WO2011060493A1 - External casing packer - Google Patents
External casing packer Download PDFInfo
- Publication number
- WO2011060493A1 WO2011060493A1 PCT/AU2010/001548 AU2010001548W WO2011060493A1 WO 2011060493 A1 WO2011060493 A1 WO 2011060493A1 AU 2010001548 W AU2010001548 W AU 2010001548W WO 2011060493 A1 WO2011060493 A1 WO 2011060493A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- grout
- casing
- sleeve
- packer
- valve
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/127—Packers; Plugs with inflatable sleeve
Definitions
- the present invention relates in general to the field of completing hydrocarbon or water wells, and more particularly to methods and apparatus for manufacturing inflatable packers, and sealing the base of a casing by cement grouting the annulus above the packer, while not damaging the underlying borehole with grout.
- the conventional process to install a casing in a borehole is to first drill a borehole, install a casing therein, and cement the casing in place.
- the borehole can then be extended beyond the bottom of the casing by drilling a smaller size hole, which usually occurs in the production zone.
- the cementing process usually involves pumping cement through the casing and out of the bottom thereof, and up into the annulus between the casing and the borehole.
- the cement is displaced downwardly and out of the casing by pumping a drilling fluid or water into the top of the casing.
- a cement displacement plug is normally used to separate the water from the cement in the casing.
- a float shoe (one way valve) is attached to the bottom of the casing so as to avoid the need to hold pressure within the casing while the cement in the annulus sets.
- An alternative process is to drill the borehole to final gauge and depth, and then run the casing with an external packer attached in the casing string or to the end thereof into the borehole. A port at the base of the external casing packer is closed and the casing is pressurised to set the packer. Cementing ports are then opened above the packer, cement is pumped through the casing ports and into the annulus to cement the casing in place. At the end of the cementing process a displacement plug is run down the casing and the cement is displaced out of the casing and into the annulus. The cementing ports are then closed.
- the casing is then free of cement and the annulus is cemented within the borehole.
- the normal process is then to run a drill string and drill bit back into the casing to drill out any cement remaining in the packer, drill out the cement displacement plug and the bottom port to clean out the borehole below the packer.
- the bottom port is usually blocked by a ball dropped into the casing.
- the cementing ports are actuated by either rotating, raising or lowering the casing or by dropping balls or darts of different sizes into the casing to move sliding annular seals.
- the external casing packer according to the various embodiments described herein is referred to at times as '"ECP."
- the operation of the ECP is however simpler than existing packer systems.
- the manufacture is also simpler and more cost effective than other packer devices currently available.
- the external casing packer according to the invention, is attached to the outer cylindrical surface of the casing, with the casing extending above and in some cases below the ECP.
- a non-return valve is fitted in the base of the ECP, which permits fluid to enter the casing from the borehole during lowering of the casing into the borehole, but prevents the reverse flow of liquids from the casing down into the borehole.
- the non-return valve is a port formed or installed in the base of the ECP, and is sealed by a ball that is dropped into the casing from surface.
- the ball seats in the port in a conventional manner in the base of the ECP.
- Alternative non-return valve arrangements may be used, such as a wire line retrievable plug, or a one-way valve such as a float shoe.
- the casing is pressurised to inflate an elastomeric sleeve of the ECP.
- the inflation of the sleeve is achieved by use of a non-return inflation valve system located between the casing and the ECP sleeve.
- a non-return inflation valve system located between the casing and the ECP sleeve.
- an elastomeric sleeve of the ECP inflates to expand and engage the annular wall of the borehole.
- frangible grout valves constructed within the mandrel of the ECP are actuated to open and to subsequently allow a cement grout mixture to be pumped through the grout valves to the portion of the annulus located above the ECP.
- the grout valves are constructed to function as a combination of a burst or shear disk, and a non-return check valve.
- the preset pressure to which the casing is pressurised is relative to the point at which the frangible grout valve discs break, and to the desired pressure to be maintained in the elastomeric sleeve.
- the inflation valve is closed and the grout valve of the ECP is activated and opened, whereupon a cement grout mixture is pumped down through the casing.
- the cement grout mixture flows down the casing and pushes the grout valves open.
- the cement grout then flows through the grout valves and into the annulus between the casing and the wall of the borehole, in the annulus area above the ECP.
- a cement displacement plug is introduced into the top of the casing.
- a liquid is then pumped down the casing to force the displacement plug downwards to the ECP. This is continued until the displacement plug reaches a location just beyond the grout valves, whereupon further downward movement of the displacement plug is halted, because a hydraulic lock forms between the cement displacement plug and the closed non-return valve in the base of the ECP.
