WO2007081711A2 - Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system - Google Patents
Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system Download PDFInfo
- Publication number
- WO2007081711A2 WO2007081711A2 PCT/US2007/000088 US2007000088W WO2007081711A2 WO 2007081711 A2 WO2007081711 A2 WO 2007081711A2 US 2007000088 W US2007000088 W US 2007000088W WO 2007081711 A2 WO2007081711 A2 WO 2007081711A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- pressure
- fluid
- borehole
- drilling
- annular space
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title claims abstract description 295
- 238000005553 drilling Methods 0.000 title claims abstract description 155
- 230000015572 biosynthetic process Effects 0.000 title claims abstract description 93
- 238000000034 method Methods 0.000 title claims abstract description 51
- 238000005086 pumping Methods 0.000 claims abstract description 7
- 230000004941 influx Effects 0.000 claims description 42
- 230000008859 change Effects 0.000 claims description 21
- 238000012544 monitoring process Methods 0.000 claims description 12
- 230000007423 decrease Effects 0.000 claims description 6
- 230000009467 reduction Effects 0.000 claims description 2
- 238000007599 discharging Methods 0.000 claims 3
- 238000005755 formation reaction Methods 0.000 description 87
- 230000002706 hydrostatic effect Effects 0.000 description 22
- 239000011148 porous material Substances 0.000 description 21
- 239000007789 gas Substances 0.000 description 18
- 238000004364 calculation method Methods 0.000 description 10
- 238000005520 cutting process Methods 0.000 description 9
- 238000005259 measurement Methods 0.000 description 8
- 239000000654 additive Substances 0.000 description 7
- 230000001276 controlling effect Effects 0.000 description 7
- 230000006870 function Effects 0.000 description 7
- 230000008901 benefit Effects 0.000 description 6
- 230000009545 invasion Effects 0.000 description 6
- 230000008569 process Effects 0.000 description 6
- 230000002829 reductive effect Effects 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 230000002411 adverse Effects 0.000 description 5
- 230000004044 response Effects 0.000 description 5
- 230000009471 action Effects 0.000 description 4
- 238000009530 blood pressure measurement Methods 0.000 description 4
- 238000001514 detection method Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000012886 linear function Methods 0.000 description 4
- 230000033001 locomotion Effects 0.000 description 4
- 230000003068 static effect Effects 0.000 description 4
- 238000004891 communication Methods 0.000 description 3
- 238000012937 correction Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 229930195733 hydrocarbon Natural products 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 230000035699 permeability Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 239000004020 conductor Substances 0.000 description 2
- 239000000356 contaminant Substances 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 150000002430 hydrocarbons Chemical class 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 238000000611 regression analysis Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 241000543381 Cliftonia monophylla Species 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000000875 corresponding effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003090 exacerbative effect Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 125000001183 hydrocarbyl group Chemical group 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 238000000518 rheometry Methods 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
- 238000012421 spiking Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
- E21B21/106—Valve arrangements outside the borehole, e.g. kelly valves
Definitions
- the invention relates generally to the field of drilling boreholes using dynamic annular pressure control devices. More specifically, the invention relates to method for determining borehole fluid control events, such as loss of drilling fluid or formation fluid entry into a borehole when such devices are used.
- the exploration for and production of hydrocarbons from subsurface Earth formations ultimately requires a method to reach and extract the hydrocarbons from the formations.
- the reaching and extracting are typically performed by drilling a borehole from the Earth's surface to the hydrocarbon-bearing Earth formations using a drilling rig.
- a land-based drilling rig is used to support a drill bit mounted on the end of a drill string.
- the drill string is typically formed from lengths of drill pipe or similar tubular segments connected end to end.
- the drill string is supported by the drilling rig structure at the Earth's surface.
- a drilling fluid made up of a base fluid, typically water or oil, and various additives, is pumped down a central opening in the drill string.
- the fluid exits the drill string through openings called "jets" in the body of the rotating drill bit.
- the drilling fluid then circulates back up an annular space formed between the borehole wall and the drill string, carrying the cuttings from the drill bit so as to clean the borehole.
- the drilling fluid is also formulated such that the hydrostatic pressure applied by the drilling fluid is greater than surrounding formation fluid pressure, thereby preventing formation fluids from entering into the borehole.
- the drilling fluid ultimately returns to the surface, where it is transferred into a mud treating system, generally including components such as a shaker table to remove solids from the drilling fluid, a degasser to remove dissolved gases from the drilling fluid, a storage tank or "mud pit" and a manual or automatic means for addition of various chemicals or additives to the fluid treated by the foregoing components.
- a mud treating system generally including components such as a shaker table to remove solids from the drilling fluid, a degasser to remove dissolved gases from the drilling fluid, a storage tank or "mud pit" and a manual or automatic means for addition of various chemicals or additives to the fluid treated by the foregoing components.
- the clean, treated drilling fluid flow is typically measured to determine fluid losses to the formation as a result of the previously described fluid invasion.
- the returned solids and fluid may be studied to determine various Earth formation characteristics used in drilling operations.
- overbalanced drilling technique is the most commonly used formation fluid pressure control method.
- Overbalanced drilling relies primarily on the hydrostatic pressure generated by the column of drilling fluid in the annular space ("annulus") to restrain entry of formation fluids into the borehole.
- annulus fluid pressure can prevent sudden influx of formation fluid into the borehole, such as gas kicks.
- gas kicks occur, the density of the drilling fluid may be increased to prevent further formation fluid influx into the borehole.
- weighting additives may not be rapid enough to deal with the formation fluid influx; and (b) may cause the hydrostatic pressure in the annulus to exceed the formation fracture pressure, resulting in the creation of fissures or fractures in the formation. Creation of fractures or fissures in the formation typically results in drilling fluid loss to the PATENT APPLICATION ATTORNEY DOCKET NO. ABL-05-02PCT
- BOPs blow out preventers
- a BOP stack is typically attached to the top of the conductor pipe, and the drilling rig positioned above the BOP stack.
- a drill string with a drill bit may be selectively rotated by rotating the entire string using the rig kelly or a top drive, or the drill bit may be rotated independent of the drill string using a drilling fluid powered motor installed in the drill string above the drill bit.
- an operator may • drill through the Earth formations ("open hole") until such time as the drilling fluid pressure at the drilling depth approaches the formation fracture pressure.
- FIG. 1 is an exemplary diagram of the use of drilling fluid density to control formation pressures during the drilling process in an intermediate borehole section.
- the top horizontal bar represents the hydrostatic pressure exerted by the drilling fluid and the vertical bar represents the total vertical depth of the borehole.
- the formation fluid (pore) J UJ Nl MU iMiii PCT/US2007/000088
- Line 10 represents the formation fracture pressure. Borehole fluid pressures in excess of the formation fracture pressure can result in the drilling fluid pressurizing the formation walls to the extent that small cracks or fractures will open in the borehole wall. Further, the drilling fluid pressure overcomes the formation pressure and causes significant fluid invasion. Fluid invasion can result in, among other problems, reduced permeability, adversely affecting formation production.
- the pressure generated by the drilling fluid and its additives is represented by line 14 and is generally a linear function of the total vertical depth.
- the hydrostatic pressure that would be generated by the fluid absent any additives, that is by plain water, is represented by line 16.
- annular pressure in the borehole is essentially a linear function of the borehole fluid density with respect to depth in the borehole. In the strictest sense this is true only when the drilling fluid is static. In. reality the drilling fluid's effective density may be modified during drilling operations due to friction in the moving drilling fluid, however, the resulting annular pressure is generally linearly related to vertical depth.
- the hydrostatic pressure 16 of the drilling fluid and the pore pressure 10 generally track each other in the intermediate section of the borehole to a depth of approximately 7000 feet. Thereafter, the pore pressure 10 (pressure of fluids in the pore spaces of the Earth formations) increases at a rate above that of an equivalent column of water in the interval from a depth of 7000 feet to approximately 9300 feet. Such abnormal formation pressures may occur where the borehole penetrates a formation interval having significantly different characteristics than the prior formation.
