WO1995018420A2 - Method for monitoring multivariate processes - Google Patents

Method for monitoring multivariate processes Download PDF

Info

Publication number
WO1995018420A2
WO1995018420A2 PCT/SE1994/001208 SE9401208W WO9518420A2 WO 1995018420 A2 WO1995018420 A2 WO 1995018420A2 SE 9401208 W SE9401208 W SE 9401208W WO 9518420 A2 WO9518420 A2 WO 9518420A2
Authority
WO
WIPO (PCT)
Prior art keywords
variables
model
point
screen
observations
Prior art date
Application number
PCT/SE1994/001208
Other languages
French (fr)
Other versions
WO1995018420A3 (en
Inventor
Svante Wold
Lasse Sundin
Original Assignee
Asea Brown Boveri
Svante Wold
Lasse Sundin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asea Brown Boveri, Svante Wold, Lasse Sundin filed Critical Asea Brown Boveri
Priority to US08/666,346 priority Critical patent/US5949678A/en
Priority to JP51766495A priority patent/JP3429769B2/en
Priority to EP95904723A priority patent/EP0775335B1/en
Priority to DE69412520T priority patent/DE69412520T2/en
Publication of WO1995018420A2 publication Critical patent/WO1995018420A2/en
Publication of WO1995018420A3 publication Critical patent/WO1995018420A3/en
Priority to FI962560A priority patent/FI962560A/en
Priority to NO19962626A priority patent/NO311818B1/en

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0224Process history based detection method, e.g. whereby history implies the availability of large amounts of data
    • G05B23/024Quantitative history assessment, e.g. mathematical relationships between available data; Functions therefor; Principal component analysis [PCA]; Partial least square [PLS]; Statistical classifiers, e.g. Bayesian networks, linear regression or correlation analysis; Neural networks
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0286Modifications to the monitored process, e.g. stopping operation or adapting control
    • G05B23/0289Reconfiguration to prevent failure, e.g. usually as a reaction to incipient failure detection

Abstract

A method for monitoring and control of an industrial or other technical process, in which the process is dependent on a multiple of variables (X) relevant to the process. The process comprises a description of the relevant variables as a multidimensional room, where each variable represents an independent component in the room, that the observations of the variable values at a certain time point represent a point in the multidimensional room, that observations from a number of time points form a point swarm in the room, that at least one first (pa) and one second (pb) principal direction of the point swarm are calculated, that the projections of the observations onto these first and second principal directions are determined, that the observations are illustrated graphically in the plane which is formed by the first and second principal directions in the point swarm, further that the principal directions (pa, pb) are continuously updated during the course of the process, the graphic information thus becoming dynamic, and, finally, that the process operator or the monitoring member, on the basis of the presented information, adapts members which influence variable quantities in the process such that the process is controlled to optimum operating conditions.

Description


  
 



  Method for monitoring multivariate processes
TECHNICAL FIELD
The present invention relates to method of monitoring an industrial process which is dependent on a large number of parameters, available through measured data, in a way which makes it possible to control the process to the desired conditions by allowing the relevant variables of the process to be represented by the axes in a linear space with as many dimensions as the number of variables, whereupon the process is projected onto a plane or a three-dimensional room, such that a calculated model of the process is obtained on-line and by comparing the model of the process with a reference model of the process such that a distance to the reference model is obtained, whereupon, when observing a drift of some parameter, the process can be restored to at least one norm range for the process by acting upon a deviating variable.



  BACKGROUND ART
For obtaining, for instance, the desired quality of a manufactured produce in a manufacturing process with the best economy or otherwise monitoring an industrial process or industrial application, it is necessary to control the processes as efficiently and optimally as possible. A manufacturing process includes many important variable quantities (here only referred to as variables), the values of which are affected by the variations of the variables during the course of the process. The optimum result is achieved if the processmonitoring operator or the process-monitoring member is able to handle and control all the process-influencing variables in one and the same operation.



  A conventional method of optimizing a process is to consider one variable at a time only, one-dimensional optimization. All the variables are fixed except one, whereupon the non-fixed variable is adjusted to an optimum result. Thereafter, the  free variable is fixed and one of the other variables adjusted, and so on.



  When the process variables have been set in this way one by one, it is supposed that the best working point of the process has been obtained. However, the fact is that this is not the whole truth. The process may still be far from its optimum working point, since the method does not take the mutual influence of the process variables into account. The difficulty of this method is to obtain a total overview of the process based on a number of mutually independent process variables as necessitated by such a view. It is only when the relationship between these variables can be interpreted correctly that the process operator gets a real overview and understanding of the process.



  An operator is limited by his or her human ability to understand and control only a limited number of variables per unit of time. A process monitoring system measures up to hundreds of variables, of which perhaps some 20 more or less directly control the process. Such a monitoring system requires a computer which can continuously register if and when slight variations occur in any of the variables.



  A model of a process is realized substantially by two different types of modelling techniques, mechanistic and empirical modelling. Mechanistic models are used, for example, in physics. Data are used to discard or verify the mechanistic model. A good mechanistic model has the advantage of being based on established theories and is usually very reliable over a wide range. However, the mechanistic model has its limitations and is only applicable for relatively small, simple systems, whereas it is insufficient, if even possible to use, for building an axiom around a complex industrial process. Many attempts have been made to model processes with the aid of mechanistic models based on differential equations.



  An important disadvantage of these models, however, is that they are greatly dependent on the dependence of certain  parameters on each other. Such parameters with great dependence on each other must be determined for the model to function. In the majority of cases it is very difficult to quantify them in a reliable manner. A consequence of this is that it is very difficult to obtain mechanistic models that work in practice.



  In empirical modelling the model is based on real data, which, of course, requires good-quality data. Process data consist of many different measured values. In other words, process data are multivariate, which presupposes multivariate techniques for process data to be modelled and illustrated. Different statistical methods exist for multivariate modelling.



  Traditional multivariate modelling technique, as for example linear regression (MLR), assume independent and error-free data. For that reason, such technique cannot handle process data, since they are highly interdependent and, in addition, influenced by noise.



  A solution to the above problems is to use projection technique. This technique is capable of selecting the actual variation in data and expressing this information in so-called latent (underlying) variables. The technique is described in
ABB Review 4/93, Bert Skagerberg, Lasse Sundin. The projection technique is most advantageous for obtaining a fast overview of a complex process. The two projection techniques, PCA and
PLS, that is, Principal Component Analysis and Projection to
Latent Structures, are tailor-made for solving problems such as process overview and identification of relationships between different process variables.



  Models created with these two methods can be executed directly (on-line) in the process information system and can be used for process monitoring. PLS is highly suitable for predicting various quality-related variables, which are normally difficult to measure or sometimes even impossible to measure routinely since they occur late in the process.  



  Modelling by means of projection techniques (PCA, PLS) is best explained by the use of simple geometry in the form of points, lines and planes. Process data are usually listed in the form of tables, wherein a row represents a set of observations, that is, registration of variable values, in the process at a certain time. For practical reasons, and for the sake of clarity, the description will be restricted in the following to a data table with three variables, that is, three columns, which can be illustrated geometrically with the aid of a three-dimensional coordinate system (Fig. 1), where the variables in the process are represented by the axes in the coordinate system. However, the method functions for an arbitrary number of variables, K, where K  >  3, e.g. K = 50 or
K = 497.

  An observation of the relevant variables in the process at a certain time may here be represented by a point in the coordinate system which is common to all variables, which means that the measured value of each variable corresponds to a coordinate for the respective axis. Mathematically, independently of the number of coordinates, a row in the table still corresponds to a point. All n rows in the table then correspond to a swarm of points (Fig. 2). The mathematical procedure for describing a process with K relevant variables is handled in the same way by the observations at each time being represented by a point in a multidimensional room with K coordinates.

 

  The projection method works on the assumption that two points that lie close together are also closely related in the process.



  The data set may now be projected to latent variables in a series of simple geometrical operations as follows: - The midpoint in the data set is calculated. This calculated point is called x. The midpoint coordinates correspond to the mean value of all the variables in the system (Fig. 3), - Starting from the midpoint x, a first straight line, pl, is  drawn, which is adapted to the data set such that the distance to the line for the individual points is as small as possible.



  This line corresponds to the direction in the data set which explains the greatest variation in the process, that is, the dominating direction in the data set and is referred to as the first principal direction. The direction coefficient of this line is combined in the loading vector pl. Each point in the data set is then projected orthogonally to this line. The coordinates from the projection of all the points to the line form a new vector tl. (Each point gives a value, here called   "score",    as a component in the vector   tl.)    - The new vector (tl) is usually called score vector and describes the first latent variable. This latent variable expresses the most important direction in the data set and is a linear combination of all three variables (or in a multidimensional system all K variables involved).

  Each variable has an influence on the latent variable which is proportional to the size of the direction coefficient in the loading vector   P1-    - Even if the line, the first principal direction, P1, given by the loading vector, pl, according to the above is one that most closely agrees to the data set, it can still be seen from
Figure 4 that the deviations from the line are relatively large. A second line, p2, may be adapted to the point swarm which represents data in the process. This second line, p2, is orthogonal to the first line, pl, and describes the next most important direction in the point swarm (Figure 4) and is referred to as the second principal direction. The score vector t2 and the direction coefficient P2 are interpreted analogously to tl and pl.



  Analogously, a third projection line can be constructed with the direction p3 and the score vector t3. However, the value of computing a third principal component in this threedimensional example is limited, since the resulting three latent variables tl, t2 and t3 only represent a rotated  version of the three-dimensional coordinate system.



  If, instead, a look is taken at the projection plane which is defined by the first two principal directions,   pl    and p2, it can be determined that this plane describes the point swarm well in two dimensions only. The advantage of this is that points projected onto a plane reproduce information which emanates from variables in three dimensions. This is one of the reasons for using PCA to analyze a complex data structure.



