WO2010145071A1 - Method and apparatus for implementing lock mechanism - Google Patents

Method and apparatus for implementing lock mechanism Download PDF

Info

Publication number
WO2010145071A1
WO2010145071A1 PCT/CN2009/072285 CN2009072285W WO2010145071A1 WO 2010145071 A1 WO2010145071 A1 WO 2010145071A1 CN 2009072285 W CN2009072285 W CN 2009072285W WO 2010145071 A1 WO2010145071 A1 WO 2010145071A1
Authority
WO
WIPO (PCT)
Prior art keywords
lock
management
locked
sheep
locking
Prior art date
Application number
PCT/CN2009/072285
Other languages
French (fr)
Chinese (zh)
Inventor
樊滑翔
孟健
王丹
Original Assignee
成都市华为赛门铁克科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 成都市华为赛门铁克科技有限公司 filed Critical 成都市华为赛门铁克科技有限公司
Priority to PCT/CN2009/072285 priority Critical patent/WO2010145071A1/en
Publication of WO2010145071A1 publication Critical patent/WO2010145071A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/02Standardisation; Integration
    • H04L41/0213Standardised network management protocols, e.g. simple network management protocol [SNMP]

Definitions

  • N P mainly includes three parts: management information ( ), management information ( anage en n o a on Ba e, B) and N P.
  • a management framework B is a collection of all management images
  • N P includes the N P operation, the format of the N P information, and the in-place program and the exchange of messages.
  • support N P each contains a media agent.
  • Each agent of the agent's information, the management station N P repairs or configures the information of the agent's mercury.
  • the management station can manage operations such as execution, etc., but only the management station can manage operations at the same time, otherwise it may be.
  • the existing wood proposes the following wooden means to manage the ET operation. Each time the management station needs to manage the ET operation, it needs the first value.
  • the value of the quantity because it is the same as the value of the management station, can be managed or repaired in the same way as the management station, that is, the same management station.
  • the above method since the above method is to operate the ET, only the above methods can support the NP interface, and the above method can have the rabbit, that is, the upper method rabbit is the same as the different management stations under the interface. However, some of them are close to supporting PP Ne con, etc. Each of the other management interfaces may not be allowed to be used. Since the management station using other management can manage operations without a prior value, the management station using the NP performs the same operation as the other management interfaces. content
  • the method and device of the present invention are the same as the operation of different management interfaces of the rabbit.
  • the present method provides a method for receiving a lock of a management image and locking a message for an information parameter value.
  • the receiving management icon is locked, locked
  • the message management of the information parameter value is locked. See if it is allowed, and the management resource is locked. In this case, the management and configuration resources can be locked, and the management in each management has the same mapping. Therefore, in the case of the lock of the lock in the lock, the operation of other management icons, including the management of the management interface without other management interfaces, is rejected, so that the same management interface can be operated by the rabbit.
  • FIG. 3 is an illustration of the first device provided herein. 4 is a schematic representation of the second device provided herein.
  • the method provided by this method includes the following steps
  • S 1 receives the lock of the management icon and locks the message with the parameter value.
  • the management method locks the permission, the lock management and the message that does not exist in the lock, or the locked message is not available. For example, in the existing S P, there is no seat, and there is no locked message, such as OC. Therefore, this is to pass the existing message, but does not need to add new messages.
  • the information parameter can be pre-informed, and the message of the information parameter value can be locked, because the message usually includes the value of the information parameter.
  • the information parameter includes an information parameter indicating the locking and an information parameter represented, and the parameter can be locked. In addition, it can be included in the lock
  • Hugh in Lock Whether to allow or not to follow the method can be locked.
  • the management of the lock has management, and the locked pipe is not locked before, then the lock is allowed.
  • the lock can be locked in multiple ways, the lock result is locked, or the lock can be GET and other operations are not locked.
  • the method of the system can include the release, the rest, the lock
  • the management of the locked management and the configuration resources can be locked, and the locked management and configuration resources are enforced.
  • the management station can manage the operations in the SP message (including GET SET Ge ex GeB ko Tap Repo t, etc.) B.
  • the agent is locked in the management station.
  • the phase is then the information parameter, the phase of the phase is the parameter in B, and the parameter is given, including locking, locking, etc., to indicate that the phase is used for system.
  • the parameter force RowSa s the parameter amount represents the lock, so that RowSa s can represent the locked phase.
  • the similarity is the value assigned by the information parameter.
  • the phase of the image is the value of the amount of the quiescence relative to the parameter in the form. For example, X Jie, X 3 , "3" is Like the interface.
  • the phase can be included, and the management station can SET to operate the unlocked resources to manage and lock the configuration resources.
  • the phase can also be many, and examples can include phases indicating locking, phases represented, and the like.
  • the phase can have it or it can be locked.
  • the example of locking the solid image can be locked all management. If the management station only needs to lock part of the management, then
  • the management station can indicate that the unlocked agent that locks the solid image receives the permission, and can represent the representation of the phased image to lock the locked Lock the management and configuration resources within the solid. That is to say, if the management station locks, specifies the lock, and the agent allows the lock, it will have the power, so as not to indicate that the lock and lock management and the configuration resource are locked successfully.
  • the lock agent receives the lock of the management station, and can control whether the rule is not locked. Permitted, including whether the management station has a management image that manages the lock-in, usually only the managed management station allows lock management. It is possible to manage whether the management of the station management is locked. For example, if the management is locked before the management, the management does not allow the management station to lock. Locked management is locked only if the lock is allowed.
  • Management of the lock will be closed And the configuration resource lock, can be multi-modal, not limited.
  • the representation of the phase represented in the phase may be otherwise, the representation of the phase represented by the phase may be failed, or the similarity of the management station may be deleted.
  • the lock of the management station A will lock the management lock in the fixed position, and the management station A can manage the operation of the execution phase.
  • the management image of the lock management operation of the other management station friends using SP or the operation of the lock of the operation of the other management interface is rejected.
  • this operation includes the SET operation of SP, the ed co 69 operation of ETCO F, and the operation of other configurations (including or repair).
  • the parameters are OK.