- the grout valves are one-way check valve devices which prevent the backflow of cement grout from the annulus back into the casing.
- the grout valves also permit breaks or interruptions in the cement grout pumping process without the backflow of the grout from the annulus back into the casing.
- a drill string can be run into the casing to drill out the cement displacement plug and the bottom non-return valve arrangement, along with any residual cement grout which has hardened in the drill path,
- Various features of the invention include the grout valves, the inflation valves and the manufacture process which can be incorporated into a single elastomer layer bonding operation.
- the one-way grout valves each comprise a chamfered valve member which is preferably a seal disc that scats in a chamfered port formed in the ECP mandrel above the packer sleeve.
- the valve or seal members are attached to respective burst or shear discs.
- the discs are preferably constructed of a frangible material having a well defined shear failure stress such as some plastics, metals or ceramics.
- the chamfered valve member is attached to an elastomeric grout valve sleeve which surrounds the mandrel. In the absence of pressure in the casing, the elastomeric nature of the grout valve sleeve retains the chamfered valve member and ensures a seal with the chamfered seat of the mandrel on closure.
- the elastomeric grout valve sleeve is bonded to the top of the chamfered valve member aad forms part of the inflatable ECP sleeve situated around the mandrel.
- the inflation valve comprises a flap of an elastomeric material situated on the inflatable elastomeric sleeve side of the mandrel.
- the inflation valves each co ver a small port formed in the mandrel. Fluid can therefore flow through the inflation ports in one direction and displace the flap outwardly to inflate the elastomeric sleeve of the ECP.
- the inflation ports are closed by the respective flaps, which prevents the packer sleeve from deflating.
- the inflation flap preferably comprises part of the ECP sleeve construction to simplify the manufacturing process.
- the inflation valves and the grout valves are both operated in a sequence during the process of inflating the elastomeric sleeve to set the packer and casing in the borehole.
- the inflated sleeve provides an obstruction in the borehole annulus so that the annulus area above the obstructing sleeve can be filled with a cement grout -Mixture.
- the casing and ECP attached thereto arc lowered at the desired location in the borehole.
- the open one-way valve in the bottom of the ECP allows air and any liquid in the lower part of the borehole to equilise during lowering of the casing and ECP therein, as the ball has not been dropped down the casing.
- a ball is then dropped down the casing to scat with the one-way valve in the bottom of the ECP, thereby plugging said valve.
- the casing is then pressurised with a liquid to inflate the elastomeric sleeve via the inflation valves.
- the pressure of the inflation liquid increases, whereupon the shear point of the grout valves is reached and such valves arc actuated and opened.
- the inflation valves automatically close due to the reverse differential pressure across the inflation valves.
- the closed inflation valves leave the sleeve pressurised and compressed against die wall of the borehole.
- the cement grout mixture can then be pumped down the casing and out of the opened grout valves into the annulus area above the inflated sleeve.
- the sealing system between the packer sleeve and mandrel comprises the packer sleeve being bonded directly to the packer mandrel at one end of the mandrel. At the other end of the packer there is a seal which moves axially along the outer surface of the mandrel and accommodates shortening of the packer sleeve as it expands radially outwardly during inflation. In most packers this takes the form of a sliding elastomeric hydraulic seal between the sleeve and the mandrel, Such a hydraulic seal requires a substantial housing to contain it.
- the sliding hydraulic seal is replaced by a sealing sleeve of elastomer that is bonded at one end to the packer sleeve at a position below a packer retaining ring, and to the packer mandrel at the other end.
- a sealing sleeve of elastomer that is bonded at one end to the packer sleeve at a position below a packer retaining ring, and to the packer mandrel at the other end.
- the packer sealing sleeve is reinforced by an open mesh interlayer which is placed on the bias to the packer axis to permit longitudinal changes in sealing sleeve dimension, and to reinforce the elastomeric sleeve against tears by preventing excessive local strain.
- the bonded sleeve system is used to transfer load between the packer sleeve reinforcement and the packer retaining ring.
- the reinforcing carries tensile load.
- the tensile load is retained against expansion by the packer retaining ring.
- the loading force on the packer retaining ring comprises the component perpendicular to the retaining ring which is restrained by the packer retaining ring operating as hoop reinforcement.
- the retaining ring tends to be pushed over the packer sleeve reinforcement contained in the elastomeric sleeve.
- a stiff or rigid sleeve which is in contact with the packer retaining ring
- the elastomeric sleeve which is in turn bonded to the reinforcing
- shear is transferred between the packer retaining ring and the reinforcement via the rigid sleeve and the elastomer.
