US9281713B2 - System and method for electricity management - Google Patents

System and method for electricity management Download PDF

Info

Publication number
US9281713B2
US9281713B2 US13/729,899 US201213729899A US9281713B2 US 9281713 B2 US9281713 B2 US 9281713B2 US 201213729899 A US201213729899 A US 201213729899A US 9281713 B2 US9281713 B2 US 9281713B2
Authority
US
United States
Prior art keywords
power supply
cabinet
supply apparatus
control unit
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active, expires
Application number
US13/729,899
Other versions
US20140097681A1 (en
Inventor
Chiou-Chu Lai
Ming-Yao Cheng
Chien-Chu Chen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lite On Technology Corp
Original Assignee
Lite On Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lite On Technology Corp filed Critical Lite On Technology Corp
Assigned to LITE-ON CLEAN ENERGY TECHNOLOGY CORP. reassignment LITE-ON CLEAN ENERGY TECHNOLOGY CORP. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CHEN, CHIEN-CHU, CHENG, MING-YAO, LAI, CHIOU-CHU
Publication of US20140097681A1 publication Critical patent/US20140097681A1/en
Assigned to LITE-ON TECHNOLOGY CORPORATION reassignment LITE-ON TECHNOLOGY CORPORATION MERGER (SEE DOCUMENT FOR DETAILS). Assignors: LITE-ON CLEAN ENERGY TECHNOLOGY CORPORATION
Application granted granted Critical
Publication of US9281713B2 publication Critical patent/US9281713B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/40Testing power supplies
    • Y10T307/344

