resource deployment
US9355010B2 (en) * 2013-10-29 2016-05-31 Seagate Technology Llc Deriving an operational state of a data center using a predictive computer analysis model
JP5530020B1 (en) * 2013-11-01 2014-06-25 株式会社日立パワーソリューションズ Abnormality diagnosis system and abnormality diagnosis method
US8832594B1 (en) 2013-11-04 2014-09-09 Palantir Technologies Inc. Space-optimized display of multi-column tables with selective text truncation based on a combined text width
US8868537B1 (en) 2013-11-11 2014-10-21 Palantir Technologies, Inc. Simple web search
US9753796B2 (en) * 2013-12-06 2017-09-05 Lookout, Inc. Distributed monitoring, evaluation, and response for multiple devices
US20150184549A1 (en) * 2013-12-31 2015-07-02 General Electric Company Methods and systems for enhancing control of power plant generating units
US9774522B2 (en) * 2014-01-06 2017-09-26 Cisco Technology, Inc. Triggering reroutes using early learning machine-based prediction of failures
WO2015112892A1 (en) 2014-01-24 2015-07-30 Telvent Usa Llc Utility resource asset management system
JP6459180B2 (en) * 2014-02-10 2019-01-30 富士ゼロックス株式会社 Failure prediction system, failure prediction device, job execution device, and program
WO2015130645A1 (en) 2014-02-27 2015-09-03 Intel Corporation Workload optimization, scheduling, and placement for rack-scale architecture computing systems
US10410116B2 (en) 2014-03-11 2019-09-10 SparkCognition, Inc. System and method for calculating remaining useful time of objects
US8935201B1 (en) 2014-03-18 2015-01-13 Palantir Technologies Inc. Determining and extracting changed data from a data source
US10521747B2 (en) 2014-04-08 2019-12-31 Northrop Grumman Systems Corporation System and method for providing a scalable semantic mechanism for policy-driven assessment and effective action taking on dynamically changing data
US9857238B2 (en) 2014-04-18 2018-01-02 Google Inc. Thermodynamic model generation and implementation using observed HVAC and/or enclosure characteristics
US20160028605A1 (en) 2014-05-30 2016-01-28 Reylabs Inc. Systems and methods involving mobile linear asset efficiency, exploration, monitoring and/or display aspects
US9734693B2 (en) 2014-07-09 2017-08-15 Mckinley Equipment Corporation Remote equipment monitoring and notification using a server system
US9733629B2 (en) 2014-07-21 2017-08-15 Honeywell International Inc. Cascaded model predictive control (MPC) approach for plantwide control and optimization
US20160028648A1 (en) 2014-07-25 2016-01-28 At&T Intellectual Property I, L.P. Resource Management Service
US9348710B2 (en) * 2014-07-29 2016-05-24 Saudi Arabian Oil Company Proactive failure recovery model for distributed computing using a checkpoint frequency determined by a MTBF threshold
CN104398431B (en) 2014-11-21 2017-03-29 贵州神奇药物研究院 It is a kind of to treat Chinese medicine extract product of chloasma and preparation method thereof
EP3026510B1 (en) 2014-11-26 2022-08-17 General Electric Company Methods and systems for enhancing control of power plant generating units
US10176032B2 (en) * 2014-12-01 2019-01-08 Uptake Technologies, Inc. Subsystem health score
US9960598B2 (en) 2015-03-03 2018-05-01 General Electric Company Methods and systems for enhancing control of power plant generating units
JP6339951B2 (en) * 2015-03-04 2018-06-06 株式会社日立製作所 Data collection system, data collection method, server, and gateway
KR20180006893A (en) 2015-05-15 2018-01-19 파커-한니핀 코포레이션 Integrated asset integrity management system
US10197631B2 (en) 2015-06-01 2019-02-05 Verizon Patent And Licensing Inc. Systems and methods for determining vehicle battery health
US10579750B2 (en) * 2015-06-05 2020-03-03 Uptake Technologies, Inc. Dynamic execution of predictive models
US10254751B2 (en) * 2015-06-05 2019-04-09 Uptake Technologies, Inc. Local analytics at an asset
US10007710B2 (en) * 2015-09-21 2018-06-26 Splunk Inc. Adaptive control of data collection requests sent to external data sources
US10489752B2 (en) 2016-08-26 2019-11-26 General Electric Company Failure mode ranking in an asset management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140286301A1 (en) * 2003-07-17 2014-09-25 Sensicast Systems Method and apparatus for wireless communication in a mesh network using frequency schedule
US20140098658A1 (en) * 2006-01-31 2014-04-10 Sigma Designs, Inc. Node repair in a mesh network
US20090146839A1 (en) * 2006-05-17 2009-06-11 Tanla Solutions Limited Automated meter reading system and method thereof
JP2013239827A (en) * 2012-05-14 2013-11-28 Secom Co Ltd Communication failure support system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
P. BROWN: "Standard Based Integration Specification: Common Information Model Framework for Asset Health Data Exchange", 16 December 2014 (2014-12-16), XP055371098, Retrieved from the Internet <URL:https://www.epri.com/abstracts/pages/productabstract.aspx?ProductId=000000003002002586> *
See also references of EP3350978A4 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020073361A (en) * 2018-08-07 2020-05-14 ザ・ボーイング・カンパニーThe Boeing Company Methods and systems for identifying associated events in aircraft
JP7256092B2 (en) 2018-08-07 2023-04-11 ザ・ボーイング・カンパニー Method and apparatus for identifying correlated events in an aircraft

