WO2002068787A2 - Method and apparatus for controlling bottom-hole pressure during dual-gradient drilling - Google Patents

Method and apparatus for controlling bottom-hole pressure during dual-gradient drilling Download PDF

Info

Publication number
WO2002068787A2
WO2002068787A2 PCT/US2002/004890 US0204890W WO02068787A2 WO 2002068787 A2 WO2002068787 A2 WO 2002068787A2 US 0204890 W US0204890 W US 0204890W WO 02068787 A2 WO02068787 A2 WO 02068787A2
Authority
WO
WIPO (PCT)
Prior art keywords
wellbore
drilling
pressure
fluid
fluid pressure
Prior art date
Application number
PCT/US2002/004890
Other languages
French (fr)
Other versions
WO2002068787A3 (en
Inventor
L. Donald Maus
Original Assignee
Exxonmobil Upstream Research Company
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxonmobil Upstream Research Company filed Critical Exxonmobil Upstream Research Company
Priority to AU2002253976A priority Critical patent/AU2002253976A1/en
Publication of WO2002068787A2 publication Critical patent/WO2002068787A2/en
Publication of WO2002068787A3 publication Critical patent/WO2002068787A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/10Valve arrangements in drilling-fluid circulation systems
    • E21B21/106Valve arrangements outside the borehole, e.g. kelly valves
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/082Dual gradient systems, i.e. using two hydrostatic gradients or drilling fluid densities
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/085Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure

Abstract

A method for controlling wellbore pressure in a wellbore during drilling. The method includes operating a drilling system to have a first fluid pressure gradient inside a drillstring (2) extending from the earth's surface to a drill bit (4) at the bottom of the wellbore. The drilling system has a second fluid pressure gradient lower than the first fluid pressure gradient in an annular space between the drillstring (2) and the wellbore from a selected depth in the wellbore to the earth's surface. Introduction of drilling fluid to the inside of the drillstring is stopped, and fluid flow in the annular space from a point below the selected depth to a point above the selected depth is selectively controlled (44) to cause a substantially constant fluid pressure at a predertermined depth in the wellbore.

