US5733359A - Pressure swing adsorption process turndown control - Google Patents

Pressure swing adsorption process turndown control Download PDF

Info

Publication number
US5733359A
US5733359A US08/665,939 US66593996A US5733359A US 5733359 A US5733359 A US 5733359A US 66593996 A US66593996 A US 66593996A US 5733359 A US5733359 A US 5733359A
Authority
US
United States
Prior art keywords
gas
component
adsorption
adsorption vessel
vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US08/665,939
Inventor
Shain-Jer Doong
Lisa A. Brenskelle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linde LLC
Original Assignee
BOC Group Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BOC Group Inc filed Critical BOC Group Inc
Priority to US08/665,939 priority Critical patent/US5733359A/en
Assigned to BOC GROUP, INC., THE reassignment BOC GROUP, INC., THE ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BRENSKELLE, LISA A., DOONG, SHAIN-JER
Priority to CA002204574A priority patent/CA2204574A1/en
Priority to IDP971645A priority patent/ID17418A/en
Priority to JP9129407A priority patent/JPH1043535A/en
Priority to ZA9704892A priority patent/ZA974892B/en
Priority to EP97304054A priority patent/EP0819463A3/en
Priority to AU24857/97A priority patent/AU2485797A/en
Priority to PL97320605A priority patent/PL320605A1/en
Priority to KR1019970025301A priority patent/KR980000547A/en
Priority to CN97113504A priority patent/CN1171286A/en
Publication of US5733359A publication Critical patent/US5733359A/en
Application granted granted Critical
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • B01D53/0454Controlling adsorption
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • B01D53/047Pressure swing adsorption
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • B01D53/0407Constructional details of adsorbing systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J20/00Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof
    • B01J20/02Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material
    • B01J20/10Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material comprising silica or silicate
    • B01J20/16Alumino-silicates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2253/00Adsorbents used in seperation treatment of gases and vapours
    • B01D2253/10Inorganic adsorbents
    • B01D2253/106Silica or silicates
    • B01D2253/108Zeolites
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/40003Methods relating to valve switching
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/40011Methods relating to the process cycle in pressure or temperature swing adsorption
    • B01D2259/40058Number of sequence steps, including sub-steps, per cycle
    • B01D2259/40073Ten
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/40011Methods relating to the process cycle in pressure or temperature swing adsorption
    • B01D2259/40058Number of sequence steps, including sub-steps, per cycle
    • B01D2259/40075More than ten
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/40011Methods relating to the process cycle in pressure or temperature swing adsorption
    • B01D2259/40077Direction of flow
    • B01D2259/40079Co-current
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/40011Methods relating to the process cycle in pressure or temperature swing adsorption
    • B01D2259/40077Direction of flow
    • B01D2259/40081Counter-current
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/402Further details for adsorption processes and devices using two beds

