US3851492A - Apparatus and method for offshore operations - Google Patents

Apparatus and method for offshore operations Download PDF

Info

Publication number
US3851492A
US3851492A US00361810A US36181073A US3851492A US 3851492 A US3851492 A US 3851492A US 00361810 A US00361810 A US 00361810A US 36181073 A US36181073 A US 36181073A US 3851492 A US3851492 A US 3851492A
Authority
US
United States
Prior art keywords
pipeline
platform
work
anchoring
vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00361810A
Inventor
G Cannon
J Kruger
T Short
B Jobe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEASCOPE SERVICES Inc
Original Assignee
SEASCOPE SERVICES Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEASCOPE SERVICES Inc filed Critical SEASCOPE SERVICES Inc
Priority to US00361810A priority Critical patent/US3851492A/en
Application granted granted Critical
Publication of US3851492A publication Critical patent/US3851492A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/26Repairing or joining pipes on or under water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C11/00Equipment for dwelling or working underwater; Means for searching for underwater objects
    • B63C11/34Diving chambers with mechanical link, e.g. cable, to a base
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details
    • B66D1/40Control devices
    • B66D1/48Control devices automatic
    • B66D1/52Control devices automatic for varying rope or cable tension, e.g. when recovering craft from water
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/09Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/06Work chambers for underwater operations, e.g. temporarily connected to well heads
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • F16L1/201Anchor rods

Definitions

  • the present invention provides a new and improved method and apparatus for offshore submarine work operations, such as anchoring pipeline beneath a body of water, salvage, repair, exploration, and the like, wherein a sled or work platformor body is lowered from a marine vessel into a position adjacent the work operation, and the work is performed beneath the body of water while the position of, and relative movement between, the vessel and the work operation and work platform is controlled in .order to permit stability of the platform during work operations. Relative movement between the vessel, the pipeline or other work piece, and the work platform is controlled by sensing the position of the vessel with respect to the pipeline and regulating movement of the work platform in response to the sensed position of the vessel.
  • the augers used in anchoring may be stored with the work or installation sled and accessible to the submarine installing operations in order that anchoring operations need not be interrupted for new augers for the next anchoring operation to be lowered from the vessel after a preceding anchoring operation.
  • the augers may be driven vertically or obliquely into the earthen floor beneath the body of water, and the pipeline may be buried by entrenching the pipeline prior to anchoring it.
  • FIG. I. is an elevation view of an apparatus of the present invention for installing submarine anchors and anchoring submarine pipeline
  • FIG. 2 is an elevation view of an alternative apparatus of the present invention for installing submarine anchors anad anchoring submarine pipeline
  • FIG. 3 is a cross-sectional view taken along the line 33 of FIG. 4;
  • FIG. 4 is an elevation view of the apparatus of FIG. 2 with the parts thereof in slightly different positions;
  • FIG. 5 is an elevation view, partly schematic, of the means for controlling the relative position and alignment between the apparatus of FIG. 1 of the present invention and the work being performed;
  • FIG. 6 is an elevation view of an alternative apparatus for installing submarine anchors
  • FIG. 7 is an isometric view of a portion of the apparatus of FIG. 6;
  • FIG. 8 is an elevation view of an alternative apparatus for anchoring submarine pipeline.
  • FIG. 9 is a schematic block diagram of the control system of the present invention for controlling relative movement of the work platform and the underwater work operation.
  • the letter A designates generally the apparatus of the present invention for controlling offshore work operations, such as undersea search, salvage, exploration, repair, or recovery.
  • a submarine pipeline P which carries oil, gas, or other gases or fluids, is anchored to the submarine earthen floor or surface beneath a body of water, such as an ocean, sea, lake, river, or the like.
  • a body of water such as an ocean, sea, lake, river, or the like.
  • the apparatus A includes a work platform, which is an anchoring installation platform I when anchoring pipeline.
  • the platform I is suspended from a marine vessel such as a barge, ship, boat, floating or fixed platform, or the like by a cable C.
  • a marine vessel such as a barge, ship, boat, floating or fixed platform, or the like.
  • the tension in the cable C is controlled, in a manner to be more evident hereinbelow, in order to regulate relative movement between the vessel and the work platform I and the pipeline P.
  • the cable C is stored with a tension control winch 10 of the control system S and extracted therefrom as the workplatform I is lowered from the vessel to a position adjacent the pipeline P in order to anchor such pipeline to the earthen floor beneath the body of water.
  • the winch is mounted at a suitable location with the vessel V.