- the rigid sleeve may advantageously be made in a longitudinally split form to permit the easy assembly and bonding to the underlying elastomer while relieving the manufacture of close tolerance issues.
- the sleeve system is therefore of low cost to fabricate and rapidly incorporated into the packer construction.
- the overall design of the packer can therefore include one or more features which are easily incorporated into the manufacture of a packer by layers of elastomer to be cured and bonded, or specifically not bonded together, according to the design.
- the elastomer may be derived from natural or synthetic sources, and is usually bonded together in a process involving pressure and heat. This is known for natural rubber systems as the process of vulcanisation. It is thus possible to achieve very strong bonding between layers of elastomer and between the elastomer and the mandrel (especially to steel) by the use of the correct surface preparation of the metal.
- a method of cement grouting a borehole using an inflatable packer system includes placing a casing with an external casing packer attached thereto at a location in a borehole for cement grouting a portion of the borehole annulus that is located above the externa) casing packer. Also included is the inflation of an inflatable elastomeric sleeve of the external casing packer to block the annulus of the borehole by pressurising the casing with an inflation fluid, which opens a one-way inflation valve in the external casing packer and inflates the inflatable sleeve to a preset pressure.
- the preset pressure is determined by a pressure relief valve located between the external casing packer and the annulus which opens at the preset pressure and then becomes a one-way grout valve.
- a liquefied cement grout mixture is pumped down through the casing via the open one-way grout valve which is located in the external casing packer above a portion of the inflated inflatable sleeve.
- the grout valve is biased to a closed position using an elastomeric member attached to the packer, whereby when the pressure of the cement grout mixture is reduced in the casing, the elastomeric member causes the grout valve to close and prevent backflow of the cement grout mixture from the annulus back into the casing!
- a method of setting an external casing packer in an annulus of a borehole to fix a casing therein includes sealing a base of the packer, and pressurising the packer to inflate an inflatable elastomeric sleeve surrounding a portion of a packer mandrel by passing a pressurised fluid through a one : way inflation valve into the inflatable sleeve.
- the inflation pressure of the inflatable sleeve is limited by using a pressure relief valve in the packer which relieves the pressure in the packer to the outside of the casing when a design differential pressure is reached.
- the pressure relief valve is used as a one-way valve to permit a grout material to flow therethrough to the annulus of the borehole.
- the pressure relief valve is closed to prevent a backflow of the grout material from the annulus back into the packer.
- a method of cement grouting a borehole using an inflatable packer system includes lowering into a borehole a casing with the inflatable packer system attached thereto.
- the casing is pressurised with a fluid so that the pressurised fluid enters one or more one-way inflation valves in the packer system to inflate a sleeve and obstruct an annulus of the borehole.
- the pressure of the fluid in the casing is increased until one or more one-way frangible grout valves rupture to allow the pressurised fluid to enter the borehole annulus above the packer system, whereby the pressure of the casing drops and the one-way inflation valves close and maintain the sleeve inflated in the borehole annulus.
- a cement grout is pumped down the casing and through the ruptured one-way grout valves and into the portion of the borehole annulus located above the packer system.
- an inflatable packer system for grouting a borehole annulus.
- the packer system includes a mandrel forming a body of the packer system, where the mandrel is adapted for attachment to a casing, and the mandrel has formed therein one or more ports for respective grout valves, and one or more ports for respective inflation valves.
- a seat is formed in a bottom part of the mandrel, where the seat is adapted to be blocked by a ball dropped down through the casing.
- An elastomeric sleeve is formed around the mandrel and around the inflation valve ports.
- An anchor seal is formed at a top portion of the elastomeric sleeve around the mandrel above the inflation valve ports and below the grout valve ports.
- a sliding seal is formed at a bottom portion of the elastomeric sleeve along the mandrel.
- One or more one- way inflation valves are provided, where each one-way inflation valve is located over one of the inflation valve ports, and each one-way inflation valve is adapted for allowing an inflation fluid to pass through the inflation valve port and into the elastomeric sleeve, but not in the reverse direction.
- Each one-way grout valve is located over one of the grout valve ports, and each one-way grout valve is adapted for allowing a cement grout to pass through the grout valve port and into the borehole annulus, but not in the reverse direction.
- Each one-way grout valve is formed with a frangible member which breaks in response to a predetermined inflation fluid pressure, whereby when the elastomeric sleeve is inflated to the predetermined fluid pressure the frangible members break to enable operation of the one-way grout valves.
- the one-way inflation valves then close to allow the elastomeric sleeve to maintain the predetermined inflation fluid pressure.