  • S P can be in phase B, and eco can be based on its own information parameters.
  • the management station using S P can use the lock of the unmanaged image in B, and the information management parameter in eco is not locked by the management parameter in eco. That is to say, the information parameters in each can be different.
  • the management stations using different management can lock the management information according to the information parameters, and finally can achieve the same purpose for different operations of the rabbit. For example, the management station that uses the S P has already locked the management A, and this uses the eco management station.
  • the value of the information parameter is not locked to management A and is also rejected.
  • the locked message OC already exists in the existing eco.
  • the management station using eco can manage the lock directly by using the OC message, so no information parameters are needed in the eco.
  • the method provided here is the same in the case of God. For example, use SP
  • the management station is similar, the management resource of the management A and the configuration resource are locked. If the management station OC of the eco is used to lock the management A, the same is rejected.
  • S2 1 agent is pre-in the middle B to support this S P
  • the phases are included, the phases include, the effects of solids, and so on.
  • the group is in the form of a table.
  • the S202 management station needs to be managed. Before performing the operation, the management image to be locked first is determined.
  • S203 management station SET operation is not similar, so it is not locked to the agent.
  • the example of the management station may include the lock of the rest.
  • S204 The agent receives the lock, the control or other rules are not locked.
  • the agent can lock the locked management and the configuration resource can be similar to the representation of the representation, and can be similar to the phase that will be distributed in different tables (ie, B can be used differently) Unphased
  • the agent can represent the similar
  • the way the management station locks the result can be S P or , for example, the agent can lock the result to the management station, or
  • the management station locks the lock in the management, the operation of the management icons of other management stations, and the operation of the management icons of other non-SP management interfaces are rejected. Therefore, it is not possible to use the same management station under the rabbit SP interface. Operation, the operation of the rabbit can be similar to different management interfaces.
  • the existing wood has the following multiple SET operations in most cases, the SET operation of other management stations interspersed in the SET operation, or The operations that other management interfaces may have.
  • the management station A needs the S S2 SET operation, and the SET operation has the same
  • the parameter a can only be operated by the SET, that is, the management station can perform other operations, but in the operation, the SET operation of other management stations may be interspersed, that is, other SETs are interspersed in the S2. Operation, so that S2 is received the same.
  • the lock is not the SET operation, but the management and configuration resources, and can be locked for multiple management, that is, the lock management station A can lock the management to perform multiple SET operations, Operation with other management stations or other management interfaces.
  • the method provided has the following results: the management and configuration resources of the previous SET operation can be locked, and the rabbits are not in the SET operation.
  • the management station completes the SET operation, and can unlock the lock that has not been locked to the agent.
  • the rest can be similar to the SET operation.
  • the agent receives the interpretation of the management station and performs the operation of the release. Hugh's, can be the representation of the appearance of the representation, or delete all of the release.
  • the management station can be used in a multi-modal manner to explain the results, including the way of proxying or managing stations.
  • the lock cannot be long, and it is impossible for the management operation to be locked by the management station, and the management operation of other management stations is locked. That is, the lock is the same as the virtual one. In this case, the agent or some management station can be the same as the longest lock. If the management station lock has not been released, the agent can force the lock. If you release the rest, you can delete the release and you can release the results to the management station.
  • the phase can usually include a lock index, S P lock
  • S P lock sub, S P lock sub, S P lock, S P S P lock line are common to the lock.
  • the lock index, S P lock, S P lock sub, S P lock sub, S P lock target (ie, the value) can be locked by the locked management station S P S P. Yes, you can usually operate on the phase.
  • the upper phase can complete the locking of the management image, and usually the upper image is grouped.
  • the monitoring can be performed in the other phases, and the phase group will be introduced separately, and the phase in each phase of the mercury information, so the information table.
  • the information table includes, the function, the user name (the locked management station, the owner, the application program, the program, or the combination), the same, and the equivalent table. Among them, before The same, , you can put the previous information on the completion of the lock does not. Usually, only the phase information in the information table can be operated.
  • the method of the present invention provides a device, a schematic representation of the first device shown in Fig. 3, the device comprising a receiving sheep 3, a lock for receiving the management image, locking
  • Sheep 3 2 in the lock of the management image, ask whether to allow the lock of the sheep 3, and allow the kernel lock to allow, lock the management and configuration resources.
  • the management of the sheep 302 lock lock is managed, and the lock is not locked before the management, and the lock is allowed.
  • the information parameter can be the phase in advance, the message that can be used for the same, is not locked. This device is included
  • the sheep 304 is stored, and the information parameters of the force are stored in the B in advance.
  • Locking the card can lock the result of the lock, either in the main mode or in the same way as locking the lock result.
  • the management station can GET the unlocked result.
  • the device can be included
  • the illustration of the second device shown in Fig. 4 may also include a second pass 406 to lock the lock result upon receiving the lock result.
  • the receiving sheep 401, the sheep 402, and the locking sheep 403, 3 of the receiving sheep 301, the sheep 302, and the locking sheep 303 are the same.
  • the third device shown in FIG. 5 indicates that the locking sheep 5 3 may include the following sub-goat locking sub-male 5031, which will lock the management and configuration resources of the operation.
  • the first device shown in Fig. 6 indicates that the locking sheep 603 may also include the following sub-goats.
  • the second locking sub-seat 6032 which will have at least the previous operation, will have the same receiving sheep 5 1 in the 5th, and the receiving sheep 301 sheep 302 in the sheep 502, 3.
  • the receiving sheep 601 in the 6th, the receiving sheep 301 in the sheep 602, 3, and the sheep 302 are the same.
  • the device includes a lock-released sheep, a rest, a management resource that can receive the lock release lock, or a forced release. Therefore, the fifth device shown in Fig. 7 can include Following sheep
  • the first release of the sheep 707 after receiving the release lock, will release the management and configuration resources of the lock
  • the receiving sheep 701, the sheep 702, and the locking sheep 703, 3 of 7 receive the same sheep 301, sheep 302 and lock sheep 303.