Definitions

  • This invention relates to the operation of pressure swing adsorption plants, and more particularly to a method of adjusting the rate of production of nonadsorbed product gas in a pressure swing adsorption plant without significantly altering the purity of the product gas.
  • Adsorption is widely used in the separation of the components of gas mixtures.
  • this technique can be used to separate a component from a gas mixture using a selected adsorbent when the adsorbent preferentially adsorbs the component relative to the other components of the mixture.
  • This procedure is successfully used to separate nitrogen from oxygen using either an adsorbent which preferentially adsorbs nitrogen or an adsorbent which preferentially adsorbs oxygen.
  • Pressure swing adsorption (PSA) systems typically operate in a cyclical process in which adsorption vessels containing adsorbent are pressurized to operating pressure with a feed gas, components of the feed gas are fractionated by adsorption as the feed gases pass through the adsorption vessels, and the adsorbent is regenerated to remove the adsorbed component from the adsorption vessel.
  • the desired component may be concentrated in either the nonadsorbed fraction or the adsorbed fraction.
  • one or more pressure equalization step may be employed to equalize the pressure between a bed that is saturated with the adsorbed fraction and a bed that has been regenerated and in which the concentration of adsorbed component is considerably diminished.
  • PSA plants are generally sized to satisfy the product gas quantity and quality requirements of the gas user.
  • the product gas quantity demand of the user is often not constant, and frequently fluctuates from time to time during the course of business operations.
  • the plant is designed to produce the maximum quantity of gas product anticipated to be required by the user at a purity specified by the user.
  • PSA systems are often required to produce product gas at higher rates during normal working hours than during off-hours.
  • Product reduction or turndown measures sometimes practiced include venting excess product gas, lengthening the cycle time, storing excess product gas, or temporarily shutting down the system.
  • Leitgeb U.S. Pat. No. 4,323,370, discloses varying the length of time of the adsorption phase and the rate of flow of the product gas from the adsorber in response to a varying demand for the product gas.
  • the flow rate and adsorption cycle times are determined as a function of a desired product gas purity and not of the actual product produced by the system.
  • control of the purity level of a product gas can be accomplished in PSA systems by varying the product flow rates at a fixed cycle time.
  • the product flow rate is set at a level greater than that needed by the consumer while the feed gas flow rate either is fixed by throttling or regulated automatically.
  • Miller et al. U.S. Pat. No. 4,693,730, disclose a product purity control pressure swing adsorption process in which a characteristic of the effluent from concurrent depressurization is sensed, and corrective action is taken in response. Any action can be taken which is effective to vary the impurity concentration in the product gas including adjusting the adsorption time to control the impurity loading of each adsorbent bed, adjusting the concurrent depressurization termination pressure to control the impurity breakthrough at the product end of each adsorbent bed, and/or adjusting the amount of purge gas received from each adsorbent bed to control the extent of regeneration.
  • European Patent Publication No. 0 207 686 discloses controlling oxygen concentration by controlling variations in the cycle time at which a further adsorption bed is substituted for any exhausted or substantially exhausted bed prior to the purging of the latter bed.
  • Umeki U.S. Pat. No. 4,494,966, discloses a two-vessel PSA process comprising the steps of adsorption, bed equalization and bed regeneration in which the process is shut down during the equalization step and the beds are evacuated.
  • PSA process improvements which compensate for variations in product demand without significant changes in product gas purity are constantly being sought.
  • This invention presents a PSA process improvement which provides the advantage of adjusting the production volume of PSA product gas with minimal variation in the purity of the product gas, and provides a power savings, relative to other methods of compensating for a reduced demand of nonadsorbed product gas.
  • the process of the invention provides a method of varying the rate of production of nonadsorbed gas from a pressure swing adsorption plant while at the same time reducing the cost of operating the facility, relative to the cost of operating the facility when other production rate modification techniques are employed.
  • the method of the invention comprises introducing an idle step into the process cycle during which the feed blower and vacuum pump (if one is used) are unloaded, i.e. operated in a bypass mode.
  • the idle step is inserted into the process cycle at the end of the bed equalization step, or, if the cycle comprises a first discrete equalization step (a step with simple transfer of gas from one vessel to another) and a second combination equalization-vent step or equalization-purge step, at the end of the discrete equalization step.
  • the invention has application in a method of producing a first component-enriched product gas from a mixture comprising the first component and a second component at a rate of production set by downstream demand for the product gas by subjecting the gas mixture to a PSA process in a system comprising a plurality of adsorption vessels each containing an adsorbent which adsorbs the second component more strongly than it adsorbs the first component, the PSA process having a repeating cycle which includes the steps:
  • the invention comprises changing the rate of production of first component-enriched gas stream in the system in response to a change in the first component-enriched gas demand by periodically isolating each vessel of the system and subjecting the system to an idle step of predetermined duration between the above-described steps (b) and (c).
  • the duration of the current idle step is the difference between (1) the product of the previous cycle time determined without adjustment for purity and the ratio of the previous product demand to the current product demand and (2) the current cycle time without an idle step (the terms used in this calculation are defined below).
  • Another preferred embodiment of the invention comprises making an adjustment for purity by measuring the purity of the first component-enriched gas and adjusting the duration of the current idle step in a manner that will minimize the difference between the specified purity and the measured purity.
  • a most preferred embodiment of the invention comprises using as an approximation of the duration of the current idle step the difference between (1) the product of the previous cycle time determined without adjustment for purity and the ratio of the previous product demand to the current product demand and (2) the current cycle time without an idle step, and then measuring the purity of the first component-enriched gas and further adjusting the duration of the current idle step in a manner that will minimize the difference between the specified purity and the measured purity.
  • the process cycle includes, between the idle step and step (c), the additional step of further pressurizing the second adsorption vessel by countercurrently flowing first component-enriched gas into the second vessel.
  • the adsorption system comprises at least one pair of first and second adsorption vessels operated 180° out of phase
  • the PSA process comprises, with respect to each pair of adsorption vessels in the system, the steps:
  • the duration of steps (c) and (f) is the difference between (1) the product of the previous cycle time determined without adjustment for purity and the ratio of the previous product demand to the current product demand and (2) the current cycle time without an idle step.
  • Another preferred aspect of this embodiment of the invention comprises measuring the purity of the first component-enriched gas and adjusting the duration of steps (c) and (f) in a manner that will minimize the difference between the specified purity and the measured purity.
  • a most preferred aspect of this embodiment of the invention comprises using as an approximation of the duration of steps (c) and (f) the difference between (1) the product of the previous cycle time determined without adjustment for purity and the ratio of the previous product demand to the current product demand and (2) the current cycle time without an idle step, and then measuring the purity of the first component-enriched gas and further adjusting the duration of steps (c) and (f) in a manner that will minimize the difference between the specified purity and the measured purity.
  • the process cycle further includes, between step (c) and step (d), the additional step of further pressurizing the second adsorption vessel by countercurrently flowing first component-enriched gas thereinto and between steps (f) and (a), the additional step of further pressurizing the first adsorption vessel by countercurrently flowing first component-enriched gas thereinto.
  • the cycle includes, between steps (a) and (b) the additional step of flowing the gas mixture cocurrently through the first adsorption vessel at the selected pressure and discharging first component-enriched fraction from the first adsorption vessel, while countercurrently flowing first component-enriched gas through the second adsorption vessel, and between steps (d) and (e) the additional step of flowing the gas mixture cocurrently through the second adsorption vessel at the selected pressure and discharging first component-enriched fraction from the second adsorption vessel, while countercurrently flowing first component-enriched gas through the first adsorption vessel.
  • the cycle further comprises, between steps (c) and (d), the additional step of flowing void space gas from the first adsorption vessel to the second adsorption vessel while countercurrently removing gas from the first adsorption vessel and, between steps (f) and (a), the additional step of flowing void space gas from the second adsorption vessel to the first adsorption vessel white countercurrently removing gas from the second adsorption vessel.
  • the cycle further includes, between steps (a) and (b), the additional step of flowing the gas mixture at the selected pressure cocurrently through the first adsorption vessel at the selected pressure and discharging first component-enriched fraction from the first adsorption vessel, while countercurrently flowing first component-enriched gas through the second adsorption vessel; between steps (c) and said additional step between steps (c) and (d), the further step of flowing void space gas from the first adsorption vessel to the second adsorption vessel while countercurrently removing gas from the first vessel; between steps (d) and (e) the additional step of flowing the gas mixture at the selected pressure cocurrently through the second adsorption vessel at the selected pressure and discharging first component-enriched fraction from the second adsorption vessel, while countercurrently flowing first component-enriched gas through the first adsorption vessel; and between steps (f) and said additional step between steps (f) and (a), the further step of flowing void space gas from the
  • the adsorption system comprises three adsorption vessels operated 120° out of phase.
  • the gas mixture is air
  • the first component is oxygen
  • the second component is nitrogen.
  • the adsorbent is selected from synthetic and natural zeolites, and in a more preferred aspect it is a synthetic zeolite selected from type X zeolite and type A zeolite.
  • the adsorption pressure is preferably in the range of about atmospheric pressure to about 3 bara.
  • the gas mixture is air, the first component is nitrogen and the second component is oxygen.
  • FIG. 1 is a schematic representation of a two-bed adsorption plant equipped for practice of the process of this invention
  • FIG. 2 is a schematic representation of a simple two-bed adsorption cycle incorporating the improvement of the invention.
  • FIG. 3 is a schematic representation of a preferred two-bed cycle incorporating the improvement of the invention.
  • FIG. 4 is a graph showing the relationship between the flow rate, purity level and idle step duration when the product demand is reduced to 81.5% of the original flow rate.
  • FIG. 5 is a graph showing the relationship between the flow rate, purity level and idle step duration when the product demand is reduced to 62.5% of the original flow rate.
  • the improved process of the invention is useful for varying the rate of production of a purified gas by PSA.
  • the process can be used to separate air to produce either nitrogen or oxygen as the nonadsorbed gas product, or it can be used to separate the components of gas mixtures other than air.
  • the rate of production of the nonadsorbed gas product is varied without significantly changing the purity of this gas. This result is accomplished by inserting an idle step into the adsorption cycle immediately following discrete bed equalization, or by increasing or decreasing the duration of the idle step in an adsorption cycle with an existing idle step. Inserting an idle step into the adsorption cycle at this point causes very little or no variation in the nonadsorbed gas product purity.
  • FIG. 1 illustrates a two adsorption vessel plant in which the invention can be carried out.
  • the system of FIG. 1 includes first and second adsorption vessels, A and B, and a nonadsorbed gas product reservoir, C.
  • Vessels A and B are conventional vessels constructed to withstand the superatmospheric and subatmospheric pressures encountered in pressure swing adsorption processes.