- FIG. 1A-1F schematically illustrate the sequence of steps for installing the external casing packer in a borehole
- Fig. 2 is a cross-sectional view illustrating the external casing packer according to an embodiment of the invention
- Fig. 3 is a cross-sectional view illustrating the grout valve according to an embodiment of the invention, in a closed condition
- Fig. 4 is a cross-sectional view of the grout valve of Fig. 3, but in an open condition;
- Fig. 5 illustrates in a one-quarter longitudinal section view the upper end of the packer with the inflation valve, according to an embodiment of the invention, in an open condition
- Fig. 6 illustrates In a one-quarter longitudinal section view the lower sliding end of the packer and the construction of the scaling sleeve according to an embodiinent of the invention. Detailed Description of the Invention
- Fig. 1A illustrates the external casing packer enclosing a casing 2 which has been lowered into a borehole 1.
- the portion of the casing 2 above the ECP extends to the surface, and the casing portion 3 below the ECP is optionally perforated, as shown.
- the body of the packer is constructed using a metal mandrel 5.
- the ECP includes an inflatable reinforced elastomeric sleeve 4 which encircles the mandrel 5.
- the grout valve at the upper end of the casing packer is shown as numeral 6.
- the packer seat 8 of the non-return valve is located in the lower portion of the mandrel 5, and is a cone of material, usually concrete.
- the inflation valve 7 is adapted for use in inflating the elastomeric sleeve 4 to obstruct or otherwise block the annulus of the borehole 1 ,
- Fig. IB illustrates a cementing system attached to the top end of the casing 2.
- the cementing system includes a top casing section 10 which contains a cement displacement plug 15 therein. Also included are grout and inflation valves 11 and 13 which are connected to the top casing section 10.
- a ball 16 is dropped down through the casing 2 and into contact with the valve seat 8 to seal the bottom end of the packer.
- the elastomeric sleeve 4 of the ECP is then inflated by pumping a fluid into the top section 10 of the casing 2 via port 14 and valve 13.
- Fig. 1C illustrates the elastomeric sleeve 4 of the ECP fully expanded and in contact with the wall of the borehole I.
- Fig. ID illustrates the process of pumping the cement grout 17 into the casing top section 10 via port 14 of grout valve 13.
- the cement grout 17 passes down through the casing 2 and out of the opened grout valve 6 to fill that part of the annulus above the packer and between the casing 2 and the borehole 1.
- the cement grout 17 also flows down through the mandrel 5 of the ECP, to the ball 16 and closed valve seat 8.
- View IE shows a fluid being pumped into port 12 through inflation valve 1 1 while grout valve 13 is closed. This fluid pushes the cement displacement plug 15 down into the casing 2 and into the top of the mandrel 5 until the cement displacement plug 15 forms a seal below the grout valve 6. At this point, a hydraulic lock forms between the cement displacement plug 15 and the ball 16 in the valve seat 8.
- Fig. IF illustrates the use of a conventional drill bit 19 attached to the end of a drill string 18 to drill out the cement grout displacement plug 15 (shown already drilled out), as well as drill out the cement grout 17 within the remainder of the casing 2, the mandrel 5, and the ball 16 and valve seat 8.
- the production zone below the packer is coupled to the casing 2 above the packer.
- Fig. 2 illustrates the structural details of the ECP.
- the ECP comprises a mandrel 5 partially covered or encircled with a reinforced elastomcric sleeve 4.
- the sleeve 4 is constructed of various layers of material to cany out the functions described herein.
- the elastomeric sleeve 4 is multilayered and would normally be constructed of a natural or synthetic rubber.
- the sleeve 4 is bonded to the mandrel 5 at the top of the packer beneath outer rigid sleeve layer 23, but is not bonded to the mandrel 5 over the remainder of sleeve 4 length.
- the packer retaining rings 20 and 21 are manufactured from high tensile steel and are bonded to the elastomeric sleeve 4, and restrained by upper and lower rigid outer sleeves 22 and 23 which are also bonded to the sleeve 4.
- the rigid outer sleeves 22 and 23 can be constructed of a rigid material or metal, such as steel.
- the mandrel 5 is shown with threaded connections at the top 26 and bottom 27 to permit attachment to casing sections located above and below the packer.
- the lower end of the mandrel 5 contains a cone-shaped valve scat 8 which forms a non-return valve when the ball 16 is dropped down the casing 2 and rests on the conical-shaped seal 8.
- the cone- shaped element 8 can be cast in concrete or other suitable materials to lower manufacture cost.
- the non-return inflation valve 7 and the grout valves 6 described above are also illustrated.
