WO2006138141A3 - Project management method and system - Google Patents
Project management method and system Download PDFInfo
- Publication number
- WO2006138141A3 WO2006138141A3 PCT/US2006/022256 US2006022256W WO2006138141A3 WO 2006138141 A3 WO2006138141 A3 WO 2006138141A3 US 2006022256 W US2006022256 W US 2006022256W WO 2006138141 A3 WO2006138141 A3 WO 2006138141A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- milestone
- task
- project
- management method
- project management
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Abstract
The method and system for managing a project with multiple tasks and milestones by defining probabilities of key project events and assessing their performance risk. Each task of the project is described as a waveform propagating from this task to an assigned milestone, and each milestone is described as a coherent superposition of task waveforms. The probability of any milestone is obtained by comparison of probabilities of non-perturbed and perturbed milestone, which caused by delay of a task or combination of tasks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/977,547 US8121881B2 (en) | 2006-06-08 | 2007-10-25 | Project management method and system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US69144805P | 2005-06-17 | 2005-06-17 | |
US60/691,448 | 2005-06-17 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2006138141A2 WO2006138141A2 (en) | 2006-12-28 |
WO2006138141A3 true WO2006138141A3 (en) | 2007-09-20 |
Family
ID=37570981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2006/022256 WO2006138141A2 (en) | 2005-06-17 | 2006-06-08 | Project management method and system |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2006138141A2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8311872B2 (en) * | 2008-06-19 | 2012-11-13 | Fishman Ilya M | Computer modeling of project management process |
EP2383689A1 (en) | 2010-04-29 | 2011-11-02 | Selex Sistemi Integrati S.p.A. | System and method to estimate the effects of risks on the time progression of projects |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5406476A (en) * | 1991-04-11 | 1995-04-11 | Sun Microsystems, Inc. | Method and apparatus for resource constraint scheduling |
-
2006
- 2006-06-08 WO PCT/US2006/022256 patent/WO2006138141A2/en active Application Filing
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5406476A (en) * | 1991-04-11 | 1995-04-11 | Sun Microsystems, Inc. | Method and apparatus for resource constraint scheduling |
Also Published As
Publication number | Publication date |
---|---|
WO2006138141A2 (en) | 2006-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2007021360A3 (en) | Computer-implemented personal information manager method and system | |
WO2011091158A3 (en) | System and method for performing project management attendant to any of various types of projects | |
WO2008036957A3 (en) | Reputation, information & communication management | |
WO2014197299A3 (en) | Industrial asset health profile | |
WO2007127336A3 (en) | Order management for electronic securities trading | |
WO2010088035A3 (en) | Gesture recognizer system architecture | |
WO2009009284A3 (en) | Behavioral predictions based on network activity locations | |
WO2007014341A3 (en) | Patent mapping | |
GB2488268A (en) | A method and system for managing configurations of system management agents in a distributed environment | |
WO2009111506A3 (en) | Systems and methods for mapping enterprise data | |
WO2006053093A3 (en) | System and method of providing system jobs within a compute environment | |
WO2008036604A3 (en) | Systems and methods for citation management | |
WO2012012687A3 (en) | Event correlation in cloud computing | |
WO2007051048A3 (en) | Assessment of click or traffic quality | |
MY149824A (en) | Platform for data services across disparate application frameworks | |
WO2011037987A3 (en) | Process management system and method | |
WO2012045496A3 (en) | Probabilistic data mining model comparison engine | |
WO2007115166A3 (en) | Session presence information management | |
WO2009002997A3 (en) | System and method for distributed software testing | |
WO2007117592A3 (en) | System and method for managing product information | |
DE602006012022D1 (en) | TERRAIN PROCESS AND SYSTEM FOR A PLANE | |
WO2008103756A3 (en) | Method and system for improved user management of a fleet of vehicles | |
ATE491161T1 (en) | SUPPORTED POSITION DETERMINATION BASED ON SATELLITE SIGNALS | |
WO2007101256A3 (en) | Transaction enabled information system | |
WO2009042911A3 (en) | Search based data management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 06784664 Country of ref document: EP Kind code of ref document: A2 |