- the hydrostatic pressure 14 maintained by the drilling fluid is safely above the pore pressure prior to about 7000 feet. In the 7000-9300 foot interval, the differential between the pore pressure 10 and hydrostatic pressure 14 is significantly reduced, decreasing the margin of safety during drilling operations. A gas kick in this interval may result if the pore
- An open loop drilling fluid system is subject to a number of other problems. It will be appreciated that it is necessary to shut off the mud pumps in order to assemble successive drill pipe segments ("joints") to the drill string to increase its length (called “making a connection”), to enable drilling successively deeper Earth formations.
- the annular pressure will undergo a negative spike that dissipates as the annular pressure stabilizes.
- the annular pressure will undergo a positive spike.
- Such spiking occurs each time a pipe joint is added to or removed from the string. It will be appreciated that these pressure spikes can cause fatigue on the mud cake and borehole wall, and could result in formation fluids entering the borehole or fracturing the formation again leading to a well control event.
- DAPC dynamic annular pressure control
- U.S. Patent No. 6,904,981 issued to van Riet and assigned to Shell Oil Company.
- the DAPC system disclosed in the '981 patent includes a fluid backpressure system in which fluid discharge from the borehole is selectively controlled to maintain a selected pressure at the bottom of the borehole, and fluid is pumped down the drilling fluid return system to maintain annulus pressure during times when the mud pumps are turned off.
- a pressure monitoring system is further provided to monitor detected borehole pressures, model expected borehole pressures for further drilling and to control the fluid backpressure system.
- a DAPC system shown in the van Riet '981 patent requires a back pressure pump for the times when the rig mud pumps are turned off in order to maintain annulus fluid pressure. It is desirable to have a DAPC system that does not rely on the use of a separate backpressure pump to maintain annulus pressure under all operating conditions.
- One aspect of the invention is method for determining existence of a well control event by controlling formation pressure during the drilling of a borehole through a subterranean formation.
- a method according to this aspect of the invention includes pumping a drilling fluid through a drill string extended into a borehole, out a drill bit at the bottom end of the drill string, and into an annular space between the drill string and ii ⁇ iKiiiuiiisiH ⁇ hi ⁇ « ⁇ ii ⁇ itii ⁇ f «Hnii ⁇ mxmm ,m practice assign, P _ CT/US _ 2007/000088 mm s wlalflSiKflftisffi ⁇ ffi ⁇ M wnfflr ⁇ iffii wm T ⁇ ii ⁇ i ⁇ ifliif ⁇ fiiiiifiTiiiiii ⁇ i! ISSSiOTM siJiiI > itm*titi!OTmuIJSH liSKs ⁇
- the drilling fluid is discharged from the annular space proximate the Earth's surface.
- Annular space fluid pressure is selectively increased to maintain a selected fluid pressure proximate the bottom of the borehole by applying fluid pressure to the annular space.
- the selective increasing includes controlling an aperture of an orifice operatively coupled between the annular space and a discharge line. The selected aperture of the orifice is monitored. Existence of a well control event is determined when the aperture changes and the rate of the pumping remains substantially constant.
- a method for controlling formation pressure during the drilling of a borehole includes pumping a drilling fluid through a drill string extended into a borehole, out a drill bit at the bottom end of the drill string, and into an annular space between drill string and the borehole.
- the drilling fluid is. discharged from the annular space proximate the Earth's surface.
- At least one of a flow rate of the drilling fluid into the borehole and a fluid flow rate out of the annular space is measured.
- a pressure of the fluid in the annular space proximate the Earth's surface and a pressure of the fluid proximate the bottom of the borehole are measured.
- a pressure of the fluid proximate the bottom of the borehole is estimated using the measured flow rate, measured annular space pressure and density of the drilling fluid.
- a warning signal is generated if a difference between the estimated pressure and the measured pressure exceeds a selected threshold.
- FIG. 1 is a graph depicting annular pressures and formation pore and fracture pressures.
- FIGS. 2A and 2B are plan views of two different embodiments of the apparatus that can be use with a method according to the invention.
- FIG. 3 is a block diagram of the pressure monitoring and control system used in the embodiment shown in FIG. 2. 088 liiiiiiiiiiii'iiiiiiiMiiiiii
- FIG. 4 is a functional diagram of the operation of the pressure monitoring and control system.
- FIG. 5 is a graph showing the correlation of predicted annular pressures to measured annular pressures.
- FIG. 6 is a graph showing the correlation of predicted annular pressures to measured annular pressures depicted in FIG. 5, upon modification of certain model parameters.
- FIG. 7 is a graph showing how the DAPC system may be used to control variations in formation pore pressure in an overbalanced condition
- FIG. 8 is a graph depicting DAPC operation as applied to at balanced drilling.
- FIGS. 9 A and 9B are graphs depicting how the DAPC system may be used to counteract annular pressure drops and spikes that accompany pump off/pump on conditions.
- FIG. 10 shows another embodiment of a DAPC system that uses only rig mud pumps for providing selected fluid pressure to both the drill string and the annulus.
- FIG. 2A is a plan view depicting a land-based drilling system having one embodiment of a dynamic annular pressure control (DAPC) system that can be used with the invention.
- DAPC dynamic annular pressure control
- the drilling system 100 is shown including a drilling rig 102 that is used to support drilling operations. Many of the components used on the drilling rig 102, such as the kelly, power tongs, slips, draw works and other equipment are not shown separately in the Figures for clarity of the illustration.
- the rig 102 is used to support a drill string 112 used for drilling a borehole through Earth formations such as shown as formation 104.
- the 088 the 088
- a casing shutoff mechanism, or downhole deployment valve, 110 is installed in the casing 108 to optionally shut off the annul us and effectively act as a valve to shut off the open hole section of the borehole 106 (the portion of the borehole 106 below the bottom of the casing 108) when a drill bit 120 is located above the valve 110.
- the drill string 112 supports a bottom hole assembly (BHA) 113 that can include the drill bit 120, a mud motor 118, a measurement- and logging-while-drilling (MWD/LWD) sensor suite 119 that preferably includes a pressure transducer 116 to determine the annular pressure in the borehole 106.
- the drill string 112 includes a check valve to prevent backflow of fluid from the annulus into the interior of the drill string 112.
- the MWD/LWD suite 119 preferably includes a telemetry package 122 that is used to transmit pressure data, MWD/LWD sensor data, as well as drilling information to be received at the Earth's surface. While FIG. 2A illustrates a BHA utilizing a mud pressure modulation telemetry system, it will be appreciated that other telemetry systems, such as radio frequency (RF), electromagnetic (EM) or drill string transmission systems may be used with the present invention.
- RF radio frequency
- EM electromagnetic
- the drilling process requires the use of a drilling fluid 150, which is typically stored in a reservoir 136.
- the reservoir 136 is in fluid communications with one or more rig mud pumps 138 which pump the drilling fluid 150 through a conduit 140.
- the conduit 140 is connected to the uppermost segment or “joint" of the drill string 112 that passes through a rotating control head or “rotating BOP" 142.
- a rotating BOP 142 when activated, forces spherically shaped elastomeric sealing elements to rotate upwardly, closing around the drill string 112 and isolating the fluid pressure in the annulus, but still enabling drill string rotation.
- the fluid 150 ultimately returns to the Earth's surface and goes through a diverter 142, through conduit 124 and various surge tanks and telemetry receiver systems (not shown separately).
- the fluid 150 proceeds to what is generally referred to herein as a backpressure system 131.
- the fluid 150 enters the backpressure system 131 and flows through a flowmeter 126.
- the flow meter 126 may be a mass-balance type or other of sufficiently high-resolution to meter the flow out of the well. Utilizing measurements from the flowmeter 152, a system operator will be able to determine how much fluid 150 has been pumped into the well through the drill string 112.. The use of a pump stroke counter may also be used in place of flowmeter 152. Typically the amount of fluid pumped and returned are essentially the same in steady state conditions when compensated for additional volume of the borehole drilled.
- the system operator In compensating for transient effects and the additional volume of borehole being drilled and based on differences between the amount of fluid 150 pumped and fluid 150 returned, the system operator is be able to determine whether fluid 150 is being lost to the formation 104, which may indicate that formation fracturing or breakdown has occurred, i.e., a significant negative fluid differential. Likewise, a significant positive differential would be indicative of formation fluid entering into the borehole 106 from the Earth formations 104.
