WO2009084953A1 - Salvage construction and method for salvaging a shipwreck or the like - Google Patents

Salvage construction and method for salvaging a shipwreck or the like Download PDF

Info

Publication number
WO2009084953A1
WO2009084953A1 PCT/NL2008/050806 NL2008050806W WO2009084953A1 WO 2009084953 A1 WO2009084953 A1 WO 2009084953A1 NL 2008050806 W NL2008050806 W NL 2008050806W WO 2009084953 A1 WO2009084953 A1 WO 2009084953A1
Authority
WO
WIPO (PCT)
Prior art keywords
shipwreck
portal
legs
section
floating body
Prior art date
Application number
PCT/NL2008/050806
Other languages
French (fr)
Inventor
Johannes Antonius Van Seumeren
Nicolaas Lamphen
Original Assignee
Mammoet Europe B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mammoet Europe B.V. filed Critical Mammoet Europe B.V.
Publication of WO2009084953A1 publication Critical patent/WO2009084953A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C7/00Salvaging of disabled, stranded, or sunken vessels; Salvaging of vessel parts or furnishings, e.g. of safes; Salvaging of other underwater objects
    • B63C7/02Salvaging of disabled, stranded, or sunken vessels; Salvaging of vessel parts or furnishings, e.g. of safes; Salvaging of other underwater objects in which the lifting is done by hauling
    • B63C7/04Salvaging of disabled, stranded, or sunken vessels; Salvaging of vessel parts or furnishings, e.g. of safes; Salvaging of other underwater objects in which the lifting is done by hauling using pontoons or the like

Definitions

  • the invention relates to a salvage construction for salvaging a shipwreck or the like, which salvage construction comprises a portal with legs, which legs serve for positioning at both sides of the shipwreck that is to be salvaged.
  • the invention also relates to a method for salvaging such a shipwreck, using the salvage construction referred to above .
  • the salvage con- struction is characterized by a sawing wire extending between legs which can be positioned at both sides of the shipwreck.
  • a sawing wire extending between legs which can be positioned at both sides of the shipwreck.
  • the salvage construction is designed such that the legs that can be positioned at both sides of the shipwreck are embodied with first frames and second frames that cooperate with each other to move the sawing wire in the horizontal and vertical direction within the boundaries of the portal.
  • the salvage construction according to the invention is effectively equipped such that it comprises hoisting means for lifting the shipwreck or sections thereof.
  • a favourable embodiment of the salvage construction ac- cording to the invention is further characterized in that the legs of the portal are provided with adjustable feet.
  • salvaging a shipwreck employing the just explained salvage construction preferably takes place such that the portal is placed over the shipwreck and that hoisting means of the portal are coupled with a shipwreck section, that subsequently a sawing wire is activated for sawing the shipwreck section off the shipwreck that is coupled with the hoisting means, and that subsequently the shipwreck section is hoisted and placed on a floating body, after which the floating body with the sawn off shipwreck section can be removed.
  • a pontoon Prior to removing the floating body with the shipwreck section placed thereon, it is further desirable to increase the floating power of the floating body such that it lifts the shipwreck section and the portal, with the legs of the portal lifting from the ground, after which the floating body with the portal is moved to a following position for placing the portal over the remaining section of the shipwreck, where the floating power of the floating body is decreased and the legs of the portal come to rest on the ground.
  • - Fig. 3 a schematic representation of a saw cut made in the ship to be salvaged
  • - Fig. 4 a detail showing frame portions with which the sawing wire is moved horizontally and vertically, respectively;
  • Fig. 6 a portion of the ship being hoisted after completion of the sawing operation
  • Fig. 1 shows a salvage construction 1 for salvaging a shipwreck 5 which, as can be clearly seen in Fig. 2, takes the form of a portal, provided with legs 12, 13 for positioning at both sides of the shipwreck 5.
  • a sawing wire 7 is provided between the above referred to legs 12, 13 that are placeable at both sides of the shipwreck 5.
  • the legs 12, 13 to be placed at both sides of the shipwreck 5 are embodied with (see in particular Fig. 4) first frames 2 and second frames 3 co-operating with each other to move the sawing wire 7 in the vertical and horizontal direction within the boundaries of the portal. This movement is clearly represented by means of the horizontal and vertical dotted lines 14, 15 shown in the Figures 1 and 3.
  • legs 12, 13 of the portal are provided with adjustable feet, so as to allow for un- evennesses on the ground on which the portal is positioned.
  • adjustable feet are indicated with reference numeral 16 in Fig . 2.
  • the hoisting means 4 are coupled to the shipwreck section 6, for example, with the aid of hooks 10 to be provided on the shipwreck section 6.
  • the shipwreck section 6 to be removed from the shipwreck 5 is coupled to the hoisting means 4 of the salvage construction 1. This is again shown in Fig. 5.
  • the hoisting means 4 can be activated and with their aid the shipwreck section 6 can be removed from the shipwreck 5, as shown in Fig. 6.
  • Fig. 7 further shows the operation of hoisting the sawn off shipwreck section 6, while Fig. 8 shows this sawn off ship- wreck section 6 being placed onto a floating body in the form of a pontoon 11.
  • the portal 1 is shown to be moved by means of a pontoon 11, which is placed in a central position between the legs 12, 13 of the portal 1, and in the Figs. 13-16 by means of two pontoons 11 placed in a lateral position with respect to the portal 1.
  • the floating power of the pontoon or pontoons is first increased such as to enable this floating body 11 to lift the salvage construction 1 from the ground, as shown in Fig. 11 and Fig. 15, respectively.
  • the salvage construction 1 can subsequently be moved from this lifted position to a following position as indicated with the arrows A in Fig. 12 and Fig. 16.
  • its floating power may be decreased again, so that the salvage construction 1, or rather its legs 12, 13, come to rest on the ground.
  • the sawing off and removal of a following section of the shipwreck 5 may take place in the manner described above with refer- ence to Figs. 1-8.