  • the cable C passes from the winch over a pulley 11 mounted with the vessel V at a suitable location and attaches with a bridle 12 to mount the work platform I with the vessel V.
  • the control system S of the present invention controls and regulates relative movement of the work platform I with respect to the work piece during offshore operations, for example, the installation platform I and the pipeline P during anchoring operations in order that movement of the surface vessel V is not transferred to the work platform I.
  • control of the movement and position of other types of work bodies or work platforms and offshore operations can be performed by the apparatus A and system S of the present invention.
  • an alternative work platform l-1 anchors the pipeline P to the earthen surface beneath the body of water.
  • the control system S may be used to regulate and control the position of and relative movement between the vessel V and each of the alternative installation sleds set forth herein, and of other work platforms and work sleds, as has been previously set forth.
  • One or two maximum positoning cables 15 each of which is stored at one end in a reel 16 mounted with the vessel V, and passes over a pulley 18 mounted with the work platform I.
  • the cables 15 have anchors 15a mounted at the ends thereof opposite the reel 16, and are used for horizontal control and positioning the work platform l with respect to the pipeline P after the vessel V has moved into the vicinity of the submarine work operation to be performed.
  • the anchors at the ends of the positioning cables 15 and 17 are positioned in the body of water or on the earthen floor beneath the body of water in order to control and maintain the work platform I in the desired position with respect to the pipeline P and the vessel V during anchoring operations.
  • the control system S controls and regulates relative movement of the work platform with respect to the pipeline P when the vessel V has been moved into position in the desired location relative to the pipeline P.
  • a sensing and control section 300 (FIG. 9) of the control and regulation system S which regulates and controls relative movement between the vessel V and the installation sled or work platform I and the work piece or pipeline P senses the position of the work platform relative to the earthen floor beneath the body of water and compensates for movement of the vessel V with respect to the installation sled l and pipeline P by controlling the tension in the controlled tension winch system 10 (FIGS. 1 and 9), to provide safe and stable offshore work operations with the platform I.
  • a transducer 310 mounted with the platform I receives an electrical signal from a sonar set 312 and transmits such signal into the body of water in order to sense the position of the work platform 1 relative to a sonar target, which may be the floor beneath the body of water or an object upon which work operations are being performed.
  • the transducer 310 receives the return signal from the floor or object beneath the body of water and converts such signal into an electrical signal and furnishes such signal to the sonar set 312.
  • the sonar set 312 provides an electrical output indication of the position of the platform I with respect to the floor of the body of water or object and furnishes such electrical signal to an alternating current-direct current converter 314 which receives the electrical signal indicative of the relative position of the platform I with respect to the pipeline P and the floor of the body of water and converts such into a direct current amplitude.
  • a potentiometer or other suitable means for manually adjusting the amplitude of the direct current signal formed by the converter 314 may be provided, if desired.
  • the converter 314 furnishes an electrical signal to a solenoid 316 which mechanically adjusts the flow of air from a pneumatic pressure or air supply source 320 by means of a valve 318 or other suitable structure.
  • a solenoid 316 which mechanically adjusts the flow of air from a pneumatic pressure or air supply source 320 by means of a valve 318 or other suitable structure.
  • Other means which control the flow of pressurized air from a pneumatic pressure source in response to the amplitude of a direct current signal may be used, if desired.
  • the controlled tension winch system 10 is thus pneumatically controlled and hydraulically operated and adjusts the tension in the cable C in accordance with controls furnished through the valve 318 from the air supply 320 under control of the sonar set 312 and converter 314 and solenoid 316.
  • a diesel-driven hydraulic power source 322 drives the controlled tension winch system 10b y means of a hydraulic fluid furnished through a fluid conduit 323.
  • a hydraulic speed and reversing control system 324 which controls and regulates the flow of hydraulic fluid through the conduit 323 is provided to control the speed and reversing of the direction of operation of the winch system 10.
  • An air-operated switch 321 receives pressurized air from the valve 318 and furnishes a sig nal indicative of a change in the relative position of the work platform l with respect to the pipeline P to the hydraulic speed and reversing control 324 in order to permit the hydraulic power supply 322 to adjust the tension in the winch 10in accordance with the control signal provided by the sonar 312, converter 314, and the pneumatically-operated valve 318 controlled by the solenoid 316.
  • a water-cooling system 325 is provided and provides cooling water flowing through the winch 131 in the interior thereof to prevent excess heat from resulting from the movement and adjusting the tension in the cable C by the winch 10 for safety and like purposes.
