WO2002064415A9 - Advanced communication-based vehicle control method - Google Patents
Advanced communication-based vehicle control methodInfo
- Publication number
- WO2002064415A9 WO2002064415A9 PCT/US2002/004426 US0204426W WO02064415A9 WO 2002064415 A9 WO2002064415 A9 WO 2002064415A9 US 0204426 W US0204426 W US 0204426W WO 02064415 A9 WO02064415 A9 WO 02064415A9
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- obc
- vehicle
- server
- guideway
- accordance
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
Definitions
- This invention relates generally to train movement, and more particularly to controlling the movement of a plurality of trains over a predetermined track layout.
- the presence of a train is typically detected directly through a sensor device, or track circuit, associated with a specific section of the rails, referred to as a block.
- the presence of a train causes a short in a block's track circuit.
- Vital decision logic is employed, utilizing the block occupancy information in conjunction with other information provided, such as track switch positions, to determine a clear route availability for trains.
- the route availability information is then conveyed to a train crew through physical signals installed along the wayside whereupon a train crew encounters the signal and visually interprets the meaning of the displayed aspect.
- the route availability information is conveyed to train crews by passing information from the wayside to the train through the rails, referred to as continuous cab signaling, or through transponders, referred to as intermittent cab signaling, so that aspect information can be directly displayed in the cab.
- the train movement is then controlled by crew actions based on displayed aspect information and, in case of failure by the crew to take necessary actions, through optional speed enforcement.
- CBTC communication-based train control
- a method for controlling movement of a plurality of vehicles over a guideway partitioned into a plurality of guideway blocks.
- the method uses a control system including an onboard computer (OBC) located on board each vehicle, at least one server for communicating with the OBCs, and a vehicle location tracking system.
- OBC onboard computer
- the method comprises the steps of determining a composite block status for all guideway blocks, broadcasting the composite block status to the OBCs, and controlling movement of each vehicle based on the composite block status.
- a method for controlling movement of a plurality of vehicles over a guideway partitioned into a plurality of guideway blocks.
- the method uses a control system including an onboard computer (OBC) located on board each vehicle, at least one server for exchanging communication with the OBCs, and a vehicle location tracking system.
- OBC onboard computer
- the method comprises the steps of providing a predetermined mapping data set to each OBC that represents a guideway layout, equivalent block boundaries, and related characteristics of the guideway and utilizing a particular OBC to determine on board a block occupancy for the vehicle including that particular OBC. That particular OBC utilizing the mapping data set.
- a system for controlling movement of a plurality of vehicles over a guideway partitioned into a plurality of guideway blocks.
- the system comprising an onboard computer (OBC) located on board each vehicle, at least one server configured to communicate with the OBCs, and a vehicle location tracking system.
- OBC onboard computer
- the system is configured to utilize each vehicle's OBC to determine a block occupancy for that respective vehicle, determines a composite block status based on the block occupancy of each vehicle, transmits the composite block status to each said OBC, and controls movement of the vehicle including a respective said OBC based on the composite block status.
- Figure 1 is a block diagram of a system for controlling the movement of a plurality of vehicles on a guideway in accordance with one embodiment of the present invention.
- Figure 2 is diagram of a portion of a guideway, utilized by the system in Figure 1 , partitioned into equivalent blocks.
- Figure 3 is an exemplary embodiment of an onboard display of information to a vehicle crew using the system described in Figure 1.
- FIG. 1 is a block diagram of a system 10 for controlling the movement of a plurality of vehicles on a guideway (not shown) in accordance with one embodiment of the present invention.
- Each vehicle includes one or more vehicular units linked together to form a single vehicle.
- System 10 includes an onboard computer 14 (OBC) on each vehicle, a server 18 located at a fixed remote site, and an onboard tracking system 22 for tracking the position of each vehicle.
- OBC 14 includes a processor 26 that performs vital and non-vital calculations as well as vital coding and decoding of information, and a data storage device 30, such as a database.
- OBC 14 is connected to an OBC display 34 for viewing information, data, and possible graphical representations, and an OBC user interface 38 that allows a user to input information, data, and/or queries to OBC 14, for example a keyboard or a mouse.
- server 18 includes a processor 42 that performs vital and non-vital calculations as well as vital coding and decoding of information, and a data storage device 46, which, in one embodiment, includes a database.
- server 18 is connected to a server display 50 for viewing information, data, and, in one embodiment, graphical representations.
- Server 18 is also connected to a server user interface 54 that allows a user to input information, data, and/or queries to server 18, for example a keyboard or a mouse.
- Both OBC 14 and server 18 interface with various control elements (not shown) such as sensors, actuators, alarms, and wayside devices such as guideway switches, i.e., turnouts, for selecting among two or more diverging routes, signals and occupancy detection circuits, e.g., track circuits.
- OBC 14 exchanges information with server 18 via a communications system such as a mobile radio network.
- Tracking system 22 includes position sensors (not shown) and devices (not shown), such as a global positioning system (GPS) receiver, a tachometer, a gyroscope, an odometer, location tags along the guideway and an onboard tag reader.
