US6076030A - Learning system and method for optimizing control of autonomous earthmoving machinery - Google Patents

Learning system and method for optimizing control of autonomous earthmoving machinery Download PDF

Info

Publication number
US6076030A
US6076030A US09/173,074 US17307498A US6076030A US 6076030 A US6076030 A US 6076030A US 17307498 A US17307498 A US 17307498A US 6076030 A US6076030 A US 6076030A
Authority
US
United States
Prior art keywords
machine
script
variable parameter
set forth
function
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US09/173,074
Inventor
Patrick S. Rowe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Carnegie Mellon University
Original Assignee
Carnegie Mellon University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Carnegie Mellon University filed Critical Carnegie Mellon University
Priority to US09/173,074 priority Critical patent/US6076030A/en
Priority to JP10363158A priority patent/JPH11315556A/en
Priority to DE19859169A priority patent/DE19859169A1/en
Assigned to CARNEGIE MELLON UNIVERSITY reassignment CARNEGIE MELLON UNIVERSITY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ROWE, PATRICK S.
Application granted granted Critical
Publication of US6076030A publication Critical patent/US6076030A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2045Guiding machines along a predetermined path
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E02F3/438Memorising movements for repetition, e.g. play-back capability
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2033Limiting the movement of frames or implements, e.g. to avoid collision between implements and the cabin
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/24Safety devices, e.g. for preventing overload
    • E02F9/245Safety devices, e.g. for preventing overload for preventing damage to underground objects during excavation, e.g. indicating buried pipes or the like
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0265Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • G05B19/19Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by positioning or contouring control systems, e.g. to control position from one programmed point to another or to control movement along a programmed continuous path
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/33Director till display
    • G05B2219/33032Learn by changing input weights as function of position error

Definitions

  • This invention relates generally to a system and method for controlling movement of robotic machinery, and more particularly, to a learning algorithm for modifying control parameters of robotic machinery during earthmoving operations.
  • Certain types of machinery perform repetitive motions during operations, such as a hydraulic excavator which performs repeated motions such as digging and loading during earthmoving operations.
  • a hydraulic excavator which performs repeated motions such as digging and loading during earthmoving operations.
  • development of systems to automate control of earthmoving and other types of machinery is underway to alleviate the need for human operators and to accomplish tasks as quickly and precisely as possible.
  • arthmoving machine and various approximations thereof refer to excavators, wheel loaders, track-type tractors, compactors, motor graders, agricultural machinery, pavers, asphalt layers, and the like, which exhibit both (1) mobility over or through a work site, and (2) the capacity to alter the topography or geography of a work site with a tool or operative portion of the machine such as a bucket, shovel, blade, ripper, compacting wheel and the like.
  • the “learning” typically includes storing a series of steps for performing a function, such as digging and dumping, and repeating the steps as many times as instructed.
  • the current learning functions are designed to replicate repetitive tasks to alleviate the need for an operator to perform the same task several times.
  • Conditions at a work site may change frequently, however, making a programmed series of steps less efficient as the conditions change. For example, at an excavating site, the shape of the terrain at the dig face constantly changes, the amount and distribution of material in a truck bed changes as loads of material are added. Further, the characteristics of the material being excavated, for example, large boulders, rocks, gravel, loose sand, or sticky clay, may change as new layers of soil are exposed.
  • a programmed series of steps that may be highly efficient at the beginning of a task may become less efficient as the work progresses.
  • the torque term is computed by a neural network trained to compute the inverse dynamics of the excavator.
  • neural networks require considerable computation time to train, but once trained, predictions are computed very quickly.
  • An additional drawback with neural networks is that they must be retrained to incorporate information from new data, i.e. they do not easily adapt autonomously to changes in the environment.
  • Rule based systems for controlling operations at a dig site are also used as disclosed, for example, by D. Seward in "LUCIE--The Autonomous Robot Excavator", Industrial Robot International Quarterly, Vol. 19, No. 1, pp. 14-18. These systems typically require a large number of rules to deal with variable conditions during excavation, and the rules must be implemented prior to the start of operations. The systems do not have the ability to adjust the rules to handle unforeseen situations or to optimize motions based on past experience. It is also unclear how the parameters or thresholds in the rules are generated.
  • U.S. patent application Ser. No. 08/796,824 which is assigned to the same assignee as the present application, discloses an automated system and method for controlling movement of machinery using parameterized scripts. Different sets of script parameters may be chosen depending on the work mode or upon the occurrence of different events.
  • the parameters of a motion such as for a hydraulic excavator, are computed using inverse kinematics, joint velocity information, and various heuristics. Some of the heuristics are used to compute the parameters dealing with soil conditions.
  • the angles between the moving components may be very different depending on characteristics of the excavated material, for example dry sand or wet mud, and a wrong angle may result in inaccurate soil placement.
  • a system that is able to autonomously monitor the work progress and modify the programming during operations so that the machine performs efficiently over a wide range of digging and loading conditions is therefore desirable.
  • the present invention is directed to overcome one or more of the problems as set forth above.
  • a motion planning algorithm is used to control an autonomous machine.
  • the motion planning algorithm consists of a template or script which captures the general trends of the motion, while parameters in the script are filled in with the kinematic details for a specific machine and set of movements.
  • a learning algorithm computes the script parameters by using feedback of how the machine performed during the preceding cycle with the current parameter set, and adjusting the parameters to improve the machine's performance during succeeding work cycles.
  • the new parameters are evaluated by the learning algorithm using a predictive function approximator to test various performance criteria such as the time required to perform a task and the accuracy with which the task was performed.
  • the performance criteria are weighted so that the prediction of the outcome of alternate motions places emphasis on the performance criteria that are considered most important.
  • the algorithm uses the history of the results of various motions to recompute and refine the parameters to improve performance.
  • FIG. 1 is a flowchart of the motion planning scheme wherein the present learning algorithm is utilized
  • FIG. 2 is a perspective view of an excavator loading a truck
  • FIG. 3 is a top view of the position of an excavator, a dig face, and a pile of excavated material at a dig site with reference to a polar coordinate system.
  • FIG. 1 shows several components in a preferred embodiment of the present invention including one or more sensor systems 20 that provide perceptual information regarding a machine's environment, for example, an excavation in an earthmoving environment.
  • the information provided by the sensor systems 20 is processed by one or more software modules in a perception system 33 that are designed to extract a particular piece of information about the environment or provide a desired result for the machine's actions.
  • the perception system 33 may perform functions such as recognizing loading receptacles and determining their location and orientation 23, determining the desired area to be excavated 24, determining the desired area to unload the excavated material 26, and detecting obstacles 28.
  • a learning algorithm 30 computes script parameters using past results of actions along with the processed information, as described hereinbelow.
  • the parameters are used in scripts 32, which are templates that describe how to perform a certain task as a series of steps.
  • the scripts 32 generate commands to the controllers 22 for positioning the movable components of the machine to accomplish required tasks.
  • the learning algorithm 30 uses the information provided by the perception system 33 about the current initial conditions 31 and the desired results for computing the next machine action.
  • the initial conditions 31 may include any required information regarding the environment that is required to accomplish the task, such as the shape and location of the terrain excavation site, the dump truck height and location in which to load the excavated material, or the initial starting configuration of the machine itself.
  • the desired results may pertain to any aspect of task performance such as a specific volume of soil captured per load, digging a maximum amount of soil in the minimum possible time, and/or the location for the bulk of the loaded material.
  • the learning algorithm 30 returns a suggested action for the machine to take which it believes will best achieve the desired results given the current initial conditions.
  • the learning algorithm 30 initiates a query to the perception system 33 requesting initial conditions 31 about the environment and what outcome is desired. After the perception system 33 responds, the learning algorithm 30 returns a suggested action for the machine to take.
  • the query may be split into separate portions, such as the initial state of the environment and the desired result for one action, such as digging, and another portion regarding the desired result for another action, such as the loading procedure. In this manner, the perception system 33 can formulate a response to the second query while the first action is performed.
  • the initial conditions 31 may include any required information regarding the environment that is required to accomplish the task, such as the shape and location of the terrain excavation site, or the dump truck height and location in which to load the excavated material.
  • the results of actions 35 may pertain to any aspect of task performance such as a specific volume of soil captured per load, digging a maximum amount of soil in the minimum possible time, and/or the location for the bulk of the loaded material. This environmental information and the desired results are available from the sensor systems 20 and the perception system 33 through the results of actions 35 data.
  • the optimization routine 38 of the learning algorithm 30 generates a suggested action for the excavator using the initial conditions 31, the desired results, and experience from past actions and results.
  • the function approximator 36 is used by the optimization routine 38 to predict the outcome of a candidate action before it is attempted on the actual machine. The predicted outcome is then used to compute a cost for that candidate action which relates how closely the predicted outcome is to the desired outcome.
  • the function approximation may be done in several ways, and the preferred embodiment utilizes a memory based learning model, where all previous machine actions are explicitly remembered over the course of a robotic machine's lifetime.
  • One such memory based learning model is locally weighted regression. In locally weighted regression, points in a database are assigned a weight which is proportional to the distance of the points from the candidate action.
  • Segments, or localities, of complex, nonlinear functions can be approximated by relatively simple algebraic models, such as linear or quadratic equations.
  • An exponential weighting term is typically used and the coefficients for the local model of the data are computed using the weighted data. Weighting the data gives more effect to data points which are closer to the candidate action than those which are farther away. Segments of complex, nonlinear functions can therefore be approximated since weighting the local points of a segment allows different coefficients for different areas of the non-linear function.
  • the database inputs which are the candidate robot actions, and the outputs, which are the results of the robot actions, depend on the task itself.
  • the inputs or candidate actions are a set of script parameters.
  • the outputs are the desired variables to optimize or improve, such as task execution time, machine efficiency, and/or accuracy in completing the task.
  • the output variables are preferably measured for each work cycle using appropriate sensor systems.
  • a simplified implementation of the learning algorithm 30 for an earthmoving machine involves choosing a limited number of input and output variables for monitoring during performance of the task.
  • the most relevant script parameters for the learning algorithm 30 to determine for an excavation work cycle were chosen to include:
  • the output variables recorded for each work cycle include the time (t) to complete the dumping motion, which begins immediately after digging is finished and ends when the excavator has dumped the dirt and has swung back to the dig site, and the location of a mound of dirt 52 in polar coordinates (r, ⁇ ) with respect to the excavator. Therefore, the output space is 3-dimensional and the input space is 7-dimensional, giving a total of 10 numbers which are stored in the database for each work cycle.
  • the optimization routine 38 generates an initial set of candidate script parameters. These candidate parameters are then evaluated by the function approximator which returns a predicted outcome of the action. This predicted outcome is used to compute a cost or score for performing the given candidate action. The cost information is then used by the optimization routine 38 to select a new set of candidate script parameters which have a lower cost or a better score. This process continues until the optimization routine 38 settles on one final set of script parameters.
  • the candidate set of script parameters used by the function approximator 36 are selected using the optimization component 38.
  • An interpolation approach may also be used which creates a new candidate action from a linear combination of previous actions in the data base. Another approach is to generate actions at random, and to use a notion of reliability of the predicted accuracy as a way to prioritize the actions. If the desired outcome can be expressed as a cost function which is to be minimized or maximized, then an algorithm such as gradient descent, as is well know in the art, can be used to select an action.
  • a preferred embodiment of the present invention utilizes the downhill simplex method as is well known in the art which uses a locally weighted linear regression function approximator 36 for each function evaluation made.
  • the initial simplex is computed using some intelligence about the gradient at the starting point. Rather than adding a small value along each dimension of the input space, a value proportional to each term in the gradient (or negative gradient if minimization is desired) is added to the starting point. In this manner, if there is a very steep slope in one dimension of the input space, the corresponding simplex vertex might start further down the hill and lead more quickly to a minimum.
  • the optimization routine may be started in several different locations if there are potential problems with local minima. The starting points are chosen to be the previous machine actions in the database which have the best performance, such as the lowest cost, lowest time, or lowest radial error.
  • the optimization component 38 is run until it reaches a minimum cost value.
  • a cost function that may be appropriate for the unloading phase of the mass excavation task is:
  • this cost function may be written as:
  • r act and ⁇ act are the actual radius and angle of the soil pile 52 with respect to a reference location on the excavation to the center of the soil pile as shown in FIG. 3, r des and ⁇ des are the desired coordinates of the soil pile 52.
  • This particular cost function is a linear combination of several output variables, namely execution time and the components of accuracy of the operation, such as radial position error, and tangential position error.
  • the ability to adjust these weights allows a human supervisor to favor one criterion over the other depending on the nature of the task.
  • Examples of other criteria that could be included in the cost function are: the error between desired and actual volume of soil captured in the bucket during digging; machine efficiency in terms of power available versus power used; and a measure of smoothness of the motion, particularly if there are perception sensors mounted on the machine.
  • selecting an action to try on the robot is restated as an optimization problem.
  • optimization of a function which can be found in the prior art. In this approach, the learning system selects what it believes to be the best action to take given what it knows so far as opposed, for example, to random action.
  • the optimization routine 38 uses the function approximator 36 to predict the outcome of a candidate machine action, which is used to compute a score for that action.
  • the function approximator 36 in this sample implementation uses a locally weighted linear regression algorithm to calculate the predicted outcomes.
  • a weighting scheme is used in the preferred embodiment to put more emphasis on the previously stored parameters that are closer to the candidate parameters.
  • weighting function is one of many which may be used: ##EQU1## where w i is the weight assigned to the ith set of parameters in the database and the index i varies from 1 to n, where n is the number of cycles for which data is recorded; x i is the ith data point, i.e., the set of parameters that was used when the data point was recorded; input is the set of one or more candidate parameters that are input to the function approximator 36 whose output is being predicted; K is the kernel width, which scales the exponential term; and D is a Euclidean distance function which returns the squared distance between input and the ith data point.
  • Points very close to the input will receive a higher weight than points which are further away, and the kernel width affects the locality of the fit. Large kernel widths result in a more globally equal weighting of the data points, while a small kernel width tends to weight only the very closest data points.
  • All of the inputs are normalized between 0 and 1 based on predetermined limits on the range of each input parameter before the weight is computed. This avoids having one data point with a very different scale dominate the distance calculation. For a database having a large amount of data, the number of cycles included in the calculation may be limited to a selected number. Additionally, intelligent data structures like k-d trees can be used to greatly speed up the data retrieval and weight computations.
  • W is an n ⁇ n diagonal matrix of the weights
  • X is an n ⁇ m matrix of the input terms or parameters of each data point
  • y is an n ⁇ 1 vector of the output associated with each data point.
  • y and v vectors there would be several different y and v vectors, but the same weights would be used since they are a function of the distance between input terms.
  • an additional column of 1's is added to the matrix X, resulting in an n ⁇ m+1 matrix.
  • a singular value decomposition algorithm is used to solve the above matrix equation for ⁇ . Different ⁇ vectors are computed for each prediction for each of the outputs.
  • kernel width K One of the more important variables to select in the locally weighted linear regression technique is the kernel width K. This can be done automatically by means of cross validation. During cross validation, one or several data points are removed from the existing data base, and the "sub-data base" is queried with these extracted points. The error between the predicted answer and the actual answer is computed. In this way, the kernel width, K, that gives the lowest cross validation error can be selected.
  • Locally weighted linear regression has desirable properties including readily available gradient information, the ability to handle noisy data, and no local minima problems (as in neural networks), because the answer is computed analytically. More sophisticated regression algorithms, such as Bayesian regression, can also return confidence intervals on the predicted output and noise statistics. Quadratic regression algorithms may also be used if the functions are locally quadratic, as opposed to linear.
  • the scripts 32 are filled in with the script parameters, the action is executed, and the results are measured and recorded. As this process of gathering more data continues, the script parameters are updated to improve performance of the machine.
  • Some robot learning systems require a period of experimentation or "practice” in order to explore areas of the environment which may ultimately lead to more efficient operation.
  • some initial calibration exercises may be performed before the task begins. For example, with an excavator, it is possible to experiment with the digging motion parameters and then dump the soil back in place after the practice is completed.
  • the experimentation phase may also provide data that would be used in the event that the result of an action cannot be measured completely during operation. This may happen when the line of sight of a sensor system is occluded from the area of interest and the data is therefore noisy or missing. In this situation, data obtained during calibration may be used to fill in for the missing data.
  • the present learning algorithm may also be combined with other motion control techniques such as rule based systems.
  • This hybrid approach allows knowledge that applies to unchanging portions of a given task to be hard-coded into rules, and then parameters may be computed for portions of the task where learning can improve operational efficiency.
  • the present invention can be applied to various types of construction and agricultural machinery.
  • An example of a script for a hydraulic excavator is shown hereinbelow that was designed to (1) move around obstacles detected in the environment; (2) minimize the time for each bucket load by coupling joint motions between the stick 54, boom 55, bucket 58, and movement about swing axis 60 of the excavator 50 as shown in FIG. 2; and (3) minimize the spillage of earth on the ground around the truck during dumping.
  • all of the parameters are joint angles.
  • the numbers in bold font are the parameters that are recomputed for every bucket load.
  • the parameters defined as commands are computed based on the geometry of the excavator.
  • the parameters that appear in the rule part of each script step are the trigger parameters that are computed using dynamic information or heuristics.
  • the script begins at step 1, when digging has completed, and the swing command associated with step 1 is 5°, which is the current swing angle. During this time, the boom angle is monitored as the boom 55 is raised. When the boom 54 passes a certain angle, in this case 14°, the script step switches from step 1 to step 2, and the swing joint command switches from 5° to 101°, which causes the excavator 50 to swing toward the designated dump location. The script continues to send this swing command until the conditions are satisfied to switch to step 3, and change the swing command again.
  • the learning algorithm will modify the parameters if it determines that a change will improve the efficiency of the operation as described hereinabove.
  • the scripts can be applied to many different types of complex motion control in robotic systems where complex tasks can be broken down into a series of simple steps.
  • Use of variable parameters in general instructions is an effective way to refine operations. Coupling movements of joints via parameters having values representing external conditions, including the occurrences of events as the result of the movement of other joints, and internal factors, such as power limitations, simplifies generation of the instructions or subscripts, and provides flexibility of operation.

