WO2001003023A2 - Process management graphical user interface, system and method - Google Patents
Process management graphical user interface, system and method Download PDFInfo
- Publication number
- WO2001003023A2 WO2001003023A2 PCT/CA2000/000689 CA0000689W WO0103023A2 WO 2001003023 A2 WO2001003023 A2 WO 2001003023A2 CA 0000689 W CA0000689 W CA 0000689W WO 0103023 A2 WO0103023 A2 WO 0103023A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- task
- user
- completed
- tasks
- fields
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
Definitions
- the present invention relates to process management and, more particularly, to methods and systems for managing processes in telecommunications networks.
- FCAPS Fault, Configuration, Accounting, Performance and Security categories
- telco craftspersons must also have knowledge of the employee to which the subsequent task is assigned, so that this next employee may be given the go- ahead to complete the subsequent task. This eventually leads to completion of the last task in the process, which then commonly results in the delivery, assurance or billing of a service to a customer.
- telco craftsperson As the same telco craftsperson is seldom involved in performing more than a few consecutive tasks, it becomes imperative to ensure good communication among telco personnel.
- telco invest extensively in human resources training, especially in the case of new hires who begin by knowing a very limited number of people within the organization.
- the invention may be summarized as a method of managing a process defined by a plurality of tasks capable of being completed by different users and intended to be completed in a particular order.
- the method includes the steps of displaying a plurality of task elements corresponding to the tasks in the process, graphically identifying the task elements corresponding to tasks which have been completed and, if the user of the method is capable of completing the next uncompleted task, specially identifying the corresponding task element. These steps are repeated upon completion of the next uncompleted task.
- the displayed task elements are arranged in a manner indicative of the order in which the tasks are intended to be completed.
- a graphical indicator e.g., an arrow, may be displayed proximate the task element corresponding to the next uncompleted task.
- each task element has a visual attribute indicative of whether or not the corresponding task is capable of being completed by the user.
- the method preferably includes the additional step of displaying information associated with the selected task.
- the information may includes a graphical indication of whether the selected task is capable of being completed by the user. It may also include a graphical indication of the functional category to which the selected task belongs.
- the information may also consist of statistical data pertaining to the selected task.
- the information includes a plurality of fields, wherein the fields contain data if the selected task has already been completed and wherein the fields require completion by the user if the selected task has not been completed. Selected ones of the fields may be completed by launching a task manager.
- the method preferably includes the additional steps of displaying a graphical entry mechanism for confirming the data occupying the fields and, in response to the current user accessing the entry mechanism, registering the task as having been completed and displaying updated information related to the selected task.
- the invention may be summarized as including the steps of graphically informing the user assigned to complete the next uncompleted task that the next uncompleted task requires execution and, upon completion of the next uncompleted task, graphically informing the user assigned to complete the task following the next uncompleted task that the following task requires execution.
- the invention also relates to a computer system and graphical user interface adapted to carry out any of the above methods and to a computer readable medium having software stored thereon for instructing a computer to carry out any of the above methods.
- the methods of the invention are implemented in a network management system.
- FIG. 1 is a block diagram of a network connected to a network management device featuring a graphical user interface according to an embodiment of the invention
- Fig. 2 shows a workflow icon corresponding to a process
- Fig. 3 shows a display appearing on the screen of the network management terminal of Fig. 1 as a result of launching a process manager in accordance with the preferred embodiment of the invention
- Fig. 4 shows the display resulting from the selection of a process and a task in the display of Fig. 3;
- Fig. 5 shows the display resulting from invoking a task manager from the display of Fig. 4;
- Fig. 6 shows the display resulting from having completed the selected task
- Fig. 7 shows the display resulting from having advanced to a next task
- Fig. 8 shows the display resulting from having moved back to a previous task
- Fig. 9 is a flowchart illustrating operation of the network management terminal.
- a NMS (network management system) 10 is shown connected to a database 12 and to a data collector 14.
- the data collector 14 is connected to a network 16 which might for example be an IP (Internet protocol) network.
- the data collector 14 is capable of collecting information from the network 16.
- the NMS 10 has a local database 29 and has a network management processor 19 which is connected to a display 21 and to various user input devices such as a keyboard 22 and a mouse 23. (If the display 21 is touch sensitive, then the display itself provides a user input device.)