  From a number of variables a small number of underlying latent variables may be obtained, these latent variables describing the main part of the systematic information about current process data. From experience, it has proved that more than 26 latent variables are not required. This can also be shown theoretically. The latent variables provide an overview of the data set and can be presented in the form of different types of diagrams or graphic images. Part of the variation of the data set will remain after the latent variables have been extracted and are called residuals (deviations). These contain no systematic information and may therefore be regarded as superfluous and are often referred to as noise.



  According to one approach, the projection plane, defined by the lines   pl    and p2, may be seen as a two-dimensional window into the multidimensional (in the example the threedimensional) world. The basic idea behind PCA is to construct such a projection window, providing the viewer with a picture of the multidimensional data set. Consequently, PCA ensures the best possible window, that which contains the optimum picture of the data set. Further, the window can be saved and displayed graphically. The projection window visualized on a computer screen provides an operator, for example, with an overview of a complex process.



  The projections described above are essentially a geometrical interpretation of the principal component analyses which have proved to be very suitable for obtaining an overview of process data. Normally, it is sufficient also among hundreds  of variables to calculate about three principal components to describe the principal information in the data set. Typical of the PCA method, when applied to process data, is that the system easily selects a strong first component, a less important second component, and a third component describing little but systematic information.



  The PCA method is suitable to use for analyzing blocks of process data. Questions which may be answered in an industrial process by means of PCA are: - Overview of a quantity of data - Classification (e.g. if the process continues normally or if
 it deviates) - Real-time monitoring (e.g. to track the process conditions
 and discover an incipient deviation as early as possible).



  Another important problem is to identify relationships between process data, X, and more quality-related data, Y. This type of relationships are difficult to analyze, if even possible using traditional modelling techniques, since the relationships are often hidden in complex interactions and correlation patterns involving different process variables.



  Projection to latent structures, PLS, is a projection technique which offers a method of modelling complex relationships in a process. PLS decomposes two blocks of data, X and
Y, into principal components as projections (Fig. 5). The two modelled blocks are similar to the solution according to the
PCA method, but differ in that in PLS the projection is made to explain X and Y simultaneously for the purpose of obtaining the best possible correlation between X and Y. Thus, the PLS method serves to model the X block in such a way that a model is obtained which in the best way predicts the Y block. A PLS model can thus be very useful for predicting quality-related parameters, which are otherwise both expensive and difficult to measure.

  Instead of having to wait perhaps a week before a critical value from the quality control laboratory becomes available, this value can be immediately predicted in a model.  



  Figure 6 illustrates an example of how the study and monitoring of an industrial process can be visualized by means of a computer screen on-line. The left half of the figure shows a score plot, that is, a representation of the observations of the measured data of the process from two latent variables ta and tb reproduced with two principal directions pa and   pb    as axes in the coordinate system of the graph. The left half of the picture shows both a static and a movable picture. The static picture consists of points which describe the variation in the reference data which are used for building the model.



  If these reference data are chosen in the best way, the picture consists of good working ranges for the process as well as ranges which should be avoided in the process. The picture may be compared to a map containing information as to which conditions the operator should strive to direct the process to, and which conditions should be avoided.



  On-line execution of measured process data results in calculated markings, that is, that observations made at a new time are reproduced as a new point in the plane which is represented by that plane which, in the form of the two selected principal directions pa and pb, constitute the coordinates of the graph on the screen. This means that each new point contains information about all the relevant measured data because of the projection to the latent variables according to the PLS method. Changes in the process may then be reproduced on-line on the screen in the form of a line in the left half of the VDU. The changes are reproduced with the aid of a movable figure in the form of a curve which connects the observations at different times. 

  The curve will thus move in time over the screen like a crawling   "snake".    To make the operator better understand the significance of the information provided by the crawling snake, the snake may be divided into a head and a tail, which are also illustrated in different colours and symbols. The head consists of present observations, whereas the tail is built up of "5historical observations. If an alarm is raised, that is, when the curve (the snake) detects prohibited areas, the snake may change  colour, for example to red.



  The movable curve is an aid to the operator to continuously monitor the status of the process by viewing the process through a "window" on the screen into the multivariate rooms of the process. The location of the snake's head is compared with the area where reference data of high quality have been attained. The ambition of the operator or the monitoring member of the process should be to control the process to this area.



  To the right in Figure 6 there is shown an example of other information which may be imparted to the operator via the screen with the aid of the PLS method. The right picture is a reproduction of loading vectors, a loading plot. This is a map of how the score plot, that is, the curve in the left picture, is influenced by the individual variables in the process. The left and right picture halves also contain associated information. This means that the direction in the left picture has a direct correspondence in the right picture. The operator may receive guidance from the right picture if he/she is to control individual process variables for the purpose of moving the process (the "snake") to achieve better operating conditions for the process.



  The use of the method described above means a powerful instrument in monitoring processes which are dependent on a large quantity of process variables in a simple and clear way. As examples of technical fields, within which process monitoring of industrial processes according to the described methods may advantageously be utilized, may be mentioned the pulp, paper, chemical, food, pharmaceutical, cement and petrochemical industries as well as power generation, power and heat distribution, and a wide range of other applications. However, the
PCA and PLS methods, respectively, used according to the prior art suffer from a weakness in that the projection plane which is built up of two principal directions, and to which plane the observations are projected, are fixed and do not change  during the course of the process.

  This means that changes in the swarm of points in the multidimensional space, which has constituted the base of the calculation of the principal directions pa and pb, are not taken into account. At the same time new observation series are constantly added during the process, in which variable values may be changed, which means that the geometry of the point swarm in space may be changed and that the calculated principal directions which are intended to reflect the shape of the point swarm are no longer of interest. This is not reflected by the graphically reproduced information about the course of the process according to the above.



  SUMMARY OF THE INVENTION
The present invention relates to a method for monitoring and control of an industrial or other technical process, in which the course of the process is dependent on a multiple of variables relevant to the process. The method involves a description of the relevant variables as a multidimensional room, wherein each variable represents an independent component in the room, that the observations of the variable values at a certain time represent a point in the multidimensional room, that the observations from a number of times form a point swarm in the room, that at least one first and one second principal direction of the point swarm are calculated, that the projections of the observations on these first and second principal directions are determined,

   that the observations are illustrated graphically in the plane which is formed by the first and second principal directions in the point swarm, further that the principal directions are continuously updated during the course of the process, whereby the graphic information becomes dynamic, and, finally, that the operator or the monitoring member of the process, based on the presented information, adapts members which influence variable quantities in the process such that the process is controlled to optimum operating conditions.  



  According to the prior art, information about the course of the process is obtained by projecting measured data onto a plane which is comprised in the variable space which describes the process. The novel feature according to the invention is that the plane to which measured data are projected, according to the PCA and PLS methods, dynamically follows the flow of new series of measured process data, the projection plane being able to rotate in the multivariate room which describes the process. This provides a constant monitoring of the process in relation to the present stage and not, as previously, in relation to a "process historical" stage.



  The illustration of the course of the process may take place according to previously known technique, on-line or off-line in the form of a snake which crawls on a screen according to the above, or in the form of ordinary historical trend curves.



  When the process is visualized with the aid of a snake crawling over a plane, this means according to the invention that the direction of crawling of the snake illustrates a direction of the process taking into consideration how variable quantities temporarily influence the model of the process, in that variable values which slide away in different directions in the process influence the above-mentioned point swarm to assume new geometries.



  When showing the course of the process as a graph on a screen, reference data for the process are also plotted on the screen in the form of regions to which the process should be controlled. Also process-influencing parameters are plotted on the screen to indicate which variables in the process have a strong influence on the process when the process slides in a certain direction indicated by the direction of movement of the graph on the screen.



  If the process is on its way into prohibited or non-optimum regions, which is indicated on the screen by the graph moving into regions which are marked on the screen as forbidden, the  operator controls the process towards allowed regions by actively influencing at least one member in the process which influences the variable or variables which is or are denoted by the graph as being capable of being influenced by the member or members which restore the process to the norm or reference region plotted on the screen.



  It is also possible, if desired, to automate the monitoring, by using known technique, by sensing which variable or variables can restore the process to the above-mentioned desired regions with known electronic devices, which then control the variable-influencing members in the process such that the process is maintained within given frames.



  According to the invention, new current models of the process are calculated dynamically. By continuously comparing the last calculated model with a reference model determined for the process, a real-time calculated value of the distance of the process from the reference model is obtained. When this distance exceeds a value fixed for the process, it is practical to initiate an alarm. A variant of this alarm is arranged such that the most interesting part of the process, indicated as a graph in the form of a crawling snake on a screen, when this graph enters forbidden regions for the process, is coloured, for example, red. Other devices for calling attention requiring action are also to raise an alarm, for example, by means of a signal, a light, a lamp, etc.

 

  In another variant of the invention, a third principal direction for the point swarm in the variable space is calculated, whereupon the observations are projected to the three-dimensional room which is defined and spanned by the three principal directions, and that the three principal directions according to the invention are continuously updated during the course of the process, and that the observations are illustrated graphically on-line as projections in the room spanned by the three principal directions, which also in this case may take place by a graph in the form of a snake crawling between  the coordinates in the room to which the current observations of the process are projected.



  Applying the described method, process automation is given a very powerful instrument for monitoring and controlling, in a well-arranged manner, also very complex processes.



  BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 shows how collected data can be represented in a coordinate system with as many dimensions as the number of variables. An observation of the process represented as a row in a matrix with variable values gives rise to a point in the coordinate system.



  Figure 2 shows a swarm of points, each one representing an observation of the process, in the coordinate system.



  Figure 3 shows how a first principal direction of the point swarm is formed.



  Figure 4 shows how a second principal direction of the point swarm is formed.



  Figure 5 illustrates how the PLS method models and identifies dependencies between two data sets, for example measured process data and quality-related data, which makes possible an immediate prediction of the occurrence of the process.



  Figure 6 illustrates in the left picture a score plot, which shows the state of the current process with the aid of a socalled "snake" which follows the course of the process, whereas the right picture shows a loading plot which, in turn, indicates how the process is influenced by process variables (TOT, FAR, PKR, etc.) introduced into the coordinate system.