Abstract

The invention relates to a salvage construction for salvaging a shipwreck or the like, comprising a portal provided with legs for positioning at both sides of the shipwreck, characterised by a sawing wire extending between the portal's legs which can be positioned at both sides of the shipwreck, with the legs that can be positioned at both sides of the shipwreck being embodied with first frames and second frames that cooperate with each other to move the sawing wire in the horizontal and vertical direction within the boundaries of the portal.

Description

Salvage construction and method for salvaging a shipwreck or the like
The invention relates to a salvage construction for salvaging a shipwreck or the like, which salvage construction comprises a portal with legs, which legs serve for positioning at both sides of the shipwreck that is to be salvaged. The invention also relates to a method for salvaging such a shipwreck, using the salvage construction referred to above .
Especially in the case of large and/or very heavy shipwrecks, the problems arising when the shipwreck to be salvaged is located under the water surface are substantial. These problems become particularly manifest when the weather conditions give cause to a rough sea but also, when it is not so much the weather conditions but a limited amount of space, the existing salvage constructions often fail to meet the preconditions de- manded by the circumstances .
It is the object of the invention to provide a method and a salvage construction that can be used in a variety of weather conditions and that is, in addition, suitable to be used for salvaging large ships, even if the available space surround- ing the shipwreck can only be described as very limited.
To this end, the salvage construction and the method for salvaging a shipwreck according to the invention is characterized by one or several of the appended claims .
In a first aspect of the invention, the salvage con- struction is characterized by a sawing wire extending between legs which can be positioned at both sides of the shipwreck. This makes it possible to limit the working area necessary for the salvaging operation to the area immediately surrounding the shipwreck . This is facilitated in particular when the salvage construction is designed such that the legs that can be positioned at both sides of the shipwreck are embodied with first frames and second frames that cooperate with each other to move the sawing wire in the horizontal and vertical direction within the boundaries of the portal. Preferably, the salvage construction according to the invention is effectively equipped such that it comprises hoisting means for lifting the shipwreck or sections thereof.
A favourable embodiment of the salvage construction ac- cording to the invention is further characterized in that the legs of the portal are provided with adjustable feet.
In accordance with the invention, salvaging a shipwreck employing the just explained salvage construction preferably takes place such that the portal is placed over the shipwreck and that hoisting means of the portal are coupled with a shipwreck section, that subsequently a sawing wire is activated for sawing the shipwreck section off the shipwreck that is coupled with the hoisting means, and that subsequently the shipwreck section is hoisted and placed on a floating body, after which the floating body with the sawn off shipwreck section can be removed.
For the floating body it is preferred to use a pontoon. Prior to removing the floating body with the shipwreck section placed thereon, it is further desirable to increase the floating power of the floating body such that it lifts the shipwreck section and the portal, with the legs of the portal lifting from the ground, after which the floating body with the portal is moved to a following position for placing the portal over the remaining section of the shipwreck, where the floating power of the floating body is decreased and the legs of the portal come to rest on the ground.