- the local database 29 contains a list of all processes, a list of all tasks in each process, the FCAPS category to which each task belongs, a list of fields associated with each task, the identity of the user(s) or user group (s) responsible for the execution of each task, an indication of which tasks were completed by which users and the level of authority associated with each potential user of the
- the NMS 10 is adapted to perform two main functions. Firstly, it presents a GUI 24 of the display 21 to enable the presentation of information to a user in a coherent manner and to enable the receipt of instructions from the user through the user input devices 22,23. Secondly, it performs processing on the data stored in the database 12 in accordance with instructions received from users through the GUI 24 to put it into a form suitable for display.
- the NMS 10 is used by telco staff who participate in the end-to-end completion of a process affecting the network 14.
- each such process consists of a multiplicity of tasks in various FCAPS categories, multiple users (often in different departments) are involved in completing the process.
- An individual task may be completed independently by launching a specialized task manager which guides the user through completion of the task.
- These task managers are part of the software running on the processor in the NMS 10. Still, some users (e.g., novice users with little knowledge of the overall flow of a process) will require guidance as to the order in which certain tasks must be executed. Such guidance is provided by a process manager in accordance with the invention.
- the process manager is preferably a piece of software running on the processor in the NMS 10.
- the process manager can be launched by the user selecting a "process manager" palette or icon from an ordinary desktop, a specialized network management desktop or a toolbar located on the screen of the display 21.
- the process manager may be invoked separately by different users of the NMS 10 and multiple instances of the process manager may run contemporaneously . Operation of the process manager is now described with reference to the flowchart in Fig. 9. (Details of the preferred graphical user interface will be described later on.)
- the process manager which is launched by a "current" user of the NMS 10 begins by obtaining the identity of the current user from the NMS 10.
- the process manager may require only the identity of the current user group.
- the process manager can, by consulting the internal database 29, obtain a list of tasks which are the responsibility of the current user (or user group) .
- the process manager can determine the authority of the current user.
- the tasks (and their associated processes) which are the responsibility of the current user are graphically presented in an " in-box" window.
- the process manager waits for the current user to select one of the displayed processes. Once a process is selected, more details about the selected process are displayed at step 908.
- the display may indicate, for example, the process due date, service level agreement, etc.
- the process manager then waits for the current user to select one of the displayed tasks.
- more details about the selected task are displayed at step 912. For example, such details may include an indication of whether or not (and by whom) the task was completed and an indication of the functional category to which the task belongs.
- a plurality of fields may also be displayed in a specific region of the screen.
- the selected task is the next task to be completed and is the responsibility of the current user, or if the current user is authorized to do so, the current user may fill the fields with data. If the field is simple to fill with data, then the filled field is displayed on the screen (steps 916A and 916B) .
- this task manager can be launched by the current user (steps 918A and 918B) .
- the current user then interacts with the task manager and the data which has filled the field as a result of this interaction is displayed on the screen (step 916B) .
- step 920 once the current user is satisfied with the data filling the various fields associated with the selected task, he or she may decide to "enter” the data.
- the process manager passes the data occupying in the various fields to the NMS 10, which then ensures that the appropriate steps for completing the task are taken.
- the completion of a task by the NMS results in updates to the information which are graphically presented to the current user on the display 21.
- the just completed task may disappear from the current user's in-box.
- the display with which other users of the process manager are interacting is also affected by the completion of a task by the current user. For instance, the in-box of the user responsible for the next task in the process will now specify this next task.
- the process manager graphically interfaces with the user and performs mainly the following functions: (I) Displays an "in-box" for the user which graphically identifies the tasks in each process that are the responsibility of that user (step 904).
- a process management window 300 displayed within the screen of the display 21.
- the window 300 appears subsequent to a user launching the process manager from within the NMS 10.
- the identity of the current user is known to the process manager by virtue of the fact that the user has already logged in to the NMS 10.
- a login screen may appear prior to the manifestation of window 300, prompting potential users of the process manager for some form of identification.
- the process manager consults the internal database 29 and is able to determine the authority of the current user and the tasks for which the current user is responsible .
- the window 300 includes an in-box 305 containing a graphical depiction of the processes having at least one task which is the responsibility of the current user.
- in-box 305 shows a workflow icon 310 corresponding to a first process entitled "Network Traffic Control” and a workflow icon 315 corresponding to a second process entitled "Request New Equipment Installation” .
- the priority associated with each process may be indicated next to the title of the process or next to the respective workflow icon.