- the returning fluid 150 proceeds to a wear resistant, controllable orifice choke
- Choke 130 is preferably one such type and is further capable of operating at variable pressures, variable openings or apertures, and through multiple duty cycles.
- the fluid 150 exits the choke 130 and flows through a valve arrangement 5.
- the fluid 150 can then be processed, first by an optional degasser 1 or directly to a series of filters and shaker table 129, designed to remove contaminants, including drill cuttings, from the fluid 150.
- the fluid 150 is then returned to the reservoir 136.
- a flow loop 119A is provided in advance of a valve arrangement 125 for conducting fluid 150 directly to the inlet of a backpressure
- the backpressure pump 128 inlet may be provided with fluid from the reservoir 136 through conduit 119B, which is in fluid communication with the trip tank.
- the trip tank is normally used on a drilling rig to monitor drilling fluid gains and losses during pipe tripping operations (withdrawing and inserting the full drill string or substantial subset thereof from the borehole).
- the trip tank functionality is preferably maintained.
- the valve arrangement 125 may be used to select loop 119A, conduit 119B or to isolate the backpressure system.
- the backpressure pump 128 is capable of utilizing returned fluid to create a backpressure by selection of flow loop 119A, it will be appreciated that the returned fluid could have contaminants that would not have been removed by filter/shaker table 129. In such case, the wear on backpressure pump 128 may be increased. Therefore, the preferred fluid supply for the backpressure pump 128 is conduit 119A to provide reconditioned fluid to the inlet of the backpressure pump 128.
- the valve arrangement 125 would select either conduit 119A or conduit 119B, and the backpressure pump 128 is engaged to ensure sufficient flow passes through the upstream side of the choke 130 to be able to maintain backpressure in the annulus 115, even when there is no drilling fluid flow coming from the annulus 115.
- the backpressure pump 128 is capable of providing up to approximately 2200 psi (15168.5 kPa) of pressure; though higher pressure capability pumps may be selected at the discretion of the system designer. It can be appreciated that the pump 128 would be positioned in any manner such that it is in fluidic communication with the annulus, the annulus being the discharge conduit of the well.
- the ability to provide backpressure is a significant improvement over normal fluid control systems.
- the pressure in the annulus provided by the fluid is a function of its density and the true vertical depth and is generally by approximation a linear function.
- additives added to the fluid in reservoir 136 must be pumped downhole to eventually change the pressure gradient applied by the fluid 150.
- the system can include a flow meter 152 in conduit 100 to measure the amount of fluid being pumped into the annulus 115. It will be appreciated that by monitoring HBiI pc ⁇ /US2007/000088 illlliillil
- FIG. 2B shows an alternative embodiment of the DAPC system.
- the backpressure pump is not required to maintain sufficient flow through the choke when the flow through the borehole needs to be shut off for any reason.
- an additional valve arrangement 6 is placed downstream of the drilling rig mud pumps 138 in conduit 140. This valve arrangement 6 allows fluid from the rig mud pumps 138 to be completely diverted from conduit 140 to conduit 7, thus diverting flow from the rig pumps 138 that would otherwise enter the interior passage of the drill string 112. By maintaining action of rig pumps 138 and diverting the pumps' 138 output to the annulus 115, sufficient flow through the choke to control annulus backpressure is ensured.
- FIG. 3 is a block diagram of the pressure monitoring system 146 of the DAPC system.
- System inputs to the pressure monitoring system 146 may optionally include the downhole pressure 202 that has been measured by the appropriate sensor in MWD/LWD sensor package 119, transmitted to the Earth's surface by the MWD telemetry package 122 and received by transducer equipment (not shown) at the Earth's surface.
- Other system inputs may optionally include pump pressure 200, input flow 204 from flow meter 152 or calculation of the flow rate into the well by calculating the displacement of the pump and rate at which the pump is operating, drilling penetration rate and drill string rotation rate, as well as optionally axial force on the drill bit ("weight on bit” or WOB) and optionally torque on the drill bit (TOB) that may be transmitted from suitable sensors (not shown separately) the BHA 113 depending on the accuracy of the bottomhole pressure measurement required.
- WOB weight on bit
- TOB optionally torque on the drill bit
- the return mud flow is measured using optional flow meter 126 where required.
- Signals representative of the various data inputs are Jli ⁇
- a control unit 230 which itself may include a drill rig control unit 232 and a drilling operator's station 234, to a DAPC processor 236 and a back pressure programmable logic controller (PLC) 238, all of which can be connected by a common data network 240.
- the DAPC processor 236 serves three functions, monitoring the state of the borehole pressure during drilling operations, predicting borehole response to continued drilling, and issuing commands to the backpressure PLC to control the aperture of the choke 130 and to selectively operate the backpressure pump 128. The specific logic associated with the DAPC processor 236 will be discussed further below.
- the DAPC processor 236 includes programming to carry out "Control" functions and "Real Time Model Calibration" functions.
- the DAPC processor 236 receives data from the various sources and continuously calculates in real time the correct backpressure set-point based on the values of the input parameters.
- the backpressure set-point is then transferred to the programmable logic controller 238, which generates control signals for the backpressure pump (128 in FIG 2A) and the choke (130 in FIG. 2A).
- the input parameters fall into three main groups.
- the first are relatively fixed parameters 250, including parameters such as borehole-and casing string geometry, drill bit nozzle diameters, and borehole trajectory.
- the actual borehole trajectory may vary from the planned trajectory, the variance may be taken into account with a correction to the planned trajectory.
- temperature profile of the drilling fluid in the annulus 115 in Figure 2A
- the drilling fluid composition As with the trajectory parameters, these are generally known and do not substantially change over small portions of the course of the borehole drilling operations.
- one objective is to be able to keep the bottom hole pressure relatively constant notwithstanding changes in fluid flow rate, by using the backpressure system to provide the additional pressure to control the annulus pressure near to the earth's surface.
- the second group of parameters 252 are variable in nature and are sensed and logged substantially in real time.
- the common data network 240 provides these data to the DAPC processor 236. These data may include flow rate data provided by either of or both the inlet and return flow meters 152 and 126, respectively, the drill string rate of penetration (ROP) or axial velocity, the drill string rotational speed, the drill bit depth, and the borehole depth, the latter two being derived from data from well known drilling rig sensors.
- the last parameter is the downhole pressure 254 that is provided by the downhole MWD/LWD sensor suite 1 19 and can be transmitted to the Earth's surface using the mud pulse telemetry package 122.
- One other input parameter is the set-point downhole pressure 256, or equivalent circulating density at the drill bit, proximate to the drill bit or at some designated point in the bore hole.
- the control module 258 attempts to calculate the pressure in the annulus (115 in Figure 2A) at each point over its full borehole length, utilizing various models designed for various formation and fluid parameters.
- the pressure in the annulus is a function not only of the hydrostatic pressure or weight of the fluid column in the borehole, but includes the pressures caused by drilling operations, including fluid displacement by the drill string, frictional losses due to the flow of fluid returning up the annulus, and other factors.
- the programming in the control module 258 considers the borehole as a finite number of segments, each assigned to a segment of borehole length. In each of the segments the dynamic pressure and the fluid weight (hydrostatic pressure) is calculated and are used to determine the pressure differential 262 for the segment. The segments are then summed and the pressure differential for the entire borehole profile is determined.
- the flow rate of the fluid 150 being pumped into the borehole is related in some respect to the flow velocity of the fluid 150 and the velocity may thus be used to determine dynamic pressure loss as the fluid 150 is being pumped into the borehole through the drill string.
- the fluid 150 density is calculated in each segment, taking into account the fluid compressibility, estimated drill cuttings loading and the thermal expansion of the fluid 150 for the specified segment, which is itself related to the temperature profile for that segment of the borehole.
- the temperature for the segment is also important for determining dynamic pressure losses for the segment.
- the composition of the fluid is also considered in determining compressibility and the thermal expansion coefficient.
- the drill string rate of axial movement is related to "surge” and “swab” pressures encountered during drilling operations as the drill string is moved into or out of the borehole.
- the drill string rotation is also used to determine dynamic pressures, as rotation creates a frictional force between the fluid in the annulus and the drill string.
- the drill bit depth, borehole depth, and borehole and drill string geometry are all used to help generate the borehole segments to be modeled.
