WO1997012114A1 - Method of producing a cased extraction hole - Google Patents

Method of producing a cased extraction hole Download PDF

Info

Publication number
WO1997012114A1
WO1997012114A1 PCT/DE1996/001795 DE9601795W WO9712114A1 WO 1997012114 A1 WO1997012114 A1 WO 1997012114A1 DE 9601795 W DE9601795 W DE 9601795W WO 9712114 A1 WO9712114 A1 WO 9712114A1
Authority
WO
WIPO (PCT)
Prior art keywords
string
conveyor
drill
line
production
Prior art date
Application number
PCT/DE1996/001795
Other languages
German (de)
French (fr)
Inventor
Axel Sperber
Thomas Kerk
Original Assignee
Becfield Drilling Services Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Becfield Drilling Services Gmbh filed Critical Becfield Drilling Services Gmbh
Publication of WO1997012114A1 publication Critical patent/WO1997012114A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • E21B7/208Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes using down-hole drives
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Definitions

  • the invention relates to a method for producing a cased bore for the extraction of liquid or gaseous substances, in particular crude oil or natural gas, in which a production section of a deep well is sunk and completed with a production line, which may also already be perforated.
  • a production borehole is drilled from a deep borehole that has been expanded with a casing tour, either in an extension thereof or deflected therefrom, which explores the deposit.
  • the production bore is then completed with a production line in a second step.
  • This known method is complex since a pipe string has to be installed and removed twice in succession, namely once to bring it down and once to complete the production bore.
  • a further disadvantage of this method is seen in the fact that after pulling the drilling set and before installing the conveyor string, there is a fall in the conveyor bore and the installation of the conveyor string can thus be hindered or impossible. This problem is particularly serious if the conveying section is deflected horizontally.
  • the invention has for its object a method of Specify the type mentioned at the outset, which avoids the disadvantages mentioned and can be carried out in a simple and economical manner.
  • the method according to the invention provides that the production line is installed in the drill line and, following the drilling set, is introduced into the production section when the production section is lowered, and that after the end depth has been reached, the production line is separated from the drill line and is suspended in the deep borehole and the drill string, including the parts of the drill set that can be pulled through the production string, is removed.
  • the drilling of a conveying section and the installation of the conveying strand in this conveying section are carried out in a common method step, in that the conveying strand is introduced into the conveying tool at the same time as the conveying section is brought down.
  • the drilling tool can be driven both above ground according to the rotary principle and with the aid of an on-site drive.
  • the conveyor string can form the lower section of the drill string, which connects the drill bit or the on-site drive of the drill bit to the drill string.
  • the local drive of the drill bit will be preferred in such an arrangement of the conveyor string.
  • Another variant of the method according to the invention provides for the conveying string and the drill string to be arranged superimposed on one another and to be releasably connected to one another in this way. that the drill string can be removed from the production string.
  • the conveyor line remains largely free of the driving forces of the drilling tool, so that drilling can also be carried out using the rotary method.
  • perforations in the conveying strand can be closed according to the invention in various ways by removable means before it is installed.
  • the perforations can be provided with plugs, e.g. to close from aluminum or a silicone mass and to remove them after the installation of the conveyor line by suitable rinsing additives by chemical means.