Abstract

In one embodiment of the present invention, a motion planning algorithm is used to control an autonomous machine. The motion planning algorithm consists of a template or script which captures the general trends of the motion, while parameters in the script are filled in with the kinematic details for a specific machine and set of movements. A learning algorithm computes the script parameters by using feedback of how the machine performed during the preceding cycle with the current parameter set, and adjusting the parameters to improve the machine's performance during succeeding work cycles. The new parameters are evaluated by the learning algorithm using a predictive function approximator to test various performance criteria such as the time required to perform a task and the accuracy with which the task was performed. The performance criteria are weighted using local regression techniques so that the prediction of the outcome of alternate motions places emphasis on the performance criteria that is considered most important. As data from repeated motions accumulates, the algorithm uses the history of the results of various motions to recompute and refine the parameters to improve performance.

Description

TECHNICAL FIELD
This invention relates generally to a system and method for controlling movement of robotic machinery, and more particularly, to a learning algorithm for modifying control parameters of robotic machinery during earthmoving operations.
BACKGROUND ART
Certain types of machinery perform repetitive motions during operations, such as a hydraulic excavator which performs repeated motions such as digging and loading during earthmoving operations. Currently, development of systems to automate control of earthmoving and other types of machinery is underway to alleviate the need for human operators and to accomplish tasks as quickly and precisely as possible. As used in this patent specification the phrase "earthmoving machine" and various approximations thereof refer to excavators, wheel loaders, track-type tractors, compactors, motor graders, agricultural machinery, pavers, asphalt layers, and the like, which exhibit both (1) mobility over or through a work site, and (2) the capacity to alter the topography or geography of a work site with a tool or operative portion of the machine such as a bucket, shovel, blade, ripper, compacting wheel and the like.
There are systems currently developed for robotic machinery that "learn" during operations. The "learning" typically includes storing a series of steps for performing a function, such as digging and dumping, and repeating the steps as many times as instructed. The current learning functions are designed to replicate repetitive tasks to alleviate the need for an operator to perform the same task several times. Conditions at a work site may change frequently, however, making a programmed series of steps less efficient as the conditions change. For example, at an excavating site, the shape of the terrain at the dig face constantly changes, the amount and distribution of material in a truck bed changes as loads of material are added. Further, the characteristics of the material being excavated, for example, large boulders, rocks, gravel, loose sand, or sticky clay, may change as new layers of soil are exposed. A programmed series of steps that may be highly efficient at the beginning of a task may become less efficient as the work progresses.
A technical paper authored by B. Song and A. Koivo entitled "Neural Adaptive Control of Excavators", Proceedings of International Conference on Intelligent Robots and Systems, Vol. 1, pp. 162-167, discloses a control system having a feed-forward torque term to adjust the digging plan in response to changes in the texture of material being excavated. The torque term is computed by a neural network trained to compute the inverse dynamics of the excavator. Although the addition of the feed-forward torque term improved overall tracking and stability, neural networks require considerable computation time to train, but once trained, predictions are computed very quickly. An additional drawback with neural networks is that they must be retrained to incorporate information from new data, i.e. they do not easily adapt autonomously to changes in the environment.
Rule based systems for controlling operations at a dig site are also used as disclosed, for example, by D. Seward in "LUCIE--The Autonomous Robot Excavator", Industrial Robot International Quarterly, Vol. 19, No. 1, pp. 14-18. These systems typically require a large number of rules to deal with variable conditions during excavation, and the rules must be implemented prior to the start of operations. The systems do not have the ability to adjust the rules to handle unforeseen situations or to optimize motions based on past experience. It is also unclear how the parameters or thresholds in the rules are generated.
U.S. patent application Ser. No. 08/796,824, which is assigned to the same assignee as the present application, discloses an automated system and method for controlling movement of machinery using parameterized scripts. Different sets of script parameters may be chosen depending on the work mode or upon the occurrence of different events. The parameters of a motion, such as for a hydraulic excavator, are computed using inverse kinematics, joint velocity information, and various heuristics. Some of the heuristics are used to compute the parameters dealing with soil conditions. The angles between the moving components may be very different depending on characteristics of the excavated material, for example dry sand or wet mud, and a wrong angle may result in inaccurate soil placement. The equations which compute these parameters do not change unless they are reprogrammed in the system. Thus, if the excavator performs poorly because of a bad assumption or heuristic, then there is currently no way to rectify the performance without interrupting operation of the machine.
A system that is able to autonomously monitor the work progress and modify the programming during operations so that the machine performs efficiently over a wide range of digging and loading conditions is therefore desirable.
Accordingly, the present invention is directed to overcome one or more of the problems as set forth above.
DISCLOSURE OF THE INVENTION
In one embodiment of the present invention, a motion planning algorithm is used to control an autonomous machine. The motion planning algorithm consists of a template or script which captures the general trends of the motion, while parameters in the script are filled in with the kinematic details for a specific machine and set of movements. A learning algorithm computes the script parameters by using feedback of how the machine performed during the preceding cycle with the current parameter set, and adjusting the parameters to improve the machine's performance during succeeding work cycles. The new parameters are evaluated by the learning algorithm using a predictive function approximator to test various performance criteria such as the time required to perform a task and the accuracy with which the task was performed. The performance criteria are weighted so that the prediction of the outcome of alternate motions places emphasis on the performance criteria that are considered most important. As data from repeated motions accumulates, the algorithm uses the history of the results of various motions to recompute and refine the parameters to improve performance.
BRIEF DESCRIPTION OF DRAWINGS
FIG. 1 is a flowchart of the motion planning scheme wherein the present learning algorithm is utilized;
FIG. 2 is a perspective view of an excavator loading a truck; and
FIG. 3 is a top view of the position of an excavator, a dig face, and a pile of excavated material at a dig site with reference to a polar coordinate system.
BEST MODE FOR CARRYING OUT THE INVENTION
Referring to the drawings, FIG. 1 shows several components in a preferred embodiment of the present invention including one or more sensor systems 20 that provide perceptual information regarding a machine's environment, for example, an excavation in an earthmoving environment. The information provided by the sensor systems 20 is processed by one or more software modules in a perception system 33 that are designed to extract a particular piece of information about the environment or provide a desired result for the machine's actions. In an earthmoving environment, for example, the perception system 33 may perform functions such as recognizing loading receptacles and determining their location and orientation 23, determining the desired area to be excavated 24, determining the desired area to unload the excavated material 26, and detecting obstacles 28. A learning algorithm 30 computes script parameters using past results of actions along with the processed information, as described hereinbelow. The parameters are used in scripts 32, which are templates that describe how to perform a certain task as a series of steps. The scripts 32 generate commands to the controllers 22 for positioning the movable components of the machine to accomplish required tasks.
The learning algorithm 30 uses the information provided by the perception system 33 about the current initial conditions 31 and the desired results for computing the next machine action. The initial conditions 31 may include any required information regarding the environment that is required to accomplish the task, such as the shape and location of the terrain excavation site, the dump truck height and location in which to load the excavated material, or the initial starting configuration of the machine itself. The desired results may pertain to any aspect of task performance such as a specific volume of soil captured per load, digging a maximum amount of soil in the minimum possible time, and/or the location for the bulk of the loaded material. The learning algorithm 30 returns a suggested action for the machine to take which it believes will best achieve the desired results given the current initial conditions.
The learning algorithm 30 initiates a query to the perception system 33 requesting initial conditions 31 about the environment and what outcome is desired. After the perception system 33 responds, the learning algorithm 30 returns a suggested action for the machine to take. The query may be split into separate portions, such as the initial state of the environment and the desired result for one action, such as digging, and another portion regarding the desired result for another action, such as the loading procedure. In this manner, the perception system 33 can formulate a response to the second query while the first action is performed. The initial conditions 31 may include any required information regarding the environment that is required to accomplish the task, such as the shape and location of the terrain excavation site, or the dump truck height and location in which to load the excavated material. The results of actions 35 may pertain to any aspect of task performance such as a specific volume of soil captured per load, digging a maximum amount of soil in the minimum possible time, and/or the location for the bulk of the loaded material. This environmental information and the desired results are available from the sensor systems 20 and the perception system 33 through the results of actions 35 data.
The optimization routine 38 of the learning algorithm 30 generates a suggested action for the excavator using the initial conditions 31, the desired results, and experience from past actions and results. The function approximator 36 is used by the optimization routine 38 to predict the outcome of a candidate action before it is attempted on the actual machine. The predicted outcome is then used to compute a cost for that candidate action which relates how closely the predicted outcome is to the desired outcome. The function approximation may be done in several ways, and the preferred embodiment utilizes a memory based learning model, where all previous machine actions are explicitly remembered over the course of a robotic machine's lifetime. One such memory based learning model is locally weighted regression. In locally weighted regression, points in a database are assigned a weight which is proportional to the distance of the points from the candidate action. Segments, or localities, of complex, nonlinear functions can be approximated by relatively simple algebraic models, such as linear or quadratic equations. An exponential weighting term is typically used and the coefficients for the local model of the data are computed using the weighted data. Weighting the data gives more effect to data points which are closer to the candidate action than those which are farther away. Segments of complex, nonlinear functions can therefore be approximated since weighting the local points of a segment allows different coefficients for different areas of the non-linear function.
The database inputs, which are the candidate robot actions, and the outputs, which are the results of the robot actions, depend on the task itself. In the case of an autonomous excavator using parameterized scripts, the inputs or candidate actions are a set of script parameters. The outputs are the desired variables to optimize or improve, such as task execution time, machine efficiency, and/or accuracy in completing the task. The output variables are preferably measured for each work cycle using appropriate sensor systems.
By way of example, a simplified implementation of the learning algorithm 30 for an earthmoving machine, namely an excavator 50 as shown in FIG. 2, involves choosing a limited number of input and output variables for monitoring during performance of the task. In this example, the most relevant script parameters for the learning algorithm 30 to determine for an excavation work cycle were chosen to include:
the angle between a boom 55 and a horizontal plane 56 which triggers swinging towards a truck 57;
the angle of rotation about a swing axis 60 which triggers motion of a stick 54 for the dumping maneuver;
the angle of rotation about the swing axis 60 which triggers when to begin opening the bucket 58;
the angle between the stick 54 and the boom 55 which triggers when to begin opening the bucket 58;
the angle between the stick 54 and the boom 55 for the first half of the dump;
the angle between the stick 54 and the boom 55 for the second half of the dump; and
the angle of the bucket 58 which triggers when the stick 54 should move from the first half to the second half dump position.
In the example implementation, the output variables recorded for each work cycle include the time (t) to complete the dumping motion, which begins immediately after digging is finished and ends when the excavator has dumped the dirt and has swung back to the dig site, and the location of a mound of dirt 52 in polar coordinates (r,θ) with respect to the excavator. Therefore, the output space is 3-dimensional and the input space is 7-dimensional, giving a total of 10 numbers which are stored in the database for each work cycle.
The optimization routine 38 generates an initial set of candidate script parameters. These candidate parameters are then evaluated by the function approximator which returns a predicted outcome of the action. This predicted outcome is used to compute a cost or score for performing the given candidate action. The cost information is then used by the optimization routine 38 to select a new set of candidate script parameters which have a lower cost or a better score. This process continues until the optimization routine 38 settles on one final set of script parameters.
The candidate set of script parameters used by the function approximator 36 are selected using the optimization component 38. There are several optimization routines that can be used in the optimization component 38 of the learning algorithm 30 in FIG. 1 to choose a candidate action. If the dimensionality of the action space is small enough, then a brute-force search over all actions at some finite resolution may be acceptable. In other instances, where the dimensionality is high, for example, above 4, some possibilities may be choosing actions at random, or perhaps making random alterations to the best previous actions. An interpolation approach may also be used which creates a new candidate action from a linear combination of previous actions in the data base. Another approach is to generate actions at random, and to use a notion of reliability of the predicted accuracy as a way to prioritize the actions. If the desired outcome can be expressed as a cost function which is to be minimized or maximized, then an algorithm such as gradient descent, as is well know in the art, can be used to select an action.
A preferred embodiment of the present invention utilizes the downhill simplex method as is well known in the art which uses a locally weighted linear regression function approximator 36 for each function evaluation made. The initial simplex is computed using some intelligence about the gradient at the starting point. Rather than adding a small value along each dimension of the input space, a value proportional to each term in the gradient (or negative gradient if minimization is desired) is added to the starting point. In this manner, if there is a very steep slope in one dimension of the input space, the corresponding simplex vertex might start further down the hill and lead more quickly to a minimum. The optimization routine may be started in several different locations if there are potential problems with local minima. The starting points are chosen to be the previous machine actions in the database which have the best performance, such as the lowest cost, lowest time, or lowest radial error.
The optimization component 38 is run until it reaches a minimum cost value. One example of a cost function that may be appropriate for the unloading phase of the mass excavation task is:
c=w.sub.1 t+w.sub.2 (loc.sub.des -loc.sub.act).sup.2
where w1 and w2 are weight values on the different terms, and locdes -locact is the error between desired and actual location of the soil pile during the unloading phase of motion. For the situation shown in FIGS. 2 and 3, this cost function may be written as:
c=w.sub.t t+w.sub.r (r.sub.des -r.sub.act).sup.2 +w.sub.θ (θ.sub.des -θ.sub.act).sup.2.
where t is execution time, ract and θact are the actual radius and angle of the soil pile 52 with respect to a reference location on the excavation to the center of the soil pile as shown in FIG. 3, rdes and θdes are the desired coordinates of the soil pile 52. The w.sub.θ in front of the tangential error term is a weight term used to dimensionalize and/or otherwise scale tangential error with respect to the radial error by using the equation s=rθ where s is the arc length in the tangential direction at radius r. This particular cost function is a linear combination of several output variables, namely execution time and the components of accuracy of the operation, such as radial position error, and tangential position error. These terms can be weighted with the adjustable weights based on what is deemed to be more important. For instance, the weights can be selected by determining how much 1 second of time is worth in units of distance, i.e., if wt =2 and wr =400, then 0.5 seconds of time would be equivalent to 5 centimeters of spatial error. The ability to adjust these weights allows a human supervisor to favor one criterion over the other depending on the nature of the task.
Examples of other criteria that could be included in the cost function are: the error between desired and actual volume of soil captured in the bucket during digging; machine efficiency in terms of power available versus power used; and a measure of smoothness of the motion, particularly if there are perception sensors mounted on the machine. With this technique, selecting an action to try on the robot is restated as an optimization problem. There are many techniques for optimization of a function which can be found in the prior art. In this approach, the learning system selects what it believes to be the best action to take given what it knows so far as opposed, for example, to random action.
The optimization routine 38 uses the function approximator 36 to predict the outcome of a candidate machine action, which is used to compute a score for that action. The function approximator 36 in this sample implementation uses a locally weighted linear regression algorithm to calculate the predicted outcomes. A weighting scheme is used in the preferred embodiment to put more emphasis on the previously stored parameters that are closer to the candidate parameters. The following weighting function is one of many which may be used: ##EQU1## where wi is the weight assigned to the ith set of parameters in the database and the index i varies from 1 to n, where n is the number of cycles for which data is recorded; xi is the ith data point, i.e., the set of parameters that was used when the data point was recorded; input is the set of one or more candidate parameters that are input to the function approximator 36 whose output is being predicted; K is the kernel width, which scales the exponential term; and D is a Euclidean distance function which returns the squared distance between input and the ith data point. Points very close to the input will receive a higher weight than points which are further away, and the kernel width affects the locality of the fit. Large kernel widths result in a more globally equal weighting of the data points, while a small kernel width tends to weight only the very closest data points. All of the inputs are normalized between 0 and 1 based on predetermined limits on the range of each input parameter before the weight is computed. This avoids having one data point with a very different scale dominate the distance calculation. For a database having a large amount of data, the number of cycles included in the calculation may be limited to a selected number. Additionally, intelligent data structures like k-d trees can be used to greatly speed up the data retrieval and weight computations.
Both the input and output terms of each data point get multiplied by the weights. One way to express this in matrix form is
Z=WX
v=Wy
Assuming n data points in the database, and m terms for the input of each data point, then W is an n×n diagonal matrix of the weights, X is an n×m matrix of the input terms or parameters of each data point, and y is an n×1 vector of the output associated with each data point. In the case of multiple outputs, such as time and spatial accuracy, there would be several different y and v vectors, but the same weights would be used since they are a function of the distance between input terms. In order to solve the problem of not requiring the linear model to pass through the origin, an additional column of 1's is added to the matrix X, resulting in an n×m+1 matrix.
After the Z and v matrices are computed, the m+1 coefficients β of the linear model are found by solving
Zβ=v
In order to provide a numerically stable algorithm in the face of singular, or nearly singular matrices, a singular value decomposition algorithm is used to solve the above matrix equation for β. Different β vectors are computed for each prediction for each of the outputs.
Once β has been computed, the predicted output is
y'=β.sup.T input
One of the more important variables to select in the locally weighted linear regression technique is the kernel width K. This can be done automatically by means of cross validation. During cross validation, one or several data points are removed from the existing data base, and the "sub-data base" is queried with these extracted points. The error between the predicted answer and the actual answer is computed. In this way, the kernel width, K, that gives the lowest cross validation error can be selected.
Locally weighted linear regression has desirable properties including readily available gradient information, the ability to handle noisy data, and no local minima problems (as in neural networks), because the answer is computed analytically. More sophisticated regression algorithms, such as Bayesian regression, can also return confidence intervals on the predicted output and noise statistics. Quadratic regression algorithms may also be used if the functions are locally quadratic, as opposed to linear.
Once the next machine action is determined by the learning algorithm 30, the scripts 32 are filled in with the script parameters, the action is executed, and the results are measured and recorded. As this process of gathering more data continues, the script parameters are updated to improve performance of the machine. Several robot learning systems require a period of experimentation or "practice" in order to explore areas of the environment which may ultimately lead to more efficient operation. With the present invention, some initial calibration exercises may be performed before the task begins. For example, with an excavator, it is possible to experiment with the digging motion parameters and then dump the soil back in place after the practice is completed. The experimentation phase may also provide data that would be used in the event that the result of an action cannot be measured completely during operation. This may happen when the line of sight of a sensor system is occluded from the area of interest and the data is therefore noisy or missing. In this situation, data obtained during calibration may be used to fill in for the missing data.
If there is no history or database to rely on for starting or improving operations, as when a machine first enters service at a new location, one solution is to use data from past operations and/or machines and assume the environmental conditions are similar. Another approach is to have a human operator initially perform some work cycles and have the system record the relevant parameters and measured outcomes in the database. Another method is to start with an initial set of parameters that are calculated with machine models and heuristics. The initial parameters can then be improved upon once the learning algorithm takes over.
The present learning algorithm may also be combined with other motion control techniques such as rule based systems. This hybrid approach allows knowledge that applies to unchanging portions of a given task to be hard-coded into rules, and then parameters may be computed for portions of the task where learning can improve operational efficiency.
Industrial Applicability
The present invention can be applied to various types of construction and agricultural machinery. An example of a script for a hydraulic excavator is shown hereinbelow that was designed to (1) move around obstacles detected in the environment; (2) minimize the time for each bucket load by coupling joint motions between the stick 54, boom 55, bucket 58, and movement about swing axis 60 of the excavator 50 as shown in FIG. 2; and (3) minimize the spillage of earth on the ground around the truck during dumping. For this script, all of the parameters are joint angles. The numbers in bold font are the parameters that are recomputed for every bucket load. The parameters defined as commands are computed based on the geometry of the excavator. The parameters that appear in the rule part of each script step are the trigger parameters that are computed using dynamic information or heuristics.
______________________________________                                    
Swing:                                                                    
1)   When digging finishes, wait                                          
                           Command = 5°                            
2)   When boom angle >14°, swing to truck                          
                           Command = 101°                          
3)   When bucket angle >10°, swing to dig                          
                           Command = -5°                           
     face                                                                 
4)   When swing angle = 5°, stop to dig                            
                           Command = -5°                           
Boom:                                                                     
1)   When digging finishes, raise boom                                    
                           Command = 18°                           
2)   When swing angle >60° and stick                               
     angle >-89°, begin dump procedure                             
                           Command = 16°                           
3)   When bucket angle >-30°, continue to                          
     dump                  Command = 18°                           
4)   When swing angle <60°, lower boom to                          
     dig                   Command = 14°                           
Stick:                                                                    
1)   When digging finishes, wait                                          
                           Command = -100°                         
2)   When boom angle >31°, begin dump                              
     procedure             Command = -76°                          
3)   When bucket angle >-30°, continue to                          
                           Command = -101°                         
     dump                                                                 
4)   When swing angle <65°, move to dig                            
                           Command = -85°                          
Bucket:                                                                   
1)   When digging finishes, capture soil                                  
                           Command = -90°                          
2)   When swing angle >60° and stick                               
                           Command = 30°                           
     angle >-89°, open bucket                                      
3)   When swing angle <60°, move to dig                            
                           Command = 7°                            
______________________________________                                    
As an example of how to read the script, consider the first two steps of the swing's subscript. The script begins at step 1, when digging has completed, and the swing command associated with step 1 is 5°, which is the current swing angle. During this time, the boom angle is monitored as the boom 55 is raised. When the boom 54 passes a certain angle, in this case 14°, the script step switches from step 1 to step 2, and the swing joint command switches from 5° to 101°, which causes the excavator 50 to swing toward the designated dump location. The script continues to send this swing command until the conditions are satisfied to switch to step 3, and change the swing command again.
The learning algorithm will modify the parameters if it determines that a change will improve the efficiency of the operation as described hereinabove. The scripts can be applied to many different types of complex motion control in robotic systems where complex tasks can be broken down into a series of simple steps. Use of variable parameters in general instructions is an effective way to refine operations. Coupling movements of joints via parameters having values representing external conditions, including the occurrences of events as the result of the movement of other joints, and internal factors, such as power limitations, simplifies generation of the instructions or subscripts, and provides flexibility of operation.
Other aspects, objects and advantages of the present invention can be obtained from a study of the drawings, the disclosure and the appended claims.