Description

METHOD FOR CONTROLLING BOTTOM-HOLE PRESSURE DURING
DUAL-GRADIENT DRILLING
CROSS REFERENCE TO RELATED APPLICATION
This application claims priority benefit from U.S. provisional application number 60/271,244 filed on February 23, 2001.
FIELD OF THE INVENTION
The invention is related to the field of wellbore drilling. More specifically, the invention is related to a method for wellbore drilling in deep ocean water.
BACKGROUND OF THE INVENTION
In many oil and gas provinces, reservoirs have reached a stage where it is difficult to maintain production rates that can support daily operational and maintenance costs. Infrastructure platform and pipeline systems are in place, but larger fields become more and more dependent on fewer wells producing at lower rates. As a result, much exploration effort is directed at hydrocarbon production from beneath very deep ocean water.
Geological and well-design barriers will eventually prohibit access to ultra- deep water basins using conventional drilling technologies. For example, as water depths increase, so does the number of casing strings needed to overcome problems associated with shallow-water flows, weak formations, lost circulation, underground blowouts, sloughing shale, and high-pressure zones. As deeper formation prospects require the use of more contingency casing strings, conventionally-drilled wellbores eventually may reach a point where progressively smaller wellbore diameters hinder drilling progress or constrain production rates.
One solution to overcome these problems is a drilling system called dual- gradient-drilling, ("DGD"). DGD can be used for drilling wells in deep ocean water. In DGD, the effects within the well of a column of returning drilling mud from the sea floor to the surface ofthe ocean are controlled so as to be substantially the same as if the returning drilling mud column were seawater. This may be accomplished by using a sea floor pump in the mud return system, or by injecting a low-density material near the base of a marine riser. Figure 1 shows a diagram of prior art DGD, more specifically for extended- reach or long horizontal well drilling. Typically, a system with DGD circulates drilling fluids down (22) a drill string (2), out a bit (4), up the well annulus (18), through a riser (6), and back to an active mud system (not shown). At the mud line (8) is a blowout preventer (BOP) stack 38 which can close and seal an annular space between the drill string (2) and the riser (6). When the BOP (38) is closed, it stops the returning mud (24) from flowing up the riser (6),. To advance fluid flow up (20) the riser (6), a pump (130) introduces gas or other low density fluid through a boost line (12) to lift the returning mud up the riser (6)). Typically, the amount of gas or low density fluid introduced into the boost line (12) is selected to provide a pressure gradient in the riser (6) equivalent to having the riser (6) filled with sea water. Below the mud line (8), a part of a wellbore is typically cased (24) to prevent the wall of the wellbore from caving in, to prevent movement of fluids from one formation to another, and to improve the efficiency of extracting petroleum if the well is productive. In a reservoir (26), however, the wellbore may be "open hole" (28), meaning it is uncased. At the wellhead, commonly, a blowout preventer stack (38) and several valves (30) are installed to prevent the escape of pressure either in the annular space between the casing (24) and the drilling string (2) or in open hole during drilling or completion operations.
In designing the circulating system, considerations include annular bottom- hole circulating pressures, hole cleaning requirements, the bottom hole assembly requirements, reservoir fluid influx, fluid regime and economics. In addition, it is important to optimize the bottom-hole pressure, which is affected by many interrelated parameters, for example, types and rates of injection fluids, performance of reservoir fluid inflow and drill string movement. All of these parameters affect bottom hole pressure.
Even though DGD enables drilling in deep water, in long horizontal wells, a significant fraction of the bottom hole pressure results from circulation pressure needed to overcome frictional pressure loss in the return mud circulation system. This pressure loss, and the circulation pressure needed to overcome it, increase as the length of well increases. However, in horizontal wells, the vertical depth of bottom of the well is about the same over the length of the horizontal segment of the well. The fracture pressure therefore does not increase with measured wellbore depth. As a result, the bottom hole pressure eventually will exceed a safe amount, even when using DGD techniques.
SUMMARY OF THE INVENTION
In one aspect, the present invention provides a method for drilling deeper than is possible using conventional drilling techniques in deep ocean water by controlling bottom-hole pressure during dual-gradient drilling.