  • Another advantageous procedure according to the invention can consist in the fact that a flushing line is installed in the conveyor line, which guides the flushing to the drill bit and possibly to the on-site drive and which can be pulled with the drill rod.
  • This procedure also opens up the possibility of connecting the lower end of the rinsing line to a measuring probe for measuring the borehole, which can be pulled using the rinsing line.
  • a measuring probe for measuring the borehole
  • the diameter of the conveyor line is sufficient, there is the possibility of attaching the lower end of the flushing line to an on-site drive that can be pulled through the flushing line, so that it can be removed after completion of the bore.
  • a foldable i.e. If the diameter of the drill bit can be reduced, it can also be pulled through the conveyor string after completion of the bore.
  • the use of a foldable drill bit also makes it possible to drill cores after pulling the drill bit.
  • FIG. 1 shows an illustration of a first embodiment of the method according to the invention with a conveyor train installed in the drill string
  • FIG. 2 shows an embodiment of the method according to the invention, in which the conveying string overlaps the drilling string and
  • FIG. 3 shows an embodiment of the method according to the invention, in which a flushing line is arranged within the delivery line installed in the drill string.
  • a conveying section 4 adjoins the cased bore section and extends into a deposit.
  • an on-site drive 5 which drives a drill bit 6, is used to drill the conveying section 4.
  • the on-site drive 5 is connected to the standing drill pipe 8 by the perforated conveyor string 7.
  • the conveying string 7 thus forms the lower section of the drill string 9.
  • the perforations in the conveying string 7 are closed by subsequently removable plugs, for example made of aluminum or silicone rubber.
  • a setting device 10 is carried, with which the production line 7 is suspended within the casing tour 3 after reaching the intended drilling depth.
  • the production section 4 of the deep borehole 1 is brought down using the rotary drilling method.
  • the drill bit 6 is connected via a drill collar 11 to the drill pipe 8, which is driven by a drill drive arranged above ground.
  • the perforated conveyor string 7 surrounds the lower section of the drill string 8 and is connected to the drill string 8 by a releasable locking device 12.
  • the conveyor string 7 is suspended in the casing tour 3 with the aid of the setting device 10 arranged at its upper end and is separated from the drill string 8 by releasing the locking device 12.
  • the drill pipe 8 with the heavy rod 11 can be pulled through the conveyor string 7 and removed. Only the drill bit 6 is cut off and remains in the borehole. If a foldable drill bit is used, it can also be pulled.
  • the conveying string 7 forms a section of the standing drill string 9 in the same way as in the example according to FIG. 1, which section transmits the reaction moment of the on-site drive 5 to the drill string 8.
  • a rinsing line 13 Inside the conveyor line 7 there is a rinsing line 13, the upper end of which is tightly connected to the drill rod 8 and the lower end of which is connected to a liner 14 via a sliding piece, in which there is a measuring probe 15 for the continuous measurement of the borehole profile during drilling located.
  • the measurement 15 contains a signal generator, through which the measurement data is also transmitted With the help of pressure pulses in the flushing stream, they are transmitted above ground.
  • a non-magnetic rod part 11 is usually arranged between the liner 14 and the on-site drive 5.
  • the conveying strand 7 is suspended in the casing tour 3 with the aid of the setting device 10.
  • the drill bit 6, the on-site drive 5, the rod part 11 and the liner 14 remain in the borehole.
  • the drill string 8 is separated from the conveying string 7 and removed together with the flushing string 13 and the measuring probe 15 attached to it.
  • the further completion of the bore such as the installation of a production pipe tour, can then be carried out in the usual way.