  Figure 7 illustrates the weighting of the observations in the monitored process in a long-term memory and a short-term  memory, respectively, according to the method.



  Figure 8 shows the utilization of control limits in the form of limits to the standard deviation from the mean value of the process, which limits may be used in a monitoring system to justify intervention into the process.



  Figure 9 explains how the projection plane, onto which all the observations are projected according to the invention, under certain circumstances may be subjected to an unintentional rotation of the model.



  Figure 10 denotes the exponential weights v in the data block and the loading block in the EWM-PCA algorithm.



  Figure 11 shows a so-called "distance-to-model" curve or DCL (Distance-To-Class) curve, which has been obtained explicitly for presentation of multivariate processes. The DCL curve describes the distances to the limits of the reference model.



  A multivariate alarm is defined depending on the level of the
DCL (Dmod).



  Figure 12 shows a schematic flow chart of the calculation steps in the calculating units which carry out the calculations to obtain the model of the process as well as the distance to the reference model.



  DESCRIPTION OF THE PREFERRED EMBODIMENTS
According to the invention, modelling by means of PCA and PLS is used by dynamic updating of the process model by means of exponentially weighted observations and is described as multivariate generalizations of the exponentially weighted moving average, abbreviated EWMA (Exponentially Weighted Moving   Average)   
Principles and determination algorithms for utilizing EWMA and realizing dynamic models, which according to the invention  make it possible to obtain optimum monitoring of a process, are presented in the following. Further, predicted control charts based on these models are shown.



  Standard PCA and PLS models assume an independence of process times, that is, that no process memory is utilized. Since projected observations (scores) by means of PCA and PLS entail good "cross sections" of process data, a natural way to model "memory effects" would be to develop simple time-series models in these scores. One of the simplest models is available via
EWMA, which provides both a good picture of the current status in a process and a "one-step-ahead" forecast about the process. In this way, an EWMA model based on multivariate projected observation (scores) from PCA and PLS constitutes a natural extension of multivariate model standards for process applications.



  A generalization of EWMA into EWM-PCA and EWM-PLS consists of two parts. The first part is related to the use of scores instead of individual variables in control charts and predictions. The second part is the dynamic updating of the PCA and
PLS models to allow the model to take into account the drift in the process.



  The obvious field of application of EWMA-PCA/PLS is process monitoring and control. Multiple responses are common in all types of automatic process control today, both because it is simple and inexpensive to measure many process-influencing quantities and because complicated products/controls impose many demands on criteria which must be monitored and controlled to ensure high quality of the product/control. As an example to illustrate EWMA-PCA in this disclosure, we use a (49x17) matrix with collected measured data of 17 variables from a paper machine over a period of time of 49 equal time intervals. The 17 variables comprise values from measured quantities such as the weight of the paper pulp, the moisture content; the breaking stress of the paper, the velocity of the machine, etc.

  The method of utilizing EWMA offers, per se,  also entirely different possibilities within fields which attract increasing interest, such as pollution of rivers, lakes, oceans, etc. When monitoring such pollution, a plurality of variables are measured where the method according to the invention would offer a clear and well-arranged way of presenting data. In the case of, for example, emission of substances/particles from an industry into a reception area, such monitoring would permit feedback of presented measured values and permit control of a change of components in the emissions.



  In, for example, chemical/technical contexts, other sequences than changes are often studied over time. Natural polymers, such as cellulose, DNA and proteins are built up of sequences of a set of monomers, wherein local monomeric EWMA- PCA properties can be used to obtain information about such things as binding sites, etc. In such applications, it may be a natural thing to extend the exponentially decreasing weighs in both directions from the centre of the model.

 

  In the following description of the model, to achieve the method according to the invention, designations according to the following table are used.



  X a matrix with process variables (entries to predict Y)
Y a matrix with "result" variables in PLS (responses
 output values, product properties) i,j index of observations, rows in x and Y;    (i,j = 1, 2   
 N)
N number of elements, observations, samplings, or process
 times; (rows in X and Y) k variable index in X and Y; (k = 1, 2, ..., K)
K number of variables in X or Y; (columns in X or Y) * used for designating a memory matrix for old values m index of response variables; (m = 1, 2, ..., M)
M number of PLS Y variables; (columns in Y in PLS model) vi weight of the observation i a component index;

   (a = 1, 2, ..., A)  
A number of components in the model
W matrix of PLS weights (dimension K x A) wa columns in W, X weights of component a
P loading matrix, dimension (K x A)
Q memory matrix of loadings (or PLS weights)
C matrix of PLS Y weights, dimension (M x A) ca columns in C, Y weights of component a
T score matrix of X, dimension (N x A) ta columns in matrix T, scores of component a
U matrix of u-scores, dimension (N x A) ua columns in matrix U, second scores of component a
Ea X or Y residuals after component a, dimension (N x K)
Fa PLS Y residuals after component a, dimension (N x M)
EWMA may be regarded as a model with two components. The first component concerns the creation of a modelling variable y and predicting this variable y at a subsequent point in time. The second component concerns the arrangement of a control chart based on the model.



  The basic idea behind EWMA is to model y as a weighted moving average, with the latest observations weighted heavier than earlier observations. Exponential weights
 vi =   X ) t - l    (1) are used for the i'th observation which precedes the current one (i=t), see Figure 7. This gives the predicted value at the time t+l according to equations (2) and (3).

  These equations may at the same time be utilized to recursively update the
EWMA model from time t to time t+l according to:
   Yt+l    =   hyt    +   (1-h)9t    (2)
 =   Bt    +   (Yt    -   yt)    =   yt    + Bet (3)
Assuming that the residuals, ei, have a constant variance   2,    the variance of EWMA will be:  
 Var(EWMA) =   C2X/(2-X)    (4)
A corresponding standard deviation (SD) may be used for creating control limits as, for example, three-sigma limits.



  Thus, the EWMA diagram can be used as a monitoring instrument for indicating if the process is significant at the side of the desired region to thereby justify an intervention. See
Figure 8. Since, on the other hand, the model provides us with a prediction of y at the next observation time, EWMA may also be used as a base for modifying the difference between the prediction and the score value, that is, an achieved dynamic process control. For this purpose, a modified EWMA is recommended as follows:
 EWMA = Yt+l =   t    +   Xlet    +   2      z    et +   3    (et -   et 1)    (5)
The values of the parameters   B1    to   3    are estimated from the process history.



  The principal component analysis, PCA, is usually based on an analysis of an (N x K) data matrix, Y, which starts with a matrix, centred and scaled into uniform column variance. PCA models this normalized matrix as a product of an (N x A) score matrix T, and an (A x K) loading matrix, P', as well as an (N x K) residual matrix, E. The number of product terms, the components A, define the dimensionality of the PC model. If the number of product terms, A, is equal to, or greater than, the dimension of X, N or K, the residuals E are identically equal to zero. The number of significant components, A, may be estimated in a plurality of ways; here we advocate crossvalidation.



   Y =   ata*pa'    + E = T P' + E (6)
The scores (the columns in T) are orthogonal and in many ways provide the best summary of data. This provides a good picture of the process if these scores are plotted into a diagram as dependent on time.  



  For an unweighted calculation of the principal components, ta and   Pa,    division into singularity values (SVD) is a method to prefer if all the components are desired (a = 1,2, min(N,K)). If only a small number of first principal components are of interest, a method known under the name NIPALS (see, e.g., H. Wold, Nonlinear estimation by Iterative Least
Squares Procedures, Research Papers in Statistics, Wiley, New
York 1966) may be applied as this method is faster since only the first components mentioned are determined. The NIPALS interpretation of the loading values (Pak) as partial regression coefficients makes the calculation of PC models uncomplicated, as is shown below.



     Eal    =   (eik,a-l)    = X -   Cba-l      tb*pb    (7) eik,a-l = tia * Pak + eik (8)
Pak =   EiN    ( eik * tia ) / SiN (tia * tia) (9)
The elements in pa are normally normalized to the unit length
EMI19.1     


<tb>   pa    <SEP> | <SEP>    = <SEP>    1)
<tb>  which gives tia =   Sk    YikPak (10)
The standard deviation (SD) of the row i of the residuals,   si,    is a measurement of the distance between the i'th observation vector and the PCA model. For this reason, this standard deviation, DMod, is often referred to as the distance to the model.



  To develop an exponentially weighted moving principal component analysis (EWMA), which is utilized according to the invention, two steps are required. The first step, which comprises updating and prediction (forecasting) of the process  values at the next point in time t + 1, is uncomplicated if an existing PCA model for the process is assumed. The second step, updating this PCA model for a process which is driving, proves to be complex.



  The forecasting part is achieved by means of K multivariate process responses Y =   {Y1,      y2,      ...,      ym    ..., yM}, and a PCA model with A components which is determined from these Y data.



  A process time point has A scores, tia (a=l, 2, ..,, A), associated with it, which form a row in the score matrix T.



  Now, assuming a certain auto-regressive auto-correlation structure and a stable cross-section correlation structure in the data set, and thus a stable PCA model, the EWMA values in the scores ta will provide us with a base for multivariate and dynamic process control.



  Here we assume that the process is driven by only A independent "latent variables", which indirectly are "observed" by the Y variables and determined as scores ta (a = 1,   2    ...,
A). This gives two alternatives for achieving control charts.

 

  Either one control chart may be maintained for each PC component, a, which is justified if the components have a separate physical meaning. An additional control chart may be constructed from the residuals of the standard deviation, the DMod table. A second alternative is obtained by combining all the significant t and DMod into one single table, which, however, leads to a loss of information about the separate model dimensions.



  The prediction about the score vector t (with A elements) at the time t+l is analogous to the equations (2) and (3) according to:
   (t+l    = Xtt +   (1-#)tt    (11)
 =   tt    +   (tt    -   tt)t    (12)  
The more elaborate form analogous to equation (5) is obvious.