Definitions

  • the present invention relates to a system and a method for electricity management, and more particularly, to a system and a method for electricity management used to test an uninterruptible power supply apparatus.
  • the electricity management system of the present invention includes a data management unit, at least one cabinet, at least one control unit, at least one uninterruptible power supply apparatus and at least one power switch. Every cabinet includes at least one electronic equipment, respectively, and the at least one cabinet is powered by an external power supply.
  • the data management unit is electrically connected with the at least one cabinet, wherein the data management unit is used to configure a testing instruction and send the testing instruction to the at least one cabinet, in addition, the data management unit can arrange a testing schedule for every cabinet and conduct the testing automatically according to the testing schedule.
  • the at least one uninterruptible power supply apparatus is electrically connected with the at least one control unit and the at least one cabinet, respectively.
  • the at least one power switch is electrically connected with the at least one control unit and the external power supply, respectively.
  • the at least one control unit controls the at least one power switch to shut down the external power supply to the at least one cabinet, and the at least one cabinet is powered by the at least one uninterruptible power supply apparatus instead; in addition, the at least one control unit measures a set of battery parameters of the at least one uninterruptible power supply apparatus, computes a power capacity of the at least one uninterruptible power supply apparatus according to the set of battery parameters, and returns the power capacity to the data management unit.
  • the data management unit is further used to determine if the power capacity is less than a default capacity, and if the power supply capacity is less than the default capacity, it then configures a service power during a blackout for the at least one cabinet.
  • the testing instruction includes a service power, wherein the at least one cabinet operates with the service power.
  • the testing instruction further includes a termination condition
  • the at least one control unit functions in accordance with the termination condition to control the at least one power switch to turn on the external power supply to power the at least one cabinet instead of the at least one uninterruptible power supply apparatus.
  • the termination condition includes whether the operation voltage of the at least one uninterruptible power supply apparatus is lower than a default voltage, whether the operation time of the at least one uninterruptible power supply apparatus exceeds a default time, or whether the amount of power supplied by the at least one uninterruptible power supply apparatus exceeds a default value of power supplied.
  • the set of battery parameters includes voltage data, electric current data, and temperature data.
  • the electronic equipment can be at least one hard disc, at least one server, or a combination of at least one hard disc and at least one server.
  • the electricity management method is used in the electricity management system, wherein the electricity management system includes a data management unit, at least one cabinet, at least one control unit, at least one uninterruptible power supply apparatus and at least one power switch.
  • Each cabinet includes at least one electronic equipment, respectively.
  • the at least one cabinet is powered by an external power supply.
  • the data management unit is electrically connected with the at least one cabinet.
  • the at least one uninterruptible power supply apparatus is electrically connected with the at least one control unit and the at least one cabinet, respectively.
  • the at least one power switch is electrically connected with the at least one control unit and the external power supply, respectively.
  • the electricity management method includes: using the data management unit to configure a testing instruction and send the testing instruction to the at least one cabinet; using the at least one control unit to control the at least one power switch to shut down the external power supply such that the at least one cabinet is powered by the at least one uninterruptible power supply apparatus instead; using the at least one control unit to measure a set of battery parameters of the at least one uninterruptible power supply apparatus, and through the at least one control unit to compute a power capacity of the at least one uninterruptible power supply apparatus according to the set of battery parameters and to return the power capacity to the data management unit.
  • the electricity management method further includes: using the data management unit to determine whether the power capacity is less than a default capacity, if the power capacity is less than the default capacity, using the data management unit to configure a service power during a blackout for the at least one cabinet.
  • the testing instruction includes a service power, and the at least one cabinet operates with the service power.
  • the testing instruction further includes a termination condition, wherein the at least one control unit further controls the at least one power switch, according to the termination condition, to turn on the external power supply to power the at least one cabinet such that the at least one uninterruptible power supply apparatus no longer supplies the at least one cabinet with power.
  • the termination condition includes whether the operation voltage of the at least one uninterruptible power supply apparatus is lower than a default voltage, whether the operation time of the at least one uninterruptible power supply apparatus exceeds a default time, or whether the amount of power supplied by the at least one uninterruptible power supply apparatus exceeds a default value of power supplied.
  • the set of battery parameters includes voltage data, electric current data, and temperature data.
  • the electronic equipment can be at least one hard disc, at least one server, or a combination of at least one hard disc and at least one server.
  • FIG. 1 is a system architecture diagram illustrating the electricity management system according to one embodiment of the present invention.
  • FIG. 2 is a procedure flow chart illustrating the electricity management method according to one embodiment of the present invention.
  • FIG. 1 is a system architecture diagram of the electricity management system 1 according to one embodiment of the present invention.
  • the electricity management system 1 of the present invention includes a data management unit 10 , cabinets 20 a and 20 b , control units 30 a and 30 b , uninterruptible power supply apparatuses 40 a and 40 b , and power switches 50 a and 50 b .
  • the outside of the electricity management system 1 has an external power supply 80 connected with the power switches 50 a and 50 b , to supply power to the cabinets 20 a , 20 b .
  • every aforementioned element not only can be disposed as a hardware apparatus, a software program, a firmware, or any such combination, but also can be disposed through a circuit loop or any appropriate type. Furthermore, every element can be disposed as an independent type as well as any combined type.
  • the present embodiment exemplifies only a good embodiment of the present invention; not all possible combinations are described in detail. Nevertheless, those skilled in the art should understand that the aforementioned elements are not all necessary. In order to present an embodiment of the present invention, it is also possible to include other detailed elements of the prior art. Any element can be omitted or modified depending on requirements, and other elements may exist between any two elements.