Claims (15)

I claim:
1. A method for controlling automated movement of an earthmoving machine having a plurality of links connected at joints that are operable to move concurrently based on commands generated using at least one script, each script including at least one variable parameter defining a movement of the machine, the method comprising the steps of:
determining at least one desired outcome from a number of desired outcomes;
measuring conditions in the machine's environment pertaining to each desired outcome;
determining a candidate value for at least one variable parameter from a number of potential candidate values using a learning algorithm before executing the script in which the variable parameter is used; and
predicting the desired outcome of the candidate value prior to executing the script in which the variable parameter is used with the candidate value being selected based upon the determined desired outcome.
2. The method as set forth in claim 1 wherein the candidate value for each variable parameter is a predetermined value that is used during initial execution of at least one script, the method further comprising the steps of:
storing the measured conditions during at least one execution cycle; and
storing the candidate value used for each variable parameter during at least one execution cycle.
3. The method as set forth in claim 2 wherein the learning algorithm comprises the step of:
executing a function approximator to evaluate each candidate value by predicting the outcome using at least one stored value for each variable parameter and at least one of the stored measured conditions from at least one execution cycle.
4. A method as set forth in claim 3 wherein the learning algorithm further comprises the step of:
optimizing a cost function that is dependent on at least one variable representing the desired outcome and at least one corresponding data value from the actual measured conditions.
5. The method as set forth in claim 4 wherein executing the function approximator further comprises the step of:
predicting the outcome of the machine action using a weighted regression algorithm, the weights being computed using an exponential function that is dependent on the difference between at least one stored variable parameter and the candidate value.
6. The method as set forth in claim 5 wherein the step of executing the function approximator includes using a locally linear function to approximate a segment of the response.
7. The method as set forth in claim 5 wherein the step of executing the function approximator includes using a locally quadratic function to approximate a segment of the response.
8. A system for controlling automated movement of a machine comprising:
a machine having a plurality of links connected at joints that are operable to move concurrently based on commands;
a processing system for executing at least one script, each script including at least one variable parameter defining a movement of the machine; and
a learning algorithm operable to modify values of at least one variable parameter based on a desired outcome of the machine's action and conditions measured in the machine's environment pertaining to the desired outcome and predicting the desired outcome of the machine's action prior to executing movement of the machine with the desired outcome being selected based upon a number of desired outcomes.
9. The system as set forth in claim 8 wherein at least one candidate value for each variable parameter is a predetermined value that is used during initial execution of at least one script, the system further comprising:
data storage means for storing the measured conditions during at least one execution cycle and for storing the value used for each variable parameter during at least one execution cycle.
10. The system as set forth in claim 9 wherein the learning algorithm comprises:
a function approximator to evaluate the at least one candidate value for modifying at least one variable parameter by predicting the outcome using at least one stored value for each variable parameter and at least one of the stored measured conditions from at least one execution cycle.
11. The system as set forth in claim 10 wherein the learning algorithm further comprises:
a cost function that is dependent on at least one variable representing the desired outcome and at least one corresponding data value from the actual measured conditions.
12. The system as set forth in claim 11 wherein the function approximator further comprises:
a weighted regression algorithm for predicting the outcome of the machine action, the weights being computed using an exponential function that is dependent on the difference between at least one stored variable parameter and the candidate value.
13. The system as set forth in claim 12 wherein the function approximator further includes using a locally linear function to approximate a segment of the machine's response.
14. The system as set forth in claim 12 wherein the function approximator further includes using a locally quadratic function to approximate a segment of the machine's response.
15. The system as set forth in claim 8 further comprising at least one fixed instruction for controlling the movement of the machine.
US09/173,074 1997-12-19 1998-10-14 Learning system and method for optimizing control of autonomous earthmoving machinery Expired - Lifetime US6076030A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US09/173,074 US6076030A (en) 1998-10-14 1998-10-14 Learning system and method for optimizing control of autonomous earthmoving machinery
JP10363158A JPH11315556A (en) 1997-12-19 1998-12-21 Learning system and method optimizing autonomous control of earth-moving machine
DE19859169A DE19859169A1 (en) 1997-12-19 1998-12-21 Learning system for controlling autonomous earth moving machines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US09/173,074 US6076030A (en) 1998-10-14 1998-10-14 Learning system and method for optimizing control of autonomous earthmoving machinery

Publications (1)

Publication Number Publication Date
US6076030A true US6076030A (en) 2000-06-13

Family

ID=22630430

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/173,074 Expired - Lifetime US6076030A (en) 1997-12-19 1998-10-14 Learning system and method for optimizing control of autonomous earthmoving machinery

Country Status (1)

Country Link
US (1) US6076030A (en)