- the present embodiment considers not only the hydrostatic pressure exerted by fluid 150, but also the fluid compression, fluid thermal expansion and the drill cuttings loading of the fluid observed during drilling operations. It will be appreciated that the cuttings loading can be. determined as the fluid is returned to the surface and reconditioned for further use. All of these factors can be used in calculation of the "static pressure" of the fluid in the annulus.
- Dynamic pressure calculation includes many of the same factors in determining static pressure. However, dynamic pressure calculation further considers a number of other factors. Among them is whether the fluid flow is laminar or turbulent. Whether the- flow is laminar or turbulent is related to the estimated roughness, borehole size and the flow velocity of the fluid. The calculation also considers the specific geometry for the segment in question. This would include borehole eccentricity and specific drill string segment geometry (e.g. threaded connection or "box/pin” upsets) that affect the flow velocity observed in any segment of the borehole annulus. The dynamic pressure, calculation further includes cuttings accumulation in the borehole, as well as fluid rheology and the drill string movement's (axial and rotational) effect on dynamic pressure of the fluid.
- the pressure differential 262 for the entire annulus is calculated and compared to the set-point pressure 256 in the control module 264.
- the desired backpressure 266 is then determined and conducted to programmable logic controller 238, which generates control signals for the backpressure pump 128 and the choke 130.
- backpressure is increased by reducing the choke aperture.
- Backpressure is decreased by increasing the choke aperture.
- the particular choke aperture extant at any time can be used as an indicator that a well control event is taking place, namely, that formation fluid is entering the borehole from one or more of the formations (a "kick"), or drilling fluid is leaving the borehole and entering one or more of the formations adjacent to the borehole (“lost circulation").
- the corrections to the model may be made by varying any of the variable parameters.
- either of the fluid density and the fluid viscosity are modified in order to correct the predicted downhole pressure to the actual bottomhole pressure.
- the actual downhole pressure measurement is used . only to calibrate the calculated downhole pressure, rather than to predict downhole annular pressure.
- the DAPC control system 236 further operates to index the inputs such that real time inputs properly correlate with delayed downhole transmitted inputs.
- the rig sensor inputs, calculated pressure differential and backpressure pressures, as well as the downhole measurements, may be "time-stamped” or "depth-stamped” such that the inputs and results may be properly correlated with later received downhole data.
- the model may be adjusted to more accurately predict actual pressure and the required backpressure. In the case where there is no time stamp or depth stamp the same regression analysis process may be used to compare the actual and calculated bottomhole pressure.
- FIG. 5 depicts the operation of the DAPC control system demonstrating an uncalibrated DAPC model.
- PWD downhole pressure while drilling
- the DAPC predicted pressure 404 is shifted in time as a result of the time delay for the signal to be selected and transmitted uphole.
- PWD non-time stamped pressure while drilling or annular pressure
- the DAPC predicted pressure 404 more closely tracks the actual bottom hole pressure 402.
- the DAPC model uses the actual bottom hole pressure to calibrate the predicted pressure and modify model inputs to more accurately reflect downhole pressure throughout the entire borehole profile.
- the DAPC control system 236 will calculate the required backpressure level 266 and transmit it to the programmable logic controller (FIG. 4 238).
- the programmable controller 238 then generates the necessary control signals to choke 130 necessary valves and backpressure pump 128 as required depending upon the embodiment in use. I PCT/US2007/000088
- calculation of the DAPC system predicted borehole pressure is delayed, after each time the rig mud pumps are started, at least until the pressure of the drilling mud at the mud pump outlet is approximately the same as the backpressure extant at the inlet to the choke.
- the purpose for the present embodiment is to overcome several adverse artifacts in pressure modeling caused by charging of the mud circulation system after restarting the rig mud pumps.
- fluid density must be selected such that the annular pressure exceeds the formation pore pressure below the casing 20.
- the use of the DAPC controlled backpressure system permits an. operator to make essentially step changes in the annular pressure.
- the DAPC pressure lines 303 is shown in FIG. 7 in response to the increase observed in the pore pressure at ⁇ : the back pressure C may be increased to increase the annular pressure from 300 to 303 in response to increasing pore pressure in contrast with normal annular pressure techniques as depicted in FIG 1 line 14.
- the DAPC system further offers the advantage of being able to decrease the back pressure in response to a decrease in pore pressure as shown in 300c.
- the difference between the DAPC-maintained annular pressure 303 and the pore pressure 300c, known as the overbalance pressure can be significantly less than the overbalance pressure seen using conventional pressure control methods as will be explained in FIG 8.
- Highly overbalanced conditions can adversely affect the. formation permeability by forcing greater amounts of borehole fluid into the formation and possibility of not being able to control the fluid loss thereby preventing further drilling of the borehole in a timely and safe manner.
- FIG. 8 is a graph depicting one application of the DAPC system in an at-balance drilling (ABD), or near ABD, environment.
- the situation in FIG. 8 shows the pore- pressure gradient in an interval 320a as being substantially linear and the fluid in the formations being kept in check by conventional annular pressure 321a.
- a sudden increase in pore pressure occurs, as shown at 320b.
- the normal process would be to set a casing 20 at this point and utilizing pressure control techniques as known in the art, the procedure would be to increase the fluid density to prevent formation fluid influx or borehole instability.
- the resulting increase in density modifies the pressure gradient of the fluid to that shown at 321b.
- the limit to conventional drilling in this manner is where 321b intersects with the reduced fracture gradient 323b due limiting the possibility to drill to the planned total depth 400.
- the technique to control the borehole in view of the. pressure increase observed at 320b is to apply backpressure to the fluid in the annulus to 088 iiilii ⁇ iilMiiiiiMiiiJMiiijJiiJiiii!
- the DAPC system may also be used to control a major well control event, such as a fluid influx.
- a major well control event such as a fluid influx.
- influx such as a gas kick
- the only practical borehole pressure control procedure was to close the BOPs to effectively hydraulically "shut in” (seal) the borehole, relieve excess annulus pressure through a choke and kill manifold, and weight up the drilling fluid to provide additional annular pressure. This technique requires time to bring the well under control.
- An alternative method is sometimes called the "driller's method", which uses- continuous drilling fluid circulation without shutting in the borehole.
- the "Weight and Wait” method involves circulating a supply of heavily weighted fluid, e.g., 18 pounds per gallon (ppg) (3.157 kg/1).
- ppg pounds per gallon
- the heavily weighted fluid is added and circulated downhole, causing the influx fluid to go into solution in the circulating fluid.
- the influx fluid starts coming out of solution upon approaching the surface as identified by Boyles Law and is released through the choke manifold. It will be appreciated that while the Driller's method provides for continuous circulation of fluid, it may still require additional circulation time without drilling ahead using the Weight and Wait method to prevent additional formation fluid influx and to permit the formation gas to go into circulation with the now higher density drilling fluid.
- An additional application of the DAPC technique relates to its use in non- continuous circulating systems.
- continuous circulation systems are used to help stabilize the formation, avoiding the sudden pressure 502 drops that occurs when the mud pumps are turned off to make/break new pipe connections.
- This pressure drop 502 is subsequently followed by a pressure spike 504 when the pumps are turned back on for drilling operations.
- FIG. 9A These variations in annular pressure 500 can adversely affect the borehole mud cake, and can result in fluid invasion into the formation.
- the DAPC system backpressure 506 may be applied to the annulus upon shutting off the mud pumps, ameliorating the sudden drop in annulus pressure from pump off condition to a more mild pressure drop 502. Prior to turning the pumps on, the backpressure may be reduced such that the pump on condition spike 504 is likewise reduced.
- the DAPC backpressure system is capable of maintaining a. relatively stable downhole pressure during drilling conditions,
- a DAPC system such as the one explained above with reference to FIGS. 2A through 9B, and one that will be further explained below with reference to FIG. 10, can be used to determine the existence of well control events.
- Well control events include influx of fluid from the Earth formations surrounding the borehole, and efflux of fluid in the borehole into the surrounding formations.
- An influx event (called a "kick") can be detected by comparing the calculated down hole pressure to the actual down hole pressure.
- Calculating the down hole pressure can be performed using a hydraulics model that determines down hole pressure based on an expected average fluid ' density in the annulus, usually the density of the drilling fluid as pumped through the drill string.