  • the electricity management system 1 allows a user to conduct a functionality testing of the uninterruptible power supply apparatus.
  • the data management unit 10 is electrically connected with the cabinets 20 a , 20 b ; when a user wants to conduct a testing, the data management unit 10 can configure a testing instruction and send the testing instruction to the cabinet 20 a or 20 b to begin the testing.
  • the cabinets 20 a and 20 b are disposed with an electronic equipment 21 a and 21 b , respectively, which the electronic equipment 21 a and 21 b can be a hard disc, a server or a combination of both, but the present invention is not limited to this disposition.
  • control units 30 a and 30 b are electrically connected with the cabinets 20 a and 20 b , respectively, and the uninterruptible power supply apparatuses 40 a and 40 b are electrically connected with the control units 30 a and 30 b and with the cabinets 20 a and 20 b , respectively.
  • the control units 30 a and 30 b can measure a set of battery parameters of the uninterruptible power supply apparatuses 40 a and 40 b .
  • the power switches 50 a and 50 b are electrically connected with the control units 30 a and 30 b respectively and with the external power supply 80 .
  • control units 30 a and 30 b can control the power switches 50 a and 50 b to shut down the external power supply 80 , and the cabinets 20 a and 20 b can be powered by the uninterruptible power supply apparatuses 40 a and 40 b instead, thus to test the uninterruptible power supply apparatuses 40 a and 40 b.
  • the electricity management system 1 does not necessarily include only two sets of the cabinets 20 a and 20 b , the control units 30 a and 30 b , the uninterruptible power supply apparatuses 40 a and 40 b , and the power switches 50 a and 50 b .
  • the number of the cabinets and other apparatuses can be increased or decreased depending on requirements.
  • FIG. 2 is a procedure flow chart illustrating the electricity management method according to one embodiment of the present invention.
  • the electricity management method of the present invention is described below using the electricity management system 1 shown in FIG. 1 .
  • the electricity management method of the present invention is not confined to the usage of the electricity management system 1 shown in FIG. 1 .
  • step S 1 the data management unit configures and sends a testing instruction to a to-be-tested cabinet.
  • the data management unit 10 configures a testing instruction and sends the testing instruction to the corresponding cabinet first.
  • the data management unit 10 can arrange a testing schedule of every cabinet and conduct tests automatically according to the testing schedule.
  • the data management unit 10 sends the testing instruction to the corresponding cabinet 20 a of the uninterruptible power supply apparatus 40 a first.
  • the testing instruction at least includes a service power to configure the service power used by the cabinet 20 a during the testing process.
  • the testing instruction can also include a termination condition, wherein the termination condition can include a default voltage, a default time or a default value of power supplied of the uninterruptible power supply apparatus 40 a , such that when the operation voltage of the uninterruptible power supply apparatus 40 a is lower than the default voltage, the operation time of the uninterruptible power supply apparatus 40 a exceeds the default time, or the amount of power supplied by the uninterruptible power supply apparatus 40 a exceeds the default value for power supplied, the testing is stopped.
  • the termination condition is not confined to these aspects.
  • step S 2 the control unit controls the power switch to shut down the external power supply, and the tested cabinet is powered by the uninterruptible power supply apparatus instead.
  • the corresponding control unit 30 a controls the power switch 50 a to shut down the power supply from the external power supply 80 to the cabinet 20 a .
  • the cabinet 20 a is powered by the uninterruptible power supply apparatus 40 a instead so as to start the testing process.
  • the power switch 50 a can be controlled by an independent element and not necessarily by the control unit 30 a.
  • step S 3 the control unit measures a set of battery parameters of the uninterruptible power supply apparatus.
  • the control unit 30 a continues measuring the uninterruptible power supply apparatus 40 a to obtain a set of battery parameters of the uninterruptible power supply apparatus 40 a .
  • the set of battery parameters can include voltage data, electric current data and temperature data, but the present invention is not confined to this aspect. What should be noted is how the set of battery parameters of the uninterruptible power supply apparatus 40 a is obtained is familiar to persons having ordinary skill in the art of the present invention, which falls into the scope of the prior art; therefore, it is not described in detail herein.
  • step S 4 according to the termination condition, the external power supply is turned on to power the tested cabinet instead of the uninterruptible power supply apparatus.
  • the control unit 30 a continues to determine whether the termination condition is met. When the termination condition is met, the control unit 30 a controls the power switch 50 a to turn on the external power supply 80 to power the cabinet 20 a instead of the uninterruptible power supply apparatus 40 a.
  • step S 5 the control unit calculates the power capacity of the uninterruptible power supply apparatus according to the set of battery parameters and returns the power capacity to the data management unit.
  • the control unit 30 a calculates the power capacity of the uninterruptible power supply apparatus 40 a according to the measured battery parameters, and then returns the power capacity to the data management unit 10 .
  • the power capacity is calculated based on the battery parameters should be familiar to persons having ordinary skill in the art of the present invention, which falls into the scope of the prior art. Therefore, it is not described in detail herein.
  • step S 6 the data management unit determines whether the power capacity is less than the default capacity.
  • the data management unit 10 determines whether the power capacity of the uninterruptible power supply apparatus 40 a is less than a default capacity. If the power capacity is less than the default capacity, then the system proceeds with step S 7 ; otherwise, the whole testing process is terminated.
  • step S 7 the data management unit configures a service power during a blackout for the tested cabinet.
  • step S 6 if the data management unit 10 determines that the power capacity of the uninterruptible power supply apparatus 40 a is less than the default capacity, then the data management unit 10 configures a service power during a blackout for the cabinet 20 a .
  • the service power during a blackout can prevent the uninterruptible power supply apparatus 40 a from supplying a greater amount of power to the cabinet 20 a during a blackout, by doing so the power supply time of the uninterruptible power supply apparatus 40 a can be extended to conform to the target time of the power supply.
  • the present invention has characteristics that are different from the prior art in terms of the objects, means, and function, and the present invention thus merits a patent.
  • the aforementioned embodiments are provided for illustration only, and not for the purpose of limiting the scope of the invention as defined by the appended claims.