Abstract

The invention concerns a method of producing a cased hole for extracting crude oil or petroleum gas, wherein a production section (4) of a deep hole is sunk and completed with a perforated production string (7) which is installed in the drill stem (9) and, following the drilling string, is introduced thereinto when the production section (4) is sunk. When the target depth has been reached, the production string (7) is separated from the drill stem (9) and suspended in the deep hole (1). The drill stem (9), including the drilling string parts which can be drawn through the production string, is then dismantled.

Description

Verfahren zur Herstellung einer verrohrten Gewinnungsbohrung Process for the production of a cased extraction well
Die Erfindung betrifft ein Verfahren zur Herstellung einer verrohrten Bohrung zur Gewinnung von flüssigen oder gasför¬ migen Stoffen, insbesondere Erdöl oder Erdgas, bei dem ein Produktionsabschnitt einer Tiefbohrung abgeteuft und mit einem Förderstrang, der auch bereits perforiert sein kann, komplettiert wird.The invention relates to a method for producing a cased bore for the extraction of liquid or gaseous substances, in particular crude oil or natural gas, in which a production section of a deep well is sunk and completed with a production line, which may also already be perforated.
Die Herstellung von verrohrten Drainage- oder Förderbohrun¬ gen der genannten Art erfolgte seither im wesentlichen in zwei aufeinanderfolgenden Schritten. Im ersten Schritt wird im allgemeinen von einer mit einer Futterrohrtour ausgebau- ten Tiefbohrung aus, entweder in Verlängerung derselben oder aus dieser abgelenkt eine Förderbohrung niederge¬ bracht, die die Lagerstätte durchörtert. Nach dem Ausbau der Bohrgarnitur wird dann in einem zweiten Schritt die Förderbohrung mit einem Förderstrang komplettiert. Dieses bekannte Verfahren ist aufwendig, da ein Rohrstrang zweimal hintereinander, nämlich einmal zu Niederbringen und einmal zum Komplettieren der Förderbohrung ein- und ausgebaut wer¬ den muß. Ein weiterer Nachteil dieses Verfahrens wird darin gesehen, daß es nach dem Ziehen der Bohrgarnitur und vor dem Einbau des Förderstrangs zu Nachfall in der Förderboh¬ rung kommen und dadurch der Einbau des Förderstrangs behin¬ dert oder unmöglich werden kann. Dieses Problem ist beson¬ ders gravierend, wenn der Förderabschnitt horizontal abge¬ lenkt ist.Since then, the production of piped drainage or production wells of the type mentioned has essentially been carried out in two successive steps. In the first step, a production borehole is drilled from a deep borehole that has been expanded with a casing tour, either in an extension thereof or deflected therefrom, which explores the deposit. After the drilling set has been removed, the production bore is then completed with a production line in a second step. This known method is complex since a pipe string has to be installed and removed twice in succession, namely once to bring it down and once to complete the production bore. A further disadvantage of this method is seen in the fact that after pulling the drilling set and before installing the conveyor string, there is a fall in the conveyor bore and the installation of the conveyor string can thus be hindered or impossible. This problem is particularly serious if the conveying section is deflected horizontally.
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren der eingangs genannten Art anzugeben, das die genannten Nach¬ teile vermeidet und auf einfache und wirtschaftliche Weise durchführbar ist.The invention has for its object a method of Specify the type mentioned at the outset, which avoids the disadvantages mentioned and can be carried out in a simple and economical manner.
Zur Lösung dieser Aufgabe ist nach dem erfindungsgemäßen Verfahren vorgesehen, daß der Förderstrang in den Bohr¬ strang eingebaut und, der Bohrgarnitur folgend, beim Abteu¬ fen des Förderabschnitts in diesen eingebracht wird und daß nach Erreichen der Endteufe der Förderstrang von dem Bohr- sträng getrennt und in der Tiefbohrung abgehängt wird und der Bohrstrang einschließlich der durch den Förderstrang ziehbaren Teile der Bohrgarnitur ausgebaut wird.To achieve this object, the method according to the invention provides that the production line is installed in the drill line and, following the drilling set, is introduced into the production section when the production section is lowered, and that after the end depth has been reached, the production line is separated from the drill line and is suspended in the deep borehole and the drill string, including the parts of the drill set that can be pulled through the production string, is removed.