- GPS global positioning system
- tracking system 22 is separate from OBC 14 and receives inputs from a least one GPS satellite (not shown).
- the onboard system may optionally receive and utilize differential correction information to improve location determination accuracy and/or integrity.
- Figure 1 shows onboard tracking system 22 separate from OBC 14, however, in another embodiment, OBC 14 includes tracking system 22.
- tracking system 22 has components that are separate from OBC 14 and components that are included in OBC 22.
- tracking system 22 components such as, a global positioning system receiver and software algorithms are included in OBC 14, while other tracking system 22 components, such as, a tachometer, a gyroscope, an odometer, and a guideway tag reader are located separate from OBC 14.
- tracking system 22 receives end of vehicle and front of vehicle information, and inputs from an operator, such as a vehicle engineer, containing information and data relating the position of a vehicle, to determine the location of at least one of the front of the vehicle and the end of the vehicle.
- an operator such as a vehicle engineer
- server 18 is located at a mobile site such as a mobile office structure or a train.
- data storage device 30 is not included in OBC 14. Instead data storage device 30 is connected to OBC 14.
- data storage device 46 is not included in server 18 but instead is connected to server 18.
- OBC 14 interface with a front of vehicle device 56, which communicates with an end of vehicle device 58 located at the end of the vehicle.
- Devices 56 and 58 provide vehicle integrity information by detecting possible vehicle separations.
- devices 56 and 58 provide information regarding the length of the vehicle and the location of the end of the vehicle.
- Alternative potential sources of vehicle length data are external systems (not shown), such as automatic equipment identification (AEI), hot box detectors, axle counters, track circuits, manual entry, and/or information systems.
- Figure 2 is diagram of a portion of a guideway 60 partitioned into equivalent blocks 64.
- Guideway 60 includes a terrestrial based network (not shown) of guideways that vehicles (not shown) use to move across terrestrial areas of varying size.
- Server 18 contains guideway data, such as equivalent block boundaries and signal logic, that relate to a portion of, or all of, guideway 60.
- server 18 contains terrain data relating to guideway 60.
- a traditional signal design algorithm is used to partition guideway 60 into equivalent blocks 64, which represent adjacent sections of guideway 60.
- the algorithm utilizes information such as, the guideway data, weight of a vehicle, speed of a vehicle, length of a vehicle, and desired traffic capacity to define equivalent blocks 64.
- the algorithm determines the number and length of equivalent blocks 64 such that the equivalent blocks 64 can be of any number, and of differing lengths.
- the block lengths change dynamically as the characteristics of vehicles on a particular section of guideway changes.
- the guideway blocks are defined to be small.
- the small defined blocks in combination with the use of a braking distance calculation based on actual vehicle and guideway characteristic, allows vehicles to be safely operated with separations approaching the theoretical minimum.
- a further embodiment permits subdividing of existing conventional physical signaling blocks into smaller sections that are treated as equivalent blocks. This subdividing allows safe reduction of vehicle separation distance in areas where conventional signals driven by guideway circuits, e.g., track circuits, already exist and continue to operate.
- Figure 2 shows guideway 60 including passing sidings 68 and 72, which are partitioned into equivalent blocks 64.
- server 18 transmits, to each OBC 14, a vitally codified mapping data set containing data related to the characteristics of the guideway.
- an off-board source other than server 18, broadcasts the codified mapping data set to the pertinent OBCs 14.
- the mapping data set is stored in database 30 and contains information and data such as equivalent block boundaries.
- the mapping data set contains related information such as permanent speed restrictions, temporary speed restrictions, grade, and information for interpreting signal aspects.
- server 18 transmits a subset of the mapping data set that is specific to a particular section of the guideway or to a particular geographical area.
- the mapping data set is predetermined and pre-loaded in database 30.
- locally relevant mapping data is transmitted incrementally as needed from devices in or near the guideway, e.g., tags or distributed servers, so that long term storage and large uploads of mapping data are not required.
- OBC 14 determines the location of the vehicle based on data received from tracking system 22. Using information obtained by tracking system 22, e.g., vehicle length and integrity information as well as the mapping data set, OBC 14 determines which equivalent blocks 64 (shown in Figure 2) the vehicle is currently occupying. Whenever a vehicle enters a new equivalent block 64, OBC 14 transmits a message to server 18 identifying which equivalent block 64 the vehicle has just entered, and whenever a vehicle leaves an equivalent block 64, OBC 14 transmits a message to server 18 identifying which equivalent block 64 the vehicle has just left. The messages are then stored in database 46.
- OBC 14 predicts and reports any equivalent block 64 that a vehicle will likely occupy before the vehicle can be stopped, for example those equivalent blocks 64 within braking distance of the vehicle. In determining predicted equivalent block occupancies, OBC 14 also applies a margin, increasing the predicted occupancy range to account for factors such as system delays resulting in latency before brakes are applied. The predicted equivalent block occupancies are transmitted to server 18 and stored in database 46
- Server 18 receives occupancy and clearance information from OBC 14 on board all vehicles utilizing the specific zone of guideway 60 (shown in Figure 2) monitored by server 18. Additionally, server 18 receives information communicated from wayside devices such as switches or human (manual) input on board. Server 18 uses the reported occupancy and other data to derive an equivalent block status for each equivalent block 64 in a manner similar to that of the logic used in conventional wayside signaling equipment for determining signal aspects from connections with guideway circuits and wayside devices such as switches. The status for each equivalent block 64 is dynamic. The equivalent block status for each block 64 is either limited to one of just two possibilities, corresponding to "block occupied" or "block free", or chosen from multiple possibilities. The multiple possibilities dictate various speed restrictions within equivalent block 64.