Abstract

A method for implementing the Simple Network Management Protocol (SNMP) lock mechanism is provided. The method includes: receiving the lock request for the management object, and the lock request being initiated by sending the message for setting the lock information parameter value (S101); judging whether the lock request for the management object is permitted (S102); if yes, locking the management object and corresponding configuration resources (S103). Through the invention, the conflict caused by the writing operations between the different network management interfaces can be avoided.

Description

神 制的方法及裝置 木領域  God-made method and device
本 涉及 木領域, 特別是涉及 制的方法及裝置。 背景 木  This relates to the field of wood, and in particular to methods and devices. Background
目前的 管理模型有多 , 包括 羊 管理 ( p e Ne wo k anage en P o oco , N P) P P Ne con 等等。 其中, N P 管理 模型的突出特 是 羊、 于 , 因而得到了 的支持。 特別是在 n e ne 上的成功 , 使得它的重要性越未越突出, 已 力事 上的工 。 There are many current management models, including sheep management (p e Ne k k anage en P o oco , N P) P P Ne con and so on. Among them, the prominent feature of the N P management model is Yang, Yu, and thus received support. Especially the success of n e ne makes its importance less prominent and has been working hard.
N P 主要包括管理信息 ( ) 、 管理信息 ( anage en n o a on Ba e, B)和 N P 三部分。 了管理 的 般框架, B是 各 的全部 管理 象的 集合, N P 包括 N P 操作、 N P信息的格式以及 何在座用程序和 各同交換消息。 N P N P mainly includes three parts: management information ( ), management information ( anage en n o a on Ba e, B) and N P. A management framework, B is a collection of all management images, and N P includes the N P operation, the format of the N P information, and the in-place program and the exchange of messages. N P
/ 管理站模型 管理, 支持 N P的 各都包含 介代理。 此代理 汞 各的各 信息, 管理站 N P , 修 或配 置代理 汞的 各的信息。  / Management station model management, support N P each contains a media agent. Each agent of the agent's information, the management station N P , repairs or configures the information of the agent's mercury.
管理站可以 管理 執行 、 等操作,但是在同 同 只能有 介管理站 介管理 操作, 否則可能 。 是指多 管理站 同 管理 操作。 了解決 ,現有 木提出了以 下 木手段 管理 介 , 將 ET操作 。 管 理站每次需要 管理 ET操作 ,都需要首先 量的值  The management station can manage operations such as execution, etc., but only the management station can manage operations at the same time, otherwise it may be. Refers to multiple management stations and management operations. To solve the problem, the existing wood proposes the following wooden means to manage the ET operation. Each time the management station needs to manage the ET operation, it needs the first value.
量的值, 由于同 同只有 介管理站 量的值, 因此可以 在同 同只有 介管理站 相 的管理 或修 等 操作,即 兔了不同管理站 同的 。  The value of the quantity, because it is the same as the value of the management station, can be managed or repaired in the same way as the management station, that is, the same management station.
但是,本 明 在 本 的 中 , 由于上 方法是將 ET操作 , 因此, 只有 各 支持 N P接口 , 上 方法才能有 兔 的 , 即上 方法 兔同 接口下的不同管理站 同的 。 然而 中, 有些 各近同 支持 P P Ne con 等, 也就是說, 同 各近可能允許使用其他 管理接口未 各 。由于使 用其他 管理 的管理站不需先 量的值就能 管理 操作, 因此使用 N P 的管理站在 各執行 操作 其他 管理接口的操作 同不友 。 內容 However, in the present, since the above method is to operate the ET, only the above methods can support the NP interface, and the above method can have the rabbit, that is, the upper method rabbit is the same as the different management stations under the interface. However, some of them are close to supporting PP Ne con, etc. Each of the other management interfaces may not be allowed to be used. Since the management station using other management can manage operations without a prior value, the management station using the NP performs the same operation as the other management interfaces. content
本 提供 制的方法及裝置, 兔不同 管理接口的 操作 同 。  The method and device of the present invention are the same as the operation of different management interfaces of the rabbit.
上 目的, 本 提供了 制的方法, 包括 接收 管理 象的鎖定 , 鎖定 用以 信息參數 值的消息  For the above purpose, the present method provides a method for receiving a lock of a management image and locking a message for an information parameter value.
管理 象的鎖定 求是否 允許  Locking the management image
果是, 則鎖定 管理 及 的配置資源。  If it is, then the management and configuration resources are locked.
以及 制的裝置, 包括  And the device, including
接收羊 , 于接收 管理 象的鎖定 , 鎖定 用以 信息參數值的消息  Receiving the sheep, receiving the lock of the management image, and locking the message for the information parameter value
羊 , 于 管理 象的鎖定 求是否 允許  Sheep, the lock on the management image, ask whether it is allowed
鎖定羊 , 于 果核鎖定 允許,鎖定 管理 及 的配置 資源。 現有 木相比, 本 具有以下  Lock the sheep, lock the kernel, allow management, and configure resources. Compared with existing wood, this has the following
本 接收 管理 象的鎖定 , 鎖定  The receiving management icon is locked, locked
信息參數值的消息 管理 象的鎖定 求是否 允許 果 是,鎖定 管理 及 的配置資源。 即本 中可以 將管理 及 的配置資源鎖定, 而各 管理 中的管理 ,其在 的 映射都是相同的。 因此,在 足 將鎖定 固內的管理 鎖 定 ,其他 管理 象的 操作, 包括未 其他管理接口的 管理 象 的 操作 被拒絕, 因此,可以 兔不同 管理接口 同的 操作  The message management of the information parameter value is locked. See if it is allowed, and the management resource is locked. In this case, the management and configuration resources can be locked, and the management in each management has the same mapping. Therefore, in the case of the lock of the lock in the lock, the operation of other management icons, including the management of the management interface without other management interfaces, is rejected, so that the same management interface can be operated by the rabbit.
。 說明. Description
1是本 提供的方法的流程 1 is the flow of the method provided
2是本 提供的另 方法的流程 2 is the flow of another method provided by this
3是本 提供的第 裝置的示意 4是本 提供的第二裝置的示意 3 is an illustration of the first device provided herein. 4 is a schematic representation of the second device provided herein.
5是本 提供的第三裝置的示意
Figure imgf000005_0001
5 is a schematic representation of the third device provided herein