- Workflow icon 315 is shown in more detail in Fig. 2, where it is seen to comprise an arrangement of task elements 205A-H in the form of circles, although other shapes such as polygons are possible.
- Each task element 205A-H corresponds to a respective task in the process.
- a task ID number may be located within or next to each task element for numerically identifying the respective task.
- the task elements (circles 205A-H) in the workflow icon 315 are aligned in a sequence corresponding to the order in which the respective tasks are to be completed so as to lead to eventual completion of the process.
- the circles 205A-H are arranged from left to right along an imaginary horizontal axis (shown in dotted outline at 210) .
- the leftmost task element 205A corresponds to the task to be completed first and the rightmost task element 205H corresponds to the task to be completed last.
- other arrangements, such as top to bottom, are possible, the only requirement being the conveyance of chronological information through the chosen arrangement.
- the task elements corresponding to such "flexible" tasks may be aligned differently (e.g., orthogonally) with respect to the axis created by the task elements corresponding to the other
- task elements 205B and 205C are stacked vertically as opposed to horizontally.
- a task element can also be imparted with an attribute which indicates whether or not the corresponding task has already been completed (either by the current user or by another user) .
- the fill level of circles 205A-H is used to convey whether or not the corresponding task has already been completed.
- Filled circles 205A-D are used to indicate completed tasks and unfilled circles 205E-H are used to indicate the opposite, i.e., that the corresponding tasks remain uncompleted.
- a task element can, if applicable, be furnished with a visual indication that the corresponding task is the responsibility of the current user.
- coloured regions surrounding certain task elements can be used to indicate that the respective tasks are the responsibility of the current user.
- the region is darkly coloured (e.g., region 215 surrounding circles 205E and 205F)
- the corresponding tasks are to be completed during the current instantiation of the process manager, while a lightly coloured region (such as region 220 surrounding circle 205H) indicates that the corresponding task is indeed executable by the current user, although following the execution by other telco staff of an intervening task corresponding to task element 205G.
- the current user is instantly made aware of which tasks in which processes he or she is responsible for. This is especially advantageous in assisting new hires who may not yet be familiar with the end-to-end flow of a process.
- the current user may then wish to execute one of the tasks for which he or she is responsible and which are surrounded by darkly coloured regions in the in-box 305.
- the current user may simply wish to obtain information about one of the processes without intending to execute a specific task.
- the current user can access one of the processes displayed in the in-box 305 by selecting the desired workflow icon, e.g., with a mouse.
- the current user can initiate a process by clicking on one of several process model tabs or menus in the window 300.
- the process model tabs or menus can be labelled FULFILMENT, ASSURANCE and BILLING to reflect adherence of each process to the widely accepted "FAB" process model.
- the FAB process model classifies each telecommunications management process as a fulfilment, assurance or billing process. Individual steps in a process each belong to an FCAPS category, with the result that the flow of a FAB process usually crosses FCAPS boundaries.
- the FAB process model is more fully described in a document entitled "Telecom Operations Map, GB910, Evaluation Version 1.1", produced by the Telemanagement Forum in April, 1999 and incorporated by reference herein.
- the window 300 also presents a working area 320 in which general information corresponding to the selected process is displayed.
- this information may include the name of the process, the customer, the location (s) where the process is taking place, the service level agreement (SLA) , the date on which the process was originated and the date by which the process is due to be completed.
- the window 300 preferably displays an enlarged workflow icon 325 corresponding to the selected process.
- the enlarged workflow icon 325 may contain features in addition to those portrayed by the corresponding workflow icon 315 in the in-box 305.
- the enlarged workflow icon 325 also contains an indicator (e.g., an arrow) which points to the first unfilled circle in the sequence of circles corresponding to the selected process.
- an indicator e.g., an arrow
- the arrow allows the current user to identify the most urgent uncompleted task in the selected process .
- workflow icon 325 resembles workflow icon 315 which corresponds to the "Request New Equipment Installation" process.
- workflow icon 315 comprises circles 205A-H, among which circles 205E and 205F are surrounded by darkly coloured region 215 and circle 205H is surrounded by light coloured region 220.
- an arrow 330 points to unfilled circle 205E, indicating the task most urgently requiring execution. It should be understood that if the arrow 330 were to point to a set of vertically arranged task elements (e.g., circles 205B and 205C) , this would indicate that the corresponding tasks are next in line to be completed, although in no particular order amongst the tasks themselves. In general, the task element pointed to by the arrow
- unfilled circle 205E pointed to by the arrow 330 is the first circle (viewed from left to right) surrounded by a darkly shaded region, which signifies that the corresponding task has indeed to be completed by the same user who has launched the process manager.