Bei dem erfindungsgemäßen Verfahren wird das Bohren eines Förderabschnitts und der Einbau des Förderstrangs in diesen Förderabschnitt in einem gemeinsamen Verfahrensschritt durchgeführt, indem der Förderstrang gleichzeitig mit dem Niederbringen des Förderabschnitts dem Bohrwerkzeug folgend in diesen eingebracht wird. Hierdurch entfällt ein Ein- und Ausbau des Bohrgestänges und ein Nachfall im Förderab¬ schnitt wird durch den dem Bohrwerkzeug unmittelbar folgen¬ den Förderstrang weitestgehend verhindert. Der Antrieb des Bohrwerkzeugs kann bei dem erfindungsgemäßen Verfahren sowohl von übertage nach dem Rotaryprinzip als auch mit Hilfe eines Vorortantrieb erfolgen. Bei beiden Antriebsar¬ ten kann der Förderstrang den unteren Abschnitt des Bohr¬ strangs bilden, der den Bohrmeißel oder den Vorortantrieb des Bohrmeißels mit dem Bohrgestänge verbindet. Um den Förderstrang, insbesondere wenn dieser vorperforiert ist, weniger zu belasten, wird man jedoch bei einer solchen Anordnung des FörderStrangs den Vorortantrieb des Bohrmei¬ ßels vorziehen.In the method according to the invention, the drilling of a conveying section and the installation of the conveying strand in this conveying section are carried out in a common method step, in that the conveying strand is introduced into the conveying tool at the same time as the conveying section is brought down. As a result, there is no need to install and remove the drill pipe and a fall in the conveyor section is largely prevented by the conveyor string immediately following the drilling tool. In the method according to the invention, the drilling tool can be driven both above ground according to the rotary principle and with the aid of an on-site drive. In both types of drive, the conveyor string can form the lower section of the drill string, which connects the drill bit or the on-site drive of the drill bit to the drill string. In order to put less strain on the conveyor string, especially if it is pre-perforated, the local drive of the drill bit will be preferred in such an arrangement of the conveyor string.
Eine andere Variante des erfindungsgemäßen Verfahrens sieht vor, den Förderstrang und das Bohrgestänge einander überla¬ gernd anzuordnen und derart lösbar miteinander zu verbin- den, daß das Bohrgestänge aus dem Förderstrang ausbaubar ist. Bei dieser Variante bleibt der Förderstrang von den Antriebskräften des Bohrwerkzeugs weitgehend frei, so daß auch im Rotaryverfahren gebohrt werden kann.Another variant of the method according to the invention provides for the conveying string and the drill string to be arranged superimposed on one another and to be releasably connected to one another in this way. that the drill string can be removed from the production string. In this variant, the conveyor line remains largely free of the driving forces of the drilling tool, so that drilling can also be carried out using the rotary method.
Um die Bohrspülung durch den Förderstrang leiten zu können, können Perforationen im Förderstrang vor dessen Einbau erfindungsgemäß auf unterschiedliche Weise durch ent¬ fernbare Mittel verschlossen werden. Zum einen kann vorge- sehen sein, die Perforationen mit Stopfen, z.B. aus Alumi¬ nium oder einer Silikonmasse zu verschließen und diese nach dem Einbau des Förderstrangs durch geeignete SpülungsZu¬ sätze auf chemischem Wege zu entfernen. Eine andere vor¬ teilhafte Verfahrensweise kann erfindungsgemäß darin beste- hen, daß in den Förderstrang ein Spülstrang eingebaut wird, der die Spülung zum Bohrmeißel und gegebenenfalls zum Vor¬ ortantrieb leitet und der mit dem Bohrgestänge ziehbar ist. Diese Verfahrensweise eröffnet weiterhin die Möglichkeit, das untere Ende des Spülstrangs mit einer Meßsonde zur Bohrlochmessung zu verbinden, die mit Hilfe des Spülstrangs ziehbar ist. Ebenso besteht die Möglichkeit, bei ausrei¬ chendem Durchmesser des Förderstrangs, das untere Ende des Spülstrangs an einem durch den Spülstrang ziehbaren Vorort¬ antrieb zu befestigen, um diesen nach Fertigstellung der Bohrung ausbauen zu können. Wird bei dem erfindungsgemäßen Verfahren ein faltbarer, d.h. in seinem Durchmesser ver¬ kleinerbarer Bohrmeißel verwendet, so kann auch dieser nach Fertigstellung der Bohrung durch den Förderstrang gezogen werden. Die Verwendung eines faltbaren Bohrmeißels ermög- licht nach Ziehen des Bohrmeißels auch das Bohren von Ker¬ nen.In order to be able to pass the drilling fluid through the conveying strand, perforations in the conveying strand can be closed according to the invention in various ways by removable means before it is installed. On the one hand, the perforations can be provided with plugs, e.g. to close from aluminum or a silicone mass and to remove them after the installation of the conveyor line by suitable rinsing additives by chemical means. Another advantageous procedure according to the invention can consist in the fact that a flushing line is installed in the conveyor