Also Published As

Publication number Publication date
JP2018500710A (en) 2018-01-11
US10261850B2 (en) 2019-04-16
US11144378B2 (en) 2021-10-12
US20160155315A1 (en) 2016-06-02
EP3350978A4 (en) 2019-02-20
KR20170117377A (en) 2017-10-23
CN107408225B (en) 2020-01-07
US20160371599A1 (en) 2016-12-22
HK1244938A1 (en) 2018-08-17
SG11201804807VA (en) 2018-07-30
CA2998345A1 (en) 2017-03-23
US20190087256A1 (en) 2019-03-21
US20160379465A1 (en) 2016-12-29
CA3111567A1 (en) 2020-03-12
AU2015355154A1 (en) 2017-07-20
CA2969452A1 (en) 2016-06-09
CA3007466A1 (en) 2017-06-15
CN107408225A (en) 2017-11-28
US9910751B2 (en) 2018-03-06
US10417076B2 (en) 2019-09-17
WO2017100245A1 (en) 2017-06-15
KR20170118039A (en) 2017-10-24
JP2018536941A (en) 2018-12-13
AU2016368298A1 (en) 2018-07-19
US20170161621A1 (en) 2017-06-08
SG11201708094XA (en) 2017-11-29
EP3227852A1 (en) 2017-10-11
US10754721B2 (en) 2020-08-25
SG11201708095WA (en) 2017-11-29
EP3227852A4 (en) 2018-05-23
JP6652247B2 (en) 2020-02-19
US10545845B1 (en) 2020-01-28
EP3227784A4 (en) 2018-04-25
US20160154690A1 (en) 2016-06-02
HK1244937A1 (en) 2018-08-17
US10025653B2 (en) 2018-07-17
US20170161659A1 (en) 2017-06-08
CA2969455A1 (en) 2016-06-09
US20200278273A9 (en) 2020-09-03
US20160371616A1 (en) 2016-12-22
US20160155098A1 (en) 2016-06-02
CA2969455C (en) 2023-06-27
WO2016089794A1 (en) 2016-06-09
JP2018500709A (en) 2018-01-11
US20160153806A1 (en) 2016-06-02
US20170161130A1 (en) 2017-06-08
US9471452B2 (en) 2016-10-18
EP3387531A4 (en) 2019-04-24
EP3350978A1 (en) 2018-07-25
HK1255721A1 (en) 2019-08-23
JP2018528693A (en) 2018-09-27
EP3387531A1 (en) 2018-10-17
US10176032B2 (en) 2019-01-08
EP3227784A1 (en) 2017-10-11
CN107408226A (en) 2017-11-28
AU2015355156A1 (en) 2017-07-20
AU2016322513A1 (en) 2018-04-12
KR20180082606A (en) 2018-07-18
WO2016089792A1 (en) 2016-06-09
US9864665B2 (en) 2018-01-09
US9842034B2 (en) 2017-12-12
US20190003929A1 (en) 2019-01-03
US20160378585A1 (en) 2016-12-29
US20170075778A1 (en) 2017-03-16

Similar Documents

Publication Publication Date Title
US10545845B1 (en) Mesh network routing based on availability of assets
US10579750B2 (en) Dynamic execution of predictive models
US11036902B2 (en) Dynamic execution of predictive models and workflows
US10878385B2 (en) Computer system and method for distributing execution of a predictive model
US10254751B2 (en) Local analytics at an asset
EP3427200B1 (en) Handling of predictive models based on asset location
EP3497569A1 (en) Computer architecture and method for recommending asset repairs
EP3311345A1 (en) Local analytics at an asset
KR20180042444A (en) Mesh network routing based on availability of assets

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16847112

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2018511273

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 11201801651V

Country of ref document: SG

ENP Entry into the national phase

Ref document number: 2998345

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2016322513

Country of ref document: AU

Date of ref document: 20160912

Kind code of ref document: A

Ref document number: 20187010351

Country of ref document: KR

Kind code of ref document: A