- the user may select (e.g., by clicking on) any task element in the enlarged workflow icon 325.
- the identity of the selected task element is fed to the underlying process manager, which then causes details pertaining to the corresponding task (known as the "selected task") to be displayed in another working area 335 in the window 300.
- the selected task is allowed to be the task to be completed, a previously completed task, or a task not yet completed and, furthermore, the selected task need not be one that is the responsibility of the current user.
- the task details appearing in working area 335 could be blank or could be those of a default task.
- the default task can be the next task to be completed by a member of the telco staff or the next task to be completed by the current user, for example. In the present case, these tasks are one and the same and are represented by circle 205E in the enlarged workflow icon 325.
- the task element corresponding to the selected (or default) task is identified by graphically enhancing the corresponding circle on the enlarged workflow icon.
- the selected task is the one corresponding to task element 205E.
- task element 205E is pointed to by another arrow 340, which is shown as being larger than arrow 330.
- An indication of the identity of the selected task may appear in the vicinity of arrow 340.
- both arrows 330 and 340 point to the same task element 205E, it is noted that the position of arrow 330 (corresponding to the next task requiring completion) is determined by the process manager and NMS, while the position of the arrow 340 (corresponding to the selected task) is controllable by the current user.
- working area 335 Within working area 335 is displayed another working area 345 which contains generic information pertaining to the selected task.
- the generic information displayed in working area 345 has the same format for any task and may include a brief description of the selected task, the FCAPS category associated with the selected task and the date by which completion of the selected task is due. If the current user does not have the authority to modify the data in the fields relating to the selected task, this fact may be graphically indicated by displaying a lock icon, for example.
- the generic information displayed in working area 345 specifies that the selected task is the "set parameters" task and indicates by displaying the letter "C” that the selected task belongs to the "CONFIGURATION" functional category. Furthermore, the absence of a lock icon in working area 345 indicates that the user is indeed authorized to modify the data in the fields relating to the "set parameters" task.
- Working area 335 also comprises a task details tab 380 and a log tab 385.
- task details tab 380 When task details tab 380 is selected, a task details window 350 appears in working area 335; when log tab 385 is selected, a log window is displayed in working area 335.
- a task details window When task details tab 380 is selected, a task details window 350 appears in working area 335; when log tab 385 is selected, a log window is displayed in working area 335.
- Preferably, only one of the two windows may be displayed in its entirety, depending on which tab is selected by the user.
- the log window can be used for recording information (e.g., statistics) pertaining to the selected task being completed by the current user.
- the log window tracks task statistics over time, records any user notes and shows the escalation path to be followed in case of difficulty.
- the escalation path refers to a list of personnel which should be notified and actions which should be taken if the selected task takes longer than a predetermined amount of time.
- a working area in the log window can be filled by the current user with information, such as messages and warnings, through use of the keyboard or other input device.
- the task details window 350 is shown to comprise a plurality of fields 355A-J which can be filled with data.
- the way in which data can fill a field varies from one field to another.
- the field is filled by incrementing or decrementing the value displayed in the field through the use of up and down arrows displayed next to the field in question.
- the field is filled by choosing from a list of options displayed when a button is displayed next to the respective field is pressed.
- Still other fields e.g., "current software" field
- 355A are filled through the use of a task manager that is launched by pressing a button displayed next to the respective field.
- a task manager that is launched by pressing a button displayed next to the respective field.
- an UPDATE button 360 is displayed next to "current software" field 355A; when the user clicks on the UPDATE button 360, the underlying process manager registers this fact and launches a task manager (and a corresponding graphical user interface) for helping the user complete the selected task.
- Fig. 5 shows an example of a task manager window 370 which may appear on top of window 300 when the task manager is launched subsequent to clicking the UPDATE button 360.
- the task manager launched in this way can be identical to the task manager which would be accessed if the current user were to perform the selected task without the benefit of a process manager.
- the process manager passes control of the display to the task manager.
- the user then fills the fields of the task manager and exits the task manager in a suitable way, e.g., by pressing a DONE button 375 in task manager window 370.
- the process manager Upon exiting the task manager, the process manager regains control of the screen and the user continues to interact with the display of the process manager.