  • a cable 20 of a control system S-l (FIGS. 1 and 5) is attached at one end thereof to the work platform I.
  • the cable 20 is stored in a winch 22 with the vessel V, and passes from the winch 22 over pulleys 21a, 21b, 23a, 23b, 24, and 27 to work platform.
  • the winch 22 reels in and passes out the cable 20 as the work platform I is raised and lowered from the vessel V into position with respect to the submarine work operation.
  • the cable 20 passes from the winch 22 over pulleys 21a, 21b, 27, 23a, 23b, and 24 into the water and to the work platform.
  • the cable 20 provides a second attachment means for connecting the platform I with the vessel V and prevents torsion or twisting of the work platform in relation to the heading of the vessel V.
  • the double attachment of the platform I with the vessel V causes the platform I to move in conjunction with the vessel V and reduce torsion or twisting in the cable C.
  • the cable could be mounted with and controlled by a winch of like structure and function to the winch 22, if desired.
  • a thruster D may be mounted with the vessel V, and may be, for example, an outboard motor or other suitable means for causing movement of a marine vessel,
  • a similar thruster may be mounted with the work platform I, if desired.
  • FIG. 1 An alternative means for controlling and maintaining positioning of the work platform I with respect to the pipeline P, illustrated in phantom in the drawings (FIG. 1), comprises a cable which is attached to the work platform I and passes over the pulley 24 to a dead weight W which is suspended in the body of water from the vessel V by the cable 25.
  • the dead weight W and the work platform I are movable with respect to the vessel V in order that movement of the vessel V does not cause movement of the work platform I.
  • wind, surface currents, tides, rough weather, or choppy waves-at the surface of the body of water do not cause unstable and unsafe anchoring operations at the work platform I.
  • the weight W will remain substantially stationary and cause the cable 25 and the platform I to remain substantially stationary, allowing the platform I to remain stable with respect to the pipeline P.
  • the cable 20 absorbs the movement of the surface vessel V so that such movement is not imparted to the cable 20 and the work platform I.
  • the cable 20 is stored in the winch 22 and passes over the pulleys 21a, 21b, 27, 23a, and 23b to pulley 24 which is fixedlymounted with respect to the vessel V.
  • the cable 20 passes from the pulley 24 to the work platform I in order to stabilize anchoring operations.
  • the pulleys 21b and 234 are rotatably mounted with respect to a support arm 28a.
  • the support arm 28a is mounted at the upper end of a piston rod 28b attached to a piston within a pneumatic cylinder 28.
  • the pneumatic pressure in the cylinder 28 is controlled to cause relative movement of the piston rod 28b and the pulleys 21b and 23a mounted therewith, in order to limit relative vertical movement of the work platform I in relation to movement of the vessel V as has been previously set forth.
  • the piston 28 may alternatively be operated hydraulically rather than pneumatically, if desired.
  • the work platform I includes an upper support plate 30 (FIG. ll) mounted serving as a motor support platform and having mounted therewith a plurality of downwardly extending support legs 31.
  • the bridle 12 is mounted at the corners of the upper surface of the upper support plate 30.
  • a storage space 32 is formed beneath the support plate 3@ and between the support I arms 31 for reasons to be more evident hereinbelow.
  • Cross-braces 33 may be used, if desired, to strengthen and support arms 31 and the support plate 30.
  • the motor support plate 30 is preferably formed from a suitably strong wire mesh in order to permit passageof water therethrough as the platform is lowered and moved in the water.
  • the plate 30 has a plurality of drive motors M mounted therewith.
  • the drive motors M may be hydraulically driven or electrically driven and receive operating power from the vessel at the surface of the body of water through suitable conduits.
  • Each of the motors M drives a drive shaft 34 (FIG. 3)
  • shaft 34- is driven downwardly towards the pipeline P and the earthen floor beneath the body of water.
  • An anchoring auger R is mounted at a lower end of each of the drive shafts 34 and is driven into the earthen floor adjacent the pipeline P by the motor M.
  • a U-shaped bracket, collar, or yoke 35 is mounted with the anchoring augers R at outwardly extending flange members 35a (Flg. 3) on each side thereof.
  • the anchoring auger R may be a single or multi-helix anchoring auger, as desired.
  • the collar 35 holds the pipeline P firmly in place against the earthern floor beneath the body of water, and prevents undue movement that could create stress and strain on the pipeline P which might result in rupture of the pipeline and pollution of the body of water by the fluid escaping from the pipeline P. It should be understood that belts, loops, or other suitable types of retaining devices to secure the pipeline P may be used to anchor the pipeline P to the earthen floor.