Hereinafter the invention will be further elucidated by way of an exemplary embodiment, in which the salvage construction according to the invention is shown, as well as a few steps of the salvaging operation the shipwreck, one thing and another with reference to the drawing. The drawing shows in:
- Fig. 1 and Fig. 2, a side view and frontal view of the salvage construction according to the invention in a first stage of salvaging a shipwreck;
- Fig. 3, a schematic representation of a saw cut made in the ship to be salvaged; - Fig. 4, a detail showing frame portions with which the sawing wire is moved horizontally and vertically, respectively;
- Fig. 5 and Fig. 6, respectively, an overview figure of the sawing operation represented in detail in Fig. 3 and in
Fig. 6, a portion of the ship being hoisted after completion of the sawing operation;
- Fig. 7, the sawn-off shipwreck section being hoisted;
- Fig. 8, the shipwreck section being placed on a pon- toon;
- Figs. 9-12, the portal being lifted and moved with the aid of the pontoon, and
- Figs. 13-16, the portal being lifted and moved with the aid of two laterally positioned pontoons. Similar parts in the figures carry the same reference numerals .
Fig. 1 shows a salvage construction 1 for salvaging a shipwreck 5 which, as can be clearly seen in Fig. 2, takes the form of a portal, provided with legs 12, 13 for positioning at both sides of the shipwreck 5.
In accordance with the invention, a sawing wire 7 is provided between the above referred to legs 12, 13 that are placeable at both sides of the shipwreck 5. To this end, the legs 12, 13 to be placed at both sides of the shipwreck 5 are embodied with (see in particular Fig. 4) first frames 2 and second frames 3 co-operating with each other to move the sawing wire 7 in the vertical and horizontal direction within the boundaries of the portal. This movement is clearly represented by means of the horizontal and vertical dotted lines 14, 15 shown in the Figures 1 and 3.
Before activating the sawing wire 1, it is important for the shipwreck section 6 that needs sawing off to be coupled to hoisting means 4 {for example winches) provided on the portal, and serving for lifting the shipwreck and, more particu- larly, the shipwreck section 6.
It should further be noted that the legs 12, 13 of the portal are provided with adjustable feet, so as to allow for un- evennesses on the ground on which the portal is positioned. These adjustable feet are indicated with reference numeral 16 in Fig . 2.
The hoisting means 4 are coupled to the shipwreck section 6, for example, with the aid of hooks 10 to be provided on the shipwreck section 6.
It has just been mentioned that prior to making the saw cut, the shipwreck section 6 to be removed from the shipwreck 5 is coupled to the hoisting means 4 of the salvage construction 1. This is again shown in Fig. 5. After completing the saw cut, the hoisting means 4 can be activated and with their aid the shipwreck section 6 can be removed from the shipwreck 5, as shown in Fig. 6.
Fig. 7 further shows the operation of hoisting the sawn off shipwreck section 6, while Fig. 8 shows this sawn off ship- wreck section 6 being placed onto a floating body in the form of a pontoon 11.
In the Figs. 9-12 the portal 1 is shown to be moved by means of a pontoon 11, which is placed in a central position between the legs 12, 13 of the portal 1, and in the Figs. 13-16 by means of two pontoons 11 placed in a lateral position with respect to the portal 1.
In the situation shown in Figs. 9, 10 and Figs. 13, 14, respectively, the floating power of the pontoon or pontoons is first increased such as to enable this floating body 11 to lift the salvage construction 1 from the ground, as shown in Fig. 11 and Fig. 15, respectively. By means of the floating body 11, the salvage construction 1 can subsequently be moved from this lifted position to a following position as indicated with the arrows A in Fig. 12 and Fig. 16. After the floating body 11 has arrived at the newly to be taken up position, its floating power may be decreased again, so that the salvage construction 1, or rather its legs 12, 13, come to rest on the ground. After that, the sawing off and removal of a following section of the shipwreck 5 may take place in the manner described above with refer- ence to Figs. 1-8.