In one embodiment of a method according to the invention, a blowout preventer is closed to stop fluid flow through the blowout preventer, which seals an annular space between a wellbore and a drill string therein, and to divert the fluid flow through a bypass conduit. This is followed by stopping introduction of fluid into the interior of the drill string during the drilling operation. . Through the bypass conduit in this embodiment, the lower end of a riser is hydraulically coupled to the wellbore at a point below the preventer. The riser in this embodiment extends from the blowout preventer to a drilling rig at the earth's surface. Passage of fluid flow is selectively controlled, using a subsea choke operatively coupled to the bypass conduit. The fluid flow is regulated to maintain a substantially constant pressure at a selected depth in the wellbore. This invention is generally applicable to any DGD system, regardless of the method used to maintain wellbore annulus pressure at the mud line. It is particularly applicable to DGD systems that employ gas or some other diluent to lighten a column of mud in the riser.
Other aspects and advantages of the invention will be apparent from the following description and the appended claims. BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 shows one example of a prior art DGD system.
Figures 2 a, 2b, and 2c show a diagram to depict mud fall effect.
Figure 3 shows a graph ofthe returning fluid flow rate with respect to time in an extended-reach well with a DGD system.
Figure 4 shows a simplified illustration of an extended-reach well with a DGD system including a drilling riser, subsea blowout preventer stack, and valves forming part of a bypass conduit.
Figure 5 shows a diagram ofthe pressure with respect to measured depth below the mud line in the wellbore of Figure 4, without using the method of the present invention.
Figure 6 shows a diagram ofthe pressure with respect to measured depth below the mud line in the wellbore of Figure 4 using the method ofthe present invention. Figure 7 shows a diagram of the pressure with respect to measured depth below the mud line in the wellbore, using the method ofthe present invention, in which the open hole portion ofthe well is inclined at about the same angle as the cased hole portion ofthe well shown in Figure 4.
DETAILED DESCRIPTION OF THE INVENTION
Exemplary embodiments of the invention will be described with reference to the accompanying drawings. Like items in the drawings are shown with the same reference numbers.
The present invention provides a solution to certain problems in deepwater drilling, more specifically extended-reach or long horizontal well drilling. In general, dual-gradient-drilling (DGD) allows drilling in deep water with fewer casing strings than possible using conventional drilling techniques. This enables drilling wells in a shorter time. However, in "open-hole" horizontal wells, full circulating bottom hole pressure reaches the drilling limit relatively early. This limit defines either the point at which an additional string of casing must be set or the maximum reach for this well.
When casing is set, additional drilling may not be possible, especially in highly inclined and horizontal wells. In DGD, during normal circulation of the drilling mud, there is a hydrostatic imbalance between the mud column in the drill string ((2) in Figure 1) and the mud column in the wellbore ((24, 28) in Figure 1) and drilling riser ((6) in Figure I). This is illustrated in Figure 2a-2c. No drilling riser is shown in Figures 2a through 2c to emphasize that the annulus pressure at the base of riser, Prl), in this embodiment is maintained equal to the pressure of the surrounding sea water, Psw, as is typical for DGD. Figure 2a depicts circulating conditions while mud is being pumped. The frictional pressure losses inside the drill string (2), across the bit nozzles (102) and in the wellbore annulus are sufficient to overcome the hydrostatic imbalance and to maintain a full drill string and a positive mud pump pressure. However, once the mud pump (not shown) is stopped, the hydrostatic imbalance causes the mud column (100) in the drill string (2) to fall, as illustrated in Figure 2b. Mud will continue to flow up the riser and out from the well until hydrostatic equilibrium is reached between the interior of the drill string (2) and the wellbore, as shown at 100 in Figure 2c. The present invention utilizes this so called "mud fall" phenomenon to advantage.
Figure 3 shows an example graph of returning mud flow volume with respect to time to depict the return flow from a DGD well during and following a five minute shutdown of the mud pumps which is about the amount of time needed to make a typical drill string connection. This particular example is for a gas lift drilling riser, (GLDR), system, such as shown in Figure 1. However, the invention may also be used with pump lift DGD systems, and the example graph shown in Figure 3 is also applicable to such systems. Prior to mud pump shut down, at time 0 minutes on the graph of Figure 3, drilling mud was circulated at 540 gpm (gallons per minute) (34 1/sec). The rapid reduction in flow to about 460 gpm (29 1/sec) is a result of the loss of mud pump pressure. The nearly linear subsequent flow decline is a result of decreasing hydrostatic imbalance as the mud level ((100) in Figure 2b) falls within the drill string ((2) in Figure 2b). Mud pumps were restarted at 540 gpm, 5 minutes after shutdown, and return flow began to increase at about 8 minutes after shutdown. The minimum flow rate during this transient was about 270 gpm (17 1/sec). If the mud pumps had not been restarted, flow would have continued to decline to zero at about 25 minutes after shutdown. The significance of the return mud flow rate will be further explained. Figure 4 is a simplified illustration of an extended-reach offshore well being drilled using DGD though a drilling riser (6) and a subsea blowout preventer (BOP) stack (38). Part of the wellbore may be depicted as being cased (24) with the remainder being a non-cased substantially horizontal segment (28). The segment between the cased wellbore (24) and the non-cased horizontal segment (28) may be curved to varying degrees gradually in both vertical and azimuthal directions and the open hole segment may be other than horizontal. The example of Figure 4, and other examples which follow, are explained in terms of offshore wells, because it is in deepwater offshore well drilling that DGD, and the method of the invention, are typically used.