Abstract

A system and a method for electricity management are disclosed. The system includes a data management unit, a cabinet, a control unit, an uninterruptible power supply apparatus and a power switch. The cabinet is powered by an external power supply. When the data management unit sends a testing instruction to the cabinet, the control unit controls the power switch to shut down the external power supply such that the cabinet is powered by the uninterruptible power supply apparatus instead. The control unit measures a set of battery parameters of the uninterruptible power supply apparatus, computes a power supply capacity of the uninterruptible power supply apparatus according to the set of battery parameters, and returns the power supply capacity to the data management unit.

Description

BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention relates to a system and a method for electricity management, and more particularly, to a system and a method for electricity management used to test an uninterruptible power supply apparatus.
2. Description of the Related Art
With the booming development of the information industry in recent years, a variety of hardware equipment, such as personal computers, communication equipment, and workstations, is broadly applied in all strata of society. As information itself is a high value-added product, people try every means to ensure the security of information and the normal operation of computer systems, so the requirement for a power supply with consistent quality has become stricter. While electronic power equipment has been heavily used, the derived harmonic waves may result in poor-quality electricity, and factors such as natural disasters, all make it impossible for electricity providers to guarantee a stable power supply with high quality. Thus, an uninterruptible power supply (UPS) becomes an indispensable device for computers or communication systems, and how to effectively test the function of the uninterruptible power supply system also becomes an important issue.
The common practice of testing the function of an uninterruptible power supply system is to discharge electricity with electronic load equipment (Loader) after removing part of the batteries in the system, and then installing them back into the system after the capacity of the other batteries has been measured and the removed batteries have been fully recharged. The reason that only part of the batteries is removed for testing is to avoid a blackout during the testing. Such a method results in shortcomings include: manpower to be allocated to battery disassembly/assembly, the expense of the discharge/recharge equipment required during the testing process builds up an increased cost structure, and moreover, an estimate of the available service time during the blackout calculated based on the discharging capacity discharged through a discharge machine may be inaccurate and unreliable. In addition, the electricity discharged during the testing conducted by the conventional testing method indicates a total waste of energy. Therefore, it is necessary to provide an electricity management system and electricity management method for testing a UPS system periodically and automatically so as to manage the status of the uninterruptible power supply system, furthermore, to control the risk of power blackout efficiently in an attempt to eliminate the shortcomings of the prior art.
SUMMARY OF THE INVENTION
It is an object of the present invention to provide an electricity management system.
It is another object of the present invention to provide an electricity management method.
In order to achieve the aforementioned objects, according to one embodiment of the present invention, the electricity management system of the present invention includes a data management unit, at least one cabinet, at least one control unit, at least one uninterruptible power supply apparatus and at least one power switch. Every cabinet includes at least one electronic equipment, respectively, and the at least one cabinet is powered by an external power supply. The data management unit is electrically connected with the at least one cabinet, wherein the data management unit is used to configure a testing instruction and send the testing instruction to the at least one cabinet, in addition, the data management unit can arrange a testing schedule for every cabinet and conduct the testing automatically according to the testing schedule. The at least one uninterruptible power supply apparatus is electrically connected with the at least one control unit and the at least one cabinet, respectively. The at least one power switch is electrically connected with the at least one control unit and the external power supply, respectively. Through the aforementioned structure, when the data management unit sends the testing instruction to the at least one cabinet, the at least one control unit controls the at least one power switch to shut down the external power supply to the at least one cabinet, and the at least one cabinet is powered by the at least one uninterruptible power supply apparatus instead; in addition, the at least one control unit measures a set of battery parameters of the at least one uninterruptible power supply apparatus, computes a power capacity of the at least one uninterruptible power supply apparatus according to the set of battery parameters, and returns the power capacity to the data management unit.
According to one embodiment of the present invention, the data management unit is further used to determine if the power capacity is less than a default capacity, and if the power supply capacity is less than the default capacity, it then configures a service power during a blackout for the at least one cabinet.
According to one embodiment of the present invention, the testing instruction includes a service power, wherein the at least one cabinet operates with the service power.
According to one embodiment of the present invention, the testing instruction further includes a termination condition, and the at least one control unit functions in accordance with the termination condition to control the at least one power switch to turn on the external power supply to power the at least one cabinet instead of the at least one uninterruptible power supply apparatus.
According to one embodiment of the present invention, the termination condition includes whether the operation voltage of the at least one uninterruptible power supply apparatus is lower than a default voltage, whether the operation time of the at least one uninterruptible power supply apparatus exceeds a default time, or whether the amount of power supplied by the at least one uninterruptible power supply apparatus exceeds a default value of power supplied.
According to one embodiment of the present invention, the set of battery parameters includes voltage data, electric current data, and temperature data.
According to one embodiment of the present invention, the electronic equipment can be at least one hard disc, at least one server, or a combination of at least one hard disc and at least one server.