Figure imgf000005_0001
休 方式  Hugh way
本 的上 目的、特 和 更 易懂, 下面結合 和 休 方式 本 步 的說明。 The above purpose, special and easier to understand, the following is a description of this step in conjunction with the rest mode.
1, 本 提供的 制的方法包括以下步驟  1, the method provided by this method includes the following steps
S 1 接收 管理 象的鎖定 , 鎖定 用以 參數值的消息  S 1 receives the lock of the management icon and locks the message with the parameter value.
S 102 管理 象的鎖定 求是否 允許  S 102 Management Image Locking Seeking permission
S 103 果 管理 象的鎖定 允許,鎖定 管理 及 本 是在 中不存在 于 鎖定 的消息,或者 于 鎖定 的消息不可用 , 提出的 方法。 例 , 在現 有的 S P 中, 沒有座 , 其 中也就沒有 于 鎖 定 的消息, 例 OC 等, 因此, 本 就是要通 中現有 的消息 未 , 而不需要增 新的消息 。 例 , 可以預先 信息參數, 然 信息參數值的消息, 可以 鎖定 , 因 中通常都包括 信息參數的值的消息。  S 103 The management method locks the permission, the lock management and the message that does not exist in the lock, or the locked message is not available. For example, in the existing S P, there is no seat, and there is no locked message, such as OC. Therefore, this is to pass the existing message, but does not need to add new messages. For example, the information parameter can be pre-informed, and the message of the information parameter value can be locked, because the message usually includes the value of the information parameter.
其中, 信息參數包括表示鎖定 固的 信息參數及表示 的 信息參數, 參數可以完成 鎖定的 。 另外, 近可以包括 于 鎖定 情況 行監控的 信息參數, 參數信息 于 鎖定情況 汞,通常 是只 的。 The information parameter includes an information parameter indicating the locking and an information parameter represented, and the parameter can be locked. In addition, it can be included in the lock The information parameters monitored by the situation line, the parameter information in the locked case mercury, usually only.
休在 鎖定 求是否 允許按照可以 下方法 果鎖定 鎖定的管理 具有管理 , 且 鎖定的管 前沒有被鎖定, 則 鎖定 允許。  Hugh in Lock Whether to allow or not to follow the method can be locked. The management of the lock has management, and the locked pipe is not locked before, then the lock is allowed.
在完成鎖定 ,鎖定 可以 多 方式 鎖定的結果, 將鎖定結果通 鎖定 , 或者鎖定 可以 GET等 操作未 鎖定結果。  Upon completion of the lock, the lock can be locked in multiple ways, the lock result is locked, or the lock can be GET and other operations are not locked.
制的方法中近可以包括釋 的 , 休的,鎖定  The method of the system can include the release, the rest, the lock
完成 管理 象的操作 , 可以將鎖定的管理 及 的配置資源釋 也可以在鎖定 定 同 ,將鎖定的管理 及 的配置資源強制 。 After the operation of the management image is completed, the management of the locked management and the configuration resources can be locked, and the locked management and configuration resources are enforced.
了 于理解, 下面以在S P 中 制的方法力 介紹。 在S P 下, B 中 存有各 管理 ,管理站可以 S P 的消息 (包括GET SET Ge ex GeB k o Tap Repo t 等) B 中的管理 操作。 了 已 的消息 型的消息, 代理預先在 B 中 相 , 使得管理站可以 SET GET等消 息 相 操作, 于管理站 相 象的 未 鎖定 管理站可以 SET操作未 相 象的 管理站 SET操作 相 象的 , 代理就 管理站在 鎖定 。 其中, 相 相 于是 信息參數, 相 象的 相 于是在 B 中 些參數 , 參數 賦予 定的 , 包括鎖定 固、鎖定 等, 以表明 相 是用于 制的。 例 , 的 參數 量力 RowSa s, 參數 量的 代表鎖定 , 此 , 就可以將RowSa s 代表鎖定 的 相 。 本領域 木 可以理解, 相 象的 就相 于是 信息參數賦予 介 的值的 。 通常, 相 于 以 形式存在的參數, 象的 相 于是 量的 介 休的值。 例 , X 介 , X 3 , "3"是 象的 介 。 In order to understand, the following is a description of the method in the SP. Under the SP, there are various managements in B, and the management station can manage the operations in the SP message (including GET SET Ge ex GeB ko Tap Repo t, etc.) B. The message-type message, the agent pre-staged in B, so that the management station can operate with messages such as SET GET, and the un-locked management station similar to the management station can operate the similarly-operated management station SET to operate similarly. The agent is locked in the management station. Among them, the phase is then the information parameter, the phase of the phase is the parameter in B, and the parameter is given, including locking, locking, etc., to indicate that the phase is used for system. For example, the parameter force RowSa s, the parameter amount represents the lock, so that RowSa s can represent the locked phase. It can be understood in the art that the similarity is the value assigned by the information parameter. Usually, the phase of the image is the value of the amount of the quiescence relative to the parameter in the form. For example, X Jie, X 3 , "3" is Like the interface.
在 休 , 相 可以 包括 介 , 管理站可以 SET操作未 量的 , 以 管理 及 的配置資源的鎖定。 然, 相 也可以是多 , 例 可以包括表示鎖定 固的 相 , 及表示 的 相 等等。 相 可以具有 的 ,也可以在 鎖定 中 。 例 , 表示鎖定 固的 相 象的 例可以 是鎖定全部的管理 , 果管理站只需要鎖定部分管理 , 則可以  In Hugh, the phase can be included, and the management station can SET to operate the unlocked resources to manage and lock the configuration resources. However, the phase can also be many, and examples can include phases indicating locking, phases represented, and the like. The phase can have it or it can be locked. For example, the example of locking the solid image can be locked all management. If the management station only needs to lock part of the management, then
表示鎖定 固的 相 象的 未指定鎖定的 果管理站沒有 管理 象的 , 可以 將全部的管理 鎖定。  If the management station of the unspecified lock indicating the locked object has no management, all management can be locked.
的 方式是, 相 至少包括表示鎖定 固的 相 ,及表示 的 相 , 管理站可以 表示鎖定 固的 相 象的 未 鎖定 代理在接收到 允許 ,可以 將表示 的 相 象的 表示有 , 以鎖定 鎖 定 的鎖定 固內的管理 及 的配置資源。也就是說, 管理站在 鎖定 , 指定鎖定 固, 代理 , 果允許鎖定, 則將 力有 ,以此未表示將 鎖定 的鎖定 固內的管理 及 的配置資源鎖定成功。  The way that the phase includes at least the phase indicating the locking solid phase, and the phase indicated, the management station can indicate that the unlocked agent that locks the solid image receives the permission, and can represent the representation of the phased image to lock the locked Lock the management and configuration resources within the solid. That is to say, if the management station locks, specifies the lock, and the agent allows the lock, it will have the power, so as not to indicate that the lock and lock management and the configuration resource are locked successfully.