- the actual recorded down hole pressure is typically measured near to the drill bit as with an annular pressure sensor or some other form of bottom hole pressure measurement that measures the actual down hole pressure.
- Another characteristic of an influx is that the choke aperture may increase somewhat due to the increased fluid discharge rate at the Earth's surface, and then stabilize at a new aperture, which may be less, greater or the same as the immediately prior choke aperture, depending on the influx fluid density and friction due to the additional fluid flow. If the influx continues and the density is less than the density of the drilling fluid and the frictional pressure drop is not significant, the average density of the fluid in the borehole will continue to decrease and the choke aperture will continue to close in response to the DAPC system attempting to maintain the down hole pressure at the set point value.
- the DAPC system determines the new choke aperture based on an adjustment of the predicted down hole pressure with respect to the actual measured down hole pressure.
- the predicted down hole pressure will be less than the previous prediction because the fluid influx has continued to reduce the average density of the column of fluid in the annulus where the frictional pressure drop due to the increased flow as a result of the influx is not sufficient to increase the bottomhole
- the DAPC system will correct for the error by continuing to close the choke for so long as the influx continues and the average fluid density in well bore continues to decrease.
- the DAPC system will open the choke- aperture to reduce the surface annulus pressure in order to compensate for the increasing average density of the fluid in the annulus for so long as the influx continues, the average density is increasing and the frictional pressure drop from the influx is not sufficient to increase the bottomhole pressure.
- the other case is when the density of the influx is practically equal to the extant ' borehole fluid density.
- the choke may open somewhat due to the increase in discharge volume where the frictional pressure drop from the influx is not sufficient to increase the bottomhole pressure and then continue at the new aperture or a new averaged aperture (due to choke aperture fluctuation using the PID controller 238, such fluctuation being typically sinusoidal).
- the DAPC system will produce an error that the choke aperture has changed without changes calculated by the hydraulics model since the model is using a number of standard parameters to calculate down hole pressure, one of which is flow into the well in the absence of a flow meter 126.
- the aperture of the choke as controlled by the DAPC system is monitored.
- the aperture may be monitored, for example, by a position sensor coupled to the choke control element.
- LVDT linear variable differential transformer
- a DAPC system may provide for automatic control over the aperture of the choke but with no measurement related to what the choke aperture actually is. In such implementations, there is no provision to monitor the position of the choke aperture control. In such implementations, it is possible to infer existence of a fluid influx or fluid loss event without a specific measurement related to the position of the choke aperture control. In such implementations, at least one of the flow rate into the well and the flow rate out of the well is measured. The actual bottom hole fluid pressure is also measured, such as with an annular pressure sensor disposed in an instrument positioned in the drill string near to the bottom of the drill string.
- the fluid flow rate into the wellbore is measured, and the fluid pressure on the wellbore annulus at or near the Earth's surface is measured.
- An expected bottom hole fluid pressure is calculated using the hydraulics model that operates with the DAPC system. Inputs to the bottom hole pressure calculation include the fluid density (mud weight), the fluid flow rate and the annulus pressure at or near the surface.
- a well influx or fluid loss event may be inferred.
- the DAPC system may cause the choke aperture to change until the measured bottom hole pressure matches the calculated bottom hole pressure.
- the DAPC system may automatically change the fluid density (mud weight) entered as input to the hydraulics model such that the measured bottom hole pressure and the calculated bottom hole pressure approximately match.
- Such change to the input fluid density is provided because neither the fluid flow rate into the wellbore PATENT APPLICATION ATTORNEY DOCKET NO. ABL-0 5 -02PCT
- the DAPC system may generate a warning signal.
- the DAPC system may change the choke aperture such that the measured bottom hole pressure is moved toward the calculated bottom hole pressure.
- an expected bottom hole pressure may be calculated- from the hydraulics model using as input the fluid density (mud weight), the flow rate of the fluid out of the wellbore and the annulus pressure near to the Earth's surface.
- the calculated bottom hole pressure is compared to the measured bottom hole pressure. If the two pressures differ, the DAPC system may change the input fluid density to the hydraulics model automatically until the pressures approximately match. If the change in fluid density exceeds a selected threshold, then the DAPC system may generate a warning signal.
- the DAPC system may also operate the choke to cause the measured bottom hole pressure to substantially match the calculated bottom hole pressure.
- the DAPC system may change the measured bottomhole pressure until the change in the input fluid density has stabilized.
- the DAPC may change the measured bottom hole pressure until it has reached a new set point value.
- a warning signal may also be generated if the calculated bottom hole pressure and the measured bottom hole pressure are different by more than a selected threshold.
- FIG. 10 Another embodiment of a backpressure system that uses the rig mud pumps is shown in schematic form in FIG. 10.
- the rig mud pump(s), shown at 138 discharge drilling mud at selected flow rates and pressures, as is ordinarily performed during drilling operations.
- a first flowmeter 152 may be disposed in the drilling mud flow path downstream of the pump(s) 138. The first flowmeter 152 may be used to measure the flow rate of the drilling fluid as it is discharged from the pump(s) 138.
- a familiar "stroke counter”, that estimates mud discharge volume by monitoring movement of the pump(s) may be used to estimate the total flow rate from the pump(s) 138.
- the drilling fluid flow is then applied to a first controllable orifice choke 130A 5 the outlet of which is ultimately coupled to the standpipe 602 (which is itself coupled to the inlet to the interior passage in the drill string).
- the first choke 130A is ordinarily fully opened.
- Drilling fluid discharge from the pump(s) 138 is also coupled to a second controllable orifice choke 130B, the outlet of which is ultimately coupled to the well discharge (the annulus 604).
- the interior of the well is sealed by a rotating control head or spherical BOP, shown at 142.
- a rotating control head or spherical BOP shown at 142.
- a third controllable orifice choke 130 can be coupled between the annulus 604 and the mud tank or pit (136 in FIG. 2) and controls the pressure at which the drilling mud leaves the well so as to maintain a selected back pressure on the annulus, similarly to what is performed in the previously described embodiments.
- the first 130A and second 130B controllable orifice chokes may each include downstream thereof a respective flow meter 152 A, 152B.
- the flow rate of drilling fluid from the pump(s) 138 into the standpipe and into the annulus may be iiMN wiiiimiMiiiiJiMiifiwliiiiiiiiiiimf m mmm PCT/US2007/000088 lii ⁇ i: M!lrilm!!IIU
- the flowmeters 152, 152 A, 152B are shown as having their respective signal outputs coupled to the PLC 238 in the DAPC unit 236, which may be essentially the same as the corresponding devices shown in FIG. 3. Control outputs from the PLC 238 are provided to operate the three controllable orifice chokes 130, 130A, 130B.
- the PLC 238 may operate the first controllable orifice choke 130A to completely close. Then, a bleed off or "dump" valve 600, which may be under operative control of the PLC 238, is opened to release all the drilling fluid pressure.
- the check valve or one way valve in the drill string retains pressure below it in the drill string. Thus, connections may be made or broken to lengthen or shorten the drill string during drilling operations.
- the correct fluid pressure is maintained on the annulus line 604 which is fluidically connected to the wellbore annulus, using the same hydraulics model as in the previous embodiments, by selectively diverting a portion of the pump(s)138 flow into the annulus return line 604 by controlling the orifices of the first 130A and second 130B chokes, and by controlling the necessary backpressure by adjusting the third choke 130.
- the second choke 130B may remain closed, such that back pressure on the well is maintained entirely by control of the orifice of the third choke 130, similar to the manner in which back pressure is maintained according to the previous embodiments.
- the second choke 130B will be opened during connection procedures, similar to the times at which the back pressure pump in the previous embodiments would be operated. 088 i ⁇ iMi ⁇ Ml'i ⁇ Mpii INjlIludu ⁇ ll-jil ⁇ llp ⁇ illl ⁇ lilllllilllUll ⁇ ll ⁇ llll :r ⁇ ii!S «!Ei ⁇ Si ⁇
- the present embodiment advantageously eliminates the need for a separate pump to maintain back pressure.