According to one embodiment of the present invention, the electricity management method is used in the electricity management system, wherein the electricity management system includes a data management unit, at least one cabinet, at least one control unit, at least one uninterruptible power supply apparatus and at least one power switch. Each cabinet includes at least one electronic equipment, respectively. The at least one cabinet is powered by an external power supply. The data management unit is electrically connected with the at least one cabinet. The at least one uninterruptible power supply apparatus is electrically connected with the at least one control unit and the at least one cabinet, respectively. The at least one power switch is electrically connected with the at least one control unit and the external power supply, respectively. The electricity management method includes: using the data management unit to configure a testing instruction and send the testing instruction to the at least one cabinet; using the at least one control unit to control the at least one power switch to shut down the external power supply such that the at least one cabinet is powered by the at least one uninterruptible power supply apparatus instead; using the at least one control unit to measure a set of battery parameters of the at least one uninterruptible power supply apparatus, and through the at least one control unit to compute a power capacity of the at least one uninterruptible power supply apparatus according to the set of battery parameters and to return the power capacity to the data management unit.
According to one embodiment of the present invention, the electricity management method further includes: using the data management unit to determine whether the power capacity is less than a default capacity, if the power capacity is less than the default capacity, using the data management unit to configure a service power during a blackout for the at least one cabinet.
According to one embodiment of the present invention, the testing instruction includes a service power, and the at least one cabinet operates with the service power.
According to one embodiment of the present invention, the testing instruction further includes a termination condition, wherein the at least one control unit further controls the at least one power switch, according to the termination condition, to turn on the external power supply to power the at least one cabinet such that the at least one uninterruptible power supply apparatus no longer supplies the at least one cabinet with power.
According to one embodiment of the present invention, the termination condition includes whether the operation voltage of the at least one uninterruptible power supply apparatus is lower than a default voltage, whether the operation time of the at least one uninterruptible power supply apparatus exceeds a default time, or whether the amount of power supplied by the at least one uninterruptible power supply apparatus exceeds a default value of power supplied.
According to one embodiment of the present invention, the set of battery parameters includes voltage data, electric current data, and temperature data.
According to one embodiment of the present invention, the electronic equipment can be at least one hard disc, at least one server, or a combination of at least one hard disc and at least one server.
Other objects, advantages, and novel features of the invention will become more apparent from the following detailed description when taken in conjunction with the accompanying drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
These and other objects and advantages of the present invention will become apparent from the following description of the accompanying drawings, which disclose several embodiments of the present invention. It is to be understood that the drawings are to be used for purposes of illustration only, and not as a definition of the invention.
In the drawings, wherein similar reference numerals denote similar elements throughout the several views:
FIG. 1 is a system architecture diagram illustrating the electricity management system according to one embodiment of the present invention.
FIG. 2 is a procedure flow chart illustrating the electricity management method according to one embodiment of the present invention.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
The aforementioned objects, characteristics, and advantages of the present invention will become more apparent from the following detailed descriptions of a concrete embodiment when taken together with the accompanying drawings.
Please refer to FIG. 1 first, which is a system architecture diagram of the electricity management system 1 according to one embodiment of the present invention. As shown in FIG. 1, according to one embodiment of the present invention, the electricity management system 1 of the present invention includes a data management unit 10, cabinets 20 a and 20 b, control units 30 a and 30 b, uninterruptible power supply apparatuses 40 a and 40 b, and power switches 50 a and 50 b. The outside of the electricity management system 1 has an external power supply 80 connected with the power switches 50 a and 50 b, to supply power to the cabinets 20 a, 20 b. What should be noted is that every aforementioned element not only can be disposed as a hardware apparatus, a software program, a firmware, or any such combination, but also can be disposed through a circuit loop or any appropriate type. Furthermore, every element can be disposed as an independent type as well as any combined type. The present embodiment exemplifies only a good embodiment of the present invention; not all possible combinations are described in detail. Nevertheless, those skilled in the art should understand that the aforementioned elements are not all necessary. In order to present an embodiment of the present invention, it is also possible to include other detailed elements of the prior art. Any element can be omitted or modified depending on requirements, and other elements may exist between any two elements.
According to one embodiment of the present invention, the electricity management system 1 allows a user to conduct a functionality testing of the uninterruptible power supply apparatus. The data management unit 10 is electrically connected with the cabinets 20 a, 20 b; when a user wants to conduct a testing, the data management unit 10 can configure a testing instruction and send the testing instruction to the cabinet 20 a or 20 b to begin the testing. The cabinets 20 a and 20 b are disposed with an electronic equipment 21 a and 21 b, respectively, which the electronic equipment 21 a and 21 b can be a hard disc, a server or a combination of both, but the present invention is not limited to this disposition.
According to one embodiment of the present invention, the control units 30 a and 30 b are electrically connected with the cabinets 20 a and 20 b, respectively, and the uninterruptible power supply apparatuses 40 a and 40 b are electrically connected with the control units 30 a and 30 b and with the cabinets 20 a and 20 b, respectively. By these connections, the control units 30 a and 30 b can measure a set of battery parameters of the uninterruptible power supply apparatuses 40 a and 40 b. The power switches 50 a and 50 b are electrically connected with the control units 30 a and 30 b respectively and with the external power supply 80. By these connections, the control units 30 a and 30 b can control the power switches 50 a and 50 b to shut down the external power supply 80, and the cabinets 20 a and 20 b can be powered by the uninterruptible power supply apparatuses 40 a and 40 b instead, thus to test the uninterruptible power supply apparatuses 40 a and 40 b.