相 多 , 可以以 表的方式組 相 , 也可以是 列羊 的 。 即, 相 在 B 可以表現 介或多 , 和/或, 介或多 。 相 以 介表的方 式存在, 則在 相 象的 , 可以 以下步驟 SET 操作在所 中 新的 行, 在 新建的行中 、鎖定 代理在接收到管理站的鎖定 ,可以 控制等規則未 鎖定 求是否 允許,包括 管理站是否有管理鎖定 固內的管理 象的 通 常只有 管理 有 的管理站 允許鎖定 管理 。近可以 管理 站 管理的管理 是否已 鎖定, 例 , 果 管理 前 于鎖定 , 則 管理 就不允許 管理站鎖定等。 果 鎖定 允許, 才將 鎖定的管理 鎖定。 于 休 何將 鎖定的管理 及 的配置資源鎖定, 可以 多 方式, 里不做限定。 鎖定完成 , 可以將 相 中表示 的 相 象的 表示有 否則,可 以 相 中表示 的 相 象的 表示失敗,或者刪除管理 站已 的 相 象的 。 There are many, you can group together in the form of a table, or you can be a sheep. That is, the phase can be expressed in B or more, and/or, or more. In the form of a table, in the similar, you can operate the new row in the following steps. In the newly created row, the lock agent receives the lock of the management station, and can control whether the rule is not locked. Permitted, including whether the management station has a management image that manages the lock-in, usually only the managed management station allows lock management. It is possible to manage whether the management of the station management is locked. For example, if the management is locked before the management, the management does not allow the management station to lock. Locked management is locked only if the lock is allowed. Management of the lock will be closed And the configuration resource lock, can be multi-modal, not limited. When the locking is completed, the representation of the phase represented in the phase may be otherwise, the representation of the phase represented by the phase may be failed, or the similarity of the management station may be deleted.
管理站 A 的鎖定 , 則將鎖定 固內的管理 鎖定 , 管理站 A就可以 管理 執行相 的 操作了。 在 已 鎖定的管理 執行 操作的 中, 使用 S P 的其他管理站友 的 鎖定 的管理 操作的 ,或者未 其他 管理接口的 操作 鎖定 的管理 象的 都 被拒絕。  The lock of the management station A will lock the management lock in the fixed position, and the management station A can manage the operation of the execution phase. In the locked management execution operation, the management image of the lock management operation of the other management station friends using SP or the operation of the lock of the operation of the other management interface is rejected.
需要說明的是, 本 的 操作包括 S P 的 SET操作, ETCO F的ed co 69操作以及其他 各配置的操作 (包括 或 修 等)。  It should be noted that this operation includes the SET operation of SP, the ed co 69 operation of ETCO F, and the operation of other configurations (including or repair).
另外需要說明的是,使用本 提供的方法 ,可以 不同的 管理 信息參數的 ,只要 利用 中已有 型的信息  In addition, it should be noted that, using the method provided by this method, it is possible to manage information parameters differently, as long as the existing type information is utilized.
參數的 即可。例 , 存在 神岡 管理 S P和 eco , 且 神岡 管理 中都沒有 于 鎖定 的消息。則 S P 可以在 B 中 相 , eco 可以依 本身 己的 信息參數。 然 , 使用 S P 的管理站可以利用 B 中 的 相 未 行管理 象的鎖定, 使用 eco 的管理站則 eco 中 的 信息參數未 行管理 象的鎖定。 也就是說, 各 中的 信息參數可以是不同的,使用不同 管理 的管理站可以依 所 屬 的 信息參數未 行管理 象的鎖定, 然最終可以 到 兔不同 操作 同的 的目的。 例 , 使用 S P 的管理站 相 象的 已 將管理 A鎖定, 此 , 果使用 eco 的管理站  The parameters are OK. For example, there are Shengang management S P and eco , and there is no news of locking in the management of the gods. Then S P can be in phase B, and eco can be based on its own information parameters. However, the management station using S P can use the lock of the unmanaged image in B, and the information management parameter in eco is not locked by the management parameter in eco. That is to say, the information parameters in each can be different. The management stations using different management can lock the management information according to the information parameters, and finally can achieve the same purpose for different operations of the rabbit. For example, the management station that uses the S P has already locked the management A, and this uses the eco management station.
信息參數的值未 鎖定管理 A , 也 被拒絕。  The value of the information parameter is not locked to management A and is also rejected.
然, 在現有的 eco 中已 存在 于 鎖定 的消息 OC , 通常, 使用 eco 的管理站直接使用 OC 消息即可 管理 鎖定 , 因此, eco 中 上不需要再 信息參數。 但是,本 提供的方法在 神情況下同 這 。例 ,使用 S P 的管理站 相 象的 , 已 將 管理 A及 的配置資源鎖定 此 , 果使用 eco 的管理站 OC 鎖定 管理 A的 , 則 同 被拒絕。However, the locked message OC already exists in the existing eco. Generally, the management station using eco can manage the lock directly by using the OC message, so no information parameters are needed in the eco. However, the method provided here is the same in the case of God. For example, use SP The management station is similar, the management resource of the management A and the configuration resource are locked. If the management station OC of the eco is used to lock the management A, the same is rejected.
2, 下面 中的例子 上 本 提供的方法可 5 以包括以下步驟  2, the following example on the above method can be 5 to include the following steps
S2 1 代理預先在 中 B ,以支持本 的S P S2 1 agent is pre-in the middle B to support this S P
B 中 了 相 , 相 包括 、 的作用 固、 等。 B 中以 介表的形式組 各 相 S202 管理站需要 管理 執行操作 前,首先 定要鎖定的管理 象 的  In B, the phases are included, the phases include, the effects of solids, and so on. In B, the group is in the form of a table. The S202 management station needs to be managed. Before performing the operation, the management image to be locked first is determined.
S203 管理站 SET操作未 相 象的 , 以此未向代理 鎖定 , 管理站 的 相 象的 例可以包括 休的鎖定 固等 S204 代理在接收到 鎖定 , 控制或其他規則未 此5 鎖定 求是否 允許  S203 management station SET operation is not similar, so it is not locked to the agent. The example of the management station may include the lock of the rest. S204 The agent receives the lock, the control or other rules are not locked.
S205 果允許,代理可以將 鎖定的管理 及 的配置資源 鎖定 近可以將表示 的 相 象的 表示有 , 同 , 近可 以 此 的 于將分布在不同表中的 相 相 (即 B 中可以用不同的 未 相 , 有 S205 allows, the agent can lock the locked management and the configuration resource can be similar to the representation of the representation, and can be similar to the phase that will be distributed in different tables (ie, B can be used differently) Unphased