- a zero or low speed restriction applies in a block that is occupied whereas full speed up to the point of braking distance from the next occupied block entrance is allowed in a block that is not occupied.
- additional information is conveyed by the block status indications, such as whether more than one vehicle is in a block, and a diverging route where a vehicle has to turn off of the main line at a turnout.
- Server 18 compiles and stores all equivalent block statuses in database 46, then derives a composite equivalent block status containing the equivalent block status information for all equivalent blocks 64 monitored by server 18.
- Server 18 broadcasts a composite equivalent block status message simultaneously to all vehicles within the zone of server 18 such that each OBC 14 on board every vehicle in the zone of server 18 receives the same information.
- server 18 broadcasts composite equivalent block status updates periodically at a predetermined rate.
- server 18 broadcasts the composite equivalent block status updates asynchronously whenever an equivalent block status changes.
- communications between server 18 and OBC 14 utilize a terrestrial based radio network.
- Each OBC 14 on all the vehicles on the monitored guideway receive radio transmissions of the composite equivalent block status information originating from server 18.
- communications between server 18 and OBC 14 utilize at least one of cellular and satellite communications.
- Figure 3 is an exemplary embodiment of a graphical representation 80 used to display information related to controlling or restricting the movement of a vehicle.
- Graphical representation 80 includes a current speed indicator 82, a speed limit indicator 84, a current milepost indicator 86, a track name indicator 88, a direction indicator 90, a target speed indicator 92, a distance to target indicator 94, a time to penalty indicator 96, and an absolute stop indicator 98, which are used to convey vehicle movement controls or restrictions.
- OBC 14 shown in Figure 1
- equipment on board each vehicle such as display 34 (shown in Figure 1), displays information or restrictions necessary to safely control the vehicle.
- information necessary to safely control the vehicle includes information pertinent to that vehicle, a target description, limits on the range of movement allowed for the vehicle, and speed restrictions that may be stored on board.
- the display shows signal aspects such as red, yellow and green lights instead of target- based movement constraints.
- system 10 shown in Figure 1 includes an audible alarm unit (not shown), on board the vehicle, that provides warnings of such things as upcoming targets, limits, signal aspect changes to a more restrictive state or when braking action has been taken.
- Exemplary restrictive statuses for a block include stopping the vehicle, reducing the speed to a low speed, such as about 20 miles per hour (mph) throughout the block, and stopping the vehicle at the entrance to the block and then proceeding at a low speed, such as 20 mph or less.
- OBC 14 scans database 30 (shown in Figure 1) retrieving static information pertaining to targets ahead, such as, speed restrictions, and dynamic data, such as occupied equivalent blocks.
- the static information designates whether a target is permanent, temporary, or aspect-related.
- OBC 14 determines if a lower speed restriction or any other type of target is being approached.
- OBC 14 calculates a braking distance based on current speed, target location, and target speed, which may be zero, equating to a stop.
- OBC 18 considers guideway gradient and vehicle braking ability to refine the braking distance calculation. OBC 14 determines which target will first require the vehicle to reduce speed or stop.
- additional information such as guideway grade, locations of guideway features, for example crossings, defects detectors, and blocks occupied by other vehicles are displayed in graphic 80 in either graphical or textual format.
- the additional information is stored in database 30 and used in combination with previously described data to determine modifications in movement of a vehicle and provide information to the crew.
- the infrastructure also supports the transmission and display of other types of messages, for example bulletins, work orders, and e-mail.
- the OBC user interface allows the crew to input information or requests for information that is used on board.
- the OBC user interface allows the crew to input information or requests for information to be transmitted off board.
- OBC 14 calculates the distance and time to where braking must start in order to comply with the restrictions associated with each target. If the remaining time for any given target is less than 60 seconds, for example, time to penalty indicator 96 will numerically display the time remaining. If the time remaining is less than one second, for example, and the crew has not taken appropriate action to control the vehicle, the penalty brake will be applied.
- server 18 interfaces with office computers (not shown), for example a dispatching system, to receive information such as requests for routes to be cleared or switch positions to be changed. Additionally, server 18 furnishes information, such as vehicle locations in the form of equivalent block occupancies, to the office computers. Furthermore, server 18 obtains information used in affecting vehicle movements, for example temporary slow orders, guideway data such as grade, permanent speed restrictions, and equivalent signal locations, and vehicle data, such as vehicle length and weight.
- system 10 includes a plurality of servers 18 located at one or more locations such as various offices or various wayside locations.