  • Feed gas line 2, provided with feed gas compressor 4 is used to introduce feed gas into the system.
  • unload gas discharge line 6 which is provided with valve 8.
  • line 2 is also connected to the inlet ends of vessels A and B via lines 10 and 12, which are provided with valves 14 and 16, respectively.
  • Bed depressurization manifold 18 is connected to line 10 through valve 20 and to line 12 through valve 22.
  • Bed evacuation line 24 connects manifold 18, at a point between valves 20 and 22, with the inlet end of vacuum pump 26.
  • Vacuum pump unload feed line 28, fitted with valve 30, is connected to line 24.
  • vacuum pump 26 On its discharge end, vacuum pump 26 is provided with waste gas discharge line 32.
  • Vessels A and B are provided with nonadsorbed gas outlet lines 34 and 36, which are fitted with valves 38 and 40, respectively. At their downstream ends, lines 34 and 36 are joined to nonadsorbed gas discharge line 42 which, in turn, is connected to nonadsorbed gas storage vessel C. Vessel C is also provided with nonadsorbed gas product line 44 and with bed product backfill line 46. Line 46 communicates with lines 34 and 36 through valves 48 and 50, respectively. Equalization gas line 56, fitted with valve 54 connects line 34 to line 36.
  • FIG. 2 illustrates an 8 step process carried out in a pair of adsorption vessels that are operated 180° out of phase, such that when the adsorbent in one vessel is in adsorption service the adsorbent in the other vessel is undergoing regeneration.
  • the steps of the half-cycle shown as steps A to D and the half cycle shown as steps E to H are adsorption/evacuation, bed equalization, idle and evacuation/product backfill, respectively.
  • step A (adsorption/evacuation)
  • valves 14, 38 and 22 are open and all other valves are closed, and compressor 4 and vacuum pump 26 are in service.
  • Feed gas, charged into vessel A at superatmospheric pressure by compressor 4 passes through lines 2 and 10 and weakly adsorbed component-enriched fraction passes out of vessel A through lines 34 and 42 and enters vessel C while the strongly adsorbed component of the gas mixture is adsorbed by the adsorbent in vessel A.
  • the vessel B evacuation step begun in step H of the previous cycle is continued, and additional strongly adsorbed component-enriched fraction is drawn from the adsorbent in vessel B through lines 12 and 24 by vacuum pump 26.
  • the evacuated gas is discharged from the system through line 32.
  • step B is initiated by the closing of valves 14, 22 and 38 and the opening of valves 8, 30 and 54. All other valves of the system remain closed during this step. A portion of the void space gas previously contained in vessel A now passes via valve 54 through lines 34 and 36 and into vessel B. Although this step is referred to as "bed equalization", the transfer of gas is often discontinued before the pressure in vessels A and B is equalized.
  • compressor 4 and pump 26 are unloaded, such that feed gas drawn through line 2 by compressor 4 is discharged from the system through line 6, and gas in drawn into line 24 through line 28 and is discharged from the system through line 32.
  • step C (idle) is begun.
  • valve 54 is closed, all other valves remain in the position they were in during step B, and the system is idled.
  • the duration of step C is such that the nonadsorbed gas produced during the current cycle is approximately equal to the nonadsorbed product gas demand.
  • the step C duration can be determined by any suitable method, but it is preferably determined by means of the formula described below, which is based on the rate of removal of nonadsorbed product gas from vessel C through line 44.
  • the duration of the idle step is also adjusted somewhat to compensate for changes in the purity of the nonadsorbed product gas produced during the turndown period.
  • compressor 4 and pump 26 remain unloaded.
  • step D bed evacuation/product backfill
  • valves 8, 20 and 50 are open and valve 28 is closed. Strongly adsorbed component-enriched fraction is now evacuated from vessel A and discharged from the system by vacuum pump 26 through lines 10, 24 and 32.
  • the pressure in vessel B is raised to near adsorption pressure by introducing nonadsorbed product gas countercurrently into vessel B through lines 46 and 36. Compressor 4 remains unloaded.
  • step E valves 16, 20 and 40 are open and all other valves are closed, and feed gas is charged into vessel B at superatmospheric pressure by compressor 4.
  • the feed gas passes through lines 2 and 12 and weakly adsorbed component-enriched fraction passes out of vessel B through lines 36 and 42 and enters vessel C, while the strongly adsorbed component of the gas mixture is adsorbed by the adsorbent in vessel B.
  • the vessel A evacuation step begun in step D is continued, and additional strongly adsorbed component-enriched fraction is withdrawn from the adsorbent in vessel A, passes through lines 10 and 24 and vacuum pump 26, and is discharged from the system through line 32.
  • step F is initiated by the closing of valves 16, 20 and 40 and the opening of valves 8, 30 and 54. All other valves remain closed. A portion of the void space gas previously contained in vessel B passes via valve 54 through lines 36 and 34 and into vessel A.
  • compressor 4 and pump 26 are unloaded, and feed gas drawn through line 2 by compressor 4 is discharged from the system through line 6 and gas drawn into line 24 through line 28 and valve 30 is passed through pump 26 and discharged from the system through line 32.
  • step G is begun.
  • valve 54 is closed, all other valves remain in the position they were in during step F, and the system is idled. Compressor 4 and pump 26 remain unloaded during this step.
  • step H is initiated with valves 8, 22 and 48 open and valve 28 is closed. Strongly adsorbed component-enriched fraction is now evacuated from vessel B and discharged from the system by vacuum pump 26 through lines 12, 24 and 32. During this step the pressure in vessel A is raised to near adsorption pressure by introducing nonadsorbed product gas into vessel A through lines 46 and 34. Compressor 4 remains unloaded.
  • step H the second half-cycle of the process is finished, and the cycle is repeated, beginning with step A.
  • FIG. 3 illustrates a more efficient embodiment of the process illustrated in FIG. 2.
  • steps A, B, C, D, E, F, G and H are substantially identical with steps of the same letter of the process illustrated in FIG. 2.
  • the FIG. 3 process includes four new steps, namely steps A1, C1, El, and G1.
  • the cycle of FIG. 3 is based on the process illustrated in FIG. 4A to 4J of U.S. Pat. No. 5,122,164. The text of this patent is incorporated herein by reference.
  • Step A1 of the FIG. 3 process is a continuation of step A of this process.
  • valves 14, 22 and 38 remain open and valve 40 is opened.
  • the production of non-adsorbed product gas is continued in vessel A.
  • the evacuation of vessel B is continued but a portion of the non-adsorbed product gas produced in vessel A is passed through vessel B generally at a reduced pressure, to effect purging of vessel B.
  • Step A1 is followed by steps B and C, which are the same as steps B and C of the process of FIG. 2.
  • Step C1 is a partial continuation of the equalization step (step B); however, in step C1 the adsorbent in vessel A begins to undergo evacuation.
  • valves 8, 20 and 54 are opened, valve 30 is closed and vessel B is further pressurized by transfer of gas from vessel A through the non-adsorbed ends of the vessels. At the same time gas is withdrawn from vessel A through its inlet end by means of pump 26. The evacuated gases pass out of the system through lines 10, 24 and 32.
  • step D is initiated by closing valve 54 and opening valve 50.
  • Valve 20 remains opened during step D so that evacuation of the bed in vessel A continues while vessel B undergoes partial repressurization with non-adsorbed product gas.
  • Step E is identical to step E of the process of FIG. 2.
  • valves 16, 20 and 40 are opened and all other valves are closed.
  • Step E1 the counterpart to step A1, is a partial continuation of the procedure carried out in step E.
  • valves 16, 20 and 40 remain opened and valve 38 is opened. This permits a portion of the non-adsorbed product gas produced in vessel B to pass countercurrently through vessel A, thereby purging the adsorbent in vessel A.
  • step F is the counterpart to step B.
  • step G is identical to step C, and during this step all valves except valves 8 and 30 are closed and the system is idled, during which period blower 4 and pump 26 are unloaded.
  • step G1 which is the counterpart to step C1 is initiated.
  • Step G1 is a partial continuation of the equalization procedure of step F. Accordingly, valve 30 is closed and valves 8 and 54 are opened. Additionally valve 22 is opened and the bed in vessel B begins to undergo evacuation.
  • step H is initiated by closing valve 54 and opening valve 48.
  • Step H serves to prepare the beds for the start of a new cycle by raising the pressure of the bed in vessel A to near adsorption pressure while evacuating bed B.
  • FIGS. 2 and 3 are representative of adsorption processes in which the idle step of this invention can be practiced.
  • the principle requirement of processes suitable for practice of the present invention is that the processes include a bed equalization step.
  • the idle step follows bed equalization in processes which include two equalization steps, such as the process of FIG. 3, the idle step follows the first bed equalization step.
  • the adsorption step of the process of this invention can be carried out at any useful pressure, however it is generally carried out at absolute pressures in the range of about 1 to about 20 atmospheres and, is preferably carried out at absolute pressures in the range of about 1 to about 10 atmospheres.
  • the bed regeneration step maybe carried out at absolute pressures in the range of about 100 torr to about 5 atmospheres and is preferably carried out at absolute pressures in the range of about 200 torr to about 1 atmosphere.
  • the pressure at which the process is carried out is not critical to the success of the process, however selection of pressure ranges does have an impact on the cost of energy for operation of the process.
  • duration of the steps of the process is a matter of choice and can be varied to provide the desired product purity and non-adsorbed gas yield for the process.
  • Typical full cycle times vary from about 1 minute to about 5 minutes.
  • the duration of the idle step depends upon the quantity of non-adsorbed gas demand at any given time.
  • the idle time is 0, i.e. the process does not include an idle step.
  • the duration of the idle step can be determined by any suitable method.
  • a close approximation of the appropriate new idle step duration, referred to as ISD FF (idle step duration, feed forward component), can be made using the formula:
  • PCT is the duration of the previous cycle, including the time required for the idle step, if an idle step occurs in the previous cycle, but determined without adjustment for purity
  • CCT o is the current cycle time without an idle step
  • PD is the volume demand of first component-enriched gas, i.e. nonadsorbed gas product, being withdrawn from the system by the user at the time of the previous cycle
  • CD is the volume demand of first component-enriched gas required by the user at the time of the current cycle.
  • PD and CD are expressed in the same units and CCT o and ISD are preferably expressed in seconds.
  • the "previous cycle” is the cycle in operation at the time of, or just prior to, the latest change in product demand, i.e. the change for which the adjustment of the idle step duration is being determined
  • the "current cycle” is the cycle just after the latest change in product demand.
  • the purity of the product gas is measured at any given time, and the duration of the idle step is increased slightly, if the product purity is higher than the desired purity, or decreased slightly, if the product purity is lower than the desired purity.
  • ISD FB The change in the duration of the idle step as a result of a correction for purity is referred to herein as "ISD FB ", which stands for “idle step duration, feedback component”. It can be appreciated that ISD FB may be positive or negative, depending on the purity of the gas at the time of the measurement.
  • the preferred procedure for making adjustments in the duration of the idle step to compensate for a change in product volume demand is to employ both of the above corrections, i.e. to algebraically sum the feed forward component and the feedback component of the idle step duration.
  • the ISD FF adjustment is usually made only once after a change in product demand is signaled, whereas the ISD FB may be made repeatedly to correct for drifting of the purity level of the product gas.
  • the runs of this example were carried out in the two-bed adsorption system illustrated in FIG. 1, using the adsorption cycle shown in FIG. 3.
  • Each bed used in the runs had a volume of 0.25 m 3 and was packed with zeolite 5A.
  • the feed gas was air and the adsorption was carried out at ambient temperature.
  • the adsorption step was conducted at an absolute pressure of 19.7 psi and the vacuum step was carried out to an absolute pressure of 250 torr.
  • the steps of the cycle were labeled with the same step labels used in FIG. 3. Three runs were conducted at three different oxygen product gas flow rates.
  • Run 1 in which the duration of steps C and G (the idle steps) was 0 secs; Run 2, in which the duration of steps C and G was 13.5 secs and Run 3, in which the duration of steps C and G was 35 secs.
  • the duration of the following steps was held constant at the indicated times: steps A and E--43 secs; steps A1 and E1--10 secs; steps B and F--6 secs; steps C1 and G1--3 secs; and steps D and H--3 secs.
  • the flow rates, oxygen product gas purlties, and contributions for the feed forward and feedback components of the duration of steps C and G are listed in the Table for each run.