0 ) 0)
S206 果不允許,則代理可以將表示 的 相 象的  If the S206 is not allowed, the agent can represent the similar
表示失敗,或是刪除管理站已 的 相 象的 (將 新 的 行刪除)  Indicates failure, or deletes the same as the management station (delete the new line)
S207 管理站 此鎖定 的 理結果 S207 management station
5 管理站 鎖定 的 理結果的方式可以 S P的 或 , 例 , 代理可以將鎖定 的 理結果 通 管理站, 也可以 5 The way the management station locks the result can be S P or , for example, the agent can lock the result to the management station, or
S2 8 果 理結果是鎖定成功,則 的鎖定 固內管理 及 的配置資源已被鎖定, 管理站可以 管理 執行其操作 果結果是鎖定 失敗, 管理站可以 些操作未 失敗的原因,也可以等待 段 同 再 提交鎖定 。 S2 8 results are locked successfully, then the lock solid management and The configuration resource has been locked, and the management station can manage to perform its operation. The result is that the lock fails, the management station can not cause some operations to fail, and can wait for the segment to resubmit the lock.
可 , 本 中鎖定的是管理 及 的配置資源, 而不管是 中的管理 近是其他 管理 中的管理 , 其在 的映射都 是相同的。 因此, 在 管理站 將鎖定 固內的管理 鎖定 , 其他管 理站的 管理 象的操作以及未 其他非 S P 管理接口的 管理 象的操作 被拒絕, 因此, 不 可以 兔 S P接口下的不同管理站 同的操作 , 近可以 兔不同 管理接口 同的操作 。  Yes, the management and configuration resources are locked in this, and the management in the middle is almost the same as the management in other management. Therefore, the management station locks the lock in the management, the operation of the management icons of other management stations, and the operation of the management icons of other non-SP management interfaces are rejected. Therefore, it is not possible to use the same management station under the rabbit SP interface. Operation, the operation of the rabbit can be similar to different management interfaces.
另外,現有 木中除了在不同 管理接口 同的操作可能 的 外, 近具有以下 大多數情況下前 的多 SET操作是有 定 的, 在 SET操作中同穿插的其它管理站的 SET操作, 或是其它 管理接口的 操作都可能 具有 的操作。 例 , 管理站 A 需要 S S2 SET操作, 且 SET操作 同具有  In addition, in addition to the same operation of different management interfaces, the existing wood has the following multiple SET operations in most cases, the SET operation of other management stations interspersed in the SET operation, or The operations that other management interfaces may have. For example, the management station A needs the S S2 SET operation, and the SET operation has the same
。 但是按照現有 木的方法, 參數a只能 次 SET操作 , 即在管理 站 是可以不 其他的操作 ,但是在執行 操作 ,可能 穿 插 未其他管理站的 SET操作, 即在S2 同穿插了其他的 SET操作, 就 使得 S2 同的 收到 。  . However, according to the existing wood method, the parameter a can only be operated by the SET, that is, the management station can perform other operations, but in the operation, the SET operation of other management stations may be interspersed, that is, other SETs are interspersed in the S2. Operation, so that S2 is received the same.
而 本 的上述 可以看出,本 中鎖定的不是SET操作,而是管理 及 的配置資源,而且可以 次鎖定多 管理 , 也就是說, 在鎖定 管理站A可以 鎖定的管理 執行多次SET操作, 同不 其他管理站或者其他的 管理接口的 操作 。可 ,本  As can be seen from the above, the lock is not the SET operation, but the management and configuration resources, and can be locked for multiple management, that is, the lock management station A can lock the management to perform multiple SET operations, Operation with other management stations or other management interfaces. Yes, this
提供的方法除了具有 兔不同 管理接口 同的操作 的 果外, 近具有以下 果 可以 多 具有前 的 SET操作將要 的管理 及 的配置資源 鎖定, 未 兔在多 SET操作的  In addition to the same operation of different management interfaces of rabbits, the method provided has the following results: the management and configuration resources of the previous SET operation can be locked, and the rabbits are not in the SET operation.
受到 。 然, 也可以 將 介 SET操作將要 的管理 及 的配 置資源 鎖定。 Received. However, it is also possible to lock the management and configuration resources of the SET operation.
管理站在完成 SET操作 , 可以向代理 釋 鎖定的 未 此 次鎖定, 休的, 可以是通 SET操作將 的 相 象的 , 或者, 向代理提交刪除相 的 相 的 。 代理接 收到管理站的釋 晴 , 執行釋 此次 的操作。 休的, 可以是將表示 的 相 象的 表示 ,或者,刪除 釋 的所 有 。 管理站同 可以 多 方式 此釋 晴 的 理結果, 例 , 包 括代理主 通 或者管理站 的方式。 The management station completes the SET operation, and can unlock the lock that has not been locked to the agent. The rest can be similar to the SET operation. Or, submit the phase of the deleted phase to the agent. The agent receives the interpretation of the management station and performs the operation of the release. Hugh's, can be the representation of the appearance of the representation, or delete all of the release. The management station can be used in a multi-modal manner to explain the results, including the way of proxying or managing stations.
然,鎖定時同也不能是 長的, 因力不可能 直由 介管理站 鎖定 的管理 操作, 而其他的管理站 鎖定的管理 操作。 即, 鎖定時同虛 在 介合理的 固內。 此, 代理或者有 的管理站可以 介 同 作力最長鎖定時同, 果 管理站 鎖定已 到了 同 近沒有 釋 , 則可以由代理強制釋 此次鎖定。 休的釋 或者, 刪除 釋 的所有 , 可以將釋 結果通 管理站。  However, the lock cannot be long, and it is impossible for the management operation to be locked by the management station, and the management operation of other management stations is locked. That is, the lock is the same as the virtual one. In this case, the agent or some management station can be the same as the longest lock. If the management station lock has not been released, the agent can force the lock. If you release the rest, you can delete the release and you can release the results to the management station.
在 休 中, 相 通常可以包括鎖定 索引、 S P鎖定  In Hugh, the phase can usually include a lock index, S P lock
、 S P鎖定 子 、 S P鎖定 子 、 S P 鎖定 、 S P S P鎖定 行狀 。 其中, S P鎖定 、 S P鎖定 子 、 S P鎖定 子 、 S P鎖定 相 共同 于 鎖定 固。鎖定 索引、 S P鎖定 、 S P鎖定 子 、 S P鎖定 子 、 S P鎖定 相 象的 (即 的值)可以由 鎖定 的管理站 S P S P鎖定 行狀 相 象的 例可以由代理 。可 ,通常可以 上 相 操作。  , S P lock sub, S P lock sub, S P lock, S P S P lock line. Among them, the S P lock, the S P lock sub, the S P lock sub, and the S P lock phase are common to the lock. The lock index, S P lock, S P lock sub, S P lock sub, S P lock target (ie, the value) can be locked by the locked management station S P S P. Yes, you can usually operate on the phase.