- the current user can register the data with the process manager by accessing an entry mechanism.
- the entry mechanism may consist of the user clicking on a button 390 displayed in working area 355.
- the button 390 may have a descriptive title which is more closely associated with the nature of the selected task.
- the button 390 is entitled “upload parameters” . It is noted that until the data is entered via the entry mechanism, the data in the various fields only remains stored in local memory. After it is entered, e.g., by pressing the "upload parameters" button 390, the process manager passes the data occupying the various fields 355A-J in the task details window 350 to the underlying network management system (NMS) 10.
- NMS network management system
- the NMS takes the appropriate steps to ensure that the task is completed. After the task has been completed the NMS updates the local database and the process manager accordingly modifies the current user's display, in particular the in-box 305.
- circle 205E is a circle 205E
- a PREVIOUS STEP button 400 and a NEXT STEP button 405 can be provided in working area 335 for allowing the user to advance or back up on a task-by-task basis.
- the data occupying the various fields corresponding to the original task can be stored in local memory so that it may be viewed upon return to the original task.
- the enlarged workflow icon 325 still shows task element 205E as being filled.
- Arrow 340 still points to the selected task element, namely circle 205F.
- arrows 330 and 340 again point to the same task element.
- Generic information about the newly selected task is displayed in working area 345 and reveals that the title of the selected task is "check parameter values" .
- the "C” indicates that the "check parameter values” task belongs to the "CONFIGURATION” functional category.
- a code corresponding to the appropriate functional category will be displayed in working area 345.
- task-specific information is displayed in a different task details window 350', which now includes a plurality of fields 355' whose contents are to be verified by the current user as part of the "check parameter values" task.
- the process manager After clicking on the verify parameters button 390', the process manager alerts the NMS 10, which then modifies the internal database 29 to indicate that the "check parameter values" task has been completed by the current user.
- the process manager subsequently modifies workflow icon 315 and modified workflow icon 325 by filling in the corresponding task element, namely task element 205F.
- the current user is also able to view information pertaining to a previously executed task.
- the current is properly authorized to do so, he or she may even enter data into fields (in the log window, for example) associated with a previously completed task.
- the current user can access a previously completed task by clicking on the PREVIOUS TASK button 400 as many times as necessary or by clicking on the desired task in the enlarged workflow icon 325.
- a feature unique to the process manager and graphical user interface of the present invention is that the user is permitted to view the data entered for a previous task (possibly belonging to a different functional category) although he or she may not have been the originator of this information.
- the user is permitted to view information about tasks not yet completed, although the insight gained from such browsing may be limited to knowledge about the types of fields requiring completion.
- Fig. 8 shows the display resulting from the current user having selected the task corresponding to circle 205D in the enlarged workflow icon 325 prior to completing the "check parameter values" task.
- Arrow 340 therefore points to the selected task element 205D.
- the fact that task element 205F is unfilled indicates that the "check parameter values" task was not completed prior to accessing the selected task.
- arrow 330 remains pointed towards task element 205F.
- Working area 345 which displays generic information relevant to the selected task, shows that the selected task is entitled “design test sheet”.
- the " F” indicates that the "design test sheet” task belongs to the "FAULT” functional category.
- the current user is alerted to the fact that he or she is not authorized to modify the data entered the "design test sheet” task. (For example, the current user may only have the authority to enter data for tasks in the "CONFIGURATION" category.)
- the entry mechanism embodied by a "download to test manager" button 390'' has been disabled by having been “grayed out”.
- the various fields Upon return to the display corresponding to the "check parameter values” task, the various fields will preferably conserve all the data previously filling the various fields before having navigated to the "design test sheet” task, by virtue of this data having been stored in local memory during browsing.
- the present invention allows different users to navigate through tasks in a process using the same graphical user interface and process manager which, through the use of coordinated in-boxes, allows process flow to be tracked across FCAPS boundaries and allows users to be alerted of the completion of tasks as completion occurs.
- this leads to an increase in the speed and reliability with which data services are delivered to the customer, as well as a considerable reduction in operations and training costs and an improvement in overall process efficiency.