Cited By (102)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6167336A (en) * 1998-05-18 2000-12-26 Carnegie Mellon University Method and apparatus for determining an excavation strategy for a front-end loader
US6292729B2 (en) * 1999-04-14 2001-09-18 Deere & Company Vehicle function management system
US6327531B1 (en) * 1999-02-25 2001-12-04 Robert Bosch Gmbh Method of and device for determination of characteristic values of an internal combustion engine
US6363632B1 (en) * 1998-10-09 2002-04-02 Carnegie Mellon University System for autonomous excavation and truck loading
WO2002044478A2 (en) * 2000-11-30 2002-06-06 Caterpillar Inc. Method and apparatus for determining the location of undergroung objects during a digging operation
US20030109975A1 (en) * 2001-12-03 2003-06-12 Mark Paice Agricultural vehicle
EP1323870A1 (en) * 2001-12-26 2003-07-02 Caterpillar Inc. Work machine control for improving cycle time
US20030161906A1 (en) * 2002-01-30 2003-08-28 Klaus Braunhardt Utility machine with portable control device
US6615114B1 (en) * 1999-12-15 2003-09-02 Caterpillar Inc Calibration system and method for work machines using electro hydraulic controls
US20030220772A1 (en) * 2002-05-22 2003-11-27 Hsiao-Dong Chiang Dynamical methods for solving large-scale discrete and continuous optimization problems
US6691010B1 (en) * 2000-11-15 2004-02-10 Caterpillar Inc Method for developing an algorithm to efficiently control an autonomous excavating linkage
US20040054457A1 (en) * 2002-07-06 2004-03-18 Georg Kormann System for documenting the operation of an attached implement
US6735889B1 (en) 2003-01-14 2004-05-18 New Holland North America, Inc. Skid steer loader neutral drift correction method
US20040136816A1 (en) * 2001-04-17 2004-07-15 Sandvik Tamrock Oy. Method and apparatus for automatic loading of dumper
US20040267404A1 (en) * 2001-08-31 2004-12-30 George Danko Coordinated joint motion control system
WO2006028966A1 (en) * 2004-09-01 2006-03-16 Siemens Energy & Automation, Inc. Method for an autonomous loading shovel
US20060129280A1 (en) * 2004-12-10 2006-06-15 Caterpillar S.A.R.L. Work machine operating system and method
US20060173661A1 (en) * 2002-10-23 2006-08-03 Wolf Kohn Method and system for optimization of general problems
US20060184292A1 (en) * 2005-02-16 2006-08-17 Lockheed Martin Corporation Mission planning system for vehicles with varying levels of autonomy
US20060243180A1 (en) * 2005-04-28 2006-11-02 Sundermeyer Jeffry N Classifying a work machine operation
US20060243056A1 (en) * 2005-04-28 2006-11-02 Sundermeyer Jeffry N Systems and methods for maintaining load histories
US20070168100A1 (en) * 2006-01-18 2007-07-19 George Danko Coordinated joint motion control system with position error correction
US20080063473A1 (en) * 2006-09-07 2008-03-13 Congdon Thomas M Method of operating a compactor machine via path planning based on compaction state data and mapping information
WO2008066654A1 (en) * 2006-11-30 2008-06-05 Caterpillar Inc. Excavation control system providing machine placement recommendation
US20080133094A1 (en) * 2006-11-30 2008-06-05 Daniel Stanek Repositioning assist for an excavating operation
US20080127529A1 (en) * 2006-11-30 2008-06-05 Daniel Stanek Recommending a machine repositioning distance in an excavating operation
US20080133093A1 (en) * 2006-11-30 2008-06-05 Daniel Stanek Preparation for machine repositioning in an excavating operation
US20080127531A1 (en) * 2006-11-30 2008-06-05 Daniel Stanek Automated machine repositioning in an excavating operation
US20080208415A1 (en) * 2007-02-28 2008-08-28 Caterpillar Inc. Method of determining a machine operation using virtual imaging
US20080288125A1 (en) * 2007-05-15 2008-11-20 Cameron John F Determining an autonomous position of a point of interest on a lifting device
US20090202109A1 (en) * 2008-02-13 2009-08-13 Caterpillar Inc. Terrain map updating system
US20090216410A1 (en) * 2008-02-26 2009-08-27 William Edward Allen Automated machine management system with destination selection
US20090218112A1 (en) * 2008-02-29 2009-09-03 Caterpillar Inc. Semi-autonomous excavation control system
US20090228394A1 (en) * 2008-03-07 2009-09-10 Caterpillar Inc. Adaptive payload monitoring system
US20090228177A1 (en) * 2008-03-07 2009-09-10 Caterpillar Inc. Adaptive work cycle control system
US20090228176A1 (en) * 2008-03-07 2009-09-10 Caterpillar Inc. Data acquisition system indexed by cycle segmentation
US20090299583A1 (en) * 2008-05-27 2009-12-03 Dell Eva Mark L Method and apparatus for detecting and compensating for pressure transducer errors
EP2146885A1 (en) * 2007-05-10 2010-01-27 Volvo Construction Equipment AB A method for controlling a work machine during operation in a repeated work cycle
US20100039319A1 (en) * 2008-08-18 2010-02-18 Cameron John F Automated recordation of crane inspection activity
US20100039262A1 (en) * 2008-08-18 2010-02-18 Cameron John F Construction equipment component location tracking
US20100044332A1 (en) * 2008-08-22 2010-02-25 Cameron John F Monitoring crane component overstress
US20100070179A1 (en) * 2008-09-17 2010-03-18 Cameron John F Providing an autonomous position of a point of interest to a lifting device to avoid collision
US20100100338A1 (en) * 2006-10-31 2010-04-22 Caterpillar Inc. Monitoring system
US20100131419A1 (en) * 2002-06-20 2010-05-27 Aldata Software Management Inc. System and method for management of commodity shipment data
EP2204503A2 (en) * 2008-12-22 2010-07-07 Deere & Company Method and system for providing a planned path for a machine for digging a drainage channel
US20100198466A1 (en) * 2007-07-13 2010-08-05 Volvo Construction Equipment Ab Method for providing an operator of a work machine with operation instructions and a computer program for implementing the method
WO2010149857A1 (en) * 2009-06-24 2010-12-29 Sandvik Mining And Construction Oy Definition of control data for automatic control of mobile mining machine
US20100332061A1 (en) * 2007-05-10 2010-12-30 Volvo Construction Equipment Ab Method and a control system for controlling a work machine
US20110087407A1 (en) * 2008-06-03 2011-04-14 Volvo Construction Equipment Ab Method for controlling a power source
NL2003800C2 (en) * 2009-11-13 2011-05-16 Baggerwerken Decloedt & Zn N V Device for dredging soil material under water.
CN102236325A (en) * 2010-04-27 2011-11-09 罗伯特·博世有限公司 Microcontroller having a computing unit and a logic circuit, and method for carrying out computations by a microcontroller for a regulation or a control in a vehicle
WO2011160580A1 (en) * 2010-06-22 2011-12-29 湖南三一智能控制设备有限公司 Intelligent control method for hydraulic excavator
US20120004813A1 (en) * 2010-07-01 2012-01-05 Joachim Baumgarten Method for adjusting at least one working unit of a self-propelled harvesting machine
US20120215352A1 (en) * 2011-02-17 2012-08-23 Convergent Information Technologies Gmbh Method for the automated programming and optimization of robotic work sequences
CN102859158A (en) * 2010-04-27 2013-01-02 罗伯特·博世有限公司 Control device and method for calculating an output parameter for a controller
US20130085981A1 (en) * 2007-05-01 2013-04-04 Raytheon Company Methods and apparatus for controlling deployment of systems
US20130218399A1 (en) * 2010-04-19 2013-08-22 Snecma Method and system for monitoring the level of oil contained in a tank of an aircraft engine
US8620535B2 (en) * 2012-05-21 2013-12-31 Caterpillar Inc. System for automated excavation planning and control
US8620533B2 (en) 2011-08-30 2013-12-31 Harnischfeger Technologies, Inc. Systems, methods, and devices for controlling a movement of a dipper
US20140012404A1 (en) * 2012-07-06 2014-01-09 Caterpillar Inc. Methods and systems for machine cut planning
US8744746B2 (en) 2009-06-24 2014-06-03 Sandvik Mining And Construction Oy Determination of route for arranging automatic control of mobile mining machine
US8768579B2 (en) 2011-04-14 2014-07-01 Harnischfeger Technologies, Inc. Swing automation for rope shovel
US20140297136A1 (en) * 2013-04-02 2014-10-02 Tadano Ltd. Device for selecting boom extension pattern
US20140371905A1 (en) * 2011-09-15 2014-12-18 Convergent Information Technologies Gmbh System and method for the automatic generation of robot programs
US8948981B2 (en) 2012-12-20 2015-02-03 Caterpillar Inc. System and method for optimizing a cut location
US8972129B2 (en) * 2012-11-30 2015-03-03 Caterpillar Inc. Determination of optimum tractor reverse speed
US8983739B2 (en) 2012-11-30 2015-03-17 Caterpillar Inc. Real time pull-slip curve modeling in large track-type tractors
US9014922B2 (en) 2012-12-20 2015-04-21 Caterpillar Inc. System and method for optimizing a cut location
US9014924B2 (en) 2012-12-20 2015-04-21 Caterpillar Inc. System and method for estimating material characteristics
US9086698B2 (en) * 2012-11-30 2015-07-21 Caterpillar Inc. Determining an optimum operating point of an earth moving machine
US20150292185A1 (en) * 2012-11-20 2015-10-15 Komatsu Ltd. Work machine and work amount measurement method in work machine
US20150299989A1 (en) * 2012-11-20 2015-10-22 Komatsu Ltd. Working machine and method of measuring work amount of working machine
EP2803769A4 (en) * 2012-01-02 2015-11-25 Volvo Constr Equip Ab Method for controlling operation of dump for construction machinery
US9206587B2 (en) 2012-03-16 2015-12-08 Harnischfeger Technologies, Inc. Automated control of dipper swing for a shovel
US20150354169A1 (en) * 2014-06-09 2015-12-10 Caterpillar Inc. Sub-bin refinement for autonomous machines
US9228315B2 (en) 2012-12-20 2016-01-05 Caterpillar Inc. System and method for modifying a path for a machine
US9260837B1 (en) * 2014-09-10 2016-02-16 Caterpillar Inc. Intelligent pass jump control
US20160048795A1 (en) * 2014-08-14 2016-02-18 Trimble Navigation Limited Work cycle management
US9469967B2 (en) 2014-09-12 2016-10-18 Caterpillar Inc. System and method for controlling the operation of a machine
EP3093400A1 (en) * 2015-05-12 2016-11-16 Doosan Infracore Co., Ltd. Method of controlling a wheel loader
US9580883B2 (en) 2014-08-25 2017-02-28 Cnh Industrial America Llc System and method for automatically controlling a lift assembly of a work vehicle
WO2017144350A1 (en) 2016-02-25 2017-08-31 Nec Europe Ltd. Method for motion planning for autonomous moving objects
WO2017184037A1 (en) * 2016-04-19 2017-10-26 Volvo Construction Equipment Ab Control unit for dumping of material
US20170322929A1 (en) * 2016-05-06 2017-11-09 Amazon Technologies, Inc. Script manager for distributed systems
US10151830B2 (en) * 2016-09-14 2018-12-11 Caterpillar Inc. Systems and methods for detecting objects proximate to a machine utilizing a learned process
US10186004B2 (en) 2015-05-20 2019-01-22 Caterpillar Inc. System and method for evaluating a material movement plan
US20190064817A1 (en) * 2017-08-29 2019-02-28 Honda Research Institute Europe Gmbh Method for setting parameters in an autonomous working device and an autonomous working device
CN109711063A (en) * 2018-12-28 2019-05-03 大连海事大学 A kind of station tunneling drilling depth method of adjustment and device suitable for upper-soft lower-hard ground
US10320922B1 (en) 2016-03-28 2019-06-11 Amazon Technologies, Inc. Inventory manager for distributed systems
US20190390435A1 (en) * 2017-03-30 2019-12-26 Komatsu Ltd. Control system for work vehicle, method for setting trajectory of work implement, and work vehicle
US10552775B2 (en) 2016-11-29 2020-02-04 Caterpillar Inc. System and method for optimizing a material moving operation
US10570582B2 (en) 2016-11-23 2020-02-25 Caterpillar Inc. System and method for operating a material-handling machine
WO2020033415A3 (en) * 2018-08-06 2020-04-16 Clark Equipment Company Augmented loader controls
CN112004975A (en) * 2018-03-30 2020-11-27 住友重机械工业株式会社 Driving support system for construction machine, and construction machine
US20200399852A1 (en) * 2018-03-01 2020-12-24 Bauer Spezialtiefbau Gmbh Construction method
US20210002852A1 (en) * 2018-03-26 2021-01-07 Sumitomo Construction Machinery Co., Ltd. Shovel
US10982410B2 (en) 2016-09-08 2021-04-20 Joy Global Surface Mining Inc System and method for semi-autonomous control of an industrial machine
CN113139652A (en) * 2020-01-17 2021-07-20 百度(美国)有限责任公司 Neural task planner for an autonomous vehicle
DE102020206371A1 (en) 2020-05-20 2021-11-25 Robert Bosch Gesellschaft mit beschränkter Haftung Method for controlling an unloading process of bulk goods onto a loading area by means of an excavator
US11274921B1 (en) * 2021-06-22 2022-03-15 Walz Scale Payload measurement system and method
US11648887B2 (en) 2019-11-12 2023-05-16 Clark Equipment Company Display integrated into door
US11738643B2 (en) 2019-02-27 2023-08-29 Clark Equipment Company Display integrated into door