line, which guides the flushing to the drill bit and possibly to the on-site drive and which can be pulled with the drill rod. This procedure also opens up the possibility of connecting the lower end of the rinsing line to a measuring probe for measuring the borehole, which can be pulled using the rinsing line. Likewise, if the diameter of the conveyor line is sufficient, there is the possibility of attaching the lower end of the flushing line to an on-site drive that can be pulled through the flushing line, so that it can be removed after completion of the bore. If a foldable, i.e. If the diameter of the drill bit can be reduced, it can also be pulled through the conveyor string after completion of the bore. The use of a foldable drill bit also makes it possible to drill cores after pulling the drill bit.
Das erfindungsgemäße Verfahren wird nachfolgend anhand von Ausführungsbeispielen näher erläutert, die in der Zeichnung schematisch dargestellt sind. Es zeigen Figur 1 eine Darstellung einer ersten Ausführungsform des erfindungsgemäßen Verfahrens mit in den Bohr¬ strang eingebautem Förderstrang,The method according to the invention is explained in more detail below on the basis of exemplary embodiments which are shown schematically in the drawing. Show it FIG. 1 shows an illustration of a first embodiment of the method according to the invention with a conveyor train installed in the drill string,
Figur 2 eine Darstellung einer Ausführungsform des erfin¬ dungsgemäßen Verfahrens, bei der der Förderstrang den Bohrstrang überlagert undFIG. 2 shows an embodiment of the method according to the invention, in which the conveying string overlaps the drilling string and
Figur 3 eine Darstellung einer Ausführungsform des erfin- dungsgemäßen Verfahrens, bei der innerhalb des in den Bohrstrang eingebauten Förderstrangs ein Spülstrang angeordnet ist.FIG. 3 shows an embodiment of the method according to the invention, in which a flushing line is arranged within the delivery line installed in the drill string.
In den Figuren 1 bis 3 ist jeweils das untere Ende einer Tiefbohrung 1 gezeigt, die mit einer durch eine Zement¬ schicht 2 fixierten Futterrohrtour 3 ausgekleidet ist. An den verrohrten Bohrungsabschnitt schließt sich ein För¬ derabschnitt 4 an, der sich in eine Lagerstätte hinein erstreckt.1 to 3 each show the lower end of a deep bore 1, which is lined with a casing pipe tour 3 fixed by a cement layer 2. A conveying section 4 adjoins the cased bore section and extends into a deposit.
Bei dem in Figur 1 gezeigten Beispiel wird zum Bohren des Förderabschnitts 4 ein Vorortantrieb 5 verwendet, der einen Bohrmeißel 6 antreibt. Der Vorortantrieb 5 ist durch den perforierten Förderstrang 7 mit dem stehenden Bohrgestänge 8 verbunden. Der Fördersträng 7 bildet somit den unteren Abschnitt des Bohrstrangs 9. Um die Spülung durch den För¬ derstrang 7 zum Vorortantrieb 5 leiten zu können, sind die Perforationen im Förderstrang 7 durch nachträglich entfern¬ bare Stopfen, z.B. aus Aluminium oder Silikonkautschuk ver- schlössen. An dem mit dem Bohrgestänge 8 verbundenen Ende des Förderstrangs 7 wird ein Setzgerät 10 mitgeführt, mit dem der Förderstrang 7 nach Erreichen der vorgesehenen Bohrteufe innerhalb der Futterrohrtour 3 abgehängt wird. Zur Bohrlochnavigation können bei dieser Vorgehensweise übliche Meßsonden am Seil eingefahren oder mitgeführt und nach Fertigstellung der Bohrung mit dem Seil wieder gezogen werden. Der Bohrmeißel 6 und der Vorortantrieb 5 verbleiben hingegen im Bohrloch. Bei dem erfindungsgemäßen Verfahren ist die Verringerung der Betriebskosten durch den Wegfall eines Ein- und Ausbaus des Bohrgestänges so erheblich, daß das Zurücklassen des Bohrmeißels und des Vorortantriebs im Bohrloch in Kauf genommen werden kann.In the example shown in FIG. 1, an on-site drive 5, which drives a drill bit 6, is used to drill the conveying section 4. The on-site drive 5 is connected to the standing drill pipe 8 by the perforated conveyor string 7. The conveying string 7 thus forms the lower section of the drill string 9. In order to be able to pass the flushing through the conveying string 7 to the on-site drive 5, the perforations in the conveying string 7 are closed by subsequently removable plugs, for example made of aluminum or silicone rubber. At the end of the production line 7 connected to the drill pipe 8, a setting device 10 is carried, with which the production line 7 is suspended within the casing tour 3 after reaching the intended drilling depth. With this procedure, conventional measuring probes on the rope can be retracted or carried along for bore hole navigation and pulled again with the rope after completion of the drilling become. In contrast, the drill bit 6 and the on-site drive 5 remain in the borehole. In the method according to the invention, the reduction in operating costs due to the elimination of the installation and removal of the drill pipe is so substantial that it is acceptable to leave the drill bit and the on-site drive in the borehole.