- the grout valves 6 described in more detail below are covered by an elastomeric grout valve sleeve 25.
- Fig. 3 illustrates the details of the grout valve 6 in a closed position.
- the grout valve 6 is constructed with a chamfered port 30 formed in the sidewall of the mandrel 5. Seated in the port 30 is a chamfered valve member 31 which in its preferred embodiment is made of metal and which is attached to a frangible shear disc 32.
- the shear disc 32 is preferably made of a material having a well-defined shear strength such as a plastic, metal or ceramic. The force exerted by the pressure of fluid in the casing during the sleeve inflating proce$$ is sufficient to fully inflate the sleeve, and shortly thereafter shear the shear disc 32.
- the shear disc 32 is connected to the valve member 31 via a fastener 33, shown as a screw.
- the elastomeric grout valve sleeve 25 encircles the mandrel 5 and is bonded to the outer surface of the grout valve member 31, but not to that part of the mandrel 5 shown to the right of the grout valve 6 in the drawing.
- the elastomeric grout valve sleeve 25 is, however, bonded to the mandrel 5 at the location to the left of the grout valve 6.
- the opening of the grout valves 6 function as a relief valve for the inflation of the elastomeric sleeve.
- the elastomeric grout valve sleeve 25 is forced to expand outwardly, as shown in Fig. 4.
- the cement grout can be pumped down the casing.
- the force of the liquefied cement grout on the grout valves 6 causes them to open and allow flow in the direction of the arrow.
- the expanded elastomeric grout valve sleeve 25 then contracts, which action returns the chamfered valve member 31 and the remaining part of the shear disc 32 back into a seated condition with the chamfered port 30 of the mandrel 5. Once the grout valve 6 returns to its seated condition due to the contraction of the elastomeric grout valve sleeve 25 around the mandrel 5, a seal is provided between the chamfered grout valve member 31 and the chamfered port 30 of the mandrel 5.
- Fig. 4 illustrates the grout valve 6 in an open position, as noted above.
- the frangible shear disc 32 is shown with its peripheral edge sheared off following its failure at the design inflation pressure of the ECP.
- the elastomeric grout valve sleeve 25 positions the chamfered valve member 31 during fluid flow, including that of cement grout, so that when the fluid flow ceases, the chamfered valve member 31 returns to the seated condition in the chamfered valve port 30.
- the registration of the grout valve member 31 and the valve port 30 is achieved by bonding the elastomeric grout valve sleeve 25 to the outer surface of the chancered valve member 31 and to the mandrel 5 at location 34.
- the elastomeric grout valve sleeve 25 can be manufactured as part of an extension of the packer sleeve, but this is not a necessity.
- Fig. 5 illustrates the upper zone of the packer sleeve 4, the inflation valve 7, the retaining ring 21 and the bonded elastomeric sleeve 4.
- the reinforced elastomeric sleeve 4 is of multi-layered construction, including an outer elastomer layer 40, a reinforcing layer 41, (depicted here as a single layer for diagrammatic convenience, but could be made of layers of steel cord or steel strips embedded in the elastomer) and an inner elastomer layer 42.
- the layered elastomeric sleeve 4 is bonded over surface area 43 to the outer cylindrical surface of the mandrel 5.
- the outer elastomer layer 40 of the reinforced sleeve 4 is bonded to the rigid outer sleeve 23.which bears against the packer retaining ring 21 at location 44.
- the retaining ring 21 has acting on it the loads from the sleeve reinforcing layer 41. This would tend to move the retaining ring 21 axially to the right in the drawing.
- the rigid outer sleeve 23 however restrains the retaining ring 21 from being moved to the right because it is bonded to the elastomer layer 40 which is in turn bonded to the reinforcing layer 41.
- the radial component of the load on the packer retaining ring 21 is contained by hoop stress within the retaining ring 21.
- the axial component of the load on the retaining ring 21 is transferred to the rigid sleeve 23 via the contact surface at location 44.
- the axial load imparted on the retaining ring 21 is transferred through shear stress in the elastomer layer 40 back to the reinforcing layer 41.
- the contact surface 44 is shown as an acute angled abutment so that the rigid sleeve 23 does not disengage under load from the packer retaining ring 21.
- the inflation valve system which permits fluid to expand the packer sleeve 4 is fitted in a concentric recess in the mandrel 5 at location 48. Although one inflation valve 7 is illustrated, it is to be understood that a number of such valves are formed around die packer mandrel 5.