- each server 18 is associated with specific equivalent blocks, and receives equivalent block occupancy information only from vehicles occupying the zone of equivalent blocks associated with a specific server 18. Therefore, each server 18 determines a composite equivalent block status unique to the equivalent blocks associated with its zone.
- OBC 14 uses a conventional onboard cab signal processor (not shown) and an operator interface, such as interface 38.
- the OBC determines and reports equivalent block occupancies and receives composite equivalent block status information for each equivalent block 64 (shown in Figure 2).
- OBC 14 synthesizes conventional cab signal codes that are structured like codes from guideway and wayside devices, but are actually communicated to OBC 14 from server 18. The synthesized signal codes are then used to drive the conventional cab signal processor instead of the code signals being detected by conventional cab signal sensors mounted on the vehicle near the guideway.
- conventional guideway blocks are used to determine block occupancy, block status, and composite block status.
- Conventional guideway block sizes are determined by physical divisions in the guideway created by conventional guideway occupancy detection circuit equipment.
- a pacing function is implemented to further improve railway operational efficiency.
- Movement planning functionality is incorporated into, or interfaced with, a dispatch system (not shown).
- the movement planner generates a movement plan for all vehicles within its realm of management with the objective of achieving optimal operations efficiency.
- the movement plan conforms with the laws of physics as well as safety constraints, such as those imposed by the equivalent block statuses.
- the movement planner transmits a relevant portion of the movement plan, referred to as a trip plan, to each OBC 14.
- Trip plans include Estimated Time of Arrival (ETA) and Estimated Time of Departure (ETD) for critical waypoints along the trip.
- Trip plan messages are sent in addition to, not in lieu of, composite equivalent block status messages.
- Functionality is added to OBC 14 to generate cues, for example, speed instructions for a vehicle driver which, if followed, control the speed of the vehicle in accordance with the plan.
- Messages transmitted from each OBC 14 in the form of equivalent block occupancy reports or precise location reports are used by the movement planner to determine if each vehicle is on schedule. If a vehicle falls off schedule to the extent of impacting other vehicles, the movement planner updates the movement plan and transmits a revised trip plan to the affected vehicles.
- a broken guideway detector is mounted on board each vehicle to monitor guideway continuity. Upon detection of a broken guideway, the guideway detector transmits a message to server 18 and notifies the crew who modifies vehicle movement based on the most restrictive aspect for the equivalent block where the break occurred. In an alternative embodiment, the guideway detector transmits a message to server 18 and server 18 notifies the crew. Additionally, notification of detection of a broken rail is transmitted to the OBC's 14 of nearby vehicles in order to inform crews of each vehicle so they may take appropriate action.
- system 10 achieves an automatic or driverless vehicle operation.
- OBC 14 interfaces with a vehicle throttle (not shown), onboard sensors (not shown), and a brake system (not shown) to automatically control vehicle movement in accordance with the controls and restrictions determined by OBC 14.
- the movement planner function and pacing function are used to direct vehicle movements.
- the driverless system controls the throttle and brake to conform with the trip plan but will not exceed the safety constraints dictated by the composite equivalent block status message and other restrictions.
- movement planner and pacing functions are not used to directly control throttle and brake. In this case, the OBC controls vehicle movements based on speed information in the composite block status received from server 18.
- the system described above provides a method of achieving railway traffic densities or throughput levels commensurate with or better than those achievable with traditional wayside signaling systems without the use of track circuits or wayside signals.
- the cost of deploying, maintaining, and modifying signaling equipment, or equivalent equipment is reduced.
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MXPA03007225A MXPA03007225A (en) | 2001-02-13 | 2002-02-13 | Advanced communication-based vehicle control method. |
AU2002242170A AU2002242170B2 (en) | 2001-02-13 | 2002-02-13 | Advanced communication-based vehicle control method |
CA2413080A CA2413080C (en) | 2001-02-13 | 2002-02-13 | Advanced communication-based vehicle control method |
BR0205810-3A BR0205810A (en) | 2001-02-13 | 2002-02-13 | Advanced communication-based vehicle control method |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US26835201P | 2001-02-13 | 2001-02-13 | |
US60/268,352 | 2001-02-13 | ||