- the present embodiment may have additional advantages over the embodiment shown in FIG. 2B which uses a valve arrangement to divert mud flow from the rig mud pumps to maintain back pressure, the most important of which is that connections can be made without the need to stop the rig mud pumps and accuracy of the fluid measurement while redirecting the flow from the well to the annulus return line to assure the correct backpressure calculation.
Abstract
Description
Claims
Priority Applications (8)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BRPI0706315-6A BRPI0706315B1 (en) | 2006-01-05 | 2007-01-04 | "METHOD FOR DETERMINING A WELL CONTROL EVENT" |
AU2007205225A AU2007205225B2 (en) | 2006-01-05 | 2007-01-04 | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system |
EP07717755A EP1969204A4 (en) | 2006-01-05 | 2007-01-04 | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system |
CA2635097A CA2635097C (en) | 2006-01-05 | 2007-01-04 | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system |
MX2008008658A MX2008008658A (en) | 2006-01-05 | 2007-01-04 | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system. |
EA200870156A EA015325B1 (en) | 2006-01-05 | 2007-01-04 | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system |
EG2008071134A EG26269A (en) | 2006-01-05 | 2008-07-03 | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system |
NO20083419A NO343086B1 (en) | 2006-01-05 | 2008-08-05 | Determination of inflow of formation fluid into or from drilling fluid loss from a borehole using a dynamic annular pressure control system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US75631106P | 2006-01-05 | 2006-01-05 | |
US60/756,311 | 2006-01-05 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2007081711A2 true WO2007081711A2 (en) | 2007-07-19 |
WO2007081711A3 WO2007081711A3 (en) | 2008-02-21 |
Family
ID=38256879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2007/000088 WO2007081711A2 (en) | 2006-01-05 | 2007-01-04 | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system |
Country Status (11)
Country | Link |
---|---|
US (1) | US7562723B2 (en) |
EP (1) | EP1969204A4 (en) |
AU (1) | AU2007205225B2 (en) |
BR (1) | BRPI0706315B1 (en) |
CA (1) | CA2635097C (en) |
EA (1) | EA015325B1 (en) |
EG (1) | EG26269A (en) |
MX (1) | MX2008008658A (en) |
MY (1) | MY144145A (en) |
NO (1) | NO343086B1 (en) |
WO (1) | WO2007081711A2 (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012035001A2 (en) | 2010-09-15 | 2012-03-22 | Managed Pressure Operations Pte. Limited | Drilling apparatus |
WO2012122468A1 (en) * | 2011-03-09 | 2012-09-13 | Prad Research And Development Limited | Method for automatic pressure control during drilling including correction for drill string movement |
US8360170B2 (en) | 2009-09-15 | 2013-01-29 | Managed Pressure Operations Pte Ltd. | Method of drilling a subterranean borehole |
US8684109B2 (en) | 2010-11-16 | 2014-04-01 | Managed Pressure Operations Pte Ltd | Drilling method for drilling a subterranean borehole |
US8887814B2 (en) | 2006-11-07 | 2014-11-18 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US9051803B2 (en) | 2009-04-01 | 2015-06-09 | Managed Pressure Operations Pte Ltd | Apparatus for and method of drilling a subterranean borehole |
US9605507B2 (en) | 2011-09-08 | 2017-03-28 | Halliburton Energy Services, Inc. | High temperature drilling with lower temperature rated tools |
US9784096B2 (en) | 2012-12-28 | 2017-10-10 | Halliburton Energy Services, Inc. | Expanded mud pulse telemetry |
US9823373B2 (en) | 2012-11-08 | 2017-11-21 | Halliburton Energy Services, Inc. | Acoustic telemetry with distributed acoustic sensing system |
US10145199B2 (en) | 2010-11-20 | 2018-12-04 | Halliburton Energy Services, Inc. | Remote operation of a rotating control device bearing clamp and safety latch |
US10233708B2 (en) | 2012-04-10 | 2019-03-19 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
Families Citing this family (77)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BR122017010168B1 (en) * | 2005-10-20 | 2018-06-26 | Transocean Sedco Forex Ventures Ltd. | METHOD TO CONTROL PRESSURE AND / OR DENSITY OF A DRILLING FLUID |
US20070227774A1 (en) * | 2006-03-28 | 2007-10-04 | Reitsma Donald G | Method for Controlling Fluid Pressure in a Borehole Using a Dynamic Annular Pressure Control System |
US7857046B2 (en) * | 2006-05-31 | 2010-12-28 | Schlumberger Technology Corporation | Methods for obtaining a wellbore schematic and using same for wellbore servicing |
EA014363B1 (en) * | 2006-10-23 | 2010-10-29 | Эм-Ай Эл. Эл. Си. | Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation |
US9435162B2 (en) | 2006-10-23 | 2016-09-06 | M-I L.L.C. | Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation |
US8994389B2 (en) * | 2007-11-09 | 2015-03-31 | M-I L.L.C. | Automated electrical stability meter |
GB0819340D0 (en) * | 2008-10-22 | 2008-11-26 | Managed Pressure Operations Ll | Drill pipe |
US7984770B2 (en) * | 2008-12-03 | 2011-07-26 | At-Balance Americas, Llc | Method for determining formation integrity and optimum drilling parameters during drilling |
US8281875B2 (en) | 2008-12-19 | 2012-10-09 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US7823656B1 (en) | 2009-01-23 | 2010-11-02 | Nch Corporation | Method for monitoring drilling mud properties |
GB2469119B (en) | 2009-04-03 | 2013-07-03 | Managed Pressure Operations | Drill pipe connector |
US7950451B2 (en) * | 2009-04-10 | 2011-05-31 | Bp Corporation North America Inc. | Annulus mud flow rate measurement while drilling and use thereof to detect well dysfunction |
US9567843B2 (en) | 2009-07-30 | 2017-02-14 | Halliburton Energy Services, Inc. | Well drilling methods with event detection |
US8757254B2 (en) * | 2009-08-18 | 2014-06-24 | Schlumberger Technology Corporation | Adjustment of mud circulation when evaluating a formation |
US8567525B2 (en) * | 2009-08-19 | 2013-10-29 | Smith International, Inc. | Method for determining fluid control events in a borehole using a dynamic annular pressure control system |
GB2473672B (en) * | 2009-09-22 | 2013-10-02 | Statoilhydro Asa | Control method and apparatus for well operations |
GB2487519B (en) * | 2009-10-21 | 2015-04-29 | Schlumberger Holdings | System, method, and computer readable medium for calculating well flow rates produced with electrical submersible pumps |
BRPI1006616B8 (en) * | 2010-01-05 | 2022-01-25 | Halliburton Energy Services Inc | well control method |
AU2015200308B2 (en) * | 2010-01-05 | 2017-03-02 | Halliburton Energy Services, Inc. | Well control systems and methods |
WO2011106004A1 (en) * | 2010-02-25 | 2011-09-01 | Halliburton Energy Services, Inc. | Pressure control device with remote orientation relative to a rig |
MX2012010290A (en) * | 2010-03-05 | 2013-02-27 | Safekick Americas Llc | System and method for safe well control operations. |
US8820405B2 (en) | 2010-04-27 | 2014-09-02 | Halliburton Energy Services, Inc. | Segregating flowable materials in a well |
US8201628B2 (en) | 2010-04-27 | 2012-06-19 | Halliburton Energy Services, Inc. | Wellbore pressure control with segregated fluid columns |
US9284799B2 (en) * | 2010-05-19 | 2016-03-15 | Smith International, Inc. | Method for drilling through nuisance hydrocarbon bearing formations |
US8413722B2 (en) * | 2010-05-25 | 2013-04-09 | Agr Subsea, A.S. | Method for circulating a fluid entry out of a subsurface wellbore without shutting in the wellbore |
EP2609282A4 (en) * | 2010-08-26 | 2015-11-04 | Halliburton Energy Services Inc | System and method for managed pressure drilling |
US8757272B2 (en) * | 2010-09-17 | 2014-06-24 | Smith International, Inc. | Method and apparatus for precise control of wellbore fluid flow |
US8739863B2 (en) | 2010-11-20 | 2014-06-03 | Halliburton Energy Services, Inc. | Remote operation of a rotating control device bearing clamp |