- a port 47 is drilled in the mandrel 5 to provide an inflation fluid entry point. Movement of the inflation valve 7 is provided by an elastomeric annular flap 46 which is bonded over the outside surface of the mandrel 5 at location 45. The bonding of the annular end of the elastomeric annular flap 46 to the mandrel 5 is under the metal retaining ring 21 to maintain the annular edge of the flap 46 anchored to the mandrel 5. During inflation of the packer sleeve 4, the inflation fluid forces the elastomeric annular flap 46 open, as shown in the drawing.
- the grout valves When pumping the packer inflation fluid to a specified pressure, the grout valves rupture and open, whereupon the pressure in the casing drops, thereby causing the elastomeric annular flap 46 to close the respective ports 47.
- the inflation valve 7 is held in the closed state by fluid pressure contained between the packer sleeve 4 and the mandrel 5.
- the force exerted on the inside of the closed elastomeric annular flap 46 by the inflated packer sleeve 4 is greater than the fluid force exerted on the other side of the inflation flapper 46 by the cement grout forced down the casing during the grouting process. Accordingly, the cement grout does not force the flapper valve 46 open during the grouting process.
- the rigid outer sleeve 23 is advantageously made in longitudinally split form so as to facilitate assembly of the packer while minimising the need for precise tolerance in diameter between the rigid outer sleeve 23 and the elastomer layer 40.
- the rigid split sleeve 23 is clamped into place to the underlying elastomer layer 40 to permit the formation of a bond therebetween.
- Fig. 6 illustrates the structural details of the lower end of the packer sleeve 4 as shortened during inflation.
- the lower end of the packer sleeve 4 includes the sliding seal 55, the retaining ring 20 and the outer sleeve layer 40.
- the arrangement of the packer sleeve 4 at the lower end thereof includes the inner elastomer layer 42, the reinforcing layer 41, the outer elastomer layer 40, the retaining ring 20, and the rigid outer sleeve 22, all of which are similar in construction to that described above in connection with the upper end of the packer in Fig. 5.
- the major difference is that the inner elastomer layer 42 is manufactured so that it can slide over the mandrel 5 in an axial direction at surface area 53 as the packer sleeve 4 shortens during inflation.
- the packer disclosed herein utilises an annular sleeve seal 55 made of an elastomer which is preferably of a similar elastomer construction as the sleeve 4.
- the annular sleeve seal 55 is contained in an annular external groove 54 formed in the mandrel 5.
- the annular sleeve seal 55 is bonded to the outside of the mandrel 5 over surface area 58, and to the inside of the packer inner elastomer layer 42 over surface area 57.
- the sleeve seal 55 is otherwise not bonded, but is free to slide axially on the mandrel 5 within the external groove 54.
- the packer sleeve 4 is shown in an inflated state, engaged in contact with the borehole 1.
- the sleeve seal 55 is longitudinally compressed from its original position where it occupies the entire length of the external groove 54.
- the distance by which the sleeve seal 55 becomes compressed is shown as the dimension G.
- the sleeve seal 55 is shown in the drawing as having been manufactured with a reinforcing layer 56. This would preferably be an open weave mesh laid on the bias so that it can compress axially.
- the reinforcing mesh 56 would be bonded into the elastomer and prevent uneven strain of the sleeve seal 55, which could otherwise lead to tears within the material of the sleeve seal 55.
- the sleeve seal 55 is held against the mandrel 5 within groove 54 by fluid pressure in the expanded sleeve 4 and is prevented from being torn from the inner elastomer 42 of the sleeve 4 by the tight annular restraint of the packer retaining ring 20. While the preferred and other embodiments of the invention have been disclosed with reference to a specific external casing packer, and associated methods of use and manufacture thereof, it is to be understood that many changes in detail may be made as a matter of engineering choices without departing from the spirit and scope of the invention, as defined by the appended claims.