US09/681,853 | 2001-06-18 | ||
US09/681,853 US6459965B1 (en) | 2000-11-22 | 2001-06-18 | Method for advanced communication-based vehicle control |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2002064415A1 WO2002064415A1 (en) | 2002-08-22 |
WO2002064415A9 true WO2002064415A9 (en) | 2004-05-06 |
Family
ID=26953022
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2002/004426 WO2002064415A1 (en) | 2001-02-13 | 2002-02-13 | Advanced communication-based vehicle control method |
Country Status (6)
Country | Link |
---|---|
US (1) | US6459965B1 (en) |
AU (1) | AU2002242170B2 (en) |
BR (1) | BR0205810A (en) |
CA (1) | CA2413080C (en) |
MX (1) | MXPA03007225A (en) |
WO (1) | WO2002064415A1 (en) |
Families Citing this family (101)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6459965B1 (en) * | 2000-11-22 | 2002-10-01 | Ge-Harris Railway Electronics, Llc | Method for advanced communication-based vehicle control |
US9151232B2 (en) | 2001-03-27 | 2015-10-06 | General Electric Company | Control system and method |
US7131614B2 (en) * | 2003-05-22 | 2006-11-07 | General Electric Company | Locomotive control system and method |
US6701228B2 (en) | 2002-05-31 | 2004-03-02 | Quantum Engineering, Inc. | Method and system for compensating for wheel wear on a train |
US6970774B2 (en) * | 2002-05-31 | 2005-11-29 | Quantum Engineering, Inc. | Method and system for compensating for wheel wear on a train |
US7283897B2 (en) * | 2002-05-31 | 2007-10-16 | Quantum Engineering, Inc. | Method and system for compensating for wheel wear on a train |
US10569792B2 (en) | 2006-03-20 | 2020-02-25 | General Electric Company | Vehicle control system and method |
US9733625B2 (en) | 2006-03-20 | 2017-08-15 | General Electric Company | Trip optimization system and method for a train |
US10308265B2 (en) | 2006-03-20 | 2019-06-04 | Ge Global Sourcing Llc | Vehicle control system and method |
US6609049B1 (en) | 2002-07-01 | 2003-08-19 | Quantum Engineering, Inc. | Method and system for automatically activating a warning device on a train |
US6865454B2 (en) | 2002-07-02 | 2005-03-08 | Quantum Engineering Inc. | Train control system and method of controlling a train or trains |
US6845953B2 (en) * | 2002-10-10 | 2005-01-25 | Quantum Engineering, Inc. | Method and system for checking track integrity |
US6996461B2 (en) * | 2002-10-10 | 2006-02-07 | Quantum Engineering, Inc. | Method and system for ensuring that a train does not pass an improperly configured device |
US6957131B2 (en) * | 2002-11-21 | 2005-10-18 | Quantum Engineering, Inc. | Positive signal comparator and method |
US6863246B2 (en) | 2002-12-31 | 2005-03-08 | Quantum Engineering, Inc. | Method and system for automated fault reporting |
US9950722B2 (en) | 2003-01-06 | 2018-04-24 | General Electric Company | System and method for vehicle control |
US20060212188A1 (en) * | 2003-02-27 | 2006-09-21 | Joel Kickbusch | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
US20060212187A1 (en) * | 2003-02-27 | 2006-09-21 | Wills Mitchell S | Scheduler and method for managing unpredictable local trains |
US7512481B2 (en) * | 2003-02-27 | 2009-03-31 | General Electric Company | System and method for computer aided dispatching using a coordinating agent |
US7797087B2 (en) | 2003-02-27 | 2010-09-14 | General Electric Company | Method and apparatus for selectively disabling train location reports |
US7937193B2 (en) | 2003-02-27 | 2011-05-03 | General Electric Company | Method and apparatus for coordinating railway line of road and yard planners |
US7725249B2 (en) * | 2003-02-27 | 2010-05-25 | General Electric Company | Method and apparatus for congestion management |
US6853888B2 (en) * | 2003-03-21 | 2005-02-08 | Quantum Engineering Inc. | Lifting restrictive signaling in a block |
US7398140B2 (en) * | 2003-05-14 | 2008-07-08 | Wabtec Holding Corporation | Operator warning system and method for improving locomotive operator vigilance |
US6915191B2 (en) | 2003-05-19 | 2005-07-05 | Quantum Engineering, Inc. | Method and system for detecting when an end of train has passed a point |
US7096096B2 (en) * | 2003-07-02 | 2006-08-22 | Quantum Engineering Inc. | Method and system for automatically locating end of train devices |
US8292172B2 (en) * | 2003-07-29 | 2012-10-23 | General Electric Company | Enhanced recordation device for rail car inspections |
US6903658B2 (en) * | 2003-09-29 | 2005-06-07 | Quantum Engineering, Inc. | Method and system for ensuring that a train operator remains alert during operation of the train |
US7221928B2 (en) * | 2003-10-01 | 2007-05-22 | Laird Mark D | Mobile emergency notification system |
JP4282534B2 (en) * | 2004-04-22 | 2009-06-24 | 三菱電機株式会社 | In-vehicle terminal for DSRC communication system |
US7908047B2 (en) * | 2004-06-29 | 2011-03-15 | General Electric Company | Method and apparatus for run-time incorporation of domain data configuration changes |
US20060015224A1 (en) * | 2004-07-15 | 2006-01-19 | Hilleary Thomas N | Systems and methods for delivery of railroad crossing and wayside equipment operational data |
US7142982B2 (en) | 2004-09-13 | 2006-11-28 | Quantum Engineering, Inc. | System and method for determining relative differential positioning system measurement solutions |