  These thus predicted scores forecast the vector y of M variables according to:
   Yt+1    =   tt+1    P' (13)
The variance of   tt+l,a    is directly given by equation (4) with   aa2    determined by means of scores from a long series of "historical" data in the process. Because of a non-full rank of the matrix Y, classical variances of   yt+1    cannot be determined without additional assumptions.

  If "partial leastsquares assumptions" are made about some independent regularity of each   yk,    an acceptable variance of the forecasted vector Yk would be:    Var(yk,t+l = à Pka2 aa2 (14)   
In the model according to the invention, an updated dynamically exponentially weighted PCA is further required, a way of handling the risk of rotation in the model, which will be discussed below, as well as closer definition of centering and scaling. These questions will be dealt with one at a time.



  To achieve a weighed PCA, we are using exponentially decreasing observation weights,   vi,    according to equation (1), whereby, with the aid of the weighted least-squares formulas and equation (9), the following is directly obtained:
Pak =   ìN    (vi * eik * tia) /   ìN    (vi * tia * tia) (15)
Consequently, the NIPALS algorithm can be utilized directly with only minor modifications when calculating EWM-PC loadings by using the exponentially decreasing weights,   vi,    according to equation (1). For a single, fixed Y, the other
NIPALS steps remain unchanged. The unweighted scores, ta, however, are no longer orthogonal, whereas the weighted   tia X    are orthogonal.  



  Prior to a multivariate modelling, data are usually centered by subtraction of the column mean values from the data matrix.



  The mean vector may be interpreted as a first loading vector,   po,    with a corresponding score vector, to, which has each element equal to 1/N.



  In the present application, there are two natural ways to proceed for determining a centering vector. In one case, a constant mean value vector is used, determined from a long process history. In the second case, EWMA is used for each variable,   (yak),    with a much smaller   X    than what is used in the
EWMA-PCA weights   (vi).    To stabilize the estimation of this
EWMAk, this is calculated by using the residuals of the PC model instead of (normalized) raw data. Thus, the observation vector Yt+l is centered and scaled by using the parameters at time t. Then, the predicted values are subtracted (by means of equation (13)), to give the residuals   eft+1,    which are used to update EWMAk in accordance with the equations (1) and (2).



  After the centering, data are scaled by multiplying each column in the data set by a scalar weight    k.    By means of   variance scaling (autoscaling), o k is calculated as l/sk,    where   sk    is the standard deviation for columns. This again leads to two obvious choices; to calculate   sk    from a long process history or to use an updated computation of   sk    based on weighted local data. A third option is based on a slowly updated "spanning" database, which is described below.



  Important variables may be scaled up by thereafter multiplying   o k by a value between 1 and 3 and inversely. Other less    important variables may in a corresponding way be scaled down.



  The above-mentioned rotation problem, which may arise when that point swarm of observations in space, which in the model is projected onto first and second principal directions, more or less has a circular propagation. In such situations, each bilinear model, both PCA and PLS, is partially undefined with respect to rotation. See Figure 9. In dynamically updated models, this leads to a potential instability; when a new  process observation is introduced in the model, this may lead to a rotation of the immediately preceding model, even if the new observation point lies very close to the model plane. This manifests itself as a jump in the score plot shown, which is incorrectly interpreted as a change of the process itself.

  To avoid this unintentional rotation, loading vectors from the preceding model are saved in an auxiliary matrix, a "P-memory" matrix, ("W-memory" in PLS), here designated   9.    Thereafter, when estimating the updated model, this P-memory matrix, exponentially weighted, is included according to the multiblock PCA/PLS algorithm published in "MULDAST NEWS", Report from the MULDAST symposium in   Ume,    4-8 June, 1984, S. Wold et al. This can be seen as a Bayesean estimation of the PC model, where information from previous events is stored in Q, the Pmemory matrix. See Figure 10.



  The consequence of including a memory matrix is that the updated loading vectors   Pa,    (or wa in PLS) are forced not to differ too much from the preceding loading vectors. The balance between new and old values is checked by an adjustable parameter, a. The full algorithm is given below.

 

  A further difficulty to take into consideration is that, when losing the memory during an instability period, each recursive model estimation has a tendency to lose the information about previous periods. This is due to the fact that if the process is stable sufficiently long, only data without appreciable variation are retained and earlier data are weighted down and will have insignificant influence in the exponentially decreasing weights.



  To force the model to remember important events further back in its history, a second auxiliary matrix is also used, a reference data matrix, Y*, in the model determination. This matrix contains those observations (points) in the process which span all the space of previous observations and which are updated whenever a new process observation has a score (ta) which exceeds a certain fixed limit value. These limit  values may be derived from "historical" data, that is, previously occurring extreme values, or be preset by the process operator. By analogy with this, an additional reference matrix for the loading vectors, Q*, is involved such that the process memory regarding the loading vectors does not disappear during some period of instability.



  As in the P-memory matrix (Q), the rows in the reference matrices (Y* and 0*) are exponentially weighted, but with a slower decrease by the use of a smaller value y which is used instead of the greater   X    in equation (1).



  Many processes now and then generate "spikes", that is, deviating values which should not be included in the modelling work. The simplest way of handling these spikes is to calculate the distance in the Y-space between a new observation and the preceding one. Observations with widely differing values, which create scores (ta) far beyond the "norm ranges" compared with the values of reference data according to the above, are discarded after a message to the operator, unless several consecutive process observations demonstrate a consistently deviating pattern.



  Applying the method according to the invention (EWM-PCA or
PLS) to a set of historical data with a given set of parameter values   B1    to   X3    gives predicted errors of one-step-ahead forecasts for each score, ta, and for each y-variable. The sum of the squares of the differences between actual values and predicted values thus forms an estimation of predictive power of the model in the same way as with cross-validation. This sum, PRESS, has components from each score, or y-variable, or both, weighted according to their perceived importance. To find the best combination of the values of   hl    to   B3,    "Response
Surface Modelling" (RSM) is recommended. In this approach, 15 models with different parameters are evaluated in parallel.



  The 15 parameter combinations   (j=1,2,...,15)    are selected according to a "Central Composite Inscribed" (CCI) design with low and high values being around, for example, 0.15 and 0.45.  



  This is then followed by a regression of y=log (PRESSj) against the extended design matrix   X=h,    which gives a predicted combination of parameter values which provides a minimum of PRESS.



  A step-by-step overview of the process model according to the invention will be presented in the following: 1. Select parameters   B1    to   B3    in equation (5) (or eqs. 11,
 12) in the simplest case. This is done based on
 experience or estimation of values which give the best
 predictions in a longer process history.



  2. Select a starting matrix,   Yg,    in accordance with process
 data at the beginning of the time interval of interest.



   If PLS modelling is used, the two starting matries   Xg    and
   Yo    are needed. From these, column mean values and stan
 dard deviation are calculated for centering and scaling
 of data.



  3. Use weighted PCA (or PLS) to derive an initial model of
 the process from normalized data according to step 2.



  4. Initiate the data memory matrix by including the data
 from Yo in PCA and   xg    in PLS which correspond to the
 maximum and minimum score values of each model dimension,
 a.



  5. Initiate the loading or weighting memory matrices, Qa,
 (Pmem or Wmem), one for each component, a, with   Pa    or
   wa'    as the first and single rows.



  6. Initiate Q*, the long-term spanning Pa or Wa matrices,
 identical with those in step 5.



  7. Make a one-step-ahead forecast of scores   ta,t+1.    Then
 calculate predicted y values from ha,t+l and P' (PCA) or
 C (PLS).  



  8. Fetch the observed values Yt+l (and xt+l for PLS).



   Investigate whether they contain spikes. Center and scale
 them by using normalization parameters from the previous
 step (time=t) and calculate the current scores   taut+   
 and the remaining residuals e = Yt+l - ta,t+lPt 9. Update the centering parameters by means of the residuals
 e.



  10. Update the EWM-PC or PLS model by iterating the algorithm
 to convergence.



  11. Update the memory matrices   Qal      (2mem,a    or Wmem,a for
 PLS), and, if justified, also the data memory matrix Y
 and the matrices P, W, Q*a and the memory matrix Y*.



  The difference between EWM-PCA and EWM-PLS may be described such that, in the "PLS" situation, the process data have been divided into two (or more) blocks; X referring to input data and Y referring to "output data", that is, a performance and quality assessment of the product. It may here be desired to monitor and forecast the process (x), the result (Y), or both.



  The algorithm for updating the model becomes somewhat more complicated by the inclusion of the Y block. The data memory will also have a Y block. Forecasts of Y are made directly from the forecasted X scores (t), as shown in step 7 above, and X data in the same way as with EWMrPCA. The inclusion of the Y block stabilizes the model and reduces the constraints on P.



  One of the most determining advantages of the process model according to the invention is that it becomes possible to follow the course of the process dynamically with the aid of a display, wherein first scores   (tl    and t2) are plotted against each other or separately versus time. Such a representation gives a good picture of how the process is developed. The distance to the model, Dmod, that is, the standard deviation of the Y residuals (X residuals for PLS) may be included as a  separate reproduction or be included in the score reproduction as colour in dependence on the distance mentioned. See Figure 11.



  Tests with process monitoring according to the model have been carried out experimentally, inter alia on ore treatment, which has allowed the process to be monitored and clearly shown when the process does not lie within the normal framework.



  Further, in summary, it can be said that the present model with EWM-PCA and EWM-PLS provides us with multivariate windows on a dynamic process, wherein the dominating properties of the development in the process are shown as scores plus a measured value of how far process data (new observations) lie from the model. If there is an auto-correlation structure in the scores, one-step-ahead forecasts of process scores (ta) and process variables (y or x) may be used for diagnosing and controlling the process.



  The algorithms for modelling the process are shown in the following step by step.

 

  It is assumed that suitable values of the parameters   hl    to   X3    are available, both as values of centering and scaling constants, EWMAk and   k    for the variables   (xk,      Yak).   



  The EWM-PC algorithm 1. Select suitable parameter values   (Bj,).   