Abstract

The flow rate of a nonadsorbed product gas stream from a multiple unit PSA plant can be reduced in response to a reduced product demand by isolating all units in the plant and inserting an idle step into the adsorption cycle immediately following bed equalization steps of the cycle. In a preferred embodiment, the duration of the idle step is inversely proportional to the percentage reduction in the product demand. To maintain the product gas purity at the desired level, minor adjustments of the idle step duration can be made following adjustment to the idle step in response to a change in product demand.

Description

FIELD OF THE INVENTION
This invention relates to the operation of pressure swing adsorption plants, and more particularly to a method of adjusting the rate of production of nonadsorbed product gas in a pressure swing adsorption plant without significantly altering the purity of the product gas.
BACKGROUND OF THE INVENTION
Adsorption is widely used in the separation of the components of gas mixtures. In general, this technique can be used to separate a component from a gas mixture using a selected adsorbent when the adsorbent preferentially adsorbs the component relative to the other components of the mixture. This procedure is successfully used to separate nitrogen from oxygen using either an adsorbent which preferentially adsorbs nitrogen or an adsorbent which preferentially adsorbs oxygen.
Pressure swing adsorption (PSA) systems typically operate in a cyclical process in which adsorption vessels containing adsorbent are pressurized to operating pressure with a feed gas, components of the feed gas are fractionated by adsorption as the feed gases pass through the adsorption vessels, and the adsorbent is regenerated to remove the adsorbed component from the adsorption vessel. The desired component may be concentrated in either the nonadsorbed fraction or the adsorbed fraction. When multiple beds are used, one or more pressure equalization step may be employed to equalize the pressure between a bed that is saturated with the adsorbed fraction and a bed that has been regenerated and in which the concentration of adsorbed component is considerably diminished.
PSA plants are generally sized to satisfy the product gas quantity and quality requirements of the gas user. The product gas quantity demand of the user is often not constant, and frequently fluctuates from time to time during the course of business operations. To accommodate the needs of the gas user the plant is designed to produce the maximum quantity of gas product anticipated to be required by the user at a purity specified by the user.
It is likely in the commercial operation of PSA systems that demand for product gas may increase or decrease from time to time. For example, PSA systems are often required to produce product gas at higher rates during normal working hours than during off-hours. Various methods of meeting this variable demand while maintaining product purity have been attempted. Product reduction or turndown measures sometimes practiced include venting excess product gas, lengthening the cycle time, storing excess product gas, or temporarily shutting down the system.
Wagner, U.S. Pat. No. 3,703,068, discloses a multi-bed PSA system wherein the pressurization rate of successive beds is controlled by the introduction of fluctuations in the product flow and pressure.
Pfetruszewski, U.S. Pat. No. 4,140,495, discloses the regulation of the quantity of product gas withdrawn by advancing cycles in successive and parallel cycle systems rather than running them concurrently.
Sebastian et al., U.S. Pat. No. 4,197,096, discloses the use of a variable rate compressor pump to correlate product demand to product supply.
Leitgeb, U.S. Pat. No. 4,323,370, discloses varying the length of time of the adsorption phase and the rate of flow of the product gas from the adsorber in response to a varying demand for the product gas. The flow rate and adsorption cycle times are determined as a function of a desired product gas purity and not of the actual product produced by the system.
Armond et al., U.S. Pat. No. 4,576,614 discloses regulating product turndown in a multi-bed system by varying the bed equalization time.
Shirley et al., U.S. Pat. No. 5,258,056discloses varying the product gas flow rate of nonadsorbed gas in a PSA system by sensing a change in product demand and, in response thereto, varying the rate of flow of feed gas to the system.
It is known that for a given rate of gas production, a variation in the feed flow rate will cause an undesirable change in the purity of the gas product. This purity drift occurs because a change in the feed rate affects the manner in which the feed gas contacts the adsorbent material, such as by reducing the amount of time the feed gas is in contact with the adsorbent bed. As a result, varying the feed rate will vary the rate of gas production at the expense of the purity of the product.
It is also known that control of the purity level of a product gas can be accomplished in PSA systems by varying the product flow rates at a fixed cycle time. The product flow rate is set at a level greater than that needed by the consumer while the feed gas flow rate either is fixed by throttling or regulated automatically.
Purity control in the form of inventory control employing a surge vessel is disclosed in European Patent Publication No. 0 135 921.
Miller et al., U.S. Pat. No. 4,693,730, disclose a product purity control pressure swing adsorption process in which a characteristic of the effluent from concurrent depressurization is sensed, and corrective action is taken in response. Any action can be taken which is effective to vary the impurity concentration in the product gas including adjusting the adsorption time to control the impurity loading of each adsorbent bed, adjusting the concurrent depressurization termination pressure to control the impurity breakthrough at the product end of each adsorbent bed, and/or adjusting the amount of purge gas received from each adsorbent bed to control the extent of regeneration.
European Patent Publication No. 0 207 686 discloses controlling oxygen concentration by controlling variations in the cycle time at which a further adsorption bed is substituted for any exhausted or substantially exhausted bed prior to the purging of the latter bed.
Gunderson, U.S. Pat. No. 4,725,293, discloses a process of controlling purity by small variations in the feed flow rate while allowing product flow to vary at the choice of the consumer.
Umeki, U.S. Pat. No. 4,494,966, discloses a two-vessel PSA process comprising the steps of adsorption, bed equalization and bed regeneration in which the process is shut down during the equalization step and the beds are evacuated.
Schroter et al., U.S. Pat. No. 5,108,467 discloses the inclusion of an idle step following the bed regeneration step of a nitrogen PSA process cycle to increase the amount of nitrogen produced in the process.
Correcting for changes in product demand by currently known techniques usually leads to an undesirable change in product gas purity level. PSA process improvements which compensate for variations in product demand without significant changes in product gas purity are constantly being sought. This invention presents a PSA process improvement which provides the advantage of adjusting the production volume of PSA product gas with minimal variation in the purity of the product gas, and provides a power savings, relative to other methods of compensating for a reduced demand of nonadsorbed product gas.
SUMMARY OF THE INVENTION
The process of the invention provides a method of varying the rate of production of nonadsorbed gas from a pressure swing adsorption plant while at the same time reducing the cost of operating the facility, relative to the cost of operating the facility when other production rate modification techniques are employed. The method of the invention comprises introducing an idle step into the process cycle during which the feed blower and vacuum pump (if one is used) are unloaded, i.e. operated in a bypass mode. The idle step is inserted into the process cycle at the end of the bed equalization step, or, if the cycle comprises a first discrete equalization step (a step with simple transfer of gas from one vessel to another) and a second combination equalization-vent step or equalization-purge step, at the end of the discrete equalization step.
According to a broad embodiment, the invention has application in a method of producing a first component-enriched product gas from a mixture comprising the first component and a second component at a rate of production set by downstream demand for the product gas by subjecting the gas mixture to a PSA process in a system comprising a plurality of adsorption vessels each containing an adsorbent which adsorbs the second component more strongly than it adsorbs the first component, the PSA process having a repeating cycle which includes the steps:
(a) flowing the gas mixture at a selected pressure cocurrently through a first adsorption vessel of the system, thereby adsorbing second component-enriched fraction and discharging first component-enriched product gas from the first adsorption vessel;
(b) partially pressurizing a second adsorption vessel of the system by flowing void space gas from the first vessel into the second vessel; and
(c) pressurizing the second adsorption vessel to the selected pressure by cocurrently flowing the gas mixture into the second adsorption vessel.
The invention comprises changing the rate of production of first component-enriched gas stream in the system in response to a change in the first component-enriched gas demand by periodically isolating each vessel of the system and subjecting the system to an idle step of predetermined duration between the above-described steps (b) and (c).
In a preferred embodiment of the invention the duration of the current idle step is the difference between (1) the product of the previous cycle time determined without adjustment for purity and the ratio of the previous product demand to the current product demand and (2) the current cycle time without an idle step (the terms used in this calculation are defined below).
Another preferred embodiment of the invention comprises making an adjustment for purity by measuring the purity of the first component-enriched gas and adjusting the duration of the current idle step in a manner that will minimize the difference between the specified purity and the measured purity.
A most preferred embodiment of the invention comprises using as an approximation of the duration of the current idle step the difference between (1) the product of the previous cycle time determined without adjustment for purity and the ratio of the previous product demand to the current product demand and (2) the current cycle time without an idle step, and then measuring the purity of the first component-enriched gas and further adjusting the duration of the current idle step in a manner that will minimize the difference between the specified purity and the measured purity.
In a modification of the above-described broad embodiment of the invention the process cycle includes, between the idle step and step (c), the additional step of further pressurizing the second adsorption vessel by countercurrently flowing first component-enriched gas into the second vessel.
In a preferred embodiment of the invention the adsorption system comprises at least one pair of first and second adsorption vessels operated 180° out of phase, and the PSA process comprises, with respect to each pair of adsorption vessels in the system, the steps:
(a) flowing the gas mixture cocurrently through the first adsorption vessel at a selected pressure, thereby adsorbing second component-enriched fraction and discharging first component-enriched fraction from the first adsorption vessel, while desorbing second component-enriched fraction from the second adsorption vessel by countercurrently depressurizing the second adsorption vessel;
(b) partially pressurizing the second adsorption vessel by flowing gas from the first adsorption vessel into the second adsorption vessel;
(c) isolating the first and second adsorption vessels and idling the process;
(d) flowing the gas mixture cocurrently through the second adsorption vessel at the selected pressure, thereby adsorbing second component-enriched fraction and discharging first component-enriched fraction from the second adsorption vessel while desorbing second component-enriched fraction from the first adsorption vessel by countercurrently depressurizing the first adsorption vessel;
(e) partially pressurizing the first adsorption vessel by flowing gas from the second adsorption vessel into the first adsorption vessel; and
(f) isolating the first and second adsorption vessels and idling the process.
In the preferred aspect of this embodiment of the invention the duration of steps (c) and (f) is the difference between (1) the product of the previous cycle time determined without adjustment for purity and the ratio of the previous product demand to the current product demand and (2) the current cycle time without an idle step.
Another preferred aspect of this embodiment of the invention comprises measuring the purity of the first component-enriched gas and adjusting the duration of steps (c) and (f) in a manner that will minimize the difference between the specified purity and the measured purity.
A most preferred aspect of this embodiment of the invention comprises using as an approximation of the duration of steps (c) and (f) the difference between (1) the product of the previous cycle time determined without adjustment for purity and the ratio of the previous product demand to the current product demand and (2) the current cycle time without an idle step, and then measuring the purity of the first component-enriched gas and further adjusting the duration of steps (c) and (f) in a manner that will minimize the difference between the specified purity and the measured purity.
In a first modification of the above-described preferred embodiment of the invention the process cycle further includes, between step (c) and step (d), the additional step of further pressurizing the second adsorption vessel by countercurrently flowing first component-enriched gas thereinto and between steps (f) and (a), the additional step of further pressurizing the first adsorption vessel by countercurrently flowing first component-enriched gas thereinto.
In another modification of the preferred embodiment the cycle includes, between steps (a) and (b) the additional step of flowing the gas mixture cocurrently through the first adsorption vessel at the selected pressure and discharging first component-enriched fraction from the first adsorption vessel, while countercurrently flowing first component-enriched gas through the second adsorption vessel, and between steps (d) and (e) the additional step of flowing the gas mixture cocurrently through the second adsorption vessel at the selected pressure and discharging first component-enriched fraction from the second adsorption vessel, while countercurrently flowing first component-enriched gas through the first adsorption vessel.
In another modification of the preferred embodiment, the cycle further comprises, between steps (c) and (d), the additional step of flowing void space gas from the first adsorption vessel to the second adsorption vessel while countercurrently removing gas from the first adsorption vessel and, between steps (f) and (a), the additional step of flowing void space gas from the second adsorption vessel to the first adsorption vessel white countercurrently removing gas from the second adsorption vessel.
In a variation of the above-mentioned first modification of the preferred embodiment, the cycle further includes, between steps (a) and (b), the additional step of flowing the gas mixture at the selected pressure cocurrently through the first adsorption vessel at the selected pressure and discharging first component-enriched fraction from the first adsorption vessel, while countercurrently flowing first component-enriched gas through the second adsorption vessel; between steps (c) and said additional step between steps (c) and (d), the further step of flowing void space gas from the first adsorption vessel to the second adsorption vessel while countercurrently removing gas from the first vessel; between steps (d) and (e) the additional step of flowing the gas mixture at the selected pressure cocurrently through the second adsorption vessel at the selected pressure and discharging first component-enriched fraction from the second adsorption vessel, while countercurrently flowing first component-enriched gas through the first adsorption vessel; and between steps (f) and said additional step between steps (f) and (a), the further step of flowing void space gas from the second adsorption vessel to the first vessel while countercurrently removing gas from the second adsorption vessel.
In another modification of the process of the invention the adsorption system comprises three adsorption vessels operated 120° out of phase.
In a preferred aspect of the above-described embodiments of the invention the first component is oxygen and said second component is nitrogen
In another preferred aspect of the above-described embodiments the gas mixture is air, the first component is oxygen and the second component is nitrogen. In this aspect the adsorbent is selected from synthetic and natural zeolites, and in a more preferred aspect it is a synthetic zeolite selected from type X zeolite and type A zeolite. Also, in this aspect the adsorption pressure is preferably in the range of about atmospheric pressure to about 3 bara.
In another preferred aspect of the above-described embodiments the gas mixture is air, the first component is nitrogen and the second component is oxygen.
BRIEF DESCRIPTION OF THE DRAWINGS
The invention is illustrated in the appended drawings, in which:
FIG. 1 is a schematic representation of a two-bed adsorption plant equipped for practice of the process of this invention;
FIG. 2 is a schematic representation of a simple two-bed adsorption cycle incorporating the improvement of the invention; and
FIG. 3 is a schematic representation of a preferred two-bed cycle incorporating the improvement of the invention.
FIG. 4 is a graph showing the relationship between the flow rate, purity level and idle step duration when the product demand is reduced to 81.5% of the original flow rate.
FIG. 5 is a graph showing the relationship between the flow rate, purity level and idle step duration when the product demand is reduced to 62.5% of the original flow rate.
The same reference numerals and letters are used to represent the same or similar parts in the various drawings.
DETAILED DESCRIPTION OF THE INVENTION
The improved process of the invention is useful for varying the rate of production of a purified gas by PSA. The process can be used to separate air to produce either nitrogen or oxygen as the nonadsorbed gas product, or it can be used to separate the components of gas mixtures other than air. By virtue of the invention the rate of production of the nonadsorbed gas product is varied without significantly changing the purity of this gas. This result is accomplished by inserting an idle step into the adsorption cycle immediately following discrete bed equalization, or by increasing or decreasing the duration of the idle step in an adsorption cycle with an existing idle step. Inserting an idle step into the adsorption cycle at this point causes very little or no variation in the nonadsorbed gas product purity.
During the idle step all adsorption vessels of the system are isolated and the feed compressor and vacuum pump associated with the system are unloaded, thereby effecting power savings.