Bei der in Figur 2 dargestellten Verfahrensvariante wird der Förderabschnitt 4 der Tiefbohrung 1 im Rotarybohrver- fahren niedergebracht. Der Bohrmeißel 6 ist über eine Schwerstange 11 mit dem Bohrgestänge 8 verbunden, das von einem übertage angeordneten Bohrantrieb angetrieben wird. Der perforierte Förderstrang 7 umgibt den unteren Abschnitt des Bohrgestänges 8 und ist durch eine lösbare Verriege- lungseinrichtung 12 mit dem Bohrgestänge 8 verbunden. Hat der Produktionsabschnitt 4 seine Endteufe erreicht, so wird der Förderstrang 7 mit Hilfe des an seinem oberen Ende angeordneten Setzgeräts 10 in der Futterrohrtour 3 abge¬ hängt und durch Lösen der Verriegelungseinrichtung 12 vom Bohrgestänge 8 getrennt. Anschließend kann das Bohrgestänge 8 mit der SchwerStange 11 durch den Förderstrang 7 gezogen und ausgebaut werden. Lediglich der Bohrmeißel 6 wird abge¬ trennt und verbleibt im Bohrloch. Wird ein faltbarer Bohr¬ meißel verwendet, so kann dieser ebenfalls gezogen werden.In the case of the method variant shown in FIG. 2, the production section 4 of the deep borehole 1 is brought down using the rotary drilling method. The drill bit 6 is connected via a drill collar 11 to the drill pipe 8, which is driven by a drill drive arranged above ground. The perforated conveyor string 7 surrounds the lower section of the drill string 8 and is connected to the drill string 8 by a releasable locking device 12. When the production section 4 has reached its final depth, the conveyor string 7 is suspended in the casing tour 3 with the aid of the setting device 10 arranged at its upper end and is separated from the drill string 8 by releasing the locking device 12. Then the drill pipe 8 with the heavy rod 11 can be pulled through the conveyor string 7 and removed. Only the drill bit 6 is cut off and remains in the borehole. If a foldable drill bit is used, it can also be pulled.
Bei dem Ausführungsbeispiel gemäß Figur 3 bildet der För¬ derstrang 7 in gleicher Weise wie bei dem Beispiel gemäß Figur 1 einen Abschnitt des stehenden Bohrstrangs 9, der das Reaktionsmoment des Vorortantriebs 5 auf das Bohrge- stänge 8 überträgt. Im Inneren des Förderstrangs 7 befindet sich ein Spülstrang 13, dessen oberes Ende mit dem Bohrge¬ stänge 8 dicht verbunden ist und der mit seinem unteren Ende über ein Schiebestück an einen Liner 14 angeschlossen ist, in dem sich eine Meßsonde 15 zur kontinuierlichen Bohrlochverlaufsmessung beim Bohren befindet. Die Messung 15 enthält einen Signalgeber, durch den die Meßdaten mit Hilfe von Druckimpulsen im Spülstrom nach übertage übertra¬ gen werden. Zwischen dem Liner 14 und dem Vorortantrieb 5 ist üblicherweise ein nicht magnetischer Stangenteil 11 angeordnet.In the exemplary embodiment according to FIG. 3, the conveying string 7 forms a section of the standing drill string 9 in the same way as in the example according to FIG. 1, which section transmits the reaction moment of the on-site drive 5 to the drill string 8. Inside the conveyor line 7 there is a rinsing line 13, the upper end of which is tightly connected to the drill rod 8 and the lower end of which is connected to a liner 14 via a sliding piece, in which there is a measuring probe 15 for the continuous measurement of the borehole profile during drilling located. The measurement 15 contains a signal generator, through which the measurement data is also transmitted With the help of pressure pulses in the flushing stream, they are transmitted above ground. A non-magnetic rod part 11 is usually arranged between the liner 14 and the on-site drive 5.
Bei diesem Verfahrensbeispiel wird nach Fertigstellung des Förderabschnitts 4 der Förderstrang 7 mit Hilfe des Setzge¬ räts 10 in der Futterrohrtour 3 abgehängt. Der Bohrmeißel 6, der Vorortantrieb 5, der Stangenteil 11 und der Liner 14 verbleiben im Bohrloch. Das Bohrgestänge 8 wird von dem Förderstrang 7 getrennt und zusammen mit dem Spülstrang 13 und der an diesen angehängten Meßsonde 15 ausgebaut. Danach kann in üblicher Weise die weitere Komplettierung der Boh¬ rung, wie der Einbau einer Produktionsrohrtour erfolgen. In this method example, after completion of the conveying section 4, the conveying strand 7 is suspended in the casing tour 3 with the aid of the setting device 10. The drill bit 6, the on-site drive 5, the rod part 11 and the liner 14 remain in the borehole. The drill string 8 is separated from the conveying string 7 and removed together with the flushing string 13 and the measuring probe 15 attached to it. The further completion of the bore, such as the installation of a production pipe tour, can then be carried out in the usual way.