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5631658A (en) * 1993-12-08 1997-05-20 Caterpillar Inc. Method and apparatus for operating geography-altering machinery relative to a work site

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5631658A (en) * 1993-12-08 1997-05-20 Caterpillar Inc. Method and apparatus for operating geography-altering machinery relative to a work site

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
B. Song & A.J. Koivo, Neural Adaptive Control of Excavators, Proceedings of the International Conference on Intelligent Robots & Systems, vol. 1, pp. 162 167, 1995. *
B. Song & A.J. Koivo, Neural Adaptive Control of Excavators, Proceedings of the International Conference on Intelligent Robots & Systems, vol. 1, pp. 162-167, 1995.
P. Rowe & A. Stentz, Parameterized Scripts for Motion Planning, Proceeding of the International Conference on Intelligent Robots & Systems, vol. 2, pp. 1119 1125, Sep. 10, 1997. *
P. Rowe & A. Stentz, Parameterized Scripts for Motion Planning, Proceeding of the International Conference on Intelligent Robots & Systems, vol. 2, pp. 1119-1125, Sep. 10, 1997.
P.J.A. Lever & F. Wang, Intelligent Excavator Control System for Lunar Mining System, Journal of Aerospace Engineering, vol. 8, No. 1, 1995. *
S. Singh, Learning to Predict Resistive Forces During Robotic Excavation, Proceedings of the International Confrence on Robotics & Automation, 1995. *
X. Shi, P. Lever & F. Wang, Experimental Robotic Excavation with Fuzzy Logic & Neural Networks, Proceedings of the International Conference on Robotics & Automation, 1996. *