上 相 可以完成 管理 象的鎖定了,而且通常 將上 相 象組 介 。 在 中, 了 于 鎖定情況 行監控, 近 可以在 中 其他 相 , 將 相 象組 另 介 , 中的各 相 于 汞 的相 信息, 因此將 信息表。 信息表中包括 、 作用 固、 、 用戶名 ( 鎖定 的管 理站 , 于 的 有者, 可以是 介 用程序 , 也可以是 台 , 或 者的組合)、 同、 同等表 。 其中, 前 的 相同, , 就可以將前面的 于完成鎖定的 信息表 未。 通常, 只能 信息表中的 相 信息 于 , 即只能 操作。 The upper phase can complete the locking of the management image, and usually the upper image is grouped. In the case of the lock situation, the monitoring can be performed in the other phases, and the phase group will be introduced separately, and the phase in each phase of the mercury information, so the information table. The information table includes, the function, the user name (the locked management station, the owner, the application program, the program, or the combination), the same, and the equivalent table. Among them, before The same, , you can put the previous information on the completion of the lock does not. Usually, only the phase information in the information table can be operated.
本 提供的 制的方法相 , 本 近提供了 制的裝置, 3所示的第 裝置的示意 , 裝置包括 接收羊 3 1, 于接收 管理 象的鎖定 , 鎖定  The method of the present invention provides a device, a schematic representation of the first device shown in Fig. 3, the device comprising a receiving sheep 3, a lock for receiving the management image, locking
用以 信息參數值的消息  Message with information parameter value
羊 3 2, 于 管理 象的鎖定 求是否 允許 鎖定羊 3, 于 果核鎖定 允許, 鎖定 管理 及 的配置資源。  Sheep 3 2, in the lock of the management image, ask whether to allow the lock of the sheep 3, and allow the kernel lock to allow, lock the management and configuration resources.
其中, 羊 302 休 于 果 鎖定 鎖定 的管理 具有管理 , 且 鎖定的管理 前沒有被鎖定, 則 鎖定 允許。  Among them, the management of the sheep 302 lock lock is managed, and the lock is not locked before the management, and the lock is allowed.
休的, 在S P 中, 信息參數可以是預先在 中 的 相 ,可以 用以 相 象的 的消息, 未 鎖定 。 此 , 裝置近包括  Hugh, in S P, the information parameter can be the phase in advance, the message that can be used for the same, is not locked. This device is included
存儲羊 304, 于預先在 B 中 存儲作力 相 象的 信 息參數。  The sheep 304 is stored, and the information parameters of the force are stored in the B in advance.
鎖定 柬 ,可以將鎖定結果通 鎖定 , 可以 用主 的方式,也可以是 鎖定 鎖定結果的 同 ,例 , 在S P 中, 管理站可以 GET操作未 鎖定結果的 。 休的, 裝置近可以包括  Locking the card can lock the result of the lock, either in the main mode or in the same way as locking the lock result. In S P, the management station can GET the unlocked result. Hugh, the device can be included
第 通 羊 305, 于 將鎖定結果通 鎖定  Pass the sheep 305, to lock the result of the lock
或者, or,
4所示的第二裝置的示意 , 也可以包括 第二通 羊 406, 于接收到 鎖定結果的 , 將鎖定結果通 鎖定 。 The illustration of the second device shown in Fig. 4 may also include a second pass 406 to lock the lock result upon receiving the lock result.
4中的接收羊 401、 羊 402及鎖定羊 403, 3中的 接收羊 301、 羊 302及鎖定羊 303相同。 5所示的第三裝置示意 , 鎖定羊 5 3可以包括以下子羊 第 鎖定子羊 5031, 于將 介 操作將要 的管理 及 的 配置資源鎖定 The receiving sheep 401, the sheep 402, and the locking sheep 403, 3 of the receiving sheep 301, the sheep 302, and the locking sheep 303 are the same. The third device shown in FIG. 5 indicates that the locking sheep 5 3 may include the following sub-goat locking sub-male 5031, which will lock the management and configuration resources of the operation.
或者, 6所示的第 裝置示意 , 鎖定羊 603也可以包括以下 子羊  Alternatively, the first device shown in Fig. 6 indicates that the locking sheep 603 may also include the following sub-goats.
第二鎖定子羊 6032, 于將至少 具有前 的 操作將要 5中的接收羊 5 1、 羊 502, 3中的接收羊 301 羊 302相同。 6中的接收羊 601、 羊 602, 3中的 接收羊 301、 羊 302相同。  The second locking sub-seat 6032, which will have at least the previous operation, will have the same receiving sheep 5 1 in the 5th, and the receiving sheep 301 sheep 302 in the sheep 502, 3. The receiving sheep 601 in the 6th, the receiving sheep 301 in the sheep 602, 3, and the sheep 302 are the same.
另外, 裝置近包括 鎖定 釋 的羊 , 休的, 可以在接收到鎖定 的釋 晴 釋 鎖定的管理 及 的配置資 源, 也可以是強制釋 , 因此, 7所示的第五裝置示意 , 休可以包 括以下羊  In addition, the device includes a lock-released sheep, a rest, a management resource that can receive the lock release lock, or a forced release. Therefore, the fifth device shown in Fig. 7 can include Following sheep
第 釋 羊 707, 于接收到釋 鎖定 , 將 鎖定的管 理 及 的配置資源釋  The first release of the sheep 707, after receiving the release lock, will release the management and configuration resources of the lock
和/或,  and / or,
第二釋 羊 708, 于 鎖定 鎖定的 同 到 , 將 鎖定的管理 及 的配置資源釋 。 The second release of the sheep 708, in the lock and lock the same, will lock the management and configuration resources.
7中的接收羊 701、 羊 702及鎖定羊 703, 3中的 接收羊 301、 羊 302及鎖定羊 303相同。  The receiving sheep 701, the sheep 702, and the locking sheep 703, 3 of 7 receive the same sheep 301, sheep 302 and lock sheep 303.
本領域普通 木 可以理解 上 方法中的全部或部分步驟 是可以 程序未指令相 的硬件未完成, 的程序可以存儲于 可 存儲 中, 程序在執行 , 包括 下步驟 接收 管理 象的鎖定 , 管理 象的鎖定 用以 信息參數值的消息  Ordinary wood in the art can understand that all or part of the steps in the method is that the hardware of the program uncommanded phase is not completed, the program can be stored in the storable, the program is executed, and the next step is to receive the lock of the management image, the management image Lock message with information parameter value
鎖定 求是否 允許 果是,鎖定 管理 及 的配置資源。 的存儲 , RO /RA 、 磁碟、 等。  Locks to ask if it is allowed, lock management and configuration resources. Storage, RO /RA, disk, etc.
以上 本 所提供的 制的方法及裝置, 了 介紹, 本文中 了 休 本 的原理及 方式 了 ,以上 的 說明只是用于 助理解本 的方法及其 思想 同 , 于本領域的 般 技木 ,依 本 的思想,在 休 方式及 固上 有 。 上 , 本說明 內容不 理解力 本 的限制。 The method and device of the system provided by the above are introduced. In this paper, the principles and methods of Hugh's book are used. The above descriptions are only used to help understand the method and its thoughts. In the field of technology, according to the idea, there are ways to do it. Above, the contents of this description do not understand the limitations of the power.