Claims

Patentansprüche claims
1. Verfahren zur Herstellung einer verrohrten Bohrung zur Gewinnung von flüssigen oder gasförmigen Stoffen, ins¬ besondere Erdöl oder Erdgas, bei dem ein Produktionsab- schnitt einer Tiefbohrung abgeteuft und mit einem För¬ derstrang, der auch bereits perforiert sein kann, komplettiert wird, dadurch gekennzeichnet, daß der Förderstrang (7) in den Bohrstrang (9) eingebaut und, der Bohrgarnitur folgend, beim Abteufen des Förderab- Schnitts (4) in diesen eingebracht wird und daß nach Erreichen der Endteufe der Förderstrang (7) von dem Bohrstrang (9) getrennt und in der Tiefbohrung (1) abgehängt wird und der Bohrstrang (9) einschließlich der durch den Förderstrang ziehbaren Teile der Bohrgar- nitur ausgebaut wird.1. A process for producing a cased bore for the extraction of liquid or gaseous substances, in particular crude oil or natural gas, in which a production section of a deep well is sunk and completed with a production line, which may also already be perforated, thereby characterized in that the conveyor string (7) is installed in the drill string (9) and, following the drilling set, is introduced into the conveyor section (4) when it sinks and that after reaching the final depth the conveyor string (7) of the drill string (9 ) is separated and suspended in the deep borehole (1) and the drill string (9) including the parts of the drilling assembly that can be pulled through the production string is removed.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß der Förderstrang (7) als ein den Bohrmeißel (6) oder einen Vorortantrieb (5) des Bohrmeißels (6) mit dem Bohrgestänge (8) verbindender Abschnitt des Bohrstrangs (9) verwendet wird.2. The method according to claim 1, characterized in that the conveyor string (7) as a the drill bit (6) or an on-site drive (5) of the drill bit (6) with the drill string (8) connecting portion of the drill string (9) is used.
3. Verfahren nach einem der Ansprüche 1 oder 2, dadurch gekennzeichnet, daß der Förderstrang (7) und das Bohr- gestänge (8) einander überlagernd angeordnet und derart lösbar miteinander verbunden werden, daß das Bohrge¬ stänge (8) nach dem Einbau des Förderstrangs (7) aus diesem ausbaubar ist.3. The method according to any one of claims 1 or 2, characterized in that the conveyor line (7) and the drill pipe (8) are arranged overlapping one another and are releasably connected to one another such that the Bohrge¬ rod (8) after the installation of Conveyor strand (7) can be removed from this.
4. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß Perforationen im Förder- sträng (7) vor dessen Einbau durch entfernbare Mittel verschlossen werden.4. The method according to any one of the preceding claims, characterized in that perforations in the conveyor strands (7) are closed by removable means before their installation.
5. Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß die Perforationen mit Stopfen, z.B. aus Aluminium oder einem anderen geeigneten Stoff, verschlossen werden und diese nach dem Einbau des Förderstrangs (7) durch che¬ mische Spülungszusätze entfernt werden.5. The method according to claim 4, characterized in that the perforations with plugs, e.g. made of aluminum or another suitable substance, and these are removed after the installation of the conveyor line (7) by chemical flushing additives.
6. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß in den Förderstrang (7) ein Spülstrang (13) eingebaut wird, der die Spülung zu dem Bohrmeißel (6) und gegebenenfalls zu einem Vorortan¬ trieb (5) leitet und der mit dem Bohrgestänge (8) zieh- bar ist.6. The method according to any one of the preceding claims, characterized in that a flushing line (13) is installed in the conveyor line (7), which guides the flushing to the drill bit (6) and optionally to a Vorortan¬ drive (5) and with the drill pipe (8) can be pulled.
7. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das untere Ende des Spül¬ strangs (13) mit einer Meßsonde (15) zur Bohrlochmes- sung verbunden wird, die mit Hilfe des Spülstrangs (13) ziehbar ist.7. The method according to any one of the preceding claims, characterized in that the lower end of the flushing strand (13) is connected to a measuring probe (15) for borehole measurement, which can be drawn using the flushing strand (13).
8. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das untere Ende des Spül- Strangs (13) an einem durch den Spülstrang (13) ziehba¬ ren Vorortantrieb (5) befestigt wird.8. The method according to any one of the preceding claims, characterized in that the lower end of the rinsing line (13) on a by the rinsing line (13) ziehba¬ ren local drive (5) is attached.
9. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß ein faltbarer Bohrmeißel verwendet wird, der in gefalteter Stellung durch den Förderstrang (7) ein- und ausbaubar ist.9. The method according to any one of the preceding claims, characterized in that a foldable drill bit is used, which can be installed and removed in the folded position by the conveying strand (7).
10. Verfahren nach Anspruch 9, dadurch gekennzeichnet, daß nach Ziehen eines faltbaren Bohrmeißels das Bohren von Kernen durchgeführt wird. 10. The method according to claim 9, characterized in that the drilling of cores is carried out after pulling a foldable drill bit.
PCT/DE1996/001795 1995-09-27 1996-09-21 Method of producing a cased extraction hole WO1997012114A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE1995135906 DE19535906B4 (en) 1995-09-27 1995-09-27 Method for producing a cased extraction well
DE19535906.2 1995-09-27

Publications (1)

Publication Number Publication Date
WO1997012114A1 true WO1997012114A1 (en) 1997-04-03

Family

ID=7773303

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/DE1996/001795 WO1997012114A1 (en) 1995-09-27 1996-09-21 Method of producing a cased extraction hole

Country Status (2)

Country Link
DE (1) DE19535906B4 (en)
WO (1) WO1997012114A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2365463A (en) * 2000-08-01 2002-02-20 Renovus Ltd Drilling and lining a borehole
CN114876414A (en) * 2022-04-20 2022-08-09 中国地质科学院水文地质环境地质研究所 Efficient extraction equipment for deep geothermal exploitation well

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2333789A (en) * 1997-08-08 1999-08-04 Baker Hughes Inc Method and apparatus for drilling and completing wells
AU2006299755B2 (en) * 2005-10-05 2011-12-22 Schlumberger Technology B.V. Method for drilling with a wellbore liner