  2. Start with an initial matrix   Yg,    magnitude NO x K. Set
   Y=Yo.    The memory matrices Y* and Q are initialized as
 empty.



     3. The    weights vi and vi* are calculated according to
 equation (1) with the parameters   X    and y. The weighted
 mean value of each variable (k) is calculated from Y:    EWMAk = ziVi*Yik / / Cjvi*     
 The scaling weights   (#k)    are calculated from both Y and
 Y* (note that Y* is centered):
 skê =   [PCivi(Yik    -   EWMAk)2    +   (1-ss)#jvj*yjk*ê]/[ss#ivi   +   
 ci-P,Cjvj*]
 = = 1 / sk   
 The constants are left as zeros with zero weight.



   Important variables may be scaled up or down by multipli
 cation of the scaling weights above by a suitable adjus
 ter between, for example 0.3 and 3. The parameter   5    which
 determines the relative effect on the current data and
 reference data may lie somewhere between 0.1 and 0.9
 depending on the stability of the process.



  4. Center and scale Y with the centering parameters EWMAk
 and the scaling parameter   disk.   



   Yik(normalized) = (yik(row) -   EWMAk)*°k    5. The central part of the EWM-PC algorithm is initiated
 here: the determination of the weighted PC model. The
 additional steps caused by cross-validation are not
 explicitly shown; they substantially comprise elaboration
 of the algorithm below several times with different parts
 of data deleted and afterwards predicting the deleted
 data from the model. The model dimension, A, with the
 smallest prediction error (PRESS) is selected, with
 preference for a smaller A, if PRESS is largely the same
 for different model dimensions.



   (i) Set dimension index a to one.



   (ii) As starting vectors for Pa and qa (loading vector),
 the ones from the previous time points are used. At
 the very first time, the last row in   Yo    is used,  
 normalized to length 1.



  (iii) Calculate the scores tia. To compensate for
 missing data, dummy variables (dik) are used, which
 are zero if element Yik is missing, otherwise equal
 to one.



   tia =   zk    dikYikPka /   #k    dikPka2
 If there is a reference matrix, Y*, the correspon
 ding scores, tia*, for this matrix are calculated
 by using   djk    and Yjk* instead of dik and Yik in
 the above equation.



  (iv) Calculate the loading vectors, Pka, using the same
 dik for compensation of missing data.



   Pka =   Si    dikYiktia /   zi    diktia2
 Normalize pa to length one; pa = pa /   pa   
 If there is a reference matrix,   Y ,    the correspon
 ding loading scores, Pka*, for this matrix are cal
 culated by using djk and Yjk* and tia* instead of
 dik, Yik and tia in the above equation.



   Form Pa as the weighted combination of two calcu
 lated pa values.



     Pa    =   ss      Pa    + (1-ss)pa*
 Normalize the new pa to length one.



  (v) Check the convergence of
EMI29.1     
 which must be smaller than 10-6 to indicate convergence. If convergence exists, proceed with step (ix), otherwise step (vi).  



  (vi) If the calculation is made at a first time,
 return to step (iii). Otherwise, continue to
 step (vii).



  (vii) Calculate the scores   ua    and ua* for the loading
 matrix P and the reference matrix P*, respectively.



   uia =   #k      Pmem,    a,ik Pka /   #k   Pkaê
 uj*   Ck    Pref, a,jk Pka /   #k   Pka2 (viii) Calculate the "loadings" of the two loading and
 reference matrices according to:
   9ka    =   #i    Pmem, a,ik uia /   #i    uia2
   9ka*      Cj      Pref,    a,jk   Uja    /   #j    (uja*)2
 Form qa as the weighted combination of two calcula
 ted qa values.



      qa = ss qa + (l-)qa *   
 Normalize this new qa value to length one. Use the
 weighted combination (weight a) of this vector and
   Pa    (weight   l-a)    and return to step (iii).



  (ix) If convergence exists, the final ta and ta* for the
 two data blocks are calculated, and from these
 temporary loading vectors which are used only to
 form the residuals to provide data in the next
 model dimension calculations. This is necessary to
 preserve orthogonality of the scores and is
 analogous to the orthogonalization step w - >  t - >  p
 in ordinary PLS regression.



   After this, the residuals Y - tapa' and Y* 
   - ta*pa*    are formed. Add one to the model dimen  
 sion (a = a + 1) and proceed with the next dimen
 sion by using the residuals Y and   Y *    as the data
 matrices in this next dimension.



   (x) The algorithm is terminated when the number of
 dimensions, a, of the model equals the desired
 number of "significant" dimensions (variables), A,
 in the model, which is determined by cross
 validation, or based on experience.



   If instead an EWM-PLS algorithm is used, the difference
 between these is that the latter (PLS) includes both X
 blocks and Y blocks for data and reference data, respec
 tively. By replacing Y by X and Y* by X*, loadings by PLS
 weights and p by w in the algorithm above, some sub-steps
 are added in step (iii) in the above algorithm. After
 calculating the scores ta and ta*, these are used for
 calculating Y weights, ca and   ca*,    respectively, which in
 turn leads to Y scores, here designated ra instead of ua.

 

   (iiia) Y and Y* weights
 cma   Ci    dim   yim    tia /   Si    dim tia2
 and analogously for Cma
 (iiib) Scores ta and   ta *   
 ria   Cm    dim   yim    Cma /   zm    dim cma2    and analogously for rja*.   



   These scores, r and rja*, are then used instead of t and
 t*, respectively, to calculate the PLS weights in step    (iv)   
Finally, after convergence, the residuals (Fa) of each Y block  are formed by subtracting the relevant t vector multiplied by the relevant c vector. These residuals are then used as Y and
Y* in the next dimension.



  After convergence of the above algorithm, the resulting scores (only t and u values) are compared with maximum and minimum values with corresponding scores for the reference data and the loading matrices. Thus, when the reference matrices are initially empty, the data vectors corresponding to the greatest and smallest t and u values for each model dimension are saved in the reference data matrix Y* and P*, respectively. The extreme scores are saved for later comparisons. In following updates, a score value which is below the minimum or above the maximum previous score with the same dimension means that the corresponding data vector is included in the reference matrix and a new score value is saved.

  Two variants of Y* may be noted, one where old data are deleted from Y* and where no exponential weighting of Y* is made, and another, recommended variant, where Y* is extended with the new data vector by using a slowly decreasing exponential weighting of
Y*. The same principles are used for the reference matrices for loadings or PLS weights.



  The described algorithm forms the basis of how a multivariate process can be illustrated graphically, as mentioned above in the description of the invention. On the basis of observed facts, as, for example, because of the drift of some individual variable, the process may be restored to a normalized position by the fact that the variable in the process may be directly influenced.



  Physically, the process monitoring according to the invention is achieved by measuring the measured data of relevant quantities by means of measuring devices for the respective physical quantity in the monitored process in a known manner. The measured values are passed via a process link to a computer, which is programmed to create models of the process according to the invention.

  The model or models are presented graphi  cally on a screen, where according to the invention the process in its entirety is projected onto a plane or a hyperplane and where the projection contains all relevant information about the process, which makes it possible for the operator to take accurate action, based on facts, in the form of intervention in the physical quantities of the process, for example by adjusting the pressure or temperature levels, contact forces for rolls in a machine, etc., all according to which is indicated according to the visualization of the process. This type of information and the possibility of physical intervention in the process have not existed according to the prior art, since a real-time on-line study of the effect of many quantities on one another in a process has not been possible.

 

  The calculations for the different steps to obtain the model of the process, referred to according to the invention, are implemented by calculating units, which are schematically reproduced in Figure 12 where a clear overview of the calculation steps is given by means of a flow chart. If, in step 2 in Figure 12, ta,i+l and/or DModX end up outside the allowable control interval, different loading plots are used to identify which process variables (xk) have caused the process to leave its operative norm range, whereby the variable or variables which have caused the drift in the process are adjusted to values which are predicted to restore the process to a norm range as soon as possible. 

Claims

1. A method for monitoring and control of an industrial or other technical process, the course of which is dependent on a multiple of variables relevant to the process, comprising the steps of - registering the measured values of the variables as an observation at a certain time, - describing the variables as a multidimensional room, wherein each variable represents one dimension in the room, - representing each observation as a point in the multi dimensional room,
whereby a series of observations carried out at different times will be represented by a point swarm in space, - calculating at least one first (Pa) and one second (Pb) principal direction in space for the point swarm, - determining the projections of the observations onto the principal directions (Pal Pb), - inserting the projection of the observations onto a point as a point on an electronic screen in a linear room which is spanned by the principal directions (Pa, Pb), characterized in that - the principal directions (Pa,Pb) of the point swarm in space are updated during the course of the process, which allows the process to be dynamically monitored, - the norm range of the process, as well as process influencing variables,
are indicated on the screen, - the process-influencing variable or variables which indicate drift in the process are adjusted by the process operator or the monitoring member, whereby the process is restored to the norm range.
2. A method according to claim 1, characterized in that the process is illustrated dynamically, on-line, as a picture on a screen, wherein a first (Pa) and a second (Pb) principal direction define the plane shown on the screen, wherein the projections of the observations are illustrated as points on the screen, and wherein the process is visualized in the form of a snake which crawls over the screen from one point to another point representing consecutive observations of the process in time.
3. A method according to claim 1, characterized in that the process is illustrated dynamically, on-line, as a picture on a screen, wherein a first, a second and a third principal direction (pa,pb) define a three-dimensional room which is shown on the screen, wherein the projections of the observations are illustrated as points on the screen, and wherein the process is visualized in the form of a snake which crawls over the screen from one point to another point representing consecutive observations of the process in time.
4. A method according to claim 2 or 3, characterized in that the process is illustrated dynamically, on-line, by determining the deviations (the residuals) between the calculated model of the process and the reference model as a quantity (Dmod) and by indicating this distance of the process to the model (Dmod) by the snake changing colour in dependence on the distance to the model (Dmod).
5. A method according to claim 4, characterized in that all of or parts of the crawling snake representing the course of the process are coloured in various colours in dependence on the magnitude of Dmod, that is, a certain colour for the visualized parts of the process where the distance to the model is outside a certain norm range for Dmod and other colours for the visualized parts of the process where this is within the norm range of the process.
6. A method according to claim 2 or 3, characterized in that the snake initiates an alarm when the snake on the screen enters a range which lies outside a norm range for the process defined on the screen in advance.
7. A method according to claim 2 or 3, characterized in that that part of the process which is of current interest is indicated as a more intensely or brightly represented snake.
8. A method for monitoring and control of an industrial or other technical process, the course of which is dependent on a multiple of variables relevant to the process, comprising the steps of - registering the measured values of the variables as an observation at a certain time, - describing the variables as a multidimensional room, wherein each variable represents one dimension in the room, - representing each observation as a point in the multi dimensional room, whereby a series of observations carried out at different times will be represented by a point swarm in space, - calculating at least one first (Pa) and one second (Pb) principal direction in space for the point swarm, - determining the projections of the observations onto the principal directions (Pa, Pb),
whereby a model of the process is obtained, - calculating the deviation (Dmod) between the calculated model and a reference model for the process.
characterized in that - the principal directions (Pa,Pb) of the point swarm in space are updated during the course of the process, whereby the calculated model of the process is dynami cally adapted to the process in real time, - initiating an alarm when the distance of the process to the model exceeds a predetermined alarm limit.
9. A method according to claim 8, characterized in that that the distance of the process to the model (Dmod) is shown online in a figure where said distance to the model (Dmod) is plotted as a function of the time of process observations made.
10. A method according to claim 8, characterized in that the distance of the process to the model (Dmod) consists of the standard deviation for the deviation of the respective observation from a reference model of the process.
11. A method according to claim 2, characterized in that the relevant variables in the process are illustrated as a picture on a screen, a score reproduction, wherein a first (Pa) and a second (Pb) principal direction define the plane shown on the screen, wherein the positions of the individual variables are projected onto this plane, and the midpoint (x) of the point swarm in this plane is illustrated as points on the screen.
12. A method according to claim 11, characterized in that the process, indicated in the form of a snake as well as a score plot, is at the same time visualized on the basis of the same plot plane defined by the same first (Pa) and second (Pb) principal directions on separate or on the same screen image, whereby the movement of the snake over the screen can be immediately related to process-driving variables, in that the directions from the midpoint (x) of the point swarm in the two images correspond to each other, whereby the direction of crawling of the snake away from the midpoint (x) of the point swarm indicates an influence on the process by one or more variables which in the score plot lie in the same direction of travel as the movement of the snake,
which means that the process operator or the monitoring member receives information about which variable/variables result in drift in the process, allowing the operator or the monitoring member to easily act on the disturbing variable.
PCT/SE1994/001208 1993-12-22 1994-12-15 Method for monitoring multivariate processes WO1995018420A2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
US08/666,346 US5949678A (en) 1993-12-22 1994-12-15 Method for monitoring multivariate processes
JP51766495A JP3429769B2 (en) 1993-12-22 1994-12-15 Method for monitoring a variable number of processes
EP95904723A EP0775335B1 (en) 1993-12-22 1994-12-15 Method for monitoring multivariate processes
DE69412520T DE69412520T2 (en) 1993-12-22 1994-12-15 METHOD FOR DISPLAYING MULTI-DIMENSIONAL PROCESSES
FI962560A FI962560A (en) 1993-12-22 1996-06-19 Method for monitoring multivariate processes
NO19962626A NO311818B1 (en) 1993-12-22 1996-06-20 Procedure for monitoring multivariate processes

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SE9304246A SE9304246L (en) 1993-12-22 1993-12-22 Procedure for monitoring multivariate processes
SE9304246-3 1993-12-22

Publications (2)

Publication Number Publication Date
WO1995018420A2 true WO1995018420A2 (en) 1995-07-06
WO1995018420A3 WO1995018420A3 (en) 1995-07-27

Family

ID=20392178

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE1994/001208 WO1995018420A2 (en) 1993-12-22 1994-12-15 Method for monitoring multivariate processes

Country Status (10)

Country Link
US (1) US5949678A (en)
EP (1) EP0775335B1 (en)
JP (1) JP3429769B2 (en)
AT (1) ATE169746T1 (en)
CA (1) CA2179719A1 (en)
DE (1) DE69412520T2 (en)
FI (1) FI962560A (en)
NO (1) NO311818B1 (en)
SE (1) SE9304246L (en)
WO (1) WO1995018420A2 (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997006475A1 (en) * 1995-08-09 1997-02-20 Siemens Aktiengesellschaft Analysis system for a technical installation, especially a power station
WO1997006474A1 (en) * 1995-08-09 1997-02-20 Siemens Aktiengesellschaft Method of analysing process signals in a technical installation, especially a power station
WO1997030382A1 (en) * 1996-02-13 1997-08-21 Westinghouse Electric Corporation Apparatus and method for monitoring pressure-temperature margins
DE19615960A1 (en) * 1996-04-22 1997-10-23 Siemens Ag Method and control and instrumentation system e.g. for power station installation
DE19637651A1 (en) * 1996-09-16 1998-03-19 Abb Patent Gmbh Process visualization methods
DE19649633A1 (en) * 1996-12-02 1998-06-04 Abb Patent Gmbh Process for the analysis and representation of transient process processes
DE19740565A1 (en) * 1997-09-15 1999-03-18 Max Planck Gesellschaft Mode detection method for dynamic system
DE19811895A1 (en) * 1998-03-18 1999-09-23 Rohde & Schwarz Method for determining various errors in a digital transmitter modulator
EP0971321A2 (en) * 1998-07-01 2000-01-12 General Electric Company System and method for generating alerts through multi-variate data assessment
WO2000002108A1 (en) * 1998-07-07 2000-01-13 Johnson Controls Technology Company Starfield display of control system diagnostic information
US6108615A (en) * 1995-08-09 2000-08-22 Siemens Aktiengesellschaft Method for analyzing process signals of a technical plant, in particular a power plant
AT500365A2 (en) * 2004-05-27 2005-12-15 Dofasco Inc REAL TIME SYSTEM AND METHOD FOR MONITORING TRANSIENTER PROCESSES IN A CONTINGENCY PROGRESS TO PREVENT EXPLOSION
EP1665076A2 (en) * 2003-09-12 2006-06-07 Tokyo Electron Limited Method and system of diagnosing a processing system using adaptive multivariate analysis
EP1733325A2 (en) * 2004-03-30 2006-12-20 Tokyo Electron Ltd. Method and system for run-to-run control
WO2007138169A1 (en) * 2006-06-01 2007-12-06 Metso Automation Oy A method and a system for monitoring the performance of a paper or pulp production process
WO2008042759A2 (en) * 2006-09-29 2008-04-10 Fisher-Rosemount Systems, Inc. On-line multivariate analysis in a distributed process control system
US7853339B2 (en) 2006-09-29 2010-12-14 Fisher-Rosemount Systems, Inc. Statistical signatures used with multivariate analysis for steady-state detection in a process
DE102019215016A1 (en) * 2018-12-28 2020-07-02 Robert Bosch Gmbh Measuring arrangement, method for setting up a measuring arrangement and method for operating a measuring arrangement