US7722134B2 (en) * | 2004-10-12 | 2010-05-25 | Invensys Rail Corporation | Failsafe electronic braking system for trains |
JP4375253B2 (en) * | 2005-02-25 | 2009-12-02 | 株式会社日立製作所 | Signal security system |
EP1861302A4 (en) * | 2005-03-14 | 2010-05-05 | Gen Electric | A system and method for railyard planning |
US7296646B2 (en) * | 2005-03-31 | 2007-11-20 | Nissan Technical Center North America, Inc. | System and method for timing of target speed for cooperative speed control system |
US7222003B2 (en) * | 2005-06-24 | 2007-05-22 | General Electric Company | Method and computer program product for monitoring integrity of railroad train |
US7457691B2 (en) | 2005-12-30 | 2008-11-25 | Canadian National Railway Company | Method and system for computing rail car switching solutions in a switchyard based on expected switching time |
US8055397B2 (en) | 2005-12-30 | 2011-11-08 | Canadian National Railway Company | System and method for computing rail car switching sequence in a switchyard |
US7742848B2 (en) | 2005-12-30 | 2010-06-22 | Canadian National Railway Company | System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for block pull time |
US7565228B2 (en) | 2005-12-30 | 2009-07-21 | Canadian National Railway Company | System and method for computing railcar switching solutions in a switchyard using empty car substitution logic |
US7742849B2 (en) | 2005-12-30 | 2010-06-22 | Canadian National Railway Company | System and method for computing car switching solutions in a switchyard using car ETA as a factor |
US7747362B2 (en) | 2005-12-30 | 2010-06-29 | Canadian National Railway Company | System and method for computing rail car switching solutions by assessing space availability in a classification track on the basis of block pull time |
US7751952B2 (en) | 2005-12-30 | 2010-07-06 | Canadian National Railway Company | System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for arrival rate |
US7596433B2 (en) | 2005-12-30 | 2009-09-29 | Canadian National Railway Company | System and method for computing rail car switching solutions in a switchyard with partially occupied classification track selection logic |
US7818101B2 (en) | 2005-12-30 | 2010-10-19 | Canadian National Railway Company | System and method for computing rail car switching solutions in a switchyard using an iterative method |
US7657348B2 (en) | 2005-12-30 | 2010-02-02 | Canadian National Railway Company | System and method for computing rail car switching solutions using dynamic classification track allocation |
US8060263B2 (en) | 2005-12-30 | 2011-11-15 | Canadian National Railway Company | System and method for forecasting the composition of an outbound train in a switchyard |
US7546185B2 (en) | 2005-12-30 | 2009-06-09 | Canadian National Railway Company | System and method for computing railcar switching solutions using an available space search logic assigning different orders of preference to classification tracks |
US7792616B2 (en) | 2005-12-30 | 2010-09-07 | Canadian National Railway Company | System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for block size |
US9828010B2 (en) | 2006-03-20 | 2017-11-28 | General Electric Company | System, method and computer software code for determining a mission plan for a powered system using signal aspect information |
US9156477B2 (en) | 2006-03-20 | 2015-10-13 | General Electric Company | Control system and method for remotely isolating powered units in a vehicle system |
NL1031437C2 (en) * | 2006-03-24 | 2007-09-25 | Movares Nederland Bv | Railway system, embankment system, surveillance system involve method for monitoring speed of trains in relation to railway signalling |
US7797088B2 (en) * | 2006-05-02 | 2010-09-14 | General Electric Company | Method and apparatus for planning linked train movements |
US20070260497A1 (en) * | 2006-05-02 | 2007-11-08 | Wolfgang Daum | Method of planning train movement using a front end cost function |
US7734383B2 (en) * | 2006-05-02 | 2010-06-08 | General Electric Company | Method and apparatus for planning the movement of trains using dynamic analysis |
US8498762B2 (en) * | 2006-05-02 | 2013-07-30 | General Electric Company | Method of planning the movement of trains using route protection |
US7680750B2 (en) * | 2006-06-29 | 2010-03-16 | General Electric Company | Method of planning train movement using a three step optimization engine |
US8082071B2 (en) * | 2006-09-11 | 2011-12-20 | General Electric Company | System and method of multi-generation positive train control system |
US9026284B2 (en) * | 2006-09-21 | 2015-05-05 | General Electric Company | Methods and systems for throttle control and coupling control for vehicles |
US20080099633A1 (en) * | 2006-10-31 | 2008-05-01 | Quantum Engineering, Inc. | Method and apparatus for sounding horn on a train |
US8433461B2 (en) * | 2006-11-02 | 2013-04-30 | General Electric Company | Method of planning the movement of trains using pre-allocation of resources |
US20080195351A1 (en) * | 2007-02-12 | 2008-08-14 | Tom Otsubo | Method and system for operating a locomotive |