FIG. 1 illustrates a two adsorption vessel plant in which the invention can be carried out. The system of FIG. 1 includes first and second adsorption vessels, A and B, and a nonadsorbed gas product reservoir, C. Vessels A and B are conventional vessels constructed to withstand the superatmospheric and subatmospheric pressures encountered in pressure swing adsorption processes. Feed gas line 2, provided with feed gas compressor 4 is used to introduce feed gas into the system. Connected to line 2 downstream of compressor 4 is unload gas discharge line 6, which is provided with valve 8. Downstream of compressor 4, line 2 is also connected to the inlet ends of vessels A and B via lines 10 and 12, which are provided with valves 14 and 16, respectively. Bed depressurization manifold 18 is connected to line 10 through valve 20 and to line 12 through valve 22. Bed evacuation line 24 connects manifold 18, at a point between valves 20 and 22, with the inlet end of vacuum pump 26. Vacuum pump unload feed line 28, fitted with valve 30, is connected to line 24. On its discharge end, vacuum pump 26 is provided with waste gas discharge line 32.
Vessels A and B are provided with nonadsorbed gas outlet lines 34 and 36, which are fitted with valves 38 and 40, respectively. At their downstream ends, lines 34 and 36 are joined to nonadsorbed gas discharge line 42 which, in turn, is connected to nonadsorbed gas storage vessel C. Vessel C is also provided with nonadsorbed gas product line 44 and with bed product backfill line 46. Line 46 communicates with lines 34 and 36 through valves 48 and 50, respectively. Equalization gas line 56, fitted with valve 54 connects line 34 to line 36.
Operation of the system of FIG. 1 will be described with reference to the cycle diagrams of FIGS. 2 and 3. FIG. 2 illustrates an 8 step process carried out in a pair of adsorption vessels that are operated 180° out of phase, such that when the adsorbent in one vessel is in adsorption service the adsorbent in the other vessel is undergoing regeneration. The steps of the half-cycle shown as steps A to D and the half cycle shown as steps E to H are adsorption/evacuation, bed equalization, idle and evacuation/product backfill, respectively.
During step A (adsorption/evacuation), valves 14, 38 and 22 are open and all other valves are closed, and compressor 4 and vacuum pump 26 are in service. Feed gas, charged into vessel A at superatmospheric pressure by compressor 4, passes through lines 2 and 10 and weakly adsorbed component-enriched fraction passes out of vessel A through lines 34 and 42 and enters vessel C while the strongly adsorbed component of the gas mixture is adsorbed by the adsorbent in vessel A. Meanwhile, the vessel B evacuation step begun in step H of the previous cycle, is continued, and additional strongly adsorbed component-enriched fraction is drawn from the adsorbent in vessel B through lines 12 and 24 by vacuum pump 26. The evacuated gas is discharged from the system through line 32.
Upon completion of step A, step B is initiated by the closing of valves 14, 22 and 38 and the opening of valves 8, 30 and 54. All other valves of the system remain closed during this step. A portion of the void space gas previously contained in vessel A now passes via valve 54 through lines 34 and 36 and into vessel B. Although this step is referred to as "bed equalization", the transfer of gas is often discontinued before the pressure in vessels A and B is equalized. During this step compressor 4 and pump 26 are unloaded, such that feed gas drawn through line 2 by compressor 4 is discharged from the system through line 6, and gas in drawn into line 24 through line 28 and is discharged from the system through line 32.
Upon completion of step B, step C (idle) is begun. During this step, valve 54 is closed, all other valves remain in the position they were in during step B, and the system is idled. The duration of step C is such that the nonadsorbed gas produced during the current cycle is approximately equal to the nonadsorbed product gas demand. The step C duration can be determined by any suitable method, but it is preferably determined by means of the formula described below, which is based on the rate of removal of nonadsorbed product gas from vessel C through line 44. The duration of the idle step is also adjusted somewhat to compensate for changes in the purity of the nonadsorbed product gas produced during the turndown period. During step C, compressor 4 and pump 26 remain unloaded.
During step D (bed evacuation/product backfill), valves 8, 20 and 50 are open and valve 28 is closed. Strongly adsorbed component-enriched fraction is now evacuated from vessel A and discharged from the system by vacuum pump 26 through lines 10, 24 and 32. During this step the pressure in vessel B is raised to near adsorption pressure by introducing nonadsorbed product gas countercurrently into vessel B through lines 46 and 36. Compressor 4 remains unloaded.
Upon completion of the above half-cycle the second half-cycle is begun, wherein the roles of vessels A and B are reversed.
During step E, valves 16, 20 and 40 are open and all other valves are closed, and feed gas is charged into vessel B at superatmospheric pressure by compressor 4. The feed gas passes through lines 2 and 12 and weakly adsorbed component-enriched fraction passes out of vessel B through lines 36 and 42 and enters vessel C, while the strongly adsorbed component of the gas mixture is adsorbed by the adsorbent in vessel B. During this period, the vessel A evacuation step begun in step D is continued, and additional strongly adsorbed component-enriched fraction is withdrawn from the adsorbent in vessel A, passes through lines 10 and 24 and vacuum pump 26, and is discharged from the system through line 32.
Upon completion of step E, step F is initiated by the closing of valves 16, 20 and 40 and the opening of valves 8, 30 and 54. All other valves remain closed. A portion of the void space gas previously contained in vessel B passes via valve 54 through lines 36 and 34 and into vessel A. During this step compressor 4 and pump 26 are unloaded, and feed gas drawn through line 2 by compressor 4 is discharged from the system through line 6 and gas drawn into line 24 through line 28 and valve 30 is passed through pump 26 and discharged from the system through line 32.
Upon completion of step F, step G is begun. During this step, valve 54 is closed, all other valves remain in the position they were in during step F, and the system is idled. Compressor 4 and pump 26 remain unloaded during this step.
Upon completion of the idle step, step H is initiated with valves 8, 22 and 48 open and valve 28 is closed. Strongly adsorbed component-enriched fraction is now evacuated from vessel B and discharged from the system by vacuum pump 26 through lines 12, 24 and 32. During this step the pressure in vessel A is raised to near adsorption pressure by introducing nonadsorbed product gas into vessel A through lines 46 and 34. Compressor 4 remains unloaded.
At the completion of step H the second half-cycle of the process is finished, and the cycle is repeated, beginning with step A.
FIG. 3 illustrates a more efficient embodiment of the process illustrated in FIG. 2. In the process of FIG. 3, steps A, B, C, D, E, F, G and H are substantially identical with steps of the same letter of the process illustrated in FIG. 2. In addition to these eight steps the FIG. 3 process includes four new steps, namely steps A1, C1, El, and G1. The cycle of FIG. 3 is based on the process illustrated in FIG. 4A to 4J of U.S. Pat. No. 5,122,164. The text of this patent is incorporated herein by reference.
Step A1 of the FIG. 3 process is a continuation of step A of this process. During step A1 valves 14, 22 and 38 remain open and valve 40 is opened. The production of non-adsorbed product gas is continued in vessel A. The evacuation of vessel B is continued but a portion of the non-adsorbed product gas produced in vessel A is passed through vessel B generally at a reduced pressure, to effect purging of vessel B. Step A1 is followed by steps B and C, which are the same as steps B and C of the process of FIG. 2.
Following step C the process is continued with step C1. Step C1 is a partial continuation of the equalization step (step B); however, in step C1 the adsorbent in vessel A begins to undergo evacuation. During step C1 valves 8, 20 and 54 are opened, valve 30 is closed and vessel B is further pressurized by transfer of gas from vessel A through the non-adsorbed ends of the vessels. At the same time gas is withdrawn from vessel A through its inlet end by means of pump 26. The evacuated gases pass out of the system through lines 10, 24 and 32.
Following step C1, step D is initiated by closing valve 54 and opening valve 50. Valve 20 remains opened during step D so that evacuation of the bed in vessel A continues while vessel B undergoes partial repressurization with non-adsorbed product gas. Step E is identical to step E of the process of FIG. 2. During step E valves 16, 20 and 40 are opened and all other valves are closed. Step E1 the counterpart to step A1, is a partial continuation of the procedure carried out in step E. During step El, valves 16, 20 and 40 remain opened and valve 38 is opened. This permits a portion of the non-adsorbed product gas produced in vessel B to pass countercurrently through vessel A, thereby purging the adsorbent in vessel A. At the completion of step El, valves 16, 20, 38 and 40 are closed and valve 54 is opened to initiate step F. Step F is the counterpart to step B. In the process illustrated in FIG. 3, step G is identical to step C, and during this step all valves except valves 8 and 30 are closed and the system is idled, during which period blower 4 and pump 26 are unloaded.
Following step G, step G1, which is the counterpart to step C1 is initiated. Step G1 is a partial continuation of the equalization procedure of step F. Accordingly, valve 30 is closed and valves 8 and 54 are opened. Additionally valve 22 is opened and the bed in vessel B begins to undergo evacuation.
At the completion of step G1 step H is initiated by closing valve 54 and opening valve 48. Step H serves to prepare the beds for the start of a new cycle by raising the pressure of the bed in vessel A to near adsorption pressure while evacuating bed B.
The processes illustrated in FIGS. 2 and 3 are representative of adsorption processes in which the idle step of this invention can be practiced. The principle requirement of processes suitable for practice of the present invention is that the processes include a bed equalization step. In all cases the idle step follows bed equalization in processes which include two equalization steps, such as the process of FIG. 3, the idle step follows the first bed equalization step.
The adsorption step of the process of this invention can be carried out at any useful pressure, however it is generally carried out at absolute pressures in the range of about 1 to about 20 atmospheres and, is preferably carried out at absolute pressures in the range of about 1 to about 10 atmospheres. The bed regeneration step maybe carried out at absolute pressures in the range of about 100 torr to about 5 atmospheres and is preferably carried out at absolute pressures in the range of about 200 torr to about 1 atmosphere. The pressure at which the process is carried out is not critical to the success of the process, however selection of pressure ranges does have an impact on the cost of energy for operation of the process.
The duration of the steps of the process is a matter of choice and can be varied to provide the desired product purity and non-adsorbed gas yield for the process. Typical full cycle times vary from about 1 minute to about 5 minutes.
As noted above, the duration of the idle step depends upon the quantity of non-adsorbed gas demand at any given time. When the product demand is equivalent to the full capacity of the adsorption system, the idle time is 0, i.e. the process does not include an idle step. When an idle step is included in the process cycle, the duration of the idle step can be determined by any suitable method. A close approximation of the appropriate new idle step duration, referred to as ISDFF (idle step duration, feed forward component), can be made using the formula:
ISD.sub.FF =(PD/CD)×PCT-CCT.sub.o
wherein "PCT" is the duration of the previous cycle, including the time required for the idle step, if an idle step occurs in the previous cycle, but determined without adjustment for purity; CCTo is the current cycle time without an idle step; "PD" is the volume demand of first component-enriched gas, i.e. nonadsorbed gas product, being withdrawn from the system by the user at the time of the previous cycle, and "CD" is the volume demand of first component-enriched gas required by the user at the time of the current cycle. PD and CD are expressed in the same units and CCTo and ISD are preferably expressed in seconds. In the formula the "previous cycle" is the cycle in operation at the time of, or just prior to, the latest change in product demand, i.e. the change for which the adjustment of the idle step duration is being determined; and the "current cycle" is the cycle just after the latest change in product demand.
It is important to maintain the purity of the product gas at the desired level. If the purity is too low the product gas will likely not be suitable for the purpose intended, and if it is too high energy is wasted maintaining the high purity level. Accordingly, after introduction into the adsorption cycle of an idle step or after a change in the duration of the idle step it is desirable to determine the purity level and make any changes in the idle step duration necessary to readjust the product gas purity to the desired level. In making purity level corrections the purity of the product gas is measured at any given time, and the duration of the idle step is increased slightly, if the product purity is higher than the desired purity, or decreased slightly, if the product purity is lower than the desired purity. The change in the duration of the idle step as a result of a correction for purity is referred to herein as "ISDFB ", which stands for "idle step duration, feedback component". It can be appreciated that ISDFB may be positive or negative, depending on the purity of the gas at the time of the measurement.
The preferred procedure for making adjustments in the duration of the idle step to compensate for a change in product volume demand is to employ both of the above corrections, i.e. to algebraically sum the feed forward component and the feedback component of the idle step duration. In other words:
ISD=ISD.sub.FF +ISD.sub.FB
The ISDFF adjustment is usually made only once after a change in product demand is signaled, whereas the ISDFB may be made repeatedly to correct for drifting of the purity level of the product gas.
It will be appreciated that it is within the scope of the present invention to utilize conventional equipment to monitor and automatically regulate the flow of gases within the system so that it can be fully automated to run continuously in an efficient manner.
The invention is further illustrated by the following example in which, unless otherwise indicated, parts, percentages and ratios are on a volume basis.
EXAMPLE 1
The runs of this example were carried out in the two-bed adsorption system illustrated in FIG. 1, using the adsorption cycle shown in FIG. 3. Each bed used in the runs had a volume of 0.25 m3 and was packed with zeolite 5A. The feed gas was air and the adsorption was carried out at ambient temperature. The adsorption step was conducted at an absolute pressure of 19.7 psi and the vacuum step was carried out to an absolute pressure of 250 torr. The steps of the cycle were labeled with the same step labels used in FIG. 3. Three runs were conducted at three different oxygen product gas flow rates. In Run 1, in which the duration of steps C and G (the idle steps) was 0 secs; Run 2, in which the duration of steps C and G was 13.5 secs and Run 3, in which the duration of steps C and G was 35 secs. The duration of the following steps was held constant at the indicated times: steps A and E--43 secs; steps A1 and E1--10 secs; steps B and F--6 secs; steps C1 and G1--3 secs; and steps D and H--3 secs. The flow rates, oxygen product gas purlties, and contributions for the feed forward and feedback components of the duration of steps C and G are listed in the Table for each run.
              TABLE                                                       
______________________________________                                    
     Product Flow,                                                        
                  O.sub.2  ISD,   ISD.sub.FF,                             
                                        ISD.sub.FB,                       
Run  Nm.sup.3 /Hr.                                                        
                  Purity, %                                               
                           secs   secs  secs                              
______________________________________                                    
1    6.4          90       0      0     0                                 
2    5.22         90       13.5   14.7  -1.2                              
3    4.0          90       35     39    -4                                
______________________________________                                    
An examination of the results tabulated in the Table show that in Run 2, in which a 14.7 sec. idle step was inserted into the adsorption cycle, the oxygen product gas flow rate was reduced from 6.4 to 5.22 Nm3 /Hr (a reduction to 81.5% of the original flow rate). The purity of the oxygen product gas stream was maintained at the desired 90% by readjusting the duration of the idle step to 13.5 secs.(a reduction of 1.2 secs. from the initial 14.7 sec. idle step duration). FIG. 4, the graph showing the change from the Run 1 rate to the Run 2 rate, shows that when the flow rate was cut back (after about 1.75 hours of operation) the product gas purity increased slightly, but after insertion of the idle step into the cycle the purity dropped. After correction for purity variation the product gas purity eventually returned to about 90%. In Run 3, in which a 39 sec. idle step was inserted into the adsorption cycle, the oxygen product gas flow rate was reduced to 4 Nm3 /hr(a reduction to 62.5% of the original flow rate). The purity of the oxygen product gas stream was maintained at the desired 90% by readjusting the duration of the idle step to 35 secs. (a reduction of 4 secs. from the initial 39 sec. idle step duration). FIG. 5, the graph showing the change from the Run 2 rate to the Run 3 rate, shows that when the duration of the idle step was further increased to adjust the system for the reduction in flow from 5.22 to 4 Nm3 /hr, the purity varied slightly, but it became steady at about 90% oxygen after correction of the idle step duration to compensate for purity variation.
The above runs show that the flow rate of nonadsorbed gas from a PSA plant can be reduced by inserting an idle step into the adsorption cycle, and that the desired purity level can be maintained at the reduced flow rate by making minor adjustments to the duration of the idle step.
Although the invention has been described with particular reference to specific equipment arrangements and process steps and to specific experiments, these features are merely exemplary of the invention and variations are contemplated. For example, although the invention was described with particular emphasis on reducing the production rate of a PSA plant, it can be used to increase the production rate from an earlier rate that was below the maximum rate for the plant. The scope of the invention is limited only by the breadth of the appended claims.