Cited By (201)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6167336A (en) * 1998-05-18 2000-12-26 Carnegie Mellon University Method and apparatus for determining an excavation strategy for a front-end loader
US6363632B1 (en) * 1998-10-09 2002-04-02 Carnegie Mellon University System for autonomous excavation and truck loading
AU762943B2 (en) * 1998-10-09 2003-07-10 Carnegie Wave Energy Limited System for autonomous excavation and truck loading
US6327531B1 (en) * 1999-02-25 2001-12-04 Robert Bosch Gmbh Method of and device for determination of characteristic values of an internal combustion engine
US6292729B2 (en) * 1999-04-14 2001-09-18 Deere & Company Vehicle function management system
US6615114B1 (en) * 1999-12-15 2003-09-02 Caterpillar Inc Calibration system and method for work machines using electro hydraulic controls
US6691010B1 (en) * 2000-11-15 2004-02-10 Caterpillar Inc Method for developing an algorithm to efficiently control an autonomous excavating linkage
US6437726B1 (en) 2000-11-30 2002-08-20 Caterpillar Inc. Method and apparatus for determining the location of underground objects during a digging operation
WO2002044478A2 (en) * 2000-11-30 2002-06-06 Caterpillar Inc. Method and apparatus for determining the location of undergroung objects during a digging operation
WO2002044478A3 (en) * 2000-11-30 2003-10-30 Caterpillar Inc Method and apparatus for determining the location of undergroung objects during a digging operation
US20060271235A1 (en) * 2001-04-17 2006-11-30 Sandvik Tamrock Oy Method and apparatus for automatic loading of dumper
US7751927B2 (en) * 2001-04-17 2010-07-06 Sandvik Mining And Construction Oy Method and apparatus for automatic loading of dumper
US20040136816A1 (en) * 2001-04-17 2004-07-15 Sandvik Tamrock Oy. Method and apparatus for automatic loading of dumper
US8145355B2 (en) 2001-08-31 2012-03-27 Board Of Regents Of The Nevada System Of Higher Education, On Behalf Of The University Of Nevada, Reno Coordinated joint motion control system
US7457698B2 (en) * 2001-08-31 2008-11-25 The Board Of Regents Of The University And Community College System On Behalf Of The University Of Nevada, Reno Coordinated joint motion control system
US20090099738A1 (en) * 2001-08-31 2009-04-16 George Danko Coordinated joint motion control system
US9969084B2 (en) 2001-08-31 2018-05-15 Board Of Regents Of The Nevada System Of Higher Education, On Behalf Of The University Of Nevada, Reno Coordinated joint motion control system
US20040267404A1 (en) * 2001-08-31 2004-12-30 George Danko Coordinated joint motion control system
US6980895B2 (en) * 2001-12-03 2005-12-27 Cnh America Llc Electronic control system for agricultural vehicle
US20030109975A1 (en) * 2001-12-03 2003-06-12 Mark Paice Agricultural vehicle
US6618967B2 (en) 2001-12-26 2003-09-16 Caterpillar Inc Work machine control for improving cycle time
EP1323870A1 (en) * 2001-12-26 2003-07-02 Caterpillar Inc. Work machine control for improving cycle time
US20030161906A1 (en) * 2002-01-30 2003-08-28 Klaus Braunhardt Utility machine with portable control device
US20030220772A1 (en) * 2002-05-22 2003-11-27 Hsiao-Dong Chiang Dynamical methods for solving large-scale discrete and continuous optimization problems
US7050953B2 (en) * 2002-05-22 2006-05-23 Bigwood Technology Incorporated Dynamical methods for solving large-scale discrete and continuous optimization problems
US20100131419A1 (en) * 2002-06-20 2010-05-27 Aldata Software Management Inc. System and method for management of commodity shipment data
US20040054457A1 (en) * 2002-07-06 2004-03-18 Georg Kormann System for documenting the operation of an attached implement
US20060173661A1 (en) * 2002-10-23 2006-08-03 Wolf Kohn Method and system for optimization of general problems
US7216004B2 (en) * 2002-10-23 2007-05-08 Clearsight Systems Inc. Method and system for optimization of general problems
US6735889B1 (en) 2003-01-14 2004-05-18 New Holland North America, Inc. Skid steer loader neutral drift correction method
AU2005282702B2 (en) * 2004-09-01 2009-05-07 Siemens Industry, Inc. Autonomous loading shovel system
US20060090379A1 (en) * 2004-09-01 2006-05-04 Ken Furem Autonomous loading shovel system
CN101061278B (en) * 2004-09-01 2013-03-06 西门子工业公司 Method and system for an autonomous loading shovel
US7578079B2 (en) * 2004-09-01 2009-08-25 Siemens Energy & Automation, Inc. Method for an autonomous loading shovel
US7574821B2 (en) * 2004-09-01 2009-08-18 Siemens Energy & Automation, Inc. Autonomous loading shovel system
AU2005282730B2 (en) * 2004-09-01 2009-05-07 Siemens Industry, Inc. Method for an autonomous loading shovel
WO2006028966A1 (en) * 2004-09-01 2006-03-16 Siemens Energy & Automation, Inc. Method for an autonomous loading shovel
WO2006028938A1 (en) * 2004-09-01 2006-03-16 Siemens Energy & Automation, Inc. Autonomous loading shovel system
US20060090378A1 (en) * 2004-09-01 2006-05-04 Ken Furem Method for an autonomous loading shovel
WO2006065341A1 (en) * 2004-12-10 2006-06-22 Caterpillar S.A.R.L. Work machine operating system and method
US20060129280A1 (en) * 2004-12-10 2006-06-15 Caterpillar S.A.R.L. Work machine operating system and method
US7630793B2 (en) 2004-12-10 2009-12-08 Caterpillar S.A.R.L. Method of altering operation of work machine based on work tool performance footprint to maintain desired relationship between operational characteristics of work tool and work machine
US7765038B2 (en) 2005-02-16 2010-07-27 Lockheed Martin Corporation Mission planning system for vehicles with varying levels of autonomy
US20060184292A1 (en) * 2005-02-16 2006-08-17 Lockheed Martin Corporation Mission planning system for vehicles with varying levels of autonomy
US7487066B2 (en) 2005-04-28 2009-02-03 Caterpillar Inc. Classifying a work machine operation
US20060243056A1 (en) * 2005-04-28 2006-11-02 Sundermeyer Jeffry N Systems and methods for maintaining load histories
US20060243180A1 (en) * 2005-04-28 2006-11-02 Sundermeyer Jeffry N Classifying a work machine operation
US7953559B2 (en) * 2005-04-28 2011-05-31 Caterpillar Inc. Systems and methods for maintaining load histories
US20070168100A1 (en) * 2006-01-18 2007-07-19 George Danko Coordinated joint motion control system with position error correction
US20120029663A1 (en) * 2006-01-18 2012-02-02 George Danko Coordinated joint motion control system with position error correction
US9304501B2 (en) * 2006-01-18 2016-04-05 Board Of Regents Of The Nevada System Of Higher Education, On Behalf Of The University Of Nevada, Reno Coordinated joint motion control system with position error correction
US20150322647A1 (en) * 2006-01-18 2015-11-12 Board Of Regents Of The Nevada System Of Higher Education, On Behalf Of The University Of Nevada, Coordinated joint motion control system with position error correction
US8065060B2 (en) * 2006-01-18 2011-11-22 The Board Of Regents Of The University And Community College System On Behalf Of The University Of Nevada Coordinated joint motion control system with position error correction
US20140107832A1 (en) * 2006-01-18 2014-04-17 Board of Regents of the Nevada System of Higher Ed cation, on behalf of the University of Nevada Coordinated joint motion control system with position error correction
US20080063473A1 (en) * 2006-09-07 2008-03-13 Congdon Thomas M Method of operating a compactor machine via path planning based on compaction state data and mapping information
US7731450B2 (en) * 2006-09-07 2010-06-08 Caterpillar Inc. Method of operating a compactor machine via path planning based on compaction state data and mapping information
US7908928B2 (en) 2006-10-31 2011-03-22 Caterpillar Inc. Monitoring system
US20100100338A1 (en) * 2006-10-31 2010-04-22 Caterpillar Inc. Monitoring system
US20080127531A1 (en) * 2006-11-30 2008-06-05 Daniel Stanek Automated machine repositioning in an excavating operation
US7634863B2 (en) 2006-11-30 2009-12-22 Caterpillar Inc. Repositioning assist for an excavating operation
WO2008066654A1 (en) * 2006-11-30 2008-06-05 Caterpillar Inc. Excavation control system providing machine placement recommendation
US20080133094A1 (en) * 2006-11-30 2008-06-05 Daniel Stanek Repositioning assist for an excavating operation
US20080133093A1 (en) * 2006-11-30 2008-06-05 Daniel Stanek Preparation for machine repositioning in an excavating operation
US7516563B2 (en) 2006-11-30 2009-04-14 Caterpillar Inc. Excavation control system providing machine placement recommendation
US7726048B2 (en) 2006-11-30 2010-06-01 Caterpillar Inc. Automated machine repositioning in an excavating operation
US7694442B2 (en) 2006-11-30 2010-04-13 Caterpillar Inc. Recommending a machine repositioning distance in an excavating operation
US20080133128A1 (en) * 2006-11-30 2008-06-05 Caterpillar, Inc. Excavation control system providing machine placement recommendation
US20080127529A1 (en) * 2006-11-30 2008-06-05 Daniel Stanek Recommending a machine repositioning distance in an excavating operation
US7753132B2 (en) 2006-11-30 2010-07-13 Caterpillar Inc Preparation for machine repositioning in an excavating operation
US8144245B2 (en) * 2007-02-28 2012-03-27 Caterpillar Inc. Method of determining a machine operation using virtual imaging
US20080208415A1 (en) * 2007-02-28 2008-08-28 Caterpillar Inc. Method of determining a machine operation using virtual imaging
US20130085981A1 (en) * 2007-05-01 2013-04-04 Raytheon Company Methods and apparatus for controlling deployment of systems
US8423224B1 (en) * 2007-05-01 2013-04-16 Raytheon Company Methods and apparatus for controlling deployment of systems
US20100332061A1 (en) * 2007-05-10 2010-12-30 Volvo Construction Equipment Ab Method and a control system for controlling a work machine
EP2146885A4 (en) * 2007-05-10 2013-01-02 Volvo Constr Equip Ab A method for controlling a work machine during operation in a repeated work cycle
US9242633B2 (en) * 2007-05-10 2016-01-26 Volvo Construction Equipment Ab Method and a control system for controlling a work machine
US20100131122A1 (en) * 2007-05-10 2010-05-27 Volvo Construction Equipment Ab Method for controlling a work machine during operation in a repeated work cycle
US8467943B2 (en) * 2007-05-10 2013-06-18 Volvo Construction Equipment Ab Method for controlling a work machine during operation in a repeated work cycle
EP2146885A1 (en) * 2007-05-10 2010-01-27 Volvo Construction Equipment AB A method for controlling a work machine during operation in a repeated work cycle
US20080288125A1 (en) * 2007-05-15 2008-11-20 Cameron John F Determining an autonomous position of a point of interest on a lifting device
US9156167B2 (en) 2007-05-15 2015-10-13 Trimble Navigation Limited Determining an autonomous position of a point of interest on a lifting device
US20100198466A1 (en) * 2007-07-13 2010-08-05 Volvo Construction Equipment Ab Method for providing an operator of a work machine with operation instructions and a computer program for implementing the method
US8793055B2 (en) * 2007-07-13 2014-07-29 Volvo Construction Equipment Ab Method for providing an operator of a work machine with operation instructions and a computer program for implementing the method
US8351684B2 (en) 2008-02-13 2013-01-08 Caterpillar Inc. Terrain map updating system
US20090202109A1 (en) * 2008-02-13 2009-08-13 Caterpillar Inc. Terrain map updating system
US20090216410A1 (en) * 2008-02-26 2009-08-27 William Edward Allen Automated machine management system with destination selection
US20090218112A1 (en) * 2008-02-29 2009-09-03 Caterpillar Inc. Semi-autonomous excavation control system
US7934329B2 (en) * 2008-02-29 2011-05-03 Caterpillar Inc. Semi-autonomous excavation control system
US20090228177A1 (en) * 2008-03-07 2009-09-10 Caterpillar Inc. Adaptive work cycle control system
US8024095B2 (en) 2008-03-07 2011-09-20 Caterpillar Inc. Adaptive work cycle control system
US20090228394A1 (en) * 2008-03-07 2009-09-10 Caterpillar Inc. Adaptive payload monitoring system
US8156048B2 (en) * 2008-03-07 2012-04-10 Caterpillar Inc. Adaptive payload monitoring system
US8185290B2 (en) * 2008-03-07 2012-05-22 Caterpillar Inc. Data acquisition system indexed by cycle segmentation
US20090228176A1 (en) * 2008-03-07 2009-09-10 Caterpillar Inc. Data acquisition system indexed by cycle segmentation
US8989971B2 (en) 2008-05-27 2015-03-24 Eaton Corporation Method and apparatus for detecting and compensating for pressure transducer errors
US20090299583A1 (en) * 2008-05-27 2009-12-03 Dell Eva Mark L Method and apparatus for detecting and compensating for pressure transducer errors
US20110087407A1 (en) * 2008-06-03 2011-04-14 Volvo Construction Equipment Ab Method for controlling a power source
US9163383B2 (en) * 2008-06-03 2015-10-20 Volvo Construction Equipment Ab Method for controlling a power source
US20100039262A1 (en) * 2008-08-18 2010-02-18 Cameron John F Construction equipment component location tracking
US8224518B2 (en) 2008-08-18 2012-07-17 Trimble Navigation Limited Automated recordation of crane inspection activity