Claims

CIAIMS
1. A salvage construction (1) for salvaging a shipwreck (5) or the like, comprising a portal (1) provided with legs (12, 13) , for positioning at both sides of the shipwreck (5) , charac- terised by a sawing wire that extends between the portal's legs (12, 13) that can be positioned at both sides of the shipwreck (5).
2. A salvage construction according to claim 1, characterised in that the legs (12, 13} that can be positioned at both sides of the shipwreck (5) are embodied with first frames (2) and second frames (3) that cooperate with each other to move the sawing wire (7) in the horizontal and vertical direction within the boundaries of the portal .
3. A salvage construction according to claim 1 or 2, characterised in that the portal (1) is equipped with hoisting means (4) for lifting the shipwreck (5) or sections (6) thereof.
4. A salvage construction according to one of the claims 1 or 2, characterised in that the legs (12, 13) of the portal (1) are provided with adjustable feet (16) .
5. A method for salvaging a shipwreck (5) or the like using a salvage construction (1), comprising a portal (1) provided with legs (12, 13} for positioning at both sides of the shipwreck (5), characterised in that the portal (1) is placed over the shipwreck (5) and in that hoisting means (4} of the portal (1} are coupled with a shipwreck section (6) of the shipwreck (5), in that subsequently a sawing wire (7) is activated for sawing the shipwreck section (6) off the shipwreck (5) that is coupled with the hoisting means (4) , and in that subsequently this shipwreck section is hoisted and placed on a floating body (11), after which the floating body (11} with the sawn off shipwreck section (6) can be removed.
6. A method according to clain 5, characterised in that prior to removing the floating body (11) with the shipwreck section (6) placed thereon, the floating power of the floating body is increased such that it lifts the shipwreck section (6) and the portal (1), and the legs of the portal (1) are lifted from the ground, after which the floating body (11) with the portal (1) is moved to a following position for placing the portal (1) over the remaining section of the shipwreck (5), where the floating power of the floating body (11) is decreased and the legs (12, 13) of the portal (1) come to rest on the ground.
PCT/NL2008/050806 2008-01-02 2008-12-17 Salvage construction and method for salvaging a shipwreck or the like WO2009084953A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2001151A NL2001151C2 (en) 2008-01-02 2008-01-02 Salvage construction and method for salvaging a shipwreck or the like.
NL2001151 2008-01-02

Publications (1)

Publication Number Publication Date
WO2009084953A1 true WO2009084953A1 (en) 2009-07-09

Family

ID=39717732

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NL2008/050806 WO2009084953A1 (en) 2008-01-02 2008-12-17 Salvage construction and method for salvaging a shipwreck or the like

Country Status (2)

Country Link
NL (1) NL2001151C2 (en)
WO (1) WO2009084953A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2363340A1 (en) * 2010-02-24 2011-09-07 Smit Nederland B.V. Method and installation for making a cut in a shipwreck
US8778259B2 (en) 2011-05-25 2014-07-15 Gerhard B. Beckmann Self-renewing cutting surface, tool and method for making same using powder metallurgy and densification techniques
WO2016085350A1 (en) * 2014-11-26 2016-06-02 1Diamond As Salvage sawing system and method
US10519628B2 (en) 2016-10-04 2019-12-31 Doosan Infracore Co., Ltd. Control system for construction machinery and control method for construction machinery
US10786855B2 (en) 2012-12-28 2020-09-29 1 Diamond, Llc Sawing system, sawing support structure and a wire replacement unit and method
US11339549B2 (en) 2018-01-30 2022-05-24 Quanta Associates, L.P. Inclined cut GBS leg