Claims (18)

What is claimed is:
1. In a method of producing a gas enriched in a first component at a specified purity and at a rate of production set by downstream demand for said gas by subjecting a gas mixture comprising said first component and a second component to a pressure swing absorption process in a system comprising a plurality of adsorption vessels each containing an adsorbent which adsorbs said second component more strongly than it adsorbs said first component, said pressure swing adsorption process having a repeating cycle which includes the steps:
(a) flowing said gas mixture at a selected pressure cocurrently through a first adsorption vessel of said system, thereby adsorbing second component-enriched fraction and discharging first component-enriched gas from said first adsorption vessel;
(b) partially pressurizing a second adsorption vessel of said system by flowing gas from said first vessel into said second vessel; and
(c) pressurizing said second adsorption vessel to said selected pressure by cocurrently flowing said gas mixture thereinto;
the improvement comprising changing the rate of production of said first component-enriched gas in said system in response to a change in downstream demand of said first component-enriched gas by periodically isolating each vessel of said system and subjecting said system to an idle step between steps (b) and (c).
2. The improved method of claim 1, wherein during a given cycle, said idle step has a duration equal to the difference between (1) the product of the duration of the cycle immediately preceding said given cycle, determined without adjustment for purity, and the ratio of the downstream demand immediately preceding said change in downstream demand to the downstream demand immediately following said change in downstream demand and (2) the duration of said given cycle without an idle step.
3. The improved method of claim 1 or claim 2, further comprising measuring the purity of the first component-enriched gas and adjusting the idle step in a manner that will minimize the difference between the specified purity and the purity of said first component-enriched gas.
4. The method of claim 1, further comprising between the idle step and step (c) the step of further pressurizing said second adsorption vessel by countercurrently flowing gas enriched in said first component thereinto.
5. The improved method of claim 1, wherein said plurality of adsorption vessels comprises three adsorption vessels operated 120° out of phase.
6. A method of producing a gas enriched in a first component at a specified purity by subjecting a gas mixture comprising said first component and a second component to a pressure swing adsorption process in a system comprising at least one pair of first and second adsorption vessels operated 180° out of phase, each adsorption vessel containing an adsorbent which adsorbs said second component more strongly than it adsorbs said first component, said pressure swing adsorption process having a repeating cycle which comprises, with respect to each pair of adsorption vessels in said system, the steps:
(a) flowing said gas mixture cocurrently through said first adsorption vessel at a selected pressure, thereby adsorbing second component-enriched fraction and discharging first component-enriched gas from said first adsorption vessel, while desorbing second component-enriched fraction from said second adsorption vessel by countercurrently depressurizing said second adsorption vessel;
(b) partially pressurizing said second adsorption vessel by flowing gas from said first adsorption vessel into said second adsorption vessel;
(c) isolating said first and said second adsorption vessels and idling said process;
(d) flowing said gas mixture at said selected pressure cocurrently through said second adsorption vessel, thereby adsorbing second component-enriched fraction and discharging first component-enriched gas from said second adsorption vessel, while desorbing second component-enriched fraction from said first adsorption vessel by countercurrently depressurizing said first adsorption vessel;
(e) partially pressurizing said first adsorption vessel by flowing gas from said second adsorption vessel into said first adsorption vessel; and
(f) isolating said first and said second adsorption vessels and idling said process.
7. The method of claim 6, wherein during a given cycle, steps (c) and (f) have a duration equal to the difference between (1) the product of the duration of the cycle immediately preceding said given cycle, determined without adjustment for purity, and the ratio of the downstream demand immediately preceding said change in downstream demand to the downstream demand immediately following said change in downstream demand and (2) the duration of said given cycle without an idle step.
8. The method of claim 6 or claim 7, further comprising measuring the purity of said first component-enriched gas and adjusting steps (c) and (f) in a manner that will minimize the difference between the specified purity and the purity of said first component enriched gas.
9. The method of claim 6, further comprising between step (c) and step (d), the additional step of further pressurizing said second adsorption vessel by countercurrently flowing gas enriched in said first component thereinto and between steps (f) and (a), the additional step of further pressurizing said first adsorption vessel by countercurrently flowing gas enriched in said first component thereinto.
10. The process of claim 9, further comprising between steps (a) and (b) the additional step of flowing said gas mixture at said selected pressure cocurrently through said first adsorption vessel at said selected pressure and discharging said first component-enriched gas from said first adsorption vessel, while countercurrently flowing gas enriched in said first component through said second adsorption vessel; between step (c) and said additional step between steps (c) and (d), the further step of flowing void space gas from said first adsorption vessel to said second adsorption vessel while countercurrently removing gas from said first vessel; between steps (d) and (e) the additional step of flowing said gas mixture at said selected pressure cocurrently through said second adsorption vessel at said selected pressure and discharging said first component-enriched gas from said second adsorption vessel, while countercurrently flowing gas enriched in said first component through said first adsorption vessel; and between step (f) and said additional step between steps (f) and (a), the further step of flowing void space gas from said second adsorption vessel to said first adsorption vessel while countercurrently removing gas from said second adsorption vessel.
11. The process of claim 6, further comprising between steps (a) and (b) the additional step of flowing said gas mixture cocurrently through said first adsorption vessel at said selected pressure and discharging first component-enriched gas from said first adsorption vessel, while countercurrently flowing gas enriched in said first component through said second adsorption vessel, and between steps (d) and (e) the additional step of flowing said gas mixture cocurrently through said second adsorption vessel at said selected pressure and discharging first component-enriched gas from said second adsorption vessel, while countercurrently flowing gas enriched in said first component through said first adsorption vessel.
12. The method of claim 6, further comprising, between steps (c) and (d), the additional step of flowing void space gas from said first adsorption vessel to said second adsorption vessel while countercurrently removing gas from said first adsorption vessel and, between steps (f) and (a), the additional step of flowing void space gas from said second adsorption vessel to said first adsorption vessel while countercurrently removing gas from said second adsorption vessel.
13. The method of claim 1 or claim 6, wherein said first component is oxygen and said second component is nitrogen.
14. The method of claim 13, wherein said gas mixture is air.
15. The method of claim 14, wherein said selected pressure is in the range of about atmospheric pressure to about 3 bara.
16. The method of claim 13, wherein said adsorbent is selected from synthetic and natural zeolites.
17. The process of claim 16, wherein said adsorbent is a synthetic zeolite selected from type X zeolite and type A zeolite.
18. The method of claim 1 or claim 6, wherein said first component is nitrogen and said second component is oxygen.
US08/665,939 1996-06-19 1996-06-19 Pressure swing adsorption process turndown control Expired - Fee Related US5733359A (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
US08/665,939 US5733359A (en) 1996-06-19 1996-06-19 Pressure swing adsorption process turndown control
CA002204574A CA2204574A1 (en) 1996-06-19 1997-05-06 Pressure swing adsorption process turndown control
IDP971645A ID17418A (en) 1996-06-19 1997-05-16 CONTROLLERS THAT REDUCE PRESSURE ADSORPTION OF PRESSURE SWING
JP9129407A JPH1043535A (en) 1996-06-19 1997-05-20 Production of gas flow
ZA9704892A ZA974892B (en) 1996-06-19 1997-06-03 Pressure swing adsorption process turndown control.
EP97304054A EP0819463A3 (en) 1996-06-19 1997-06-11 Pressure swing adsorption process
AU24857/97A AU2485797A (en) 1996-06-19 1997-06-12 Pressure swing adsorption process turndown control
PL97320605A PL320605A1 (en) 1996-06-19 1997-06-17 Method of producing a gas jet
KR1019970025301A KR980000547A (en) 1996-06-19 1997-06-18 Pressurized Swing Adsorption Process Turndown Control
CN97113504A CN1171286A (en) 1996-06-19 1997-06-19 Pressure swing adsorption process turndown control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US08/665,939 US5733359A (en) 1996-06-19 1996-06-19 Pressure swing adsorption process turndown control

Publications (1)

Publication Number Publication Date
US5733359A true US5733359A (en) 1998-03-31

Family

ID=24672172

Family Applications (1)

Application Number Title Priority Date Filing Date
US08/665,939 Expired - Fee Related US5733359A (en) 1996-06-19 1996-06-19 Pressure swing adsorption process turndown control

Country Status (10)

Country Link
US (1) US5733359A (en)
EP (1) EP0819463A3 (en)
JP (1) JPH1043535A (en)
KR (1) KR980000547A (en)
CN (1) CN1171286A (en)
AU (1) AU2485797A (en)
CA (1) CA2204574A1 (en)
ID (1) ID17418A (en)
PL (1) PL320605A1 (en)
ZA (1) ZA974892B (en)