Also to be noted is that the electricity management system 1 does not necessarily include only two sets of the cabinets 20 a and 20 b, the control units 30 a and 30 b, the uninterruptible power supply apparatuses 40 a and 40 b, and the power switches 50 a and 50 b. The number of the cabinets and other apparatuses can be increased or decreased depending on requirements.
Please refer to FIG. 2, which is a procedure flow chart illustrating the electricity management method according to one embodiment of the present invention. The electricity management method of the present invention is described below using the electricity management system 1 shown in FIG. 1. What should be noted is that the electricity management method of the present invention is not confined to the usage of the electricity management system 1 shown in FIG. 1.
First of all, the system proceeds with step S1: the data management unit configures and sends a testing instruction to a to-be-tested cabinet.
Please refer to FIG. 1, when the user intends to conduct a testing on the uninterruptible power supply apparatus, the data management unit 10 configures a testing instruction and sends the testing instruction to the corresponding cabinet first. Generally speaking, the data management unit 10 can arrange a testing schedule of every cabinet and conduct tests automatically according to the testing schedule. In the present embodiment, for example, when the user wants to test the uninterruptible power supply apparatus 40 a, the data management unit 10 sends the testing instruction to the corresponding cabinet 20 a of the uninterruptible power supply apparatus 40 a first.
According to one embodiment of the present invention, the testing instruction at least includes a service power to configure the service power used by the cabinet 20 a during the testing process. The testing instruction can also include a termination condition, wherein the termination condition can include a default voltage, a default time or a default value of power supplied of the uninterruptible power supply apparatus 40 a, such that when the operation voltage of the uninterruptible power supply apparatus 40 a is lower than the default voltage, the operation time of the uninterruptible power supply apparatus 40 a exceeds the default time, or the amount of power supplied by the uninterruptible power supply apparatus 40 a exceeds the default value for power supplied, the testing is stopped. However, what should be noted is that the termination condition is not confined to these aspects.
Next, the system proceeds with step S2: the control unit controls the power switch to shut down the external power supply, and the tested cabinet is powered by the uninterruptible power supply apparatus instead.
According to one embodiment of the present invention, after the data management unit 10 sends the testing instruction to the cabinet 20 a, the corresponding control unit 30 a controls the power switch 50 a to shut down the power supply from the external power supply 80 to the cabinet 20 a. At the same time, the cabinet 20 a is powered by the uninterruptible power supply apparatus 40 a instead so as to start the testing process. Also to be noted is that the power switch 50 a can be controlled by an independent element and not necessarily by the control unit 30 a.
Next, the system proceeds with step S3: the control unit measures a set of battery parameters of the uninterruptible power supply apparatus.
According to one embodiment of the present invention, when the uninterruptible power supply apparatus 40 a supplies power to the cabinet 20 a, the control unit 30 a continues measuring the uninterruptible power supply apparatus 40 a to obtain a set of battery parameters of the uninterruptible power supply apparatus 40 a. The set of battery parameters can include voltage data, electric current data and temperature data, but the present invention is not confined to this aspect. What should be noted is how the set of battery parameters of the uninterruptible power supply apparatus 40 a is obtained is familiar to persons having ordinary skill in the art of the present invention, which falls into the scope of the prior art; therefore, it is not described in detail herein.
Next, the system proceeds with step S4: according to the termination condition, the external power supply is turned on to power the tested cabinet instead of the uninterruptible power supply apparatus.
According to one embodiment of the present invention, during the testing process of the uninterruptible power supply apparatus 40 a, the control unit 30 a continues to determine whether the termination condition is met. When the termination condition is met, the control unit 30 a controls the power switch 50 a to turn on the external power supply 80 to power the cabinet 20 a instead of the uninterruptible power supply apparatus 40 a.
Next, the system proceeds with step S5: the control unit calculates the power capacity of the uninterruptible power supply apparatus according to the set of battery parameters and returns the power capacity to the data management unit.
According to one embodiment of the present invention, after the uninterruptible power supply apparatus 40 a stops supplying power to the cabinet 20 a, the control unit 30 a calculates the power capacity of the uninterruptible power supply apparatus 40 a according to the measured battery parameters, and then returns the power capacity to the data management unit 10. What should be noted is that how the power capacity is calculated based on the battery parameters should be familiar to persons having ordinary skill in the art of the present invention, which falls into the scope of the prior art. Therefore, it is not described in detail herein.
Next, the system proceeds with step S6: the data management unit determines whether the power capacity is less than the default capacity.
According to one embodiment of the present invention, the data management unit 10 then determines whether the power capacity of the uninterruptible power supply apparatus 40 a is less than a default capacity. If the power capacity is less than the default capacity, then the system proceeds with step S7; otherwise, the whole testing process is terminated.
Finally, the system proceeds with step S7: the data management unit configures a service power during a blackout for the tested cabinet.
During step S6, if the data management unit 10 determines that the power capacity of the uninterruptible power supply apparatus 40 a is less than the default capacity, then the data management unit 10 configures a service power during a blackout for the cabinet 20 a. The service power during a blackout can prevent the uninterruptible power supply apparatus 40 a from supplying a greater amount of power to the cabinet 20 a during a blackout, by doing so the power supply time of the uninterruptible power supply apparatus 40 a can be extended to conform to the target time of the power supply.
What should be noted here is that the electricity management method of the present invention is not confined to the order of the aforementioned steps. The order of the aforementioned steps can also be changed as long as it achieves the objects of the present invention.
To sum up, the present invention has characteristics that are different from the prior art in terms of the objects, means, and function, and the present invention thus merits a patent. What should be noted is that the aforementioned embodiments are provided for illustration only, and not for the purpose of limiting the scope of the invention as defined by the appended claims.