  • a plurality of fluid conduits 36 each having a jet stinger or suction system 36a formed at the lower end thereof are mounted with a support leg 31.
  • the jets 36a at the ends of the conduits 36 point downwardly and inwardly toward the earthen surface adjacent the pipeline P and spray and fluidize the earthen surface with gas or liquid under pressure or in suction in order that the pipeline P may be uncovered or the covering earth removed to allow the bracket 35 to be installed beneath the earthen floor of the body of water to anchor the pipeline P.
  • the storage space 32 serves as a storage area space for a plurality of anchoring augers R, wherein such augers R are suspended from beneath the upper support platform 20 by hooks, clamps, or other suitable structure.
  • the storage of the augers R in the storage space 32 permits a plurality of anchoring augers R to be stored with the work platform I and lowered with the platform I to a position adjacent the pipeline P.
  • the augers R are available for further anchoring operation upon completion of a prior anchoring operation by removal from the storage space 32 by the diver or by remote control equipment or by other anchoring equipment operators. In this manner, it is not necessary, as was the case in the prior art, that anchoring operations be interrupted in order that the anchoring augers for the next drilling operation be lowered from the vessel to the work platform.
  • a rail member 37 supports and connects the downwa'rdly-extending support legs 31 at the lower ends of said members.
  • a rear yoke member 36 extends between the rail members 37 at the rear ends thereof to connect same for strength and support.
  • a television camera T (FIGS. 11 and 2) is mounted with the strut or support leg 31 of the work platform I in a position wherein observation of the anchoring operation with the anchoring auger R may be performed.
  • Suitable illumination sources in order to illuminate the body of water and submarine earthen floor beneath the body of water in which the anchoring or other operation is taking place are also provided.
  • the television camera T and the illumination sources receive electrical power from the support vessel through suitable conduits, and the television camera T returns a television picture of the anchoring operation to personnel aboard the vessel in order to monitor and control the anchoring operations, and remotely control such, if desired.
  • the cable C is stored in the vessel V and extracted therefrom as the installation sled I-l is lowered from the vessel to a position adjacent the pipeline P.
  • a reel 110 is rotatably mounted at an axle 110a thereof with respect to the installation sled I at a spindle llOb mounted to an upper support plate 120 of the installation sled [-1.
  • a cable 111 is stored with the reel 110 and is attached at a motor support plate 112, for reasons to be set forth hereinbelow.
  • the upper support plate 120 is mounted to the bridle 12 at its corners and is mounted above a middle support platform 112 by a plurality of upwardly extending support arms 121.
  • a storagespace 123 is formed between the support plate 120, the middle support platform 122 and the support arms 121 for reasons previously set forth.
  • Cross braces may be used, if desired, to strengthen the support arms 121 and the support plate 120.
  • the motor support platform 1 12 has the drive motors M mounted therewith.
  • the motor support plate 112 When the motors M are driving the anchoring augers R into the submarine earthen floor, the motor support plate 112 is lowered by the cable 111 to permit such anchoring operation.
  • a plurality of support legs 126 support the platform 122 above a lower platform 128.
  • the lower platform 128 is preferably formed from a wire mesh, for reasons previously set forth, and has an aperture formed therein to permit passage of the housing 34 and the drive shafts 34a therethrough.
  • the aperture formed in the lower support platform 128 is of sufficient dimension to permit the passage therethrough of the pipeline anchoring collar or yoke 35 which anchors the pipeline P in place.
  • the anchoring auger R is mounted at a lower end of each of the drive shafts 34 and is driven into the earthen floor adjacent the pipeline P by the motor M.
  • the U-shaped collar or yoke 35 is mounted with the anchoring augers R at outwardly-extending flange members 35a (FIG. 3) on each side thereof.
  • a plurality of fluid conduits 130 each having a jet 130a formed at the lower end thereof are mounted beneath the lower support platform 128.
  • the jets 130a at the ends of the conduits 130 point downwardly and inwardly towards the earthen surface adjacent the pipeline P and spray and fluidize the earthen surface for reasons previously set forth.
  • a plurality of struts 134 support the lower platform 128 above a pair of runners 136 which extend longitudinally with respect to the pipeline F when the apparatus A is mounted adjacent the pipeline for anchoring operations.
  • the runners 136 engage the earthen surface beneath the body of water and support the apparatus A above the pipeline P (FIG. 3).
  • a longitudinal support brace 136a extends between the ends of the runner 136 and provides support for the runners 136.