Figure 4 also illustrates a flow path (42), or bypass conduit, coupled hydraulically from below the BOP stack (38) to the base ofthe drilling riser (6) above it, bypassing the BOP stack (38). The bypass conduit (42) in this embodiment contains a remotely operable subsea choke (44) or throttling valve and several isolation valves (30). These components are part of the GLDR system and are otherwise used for well control in that system. Other types of DGD systems may include similar one or more bypass lines, multiple choke lines, or two in parallel. For example, in pump lift DGD systems, a mud return line couples the wellbore from below a rotating subsea diverter to the intake of a mud lift pump disposed generally near the sea floor. The mud return line may be throttled using a remotely operable choke or the like.
Figure 5 shows a graph ofthe pressures in the wellbore of Figure 4 without the benefit the present invention. Pressure is plotted as a function of the measured depth (along the trajectory of the well) below the mud line (8). Figure 5 also shows the acceptable range of bottom hole pressures (120) in the open hole segment (28). This pressure range is explained as follows. Wellbore pressures must be maintained above the formation pore pressure, (46), plus an appropriate safety margin (48), and below the formation fracture pressure, (50), less an appropriate safety margin (48). This region represents the operable range of drilling pressure within limiting conditions of full circulating rate pressure, (58), and the static conditions after the "mud fall" effect has ceased, (56). At the mud line (8), the pressure in the casing annulus, is maintained constant and generally equal to the surrounding seawater pressure (66) during drilling by the DGD system. Under static conditions, the wellbore pressure (56) increases with measured depth according to the hydrostatic gradient of the mud until it reaches the start of the horizontal segment, which in this example, is at the casing seat (36). The wellbore pressure remains constant throughout the horizontal segment ((28) in Figure 4). Figure 5 illustrates that, under static conditions, the mud weight has been chosen to produce the minimum allowable pressure in the open hole. Under circulating conditions, the wellbore pressure (58) increases by the amount ofthe annulus friction pressure, (AFP) (60), shown in the lower part of Figure 5. This can be tolerated as long as the circulating pressure (58) does not exceed the margin (48) on the fracture pressure (50). The point along the length ofthe wellbore at which this occurs is shown as the drilling limit (104). At the limit (104), an additional casing string must be set in order to continue drilling safely. However, when casing is set, additional drilling may be difficult or may not be possible, especially in highly inclined or horizontal wells. As a result, the drilling limit (104) may represent the maximum safe depth for such a well.
In the previous example, it is assumed that the BOPs ((38) in Figure 4) remain open throughout drilling operation because a GLDR is used. The present embodiment involves closure of the BOP ((38) in Figure 4) and use of a subsea choke ((44) in Figure 4), as will be further explained. In Figure 6, the mud weight is less than in the previous example as illustrated by curve (62). As shown, this would result in pressures in the open hole segment less than the minimum allowable under static conditions. However, the operations described below prevent this occurrence, particularly during operations such as making drill string connections. Under circulating conditions, in Figure 6, the circulating pressure (64) increases from seawater pressure (66) at the mud line (8) to the pressure at the casing shoe (36) as a result of the combined effects of the hydrostatic and annular friction pressure (AFP) gradients (60). The hydrostatic gradient is less than in the previous example due to the lower mud weight. Therefore, the value of circulating pressure (64) at the casing seat (36) is less than shown in Figure 5. Circulating pressure (64) increases along the length ofthe open hole segment by the amount ofthe AFP (60) in this part of well. The AFP (60) gradient as illustrated in Figure 6 is shown as being the substantially the same as shown in Figure 5 because the higher circulating rate needed to assure adequate hole cleaning will tend to offset any reduced frictional effects of lower viscosity which may be a property of less-dense mud. Because the circulating pressure (64) starts at a lower pressure at the casing seat (36), the circulating pressure (64) does not intersect the maximum allowable pressure in the wellbore until it reaches a greater drilling limit (68) than the one shown in Figure 5. This allows drilling to longer lateral reaches without setting casing or terminating drilling.