Claims (14)

What is claimed is:
1. An electricity management system, comprising:
at least one cabinet, wherein every cabinet includes at least one electronic equipment, and the at least one cabinet is powered by an external power supply;
a data management unit, which is electrically connected with the at least one cabinet, the data management unit being used to configure a testing instruction and send the testing instruction to the at least one cabinet;
at least one control unit;
at least one uninterruptible power supply apparatus, which is electrically connected with the at least one control unit and the at least one cabinet respectively; and
at least one power switch, which is electrically connected with the at least one control unit and the external power supply, respectively;
by means of the aforementioned structure, when the data management unit sends the testing instruction to the at least one cabinet, the at least one control unit controls the at least one power switch to shut down the power to the at least one cabinet from the external power supply and the at least one cabinet is powered by the at least one uninterruptible power supply apparatus instead, and the at least one control unit measures a set of battery parameters of the at least one uninterruptible power supply apparatus and calculates a power capacity of the at least one uninterruptible power supply apparatus according to the set of battery parameters, and returns the power capacity to the data management unit.
2. The electricity management system as claimed in claim 1, wherein the data management unit is further used to determine whether the power capacity is less than a default capacity, and if the power capacity is less than the default capacity, the data management unit configures a service power during a blackout for the at least one cabinet.
3. The electricity management system as claimed in claim 2, wherein the testing instruction includes a service power, and the at least one cabinet is operated with the service power.
4. The electricity management system as claimed in claim 3, wherein the testing instruction further includes a termination condition, the at least one control unit functions according to the termination condition to control the at least one power switch to turn on the external power supply to power the at least one cabinet instead of the at least one uninterruptible power supply apparatus.
5. The electricity management system as claimed in claim 4, wherein the termination condition includes whether the operation voltage of the at least one uninterruptible power supply apparatus is lower than a default voltage, whether the operation time of the at least one uninterruptible power supply apparatus exceeds a default time, or whether the amount of power supplied by the at least one uninterruptible power supply apparatus exceeds a default value of power supplied.
6. The electricity management system as claimed in claim 1, wherein the set of battery parameters includes voltage data, electric current data, and temperature data.
7. The electricity management system as claimed in claim 1, wherein the electronic equipment can be at least one hard disc, at least one server, or a combination of at least one hard disc and at least one server.
8. An electricity management method, which is used by an electricity management system, and the electricity management system includes a data management unit, at least one cabinet, at least one control unit, at least one uninterruptible power supply apparatus and at least one power switch, wherein every cabinet includes at least one electronic equipment, the at least one cabinet is powered by an external power supply, the data management unit is electrically connected with the at least one cabinet, the at least one uninterruptible power supply apparatus is electrically connected with the at least one control unit and the at least one cabinet, respectively, and the at least one power switch is electrically connected with the at least one control unit and the external power supply, respectively; the method comprising:
by means of the data management unit, configuring a testing instruction and sending the testing instruction to the at least one cabinet;
by means of the at least one control unit, controlling the at least one power switch to shut down the power to the at least one cabinet from the external power supply such that the at least one cabinet is powered by the at least one uninterruptible power supply apparatus instead;
by means of the at least one control unit, measuring a set of battery parameters of the at least one uninterruptible power supply apparatus; and
by means of the at least one control unit, calculating a power capacity of the at least one uninterruptible power supply apparatus according to the set of battery parameters and returning the power capacity to the data management unit.
9. The electricity management method as claimed in claim 8, further includes: by means of the data management unit, determining whether the power capacity is less than a default capacity; and
if the power capacity is less than the default capacity, then the data management unit configures a service power during a blackout for the at least one cabinet.
10. The electricity management method as claimed in claim 9, wherein the testing instruction includes a service power, and the at least one cabinet is operated with the service power.
11. The electricity management method as claimed in claim 10, wherein the testing instruction further includes a termination condition, the at least one control unit functions according to the termination condition to control the at least one power switch to turn on the external power supply to power the at least one cabinet instead of the at least one uninterruptible power supply apparatus.
12. The electricity management method as claimed in claim 11, wherein the termination condition includes whether the operation voltage of the at least one uninterruptible power supply apparatus is lower than a default voltage, whether the operation time of the at least one uninterruptible power supply apparatus exceeds a default time or whether the amount of power supplied by the at least one uninterruptible power supply apparatus exceeds a default value of power supplied.
13. The electricity management method as claimed in claim 8, wherein the set of battery parameters includes voltage data, electric current data, and temperature data.
14. The electricity management method as claimed in claim 8, wherein the electronic equipment can be at least one hard disc, at least one server or a combination of at least one hard disc and at least one server.
US13/729,899 2012-10-04 2012-12-28 System and method for electricity management Active 2034-08-02 US9281713B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
TW101136728A 2012-10-04
TW101136728 2012-10-04
TW101136728A TW201415746A (en) 2012-10-04 2012-10-04 System and method for electricity management

Publications (2)

Publication Number Publication Date
US20140097681A1 US20140097681A1 (en) 2014-04-10
US9281713B2 true US9281713B2 (en) 2016-03-08

Family

ID=50432146

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/729,899 Active 2034-08-02 US9281713B2 (en) 2012-10-04 2012-12-28 System and method for electricity management

Country Status (2)