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB231907A (en) * 1924-04-07 1926-01-14 Elektrotrennmaschinen Ges Mit A method of cutting to pieces or demolishing wrecked ships or the like
WO2000078491A1 (en) * 1999-06-22 2000-12-28 Oceaneering International, Inc. Pipeline cutting apparatus
WO2003009960A1 (en) * 2001-07-26 2003-02-06 Smit Engineering B.V. Saw, sawing installation and use of a saw
NL1022710C2 (en) * 2003-02-17 2004-08-19 Mammoet Holding B V Offshore platform for salvaging shipwrecks, has sawing device for cutting through shipwreck

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB231907A (en) * 1924-04-07 1926-01-14 Elektrotrennmaschinen Ges Mit A method of cutting to pieces or demolishing wrecked ships or the like
WO2000078491A1 (en) * 1999-06-22 2000-12-28 Oceaneering International, Inc. Pipeline cutting apparatus
WO2003009960A1 (en) * 2001-07-26 2003-02-06 Smit Engineering B.V. Saw, sawing installation and use of a saw
NL1022710C2 (en) * 2003-02-17 2004-08-19 Mammoet Holding B V Offshore platform for salvaging shipwrecks, has sawing device for cutting through shipwreck

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2363340A1 (en) * 2010-02-24 2011-09-07 Smit Nederland B.V. Method and installation for making a cut in a shipwreck
US8778259B2 (en) 2011-05-25 2014-07-15 Gerhard B. Beckmann Self-renewing cutting surface, tool and method for making same using powder metallurgy and densification techniques
US10786855B2 (en) 2012-12-28 2020-09-29 1 Diamond, Llc Sawing system, sawing support structure and a wire replacement unit and method
WO2016085350A1 (en) * 2014-11-26 2016-06-02 1Diamond As Salvage sawing system and method
NO338419B1 (en) * 2014-11-26 2016-08-15 1Diamond As Sawing system and method of salvage
US10046405B2 (en) 2014-11-26 2018-08-14 Quanta Associates, L.P. Salvage sawing system and method
US10519628B2 (en) 2016-10-04 2019-12-31 Doosan Infracore Co., Ltd. Control system for construction machinery and control method for construction machinery
US11339549B2 (en) 2018-01-30 2022-05-24 Quanta Associates, L.P. Inclined cut GBS leg

Also Published As

Publication number Publication date
NL2001151C2 (en) 2009-07-06

Similar Documents

Publication Publication Date Title
WO2009084953A1 (en) Salvage construction and method for salvaging a shipwreck or the like
EP1560748B1 (en) Offshore deployment of extendable draft platforms
US6718903B1 (en) Life boat
CA2397023C (en) Removal of decks from offshore structures
US7419329B1 (en) Semi-submersible dry-docking lift apparatus
EP2070813A2 (en) Method and system for the removal of platforms at sea
WO1998026979A1 (en) Transporter for heavy objects at sea
US6540441B1 (en) Transporter for installation or removal of an offshore platform and a method for removal of an offshore platform
RU2417921C2 (en) Method of surfacing and transporting sunken submarines and other objects
CN100493988C (en) Method of salvaging applying ship for loading and unloading, and its device
CN210151774U (en) Tool for hoisting vertical pile of steel pipe pile of offshore wind power single-pile foundation
RU2388648C1 (en) Method to carry out underwater handling operations and device to this end
TWI342852B (en) A method of constructing a semi-submersible rig using dry dock mating
EP2363340A1 (en) Method and installation for making a cut in a shipwreck
JPH01197196A (en) Launching way recovery method
CN207631439U (en) Large-tonnage synchronization lifting system
JP6732187B2 (en) Semi-sub type floating body and connecting method of semi-sub type floating body
EP3254946B1 (en) Workboat for anchor handling
NL2004143C2 (en) Offshore floating deck.
NL1022710C2 (en) Offshore platform for salvaging shipwrecks, has sawing device for cutting through shipwreck
JP5053181B2 (en) Removal method of legged structure
KR200338974Y1 (en) Boat for repairing lower surface of quay
AU2014342198A1 (en) Method and apparatus for removing underwater platforms
JPS5812881A (en) Remodeling procedure of surface floating structure
FI96896B (en) Method for improving the safety and use of a drilling rig of the jack-up type, and the drilling rig of the jack-up type

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08867810

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08867810

Country of ref document: EP

Kind code of ref document: A1