Cited By (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5863315A (en) * 1996-07-26 1999-01-26 Institut Francais Du Petrole Process for the separation of isoalkanes/n-alkanes by gas phase adsorption using a pressure swing and four adsorbers
US5964924A (en) * 1997-04-02 1999-10-12 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process and installation for the separation of a gas mixture by adsorption
US5985003A (en) * 1994-06-02 1999-11-16 Nippon Sanso Corporation Oxygen production process by pressure swing adsorption separation
US5997611A (en) * 1998-07-24 1999-12-07 The Boc Group, Inc. Single vessel gas adsorption system and process
US6010555A (en) * 1997-11-04 2000-01-04 Praxair Technology, Inc. Vacuum pressure swing adsorption system and method
US6030435A (en) * 1997-07-25 2000-02-29 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Regulation of a PSA process
US6048384A (en) * 1997-12-09 2000-04-11 Smolarek; James PSA process and system using simultaneous top and bottom evacuation of absorbent bed
US6077331A (en) * 1995-12-02 2000-06-20 Normalair-Garrett (Holdings) Limited Molecular sieve type gas separation apparatus and method
US6090185A (en) * 1997-12-18 2000-07-18 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process for gas separation by adsorption with variable production rate
US6224651B1 (en) * 1998-08-04 2001-05-01 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process from separation of a gas mixture by pressure swing adsorption and plant for its implementation
US6238458B1 (en) * 1998-09-25 2001-05-29 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process for treatment of a gaseous mixture by pressure swing adsorption, with variable production flow rate
US6277174B1 (en) * 2000-01-07 2001-08-21 Praxair Technology, Inc. Low pressure ratio VPSA plant tuning and balancing system
US6287366B1 (en) * 1998-04-07 2001-09-11 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process for the production of oxygen by adsorption with transatmospheric pressure variation
US6346139B1 (en) 1999-05-12 2002-02-12 Respironics, Inc. Total delivery oxygen concentration system
US6585804B2 (en) 2001-11-09 2003-07-01 Air Products And Chemicals, Inc. Pressure swing adsorption process operation at turndown conditions
US6669758B1 (en) 2002-06-27 2003-12-30 Carleton Life Support Systems, Inc. Variable inlet air restriction for composition control of product gas
US6709486B2 (en) * 2002-04-08 2004-03-23 Air Products And Chemicals, Inc. Pressure swing adsorption process with controlled internal depressurization flow
US6733568B2 (en) * 2002-02-13 2004-05-11 L'Air Liquide, Société Anonyme á Directoire et Conseil de Surveillance pour l'Etude et l'Exploitation des Procédés Georges Claude Method of controlling a plant for processing a gas by adsorption and corresponding processing plant
US20040211476A1 (en) * 2003-04-27 2004-10-28 Litton Systems, Inc. Air conserving slide valve
US20050126570A1 (en) * 2002-03-01 2005-06-16 Honeywell Normalair-Garrett (Holdings) Limited Breathing gas supply system
US20060283325A1 (en) * 2003-09-09 2006-12-21 Masato Sugano Oxygen concentrating apparatus and rotary valve
US20090065007A1 (en) * 2007-09-06 2009-03-12 Wilkinson William R Oxygen concentrator apparatus and method
WO2011075398A1 (en) * 2009-12-17 2011-06-23 Idatech, Llc Initiating operation of pressure swing adsorption systems in hydrogen-producing systems
US8435328B2 (en) 2011-01-11 2013-05-07 Praxair Technology, Inc. Ten bed pressure swing adsorption process operating in normal and turndown modes
US8449649B2 (en) 2010-05-11 2013-05-28 Idatech, Llc Systems and methods for starting up pressure swing adsorption assemblies and hydrogen-producing fuel processing systems including the same
US8491704B2 (en) 2011-01-11 2013-07-23 Praxair Technology, Inc. Six bed pressure swing adsorption process operating in normal and turndown modes
US8496733B2 (en) 2011-01-11 2013-07-30 Praxair Technology, Inc. Large scale pressure swing adsorption systems having process cycles operating in normal and turndown modes
US8551217B2 (en) 2011-01-11 2013-10-08 Praxair Technology, Inc. Six bed pressure swing adsorption process operating in normal and turndown modes
US8603228B2 (en) 2010-09-07 2013-12-10 Inova Labs, Inc. Power management systems and methods for use in an oxygen concentrator
US8616207B2 (en) 2010-09-07 2013-12-31 Inova Labs, Inc. Oxygen concentrator heat management system and method
CN103801171A (en) * 2014-02-14 2014-05-21 上海穗杉实业有限公司 Two-stage-tandem PSA (pressure swing adsorption) oxygen production system capable of increasing recovery rate of oxygen and operating method of two-stage PSA oxygen production system
US8932387B2 (en) 2010-01-26 2015-01-13 Osaka Gas Co., Ltd. Enrichment system for combustible gas
US9440179B2 (en) 2014-02-14 2016-09-13 InovaLabs, LLC Oxygen concentrator pump systems and methods
US9440180B2 (en) 2012-10-12 2016-09-13 Inova Labs, Llc Oxygen concentrator systems and methods
US9440036B2 (en) 2012-10-12 2016-09-13 InovaLabs, LLC Method and systems for the delivery of oxygen enriched gas
US9458013B1 (en) 2015-05-27 2016-10-04 Air Products And Chemicals, Inc. Process for the production of hydrogen
US9717876B2 (en) 2012-10-12 2017-08-01 Inova Labs, Inc. Dual oxygen concentrator systems and methods
WO2019094803A1 (en) * 2017-11-09 2019-05-16 Apache Corporation Natural gas liquids recovery from pressure swing adsorption and vacuum swing adsorption
US10646817B2 (en) 2017-11-09 2020-05-12 Apache Corporation Porous materials for natural gas liquids separations
CN112295360A (en) * 2020-10-23 2021-02-02 宁波岚新空分设备科技有限公司 Pressure swing adsorption nitrogen preparation system
US11458274B2 (en) 2016-05-03 2022-10-04 Inova Labs, Inc. Method and systems for the delivery of oxygen enriched gas

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4908997B2 (en) * 2006-09-28 2012-04-04 大陽日酸株式会社 Pressure fluctuation adsorption gas separation method and separation apparatus
FR3011480B1 (en) * 2013-10-04 2017-01-27 Air Liquide ADSORPTION METHOD WITH PRESSURE MODULATION WITH ADDITIONAL ELUTION
FR3011481B1 (en) * 2013-10-04 2017-01-20 Air Liquide PRESSURE MODULATION ADSORPTION METHOD WITH REGULATION
CN107126813A (en) * 2017-06-20 2017-09-05 西梅卡亚洲气体系统成都有限公司 A kind of structure and control method of stepless varying duty pressure swing adsorption air separator
CN108760160B (en) * 2018-05-10 2020-02-07 无锡格林司通自动化设备有限公司 Pressure regulating system
CN114437847B (en) * 2020-11-04 2022-12-09 中国石油化工股份有限公司 Computer control method and system for natural gas pressure swing adsorption denitrification process

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3703068A (en) * 1971-03-26 1972-11-21 Union Carbide Corp Control system for selective adsorption process
US4140495A (en) * 1977-05-27 1979-02-20 Union Carbide Corporation Turndown control for pressure swing adsorption
US4299595A (en) * 1978-11-30 1981-11-10 Linde Aktiengesellschaft Method of operating a cyclical pressure-swing adsorption installation
US4315759A (en) * 1979-07-28 1982-02-16 Linde Aktiengesellschaft Adsorption process producing chronologically constant amount of a residual gas
US4323370A (en) * 1979-06-08 1982-04-06 Linde Aktiengesellschaft Adsorption process producing varying amounts of product gas of a constant purity
US4472177A (en) * 1982-09-09 1984-09-18 Air Products And Chemicals, Inc. Control system and method for air fractionation by vacuum swing adsorption
US4494966A (en) * 1982-07-07 1985-01-22 The Boc Group Plc Process for nitrogen enrichment
US4576614A (en) * 1980-10-30 1986-03-18 The Boc Group, Inc. Process and apparatus for separation of a gaseous mixture
US4643743A (en) * 1983-02-10 1987-02-17 Union Carbide Corporation Pressure swing adsorption process for supplying oxygen under variable demand conditions
US4948391A (en) * 1988-05-12 1990-08-14 Vacuum Optics Corporation Of Japan Pressure swing adsorption process for gas separation
US5015271A (en) * 1988-09-01 1991-05-14 Bayer Aktiengesellschaft Separation of gas mixtures by vacuum swing adsorption (VSA) in a two-adsorber system
US5042994A (en) * 1990-05-25 1991-08-27 Union Carbide Industrial Gases Technology Corporation Control of pressure swing adsorption operations
US5108467A (en) * 1988-09-08 1992-04-28 Bergwerksverband Gmbh Process for at least partially separating a gaseous component from a mixture of gaseous components
US5122164A (en) * 1990-03-29 1992-06-16 The Boc Group, Inc. Process for producing oxygen enriched product stream
US5258056A (en) * 1991-09-27 1993-11-02 The Boc Group, Inc. PSA system with product turndown and purity control
US5407465A (en) * 1993-12-16 1995-04-18 Praxair Technology, Inc. Tuning of vacuum pressure swing adsorption systems
US5441558A (en) * 1994-08-09 1995-08-15 Air Products And Chemicals, Inc. High purity nitrogen PSA utilizing controlled internal flows
US5486226A (en) * 1992-12-09 1996-01-23 The Boc Group Plc Separation of gaseous mixtures
US5518526A (en) * 1994-10-07 1996-05-21 Praxair Technology, Inc. Pressure swing adsorption process
US5520720A (en) * 1994-11-30 1996-05-28 The Boc Group, Inc. Pressure swing adsorption process
US5529607A (en) * 1995-03-15 1996-06-25 The Boc Group, Inc. PSA process with dynamic purge control
US5536299A (en) * 1994-09-01 1996-07-16 Praxair Technology, Inc. Simultaneous step pressure swing adsorption process

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0447029A1 (en) * 1990-02-09 1991-09-18 Air Products And Chemicals, Inc. Enhanced primary component output from adsorptive separation
CA2076454A1 (en) * 1991-08-27 1993-02-28 Wilbur C. Kratz Pressure swing adsorption for hydrogen with high productivity
US5294247A (en) * 1993-02-26 1994-03-15 Air Products And Chemicals, Inc. Adsorption process to recover hydrogen from low pressure feeds
US5447557A (en) * 1994-03-23 1995-09-05 Air Products And Chemicals, Inc. Oxygen selective adsorbents

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3703068A (en) * 1971-03-26 1972-11-21 Union Carbide Corp Control system for selective adsorption process
US4140495A (en) * 1977-05-27 1979-02-20 Union Carbide Corporation Turndown control for pressure swing adsorption
US4299595A (en) * 1978-11-30 1981-11-10 Linde Aktiengesellschaft Method of operating a cyclical pressure-swing adsorption installation
US4323370A (en) * 1979-06-08 1982-04-06 Linde Aktiengesellschaft Adsorption process producing varying amounts of product gas of a constant purity
US4315759A (en) * 1979-07-28 1982-02-16 Linde Aktiengesellschaft Adsorption process producing chronologically constant amount of a residual gas
US4576614A (en) * 1980-10-30 1986-03-18 The Boc Group, Inc. Process and apparatus for separation of a gaseous mixture
US4494966A (en) * 1982-07-07 1985-01-22 The Boc Group Plc Process for nitrogen enrichment
US4472177A (en) * 1982-09-09 1984-09-18 Air Products And Chemicals, Inc. Control system and method for air fractionation by vacuum swing adsorption
US4643743A (en) * 1983-02-10 1987-02-17 Union Carbide Corporation Pressure swing adsorption process for supplying oxygen under variable demand conditions
US4948391A (en) * 1988-05-12 1990-08-14 Vacuum Optics Corporation Of Japan Pressure swing adsorption process for gas separation
US5015271A (en) * 1988-09-01 1991-05-14 Bayer Aktiengesellschaft Separation of gas mixtures by vacuum swing adsorption (VSA) in a two-adsorber system
US5108467A (en) * 1988-09-08 1992-04-28 Bergwerksverband Gmbh Process for at least partially separating a gaseous component from a mixture of gaseous components
US5122164A (en) * 1990-03-29 1992-06-16 The Boc Group, Inc. Process for producing oxygen enriched product stream
US5042994A (en) * 1990-05-25 1991-08-27 Union Carbide Industrial Gases Technology Corporation Control of pressure swing adsorption operations
US5258056A (en) * 1991-09-27 1993-11-02 The Boc Group, Inc. PSA system with product turndown and purity control
US5486226A (en) * 1992-12-09 1996-01-23 The Boc Group Plc Separation of gaseous mixtures
US5407465A (en) * 1993-12-16 1995-04-18 Praxair Technology, Inc. Tuning of vacuum pressure swing adsorption systems
US5441558A (en) * 1994-08-09 1995-08-15 Air Products And Chemicals, Inc. High purity nitrogen PSA utilizing controlled internal flows
US5536299A (en) * 1994-09-01 1996-07-16 Praxair Technology, Inc. Simultaneous step pressure swing adsorption process
US5518526A (en) * 1994-10-07 1996-05-21 Praxair Technology, Inc. Pressure swing adsorption process
US5520720A (en) * 1994-11-30 1996-05-28 The Boc Group, Inc. Pressure swing adsorption process
US5529607A (en) * 1995-03-15 1996-06-25 The Boc Group, Inc. PSA process with dynamic purge control