Abstract
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201080052564XA CN102741497A (en) | 2009-11-19 | 2010-11-19 | External casing packer |
CA2781001A CA2781001A1 (en) | 2009-11-19 | 2010-11-19 | External casing packer |
US13/510,307 US20120227969A1 (en) | 2009-11-19 | 2010-11-19 | External Casing Packer |
AU2010321679A AU2010321679A1 (en) | 2009-11-19 | 2010-11-19 | External casing packer |
ZA2012/03565A ZA201203565B (en) | 2009-11-19 | 2012-05-16 | External casing packer |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2009905660A AU2009905660A0 (en) | 2009-11-19 | Inflatable Packer End Details | |
AU2009905659 | 2009-11-19 | ||
AU2009905659A AU2009905659A0 (en) | 2009-11-19 | An External Casing Packer | |
AU2009905660 | 2009-11-19 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011060493A1 true WO2011060493A1 (en) | 2011-05-26 |
Family
ID=44059114
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AU2010/001550 WO2011060495A1 (en) | 2009-11-19 | 2010-11-19 | Sliding seal for an inflatable packer |
PCT/AU2010/001548 WO2011060493A1 (en) | 2009-11-19 | 2010-11-19 | External casing packer |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AU2010/001550 WO2011060495A1 (en) | 2009-11-19 | 2010-11-19 | Sliding seal for an inflatable packer |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN102741497A (en) |
AU (1) | AU2010321679A1 (en) |
CA (1) | CA2781001A1 (en) |
WO (2) | WO2011060495A1 (en) |
ZA (1) | ZA201203565B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103742104A (en) * | 2014-01-06 | 2014-04-23 | 淮南宏昌科技有限责任公司 | Hole packer |
WO2014205424A3 (en) * | 2013-06-21 | 2015-04-23 | Tam International, Inc. | Hydraulic anchor for downhole packer |
GB2538530A (en) * | 2015-05-20 | 2016-11-23 | Statoil Petroleum As | Method and apparatus for sealing an annulus around a drill-pipe when drilling down-hole |
CN114737913A (en) * | 2022-04-18 | 2022-07-12 | 中煤科工集团西安研究院有限公司 | Underground coal mine long drill hole internal local grouting reinforcement system and grouting method |
US11634964B2 (en) | 2019-07-16 | 2023-04-25 | Halliburton Energy Services, Inc. | Swellable rubber element that also creates a cup packer |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10060198B2 (en) | 2014-03-18 | 2018-08-28 | Baker Hughes, A Ge Company, Llc | Isolation packer with automatically closing alternate path passages |
US9637999B2 (en) * | 2014-03-18 | 2017-05-02 | Baker Hughes Incorporated | Isolation packer with automatically closing alternate path passages |
CN106988487A (en) * | 2016-01-20 | 2017-07-28 | 上海标仕建筑工程材料有限公司 | Half grouting formula steel bar connector |
CN105908746B (en) * | 2016-04-20 | 2017-11-21 | 山东大学 | A kind of pile concrete drill core after-teeming sizing device and after-teeming paste-making method |
CN107654206B (en) * | 2017-09-21 | 2020-06-05 | 青岛地质工程勘察院(青岛地质勘查开发局) | Drilling water stopping device and water stopping method |
CN115030230B (en) * | 2022-08-10 | 2023-07-18 | 衡橡科技股份有限公司 | Pile-first grouting sealing packer and sealing method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB516027A (en) * | 1938-06-27 | 1939-12-20 | William Warren Triggs | An improved appliance for use in packing off, cementing, repressuring, and other operations in wells |
US5738171A (en) * | 1997-01-09 | 1998-04-14 | Halliburton Company | Well cementing inflation packer tools and methods |
AU737667B3 (en) * | 2001-02-28 | 2001-08-30 | Industrial Innovations & Concepts Pty Ltd | Packer assembly and associated downhole tool and wireline grouting system |
US20090151960A1 (en) * | 2007-12-12 | 2009-06-18 | Halliburton Energy Services, Inc. | Method and Apparatus for Sealing and Cementing a Wellbore |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2828823A (en) * | 1955-07-07 | 1958-04-01 | Exxon Research Engineering Co | Reinforced inflatable packer |
US4744421A (en) * | 1983-04-01 | 1988-05-17 | Completion Tool Company | Inflatable packer systems |
CA1289056C (en) * | 1986-08-25 | 1991-09-17 | Masx Energy Services Group, Inc. | Method and apparatus for multi-stage cementing of a well casing |
US5549159A (en) * | 1995-06-22 | 1996-08-27 | Western Atlas International, Inc. | Formation testing method and apparatus using multiple radially-segmented fluid probes |
US6854522B2 (en) * | 2002-09-23 | 2005-02-15 | Halliburton Energy Services, Inc. | Annular isolators for expandable tubulars in wellbores |
US7591321B2 (en) * | 2005-04-25 | 2009-09-22 | Schlumberger Technology Corporation | Zonal isolation tools and methods of use |
US7762325B2 (en) * | 2007-07-25 | 2010-07-27 | Schlumberger Technology Corporation | Methods and apparatus to apply axial force to a packer in a downhole tool |