US20080231506A1 (en) * | 2007-03-19 | 2008-09-25 | Craig Alan Stull | System, method and computer readable media for identifying the track assignment of a locomotive |
US7731129B2 (en) * | 2007-06-25 | 2010-06-08 | General Electric Company | Methods and systems for variable rate communication timeout |
US9073562B2 (en) | 2007-10-12 | 2015-07-07 | General Electric Company | System and method for a simulation based movement planner |
PL2910570T3 (en) | 2008-03-18 | 2017-06-30 | Novo Nordisk A/S | Protease stabilized, acylated insulin analogues |
US8731746B2 (en) * | 2008-05-29 | 2014-05-20 | Greenbrier Management Services, Llc | Integrated data system for railroad freight traffic |
US8224510B2 (en) * | 2008-11-26 | 2012-07-17 | General Electric Company | System and method to provide communication-based train control system capabilities |
US20100213321A1 (en) * | 2009-02-24 | 2010-08-26 | Quantum Engineering, Inc. | Method and systems for end of train force reporting |
US9834237B2 (en) | 2012-11-21 | 2017-12-05 | General Electric Company | Route examining system and method |
US20100258682A1 (en) * | 2009-04-14 | 2010-10-14 | Jeffrey Michael Fries | System and method for interfacing wayside signal device with vehicle control system |
GB0909373D0 (en) * | 2009-05-30 | 2009-07-15 | Park Signalling Ltd | Apparatus and method for implementing safe visual information provision |
US8509970B2 (en) | 2009-06-30 | 2013-08-13 | Invensys Rail Corporation | Vital speed profile to control a train moving along a track |
GB2479900A (en) * | 2010-04-28 | 2011-11-02 | Westinghouse Brake & Signal | Block by block initialisation of a rail signalling system for a rail network. |
TWI431560B (en) * | 2010-12-14 | 2014-03-21 | Inst Information Industry | Driving assisting system and method and computer readable storage medium storing thereof |
US8996161B2 (en) | 2011-05-19 | 2015-03-31 | Rockwell Automation, Inc. | Controlled architecture for transport systems |
US9702715B2 (en) | 2012-10-17 | 2017-07-11 | General Electric Company | Distributed energy management system and method for a vehicle system |
US20140142868A1 (en) * | 2012-11-18 | 2014-05-22 | Andian Technologies Ltd. | Apparatus and method for inspecting track in railroad |
US9669851B2 (en) | 2012-11-21 | 2017-06-06 | General Electric Company | Route examination system and method |
US10300752B2 (en) * | 2013-03-14 | 2019-05-28 | Bandt Road Rail Corporation | Road/rail vehicle with tractive weight control |
US8989985B2 (en) | 2013-08-14 | 2015-03-24 | Thales Canada Inc. | Vehicle-based positioning system and method of using the same |
WO2015031772A1 (en) * | 2013-08-29 | 2015-03-05 | General Electric Company | Vehicle yard planner system and method |
US9327740B2 (en) * | 2014-07-31 | 2016-05-03 | General Electric Company | Method and system for communicating data with vehicles |
USD781889S1 (en) | 2014-08-29 | 2017-03-21 | General Electric Company | Display screen with graphical user interface for a visual scheduling system and method of vehicle movement through yards |
DE102014223197A1 (en) * | 2014-11-13 | 2016-05-19 | Siemens Aktiengesellschaft | Method for carrying out an automatic train service and train system for carrying out an automatic train service |
DE102014223195A1 (en) * | 2014-11-13 | 2016-05-19 | Siemens Aktiengesellschaft | Method for carrying out an automatic train service and train system for carrying out an automatic train service |
DE102014223429A1 (en) * | 2014-11-17 | 2016-05-19 | Siemens Aktiengesellschaft | Method for carrying out an automatic train service and train system for carrying out an automatic train service |
CN104401368B (en) * | 2014-12-02 | 2016-04-06 | 合肥工大高科信息科技股份有限公司 | Based on locomotive position fixing system and the localization method thereof of track circuit and DGPS |
DE102015204356A1 (en) * | 2015-03-11 | 2016-09-15 | Siemens Aktiengesellschaft | Method and device for operating a tracked vehicle |
DE102015204437A1 (en) * | 2015-03-12 | 2016-09-15 | Siemens Aktiengesellschaft | Method and device for determining a signal term for a rail vehicle |
US9925994B2 (en) * | 2015-10-27 | 2018-03-27 | Siemens Industry, Inc. | Cutout systems and methods |
US10279823B2 (en) * | 2016-08-08 | 2019-05-07 | General Electric Company | System for controlling or monitoring a vehicle system along a route |
CN106672020B (en) * | 2016-12-12 | 2019-04-16 | 交控科技股份有限公司 | Front truck recognition methods, Vehicle Controller and train based on object controller |
CN107878505B (en) * | 2016-12-23 | 2019-04-19 | 比亚迪股份有限公司 | Controlling of path thereof and device |
GB201707347D0 (en) * | 2017-05-08 | 2017-06-21 | Apollo Train Control Ltd | A system and apparatus for decentralised continuous train control |
FR3071213B1 (en) * | 2017-09-18 | 2019-10-11 | Sncf Mobilites | METHOD AND SYSTEM FOR MANAGING RAILWAY CIRCULATION ON A RAILWAY |
CN109005553B (en) * | 2018-03-26 | 2021-09-24 | 南京地铁建设有限责任公司 | In-system maintenance method based on LTE bearing CBTC service |
EP4045380A4 (en) | 2019-10-17 | 2023-11-22 | Thales Canada Inc. | Method for cbtc system migration using autonomy platform |