Claims

要 求 Claim
1、 制的方法, 其特 在于, 包括  1. The method of the system, which is characterized by
接收 管理 象的鎖定 , 鎖定 用以 信息參數 值的消息  Receiving a lock on the management icon, locking the message with the value of the information parameter
管理 象的鎖定 求是否 允許  Locking the management image
果是, 則鎖定 管理 及 的配置資源。  If it is, then the management and configuration resources are locked.
2、 要求 1 的方法, 其特 在于, 信息參數包括在管 理信息 中預先 的 相 信息參數值的消息包括 鎖定 的用以 相 象的 的消息。 2. The method of claim 1, wherein the message that the information parameter includes the pre-phase information parameter value in the management information comprises the locked message for the same.
3、 要求 1 的方法, 其特 在于, 信息參數包括表示 鎖定 固的 信息參數及表示 的 信息參數。  3. The method of claim 1, wherein the information parameter comprises an information parameter indicating the locking and an information parameter of the representation.
4、 要求3 的方法, 其特 在于, 信息參數近包括 于 鎖定情況 行監控的 信息參數。  4. The method of claim 3, characterized in that the information parameter is included in the information parameter of the lock situation monitoring.
5、 要求 1 的方法, 其特 在于, 近包括  5. The method of claim 1 is characterized by
將鎖定結果通 鎖定  Lock the result
或者,  Or,
接收到 鎖定結果的 , 將鎖定結果通 鎖定 。  If the result of the lock is received, the result of the lock is locked.
6、 要求 1 的方法, 其特 在于, 管理 象 的鎖定 求是否 允許包括 6. The method of claim 1 is characterized in that the locking of the management image is allowed to be included.
果鎖定 鎖定的管理 具有管理 , 且 鎖定的管理 前沒有被鎖定, 則 鎖定 允許。  If the lock management is managed and the lock management is not locked before, the lock is allowed.
7、 要求 1 的方法, 其特 在于, 鎖定的管理 包括 介 操作將要 的管理 ,或者至少 具有前 的 操作將要 的管理 。 7. The method of claim 1 is characterized in that the management of the lock includes management of the operation to be performed, or at least management of the previous operation.
8、 要求 1 的方法, 其特 在于, 近包括  8. The method of claim 1, which is characterized by
接收到釋 鎖定 ,將 鎖定的管理 及 的配置資源 和/或,  Received lockouts, locked management and configuration resources and/or,
鎖定 鎖定的 同 到 ,將 鎖定的管 Lock the lock to the same, the tube that will lock
9、 要求8 的方法, 其特 在于, 近包括 9. The method of claim 8, which is characterized by
將表示 的 信息參數值 表示 或釋  Indicate or release the indicated information parameter value
或者,  Or,
刪除 釋 的 信息參數值。  Delete the information parameter value.
10、 制的裝置, 其特 在于, 包括  10. The device, which is characterized in that it includes
接收羊 , 于接收 管理 象的鎖定 , 鎖定 用以 信息參數值的消息  Receiving the sheep, receiving the lock of the management image, and locking the message for the information parameter value
羊 , 于 管理 象的鎖定 求是否 允許  Sheep, the lock on the management image, ask whether it is allowed
鎖定羊 , 于 果核鎖定 允許,鎖定 管理 及 的配置 資源。  Lock the sheep, lock the kernel, allow management, and configure resources.
11、 要求 10 的裝置, 其特 在于, 近包括  11. The device of claim 10, which is characterized by
存儲羊 , 于預先在 中 存儲 信息參數。  Store the sheep and store the information parameters in advance.
12、 要求 10 的裝置, 其特 在于, 近包括  12. The device of claim 10, which is characterized by
第 通 羊 , 于 將鎖定結果通 鎖定  The first sheep, the lock result is locked
或者,  Or,
第二通 羊 , 于接收到 鎖定結果的 ,將鎖定結果通 鎖 定 。  The second pass, when the result of the lock is received, locks the lock result.
13、 要求 10 的裝置, 其特 在于, 羊 休 于 果鎖定 鎖定的管理 具有管理 , 且 鎖定的管理 前沒有被鎖定, 則 鎖定 允許。  13. The device of claim 10, characterized in that the management of the locking function of the sheep is managed, and the locking is not locked before the management is locked, and the locking is allowed.
14、 要求 10 的裝置, 其特 在于, 鎖定羊 包括 第 鎖定子羊 , 于將 介 操作將要 的管理 及 的配置資 源鎖定  14. The device of claim 10, characterized in that the locking sheep comprises a first locking sub-goat to lock the management and configuration resources of the operation.
或者,  Or,
第二鎖定子羊 , 于將至少 具有前 的 操作將要 的 管理 及 的配置資源鎖定。  The second lock is to lock the management and configuration resources that will have at least the previous operation.
15、 要求 10 的裝置, 其特 在于, 近包括  15. The device of claim 10, which is characterized by
第 釋 羊 , 于接收到釋 鎖定 ,將 鎖定的管理 及 的配置資源釋 The first release of the sheep, after receiving the release lock, will lock the management And configuration resources
和/或,  and / or,
第二釋 羊 , 于 鎖定 鎖定的 同 到 將 鎖定的管理 的配置資源釋 。  The second release, in the lock and lock, releases the configuration resources of the locked management.
PCT/CN2009/072285 2009-06-16 2009-06-16 Method and apparatus for implementing lock mechanism WO2010145071A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2009/072285 WO2010145071A1 (en) 2009-06-16 2009-06-16 Method and apparatus for implementing lock mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2009/072285 WO2010145071A1 (en) 2009-06-16 2009-06-16 Method and apparatus for implementing lock mechanism

Publications (1)

Publication Number Publication Date
WO2010145071A1 true WO2010145071A1 (en) 2010-12-23

Family

ID=43355676

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2009/072285 WO2010145071A1 (en) 2009-06-16 2009-06-16 Method and apparatus for implementing lock mechanism

Country Status (1)

Country Link
WO (1) WO2010145071A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6704767B1 (en) * 2000-09-26 2004-03-09 Oracle International Corporation Using distributed information about lock conversion requests to efficiently manage lock state transitions
CN1808389A (en) * 2006-02-20 2006-07-26 南京联创科技股份有限公司 Autonomous locking method based on shared memory for account background memory database
US20060242644A1 (en) * 1999-12-21 2006-10-26 Blue Reginald V Architecture for a read/write thread lock
CN101119565A (en) * 2007-09-03 2008-02-06 华为技术有限公司 Mobile communications terminal data protection method, system and equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060242644A1 (en) * 1999-12-21 2006-10-26 Blue Reginald V Architecture for a read/write thread lock
US6704767B1 (en) * 2000-09-26 2004-03-09 Oracle International Corporation Using distributed information about lock conversion requests to efficiently manage lock state transitions
CN1808389A (en) * 2006-02-20 2006-07-26 南京联创科技股份有限公司 Autonomous locking method based on shared memory for account background memory database
CN101119565A (en) * 2007-09-03 2008-02-06 华为技术有限公司 Mobile communications terminal data protection method, system and equipment

Similar Documents

Publication Publication Date Title
CN103038788B (en) Providing multiple network resources
JP5727020B2 (en) Cloud computing system and data synchronization method thereof
US8166476B2 (en) On-demand access to a virtual representation of a physical computer system
US8812628B2 (en) Method and system for remote configuration of a device
US10454911B2 (en) Integrated intranet workspace
CN106415538A (en) File service using a shared file access-REST interface
JP4371321B2 (en) NFS server, NFS server control program, and NFS server control method
CN102427409A (en) Configuration data submission method based on network configuration (NETCONF) protocol and server thereof
KR102034402B1 (en) Multimedia resource playback system, method and server
WO2009015585A1 (en) Method, system and terminal for right control in device management
JP2005011354A (en) System and method for managing cache object using notification bond
WO2022127762A1 (en) Cloud platform and bucket management method for object storage service provided thereby
US20130227568A1 (en) Systems and methods involving virtual machine host isolation over a network
WO2016131171A1 (en) Operation method and device for vnf package
US20090282400A1 (en) APPARATUS TO MANAGE BINDING INFORMATION ON BUNDLES REMOTELY INSTALLED INTO AN OSGi SERVICE PLATFORM AND METHOD THEREOF
WO2010069226A1 (en) Method and apparatus for managing object instance alias
WO2010145071A1 (en) Method and apparatus for implementing lock mechanism
WO2007022696A1 (en) A method and a network management apparatus for implementing information service hierarchy inherited relation in the network management interface
WO2010142244A1 (en) Method and apparatus for performing upload comparison automatically when telecommunication network management data and network element data are not identical
CN102904742B (en) To method of operation and the system of executable node
WO2009146650A1 (en) Method for erasing data of terminal and terminal device
WO2009052735A1 (en) Managing method, system and device for an appearance packet
JPWO2020252088A5 (en)
CN101485142B (en) Automatic detection of agents
US20230195722A1 (en) Blockchain manager system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09845985

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09845985

Country of ref document: EP

Kind code of ref document: A1