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE362867C (en) * 1922-11-02 Eduard Frieh Horizontal drilling process for layers containing oil, gas or liquid
US3955633A (en) * 1974-04-26 1976-05-11 Mindrill Limited Drill
US4750571A (en) * 1986-10-08 1988-06-14 Geeting Marvin D Screen placement method and apparatus
DE3839760C1 (en) * 1988-11-25 1990-01-18 Gewerkschaft Walter Ag Double rotary drilling apparatus for making directionally accurate bores, in particular horizontal bores
US5197553A (en) * 1991-08-14 1993-03-30 Atlantic Richfield Company Drilling with casing and retrievable drill bit
US5255741A (en) * 1991-12-11 1993-10-26 Mobil Oil Corporation Process and apparatus for completing a well in an unconsolidated formation
US5320178A (en) * 1992-12-08 1994-06-14 Atlantic Richfield Company Sand control screen and installation method for wells

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1222452B (en) * 1965-01-11 1966-08-11 Nikex Nehezipari Kulkere Combined filter and drilling device, as well as methods for the drainage of rock layers containing water and gas under high pressure
GB1161372A (en) * 1968-01-30 1969-08-13 Shell Int Research Well Installation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE362867C (en) * 1922-11-02 Eduard Frieh Horizontal drilling process for layers containing oil, gas or liquid
US3955633A (en) * 1974-04-26 1976-05-11 Mindrill Limited Drill
US4750571A (en) * 1986-10-08 1988-06-14 Geeting Marvin D Screen placement method and apparatus
DE3839760C1 (en) * 1988-11-25 1990-01-18 Gewerkschaft Walter Ag Double rotary drilling apparatus for making directionally accurate bores, in particular horizontal bores
US5197553A (en) * 1991-08-14 1993-03-30 Atlantic Richfield Company Drilling with casing and retrievable drill bit
US5255741A (en) * 1991-12-11 1993-10-26 Mobil Oil Corporation Process and apparatus for completing a well in an unconsolidated formation
US5320178A (en) * 1992-12-08 1994-06-14 Atlantic Richfield Company Sand control screen and installation method for wells

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2365463A (en) * 2000-08-01 2002-02-20 Renovus Ltd Drilling and lining a borehole
GB2365463B (en) * 2000-08-01 2005-02-16 Renovus Ltd Drilling method
CN114876414A (en) * 2022-04-20 2022-08-09 中国地质科学院水文地质环境地质研究所 Efficient extraction equipment for deep geothermal exploitation well

Also Published As

Publication number Publication date
DE19535906B4 (en) 2006-02-09
DE19535906A1 (en) 1997-04-03

Similar Documents

Publication Publication Date Title
DE60305733T2 (en) DRILLING A DRILL
DE60116755T2 (en) METHOD FOR DRILLING WITH A FEED TUBE
EP0397870A1 (en) Method of casing the production seam in a well
DE4393857C2 (en) Method and apparatus for sealing the joint between a main well and a branch well
EP0768446B1 (en) Method and boring tool for drilling into subterranean formations
DE69909617T2 (en) METHOD FOR INSTALLING A SENSOR IN CONNECTION WITH SEALING A DRILL HOLE
DE69918297T2 (en) PROCESS FOR FORMING A STOPPING IN A PETROLEUM DRILLING
DE69830059T2 (en) DEFORMED TEMPLATE FOR MULTIPLE HOLES AND METHOD FOR THEIR USE
DE602004009910T2 (en) METHOD FOR PRODUCING A BOREOUR OF AN EARTH INFORMATION
DE2649488C2 (en) Process for extracting petroleum from an underground formation
DE3902869C1 (en)
DE602004001328T2 (en) Underground drilling of a lateral bore
DE2840014C2 (en)
DE60026249T2 (en) Apparatus and method for testing and drilling a wellbore
EP0392544A2 (en) Drilling tool
DE3108628A1 (en) LOCKING DEVICE FOR DEVICES IN DRILL HOLES
DE102004035783A1 (en) A downhole tool and method for reducing debris in a perforation in a wellbore
DE2540590A1 (en) METHOD AND DEVICE FOR MAKING A BORE UNDER AN OBSTACLE ALONG AN ARC-SHAPED TRACK
DE3941763C2 (en)
DE2144570A1 (en) Platform construction with standpipe guides for deep boreholes and methods for setting up the construction on the bottom of a body of water
DE2343079A1 (en) DRILLING METHOD AND DEVICE FOR ITS IMPLEMENTATION
AT412739B (en) METHOD AND DEVICE FOR DRILLING A HOLE IN GROUND OR ROCK MATERIAL AND FOR FORMING AN ANCHORAGE
WO1997012114A1 (en) Method of producing a cased extraction hole
AT413422B (en) METHOD AND DEVICE FOR MEASURING A BOREOOL
DE3418314A1 (en) MECHANICALLY OPERABLE PACKER FOR DRILL HOLES FROM A WIRE ROPE

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): CZ HU SK TR US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase