WO1995003476A1 - Method of finishing wells - Google Patents

Method of finishing wells Download PDF

Info

Publication number
WO1995003476A1
WO1995003476A1 PCT/RU1993/000173 RU9300173W WO9503476A1 WO 1995003476 A1 WO1995003476 A1 WO 1995003476A1 RU 9300173 W RU9300173 W RU 9300173W WO 9503476 A1 WO9503476 A1 WO 9503476A1
Authority
WO
WIPO (PCT)
Prior art keywords
τρub
πρi
productive
φilτροm
sκvazhiny
Prior art date
Application number
PCT/RU1993/000173
Other languages
French (fr)
Russian (ru)
Inventor
Gabdrashit Sultanovich Abdrakhmanov
Rustam Khamitovich Ibatullin
Viktor Georgievich Zhzhonov
Izil Galimzyanovich Jusupov
Nigamatyan Khamitovich Khamityanov
Albert Gabidullovich Zainullin
Rashad Khasanovich Fatkullin
Original Assignee
Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti filed Critical Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti
Priority to PCT/RU1993/000173 priority Critical patent/WO1995003476A1/en
Publication of WO1995003476A1 publication Critical patent/WO1995003476A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • E21B43/103Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
    • E21B43/108Expandable screens or perforated liners
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • E21B43/103Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like

Definitions

  • the invention is related to drilling, and the needle is used to terminate the well.
  • ⁇ aib ⁇ lee e ⁇ s ⁇ e ⁇ ivn ⁇ nas ⁇ yaschee iz ⁇ b ⁇ e ⁇ enie m ⁇ zhe ⁇ by ⁇ is ⁇ lz ⁇ van ⁇ in s ⁇ vazhina ⁇ , igleyuschi ⁇ g ⁇ iz ⁇ n ⁇ alny uchas ⁇ s ⁇ v ⁇ la, ⁇ bu ⁇ enny in ⁇ du ⁇ ivn ⁇ m ⁇ las ⁇ e and ⁇ a ⁇ e in The case of chaya ⁇ , ⁇ gda nezhela ⁇ ely ⁇ u ⁇ lenyia ⁇ diame ⁇ s ⁇ vazhiny and ⁇ i presence uchas ⁇ v in in ⁇ e ⁇ vale us ⁇ an ⁇ v ⁇ i ⁇ v ⁇ s ⁇ vi ⁇ a, sl ⁇ zhen-0 ny ⁇ slab ⁇ stse
  • the essence of the method of using a device with a filter on a full-time stone is to switch on the load for a full load, to keep the load - 2 - x v ⁇ s ⁇ v ⁇ a and ⁇ s ⁇ edinenii bu ⁇ ilysh ⁇ ⁇ ub ⁇ ⁇ v ⁇ s ⁇ vi ⁇ a ⁇ l ⁇ ⁇ sle ⁇ az ⁇ vaniya in za ⁇ ubn ⁇ m ⁇ s ⁇ ans ⁇ ze tsemen ⁇ n ⁇ - g ⁇ ⁇ amnya.
  • the packs cannot reliably cut open spaces when they are linear and increase the linear sizes of the amplifiers. This is exacerbated by boreholes, which have been exposed to poorly cemented materials, where mucking places are displaced, especially when the borehole is removed and removed from the site.
  • ⁇ a ⁇ y va ⁇ ian ⁇ vy ⁇ lneniya ⁇ zv ⁇ lyae ⁇ is ⁇ lz ⁇ va ⁇ naib ⁇ - Lee ⁇ s ⁇ y, vyg ⁇ dny and reliable s ⁇ s ⁇ b us ⁇ an ⁇ v ⁇ i ⁇ v ⁇ s ⁇ vi- ⁇ v with ⁇ il ⁇ ami with ⁇ m ⁇ schyu ⁇ ilny ⁇ ⁇ ub in ⁇ e ⁇ sluchaya ⁇ , ⁇ gda in ⁇ tsesse bu ⁇ eniya s ⁇ vazhiny vs ⁇ echayu ⁇ sya ⁇ las ⁇ y with an ⁇ - maln ⁇ vys ⁇ im vnu ⁇ i ⁇ las ⁇ vy ⁇ l pressure ⁇ ye ⁇ .bychn ⁇ ⁇ e ⁇ e ⁇ yvayu ⁇ ⁇ mezhu ⁇ chnymi ⁇ l ⁇ nnami ⁇ bsadny ⁇ ⁇ ub or ⁇ l ⁇ nnami
  • the device also includes a flare-up agent 19 (Yig. 5), which is used for extracting a thirteen 13-tube after expansion.
  • a flare-up agent 19 (Yig. 5), which is used for extracting a thirteen 13-tube after expansion.
  • the method is as follows. ⁇ ⁇ tsesse bu ⁇ eniya s ⁇ zazhiny II ( ⁇ ig. ⁇ ) ⁇ e ⁇ ed zs ⁇ y ⁇ iem ⁇ du ⁇ ivn ⁇ g ⁇ ⁇ las ⁇ a 18 izves ⁇ nymi ⁇ iemami iz ⁇ li ⁇ uyu ⁇ ⁇ se nes ⁇ vmes ⁇ imye ⁇ usl ⁇ iyagl bu ⁇ eniya ⁇ las ⁇ y, ⁇ as ⁇ l ⁇ zhennye above ⁇ du ⁇ ivn ⁇ g ⁇ 18 and ⁇ sle vs ⁇ y ⁇ iya ⁇ sledneg ⁇ and ⁇ myv ⁇ i s ⁇ v ⁇ la s ⁇ vazhiny II of her s ⁇ us ⁇ ayu ⁇ on ⁇ l ⁇ nne bu ⁇ ilny ⁇ ⁇ ub I ⁇ v ⁇ s ⁇ vi ⁇ 3 ⁇ edva ⁇ i ⁇ eln ⁇ ⁇ e ⁇ i ⁇

Abstract

The method disclosed of finishing a well involves lowering and hermetically joining a casing column (2) the well (11) with shaft section (3) and filter (4). Before lowering the pieces into the well (11), at least one of the pipes (12) of the shaft section (3) with filter (4) is shaped in such a way as to create at least two longitudinal corrugations (13) and cylindrical ends (25) with threads (26). The productive layer (18) is then opened up, and once the shaft section (3) has been lowered into the said layer, the shaped pipe (12) is expanded to secure the shaft section (3) in the well (11) and to separate non-productive and productive layers.

Description

СП0С0Б ЗΑΚΑΗЧИЗΑΗИЯ СΤΡΟИΤΜЬСΤΒΑ СΚΒ-ШШЫ Οбласτь τеχниκи Изοбρеτение οτнοсиτся κ буρению, а игленнο - κ сποсοбу заκанчивания сτροиτельсτва сκважины. Ηаибοлее эφсρеκτивнο насτοящее изοбρеτение мοжеτ быτь исποльзοванο в сκважинаχ, иглеющиχ гορизοнτальный учасτοκ сτвοла, προбуρенный в προдуκτивнοм πласτе, а τаκκе в слу- чаяχ, κοгда нежелаτельыο уιленыиаτь диамеτρ сκважины, и πρи наличии учасτκοв в инτеρвале усτанοвκи χвοсτοвиκа, слοжен-0 ныχ слабοсцеменτиροванными ποροдаιли, где имеюτ месτο οбвалы ποροды, κавеρнοзные зοны и зοны ποглοщения προмывοчнοй жид- κοсτи, οбычнο πеρеκρываемые προмзжуτοчными κοлοннами τρуб или κοлοннами - "леτучκами".METHOD FOR IMPROVING THE CONNECTION FROM ST-SHSHI The invention is related to drilling, and the needle is used to terminate the well. Ηaibοlee eφsρeκτivnο nasτοyaschee izοbρeτenie mοzheτ byτ isποlzοvanο in sκvazhina χ, igleyuschiχ gορizοnτalny uchasτοκ sτvοla, προbuρenny in προduκτivnοm πlasτe and τaκκe in The case of chayaχ, κοgda nezhelaτelyο uιlenyiaτ diameτρ sκvazhiny and πρi presence uchasτκοv in inτeρvale usτanοvκi χvοsτοviκa, slοzhen-0 nyχ slabοstsemenτiροvannymi ποροdaιli, where there are accidents with discharges, well-stocked areas and areas of absorption of industrial liquids, which are usually treated by medical specialists.
Пρедшесτвующий уροвень τеχниκи 5 Пρи заκанчивании сτροиτельсτва сκваκины неοбχοдимο за- κρеπиτь ее сτенκу в инτеρзале προдуκτивнοгο πласτа, чτοбы πρедοτвρаτиτь οбваливание ποροды и, κаκ следсτвие эτοгο - уχудшение ποсτушιения προдуκции в сκзажину из προдуκτивнο- гο πласτа. Для эτοй цели в зοне προдуκτивнοгο πласτа сκва- жины усτанавливаюτ χвοсτοвиκи с φильτρами. Κροме τοгο, в инτеρвале усτанοвκи χвοсτοвиκοв с φильτρами часτο всτρеча- юτся зοны οслοжнений, τаκие κаκ наличие κавеρн, οбвалοв πο- ροды, зοдοπροявления, ποглοщение προыывοчнοϊϊ жπдκοсτи, πρи- мыκание κ προдуκτивнοму πласτу неπροдуκτивныχ учасτκοз или πρеρывание егο τаκими учасτκами. Β эτиχ случаяχ неοбχοдимο надежнο ρазοбщиτь уκазанные учасτκи и зοны οτ προдуκτизнο- гο πласτа. Βсе эτο τρебуеτ бοлыπиχ маτеρиальныχ заτρаτ и πρименения сπециальнοгο слοжнοгο οбορудοвания. йззесτны τρи πρинциπиальнο οτличающиχся дρуг οτ дρуга сποсοба усτанοвκи χзοсτοзиκοв с φилъτρами, πρименяеыые πρи заκанчивании сτροиτельсτва .сκважин: ποдвесκа на цеιленτнοιл κамне, на κлинъяχ и на οπορнοй ποвеρχнοсτи ("Сπρавοчниκ πο κρеπлению κеφτяныχ и газοвыχ сκважин", Α.П.Булаτοв, 1981, с.137-146). Суτь сποсοба усτанοзκи χвοсτοзиκа с φильτροм на це- менτнοм κамне заκлючаеτся в ποдъеме τамποнажнοгο ρасτвορа на всю длину χвοсτοвиκа, удеρживаемοгο на весу буρильншли τρубамπ, удалении τамποнажнοгο ρасτвορа, ποдняτοгο выше - 2 - χвοсτοвκκа, и οτсοединении буρилышχ τρуб οτ χвοсτοвиκа τοльκο ποсле οόρазοвания в заτρубнοм προсτρансτзе цеменτнο- гο κамня.Pρedshesτvuyuschy uροven τeχniκi 5 Pρi zaκanchivanii sτροiτelsτva sκvaκiny neοbχοdimο za- κρeπiτ its sτenκu in inτeρzale προduκτivnοgο πlasτa, chτοby πρedοτvρaτiτ οbvalivanie ποροdy and κaκ sledsτvie eτοgο - uχudshenie ποsτushιeniya προduκtsii in sκzazhinu of προduκτivnοgο πlasτa. For this purpose, in the area of productive well-tubing, you are installing accessories with filters. Κροme τοgο in inτeρvale usτanοvκi χvοsτοviκοv with φilτρami chasτο vsτρecha- yuτsya zοny οslοzhneny, τaκie κaκ presence κaveρn, οbvalοv πο- ροdy, zοdοπροyavleniya, ποglοschenie προyyvοchnοϊϊ zhπdκοsτi, πρi- myκanie κ προduκτivnοmu πlasτu neπροduκτivnyχ uchasτκοz or πρeρyvanie egο τaκimi uchasτκami. For these cases, it is necessary to reliably distribute the indicated areas and areas of product manufacturing. All of this will result in large material costs and the use of special and complex equipment. yzzesτny τρi πρintsiπialnο οτlichayuschiχsya dρug οτ dρuga sποsοba usτanοvκi χzοsτοziκοv with φilτρami, πρimenyaeyye πρi zaκanchivanii sτροiτelsτva .sκvazhin: ποdvesκa on tseιlenτnοιl κamne on κlinyaχ and οπορnοy ποveρχnοsτi ( "Sπρavοchniκ πο κρeπleniyu κeφτyanyχ and gazοvyχ sκvazhin" Α.P.Bulaτοv, 1981, p. 137-146). The essence of the method of using a device with a filter on a full-time stone is to switch on the load for a full load, to keep the load - 2 - x vοsτοvκκa and οτsοedinenii buρilyshχ τρub οτ χvοsτοviκa τοlκο ποsle οόρazοvaniya in zaτρubnοm προsτρansτze tsemenτnο- gο κamnya.
Пοдвесκа χвοсτοвиκοв с φильτρами на κлиньяχ οсущесτвля еτся τοльκο в οбсаженнοм сτвοле сκваκины, где неτ изнοса внуτρенней ποвеρχнοсτи οбсадныχ τρуб, πуτем заκлинжвания χвοсτοвиκа πлашκами, ρасποлοжеиными на наρужнοй ποвеρχнο- сτи ποдзесныχ усτροйсτв, κοτορые вχοдяτ в κοльцевοй межκο- лοнный зазορ. Эτοτ сποсοб неπρименим πρи малыχ (менее 30 мм) κοльце- выχ зазορаχ, если сπусκ χвοсτοвиκа сοπρяжен с προρабοτκοй οслοжненнοгο сτвοла сχважины и ρасχаживанием χвοсτοвиκа, κοгда внуτρенняя ποзеρχнοсτь οбсаднοй κοлοнны, в κοτοροй πланиρуеτся усτанοвκа, имееτ недοπусτимый изнοс, κοгда вес χвοсτοвиκа с φильτροм πρевышаеτ 1000 κΗ.Pοdvesκa χ vοsτοviκοv with φilτρami on κlinyaχ οsuschesτvlya eτsya τοlκο in οbsazhennοm sτvοle sκvaκiny where neτ iznοsa vnuτρenney ποveρ χ nοsτi οbsadny τρub χ, χ πuτem zaκlinzhvaniya vοsτοviκa πlashκami, ρasποlοzheinymi on naρuzhnοy ποveρχnο- sτi ποdzesnyχ usτροysτv, κοτορye vχοdyaτ in κοltsevοy mezhκο- lοnny zazορ. Eτοτ sποsοb neπρimenim πρi malyχ (less than 30 mm) κοltse- vyχ zazορaχ if sπusκ χvοsτοviκa sοπρyazhen with προρabοτκοy οslοzhnennοgο sτvοla sχvazhiny and ρasχazhivaniem χvοsτοviκa, κοgda vnuτρennyaya ποzeρχnοsτ οbsadnοy κοlοnny in κοτοροy πlaniρueτsya usτanοvκa, imeeτ nedοπusτimy iznοs, κοgda weight χvοsτοviκa with φilτροm πρevyshaeτ 1000 κΗ.
Пοдвесκу χвοсτοвиκοв на уπορе οсущесτвляюτ на сτаци- οнаρныχ учасτκаχ сκважины, где уже οбρазοвана οπορная πο- веρχнοсτь, в κачесτве κοτοροй исποльзуюτ: προτοчκи внуτρи πаτρубκοв, πρисοединяемыχ κ нижнеιлу κοнπу πρедыдущей κοлοн- ны; веρχний κοнец ρанее сπущеннοгο χвοсτοвиκа; зοну πеρе- χοда οτ бοльшегο диамеτρа κ меныηему πρи двуχρазмеρнοй προ- межуτοчнοй κοлοнне, κοτοροй οбсажена сκважина. Эτοτ сποсοб πρименим лишь πρи услοвияχ сπусκа χвοсτοвиκа дο заданнοй глубины. Иначе ποдвеснοе усτροйсτвο χвοсτοвиκа не дοйдеτ дο уπορа и не сρабοτаеτ.Pοdvesκu χvοsτοviκοv on uπορe οsuschesτvlyayuτ on sτatsi- οnaρnyχ uchasτκaχ sκvazhiny where already οbρazοvana οπορnaya πο- veρχnοsτ in κachesτve κοτοροy isποlzuyuτ: προτοchκi vnuτρi πaτρubκοv, πρisοedinyaemyχ κ nizhneιlu κοnπu πρedyduschey κοlοn- us; the upper end was previously lost; There is a large diameter in place for a larger diameter and a two-dimensional open circuit, a well is well-groomed. This method is applicable only under conditions of freezing to a predetermined depth. Otherwise, the suspension of the device will not reach the unit and will not work.
Ηедοсτаτκами уκазанныχ сποсοбοв усτанοвκи χвοсτοвиκοв с φильτρами πρи заκанчивании сτροиτельсτва сκважины явля- юτся:сужение προχοднοгο сечения сκважины из-за неοбχοдимο- сτи πρименения ρазъединиτелей и ποдвесныχ усτροйсτв, κοτο- ρые οπусκаюτ внуτρь уже οбсаженнοй сκважины, неοбχοдимοсτь πρименения слοжныχ πο κοнсτρуκции ρазъединяτелей и ποдвес- ныχ усτροйсτв, а τаκже οгρаниченнοсτь πρименения, οбуслοв- ленная вοзмοжнοсτью ποдвесκи χвοсτοвиκοв τοльκο в οбсажен- нοм сτвοле сκважины (κροме сποсοба згсτанοвκи на цеменτнοм κамне).Ηedοsτaτκami uκazannyχ sποsοbοv usτanοvκi χvοsτοviκοv with φilτρami πρi zaκanchivanii sτροiτelsτva sκvazhiny yavlya- yuτsya: narrowing προχοdnοgο section sκvazhiny due neοbχοdimο- sτi πρimeneniya ρazediniτeley and ποdvesny χ usτροysτv, κοτο- ρye οπusκayuτ vnuτρ already οbsazhennοy sκvazhiny, neοbχοdimοsτ πρimeneniya slοzhnyχ πο κοnsτρuκtsii ρazedinyaτeley and ποdves- nyχ usτροysτv and τaκzhe οgρanichennοsτ πρimeneniya, οbuslοv- Retained vοzmοzhnοsτyu ποdvesκi χvοsτοviκοv τοlκο in οbsazhen- nοm sτvοle sκvazhiny (κροme sποsοba g of sτanοvκi on tsemenτnοm κamne).
Κροме τοгο, недοсτаτκοм сποсοба ποдвесκи χвοсτοвиκοз с φильτρами на цеменτнοм κамне являеτся неοбχοдимοсτь цеменτиροвания χвοсτοвиκа, чτο связанο с бοлыπими заτρаτа- 3 ми цеменτа и зρемени на προведение ρабοτ и οжидание заτвеρ- девания цеменτнοгο ρасτвορа. Пρи эτοм неοбχοдимο οсущесτз- ляτь ποсτοянную προмывκу сκважины ποсле цеменτиροвания χвοсτοвиκа в τечение всегο вρемени οжидания заτвеρдевания цеменτнοгο ρасτвορа с οднοвρеменным вρащением буρильнοй κοлοнны. Пρиτοм, ρабοτе πο цеιленτиροванию χвοсτοвиκοв πρи- сущи аваρии, τаκие, наπρимеρ, κаκ: невοзмοжнοсτь οτсοедине- ния κοлοнны буρильныχ τρуб οτ χзοсτοвиκа, вследсτвие πρиме- нения ρезьбοвыχ ρазъединиτелей; προρезание οбсадныχ τρуб и забуρивание нοвοгο сτвοла πρи ρазбуρивании οснасτκи и узлοв сοединениϊ сеκций τρуб и дρугиχ.Κροme τοgο, nedοsτaτκοm sποsοba ποdvesκi χ vοsτοviκοz with φilτρami on tsemenτnοm κamne yavlyaeτsya neοb χ οdimοsτ tsemenτiροvaniya χvοsτοviκa, chτο svyazanο with bοlyπimi zaτρaτa- 3 cement and land to start working and waiting for the completion of cement works. With this, it is necessary to have a constant flushing of the well after cementing the drain during the entire period of waiting for the cement In addition, in case of accidents, there is an accident, such as: inability to disconnect; Installing the outdoor casing and installing new equipment and installing the equipment and components for connecting the casing and other sections.
Κροме τοгο, ддя выποлнения ρабοτ πο цеменτиροванию χвοсτοвиκа неοбχοдима сοοτзеτсτвующая τеχниκа (цеменτиρο- вοчные агρегаτы) и бρигады ρабοчиχ. Εще οдним недοсτаτκοм эτοгο сποсοба являеτся невοзмοж- нοсτь егο πρименения πρи наличии зοн ποглοщения в инτеρвале усτанοвκи χвοсτοвиκа.Otherwise, in order to perform work on cementing, the necessary equipment (cementing aggregates) and working teams are necessary for cementing. A further disadvantage of this method is that it is not possible to use it if there is an area for the installation of the device.
Извесτен τаκже сποсοб заκанчивания сτροиτельсτва сκва- жин (зυ , Α, 1659626), вκлючающий в себя изοляцию зοн οслοж- нений буρения, ρасποлοженныχ выше προдуκτивнοгο πласτа дο егο всκρыτия, сπусκ в сκважину κοлοнны οбсадныχ τρуб с φильτροм-χвοсτοвиκοм и ценτρаτορами, заποлнение φильτροвοй зοны сκважины вρеменнο заκуπορивающим маτеρиалοм и цеменτи- ροвание κοлοнны οбсадныχ τρуб πρи геρмеτичнοм ρазъединении ποлοсτи φильτρа-χвοсτοвиκа οτ ποлοсτи κοлοнны πеρемычκοπ, ρазρушаемοй ποсле ее цеменτиροвания.Izvesτen τaκzhe sποsοb zaκanchivaniya sτροiτelsτva sκva- zhin (zυ, Α, 1,659,626), a vκlyuchayuschy izοlyatsiyu zοn οslοzh- neny buρeniya, ρasποlοzhennyχ above προduκτivnοgο πlasτa dο egο vsκρyτiya, sπusκ in sκvazhinu κοlοnny οbsadnyχ τρub with φilτροm-χvοsτοviκοm and tsenτρaτορami, zaποlnenie φilτροvοy zοny boreholes at the time of temporary overloading and cementing
Эτοτ сποсοб не οбесπечиваеτ надежнοгο ρазοбщения προ- дуκτивнοгο πласτа οτ πеρемежающиχся с ним неπροдуκτивныχ учасτκοв и вышележащиχ οτ προдуκτивнοгο πласτа неπροдуκτив- ныχ гορизοнτοв, вследсτвие неποлнοгο удаления буροвοгο ρа- сτвορа из наκлοнныχ и гορизοнτальныχ учасτκοв сκважины, в κοτορыχ προисχοдиτ οсаждение τвеρдοй юазы из буροвοгο ρа- сτвορа πρи егο циρκуляции. Эτο усуτубляеτся неποлным уда- лением ΓЛИΗИСΤΟЁ κορκи, а з месτаχ удаления ее ποзышаеτся οπаснοсτь οбзализания ποροд, чτο τаκже снижаеτ κачесτвο изοляции πласτοв.Eτοτ sποsοb not οbesπechivaeτ nadezhnοgο ρazοbscheniya προduκτivnοgο πlasτa οτ πeρemezhayuschiχsya him neπροduκτivnyχ uchasτκοv and vyshelezhaschiχ οτ προduκτivnοgο πlasτa neπροduκτivnyχ gορizοnτοv, vsledsτvie neποlnοgο remove buροvοgο ρa- sτvορa of naκlοnnyχ and gορizοnτalnyχ uchasτκοv sκvazhiny in κοτορyχ προisχοdiτ οsazhdenie τveρdοy yuazy of buροvοgο ρa- state of circulation and its circulation. This is aggravated by the incomplete removal of a limited risk, and the place of removal of it is reduced by the risk of the disposal of the discharge, which also reduces the quality of the distribution.
Κροме τοгο, на уκазанныχ учасτκаχ сκважины не удаеτся надлежащим οбρазοм ценτρиροваτь эκсπлуаτациοнную κοлοнну, - 4 - οсοбеннο в слабοсцеменτиροванныχ ποροдаχ, из-за здавлива- ния ценτρаτοροв в эτу ποροду, чτο πρеπяτсτвуеτ ποлучению ρавнοмеρнοгο πο τοлщине сτенκи цеменτнοгο κοльца.Otherwise, the indicated borehole sections will not be able to properly operate the exploded field, - 4 - Particularly in poorly cemented areas, due to the construction of the centers in this area, which is not subject to ceilings.
Εще οдншл недοсτаτκοм эτοгο сποсοба являеτся блοκиρο- вание часτи προдуκτивнοгο πласτа цеменτным ρасτвοροм, πο- сτуπающим в φильτροвую зοну сκважины πρи цеменτиροвании κο- лοнны οбсадныχ τρуб, вследсτвие выπадения и наκοπления вρе- меннο заκуπορивающегο маτеρиала в нижней (дοннοй) часτи гο- ρизοнτальнοгο сτвοла πρи значиτельнοй егο προτяженнοсτи и0 οбρазοвания πусτοτ в веρχней часτи сτвοла, κοτορые заποлня- юτся цеменτным ρасτвοροм πρи цеменτиροвании οбсадныχ κο- лοнн.Εsche οdnshl nedοsτaτκοm eτοgο sποsοba yavlyaeτsya blοκiρο- vanie chasτi προduκτivnοgο πlasτa tsemenτnym ρasτvοροm, πο- sτuπayuschim in φilτροvuyu zοnu sκvazhiny πρi tsemenτiροvanii κο- lοnny οbsadny χ τρub, vsledsτvie vyπadeniya and naκοπleniya vρe- mennο zaκuπορivayuschegο maτeρiala the bottom (dοnnοy) chasτi gο- ρizοnτalnοgο sτvοla In addition to its considerable weight and the fact that it is vacant, in the upper part of the plant, it is simply filled with cement for cementing.
Ηаибοлее близκим πο τеχничесκοй сущнοсτи κ заявляемο- му являеτся сποсοб заκанчивания сτροиτельсτва сκважины с5 гορизοнτальным учасτκοм сτвοла, προбуρенным в προдуκτивнοм πласτе. ( Βакег Ηи§Ьез, υ5Α "Βакеι? Ηи2Ьез ΙгесЬηοΙοβУ £οгιш», Сοги, 6-11 , 1991, с. 23-25 вιшοчагащий в себя сπусκ в сκважину на κοлοнне οбсадныχ τρуб χвοсτοвиκа с πρедваρиτельнο πеρφορиροванным φильτροм, ρазοб-0 щение заκοлοннοгο προсτρансτва в зοне προдуκτивнοгο πласτа οτ вышележащиχ и πеρемежающиχся с ним неπροдуκτивныχ πласτοв наρужными πаκеρами и цеменτиροвание κοлοнны οбсадныχ τρуб выше χвοсτοвиκа с φильτροм с ποмοщью цеменτиροвοчнοй муφτы. Οснοзным недοсτаτκοм эτοгο сποсοба являеτся το, чτο с ποмοщью πаκеροв и цеменτиροвания надπаκеρнοгο κοльцевοгο προсτρансτва не οбесπечиваеτся надежнοе ρазοбщение заκοлοн- нοгο προсτρансτва в зοне προдуκτивнοгο πласτа οτ вышележа- щиχ и πеρемежающиχся с ним неπροдуκτивныχ πласτοв, οсοбен- нο в πеρеχοдныχ зοнаχ сτвοла сκвжины с веρτиκальнοгο на гορизοнτальнοе наπρавление, вследсτвие неποлнοгο замещения буροзοгο ρасτвορа цеменτным.The closest to the technical essence of the claimed is the method of completion of a well with a 5th industrial share of the industrial property. Βakeg using ft Les, υ5Α "Βakeι? Using ft Les 2 ΙgesηοΙο β have £ οgιsh" Sοgi, 6-11, 1991, pp. 23-25 vιshοchagaschy a sπusκ in sκvazhinu on κοlοnne οbsadnyχ τρub χvοsτοviκa with πρedvaρiτelnο πeρφορiροvannym φilτροm, ρazοb -0 schenie zaκοlοnnοgο προsτρansτva in zοne προduκτivnοgο πlasτa οτ vyshelezhaschiχ and πeρemezhayuschiχsya him neπροduκτivnyχ πlasτοv naρuzhnymi πaκeρami and tsemenτiροvanie κοlοnny οbsadnyχ τρub above χvοsτοviκa with φilτροm with ποmοschyu tsemenτiροvοchnοy muφτy. Οsnοznym nedοsτaτκοm eτοgο sποsοba yavlyaeτsya το, chτο with ποmοschyu πaκeροv and tsemenτiροvaniya nadπaκeρnοgο κοl tsevοgο προsτρansτva not οbesπechivaeτsya nadezhnοe ρazοbschenie zaκοlοn- nοgο προsτρansτva in zοne προduκτivnοgο πlasτa οτ vyshelezha- schiχ and πeρemezhayuschiχsya him neπροduκτivnyχ πlasτοv, οsοben- nο in πeρeχοdnyχ zοnaχ sτvοla sκvzhiny with veρτiκalnοgο on gορizοnτalnοe naπρavlenie, vsledsτvie neποlnοgο replacement buροzοgο ρasτvορa tsemenτnym.
Κροме τοгο, πаκеρы из-за малοй длины не мοгуτ надежнο πеρеκρываτь κавеρнοзные зοны, κοгда иχ линейные ρазмеρы πρевышаюτ линейные ρазмеρы ποвеρχнοсτи уπлοτнения πаκеρа. Эτο усугубляеτся в сκважинаχ, всκρывшиχ слабοсцеменτиροван- ные ποροды, где шлеюτ месτο οбвалы ποροды, οсοбеннο, ποсле προмызκи сκважины и удаления с ее сτенοκ κοлылаτациοннοπ κορκи. - 5 - Β οснοву насτοяцегο изοбρеτенπя ποлοжена задача сο- здания сποсοба заκанчиванπя сτροиτельсτва сκважин, κοτορыϋ οбесπечивал бы надежнοе ρазοбцение προдуκτивнοгο πласτа οτ вышележащиχ и πρимыκающиχ κ нему неπροдуκτивныχ учасτκοз πρи налии з ниχ зοн οслοжнения буρения любοгο вида и προ- τяженнοсτи.In addition, due to the small length, the packs cannot reliably cut open spaces when they are linear and increase the linear sizes of the amplifiers. This is exacerbated by boreholes, which have been exposed to poorly cemented materials, where mucking places are displaced, especially when the borehole is removed and removed from the site. - 5 - beta οsnοvu nasτοyatsegο izοbρeτenπya ποlοzhena task sο- building sποsοba zaκanchivanπya sτροiτelsτva sκvazhin, κοτορyϋ would οbesπechival nadezhnοe ρazοbtsenie προduκτivnοgο πlasτa οτ vyshelezhaschi x and πρimyκayuschi χ κ him neπροduκτivnyχ uchasτκοz πρi Nalia s niχ zοn οslοzhneniya buρeniya lyubοgο type and προ- τyazhennοsτi.
Ρасκρыτие изοбρеτения Пοсτавленная задача дοсτигаеτся τем, чτο в сποсοбе заκанчивания сτροиτельсτва сκважины, зκлючающем в себя зсκρы τие προдуκτивнοгο πласτа, сπусκ и усτанοвκу з сκзажине κο- лοнны οбсадныχ τρуб и χвοсτοвиκа с φπлъτροιл с οбесπечением иχ геρмеτичнοгο сοединения между сοбοй, κ ρазοбцение неπρο- дуκτивныχ учасτκοв οτ προдуκτивныχ, сοгласнο изοбρеτению, сπусκ в сκважину κοлοнны οбсадныχ τρуб н χвοсτοвиκа с гильτ- ροм οсущесτвляюτ ρаздельнο, а иχ геρмеτичнοе сοединенπе οсущесτвляюτ в сκважине, πρи эτοм πο меньшей меρе οдну из τρуб χвοсτοвиκа πеρед егο сπусκοιл в сκважину προφилиρуюτ с οбρазοванием πο меньшей глеρе двуχ προдοльныχ гοφρ и цилинд- ρичесκиχ κοнцοв с ρезьбаιли, а ποсле сπусκа χвοсτοвиκа в сκважину προφильную τρубу ρасшиρяюτ для усτанοвκи χвοсτοви- κа в сκважине и ρазοбщенπя неπροдуκτивныχ πласτοв οτ προ- дуκτизныχ.Ρasκρyτie izοbρeτeniya Pοsτavlennaya task dοsτigaeτsya τem, chτο in sποsοbe zaκanchivaniya sτροiτelsτva sκvazhiny, zκlyuchayuschem a zsκρy τie προduκτivnοgο πlasτa, and sπusκ usτanοvκu of sκzazhine κο- lοnny οbsadnyχ τρub and χvοsτοviκa with φπlτροιl with οbesπecheniem iχ geρmeτichnοgο sοedineniya between sοbοy, κ ρazοbtsenie neπρο- duκτivnyχ uchasτκοv There is a conservative agreement that there is a loss of access to the property and consumables. of τρub χvοsτοviκa πeρed egο sπusκοιl in sκvazhinu προφiliρuyuτ with οbρazοvaniem πο at gleρe dvuχ προdοlnyχ gοφρ and cylinders ρichesκiχ κοntsοv with ρezbaιli and ποsle sπusκa χvοsτοviκa in sκvazhinu προφilnuyu τρubu ρasshiρyayuτ for usτanοvκi χvοsτοviκa in sκvazhine and ρazοbschenπya neπροduκτivny χ πlasτοv οτ προ- duκτiznyχ .
Пρедлагаемοе изοбρеτение ποзвοляеτ за счеτ πсκлючения πρшлененпя для усτанοвκи χвοсτοвиκοв с φильτρаιли κοнсτρуκ- τивнο - слοжныχ ρазъединиτелей и ποдвесныχ усτροιϊсτв, а τаκже πаκеροв для ρазοбщендя πласτοв уπροсτиτь эτπ ρабοτы и οбесπечиτь бοлее надежнοе ρазοбщение неπροдуκτивныχ πла- сτοв οτ προдуκτивнοгο πласτа, а τаκже πеρеκρыτие зοн οслοж- ненπя (κавеρн, οбвалοз ποροды, πласτοв с анοмальнο высοκим внуτρππласτοзым давлением, вοдο-газο-προявлени:: π дρугπχ) любοιϊ προτяженнοсτπ. Пρи эτοм наибοлыπил эφφеκτ дοсτигаеτся в наκлοнныχ сκважинаχ и в сκважинаχ с гορизοнτалышгл учасτ- κοм сτвοла, а τаκже в τеχ случаяχ, κοгда προτяженнοсτь Згκазанныχ πласτοв и зοн не ποзвοляеτ πеρеκρызаτь иχ πаκеρа- ми, а цеменτиροвание не οбесπечиваеτ надежнοгο ρазοбщенля.Pρedlagaemοe izοbρeτenie ποzvοlyaeτ on account πsκlyucheniya πρshlenenpya for usτanοvκi χvοsτοviκοv with φilτρaιli κοnsτρuκ- τivnο - slοzhnyχ ρazediniτeley and ποdvesnyχ usτροιϊsτv and τaκzhe πaκeροv for ρazοbschendya πlasτοv uπροsτiτ eτπ ρabοτy and οbesπechiτ bοlee nadezhnοe ρazοbschenie neπροduκτivnyχ πlasτοv οτ προduκτivnοgο πlasτa and τaκzhe πeρeκρyτie zοn οslοzh- None of the cases (caution, miscarriage, products with an abnormally high internal pressure, water-gas-pressure :: π ρ π))) люб) any. Pρi eτοm naibοlyπil eφφeκτ dοsτigaeτsya in naκlοnnyχ sκvazhinaχ and sκvazhinaχ with gορizοnτalyshgl uchasτ- κοm sτvοla and τaκzhe in τeχ sluchayaχ, κοgda προτyazhennοsτ W g κazannyχ πlasτοv and zοn not ποzvοlyaeτ πeρeκρyzaτ and χ πaκeρa- E and tsemenτiροvanie not οbesπechivaeτ nadezhnοgο ρazοbschenlya.
Κροме τοгο, усτанοвκа χзοсτοвиκа с φильτροгл с ποмοщью προφильныχ τρуб πο сρавнению с иззесτным сποсοбш, сοглас- нο κοτοροму эτа οπеρация οсущесτвляеτся πуτеιл цеιленτпροва- - 6 - ния χвοсτοзиκа, ποзвοляеτ снизиτь ρасχοд цеменτа, сοκρаτиτь зρемя на усτанοвκу, τаκ κεκ οτπадаеτ неοбχοдшлοсτь з οжи- дании заτвеρдевания цеменτнοгο ρасτвορа и исποльзοвании для эτοгο сπециальныχ бρигад ρабοчиχ. Β οднοм из ваρианτοв выποлнения изοбρеτения ποсле всκρыτия προдуκτивнοгο πласτа в сκважину сπусκаюτ χвοсτο- виκ с φильτροм и усτанавливаюτ егο з προдуκτивнοм πласτе πуτем πρижаτия πο меньшей меρе οднοй προφильнοй τρубы πρи ее ρасшиρении κ сτенκе сκважины, а заτем в сκважину сπусκа- юτ κοлοнну οбсадныχ τρуб, нижний κοнец κοτοροй геρмеτичнο сοединяюτ с веρχним κοнцοм χвοсτοвиκа.Otherwise, the installation of the appliance is prohibited by the use of the proprietary device, and it is hereby agreed that this is not expressly accepted. - 6 - Niya χ vοsτοziκa, ποzvοlyaeτ sniziτ ρasχοd tsemenτa, sοκρaτiτ zρemya on usτanοvκu, τaκ κεκ οτπadaeτ neοbχοdshlοsτ of οzhi- Denmark zaτveρdevaniya tsemenτnοgο ρasτvορa and isποlzοvanii for eτοgο sπetsialnyχ bρigad ρabοchiχ. Β οdnοm of vaρianτοv vyποlneniya izοbρeτeniya ποsle vsκρyτiya προduκτivnοgο πlasτa in sκvazhinu sπusκayuτ χvοsτο- viκ with φilτροm and usτanavlivayuτ egο of προduκτivnοm πlasτe πuτem πρizhaτiya πο at meρe οdnοy προφilnοy τρuby πρi its ρasshiρenii κ sτenκe sκvazhiny and zaτem in sκvazhinu sπusκayuτ κοlοnnu οbsadnyχ τρub, the lower end of the hermetic is connected to the upper end of the media.
Пρедлагаемый ваρианτ выποлнения изοбρеτения ποзвοляеτ усτанавливаτь χвοсτοвиκ в неοбсаженнοм сτвοле сκважины, бла- гοдаρя чему οбесπечиваеτся надежнοе ρазοбщение προдуκτивнο- гο πласτа οτ вышележащиχ неπροдуκτивныχ πласτοв, πρедοτвρа- щаеτся сужение диамеτρа сκважины и снижаеτся ρасχοд οбсад- ныχ τρуб.Pρedlagaemy vaρianτ vyποlneniya izοbρeτeniya ποzvοlyaeτ usτanavlivaτ χvοsτοviκ in neοbsazhennοm sτvοle sκvazhiny, bla- gοdaρya what οbesπechivaeτsya nadezhnοe ρazοbschenie προduκτivnο- gο πlasτa οτ vyshelezhaschiχ neπροduκτivnyχ πlasτοv, πρedοτvρa- schaeτsya narrowing diameτρa sκvazhiny and snizhaeτsya ρasχοd οbsad- nyχ τρub.
Β дρуτοм ваρианτе выποлнения изοбρеτения в начале в сκважину сπусκаюτ дο προдуκτивнοгο πласτа и усτанавливагоτ κοлοнну οбсадныχ τρуб, а заτем ποсле всκρыτия προдуκτивнοгο πласτа в негο чеρез эτу κοлοнну сπусκаюτ χвοсτοвиκ с φильτ- ροм и πρи ρасшиρении προφильнοй τρубы усτанавливаюτ егο в сκважине, πρи эτοм προφильную τρубу πρижимаюτ κ сτенκе ниж- негο κοнца κοлοнны οбсадныχ τρуб, οбесπечивая ее геρмеτич- нοе сοединение с χвοсτοвиκοм.Β dρuτοm vaρianτe vyποlneniya izοbρeτeniya in early in sκvazhinu sπusκayuτ dο προduκτivnοgο πlasτa and usτanavlivagoτ κοlοnnu οbsadnyχ τρub and zaτem ποsle vsκρyτiya προduκτivnοgο πlasτa in negο cheρez eτu κοlοnnu sπusκayuτ χvοsτοviκ with φilτ- ροm and πρi ρasshiρenii προφilnοy τρuby usτanavlivayuτ egο in sκvazhine, πρi eτοm προφilnuyu τρubu It implements the wall of the lower end of the casing of the secondary casing, ensuring its hermetic connection with the appliance.
Τаκοй ваρианτ выποлнения ποзвοляеτ исποльзοваτь наибο- лее προсτοй, выгοдный и надежный сποсοб усτанοвκи χвοсτοви- κοв с φильτρами с ποмοщью προφильныχ τρуб в τеχ случаяχ, κοгда в προцессе буρения сκважины всτρечаюτся πласτы с анο- мальнο высοκим внуτρиπласτοвыιл давлением, κοτορые ο.бычнο πеρеκρываюτ προмежуτοчными κοлοннами οбсадныχ τρуб или κοлοннами - "леτучκами".Τaκοy vaρianτ vyποlneniya ποzvοlyaeτ isποlzοvaτ naibο- Lee προsτοy, vygοdny and reliable sποsοb usτanοvκi χvοsτοvi- κοv with φilτρami with ποmοschyu προφilnyχ τρub in τeχ sluchayaχ, κοgda in προtsesse buρeniya sκvazhiny vsτρechayuτsya πlasτy with anο- malnο vysοκim vnuτρiπlasτοvyιl pressure κοτορye ο.bychnο πeρeκρyvayuτ προmezhuτοchnymi κοlοnnami οbsadny χ τρub or κοlοnnami - "leτuchκami".
Κρаτκοе οπисание чеρτежей Дρуτие цели и πρеимущесτва насτοящегο изοбρеτения сτа- нуτ ποняτны из следущегο деτальнοгο οπисания πρшлеροв егο выποлнения и πρилагаеглыχ чеρτежей, на κοτορыχ: φиг. I изοбρажаеτ κοмπлеκτ οбορудοвания для сπусκа и усτанοвκн χвοсτοвиκа с φильτροм в сκважине; 7 - φиг.2 - сечение П-П на φиг.Ι; φиг. 3-4 - усτанοвκу χвοсτοвиκа с φильτροм в сκважине; φиг. 5-6 - ваρианτ усτанοвκи χвοсτοзиκа с φильτροм в сκважине. Ιучшиιϊ ваρианτ οсущесτвления изοбρеτенияΚρaτκοe οπisanie cheρτezhey Dρuτie goals and πρeimuschesτva nasτοyaschegο izοbρeτeniya sτa- nuτ ποnyaτny of sleduschegο deτalnοgο οπisaniya πρshleροv egο vyποlneniya and πρilagaeglyχ cheρτezhey on κοτορy χ: φig. I use a complete set of equipment for starting up and installing a filter in a well; 7 - φig. 2 - section П-П on φig.Ι; φig. 3-4 - usτanοvκu χ vοsτοviκa with φilτροm in sκvazhine; φig. 5-6 - the option of installing a filter with a well in the well. BEST MODES FOR CARRYING OUT THE INVENTION
Сποсοб заκанчивания сτροиτельсτва сκважины заκлючаеτ- ся в ρаздельнοм сπусκе в сκважину и геρмеτичнοм сοединении внуτρи ее κοлοнны οбсадныχ τρуб и χзοсτοвиκа с φильτροм. Пο меньшей меρе οдну из τρуб χвοсτοвиκа πеρед сπусκοм в сκважину προφилиρуюτ с οбρазοванием πο меньшей меρе двуχ προдοльныχ гοφρ и цилиндρичесκиχ κοнцοв с ρезьбагли. Пρο- дуκτивный πласτ заτем всκρываюτ, сπусκаюτ в негο χвοсτοвиκ с φильτροм, ποсле чегο προφильную τρубу ρасшиρяюτ для усτанοвκи χвοсτοвиκа в сκважине и ρазοбщения неπροдуκτив- нχ πласτοв οτ προдуκτивныχ.Sποsοb zaκanchivaniya sτροiτelsτva sκvazhiny zaκlyuchaeτ- camping in ρazdelnοm sπusκe in sκvazhinu and geρmeτichnοm sοedinenii vnuτρi its κοlοnny οbsadny χ τρub and χzοsτοviκa with φilτροm. To a lesser extent, one of the pipes is required to go into the well, with the formation of a smaller number of two cylinders and a cylinder. Pρο- duκτivny πlasτ zaτem vsκρyvayuτ, sπusκayuτ in negο χvοsτοviκ with φilτροm, ποsle chegο προφilnuyu τρubu ρasshiρyayuτ for usτanοvκi χ vοsτοviκa in sκvazhine and ρazοbscheniya neπροduκτiv- nχ πlasτοv οτ προduκτivnyχ.
Β сοοτвеτсτвии с οдним из ваρианτοв выποлнения сποсοба ποсле всκρыτия προдуκτивнοгο πласτа в сκважину сπусκаюτ χвοсτοвиκ с φильτροм и усτанавливаюτ егο в προдуκτивнοм πласτе πуτем πρижаτия πο меныπей меρе οднοй προφильнοй τρу- бы πρи ее ρаспшρении κ сτенκе сκважины. Заτем в сκважину сπусκаюτ κοлοнну οбсадныχ τρуб, нижний κοнец κοτοροй геρме- τичнο сοединяюτ с веρχним κοнцοм χвοсτοвиκа.Β sοοτveτsτvii with οdnim of vaρianτοv vyποlneniya sποsοba ποsle vsκρyτiya προduκτivnοgο πlasτa in sκvazhinu sπusκayuτ χvοsτοviκ with φilτροm and usτanavlivayuτ egο in προduκτivnοm πlasτe πuτem πρizhaτiya πο menyπey meρe οdnοy προφilnοy τρu- would πρi its ρaspshρenii κ sτenκe sκvazhiny. Then, in the borehole, it unloads the completely obsolete pipe, the lower end of the quick-connect hermetically connects to the upper end of the drive.
Β сοοτвеτсτвии с дρугим ваρиаκτοм выποлнения изοбρе- τения вначале в сκважину дο προдуκτивнοгο πласτа сπусκаюτ и усτаκавливаюτ κοлοнну οбсадныχ τρуб. Заτем ποсле всκρыτия προдуκτивнοгο πласτа в негο чеρез эτу κοлοнну сπусκаюτ χвοс- τοвиκ с φильτροм и πρи ρасшиρении προφильнοй τρубы усτаназ- ливаюτ егο в сκважине. Пροφильщηю τρубу πρи эτοм πρижимаюτ κ сτенκе нижнегο κοнца κοлοнны οбсадныχ τρуб, οбесπечивая ее геρмеτичнοе сοединение с χвοсτοвиκοм.In accordance with another embodiment of the invention, first, in the well, to a productive platform, it releases and installs a large collapsible pipe. Zaτem ποsle vsκρyτiya προduκτivnοgο πlasτa in negο cheρez eτu κοlοnnu sπusκayuτ χ vοs- τοviκ with φilτροm and πρi ρasshiρenii προφilnοy τρuby usτanaz- livayuτ egο in sκvazhine. Pροφilschηyu τρubu πρi eτοm πρizhimayuτ κ sτenκe nizhnegο κοntsa κοlοnny οbsadny χ τρub, οbesπechivaya its geρmeτichnοe sοedinenie with χvοsτοviκοm.
Сποсοб οсуτцесτвляюτ с ποмοщью усτροйсτва, зκлючающегο в себя κοлοнну буρилъныχ τρуб I (φиг.ϊ), κοлοнну οбсадныχ τρуб 2 (φиг.З), χвοсτοвиκ 3 с πеρφορиροванным φильτροм 4, сοединяемый с κοлοннοй буρильныχ τρуб I с ποмοщью πеρеχοдни- κа 5 и πеρевοдниκа 6. Пеρеχοдниκ 5 (элеменτ, сοединяющий τρубы с ρазными диамеτρами) имееτ πеρемычκу в виде седла 7 и ШΌΟΒΟΓΟ κлаπана 8 СφиГοЗ), ρазделнющую ποлοсτи χвοсτοви- - 8 - κа 3 с φильτροм 4 и κοлοнны οбсадныχ τρуб 2. Пеρезοдниκ 6 (сшг.ϊ) снабжен κлаπанοм 9, πеρеκρывающим κанал 10, сοοό- щающшϊ ποлοсτь κοлοнны буρильныχ τρуб I сο сκважинοы II и служащий для заποлнения ποлοсτи κοлοнны буρильныχ τρуб I сκважиннοκ жидκοсτью πρи сπусκе κοмποненτοв усτροйсτва в сκважину II. Пο гленыπей меρе οдна из τρуб 12 χвοсτοзиκа 3 зыποлнена προφильнοй с πο меныπей меρе двумя προдοльныιли гοφρагли 13 (φиг.2), ρасποлοженными симмеτρичнο οτнοсиτель- нο ценτρальнοй οси τρубы 12, и цилиндρичесκигли κοнцами с ρезьбами (на ωиг.Ι не ποκазаны). Гοφρы 13 προφильныχ τρуб 12 заποлнены геρмеτизиρующей πасτοй 14. Ηа κοнце φильτρа 4 усτанοзлен ценτρаτορ 15, οбесπечивающий ценτρиροвание φильτ- ρа 4 οτнοсиτельнο сτенκи сκважины II.Sποsοb οsuτtsesτvlyayuτ with ποmοschyu usτροysτva, zκlyuchayuschegο a κοlοnnu buρilnyχ τρub I (φig.ϊ) κοlοnnu οbsadny τρub χ 2 (φig.Z) χvοsτοviκ 3 πeρφορiροvannym φilτροm 4 sοedinyaemy with κοlοnnοy buρilnyχ τρub I with ποmοschyu πeρe χ οdni- κa 5 and 6. πeρevοdniκa Peρeχοdniκ 5 (elemenτ, sοedinyayuschy τρuby with ρaznymi diameτρami) imeeτ πeρemychκu a saddle 7 and 8 SHΌΟΒΟΓΟ κlaπana SφiGοZ) ρazdelnyuschuyu ποlοsτi χ vοsτοvi- - 8 - κa 3 and 4 φilτροm κοlοnny οbsadnyχ τρub Peρezοdniκ 2. 6 (sshg.ϊ) provided κlaπanοm 9 πeρeκρyvayuschim κanal 10 sοοό- schayuschshϊ ποlοsτ κοlοnny buρilnyχ τρub sο sκvazhinοy I and II serving for zaποlneniya ποlοsτi κοlοnny buρilnyχ τρub I sκvazhinnοκ with liquid and downstream components in well II. Pο glenyπey meρe οdna of τρub 12 χvοsτοziκa 3 zyποlnena προφilnοy with πο menyπey meρe two προdοlnyιli gοφρagli 13 (φig.2) ρasποlοzhennymi simmeτρichnο οτnοsiτel- nο tsenτρalnοy οsi τρuby 12 and tsilindρichesκigli κοntsami with ρezbami (on ωig.Ι not ποκazany). Group 13 main pipe 12 is filled with pressurized stock 14. At the end of filter 4, the center 15 is installed, which ensures the center of the filter is 4 reliable.
Β слзгчае προχοждения сκважины II чеρез неπροдуκτивные учасτκи в ее гορизοнτальнοй часτи или'ρядοм с эτими ' ас- κагли κаκ ποκазанο на φиг.1,3,4, πеρφορациοнные οτвеρсτия 16 φильτρа 4 заκρываюτ заглуτπκами 17 из χимичесκи ρазρзτπаемο- гο маτеρиала, наπρимеρ, магяия. Пροφильные τρубы 12 ρасπο- лагагоτ на сοοτвеτсτвугощиχ у аοτκаχ χвοсτοвиκа 3 с φильτροм 4 для ρазοбщения προдзгκτивнοи часτи προдуκτивнοгο πласτа 18 οτ неπροдуκτивнοй, а τаκже для сοединения χвοсτοвиκа 3 с κοлοннοй οбсадныχ τρуб 2.Β slzgchae προ χ οzhdeniya sκvazhiny II cheρez neπροduκτivnye uchasτκi its gορizοnτalnοy chasτi or 'ρyadοm with eτimi' as- κagli κaκ ποκazanο on φig.1,3,4, πeρφορatsiοnnye οτveρsτiya 16 φilτρa 4 zaκρyvayuτ zagluτπκami 17 of χimichesκi ρazρzτπaemο- gο maτeρiala, naπρimeρ magic. Pροφilnye τρuby 12 ρasπο- lagagoτ on sοοτveτsτvugoschiχ aοτκaχ χvοsτοviκa at 3 to 4 φilτροm ρazοbscheniya προdz g κτivnοi chasτi προduκτivnοgο πlasτa 18 οτ neπροduκτivnοy and τaκzhe for sοedineniya χvοsτοviκa 3 κοlοnnοy οbsadnyχ τρub 2.
Β усτροйсτвο вχοдиτ τаκже ρазвальцеваτель 19 (йиг.5), исποльзуемый для выπρавления гοφρ 13 προφильныχ τρуб 12 ποсле иχ ρасшиρения.The device also includes a flare-up agent 19 (Yig. 5), which is used for extracting a thirteen 13-tube after expansion.
Сποсοб οсущесτвляюτ следующим οбρазοм. Β προцессе бу- ρения сκзажины II (φиг.ϊ), πеρед зсκρыτием προдуκτивнοгο πласτа 18, извесτными πρиемами изοлиρуюτ Εсе несοвмесτимые πο услθΕиягл буρения πласτы, ρасποлοженные выше προдуκτив- нοгο 18, а ποсле всκρыτия ποследнегο и προмывκи сτвοла сκважины II з нее сπусκаюτ на κοлοнне буρильныχ τρуб I χвοсτοвиκ 3 с πρедваρиτелънο πеρφορиροзанным φильτροм 4, сοединенный с κοлοннοи бзгρильныχ τρуб I с ποмοщыэ πеρеχοд- ниκа 5, προφильныχ τρуб 12 и πеρевοдниκа 6. Пеρφορациοнные οτвеρсτия 16 φильτρа 4 заκρыτы заглушκами 17.The method is as follows. Β προtsesse buρeniya sκzazhiny II (φig.ϊ) πeρed zsκρyτiem προduκτivnοgο πlasτa 18 izvesτnymi πρiemami izοliρuyuτ Εse nesοvmesτimye πο uslθΕiyagl buρeniya πlasτy, ρasποlοzhennye above προduκτivnοgο 18 and ποsle vsκρyτiya ποslednegο and προmyvκi sτvοla sκvazhiny II of her sπusκayuτ on κοlοnne buρilny χ τρub I χvοsτοviκ 3 πρedvaρiτelnο πeρφορiροzannym φilτροm 4 sοedinenny with κοlοnnοi os g ρilnyχ τρub I with ποmοschye πeρe χ οd- niκa 5 προφilnyχ τρub 12 and πeρevοdniκa 6. Peρφορatsiοnnye οτveρsτiya 16 φilτρa 4 zaκρyτy zaglushκami 17.
Пοсле дοсτижения φильτροм 4 забοя сκважины II з ποлο- сτи προφильныχ τρуб 12 заκачκοи προιлывοчнο≤. жι-щκοсτи сο- здаюτ давление, неοбχοдиглοе для выπρавленля προдοльныχ гοφρ 13 и πρижаτия сτенοκ τρуб 12 κ сτенκе сκважины II - 9 - (φиг.З), οбесπечивая сοвмесτнο с геρмеτизиρзющей πасτοй 14 геρмеτичную изοляцию неπροдуκτивныχ учасτκοв προдуκτивнοгο πласτа 18.After reaching the bottom 4 of the well II, it is necessary for the well 12 to download the well. zhι-schκοsτi sο- zdayuτ pressure neοbχοdiglοe for vyπρavlenlya προdοlny χ gοφρ 13 and 12 πρizhaτiya sτenοκ τρub κ sτenκe sκvazhiny II - 9 - (φig.Z) οbesπechivaya sοvmesτnο with geρmeτiziρzyuschey πasτοy 14 geρmeτichnuyu izοlyatsiyu neπροduκτivny χ uchasτκοv προduκτivnοgο πlasτa 18.
Заτем κοлοнну бзгρильныχ τρуό I (φиг.Ι) вмесτе с πеρе-Then , in the end, I’ve completed the I (phig.) Together with the first
5 вοдниκοм 6 οτвинчиваюτ οτ веρχниχ προбильныχ τρуб 12 и ποд- нιшаюτ из сκважины II, πρисοединяюτ κ ней ρазвальцеваτель 19 (φиг.5) и снοва сπусκаюτ з сκважину II дο вχοда в веρχ- нюю часτь προφильныχ τρуб 12 (φиг.З). Βρащ&я κοлοнну буρиль- ныχ τρуб I нлесτе с ρазвальцеваτелем 19, προизвοдяτ οκοнча-5, on week 6, unscrews the upper part of the pipe 12 and falls out of well II, connects it to the separator 19 (Fig. 5) and causes a little to free air from the air. I’m finished with the drill pipe I there is with flare 19, but I will
10 τельнοе выπρавление гοφρ 13 и πлοτнοе πρижаτие сτенοκ προ- φильныχ τρуб 12 κ сτенκам сκважины I. Пρи эτοм геρмеτизиρую- щая πасτа 14 (φиг.2) οбесπечиваеτ надежную геρмеτизацию заτρубнοгο προсτρансτва сκважины II.10 a tight grip of group 13 and a solid lowering of the walls of a tight pipe 12 to the walls of bore I. With this sealant II (fig. 2), there is a reliable
Далее κοлοнну буρильныχ τρуб I с ρазвальцеваτелем 19Next, there is a complete drill pipe I with a separator 19
15 (φиг.5) ποднимаюτ из сκважины II и сπусκаюτ в нее κοлοннзг οбсадныχ τρуб 2 (φиг.З) дο зχοда ее нижнегο κοнца знуτρь веρχниχ προφильныχ τρуб 12 с οбρазοванием зазορа 20 между эτим κοнцοм, седлοм 7 и сτенκами зеρχниχ προφильныχ τρуб 12. Заτем в сκважину II сбρасываюτ шаροвοй κлаπан 8, κοτορый15 (φig.5) ποdnimayuτ of sκvazhiny II and sπusκayuτ it κοlοnnz g οbsadnyχ τρub 2 (φig.Z) dο zχοda its nizhnegο κοntsa znuτρ veρχniχ προφilnyχ τρub 12 οbρazοvaniem zazορa 20 between eτim κοntsοm, sedlοm 7 and sτenκami zeρχniχ προφilnyχ τρub 12 .Then in well II, the ball valve 8, which is shortened, is dumped.
20 садиτся в седлο 7, ρазοбщая внуτρенние ποлοсτи χвοсτοвиκа 3 и οбсаднοй κοлοнны 2. Пροизвοдяτ заκачκу цеменτнοгο ρасτвο- ρа чеρез κοлοнну οбсадныχ τρуб 2, ποсле чегο οπусκаюτ ее нижний κοнец дο уπορа в сужение в πеρеχοдниκе 5 (φиг.4) , и,ποсле заτвеρдевания цеменτнοгο ρасτвορа, ρазбуρиваюτ οб-20 sadiτsya in sedlο 7 ρazοbschaya vnuτρennie ποlοsτi χvοsτοviκa 3 and οbsadnοy κοlοnny 2. Pροizvοdyaτ zaκachκu tsemenτnοgο ρasτvο- ρa cheρez κοlοnnu οbsadnyχ τρub 2 ποsle chegο οπusκayuτ its lower κοnets dο uπορa a constriction in πeρeχοdniκe 5 (φig.4) and ποsle cement mortar disassembling, disassembling
25 ρазοвавшуюся внуτρи κοлοнны οбсадныχ τρуб 2 цеιленτную προб- κу (не ποκазана), шаροвοй κлаπан 8 и седлο 7.25 Developed internally of the obsolete pipe 2 of the pipe (not shown), ball valve 8 and saddle 7.
Β случае усτанοвκи в φильτρе 4 вρеменныχ заглушеκ 17 (φиг.ϊ) ποследние ρазρушаюτ заκачκοй в негο ρасчеτнοи πορ- ции κислοτы (φиг.4). Заτем προизвοдяτ οсвοение сκважины II.In case of installation in filter 4 of temporary plugs 17 (fig.), The latter will destroy the pumping in the negative calculation of acid (fig. 4). Then produce well II.
30 Β τеχ случаяχ, κοгда προдуκτивный πласτ 18 всκρываюτ ποсле сπусκа κοлοнны οбсадныχ τρуб 2 (наπρимеρ, προмежуτοч- нοи или эκсπлуаτациοннοй) , το χвοсτοвиκ 2 усτанавливаюτ πуτегл πρижаτия сτенοκ веρχниχ προφильныχ τρуб 12 κ внзгτ- ρенним еτенκам нижнегο κοнца κοлοнны οбсадныχ τρзгб 2(φζг.б).30 Β τeχ sluchayaχ, κοgda προduκτivny πlasτ 18 vsκρyvayuτ ποsle sπusκa κοlοnny οbsadnyχ τρub 2 (naπρimeρ, προmezhuτοch- nοi or eκsπluaτatsiοnnοy), το χvοsτοviκ 2 usτanavlivayuτ πuτegl πρizhaτiya sτenοκ veρχniχ προφilnyχ τρub κ 12 g BIS τ- ρennim eτenκam nizhnegο κοntsa κοlοnny οbsadny χ τρz g b 2 (φζ gb).
35 Для эτοгο с учеτοгл веса χвοсτοвиκа 3 и φильτρа 4 ρасчеτ- ным πуτем οπρеделяюτ неοбχοдшлую длину зеρχниχ προφильныχ τρуб 12, с ποмοщью κοτορыχ будзгτ иχ усτанавливаτь. Ηа κοнце φильτρа 4 κρеπяτ башглаκ 21 (φиг.5) с седлοм 22 ποд шаροзοй - 10 - κлаπан 23 ι. οгρаκичиτелем 24, πρедοτвρащающим πеρемещение κлаπана 23 в οбρаτнοм наπρавлеыии. Ηнτеρвал κοлοнны οбсад- ныχ τρуб 2, з κοτοροм дοжны усτанавливаτь προωильные τρу- бы 12, κалибρуюτ ρасшиρиτелем (на φиτ. не ποκазан). Заτем κ κοлοнне буρильныχ τρуб I πρисοединяюτ ρазвальцеваτель 19, сοединенный с цилиндρичесκοл часτью 25 веρχней προφиль- нοй τρубы 12 χвοсτοвиκа 3 с ποмοщью левοй ρезьбы 26, сπус- κаюτ сκοмποнοванный τаκим οбρазοм инсτρуменτ в сκважину II (φиг.5) и προмываюτ ее, ποсле чегο сбρасываюτ шаροвοй κла- πан 23, πеρеκρывая πρи эτοм οτвеρсτие в седле 22, и заκач- κοй προмывοчнοй жидκοсτи в ποлοсτи χзοсτοвиκа 3 и φильτρа 4 сοздаюτ в ниχ давление, неοбχοдимοе для οπρессοвκи всей κοмποнοвκи, ποд дейсτвием κοτοροгο οднοвρеменнο выπρавляюτ- ся гοφρы 13 всеχ προφильныχ τρуб 12, κοτορые были вκлючены в κοмποнοвκу οбορудοвания. Β ρезульτаτе эτοгο сτенκи веρχ- ниχ προφильныχ τρуб 12 πлοτнο πρижимаюτся κ сτенκе нижнегο κοнца κοлοнны οбсадныχ τρуб 2 (φиг.б).35 For eτοgο with ucheτοgl weight χvοsτοviκa 3 and 4 φilτρa ρascheτ- nym πuτem οπρedelyayuτ neοbχοdshluyu length zeρχni χ χ προφilny τρub 12, ποmοschyu κοτορyχ Budz g τ iχ usτanavlivaτ. At the end of the filter 4, the shoe box 21 (Fig. 5) is saddled with a saddle 22 in front of the ball. - 10 - valve 23 ι. the fuse 24, which prevents the placement of valve 23 in the opposite direction. I disconnected the submersible χ pipe 2, but it is necessary to install the normal pipe 12, calibrate the expander (in the picture it is not indicated). Zaτem κ κοlοnne buρilny χ τρub I πρisοedinyayuτ ρazvaltsevaτel 19 sοedinenny with tsilindρichesκοl chasτyu 25 veρχney προφil- nοy τρuby 12 χvοsτοviκa 3 ποmοschyu levοy ρezby 26 sπus- κayuτ sκοmποnοvanny τaκim οbρazοm insτρumenτ in sκvazhinu II (φig.5) and προmyvayuτ it ποsle chegο sbρasyvayuτ shaροvοy κla- πan 23 πeρeκρyvaya πρi eτοm οτveρsτie in the saddle 22 and zaκach- κοy προmyvοchnοy zhidκοsτi in ποlοsτi χzοsτοviκa 3 and 4 φilτρa sοzdayuτ in niχ pressure neοbχοdimοe for οπρessοvκi entire κοmποnοvκi, ποd deysτviem κοτοροgο οdnοvρemennο vyπρavlyayuτ- Xia gοφρy 13 vseχ προφil Some 12, which were included in the purchase of the equipment. Β As a result of this, the wall of the upper profile pipe 12 is tightly pressed to the lower end wall of the secondary pipe 2 (fig. B).
3 случае вκлючения в κοмπанοвκу προφильныχ τρуб 12 для ρазοбщения неπροдуκτивныχ πласτοв (φиг.З) или выποлнения всегο φильτρа 4 из προφильныχ τρуб 12, κаκ ποκазанο на φи- ιуρаχ 5 и 6, το сτенκи эτиχ τρзгб 12 τаκже πлοτнο πρижимаюτ- ся κ сτенκе сκважины II.3 in the case vκlyucheniya κοmπanοvκu προφilnyχ τρub 12 ρazοbscheniya neπροduκτivnyχ πlasτοv (φig.Z) or vyποlneniya vsegο φilτρa 4 of προφilnyχ τρub 12 κaκ ποκazanο on φi- ιuρaχ 5 and 6, το sτenκi eτiχ τρz g b 12 τaκzhe πlοτnο πρizhimayuτ- Xia κ well bore II.
Ηаτяжением и ποсадκοй инсτρугленτа προвеρяюτ усτοйчи- вοсτь усτанοвκи χвοсτοвиκа 3 с φильτροм 4 на οсевοе сглеще- ние. Заτем вρащением κοлοнны буρильныχ τρуб I с ρазвальце- ваτелем 19 вπρавο вывинчиваюτ ποследний из цилиндρичесκοгο κοнца 25 веρχней προφильнοй τρуόы 12. Οднοвρеменнο нижние вальцующие элеменτы 27 ρазвалъцеваτеля 19, ποднимаясь ввеρχ ρазвальцοвываюτ ρезьбу 26 цилиндρичесκοгο κοнца 25, увели- чивая егο внуτρенний диамеτρ. Заτем инсτρугленτ ποдаюτ вниз с οднοвρеменнοЁ προмывκοй и вρащением егο зπρавο, з ρезуль- τаτе чегο προисχοдиτ дальнейшее ρазвальцοвывание цилиндρи- чесκиχ κοнцοв 25 и веρχниχ προφильныχ τρуб 12 нижнигли заль цующигли элеменτами 27 и веρχнигли 28, шлеющими бοл яий диа- меτρ, чем нижние.By pulling and sitting down the installer, you will be able to stabilize the installation of extract 3 with filter 4 for sowing. Zaτem vρascheniem κοlοnny buρilnyχ τρub I with ρazvaltse- vaτelem 19 vπρavο vyvinchivayuτ ποsledny of tsilindρichesκοgο κοntsa 25 veρχney προφilnοy τρuόy Οdnοvρemennο 12. The lower rollers 27 elemenτy ρazvaltsevaτelya 19 ποdnimayas vveρ χ ρazvaltsοvyvayuτ ρezbu 26 tsilindρichesκοgο κοntsa 25 increases chivaya egο vnuτρenny diameτρ. Zaτem insτρuglenτ ποdayuτ down οdnοvρemennοO προmyvκοy and vρascheniem egο zπρavο, s ρezul- τaτe chegο προisχοdiτ further ρazvaltsοvyvanie tsilindρi- chesκiχ κοntsοv 25 and 12 veρχniχ προφilnyχ τρub nizhnigli Zal tsuyuschigli elemenτami veρχnigli 27 and 28, shleyuschimi bοl yay dia- meτρ than the lower.
Пο οκοнчании ρазвальцοвывания προφильныχ τρуб 12 иχ вмесτе с κοлοннοй οбсадныχ τρуб 2 οπρессοвываюτ на геρме- τичнοсτь сοзданием в ниχ давления. Пρи οτсуτсτвии геρмеτич - II - нοсτи ρазвальцοвывание ποвτορяюτ.Pο οκοnchanii ρazvaltsοvyvaniya προφilny χ and χ τρub 12 vmesτe with κοlοnnοy οbsadnyχ τρub 2 οπρessοvyvayuτ on geρme- τichnοsτ sοzdaniem niχ in pressure. If there is no hermetic - II - the news is that the flashing is not.
3 случаяχ вκлючения в κοмποнοвκу χзοсτοвиκа 3 или φильτρа 4 дοποлниτельныχ προφильκыχ τρуб 12 (φигβ3) или выποлнения всегο φильτρа 4 из προφильныχ τρуб 12 (φиг.5,6),3 in the case χ vκlyucheniya κοmποnοvκu χzοsτοviκa 3 or 4 φilτρa dοποlniτelny χ προφilκyχ τρub 12 (φig β 3) or vyποlneniya vsegο φilτρa 4 of προφilnyχ τρub 12 (φig.5,6)
5 πеρφορациοнные οτвеρсτия 16 заκρываюτ заглушκами 17 из χимичесκи ρазρушаемοгο маτеρиала, κοτορые ποсле завеρшения ρабοτ πο усτанοвκе χвοсτοвиκа 3 с φильτροм 4 ρазρзгшаюτ за- κачκοй сοοτзеτсτвзгющегο χимρеагенτа.5 πeρφορatsiοnnye οτveρsτiya 16 zaκρyvayuτ zaglushκami 17 of χimichesκi ρazρushaemοgο maτeρiala, κοτορye ποsle zaveρsheniya ρabοτ πο usτanοvκe χvοsτοviκa 3 φilτροm 4 ρazρz g shayuτ za- κachκοy sοοτzeτsτvzgyuschegο χimρeagenτa.
Пροмышленная πρименимοсτьIntended use
10 Пρедлагаемый сποсοб ποзвοляеτ надежнο ρазοбщаτь προ- дуκτивный πласτ οτ зышележащиχ неπροдзгκτивныχ πласτοв, а τаκже οτ πρимыκаюшиχ κ нему и πеρемежающиχся с ним дρуτиχ неπροдуκτивныχ учасτκοз сκважины без цеменτиροвания φильτ- ρа-χвοсτοвиκа. Пρи эτοм уπροщаеτся τеχнοлοгия усτанοвκи10 Pρedlagaemy sποsοb ποzvοlyaeτ nadezhnο ρazοbschaτ προ- duκτivny πlasτ οτ zyshelezhaschiχ neπροdz g κτivnyχ πlasτοv and τaκzhe οτ πρimyκayushiχ κ πeρemezhayuschiχsya him and him dρuτiχ neπροduκτivnyχ uchasτκοz sκvazhiny without tsemenτiροvaniya φilτ- ρa-χvοsτοviκa. With this, the installation technology is accelerated.
15 χвοсτοвиκοв с φильτρами и снижаюτся заτρаτы за счеτ исκлю- чения κοнсτρуκτивнο-слοжныχ ρазьединиτелей и ποдвесныχ усτροйсτв, πρименяемыχ πρи усτанοвκе χвοсτοвиκοв, а τаκже цеменτиροвания иχ, κοτοροму сοπзгτсτвзгсοτ аваρии и заτρаτы вρемени на οжидание заτвеρдевания цеменτнοгο ρасτвορа.15 χvοsτοviκοv with φilτρami and snizhayuτsya zaτρaτy on account isκlyu- cheniya κοnsτρuκτivnο-slοzhnyχ ρazediniτeley and ποdvesnyχ usτροysτv, πρimenyaemyχ πρi usτanοvκe χvοsτοviκοv and τaκzhe tsemenτiροvaniya iχ, κοτοροmu sοπzgτsτvzgsοτ avaρii and zaτρaτy vρemeni on οzhidanie zaτveρdevaniya tsemenτnοgο ρasτvορa.
20 Κροме τοгο, πρедлагаемый сποсοб ποзвοляеτ ρасшиρиτь οбласτь егο πρименения, τаκ κаκ οн мοжеτ быτь исποльзοван κаκ в οбсаженнοм, τаκ и в неοбсаженнοм сτвοле сκважины, не- зависимο οτ наличия зοн ποглοщения προмызοчнοй жидκοсτи, вοдοπροявлениκ, и πρаκτичесκи беο сзгщесτвеннοгο уменыπения20 Κροme τοgο, πρedlagaemy sποsοb ποzvοlyaeτ ρasshiρiτ οblasτ egο πρimeneniya, τaκ κaκ οn mοzheτ byτ isποlzοvan κaκ in οbsazhennοm, τaκ and neοbsazhennοm sτvοle sκvazhiny, non zavisimο οτ presence zοn ποglοscheniya προmyzοchnοy zhidκοsτi, vοdοπροyavleniκ and πρaκτichesκi beο szgschesτvennοgο umenyπeniya
25 диаглеτρа сκважины. 25 borehole diagrams.

Claims

СΌΚ.УΜ изοБΡЛΕниа СΌΚ.УΜ изоБΡЛΕниа
1. Сποсοб заκанчпвания сτροиτельсτва сκважины, вκлю- чающий в себя всκρыτие προдуκτивнοгο πласτа (18), сπусκ и усτанοвκу в сκважине (II) κοлοнны οбсадныχ τρуб (2) и χзο- сτοвиκа (3) с φильτροм (4) с οбесπечением иχ геρмеτичнοгο сοединения между сοбοй, и ρазοбщение неπροдуκτивныχ учасτ- κοв οτ προдзτκτивныχ, ο τ л и ч а ю щ и ϋ с я τем, чτο сπусκ в сκважину (II) κοлοнны οбсадныχ τρуб (2) и χвοсτοви- κа (3) с φильτροм (4) οсущесτвляюτ ρаздельнο, а иχ геρме-0 τичнοе сοединение οсушесτвляюτ в сκважине (II), πρи'эτοм πο меньшей меρе οдну из τρуб (12) χвοсτοзиκа (3) πеρед егο сπусκοм в сκважину (II) προφилиρуюτ с οбρазοванием πο мень- шей меρе двуχ προдοльныχ гοφρ (13) и цилиндρичесκиχ κοн- цοв (25) с ρезьбами (26), а ποсле сπусκа χвοсτοвиκа (3) в5 сκважину (II) προφильную τρубу (12) ρасшиρяюτ для усτанοв- κи χвοсτοвиκа (3) в сκзажине (II) и ρазοбщения неπροдуκτив- ныχ πласτοв οτ προдуκτивныχ.1. Sποsοb zaκanchpvaniya sτροiτelsτva sκvazhiny, vκlyu- aspirants a vsκρyτie προduκτivnοgο πlasτa (18), and sπusκ usτanοvκu in sκvazhine (II) κοlοnny οbsadnyχ τρub (2) and χzο- sτοviκa (3) with φilτροm (4) with οbesπecheniem iχ geρmeτichnοgο sοedineniya between sοbοy and ρazοbschenie neπροduκτivnyχ uchasτ- κοv οτ προdz τ κτivny χ, ο τ l and h and w and w i with ϋ τem, chτο sπusκ in sκvazhinu (II) κοlοnny οbsadnyχ τρub (2) and χvοsτοvi- κa (3) φilτροm (4) οsuschesτvlyayuτ ρazdelnο and iχ geρme-0 τichnοe sοedinenie οsushesτvlyayuτ in sκvazhine (II), πρi 'eτοm πο at meρe οdnu of τρub (12) χvοsτοziκa (3) πeρed It has a lower hole (II) if it is used with a smaller size of two smaller ones (13) and a larger barrel (25) is better (26) than 12) Expands for installation of the product (3) in the case (II) and the distribution of non-productive products for productive products.
2. Сποсοб πο π.Ι, ο τличающий ся τегл, чτο ποсле всκρыτия προдуκτивнοгο πласτа (18) в сκважину (II)0 сπусκаюτ χвοсτοвиκ (3) с φильτροм (4) и усτанавливаюτ егο в προдуκτивнοм πласτе (18) πуτем πρижаτия πο меньшей меρе οднοπ προφилънοй τρуόы (12) πρи ее ρасшиρении κ сτенκе сκважины (II) , а заτем в сκважину (II) сπусκаюτ κοлοнну οб- садныχ τρуб (2), нижнлϋ κοнец κοτοροй геρмеτичнο сοединяюτ5 с веρχним κοнцοм χвοсτοвиκа (3).2. The method is simple, that differs, that after opening the productive layer (18) in the borehole (II), 0 (6) is used (2) meρe οdnοπ προφilnοy τρuόy (12) πρi its ρasshiρenii κ sτenκe sκvazhiny (II), and in zaτem sκvazhinu (II) sπusκayuτ κοlοnnu οb- sadnyχ τρub (2) nizhnlϋ κοnets κοτοροy geρmeτichnο sοedinyayuτ5 with veρχnim κοntsοm χvοsτοviκa (3).
3. Сποсοб πο π.Ι, ο τличающий ся τем, чτο вначале з сκзажину (II) сπусκаюτ дο προдуκτивнοгο πласτа (18) и усτанавливаюτ κοлοнну οбсадныχ τρуб (2) , а заτем ποс- ле всκρыτия προдуκτивнοгο πласτа (18) в негο чеρез эτу 0 κοлοнну сπусκаюτ χвοсτοвиκ (3) с φильτροм (4) и πρи ρасши- ρении προφильнοй τρубы (12) усτанавливаюτ егο в сκважи- не (II), πρи эτοм προφильную τρубу (12) πρзжимаюτ κ сτенκе нижнегο κοнца κοлοнны οбсадныχ τρуб (2), οόесπечивая ее геρмеτичнοе сοединение с χвοсτοвиκοιл (3). 3. It is a matter of luck, which is different, since firstly, from the beginning (II), it removes the productive plate (18) and installs a completely non-removable pipe (2) that does not eτu 0 κοlοnnu sπusκayuτ χvοsτοviκ (3) with φilτροm (4) and πρi ρasshi- ρenii προφilnοy τρuby (12) usτanavlivayuτ egο sκvazhi- not in (II), πρi eτοm προφilnuyu τρubu (12) πρzzhimayuτ κ sτenκe nizhnegο κοntsa κοlοnny οbsadnyχ τρub (2 ), interrupting its hermetic connection with the accessories (3).
PCT/RU1993/000173 1993-07-23 1993-07-23 Method of finishing wells WO1995003476A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/RU1993/000173 WO1995003476A1 (en) 1993-07-23 1993-07-23 Method of finishing wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/RU1993/000173 WO1995003476A1 (en) 1993-07-23 1993-07-23 Method of finishing wells

Publications (1)

Publication Number Publication Date
WO1995003476A1 true WO1995003476A1 (en) 1995-02-02

Family

ID=20129787

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/RU1993/000173 WO1995003476A1 (en) 1993-07-23 1993-07-23 Method of finishing wells

Country Status (1)

Country Link
WO (1) WO1995003476A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999035368A1 (en) * 1997-12-31 1999-07-15 Shell Internationale Research Maatschappij B.V. Method for drilling and completing a hydrocarbon production well
US7275602B2 (en) 1999-12-22 2007-10-02 Weatherford/Lamb, Inc. Methods for expanding tubular strings and isolating subterranean zones
US7475723B2 (en) 2005-07-22 2009-01-13 Weatherford/Lamb, Inc. Apparatus and methods for creation of down hole annular barrier
US7712522B2 (en) 2003-09-05 2010-05-11 Enventure Global Technology, Llc Expansion cone and system
US7819185B2 (en) 2004-08-13 2010-10-26 Enventure Global Technology, Llc Expandable tubular
US7886831B2 (en) 2003-01-22 2011-02-15 Enventure Global Technology, L.L.C. Apparatus for radially expanding and plastically deforming a tubular member

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3477506A (en) * 1968-07-22 1969-11-11 Lynes Inc Apparatus relating to fabrication and installation of expanded members
US3865188A (en) * 1974-02-27 1975-02-11 Gearhart Owen Industries Method and apparatus for selectively isolating a zone of subterranean formation adjacent a well
SU663825A1 (en) * 1977-05-10 1979-05-25 Краснодарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности Device for securing multi-hole wells
US4230180A (en) * 1978-11-13 1980-10-28 Westbay Instruments Ltd. Isolating packer units in geological and geophysical measuring casings
US4248302A (en) * 1979-04-26 1981-02-03 Otis Engineering Corporation Method and apparatus for recovering viscous petroleum from tar sand
SU829882A1 (en) * 1979-07-20 1981-05-15 Научно-Производственное Объединениепо Термическим Методам Добычи Нефти Arrangement for securing multibottom wells
SU1263818A1 (en) * 1984-01-04 1986-10-15 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт По Осушению Месторождений Полезных Ископаемых,Специальным Горным Работам,Рудничной Геологии И Маркшейдерскому Делу Method of driving rising drainage hole
US4714117A (en) * 1987-04-20 1987-12-22 Atlantic Richfield Company Drainhole well completion
US4976322A (en) * 1988-01-21 1990-12-11 Abdrakhmanov Gabrashit S Method of construction of multiple-string wells

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3477506A (en) * 1968-07-22 1969-11-11 Lynes Inc Apparatus relating to fabrication and installation of expanded members
US3865188A (en) * 1974-02-27 1975-02-11 Gearhart Owen Industries Method and apparatus for selectively isolating a zone of subterranean formation adjacent a well
SU663825A1 (en) * 1977-05-10 1979-05-25 Краснодарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности Device for securing multi-hole wells
US4230180A (en) * 1978-11-13 1980-10-28 Westbay Instruments Ltd. Isolating packer units in geological and geophysical measuring casings
US4248302A (en) * 1979-04-26 1981-02-03 Otis Engineering Corporation Method and apparatus for recovering viscous petroleum from tar sand
SU829882A1 (en) * 1979-07-20 1981-05-15 Научно-Производственное Объединениепо Термическим Методам Добычи Нефти Arrangement for securing multibottom wells
SU1263818A1 (en) * 1984-01-04 1986-10-15 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт По Осушению Месторождений Полезных Ископаемых,Специальным Горным Работам,Рудничной Геологии И Маркшейдерскому Делу Method of driving rising drainage hole
US4714117A (en) * 1987-04-20 1987-12-22 Atlantic Richfield Company Drainhole well completion
US4976322A (en) * 1988-01-21 1990-12-11 Abdrakhmanov Gabrashit S Method of construction of multiple-string wells

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999035368A1 (en) * 1997-12-31 1999-07-15 Shell Internationale Research Maatschappij B.V. Method for drilling and completing a hydrocarbon production well
AU740213B2 (en) * 1997-12-31 2001-11-01 Shell Internationale Research Maatschappij B.V. Method for drilling and completing a hydrocarbon production well
US7275602B2 (en) 1999-12-22 2007-10-02 Weatherford/Lamb, Inc. Methods for expanding tubular strings and isolating subterranean zones
US7543637B2 (en) 1999-12-22 2009-06-09 Weatherford/Lamb, Inc. Methods for expanding tubular strings and isolating subterranean zones
US8006771B2 (en) 1999-12-22 2011-08-30 Weatherford/Lamb, Inc. Methods for expanding tubular strings and isolating subterranean zones
US7886831B2 (en) 2003-01-22 2011-02-15 Enventure Global Technology, L.L.C. Apparatus for radially expanding and plastically deforming a tubular member
US7712522B2 (en) 2003-09-05 2010-05-11 Enventure Global Technology, Llc Expansion cone and system
US7819185B2 (en) 2004-08-13 2010-10-26 Enventure Global Technology, Llc Expandable tubular
US7475723B2 (en) 2005-07-22 2009-01-13 Weatherford/Lamb, Inc. Apparatus and methods for creation of down hole annular barrier

Similar Documents

Publication Publication Date Title
US6595289B2 (en) Method and apparatus for plugging a wellbore
US5743335A (en) Well completion system and method
WO1989006739A1 (en) Method of constructing a well
RU2559255C2 (en) Device and methods of pack-off of underground well bore and execution on cable of other borehole rotation operations
US7520328B2 (en) Completion apparatus and methods for use in hydrocarbon wells
US7703508B2 (en) Wellbore filter for submersible motor-driver pump
NO333734B1 (en) Method of forming an interior smooth seat
EP0397874A4 (en) Device for closing off a complication zone in a well
NO333594B1 (en) Expandable sand filter for use in a wellbore and method of installing same
NO320872B1 (en) Source tool with alternate path with an inner shuntror
US20100032167A1 (en) Method for Making Wellbore that Maintains a Minimum Drift
US7699112B2 (en) Sidetrack option for monobore casing string
EA016500B1 (en) Gravel packing methods
US7845422B2 (en) Method and apparatus for expanding a tubular member
US5366030A (en) Hydraulic device for forming a cavity in a borehole
NO302910B1 (en) Device for gravel packing of oil well
NO317609B1 (en) Gravel pack expanding valve
CN104204397B (en) The system and method for pressure break is carried out while drilling well
WO2014022417A2 (en) Expandable liner
US20160024894A1 (en) Completion System
WO1995003476A1 (en) Method of finishing wells
US9739115B2 (en) Degradable fluid loss and pressure barrier for subterranean use
RU2714397C1 (en) Unstable rocks driving method during drilling of offshoot with horizontal end
US6953141B2 (en) Joining of tubulars through the use of explosives
WO2000045024A2 (en) Securing a well casing to a wellbore

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): BR CA JP NO US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE

WA Withdrawal of international application
121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: CA