Referring back to Figure 4, prior to shutting down the mud pumps (not shown) for a drill string connection or other reason, the isolation valves (30) will be opened to provide the bypass flow path (42) around the BOP stack (38). The BOP (38) is then closed to cause the return mud flow to pass through the bypass (42) which includes the choke (44). The mud pumps (not shown) are then shut down. Note that in pump- lift DGD systems, a rotating subsea diverter (not shown) will already be closed to divert mud from the wellbore annulus to a mud return line (not shown).
As the return flow from the well declines, the subsea choke (44) is remotely controlled to compensate for the resulting decline in the annulus friction pressure in the wellbore. As shown in Figure 6, the choke ((44) in Figure 4) is controlled to maintain a substantially constant wellbore pressure at the casing seat (36). If the pump shut down is of short duration, such as illustrated in Figure 3, return flow will not decline to zero and the wellbore pressures will remain within the operable range (122 in Figure 5). Operation of the choke ((44) in Figure 4) will serve to reduce the rate of the mud fall in the drill string because the flowing pressure drop through the choke ((44) in Figure 4) will resist some of the hydrostatic pressure imbalance. If the mud pumps (not shown) are not restarted, the ultimate condition is represented by the static pressure curve (70). In this condition, the choke ((44) in Figure 4) is fully closed, circulation has ceased and the remaining hydrostatic imbalance is providing the necessary pressure drop (110) across the choke ((44) in Figure 4). Note, in Figure 6, that maintaining a constant wellbore pressure at the casing seat (36) causes the static pressure (70) and circulating pressure (64) to intersect at the casing seat depth.
The example described above is for the purpose of describing a case in which the open hole segment ((28) in Figure 4) is substantially horizontal. However, the same principles apply to other drilling situations. Figure 7 represents a case in which the open-hole segment ((28) in Figure 4) of the wellbore is inclined at substantially the same angle as the cased hole. In this instance, the pore pressure (72), fracture pressure (74), static pressure (76), and circulating pressure (78) all increase with measured depth in the open hole segment as a result of increasing vertical depth. The slopes (gradients) of the pore pressure (72) and fracture pressure (74) curves can vary significantly, depending on geological conditions and hole angle (inclination angle of the wellbore). For the case illustrated in Figure 7, the full circulating (78) and static (76) pressure curves are controlled using the subsea choke ((44) in Figure 4) as for the case illustrated in Figure 6. However, the drilling limit (80) occurs when the static pressure (76) reaches the margin on the pore pressure (72) rather than when the circulating pressure (78) reaches the margin on the fracture pressure (74), as in Figure 6. This limit (80) can be extended in the case of Figure 7 by increasing the depth at which the wellbore pressure is maintained substantially constant. By shifting this "crossing point" to a measured depth below the casing seat (82), the static pressure (76) will be increased in the open hole. A higher pressure drop across the subsea choke ((44) in Figure 4) will achieve this increase in "constant pressure depth".
To properly control the subsea choke ((44) in Figure 4) to maintain a constant or nearly constant pressure at the casing seat, or other selected point in the wellbore, it is necessary that the constant pressure at selected point in the wellbore be approximately known or be predictable for all flow conditions from static to the full circulating rate. If the return flow rate from the well can be determined, then the AFP (60) between the mud line and the casing seat (82) or other point can be computed based in this flow, the rheological properties of the drilling mud and the annular geometry of the wellbore in this interval. DGD systems known in the art have or can incorporate methods of determining the AFP based on this flow rate essentially in real time. The choke ((44) in Figure 4) can then be controlled to cause the casing annulus pressure (84) to increase by an amount equal to the computed reduction in the casing seat pressure.
The above description of this invention is generally applicable to any DGD system, regardless of the method used to maintain wellbore annulus pressure at the mud line substantially equal to ambient seawater pressure. It is particularly applicable to DGD systems that employ gas or some other diluent to lighten a column of mud in the drilling riser. The pressure at the base of the riser is a result of the integrated density of fluid column with in the riser. This pressure is inherently slow to respond to changes in flow conditions at the base of the riser, making it difficult to vary the pressure at the base of the riser, RBP, during relatively rapid transients such as encountered during and following drill string connections. Furthermore, it is also desirable to maintain RBP as constant as possible during drilling operations. Therefore, control of RBP is not practical during drill string connections and other short-term circulation transients to achieve the adjustments in wellbore pressure necessary to compensate for changes in AFP. The slow response of RBP makes the invention practical.
While the invention has been described with respect to a limited number of embodiments, those skilled in the art will appreciate that other embodiments can be devised which do not depart from the scope of the invention as disclosed herein. Accordingly, the scope ofthe invention should be limited only by the attached claims.