US8514058B2 (en) * 2008-08-18 2013-08-20 Trimble Navigation Limited Construction equipment component location tracking
US20100039319A1 (en) * 2008-08-18 2010-02-18 Cameron John F Automated recordation of crane inspection activity
US20100044332A1 (en) * 2008-08-22 2010-02-25 Cameron John F Monitoring crane component overstress
US20100070179A1 (en) * 2008-09-17 2010-03-18 Cameron John F Providing an autonomous position of a point of interest to a lifting device to avoid collision
EP2204503A2 (en) * 2008-12-22 2010-07-07 Deere & Company Method and system for providing a planned path for a machine for digging a drainage channel
EP2204503A3 (en) * 2008-12-22 2014-02-12 Deere & Company Method and system for providing a planned path for a machine for digging a drainage channel
WO2010149857A1 (en) * 2009-06-24 2010-12-29 Sandvik Mining And Construction Oy Definition of control data for automatic control of mobile mining machine
CN102803618A (en) * 2009-06-24 2012-11-28 山特维克矿山工程机械有限公司 Definition of control data for automatic control of mobile mining machine
US8571765B2 (en) * 2009-06-24 2013-10-29 Sandvik Mining And Construction Oy Definition of control data for automatic control of mobile mining machine
EP2446091A4 (en) * 2009-06-24 2017-06-07 Sandvik Mining and Construction Oy Definition of control data for automatic control of mobile mining machine
CN102803618B (en) * 2009-06-24 2016-03-02 山特维克矿山工程机械有限公司 For defining the method for control data and comprising the equipment of the data processing equipment for defining control data
AU2010264557B2 (en) * 2009-06-24 2014-04-03 Sandvik Mining And Construction Oy Definition of control data for automatic control of mobile mining machine
AU2010264557C1 (en) * 2009-06-24 2014-08-14 Sandvik Mining And Construction Oy Definition of control data for automatic control of mobile mining machine
US8744746B2 (en) 2009-06-24 2014-06-03 Sandvik Mining And Construction Oy Determination of route for arranging automatic control of mobile mining machine
NL2003800C2 (en) * 2009-11-13 2011-05-16 Baggerwerken Decloedt & Zn N V Device for dredging soil material under water.
EP2322728A3 (en) * 2009-11-13 2011-06-01 Baggerwerken Decloedt en Zoon N.V. Backhoe dredger for dredging soil material under water
US9540974B2 (en) * 2010-04-19 2017-01-10 Snecma Method and system for monitoring the level of oil contained in a tank of an aircraft engine
US20130218399A1 (en) * 2010-04-19 2013-08-22 Snecma Method and system for monitoring the level of oil contained in a tank of an aircraft engine
CN102236325A (en) * 2010-04-27 2011-11-09 罗伯特·博世有限公司 Microcontroller having a computing unit and a logic circuit, and method for carrying out computations by a microcontroller for a regulation or a control in a vehicle
CN102859158B (en) * 2010-04-27 2016-02-24 罗伯特·博世有限公司 For calculating control apparatus and the method for the output parameter controlled
US8731737B2 (en) * 2010-04-27 2014-05-20 Robert Bosch Gmbh Microcontroller having a computing unit and a logic circuit, and method for carrying out computations by a microcontroller for a regulation or a control in a vehicle
US20110282517A1 (en) * 2010-04-27 2011-11-17 Felix Streichert Microcontroller having a computing unit and a logic circuit, and method for carrying out computations by a microcontroller for a regulation or a control in a vehicle
CN102859158A (en) * 2010-04-27 2013-01-02 罗伯特·博世有限公司 Control device and method for calculating an output parameter for a controller
US20130110749A1 (en) * 2010-04-27 2013-05-02 Robert Bosch Gmbh Control device and method for calculating an output parameter for a controller
CN102236325B (en) * 2010-04-27 2017-01-18 罗伯特·博世有限公司 Microcontroller having a computing unit and a logic circuit, and method for carrying out computations by a microcontroller for a regulation or a control in a vehicle
US10013658B2 (en) * 2010-04-27 2018-07-03 Robert Bosch Gmbh Control device and method for calculating an output parameter for a controller
WO2011160580A1 (en) * 2010-06-22 2011-12-29 湖南三一智能控制设备有限公司 Intelligent control method for hydraulic excavator
US9220196B2 (en) * 2010-07-01 2015-12-29 Claas Selbstfahrende Erntemaschinen Gmbh Method for adjusting at least one working unit of a self-propelled harvesting machine
US20120004813A1 (en) * 2010-07-01 2012-01-05 Joachim Baumgarten Method for adjusting at least one working unit of a self-propelled harvesting machine
US20120215352A1 (en) * 2011-02-17 2012-08-23 Convergent Information Technologies Gmbh Method for the automated programming and optimization of robotic work sequences
US8892255B2 (en) * 2011-02-17 2014-11-18 Convergent Information Technologies Gmbh Method for the automated programming and optimization of robotic work sequences
US11028560B2 (en) 2011-04-14 2021-06-08 Joy Global Surface Mining Inc Swing automation for rope shovel
US8768579B2 (en) 2011-04-14 2014-07-01 Harnischfeger Technologies, Inc. Swing automation for rope shovel
US9567725B2 (en) 2011-04-14 2017-02-14 Harnischfeger Technologies, Inc. Swing automation for rope shovel
US9315967B2 (en) 2011-04-14 2016-04-19 Harnischfeger Technologies, Inc. Swing automation for rope shovel
US10227754B2 (en) 2011-04-14 2019-03-12 Joy Global Surface Mining Inc Swing automation for rope shovel
US8620533B2 (en) 2011-08-30 2013-12-31 Harnischfeger Technologies, Inc. Systems, methods, and devices for controlling a movement of a dipper
US8688334B2 (en) 2011-08-30 2014-04-01 Harnischfeger Technologies, Inc. Systems, methods, and devices for controlling a movement of a dipper
US9701019B2 (en) * 2011-09-15 2017-07-11 Convergent Information Technologies Gmbh System and method for the automatic generation of robot programs
US20140371905A1 (en) * 2011-09-15 2014-12-18 Convergent Information Technologies Gmbh System and method for the automatic generation of robot programs
EP2803769A4 (en) * 2012-01-02 2015-11-25 Volvo Constr Equip Ab Method for controlling operation of dump for construction machinery
US11761172B2 (en) 2012-03-16 2023-09-19 Joy Global Surface Mining Inc Automated control of dipper swing for a shovel
US9745721B2 (en) 2012-03-16 2017-08-29 Harnischfeger Technologies, Inc. Automated control of dipper swing for a shovel
US10655301B2 (en) 2012-03-16 2020-05-19 Joy Global Surface Mining Inc Automated control of dipper swing for a shovel
US9206587B2 (en) 2012-03-16 2015-12-08 Harnischfeger Technologies, Inc. Automated control of dipper swing for a shovel
US8620535B2 (en) * 2012-05-21 2013-12-31 Caterpillar Inc. System for automated excavation planning and control
AU2013206228B2 (en) * 2012-05-21 2018-03-15 Caterpillar Inc. System for automated excavation planning and control
US20140012404A1 (en) * 2012-07-06 2014-01-09 Caterpillar Inc. Methods and systems for machine cut planning
US9309650B2 (en) * 2012-11-20 2016-04-12 Komatsu Ltd. Working machine and method of measuring work amount of working machine
US20150299989A1 (en) * 2012-11-20 2015-10-22 Komatsu Ltd. Working machine and method of measuring work amount of working machine
US9476183B2 (en) * 2012-11-20 2016-10-25 Komatsu Ltd. Work machine and work amount measurement method in work machine
US20150292185A1 (en) * 2012-11-20 2015-10-15 Komatsu Ltd. Work machine and work amount measurement method in work machine
US8972129B2 (en) * 2012-11-30 2015-03-03 Caterpillar Inc. Determination of optimum tractor reverse speed
US8983739B2 (en) 2012-11-30 2015-03-17 Caterpillar Inc. Real time pull-slip curve modeling in large track-type tractors
US9086698B2 (en) * 2012-11-30 2015-07-21 Caterpillar Inc. Determining an optimum operating point of an earth moving machine
US9228315B2 (en) 2012-12-20 2016-01-05 Caterpillar Inc. System and method for modifying a path for a machine
US9014922B2 (en) 2012-12-20 2015-04-21 Caterpillar Inc. System and method for optimizing a cut location
US8948981B2 (en) 2012-12-20 2015-02-03 Caterpillar Inc. System and method for optimizing a cut location
US9014924B2 (en) 2012-12-20 2015-04-21 Caterpillar Inc. System and method for estimating material characteristics
US9031750B2 (en) * 2013-04-02 2015-05-12 Tadano Ltd. Device for selecting boom extension pattern
US20140297136A1 (en) * 2013-04-02 2014-10-02 Tadano Ltd. Device for selecting boom extension pattern
US9404239B2 (en) * 2014-06-09 2016-08-02 Caterpillar Inc. Sub-bin refinement for autonomous machines
US20150354169A1 (en) * 2014-06-09 2015-12-10 Caterpillar Inc. Sub-bin refinement for autonomous machines
US10671948B2 (en) * 2014-08-14 2020-06-02 Trimble Inc. Work cycle management
US20160048795A1 (en) * 2014-08-14 2016-02-18 Trimble Navigation Limited Work cycle management
US9580883B2 (en) 2014-08-25 2017-02-28 Cnh Industrial America Llc System and method for automatically controlling a lift assembly of a work vehicle
US9260837B1 (en) * 2014-09-10 2016-02-16 Caterpillar Inc. Intelligent pass jump control
US9469967B2 (en) 2014-09-12 2016-10-18 Caterpillar Inc. System and method for controlling the operation of a machine
EP3093400A1 (en) * 2015-05-12 2016-11-16 Doosan Infracore Co., Ltd. Method of controlling a wheel loader
US10186004B2 (en) 2015-05-20 2019-01-22 Caterpillar Inc. System and method for evaluating a material movement plan
US10802494B2 (en) 2016-02-25 2020-10-13 Nec Corporation Method for motion planning for autonomous moving objects
WO2017144350A1 (en) 2016-02-25 2017-08-31 Nec Europe Ltd. Method for motion planning for autonomous moving objects
US10320922B1 (en) 2016-03-28 2019-06-11 Amazon Technologies, Inc. Inventory manager for distributed systems
US11047109B2 (en) 2016-04-19 2021-06-29 Volvo Construction Equipment Ab Control unit for dumping of material
WO2017184037A1 (en) * 2016-04-19 2017-10-26 Volvo Construction Equipment Ab Control unit for dumping of material
US20170322929A1 (en) * 2016-05-06 2017-11-09 Amazon Technologies, Inc. Script manager for distributed systems
US10733238B2 (en) * 2016-05-06 2020-08-04 Amazon Technologies, Inc. Script manager for distributed systems
US10982410B2 (en) 2016-09-08 2021-04-20 Joy Global Surface Mining Inc System and method for semi-autonomous control of an industrial machine
US10151830B2 (en) * 2016-09-14 2018-12-11 Caterpillar Inc. Systems and methods for detecting objects proximate to a machine utilizing a learned process
US10570582B2 (en) 2016-11-23 2020-02-25 Caterpillar Inc. System and method for operating a material-handling machine
US10552775B2 (en) 2016-11-29 2020-02-04 Caterpillar Inc. System and method for optimizing a material moving operation
US11578470B2 (en) * 2017-03-30 2023-02-14 Komatsu Ltd. Control system for work vehicle, method for setting trajectory of work implement, and work vehicle
US20190390435A1 (en) * 2017-03-30 2019-12-26 Komatsu Ltd. Control system for work vehicle, method for setting trajectory of work implement, and work vehicle
EP3451084A1 (en) * 2017-08-29 2019-03-06 Honda Research Institute Europe GmbH Method for setting parameters in an autonomous working device and an autonomous working device
US11119481B2 (en) * 2017-08-29 2021-09-14 Honda Research Institute Europe Gmbh Method for setting parameters in an autonomous working device and an autonomous working device
US20190064817A1 (en) * 2017-08-29 2019-02-28 Honda Research Institute Europe Gmbh Method for setting parameters in an autonomous working device and an autonomous working device
US20200399852A1 (en) * 2018-03-01 2020-12-24 Bauer Spezialtiefbau Gmbh Construction method
US11643786B2 (en) * 2018-03-01 2023-05-09 Bauer Spezialtiefbau Gmbh Construction method
US20210002852A1 (en) * 2018-03-26 2021-01-07 Sumitomo Construction Machinery Co., Ltd. Shovel
CN112004975A (en) * 2018-03-30 2020-11-27 住友重机械工业株式会社 Driving support system for construction machine, and construction machine
WO2020033415A3 (en) * 2018-08-06 2020-04-16 Clark Equipment Company Augmented loader controls
US11372405B2 (en) 2018-08-06 2022-06-28 Clark Equipment Company Augmented loader controls
CN109711063A (en) * 2018-12-28 2019-05-03 大连海事大学 A kind of station tunneling drilling depth method of adjustment and device suitable for upper-soft lower-hard ground
CN109711063B (en) * 2018-12-28 2022-10-18 大连海事大学 Station underground excavation footage adjusting method and device suitable for soft upper and hard lower strata
US11738643B2 (en) 2019-02-27 2023-08-29 Clark Equipment Company Display integrated into door
US11648887B2 (en) 2019-11-12 2023-05-16 Clark Equipment Company Display integrated into door
JP2021113487A (en) * 2020-01-17 2021-08-05 バイドゥ ユーエスエイ エルエルシーBaidu USA LLC Neural task planning part for autonomous travelling vehicle
US11409287B2 (en) * 2020-01-17 2022-08-09 Baidu Usa Llc Neural task planner for autonomous vehicles
CN113139652A (en) * 2020-01-17 2021-07-20 百度(美国)有限责任公司 Neural task planner for an autonomous vehicle
DE102020206371A1 (en) 2020-05-20 2021-11-25 Robert Bosch Gesellschaft mit beschränkter Haftung Method for controlling an unloading process of bulk goods onto a loading area by means of an excavator
US11274921B1 (en) * 2021-06-22 2022-03-15 Walz Scale Payload measurement system and method