-
2010
- 2010-11-19 AU AU2010321679A patent/AU2010321679A1/en not_active Abandoned
- 2010-11-19 CA CA2781001A patent/CA2781001A1/en not_active Abandoned
- 2010-11-19 CN CN201080052564XA patent/CN102741497A/en active Pending
- 2010-11-19 WO PCT/AU2010/001550 patent/WO2011060495A1/en active Application Filing
- 2010-11-19 WO PCT/AU2010/001548 patent/WO2011060493A1/en active Application Filing
-
2012
- 2012-05-16 ZA ZA2012/03565A patent/ZA201203565B/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB516027A (en) * | 1938-06-27 | 1939-12-20 | William Warren Triggs | An improved appliance for use in packing off, cementing, repressuring, and other operations in wells |
US5738171A (en) * | 1997-01-09 | 1998-04-14 | Halliburton Company | Well cementing inflation packer tools and methods |
AU737667B3 (en) * | 2001-02-28 | 2001-08-30 | Industrial Innovations & Concepts Pty Ltd | Packer assembly and associated downhole tool and wireline grouting system |
US20090151960A1 (en) * | 2007-12-12 | 2009-06-18 | Halliburton Energy Services, Inc. | Method and Apparatus for Sealing and Cementing a Wellbore |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014205424A3 (en) * | 2013-06-21 | 2015-04-23 | Tam International, Inc. | Hydraulic anchor for downhole packer |
US9482067B2 (en) | 2013-06-21 | 2016-11-01 | Tam International, Inc. | Hydraulic anchor for downhole packer |
CN103742104A (en) * | 2014-01-06 | 2014-04-23 | 淮南宏昌科技有限责任公司 | Hole packer |
CN103742104B (en) * | 2014-01-06 | 2017-01-25 | 淮南宏昌科技有限责任公司 | Hole packer |
GB2538530A (en) * | 2015-05-20 | 2016-11-23 | Statoil Petroleum As | Method and apparatus for sealing an annulus around a drill-pipe when drilling down-hole |
GB2538530B (en) * | 2015-05-20 | 2018-06-06 | Statoil Petroleum As | Method and apparatus for sealing an annulus around a drill-pipe when drilling down-hole |
US10443342B2 (en) | 2015-05-20 | 2019-10-15 | Statoil Petroleum As | Method and apparatus for sealing an annulus around a drill-pipe when drilling down-hole |
US11634964B2 (en) | 2019-07-16 | 2023-04-25 | Halliburton Energy Services, Inc. | Swellable rubber element that also creates a cup packer |
CN114737913A (en) * | 2022-04-18 | 2022-07-12 | 中煤科工集团西安研究院有限公司 | Underground coal mine long drill hole internal local grouting reinforcement system and grouting method |
CN114737913B (en) * | 2022-04-18 | 2023-10-27 | 中煤科工集团西安研究院有限公司 | Local grouting reinforcement system and grouting method in long drilling hole of underground coal mine |
Also Published As
Publication number | Publication date |
---|---|
AU2010321679A1 (en) | 2012-05-31 |
ZA201203565B (en) | 2013-01-30 |
CN102741497A (en) | 2012-10-17 |
WO2011060495A1 (en) | 2011-05-26 |
CA2781001A1 (en) | 2011-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20120227969A1 (en) | External Casing Packer | |
WO2011060493A1 (en) | External casing packer | |
US10202819B2 (en) | Annular barrier and annular barrier system | |
US6966368B2 (en) | Plug and expel flow control device | |
USRE41118E1 (en) | Annular isolators for expandable tubulars in wellbores | |
US5400855A (en) | Casing inflation packer | |
US20120018143A1 (en) | Swellable Packer Anchors | |
AU648756B2 (en) | Inflatable tool | |
US5305828A (en) | Combination packer/safety valve assembly for gas storage wells | |
CA2803714C (en) | Fracturing system | |
US20140238694A1 (en) | Support device for use in a wellbore and a method for deploying a barrier in a wellbore | |
CA2205728C (en) | Inflatable packer with port collar valving | |
US7971640B2 (en) | Method and device for setting a bottom packer | |
US20190301263A1 (en) | Improved sealing apparatus | |
US8230926B2 (en) | Multiple stage cementing tool with expandable sealing element | |
US20160356109A1 (en) | Well system with settable shoulder | |
EP1669540A1 (en) | Device for controlling fluid communication in a wellbore | |
WO2023230733A1 (en) | Downhole plug |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201080052564.X Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10830954 Country of ref document: EP Kind code of ref document: A1 |
|
DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2010321679 Country of ref document: AU |
|
ENP | Entry into the national phase |
Ref document number: 2781001 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 4283/CHENP/2012 Country of ref document: IN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13510307 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2010321679 Country of ref document: AU Date of ref document: 20101119 Kind code of ref document: A |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 10830954 Country of ref document: EP Kind code of ref document: A1 |