CN111746599A (en) * | 2020-06-29 | 2020-10-09 | 湖南中车时代通信信号有限公司 | Partition control system |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4711418A (en) | 1986-04-08 | 1987-12-08 | General Signal Corporation | Radio based railway signaling and traffic control system |
FR2644420B1 (en) * | 1989-03-17 | 1991-07-05 | Aigle Azur Concept | SYSTEM FOR CONTROLLING THE PROGRESS OF SEVERAL RAIL CONVEYS ON A NETWORK |
GB9202830D0 (en) * | 1992-02-11 | 1992-03-25 | Westinghouse Brake & Signal | A railway signalling system |
US5364047A (en) | 1993-04-02 | 1994-11-15 | General Railway Signal Corporation | Automatic vehicle control and location system |
US5398894B1 (en) | 1993-08-10 | 1998-09-29 | Union Switch & Signal Inc | Virtual block control system for railway vehicle |
IL108549A (en) * | 1994-02-03 | 1998-08-16 | Zelinkovsky Reuven | Transport system |
US5533695A (en) | 1994-08-19 | 1996-07-09 | Harmon Industries, Inc. | Incremental train control system |
US5828979A (en) | 1994-09-01 | 1998-10-27 | Harris Corporation | Automatic train control system and method |
US6049745A (en) * | 1997-02-10 | 2000-04-11 | Fmc Corporation | Navigation system for automatic guided vehicle |
WO1998037432A1 (en) * | 1997-02-21 | 1998-08-27 | Ge-Harris Railway Electronics, L.L.C. | Method and system for proximity detection and location determination |
DE19715773A1 (en) * | 1997-04-16 | 1998-10-22 | Ee Signals Gmbh & Co Kg | Rail network operating safety method |
US6459965B1 (en) * | 2000-11-22 | 2002-10-01 | Ge-Harris Railway Electronics, Llc | Method for advanced communication-based vehicle control |
-
2001
- 2001-06-18 US US09/681,853 patent/US6459965B1/en not_active Expired - Lifetime
-
2002
- 2002-02-13 MX MXPA03007225A patent/MXPA03007225A/en active IP Right Grant
- 2002-02-13 BR BR0205810-3A patent/BR0205810A/en not_active IP Right Cessation
- 2002-02-13 CA CA2413080A patent/CA2413080C/en not_active Expired - Lifetime
- 2002-02-13 WO PCT/US2002/004426 patent/WO2002064415A1/en active IP Right Grant
- 2002-02-13 AU AU2002242170A patent/AU2002242170B2/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
CA2413080A1 (en) | 2002-08-22 |
US20020062181A1 (en) | 2002-05-23 |
CA2413080C (en) | 2013-01-15 |
AU2002242170B2 (en) | 2007-08-09 |
US6459965B1 (en) | 2002-10-01 |
BR0205810A (en) | 2003-08-19 |
WO2002064415A1 (en) | 2002-08-22 |
MXPA03007225A (en) | 2004-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2002242170B2 (en) | Advanced communication-based vehicle control method | |
AU2002242170A1 (en) | Advanced communication-based vehicle control method | |
US5950966A (en) | Distributed positive train control system | |
US9751543B2 (en) | Light rail vehicle monitoring and stop bar overrun system | |
AU2016201090B2 (en) | Signalling system for a railway network and method for the full supervision of a train realised by such a signalling system | |
US5533695A (en) | Incremental train control system | |
US8651433B2 (en) | Method and apparatus for a hybrid train control device | |
EP2571742B1 (en) | Onboard train control device | |
WO2018206610A1 (en) | A decentralised communications based train control system | |
US20040049327A1 (en) | Radio based automatic train control system using universal code | |
US9475511B2 (en) | Parallel tracks design description | |
Burns et al. | Safety and productivity improvement of railroad operations by advanced train control system | |
ZA200210165B (en) | Advanced communication-based vehicle control method. | |
Mattalia | The effects on operation and capacity on railways deriving from the switching to continous signals and tracing systems (ERTMS) | |
RU2676597C2 (en) | Parallel tracks design description | |
Pollack | Communications-based signaling: advanced capability for mainline railroads | |
Bezabih | Automatic train control standard for Ethiopia | |
Pollack | Train control. Automating the world's railways for safety | |
Steo et al. | INFORMATION/COMMUNICATION BASED TRAIN CONTROL: presented at Institution of Civil Engineers Conference Innovation in the Railway System Basel Switzerland December 5, 1996 | |
AMIRKHANI | Effective signaling system management on an upgraded railway: The case study of Ghana Western Line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG UZ VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2413080 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2002/10165 Country of ref document: ZA Ref document number: 200210165 Country of ref document: ZA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2002242170 Country of ref document: AU |
|
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: PA/a/2003/007225 Country of ref document: MX |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
122 | Ep: pct application non-entry in european phase | ||
COP | Corrected version of pamphlet |
Free format text: PAGES 1/3-3/3, DRAWINGS, REPLACED BY NEW PAGES 1/2-2/2; DUE TO LATE TRANSMITTAL BY THE RECEIVING OFFICE |
|
NENP | Non-entry into the national phase |
Ref country code: JP |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |
|
WWG | Wipo information: grant in national office |
Ref document number: 2002242170 Country of ref document: AU |