US9016381B2 (en) | 2011-03-17 | 2015-04-28 | Hydril Usa Manufacturing Llc | Mudline managed pressure drilling and enhanced influx detection |
CA2829779C (en) * | 2011-03-31 | 2017-07-25 | National Oilwell Varco Norway As | Method and device for preventing a mud relief valve from incorrect opening |
US9249638B2 (en) | 2011-04-08 | 2016-02-02 | Halliburton Energy Services, Inc. | Wellbore pressure control with optimized pressure drilling |
EP2694772A4 (en) * | 2011-04-08 | 2016-02-24 | Halliburton Energy Services Inc | Automatic standpipe pressure control in drilling |
US9394783B2 (en) | 2011-08-26 | 2016-07-19 | Schlumberger Technology Corporation | Methods for evaluating inflow and outflow in a subterranean wellbore |
US9134451B2 (en) * | 2011-08-26 | 2015-09-15 | Schlumberger Technology Corporation | Interval density pressure management methods |
US9677337B2 (en) * | 2011-10-06 | 2017-06-13 | Schlumberger Technology Corporation | Testing while fracturing while drilling |
CA2854076A1 (en) * | 2011-11-08 | 2013-05-16 | Halliburton Energy Services, Inc. | Preemptive setpoint pressure offset for flow diversion in drilling operations |
US9447647B2 (en) | 2011-11-08 | 2016-09-20 | Halliburton Energy Services, Inc. | Preemptive setpoint pressure offset for flow diversion in drilling operations |
US9725974B2 (en) * | 2011-11-30 | 2017-08-08 | Halliburton Energy Services, Inc. | Use of downhole pressure measurements while drilling to detect and mitigate influxes |
US9080427B2 (en) | 2011-12-02 | 2015-07-14 | General Electric Company | Seabed well influx control system |
US9932787B2 (en) * | 2011-12-14 | 2018-04-03 | Smith International, Inc. | Systems and methods for managed pressured drilling |
US9033048B2 (en) * | 2011-12-28 | 2015-05-19 | Hydril Usa Manufacturing Llc | Apparatuses and methods for determining wellbore influx condition using qualitative indications |
US20130220600A1 (en) * | 2012-02-24 | 2013-08-29 | Halliburton Energy Services, Inc. | Well drilling systems and methods with pump drawing fluid from annulus |
US10138692B2 (en) * | 2012-04-27 | 2018-11-27 | Weatherford Technology Holdings, Llc | Method and apparatus for controlling the flow of wellbore returns |
CN103470201B (en) | 2012-06-07 | 2017-05-10 | 通用电气公司 | Fluid control system |
US20140048331A1 (en) | 2012-08-14 | 2014-02-20 | Weatherford/Lamb, Inc. | Managed pressure drilling system having well control mode |
WO2014138055A2 (en) | 2013-03-04 | 2014-09-12 | Fereidoun Abbassian | System and console for monitoring and managing well site operations |
WO2014151627A2 (en) * | 2013-03-15 | 2014-09-25 | Fereidoun Abbassian | System and console for rig site fluid management at a well site |
WO2015002905A2 (en) | 2013-06-30 | 2015-01-08 | Fereidoun Abbassian | System and console for monitoring data stream quality in drilling and production operations at a well site |
WO2015002904A2 (en) | 2013-06-30 | 2015-01-08 | Fereidoun Abbassian | System and console for monitoring and managing well site operations |
US9664003B2 (en) | 2013-08-14 | 2017-05-30 | Canrig Drilling Technology Ltd. | Non-stop driller manifold and methods |
CA2930426A1 (en) | 2013-11-13 | 2015-05-21 | Schlumberger Canada Limited | Well alarms and event detection |
US10323502B2 (en) | 2014-05-02 | 2019-06-18 | Kongsberg Oil And Gas Technologies As | System and console for monitoring and managing tripping operations at a well site |
US10301923B2 (en) | 2014-05-02 | 2019-05-28 | Kongsberg Oil And Gas Technologies As | System and console for monitoring and managing well site drilling operations |
US10436014B2 (en) | 2014-05-02 | 2019-10-08 | Kongsberg Oil And Gas Technologies As | System and console for monitoring and managing pressure testing operations at a well site |
US10260332B2 (en) | 2014-05-02 | 2019-04-16 | Kongsberg Oil And Gas Technologies As | System and console for monitoring and managing well site operations |
US10184305B2 (en) * | 2014-05-07 | 2019-01-22 | Halliburton Enery Services, Inc. | Elastic pipe control with managed pressure drilling |
GB2540685B (en) * | 2014-05-15 | 2017-07-05 | Halliburton Energy Services Inc | Monitoring of drilling operations using discretized fluid flows |
US9995098B2 (en) * | 2014-10-08 | 2018-06-12 | Weatherford Technology Holdings, Llc | Choke control tuned by flow coefficient for controlled pressure drilling |
US10041316B2 (en) * | 2015-06-16 | 2018-08-07 | Baker Hughes, A Ge Company, Llc | Combined surface and downhole kick/loss detection |
US10145227B2 (en) * | 2015-07-31 | 2018-12-04 | The Johns Hopkins University | Method for estimating permeability of fractured rock formations from induced slow fluid pressure waves |
WO2017035658A1 (en) * | 2015-09-01 | 2017-03-09 | Pason Systems Corp. | Method and system for detecting at least one of an influx event and a loss event during well drilling |
CA2996170C (en) * | 2015-09-01 | 2020-07-21 | Schlumberger Canada Limited | Proportional control of rig drilling mud flow |
US10845501B2 (en) * | 2015-11-12 | 2020-11-24 | Schlumberger Technology Corporation | Control of electrically operated radiation generators |
US10227838B2 (en) | 2016-05-10 | 2019-03-12 | Weatherford Technology Holdings, Llc | Drilling system and method having flow measurement choke |
BR112018074933B1 (en) | 2016-05-31 | 2023-02-14 | National Oilwell Dht, L.P | SYSTEMS AND METHOD TO MITIGATE THE ACCUMULATION OF DRILLING CHIPS WHEN DRILLING HOLES IN HYDROCARBON WELLS |
US10648315B2 (en) * | 2016-06-29 | 2020-05-12 | Schlumberger Technology Corporation | Automated well pressure control and gas handling system and method |
US10844676B2 (en) | 2016-12-22 | 2020-11-24 | Schlumberger Technology Corporation | Pipe ram annular adjustable restriction for managed pressure drilling with changeable rams |
US10364622B2 (en) * | 2017-02-23 | 2019-07-30 | Cameron International Corporation | Manifold assembly for a mineral extraction system |
US10590719B2 (en) * | 2017-02-23 | 2020-03-17 | Cameron International Corporation | Manifold assembly for a mineral extraction system |
US11041349B2 (en) | 2018-10-11 | 2021-06-22 | Schlumberger Technology Corporation | Automatic shift detection for oil and gas production system |
CN109458171B (en) * | 2018-10-23 | 2022-04-22 | 西南石油大学 | Novel method for measuring stratum leakage pressure with narrow safe density window |
CN109488286B (en) * | 2018-12-03 | 2022-03-11 | 西南石油大学 | Method for monitoring underground multi-point pressure measurement overflow of oil and gas well |
RU2728079C1 (en) * | 2019-06-10 | 2020-07-28 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Астраханский государственный технический университет" ФГБОУ ВО "АГТУ" | Well drilling process control device |
US11261712B2 (en) * | 2020-04-22 | 2022-03-01 | Saudi Arabian Oil Company | System and method for automated well annulus pressure control |
US11028648B1 (en) * | 2020-11-05 | 2021-06-08 | Quaise, Inc. | Basement rock hybrid drilling |
US11892421B2 (en) | 2021-12-06 | 2024-02-06 | Schlumberger Technology Corporation | System and method for cleaning electrical stability probe |
US20240076946A1 (en) * | 2022-09-01 | 2024-03-07 | Schlumberger Technology Corporation | Approaches to drilling fluid volume management |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002050398A1 (en) | 2000-12-18 | 2002-06-27 | Impact Engineering Solutions Limited | Cloded loop fluid-handing system for well drilling |
US6820702B2 (en) | 2002-08-27 | 2004-11-23 | Noble Drilling Services Inc. | Automated method and system for recognizing well control events |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3338319A (en) * | 1965-07-29 | 1967-08-29 | Bass Brothers Entpr Inc | Apparatus for maintaining balanced mud circulation to prevent blowouts |