Abstract
Description
Claims
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU53808/00A AU5380800A (en) | 1999-06-30 | 2000-06-08 | Process management graphical user interface, system and method |
EP00938395A EP1145167A3 (en) | 1999-06-30 | 2000-06-08 | Process management graphical user interface, system and method |
CA002337933A CA2337933A1 (en) | 1999-06-30 | 2000-06-08 | Process management graphical user interface, system and method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US34339199A | 1999-06-30 | 1999-06-30 | |
US09/343,391 | 1999-06-30 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2001003023A2 true WO2001003023A2 (en) | 2001-01-11 |
WO2001003023A3 WO2001003023A3 (en) | 2001-08-02 |
Family
ID=23345935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CA2000/000689 WO2001003023A2 (en) | 1999-06-30 | 2000-06-08 | Process management graphical user interface, system and method |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP1145167A3 (en) |
AU (1) | AU5380800A (en) |
CA (1) | CA2337933A1 (en) |
WO (1) | WO2001003023A2 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6671869B2 (en) | 2001-12-12 | 2003-12-30 | Scott A. Davidson | Method and apparatus for graphically programming a programmable circuit |
US8261362B2 (en) | 2010-12-30 | 2012-09-04 | Ensighten, Inc. | Online privacy management |
US8640037B2 (en) | 2012-02-21 | 2014-01-28 | Ensighten, Llc | Graphical overlay related to data mining and analytics |
US8996986B2 (en) | 2010-01-11 | 2015-03-31 | Ensighten, Inc. | Enhanced delivery of content and program instructions |
US9003552B2 (en) | 2010-12-30 | 2015-04-07 | Ensighten, Inc. | Online privacy management |
US9165308B2 (en) | 2011-09-20 | 2015-10-20 | TagMan Inc. | System and method for loading of web page assets |
US9219787B1 (en) | 2014-11-26 | 2015-12-22 | Ensighten, Inc. | Stateless cookie operations server |
US9268547B2 (en) | 2010-01-11 | 2016-02-23 | Ensighten, Inc. | Conditional logic for delivering computer-executable program instructions and content |
US9317490B2 (en) | 2012-09-19 | 2016-04-19 | TagMan Inc. | Systems and methods for 3-tier tag container architecture |
US9553918B1 (en) | 2014-11-26 | 2017-01-24 | Ensighten, Inc. | Stateful and stateless cookie operations servers |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106899666B (en) * | 2017-02-21 | 2019-12-24 | 阿里巴巴集团控股有限公司 | Data processing method and device for service identification |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5563994A (en) * | 1994-03-11 | 1996-10-08 | Harmon; Samuel T. | System for graphically generating the sequence and temporal relationship between tasks in a project |
EP0841627A2 (en) * | 1996-11-08 | 1998-05-13 | Hitachi, Ltd. | Task execution support system |
US5765140A (en) * | 1995-11-17 | 1998-06-09 | Mci Corporation | Dynamic project management system |
-
2000
- 2000-06-08 AU AU53808/00A patent/AU5380800A/en not_active Abandoned
- 2000-06-08 CA CA002337933A patent/CA2337933A1/en not_active Abandoned
- 2000-06-08 EP EP00938395A patent/EP1145167A3/en not_active Withdrawn
- 2000-06-08 WO PCT/CA2000/000689 patent/WO2001003023A2/en not_active Application Discontinuation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5563994A (en) * | 1994-03-11 | 1996-10-08 | Harmon; Samuel T. | System for graphically generating the sequence and temporal relationship between tasks in a project |
US5765140A (en) * | 1995-11-17 | 1998-06-09 | Mci Corporation | Dynamic project management system |
EP0841627A2 (en) * | 1996-11-08 | 1998-05-13 | Hitachi, Ltd. | Task execution support system |
Non-Patent Citations (2)
Title |
---|
"INTEGRATION OF GROUPWARE WITH PROJECT MANAGEMENT VIA FACILITATED WORK SESSIONS" IBM TECHNICAL DISCLOSURE BULLETIN,IBM CORP. NEW YORK,US, vol. 39, no. 3, 1 March 1996 (1996-03-01), pages 171-173, XP000581663 ISSN: 0018-8689 * |
SURJAPUTRA, R. ET AL.: "A Distributed Software Project Management Tool" PROC. OF 8TH INT IEEE WORKSHOP ON ENABLING TECHNOLOGIES, 16 - 18 June 1999, pages 30-31, XP002157255 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6671869B2 (en) | 2001-12-12 | 2003-12-30 | Scott A. Davidson | Method and apparatus for graphically programming a programmable circuit |
US8996986B2 (en) | 2010-01-11 | 2015-03-31 | Ensighten, Inc. | Enhanced delivery of content and program instructions |
US9268547B2 (en) | 2010-01-11 | 2016-02-23 | Ensighten, Inc. | Conditional logic for delivering computer-executable program instructions and content |
US9923900B2 (en) | 2010-12-30 | 2018-03-20 | Ensighten, Inc. | Online privacy management system with enhanced automatic information detection |