Claims

CLAIMS What is claimed is: 1. A method of controlling the pressure in a wellbore during a subsea drilling operation, comprising: operating a drilling system to have a first fluid pressure gradient inside a drill string extending from the sea surface to a drill bit near the bottom ofthe wellbore, the drilling system having a second fluid pressure gradient lower than the first fluid pressure gradient in a fluid return path extending from a selected depth in the wellbore to the sea surface; stopping introduction of drilling fluid to the inside ofthe drill string; and selectively controlling fluid flow in the fluid return path.
2. The method of claim 1 wherein the second fluid pressure gradient is generated by introducing gas into the fluid return path at a selected depth in the wellbore.
3. The method as defined in claim 2 wherein the selectively controlling comprises closing a blowout preventer adapted to seal an annular space between the wellbore and the drill string, the annular space forming the fluid return path, substantially at the selected depth; and remotely operating an adjustable choke disposed in a bypass line between a point below and a point above the selected depth.
4. The method as defined in claim 1 wherein the second fluid pressure gradient is generated by pump lifting fluid in the fluid return path from the selected depth to the earth's surface.
5. The method as defined in claim 1 wherein the predetermined depth is substantially equal to a casing seat depth.
6. The method as defined in claim 1 wherein the predetermined depth is greater than a casing seat depth
7. The method as defined in claim 1 wherein a static fluid pressure at the bottom ofthe wellbore is less than an expected formation fluid pressure.
8. The method as defined in claim 1 wherein a portion ofthe wellbore is substantially horizontal.
PCT/US2002/004890 2001-02-23 2002-02-20 Method and apparatus for controlling bottom-hole pressure during dual-gradient drilling WO2002068787A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2002253976A AU2002253976A1 (en) 2001-02-23 2002-02-20 Method and apparatus for controlling bottom-hole pressure during dual-gradient drilling

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US27124401P 2001-02-23 2001-02-23
US60/271,244 2001-02-23

Publications (2)

Publication Number Publication Date
WO2002068787A2 true WO2002068787A2 (en) 2002-09-06
WO2002068787A3 WO2002068787A3 (en) 2003-02-20

Family

ID=23034780

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2002/004890 WO2002068787A2 (en) 2001-02-23 2002-02-20 Method and apparatus for controlling bottom-hole pressure during dual-gradient drilling

Country Status (3)

Country Link
US (1) US6571873B2 (en)
AU (1) AU2002253976A1 (en)
WO (1) WO2002068787A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2281103A4 (en) * 2008-04-04 2015-09-02 Ocean Riser Systems As Systems and methods for subsea drilling