US3614761A (en) * | 1969-11-03 | 1971-10-19 | Dresser Ind | Method and apparatus for monitoring potential or lost circulation in an earth borehole |
US4355784A (en) * | 1980-08-04 | 1982-10-26 | Warren Automatic Tool Company | Method and apparatus for controlling back pressure |
US4630675A (en) * | 1985-05-28 | 1986-12-23 | Smith International Inc. | Drilling choke pressure limiting control system |
US7174975B2 (en) * | 1998-07-15 | 2007-02-13 | Baker Hughes Incorporated | Control systems and methods for active controlled bottomhole pressure systems |
US6374925B1 (en) * | 2000-09-22 | 2002-04-23 | Varco Shaffer, Inc. | Well drilling method and system |
US6394195B1 (en) * | 2000-12-06 | 2002-05-28 | The Texas A&M University System | Methods for the dynamic shut-in of a subsea mudlift drilling system |
US7992655B2 (en) * | 2001-02-15 | 2011-08-09 | Dual Gradient Systems, Llc | Dual gradient drilling method and apparatus with multiple concentric drill tubes and blowout preventers |
US6575244B2 (en) * | 2001-07-31 | 2003-06-10 | M-I L.L.C. | System for controlling the operating pressures within a subterranean borehole |
US7027968B2 (en) * | 2002-01-18 | 2006-04-11 | Conocophillips Company | Method for simulating subsea mudlift drilling and well control operations |
US6904981B2 (en) * | 2002-02-20 | 2005-06-14 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
CA2477242C (en) * | 2002-02-20 | 2011-05-24 | Shell Canada Limited | Dynamic annular pressure control apparatus and method |
US7185719B2 (en) * | 2002-02-20 | 2007-03-06 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
US6755261B2 (en) * | 2002-03-07 | 2004-06-29 | Varco I/P, Inc. | Method and system for controlling well fluid circulation rate |
US6920942B2 (en) * | 2003-01-29 | 2005-07-26 | Varco I/P, Inc. | Method and apparatus for directly controlling pressure and position associated with an adjustable choke apparatus |
OA13240A (en) * | 2003-08-19 | 2007-01-31 | Shell Int Research | Drilling system and method. |
US20050092523A1 (en) * | 2003-10-30 | 2005-05-05 | Power Chokes, L.P. | Well pressure control system |
US7156193B2 (en) * | 2004-06-04 | 2007-01-02 | Matt Swartout | Continuous positive flow backflash prevention system |
US7407019B2 (en) * | 2005-03-16 | 2008-08-05 | Weatherford Canada Partnership | Method of dynamically controlling open hole pressure in a wellbore using wellhead pressure control |
-
2007
- 2007-01-04 CA CA2635097A patent/CA2635097C/en active Active
- 2007-01-04 BR BRPI0706315-6A patent/BRPI0706315B1/en active IP Right Grant
- 2007-01-04 EP EP07717755A patent/EP1969204A4/en not_active Withdrawn
- 2007-01-04 WO PCT/US2007/000088 patent/WO2007081711A2/en active Application Filing
- 2007-01-04 US US11/649,567 patent/US7562723B2/en active Active
- 2007-01-04 MY MYPI20082462A patent/MY144145A/en unknown
- 2007-01-04 AU AU2007205225A patent/AU2007205225B2/en not_active Ceased
- 2007-01-04 MX MX2008008658A patent/MX2008008658A/en active IP Right Grant
- 2007-01-04 EA EA200870156A patent/EA015325B1/en not_active IP Right Cessation
-
2008
- 2008-07-03 EG EG2008071134A patent/EG26269A/en active
- 2008-08-05 NO NO20083419A patent/NO343086B1/en unknown
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002050398A1 (en) | 2000-12-18 | 2002-06-27 | Impact Engineering Solutions Limited | Cloded loop fluid-handing system for well drilling |
US6820702B2 (en) | 2002-08-27 | 2004-11-23 | Noble Drilling Services Inc. | Automated method and system for recognizing well control events |
Non-Patent Citations (1)
Title |
---|
See also references of EP1969204A4 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8887814B2 (en) | 2006-11-07 | 2014-11-18 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US9051803B2 (en) | 2009-04-01 | 2015-06-09 | Managed Pressure Operations Pte Ltd | Apparatus for and method of drilling a subterranean borehole |
US8360170B2 (en) | 2009-09-15 | 2013-01-29 | Managed Pressure Operations Pte Ltd. | Method of drilling a subterranean borehole |
WO2012035001A2 (en) | 2010-09-15 | 2012-03-22 | Managed Pressure Operations Pte. Limited | Drilling apparatus |
US8684109B2 (en) | 2010-11-16 | 2014-04-01 | Managed Pressure Operations Pte Ltd | Drilling method for drilling a subterranean borehole |
US9506336B2 (en) | 2010-11-16 | 2016-11-29 | Managed Pressure Operations Pte Ltd | Method and apparatus for drilling subterranean borehole |
US10145199B2 (en) | 2010-11-20 | 2018-12-04 | Halliburton Energy Services, Inc. | Remote operation of a rotating control device bearing clamp and safety latch |
WO2012122468A1 (en) * | 2011-03-09 | 2012-09-13 | Prad Research And Development Limited | Method for automatic pressure control during drilling including correction for drill string movement |
US9605507B2 (en) | 2011-09-08 | 2017-03-28 | Halliburton Energy Services, Inc. | High temperature drilling with lower temperature rated tools |
US10233708B2 (en) | 2012-04-10 | 2019-03-19 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US9823373B2 (en) | 2012-11-08 | 2017-11-21 | Halliburton Energy Services, Inc. | Acoustic telemetry with distributed acoustic sensing system |
US9784096B2 (en) | 2012-12-28 | 2017-10-10 | Halliburton Energy Services, Inc. | Expanded mud pulse telemetry |
Also Published As
Publication number | Publication date |
---|---|
NO343086B1 (en) | 2018-10-29 |
WO2007081711A3 (en) | 2008-02-21 |
US20070151762A1 (en) | 2007-07-05 |
US7562723B2 (en) | 2009-07-21 |
NO20083419L (en) | 2008-08-05 |
MX2008008658A (en) | 2008-11-28 |
BRPI0706315A2 (en) | 2011-03-22 |
EA200870156A1 (en) | 2008-12-30 |
EP1969204A4 (en) | 2012-12-26 |
EG26269A (en) | 2013-06-05 |
CA2635097A1 (en) | 2007-07-19 |
AU2007205225B2 (en) | 2010-11-11 |
AU2007205225A1 (en) | 2007-07-19 |
MY144145A (en) | 2011-08-15 |
BRPI0706315B1 (en) | 2018-02-06 |
CA2635097C (en) | 2011-08-09 |
EP1969204A2 (en) | 2008-09-17 |
EA015325B1 (en) | 2011-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7562723B2 (en) | Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system | |
US8567525B2 (en) | Method for determining fluid control events in a borehole using a dynamic annular pressure control system | |
CA2477242C (en) | Dynamic annular pressure control apparatus and method | |
US6904981B2 (en) | Dynamic annular pressure control apparatus and method | |
US20070227774A1 (en) | Method for Controlling Fluid Pressure in a Borehole Using a Dynamic Annular Pressure Control System | |
US20070246263A1 (en) | Pressure Safety System for Use With a Dynamic Annular Pressure Control System | |
US8490719B2 (en) | Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation | |
US7395878B2 (en) | Drilling system and method | |
US9435162B2 (en) | Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation | |
CA2829378A1 (en) | Method for charcterizing subsurface formations using fluid pressure response during drilling operations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2007717755 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2635097 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/a/2008/008658 Country of ref document: MX |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2007205225 Country of ref document: AU |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 08076134 Country of ref document: CO |
|
ENP | Entry into the national phase |
Ref document number: 2007205225 Country of ref document: AU Date of ref document: 20070104 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: DZP2008000486 Country of ref document: DZ |
|
WWE | Wipo information: entry into national phase |
Ref document number: 200870156 Country of ref document: EA |
|
ENP | Entry into the national phase |
Ref document number: PI0706315 Country of ref document: BR Kind code of ref document: A2 Effective date: 20080704 |