Similar Documents

Publication Publication Date Title
US6076030A (en) Learning system and method for optimizing control of autonomous earthmoving machinery
US6108949A (en) Method and apparatus for determining an excavation strategy
US5908458A (en) Automated system and method for control of movement using parameterized scripts
Singh State of the art in automation of earthmoving
AU753517B2 (en) Software architecture for autonomous earthmoving
US9304501B2 (en) Coordinated joint motion control system with position error correction
Singh Learning to predict resistive forces during robotic excavation
Ha et al. Robotic excavation in construction automation
Sing Synthesis of tactical plans for robotic excavation
Azulay et al. Wheel loader scooping controller using deep reinforcement learning
Schmidt et al. Simulation and control of an autonomous bucket excavator for landscaping tasks
Cannon Extended earthmoving with an autonomous excavator
Dadhich et al. Machine learning approach to automatic bucket loading
Singh et al. Multi-resolution planning for earthmoving
JPH11315556A (en) Learning system and method optimizing autonomous control of earth-moving machine
Eraliev et al. Sensing, perception, decision, planning and action of autonomous excavators
Corke et al. Models for automated earthmoving
Chacko et al. State of the art in excavators
Gu et al. Proportional‐Integral‐Plus control of an intelligent excavator
JP2023054776A (en) Device and computer-implemented method for providing training data to agent for reinforcement learning for generating strategy to control vehicle, device and method for generating strategy to control vehicle, and vehicle
Rowe et al. Parameterized scripts for motion planning
Rowe Adaptive motion planning for autonomous mass excavation
Groll et al. A behavior-based architecture for excavation tasks
Lever An automated digging control for a wheel loader
Wu A study on automatic control of wheel loaders in rock/soil loading

Legal Events

Date Code Title Description
AS Assignment

Owner name: CARNEGIE MELLON UNIVERSITY, PENNSYLVANIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ROWE, PATRICK S.;REEL/FRAME:009702/0210

Effective date: 19990111

STCF Information on status: patent grant

Free format text: PATENTED CASE

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

FPAY Fee payment

Year of fee payment: 12