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020112888A1 (en) 2000-12-18 2002-08-22 Christian Leuchtenberg Drilling system and method
USRE43199E1 (en) 2001-09-10 2012-02-21 Ocean Rider Systems AS Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells
BRPI0212430B1 (en) 2001-09-10 2017-05-02 Ocean Riser Systems As drilling device to compensate for changes in equivalent mud circulation density (ecd), or dynamic pressure, and method for compensating for equivalent mud circulation density (ecd), or for increasing or decreasing dynamic pressure
US7185719B2 (en) * 2002-02-20 2007-03-06 Shell Oil Company Dynamic annular pressure control apparatus and method
US6904981B2 (en) 2002-02-20 2005-06-14 Shell Oil Company Dynamic annular pressure control apparatus and method
US20060086538A1 (en) * 2002-07-08 2006-04-27 Shell Oil Company Choke for controlling the flow of drilling mud
CA2534502C (en) * 2003-08-19 2011-12-20 Shell Canada Limited Drilling system and method
US7032691B2 (en) * 2003-10-30 2006-04-25 Stena Drilling Ltd. Underbalanced well drilling and production
US7284615B2 (en) * 2004-08-30 2007-10-23 Anadarko Petroleum Corporation Method and system for installing and maintaining a pipeline while minimizing associated ground disturbance
CA2867393C (en) 2006-11-07 2015-06-02 Charles R. Orbell Method of drilling with a riser string by installing multiple annular seals
US8281875B2 (en) * 2008-12-19 2012-10-09 Halliburton Energy Services, Inc. Pressure and flow control in drilling operations
US9567843B2 (en) * 2009-07-30 2017-02-14 Halliburton Energy Services, Inc. Well drilling methods with event detection
WO2011071586A1 (en) * 2009-12-10 2011-06-16 Exxonmobil Upstream Research Company System and method for drilling a well that extends for a large horizontal distance
US8201628B2 (en) 2010-04-27 2012-06-19 Halliburton Energy Services, Inc. Wellbore pressure control with segregated fluid columns
US8820405B2 (en) 2010-04-27 2014-09-02 Halliburton Energy Services, Inc. Segregating flowable materials in a well
US8403059B2 (en) * 2010-05-12 2013-03-26 Sunstone Technologies, Llc External jet pump for dual gradient drilling
US8783359B2 (en) 2010-10-05 2014-07-22 Chevron U.S.A. Inc. Apparatus and system for processing solids in subsea drilling or excavation
BR112013024718B1 (en) 2011-04-08 2020-10-27 Halliburton Energy Services, Inc vertical pipe pressure control method and system for use in a drilling operation and well system
US9249638B2 (en) 2011-04-08 2016-02-02 Halliburton Energy Services, Inc. Wellbore pressure control with optimized pressure drilling
US9080407B2 (en) 2011-05-09 2015-07-14 Halliburton Energy Services, Inc. Pressure and flow control in drilling operations
MY172254A (en) 2011-09-08 2019-11-20 Halliburton Energy Services Inc High temperature drilling with lower temperature drated tools
US9080427B2 (en) * 2011-12-02 2015-07-14 General Electric Company Seabed well influx control system
EP2617939A1 (en) * 2012-01-17 2013-07-24 Geoservices Equipements Installation for drilling a well into a soil and associated drilling method.
AU2013221574B2 (en) 2012-02-14 2017-08-24 Chevron U.S.A. Inc. Systems and methods for managing pressure in a wellbore
CN103470201B (en) * 2012-06-07 2017-05-10 通用电气公司 Fluid control system
US9500035B2 (en) 2014-10-06 2016-11-22 Chevron U.S.A. Inc. Integrated managed pressure drilling transient hydraulic model simulator architecture
GB201515284D0 (en) * 2015-08-28 2015-10-14 Managed Pressure Operations Well control method
AU2015408209A1 (en) * 2015-09-02 2018-02-01 Halliburton Energy Services, Inc. Software simulation method for estimating fluid positions and pressures in the wellbore for a dual gradient cementing system
CA3164712A1 (en) * 2020-01-16 2021-07-22 Opla Energy Ltd. Pressure management device for drilling system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3815673A (en) * 1972-02-16 1974-06-11 Exxon Production Research Co Method and apparatus for controlling hydrostatic pressure gradient in offshore drilling operations
US4046191A (en) * 1975-07-07 1977-09-06 Exxon Production Research Company Subsea hydraulic choke
US4813495A (en) * 1987-05-05 1989-03-21 Conoco Inc. Method and apparatus for deepwater drilling
US6328107B1 (en) * 1999-09-17 2001-12-11 Exxonmobil Upstream Research Company Method for installing a well casing into a subsea well being drilled with a dual density drilling system