Country Link
US (1) US9281713B2 (en)
TW (1) TW201415746A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150276821A1 (en) * 2014-03-31 2015-10-01 Lg Electronics Inc. Power determining apparatus and electronic appliance including the same

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201408374D0 (en) * 2014-05-12 2014-06-25 Eaton Ind France Sas Functional check of power supply units
CN108933474B (en) * 2018-09-06 2020-07-07 深圳市顺为新能源技术有限公司 System and method for realizing standby power supply by intelligent centralized charging and battery replacing cabinet

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5117324A (en) 1989-11-13 1992-05-26 Exide Electronics Ups-computer system and method for initiating computer shutdown based on remaining battery time as determined from sensed battery voltage and discharge curves
US5295078A (en) 1991-05-17 1994-03-15 Best Power Technology Corporation Method and apparatus for determination of battery run-time in uninterruptible power system
US5458991A (en) 1993-05-19 1995-10-17 Sl Waber, Inc. UPS with auto self test
US6031354A (en) 1996-02-01 2000-02-29 Aims Systems, Inc. On-line battery management and monitoring system and method
US6236226B1 (en) * 1997-11-05 2001-05-22 Nec Corporation Test method and system for uninterruptible power supply
US20040128562A1 (en) 2002-12-31 2004-07-01 International Business Machines Corporation Non-disruptive power management indication method, system and apparatus for server

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5117324A (en) 1989-11-13 1992-05-26 Exide Electronics Ups-computer system and method for initiating computer shutdown based on remaining battery time as determined from sensed battery voltage and discharge curves
US5295078A (en) 1991-05-17 1994-03-15 Best Power Technology Corporation Method and apparatus for determination of battery run-time in uninterruptible power system
US5458991A (en) 1993-05-19 1995-10-17 Sl Waber, Inc. UPS with auto self test
US6031354A (en) 1996-02-01 2000-02-29 Aims Systems, Inc. On-line battery management and monitoring system and method
US6236226B1 (en) * 1997-11-05 2001-05-22 Nec Corporation Test method and system for uninterruptible power supply
US20040128562A1 (en) 2002-12-31 2004-07-01 International Business Machines Corporation Non-disruptive power management indication method, system and apparatus for server

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150276821A1 (en) * 2014-03-31 2015-10-01 Lg Electronics Inc. Power determining apparatus and electronic appliance including the same
US10027164B2 (en) * 2014-03-31 2018-07-17 Lg Electronics Inc. Power determining apparatus and electronic appliance including the same

Also Published As

Publication number Publication date
US20140097681A1 (en) 2014-04-10
TW201415746A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
US8793518B2 (en) Systems and methods for providing supplemental power to battery powered information handling systems
US9887571B1 (en) Combining power from an internal battery and an external power storage adapter
US10386421B2 (en) Energy based battery backup unit testing
US10642333B2 (en) Power storage adapter for efficient supply of power of multiple portable information handling systems
US8533509B2 (en) Device and method for controlling secondary battery
US10181731B1 (en) Combining power from a battery and an AC-DC converter of a power storage adapter
US20100299548A1 (en) Blade server
US8129947B2 (en) Method and system for utilizing a memory control circuit for controlling data transfer to and from a memory system
CA2765824C (en) Power pack partial failure detection and remedial charging control
WO2016051722A1 (en) Electric power storage device, control device, electric power storage system, method for controlling electric power storage device, and non-transitory computer-readable medium storing control program
US20020153865A1 (en) Uninterruptible power supply system having an NiMH or Li-ion battery
US20030205995A1 (en) Method for displaying information concerning power consumption and electronic device
KR20130066283A (en) Apparatus for simulating battery system
US11513928B2 (en) Power storage adapter with power cable validation
CN102195304A (en) Method and device for managing service time of cell and portable computer
CN108732413B (en) Alarm method and device for electric equipment
US20160012706A1 (en) Power Supplies
KR101291287B1 (en) Equipped with a spare battery for the maintenance of UPS Systems
US9281713B2 (en) System and method for electricity management
KR20130090715A (en) Electronic apparatus and method for drive control thereof
US10705586B2 (en) Power distribution apparatus and method of operating the same
US20060132097A1 (en) Smart battery simulator
KR20130020626A (en) High voltage direct current power feeding apparatus considering battery states and load power, and its method
CN109245214A (en) Communication base station multichannel based on competition mechanism uses battery manager with
JP2005287174A (en) Uninterruptible power supply unit

Legal Events

Date Code Title Description
AS Assignment

Owner name: LITE-ON CLEAN ENERGY TECHNOLOGY CORP., TAIWAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LAI, CHIOU-CHU;CHENG, MING-YAO;CHEN, CHIEN-CHU;REEL/FRAME:029588/0420

Effective date: 20121226

AS Assignment

Owner name: LITE-ON TECHNOLOGY CORPORATION, TAIWAN

Free format text: MERGER;ASSIGNOR:LITE-ON CLEAN ENERGY TECHNOLOGY CORPORATION;REEL/FRAME:033108/0839

Effective date: 20140502

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8