Families Citing this family (89)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19627464A1 (en) * 1996-07-08 1998-01-15 Siemens Ag Process automation system
JP3277142B2 (en) * 1997-06-18 2002-04-22 インターナショナル・ビジネス・マシーンズ・コーポレーション Method and apparatus for creating regression tree
US6151532A (en) * 1998-03-03 2000-11-21 Lam Research Corporation Method and apparatus for predicting plasma-process surface profiles
SE512540C2 (en) * 1998-06-22 2000-04-03 Umetri Ab Method and apparatus for calibrating input data
EP1021263B1 (en) * 1998-07-21 2004-11-03 Dofasco Inc. Multivariate statistical model-based system for monitoring the operation of a continuous caster and detecting the onset of impending breakouts
US6671661B1 (en) * 1999-05-19 2003-12-30 Microsoft Corporation Bayesian principal component analysis
US6560514B1 (en) * 1999-09-23 2003-05-06 Kic Thermal Profiling Method and apparatus for optimizing control of a part temperature in conveyorized thermal processor
ATE248412T1 (en) * 1999-12-23 2003-09-15 Abb Ab METHOD AND DEVICE FOR MONITORING THE OPERATING STATE OF A SINGLE MACHINE
US6950816B1 (en) * 2000-02-29 2005-09-27 Unisys Corporation Built in headroom for a preemptive multitasking operating system sizer
US6957172B2 (en) 2000-03-09 2005-10-18 Smartsignal Corporation Complex signal decomposition and modeling
AU4733601A (en) * 2000-03-10 2001-09-24 Cyrano Sciences Inc Control for an industrial process using one or more multidimensional variables
GB0007063D0 (en) * 2000-03-23 2000-05-10 Simsci Limited Mulitvariate statistical process monitors
ATE354822T1 (en) * 2000-06-30 2007-03-15 Siemens Corp Res Inc METHOD AND SYSTEM FOR INDUSTRIAL USER GUIDANCE USING PREDICTIVE ALARM DETECTION
US6636842B1 (en) * 2000-07-15 2003-10-21 Intevep, S.A. System and method for controlling an industrial process utilizing process trajectories
US20020019722A1 (en) * 2000-07-19 2002-02-14 Wim Hupkes On-line calibration process
US6895293B2 (en) 2000-09-14 2005-05-17 Applied Materials, Inc. Fault detection and virtual sensor methods for tool fault monitoring
CA2419240C (en) * 2000-10-26 2007-04-10 Triant Technologies Inc. Method for estimating and reducing uncertainties in process measurements
US7092863B2 (en) * 2000-12-26 2006-08-15 Insyst Ltd. Model predictive control (MPC) system using DOE based model
US6675129B1 (en) 2000-12-28 2004-01-06 General Electric Company Internet based supplier process reliability system
US7233886B2 (en) * 2001-01-19 2007-06-19 Smartsignal Corporation Adaptive modeling of changed states in predictive condition monitoring
MXPA03006668A (en) * 2001-01-30 2003-10-24 Thomson Licensing Sa Geometric source separation signal processing technique.
US6785632B1 (en) 2001-04-12 2004-08-31 Seagate Removable Solutions Llc Real time statistical computation in embedded systems
GB0111215D0 (en) * 2001-05-08 2001-06-27 Curvaceous Software Ltd Multi-variable process
EP1262844A1 (en) * 2001-06-01 2002-12-04 Sony International (Europe) GmbH Method for controlling a man-machine-interface unit
US6564113B1 (en) * 2001-06-15 2003-05-13 Advanced Micro Devices, Inc. Lot start agent that calculates virtual WIP time in a multi-product and multi-bottleneck manufacturing environment
EP1428021A4 (en) * 2001-08-24 2007-04-11 Bio Rad Laboratories Biometric quality control process
US20050118812A1 (en) * 2001-12-31 2005-06-02 Tokyo Elecron Limited Method of detecting, identifying and correcting process performance
US7660705B1 (en) 2002-03-19 2010-02-09 Microsoft Corporation Bayesian approach for learning regression decision graph models and regression models for time series analysis
US7096074B2 (en) * 2002-05-30 2006-08-22 Insyst Ltd. Methods and apparatus for early fault detection and alert generation in a process
DE10228799A1 (en) * 2002-06-27 2004-01-29 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Device and method for monitoring an ongoing process
JP2004047885A (en) * 2002-07-15 2004-02-12 Matsushita Electric Ind Co Ltd Monitoring system and monitoring method of semiconductor manufacturing apparatus
US7043403B1 (en) * 2002-09-04 2006-05-09 Advanced Micro Devices, Inc. Fault detection and classification based on calculating distances between data points
DE10241746B8 (en) * 2002-09-10 2007-09-20 Haag, Günter, Prof.Dr. Method for cyclic quality assessment and process monitoring in periodical production processes
US6799143B1 (en) * 2002-12-10 2004-09-28 Abb Inc. Process and device for evaluating the performance of a process control system
CA2414167A1 (en) * 2002-12-12 2004-06-12 Dofasco Inc. Method and online system for monitoring continuous caster start-up operation and predicting start cast breakouts
US7185012B1 (en) * 2003-02-10 2007-02-27 At&T Corp. Method and apparatus for ranked join indices
US7580813B2 (en) * 2003-06-17 2009-08-25 Microsoft Corporation Systems and methods for new time series model probabilistic ARMA
US6993404B2 (en) * 2003-07-11 2006-01-31 Mks Instruments, Inc. Graphical user interface with process quality indicator
DE10355022B4 (en) * 2003-11-25 2016-10-06 Prof. Dr.Thomas Bartsch Method for monitoring a technical system
US7451003B2 (en) * 2004-03-04 2008-11-11 Falconeer Technologies Llc Method and system of monitoring, sensor validation and predictive fault analysis
DE102004028557A1 (en) * 2004-06-15 2006-02-16 Abb Patent Gmbh Method and system for evaluating the condition of at least one pivot joint
US7465417B2 (en) * 2004-07-19 2008-12-16 Baxter International Inc. Parametric injection molding system and method
US7424395B2 (en) * 2004-09-10 2008-09-09 Exxonmobil Research And Engineering Company Application of abnormal event detection technology to olefins recovery trains
US20060074598A1 (en) * 2004-09-10 2006-04-06 Emigholz Kenneth F Application of abnormal event detection technology to hydrocracking units
US7567887B2 (en) * 2004-09-10 2009-07-28 Exxonmobil Research And Engineering Company Application of abnormal event detection technology to fluidized catalytic cracking unit
US7349746B2 (en) * 2004-09-10 2008-03-25 Exxonmobil Research And Engineering Company System and method for abnormal event detection in the operation of continuous industrial processes
WO2006034179A2 (en) * 2004-09-17 2006-03-30 Mks Instruments, Inc. Method and apparatus for multivariate control of semiconductor manufacturing processes
US7596475B2 (en) * 2004-12-06 2009-09-29 Microsoft Corporation Efficient gradient computation for conditional Gaussian graphical models
US7421380B2 (en) * 2004-12-14 2008-09-02 Microsoft Corporation Gradient learning for probabilistic ARMA time-series models
US7280941B2 (en) * 2004-12-29 2007-10-09 General Electric Company Method and apparatus for in-situ detection and isolation of aircraft engine faults
US20080021801A1 (en) * 2005-05-31 2008-01-24 Yuh-Shen Song Dynamic multidimensional risk-weighted suspicious activities detector
JP2009500853A (en) * 2005-07-07 2009-01-08 エム ケー エス インストルメンツ インコーポレーテッド Self-correcting multivariate analysis for monitoring dynamic parameters in process environments
GB0515726D0 (en) * 2005-07-30 2005-09-07 Curvaceous Software Ltd Multi-variable operations
US20070088448A1 (en) * 2005-10-19 2007-04-19 Honeywell International Inc. Predictive correlation model system
US7617010B2 (en) 2005-12-28 2009-11-10 Microsoft Corporation Detecting instabilities in time series forecasting
US7761172B2 (en) * 2006-03-21 2010-07-20 Exxonmobil Research And Engineering Company Application of abnormal event detection (AED) technology to polymers
US7720641B2 (en) * 2006-04-21 2010-05-18 Exxonmobil Research And Engineering Company Application of abnormal event detection technology to delayed coking unit
US8275577B2 (en) 2006-09-19 2012-09-25 Smartsignal Corporation Kernel-based method for detecting boiler tube leaks
US7580768B2 (en) * 2006-09-22 2009-08-25 Texas Instruments Deutschland Gmbh Method of adjusting process variables in a processing flow
EP1914638A1 (en) * 2006-10-18 2008-04-23 Bp Oil International Limited Abnormal event detection using principal component analysis
WO2008133715A2 (en) * 2006-11-03 2008-11-06 Air Products And Chemicals, Inc. System and method for process monitoring
US8311774B2 (en) 2006-12-15 2012-11-13 Smartsignal Corporation Robust distance measures for on-line monitoring
US8271103B2 (en) 2007-05-02 2012-09-18 Mks Instruments, Inc. Automated model building and model updating
US7970482B2 (en) * 2007-08-09 2011-06-28 Honeywell International Inc. Method and system for process control
US8924877B2 (en) * 2007-10-29 2014-12-30 Honeywell International Inc. Apparatus and method for displaying changes in statistical parameters in a process control system
US8213706B2 (en) * 2008-04-22 2012-07-03 Honeywell International Inc. Method and system for real-time visual odometry
US8494798B2 (en) * 2008-09-02 2013-07-23 Mks Instruments, Inc. Automated model building and batch model building for a manufacturing process, process monitoring, and fault detection
US8090676B2 (en) * 2008-09-11 2012-01-03 Honeywell International Inc. Systems and methods for real time classification and performance monitoring of batch processes
US8706737B2 (en) * 2008-12-31 2014-04-22 At&T Intellectual Property I, L.P. Method and apparatus for processing of top-K queries from samples
US9069345B2 (en) * 2009-01-23 2015-06-30 Mks Instruments, Inc. Controlling a manufacturing process with a multivariate model
JP5229631B2 (en) * 2009-03-17 2013-07-03 富士電機株式会社 Manufacturing condition adjustment device
US8285414B2 (en) * 2009-03-31 2012-10-09 International Business Machines Corporation Method and system for evaluating a machine tool operating characteristics
DE102009040386A1 (en) * 2009-09-07 2011-03-10 Schaeffler Technologies Gmbh & Co. Kg Method for state and process monitoring and device therefor
US8862433B2 (en) 2010-05-18 2014-10-14 United Technologies Corporation Partitioning of turbomachine faults
US8408051B2 (en) * 2010-09-01 2013-04-02 Frito-Lay North America, Inc. Method for decreasing variability in a moisture analyzer
US8855804B2 (en) 2010-11-16 2014-10-07 Mks Instruments, Inc. Controlling a discrete-type manufacturing process with a multivariate model
US8600915B2 (en) 2011-12-19 2013-12-03 Go Daddy Operating Company, LLC Systems for monitoring computer resources
US8719196B2 (en) 2011-12-19 2014-05-06 Go Daddy Operating Company, LLC Methods for monitoring computer resources using a first and second matrix, and a feature relationship tree
US9429939B2 (en) 2012-04-06 2016-08-30 Mks Instruments, Inc. Multivariate monitoring of a batch manufacturing process
US9541471B2 (en) 2012-04-06 2017-01-10 Mks Instruments, Inc. Multivariate prediction of a batch manufacturing process
EP2682168A1 (en) 2012-07-02 2014-01-08 Millipore Corporation Purification of biological molecules
CN103309347B (en) * 2013-06-05 2015-11-18 浙江大学 A kind of multiple operating modes process method for supervising based on rarefaction representation
CN103336507B (en) * 2013-06-24 2015-08-19 浙江大学 Automatically the statistical modeling divided based on the multi-modal collaborative period and on-line monitoring method
CN105159247B (en) * 2015-08-05 2018-02-09 北京工业大学 Batch process real-time sampling point stage ownership determination methods based on information transmission
JP7031512B2 (en) * 2018-06-25 2022-03-08 東芝三菱電機産業システム株式会社 Monitoring work support system for steel plants
JP7068583B2 (en) * 2018-09-20 2022-05-17 日本電信電話株式会社 Learning device, estimation device, learning method, estimation method and program
GB201900746D0 (en) 2019-01-18 2019-03-06 Cullum Stephen Process for evaluating software elements within software
WO2021014638A1 (en) 2019-07-25 2021-01-28 三菱電機株式会社 Device for monitoring apparatus state and method for monitoring apparatus state
CN117421701B (en) * 2023-12-19 2024-03-08 中国电建集团华东勘测设计研究院有限公司 Three-dimensional space attitude distributed monitoring method for pile leg of self-elevating platform