Cited By (62)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5985003A (en) * 1994-06-02 1999-11-16 Nippon Sanso Corporation Oxygen production process by pressure swing adsorption separation
US6077331A (en) * 1995-12-02 2000-06-20 Normalair-Garrett (Holdings) Limited Molecular sieve type gas separation apparatus and method
US6383256B1 (en) * 1995-12-02 2002-05-07 Normalair-Garrett (Holdings) Limited Molecular sieve type gas separation apparatus
US5863315A (en) * 1996-07-26 1999-01-26 Institut Francais Du Petrole Process for the separation of isoalkanes/n-alkanes by gas phase adsorption using a pressure swing and four adsorbers
US5964924A (en) * 1997-04-02 1999-10-12 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process and installation for the separation of a gas mixture by adsorption
US6030435A (en) * 1997-07-25 2000-02-29 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Regulation of a PSA process
US6010555A (en) * 1997-11-04 2000-01-04 Praxair Technology, Inc. Vacuum pressure swing adsorption system and method
US6048384A (en) * 1997-12-09 2000-04-11 Smolarek; James PSA process and system using simultaneous top and bottom evacuation of absorbent bed
US6090185A (en) * 1997-12-18 2000-07-18 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process for gas separation by adsorption with variable production rate
US6287366B1 (en) * 1998-04-07 2001-09-11 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process for the production of oxygen by adsorption with transatmospheric pressure variation
US5997611A (en) * 1998-07-24 1999-12-07 The Boc Group, Inc. Single vessel gas adsorption system and process
US6224651B1 (en) * 1998-08-04 2001-05-01 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process from separation of a gas mixture by pressure swing adsorption and plant for its implementation
US6238458B1 (en) * 1998-09-25 2001-05-29 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Process for treatment of a gaseous mixture by pressure swing adsorption, with variable production flow rate
US6346139B1 (en) 1999-05-12 2002-02-12 Respironics, Inc. Total delivery oxygen concentration system
US6478857B2 (en) 1999-05-12 2002-11-12 Respironics, Inc. Total delivery oxygen concentration system
US6277174B1 (en) * 2000-01-07 2001-08-21 Praxair Technology, Inc. Low pressure ratio VPSA plant tuning and balancing system
US6585804B2 (en) 2001-11-09 2003-07-01 Air Products And Chemicals, Inc. Pressure swing adsorption process operation at turndown conditions
US6733568B2 (en) * 2002-02-13 2004-05-11 L'Air Liquide, Société Anonyme á Directoire et Conseil de Surveillance pour l'Etude et l'Exploitation des Procédés Georges Claude Method of controlling a plant for processing a gas by adsorption and corresponding processing plant
US20050126570A1 (en) * 2002-03-01 2005-06-16 Honeywell Normalair-Garrett (Holdings) Limited Breathing gas supply system
US7255104B2 (en) * 2002-03-01 2007-08-14 Honeywell Normalair-Garrett (Holdings) Limited Breathing gas supply system
US6709486B2 (en) * 2002-04-08 2004-03-23 Air Products And Chemicals, Inc. Pressure swing adsorption process with controlled internal depressurization flow
US6669758B1 (en) 2002-06-27 2003-12-30 Carleton Life Support Systems, Inc. Variable inlet air restriction for composition control of product gas
US20040211476A1 (en) * 2003-04-27 2004-10-28 Litton Systems, Inc. Air conserving slide valve
US7036521B2 (en) 2003-04-27 2006-05-02 Carleton Life Support Systems, Inc. Air conserving slide valve
US20060283325A1 (en) * 2003-09-09 2006-12-21 Masato Sugano Oxygen concentrating apparatus and rotary valve
US20110030685A1 (en) * 2007-09-06 2011-02-10 Wilkinson William R Oxygen concentrator apparatus and method of delivering pulses of oxygen
US9956370B2 (en) 2007-09-06 2018-05-01 Inova, Labs, LLC. Oxygen concentrator apparatus and method having flow restricted coupling of the canisters
US20110030687A1 (en) * 2007-09-06 2011-02-10 Inova Labs, Inc. Oxygen concentrator apparatus and method with an oxygen assisted venting system
US20110030689A1 (en) * 2007-09-06 2011-02-10 Inova Labs, Inc. Oxygen concentrator apparatus and method having an ultrasonic detector
US20110030684A1 (en) * 2007-09-06 2011-02-10 Inova Labs, Inc. Oxygen concentrator apparatus and method having flow restricted coupling of the canisters
US20090065007A1 (en) * 2007-09-06 2009-03-12 Wilkinson William R Oxygen concentrator apparatus and method
US20110030686A1 (en) * 2007-09-06 2011-02-10 Inova Labs, Inc. Oxygen concentrator apparatus and method having variable operation modes
US9649465B2 (en) 2007-09-06 2017-05-16 Inova Labs, Inc. Oxygen concentrator apparatus and method having variable operation modes
US9649464B2 (en) 2007-09-06 2017-05-16 Inova Labs, Inc. Oxygen concentrator apparatus and method having an ultrasonic detector
US8915248B2 (en) 2007-09-06 2014-12-23 Inova Labs, Inc. Oxygen concentrator apparatus and method with an oxygen assisted venting system
US8794237B2 (en) 2007-09-06 2014-08-05 Inova Labs, Inc. Oxygen concentrator apparatus and method having flow restricted coupling of the canisters
WO2011075398A1 (en) * 2009-12-17 2011-06-23 Idatech, Llc Initiating operation of pressure swing adsorption systems in hydrogen-producing systems
US8790618B2 (en) * 2009-12-17 2014-07-29 Dcns Sa Systems and methods for initiating operation of pressure swing adsorption systems and hydrogen-producing fuel processing systems incorporating the same
TWI459623B (en) * 2009-12-17 2014-11-01 Idatech Llc Systems and methods for initiating operation of pressure swing adsorption systems and hydrogen-producing fuel processing systems incorporating the same
US20110150756A1 (en) * 2009-12-17 2011-06-23 Idatech, Llc Systems and methods for initiating operation of pressure swing adsorption systems and hydrogen-producing fuel processing systems incorporating the same
US8932387B2 (en) 2010-01-26 2015-01-13 Osaka Gas Co., Ltd. Enrichment system for combustible gas
US8449649B2 (en) 2010-05-11 2013-05-28 Idatech, Llc Systems and methods for starting up pressure swing adsorption assemblies and hydrogen-producing fuel processing systems including the same
US8603228B2 (en) 2010-09-07 2013-12-10 Inova Labs, Inc. Power management systems and methods for use in an oxygen concentrator
US8616207B2 (en) 2010-09-07 2013-12-31 Inova Labs, Inc. Oxygen concentrator heat management system and method
US8496733B2 (en) 2011-01-11 2013-07-30 Praxair Technology, Inc. Large scale pressure swing adsorption systems having process cycles operating in normal and turndown modes
US8551217B2 (en) 2011-01-11 2013-10-08 Praxair Technology, Inc. Six bed pressure swing adsorption process operating in normal and turndown modes
US8491704B2 (en) 2011-01-11 2013-07-23 Praxair Technology, Inc. Six bed pressure swing adsorption process operating in normal and turndown modes
US8435328B2 (en) 2011-01-11 2013-05-07 Praxair Technology, Inc. Ten bed pressure swing adsorption process operating in normal and turndown modes
US9440036B2 (en) 2012-10-12 2016-09-13 InovaLabs, LLC Method and systems for the delivery of oxygen enriched gas
US11364359B2 (en) 2012-10-12 2022-06-21 Inova Labs, Inc. Method and systems for the delivery of oxygen enriched gas
US9440180B2 (en) 2012-10-12 2016-09-13 Inova Labs, Llc Oxygen concentrator systems and methods
US9717876B2 (en) 2012-10-12 2017-08-01 Inova Labs, Inc. Dual oxygen concentrator systems and methods
US11684744B2 (en) 2012-10-12 2023-06-27 Inova Labs, Inc. Method and systems for the delivery of oxygen enriched gas
US9440179B2 (en) 2014-02-14 2016-09-13 InovaLabs, LLC Oxygen concentrator pump systems and methods
CN103801171A (en) * 2014-02-14 2014-05-21 上海穗杉实业有限公司 Two-stage-tandem PSA (pressure swing adsorption) oxygen production system capable of increasing recovery rate of oxygen and operating method of two-stage PSA oxygen production system
US9458013B1 (en) 2015-05-27 2016-10-04 Air Products And Chemicals, Inc. Process for the production of hydrogen
US11458274B2 (en) 2016-05-03 2022-10-04 Inova Labs, Inc. Method and systems for the delivery of oxygen enriched gas
US10441915B2 (en) 2017-11-09 2019-10-15 Apache Corporation Natural gas liquids recovery from pressure swing adsorption and vacuum swing adsorption
US10730005B2 (en) 2017-11-09 2020-08-04 Apache Corporation Porous materials for natural gas liquids separations
US10646817B2 (en) 2017-11-09 2020-05-12 Apache Corporation Porous materials for natural gas liquids separations
WO2019094803A1 (en) * 2017-11-09 2019-05-16 Apache Corporation Natural gas liquids recovery from pressure swing adsorption and vacuum swing adsorption
CN112295360A (en) * 2020-10-23 2021-02-02 宁波岚新空分设备科技有限公司 Pressure swing adsorption nitrogen preparation system

Also Published As

Publication number Publication date
EP0819463A3 (en) 1998-07-01
CN1171286A (en) 1998-01-28
AU2485797A (en) 1998-01-08
KR980000547A (en) 1998-03-30
ZA974892B (en) 1997-12-30
ID17418A (en) 1997-12-24
JPH1043535A (en) 1998-02-17
PL320605A1 (en) 1997-12-22
CA2204574A1 (en) 1997-12-19
EP0819463A2 (en) 1998-01-21

Similar Documents

Publication Publication Date Title
US5733359A (en) Pressure swing adsorption process turndown control
US5258056A (en) PSA system with product turndown and purity control
JP4025021B2 (en) Low pressure ratio VPSA plant conditioning and balancing system
US4816039A (en) PSA multicomponent separation utilizing tank equalization
KR0160246B1 (en) Psa process with dynamic purge control
US4576614A (en) Process and apparatus for separation of a gaseous mixture
US6641645B1 (en) Vacuum swing adsorption process with controlled waste gas withdrawal
US4070164A (en) Adsorption-desorption pressure swing gas separation
EP0658365B1 (en) Tuning of vacuum pressure swing adsorption systems
EP0793991B1 (en) Vacuum pressure swing adsorption process
US5441558A (en) High purity nitrogen PSA utilizing controlled internal flows
EP0753334A1 (en) Pressure swing adsorption process and system with segregated product storage tank
US6048384A (en) PSA process and system using simultaneous top and bottom evacuation of absorbent bed
GB2055610A (en) Adsorptive separation of gas containing nitrogen and oxygen
EP1459798B1 (en) Gas separation method and device
US7468096B2 (en) Apparatus for producing oxygen and method for controlling the same
WO2017170983A1 (en) Pressure swing adsorption type gas manufacturing device
GB1572532A (en) Method for separation of a gaseous mixture
US6090185A (en) Process for gas separation by adsorption with variable production rate
EP0849218B1 (en) Nitrogen PSA with intermediate pressure transfer
US4848985A (en) Separation of gas mixtures
JPS62176515A (en) Pretreatment device for gas separation
JP3143758B2 (en) Weight loss operation method of pressure fluctuation adsorption device
NZ243350A (en) Producing oxygen enriched gas from air by pressure swing adsorption; two bed system with short cycle time
JPH0278415A (en) Reduced-capacity operating method of pressure swinging adsorber

Legal Events

Date Code Title Description
AS Assignment

Owner name: BOC GROUP, INC., THE, NEW JERSEY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:DOONG, SHAIN-JER;BRENSKELLE, LISA A.;REEL/FRAME:008092/0327

Effective date: 19960619

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20060331