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2512783A (en) 1946-05-04 1950-06-27 Augustine J Tucker Marine drilling
US2808230A (en) 1955-01-17 1957-10-01 Shell Oil Co Off-shore drilling
US2923531A (en) 1956-04-26 1960-02-02 Shell Oil Co Drilling
US3434550A (en) 1966-06-06 1969-03-25 Mobil Oil Corp Method and apparatus for lightening the load on a subsea conductor pipe
US3465817A (en) 1967-06-30 1969-09-09 Pan American Petroleum Corp Riser pipe
US3603409A (en) 1969-03-27 1971-09-07 Regan Forge & Eng Co Method and apparatus for balancing subsea internal and external well pressures
US3955411A (en) 1974-05-10 1976-05-11 Exxon Production Research Company Method for measuring the vertical height and/or density of drilling fluid columns
US4060140A (en) 1975-10-22 1977-11-29 Halliburton Company Method and apparatus for preventing debris build-up in underwater oil wells
GB1546919A (en) 1976-08-04 1979-05-31 Shell Int Research Marine structure and method of drilling a hole by means ofsaid structure
US4099583A (en) 1977-04-11 1978-07-11 Exxon Production Research Company Gas lift system for marine drilling riser
US4091881A (en) 1977-04-11 1978-05-30 Exxon Production Research Company Artificial lift system for marine drilling riser
US4210208A (en) 1978-12-04 1980-07-01 Sedco, Inc. Subsea choke and riser pressure equalization system
US4291772A (en) 1980-03-25 1981-09-29 Standard Oil Company (Indiana) Drilling fluid bypass for marine riser
CA2148969A1 (en) 1995-05-09 1996-11-10 George B. Gleadall Application of low density drilling muds
US6065550A (en) 1996-02-01 2000-05-23 Gardes; Robert Method and system for drilling and completing underbalanced multilateral wells utilizing a dual string technique in a live well
US5873420A (en) 1997-05-27 1999-02-23 Gearhart; Marvin Air and mud control system for underbalanced drilling
NO974348L (en) 1997-09-19 1999-03-22 Petroleum Geo Services As Device and method for controlling rise margin
MY126556A (en) 1997-09-25 2006-10-31 Shell Int Research Subsea drill fluid pumping and treatment system for deepwater drilling
US6325159B1 (en) 1998-03-27 2001-12-04 Hydril Company Offshore drilling system
US6415877B1 (en) 1998-07-15 2002-07-09 Deep Vision Llc Subsea wellbore drilling system for reducing bottom hole pressure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3815673A (en) * 1972-02-16 1974-06-11 Exxon Production Research Co Method and apparatus for controlling hydrostatic pressure gradient in offshore drilling operations
US4046191A (en) * 1975-07-07 1977-09-06 Exxon Production Research Company Subsea hydraulic choke
US4813495A (en) * 1987-05-05 1989-03-21 Conoco Inc. Method and apparatus for deepwater drilling
US6328107B1 (en) * 1999-09-17 2001-12-11 Exxonmobil Upstream Research Company Method for installing a well casing into a subsea well being drilled with a dual density drilling system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2281103A4 (en) * 2008-04-04 2015-09-02 Ocean Riser Systems As Systems and methods for subsea drilling
US9222311B2 (en) 2008-04-04 2015-12-29 Ocean Riser Systems AS Lilleakerveien 2B Systems and methods for subsea drilling

Also Published As

Publication number Publication date
AU2002253976A1 (en) 2002-09-12
US20020129943A1 (en) 2002-09-19
US6571873B2 (en) 2003-06-03
WO2002068787A3 (en) 2003-02-20

Similar Documents

Publication Publication Date Title
US6571873B2 (en) Method for controlling bottom-hole pressure during dual-gradient drilling
US6854532B2 (en) Subsea wellbore drilling system for reducing bottom hole pressure
AU2013221574B2 (en) Systems and methods for managing pressure in a wellbore
US6536540B2 (en) Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications
NO20181387A1 (en) Drilling system and method
WO2006118920A2 (en) Systems and methods for managing downhole pressure
US8851181B2 (en) Method for circulating a fluid entry out of a subsurface wellbore without shutting in the wellbore
CA2822571C (en) Method and apparatus for controlling fluid flow into a wellbore
WO2019014431A1 (en) Hybrid managed pressure drilling systems and methods
US20170175466A1 (en) Forming a subsea wellbore
WO2019014428A1 (en) Riserless managed pressure drilling systems and methods
Anthony et al. Downhole Water Sink Technology Improves Recovery and Rates from Strong Water Drive Reservoirs in North Kuwait–A Pilot Case Study
Agustinus et al. Managed pressure drilling application to deploy lower completion safely and efficiently in static-underbalanced well
Fossli et al. Managed-pressure drilling; techniques and options for improving efficiency, operability, and well safety in subsea TTRD
Bourgoyne Jr et al. An experimental study of well control procedures for deepwater drilling operations
WO2022154666A1 (en) A system and method for circulating drilling fluid in connection with open water drilling
Sangesland Riser lift pump for deep water drilling
Prabowo et al. Deepwater Drilling Solutions New Dual Gradient Drilling Concept
Saptharishi Optimization of Well Performance by Dual Gradient Drilling-A Literature Analysis
Bybee Analysis of alternative well-control methods for dual-density deepwater drilling
Rasmussen et al. Managed Pressure Drilling; Techniques and Options for Improving Efficiency, Operability and Well Safety in Subsea TTRD.
Cheatham Improved Pressure-Volume Schedules for Circulating Out Kicks in Directional Wells

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A3

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG UZ VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A3

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office