US8261362B2 (en) | 2010-12-30 | 2012-09-04 | Ensighten, Inc. | Online privacy management |
US8516601B2 (en) | 2010-12-30 | 2013-08-20 | Ensighten, Llc | Online privacy management |
US9003552B2 (en) | 2010-12-30 | 2015-04-07 | Ensighten, Inc. | Online privacy management |
US10257199B2 (en) | 2010-12-30 | 2019-04-09 | Ensighten, Inc. | Online privacy management system with enhanced automatic information detection |
US9165308B2 (en) | 2011-09-20 | 2015-10-20 | TagMan Inc. | System and method for loading of web page assets |
US8640037B2 (en) | 2012-02-21 | 2014-01-28 | Ensighten, Llc | Graphical overlay related to data mining and analytics |
US9317490B2 (en) | 2012-09-19 | 2016-04-19 | TagMan Inc. | Systems and methods for 3-tier tag container architecture |
US9553918B1 (en) | 2014-11-26 | 2017-01-24 | Ensighten, Inc. | Stateful and stateless cookie operations servers |
US9219787B1 (en) | 2014-11-26 | 2015-12-22 | Ensighten, Inc. | Stateless cookie operations server |
Also Published As
Publication number | Publication date |
---|---|
CA2337933A1 (en) | 2001-01-11 |
EP1145167A3 (en) | 2001-12-19 |
AU5380800A (en) | 2001-01-22 |
WO2001003023A3 (en) | 2001-08-02 |
EP1145167A2 (en) | 2001-10-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6353446B1 (en) | Method and system for integrated network management applications | |
US6687750B1 (en) | Network traffic visualization | |
US6020889A (en) | System for displaying a computer managed network layout with varying transience display of user selected attributes of a plurality of displayed network objects | |
US10832181B2 (en) | Management of business process key performance indicators | |
US7519912B2 (en) | Method and system for sensing and communicating the use of communication modes by remote users | |
US11233708B1 (en) | System, apparatus and method for deploying infrastructure to the cloud | |
CA1318040C (en) | Electronic mail follow-up system | |
US7133833B1 (en) | Lightweight directory access protocol workflow management system | |
US20120210244A1 (en) | Cross-Domain Privacy Management Service For Social Networking Sites | |
US20080147789A1 (en) | Intelligent knowledge management and content delivery system | |
EP0974900A2 (en) | Method for communicating between frames within a web browser window | |
US9628458B2 (en) | Access management for controlling access to computer resources | |
WO2001003023A2 (en) | Process management graphical user interface, system and method | |
US20050125496A1 (en) | Automatically initiating an instant messaging action when a subscriber's availability status changes | |
JPH11167540A (en) | Management method for computer system | |
WO2001082205A1 (en) | Method, system, and computer program product for assessing information security | |
GB2469742A (en) | Monitoring system for tracking and resolving incidents | |
US20080082391A1 (en) | System and method for scheduling healthcare workers | |
EP2497060A2 (en) | User interface for defining account dimension combinations | |
US20030126003A1 (en) | Method for monitoring and controlling workflow of a project, applications program and computer product embodying same and related computer systems | |
US20240045569A1 (en) | Displaying queue information in a graphical user interface of an issue tracking system | |
US9405531B2 (en) | Methods for building application intelligence into event driven applications through usage learning, and systems supporting such applications | |
US7346888B1 (en) | Use case integration | |
US20120304095A1 (en) | Identity Manager Operations Dashboard | |
US20030069782A1 (en) | System and method for scheduling and tracking retail store resets and remodels |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG |
|
ENP | Entry into the national phase |
Ref document number: 2337933 Country of ref document: CA Kind code of ref document: A Ref document number: 2337933 Country of ref document: CA |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2000938395 Country of ref document: EP |
|
AK | Designated states |
Kind code of ref document: A3 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A3 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG |
|
WWP | Wipo information: published in national office |
Ref document number: 2000938395 Country of ref document: EP |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
NENP | Non-entry into the national phase |
Ref country code: JP |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 2000938395 Country of ref document: EP |