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4965742A (en) * 1987-09-30 1990-10-23 E. I. Du Pont De Nemours And Company Process control system with on-line reconfigurable modules
US5249120A (en) * 1991-01-14 1993-09-28 The Charles Stark Draper Laboratory, Inc. Automated manufacturing costing system and method
US5196997A (en) * 1991-01-22 1993-03-23 International Business Machines Corporation Method and apparatus for quality measure driven process control
US5402333A (en) * 1992-06-15 1995-03-28 E. I. Du Pont De Nemours & Co., Inc. System and method for improving model product property estimates
US5488561A (en) * 1992-08-19 1996-01-30 Continental Controls, Inc. Multivariable process control method and apparatus
GB2274376B (en) * 1992-12-09 1996-12-18 Honda Motor Co Ltd Method of and system for producing solid models
US5408405A (en) * 1993-09-20 1995-04-18 Texas Instruments Incorporated Multi-variable statistical process controller for discrete manufacturing
GB9326354D0 (en) * 1993-12-23 1994-02-23 British Aerospace Methods and apparatus for the testing,monitoring and improvement of manufacturing process effectiveness
US5457625A (en) * 1994-04-13 1995-10-10 The M. W. Kellogg Company Maximizing process production rates using permanent constraints
US5610843A (en) * 1995-03-01 1997-03-11 Sri International Methods and apparatuses for multi input/multi output control systems

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6108615A (en) * 1995-08-09 2000-08-22 Siemens Aktiengesellschaft Method for analyzing process signals of a technical plant, in particular a power plant
WO1997006474A1 (en) * 1995-08-09 1997-02-20 Siemens Aktiengesellschaft Method of analysing process signals in a technical installation, especially a power station
WO1997006475A1 (en) * 1995-08-09 1997-02-20 Siemens Aktiengesellschaft Analysis system for a technical installation, especially a power station
WO1997030382A1 (en) * 1996-02-13 1997-08-21 Westinghouse Electric Corporation Apparatus and method for monitoring pressure-temperature margins
DE19615960A1 (en) * 1996-04-22 1997-10-23 Siemens Ag Method and control and instrumentation system e.g. for power station installation
DE19637651A1 (en) * 1996-09-16 1998-03-19 Abb Patent Gmbh Process visualization methods
DE19649633A1 (en) * 1996-12-02 1998-06-04 Abb Patent Gmbh Process for the analysis and representation of transient process processes
DE19740565A1 (en) * 1997-09-15 1999-03-18 Max Planck Gesellschaft Mode detection method for dynamic system
US7277831B1 (en) 1997-09-15 2007-10-02 Fraunhofer-Gesellschaft Zur Forderung Der Angewandten Forschung E. V. Method for detecting time dependent modes of dynamic systems
DE19811895A1 (en) * 1998-03-18 1999-09-23 Rohde & Schwarz Method for determining various errors in a digital transmitter modulator
DE19811895B4 (en) * 1998-03-18 2007-06-21 Rohde & Schwarz Gmbh & Co. Kg Method for determining various errors of a digital transmitter modulator
EP0971321A2 (en) * 1998-07-01 2000-01-12 General Electric Company System and method for generating alerts through multi-variate data assessment
JP2000137702A (en) * 1998-07-01 2000-05-16 General Electric Co <Ge> System and method for issuing caution by evaluating multivariable data
EP0971321A3 (en) * 1998-07-01 2003-11-05 General Electric Company System and method for generating alerts through multi-variate data assessment
WO2000002108A1 (en) * 1998-07-07 2000-01-13 Johnson Controls Technology Company Starfield display of control system diagnostic information
EP1665076A4 (en) * 2003-09-12 2007-06-20 Tokyo Electron Ltd Method and system of diagnosing a processing system using adaptive multivariate analysis
EP1665076A2 (en) * 2003-09-12 2006-06-07 Tokyo Electron Limited Method and system of diagnosing a processing system using adaptive multivariate analysis
US7328126B2 (en) 2003-09-12 2008-02-05 Tokyo Electron Limited Method and system of diagnosing a processing system using adaptive multivariate analysis
EP1733325A4 (en) * 2004-03-30 2007-12-26 Tokyo Electron Ltd Method and system for run-to-run control
EP1733325A2 (en) * 2004-03-30 2006-12-20 Tokyo Electron Ltd. Method and system for run-to-run control
AT500365B1 (en) * 2004-05-27 2009-04-15 Dofasco Inc REAL TIME SYSTEM AND METHOD FOR MONITORING TRANSIENTER PROCEDURES IN A CONTINUITY CONTROL PROCESS
AT500365A2 (en) * 2004-05-27 2005-12-15 Dofasco Inc REAL TIME SYSTEM AND METHOD FOR MONITORING TRANSIENTER PROCESSES IN A CONTINGENCY PROGRESS TO PREVENT EXPLOSION
WO2007138169A1 (en) * 2006-06-01 2007-12-06 Metso Automation Oy A method and a system for monitoring the performance of a paper or pulp production process
WO2008042759A3 (en) * 2006-09-29 2009-08-27 Fisher-Rosemount Systems, Inc. On-line multivariate analysis in a distributed process control system
WO2008042759A2 (en) * 2006-09-29 2008-04-10 Fisher-Rosemount Systems, Inc. On-line multivariate analysis in a distributed process control system
US7853339B2 (en) 2006-09-29 2010-12-14 Fisher-Rosemount Systems, Inc. Statistical signatures used with multivariate analysis for steady-state detection in a process
US7853431B2 (en) 2006-09-29 2010-12-14 Fisher-Rosemount Systems, Inc. On-line monitoring and diagnostics of a process using multivariate statistical analysis
US7917240B2 (en) 2006-09-29 2011-03-29 Fisher-Rosemount Systems, Inc. Univariate method for monitoring and analysis of multivariate data
US7937164B2 (en) 2006-09-29 2011-05-03 Fisher-Rosemount Systems, Inc. Multivariate detection of abnormal conditions in a process plant
US7966149B2 (en) 2006-09-29 2011-06-21 Fisher-Rosemount Systems, Inc. Multivariate detection of transient regions in a process control system
US8014880B2 (en) 2006-09-29 2011-09-06 Fisher-Rosemount Systems, Inc. On-line multivariate analysis in a distributed process control system
US8489360B2 (en) 2006-09-29 2013-07-16 Fisher-Rosemount Systems, Inc. Multivariate monitoring and diagnostics of process variable data
DE102019215016A1 (en) * 2018-12-28 2020-07-02 Robert Bosch Gmbh Measuring arrangement, method for setting up a measuring arrangement and method for operating a measuring arrangement

Also Published As

Publication number Publication date
EP0775335A2 (en) 1997-05-28
DE69412520D1 (en) 1998-09-17
NO311818B1 (en) 2002-01-28
WO1995018420A3 (en) 1995-07-27
NO962626D0 (en) 1996-06-20
JP3429769B2 (en) 2003-07-22
FI962560A (en) 1996-08-21
CA2179719A1 (en) 1995-07-06
FI962560A0 (en) 1996-06-19
US5949678A (en) 1999-09-07
EP0775335B1 (en) 1998-08-12
JPH11502609A (en) 1999-03-02
DE69412520T2 (en) 1999-02-04
SE9304246D0 (en) 1993-12-22
NO962626L (en) 1996-07-25
SE9304246L (en) 1995-06-23
ATE169746T1 (en) 1998-08-15

Similar Documents

Publication Publication Date Title
US5949678A (en) Method for monitoring multivariate processes
JP7162075B2 (en) Computer system, method and computer program product for automatic alignment of batch data in batch process modeling, monitoring and control
Portnoy et al. An improved weighted recursive PCA algorithm for adaptive fault detection
Rännar et al. Adaptive batch monitoring using hierarchical PCA
US5442562A (en) Method of controlling a manufacturing process using multivariate analysis
US9733626B2 (en) Method of monitoring an industrial process
Warne et al. Statistical and computational intelligence techniques for inferential model development: a comparative evaluation and a novel proposition for fusion
DE102011102034B4 (en) Online comparison of a process analytical model with effective process operation
US7447554B2 (en) Adaptive multivariable MPC controller
JP4046309B2 (en) Plant monitoring device
CN102906650A (en) Multi-stage process modeling method
EP2423766A1 (en) Model predictive controller solution analysis process
EP1891489A2 (en) Online dynamic advisor from mpc models
US9199860B2 (en) Apparatus and method for nonlinear process identification using orthonormal bases and ordinal splines in a process control system
US20130116802A1 (en) Tracking simulation method
JPWO2018235807A1 (en) Apparatus for diagnosing abnormal state of process and method for diagnosing abnormal state
WO2020188696A1 (en) Abnormality detection device, and abnormality detection method
CN113287104A (en) Data sorting device
CN114692494A (en) Lithium battery temperature field online modeling method and system
US7502715B1 (en) Observability in metrology measurements
Kai et al. Plant-wide quantitative assessment of a process industry system’s operating state based on color-spectrum
WO2022091291A1 (en) Information processing device, information processing method, and recording medium
JP5125875B2 (en) PID controller tuning apparatus, PID controller tuning program, and PID controller tuning method
WO2024090428A1 (en) Information processing method, computer program, and information processing device
US11514384B2 (en) Productivity improvement support system and productivity improvement support method

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): CA FI JP NO US

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE

AK Designated states

Kind code of ref document: A3

Designated state(s): CA FI JP NO US

AL Designated countries for regional patents

Kind code of ref document: A3

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 962560

Country of ref document: FI

WWE Wipo information: entry into national phase

Ref document number: 2179719

Country of ref document: CA

ENP Entry into the national phase

Ref document number: 1995 517664

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 1995904723

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 08666346

Country of ref document: US

WWP Wipo information: published in national office

Ref document number: 1995904723

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 1995904723

Country of ref document: EP