  • a lateral support brace 137 extends between the runners 136 (FIG. 3) to provide further structural support for the installation sled I at each end thereof.
  • a plurality of angular support braces 138 are mounted between the lower support platform 128 and the inner section of the runners 136 and the lateral support braces 137 to provide further strength and support and stability for the installation sled [-1 during anchoring operations.
  • the storage space 123 (FIG. 2) in a like manner, serves as a storage area space for a plurality of anchoring augers, wherein such augers R are suspended from beneath the upper support platform 20 by hooks, clamps, or other suitable structure.
  • a pair of guide bars G extend forwardly from the runners 136 in the installation sled L1 in the direction of the longitudinal axis of the pipeline P.
  • a plurality of yokes or collars 140 are formed extending between the guide bars G above the pipeline P. Wheels or rollers 141 are mounted with the yokes 140 and engage the exterior surface of the pipe P and support and guide the installation sled I-l as such sled is being moved along the pipeline P between anchoring operations.
  • An eyelet 140a is formed in the top surface of the yokes 140 to permit passage therethrough of a tow line or cable 143.
  • the tow line or cable 143 is attached with the installation sled I-l at the runners 36 in order that the installation sled I-1 may be moved along the pipeline P after completion of each anchoring operation to a position for beginning of a new anchoring operation, as will be more evident hereinbelow.
  • the tow line may be attached to an eyelet 144 formed in an upwardly-extending front member 145 of the guide bar G in order that the installation sled [-1 may be towed along the pipeline P between anchoring operations.
  • the television camera T (FIGS. 2 and 3) is mounted with the strut 134 of the installation sled l-l in a position wherein observation of the anchoring operation with the anchoring auger R may be performed.
  • jet stringers or suction systems similar to jets 30 and 130 may be mounted with the guide bar G to fluidize and soften the submarine earthen floor in order to entrench the pipeline P as such pipeline is being anchored by the augers R and brackets 35.
  • An installation sled I-2 (FIGS. 6 and 7) drives the anchoring augers R obliquely into the ocean floor adjacent the pipeline P being anchored beneath the body of water.
  • the installation sled I-2 may be used to anchor wire mesh belts circumferentially encircling the pipeline P when such belts are used to anchor the pipeline P, and in addition may be used to anchor collars or other suitable anchoring structure to the earthen floor to anchor the pipeline P.
  • the installation sled I-2 like structure to that of the installation sleds previously set forth, performing like functions to such structure bear like reference numerals.
  • the installation sled I-2 is suspended from the marine vessel V by the bridle 12 and the cable C whose tension is controlled by the control system S to control and regulate relative movement between the sled l-2 and the vessel, as has been previously set forth or towed as shown in [-1 (FIG. 2):
  • the upper support plate 30 is mounted with a lower support plate 222 by a plurality of support members 31 which are strengthened by supporting cross braces 221.
  • a plurality of additional anchoring augers R may be suspended from the upper support plate 30 or otherwise suitably stored in the space between the upper support plate 30 and the lower support plate 222 in order that anchoring operations may continue without requiring time to be consumed in order to lower additional augers from the vessel, as has been previously set forth.
  • the struts 134, the runners l36, the longitudinal support braces 136a, the lateral support braces 137 and the angular support braces 138 mounted with the lower support plate 222 of the installation sled l-2 are like in structure and function to the like numbered structure of the installation sled l-l (FIGS. 2-4).
  • An auger trough 240 which maintains the anchoring augers R in the proper position during insertion thereof into the earthen surface by the motor M and drive shaft 24 is mounted with the lower support plate 282 of the installation sled l-2 by a mounting sleeve 24].
  • An elevation adjusting crank 241a is mounted with the mounting sleeve 241 to adjust the elevation of the auger trough 240 with respect to the earthen floor and accordingly vary the angle or insertion of the anchoring augers R with respect to the earthen floor (as indicated by an arrow 249) from an oblique to a substantially vertical angle.
  • the auger trough 241) is pivotally mounted at a mounting flange 242 by a pin 242a to a sleeve 237.
  • the sleeve 237 is slidably movable with respect to the lateral support brace 37 as indicated by the arrow 250 (FIG. 7) in order to allow anchoring augers R to be inserted on either or both sides of the pipeline P to anchor such pipeline.
  • the pivotal connection between the auger'trough 240 and the sleeve 237 permits the angle of placement of the auger trough 240 with respect to the earthen surface to be varied by movement of the elevation adjusting crank 241a and the mounting sleeve 241.
  • a pivotally'movable sleeve portion 2400 is formed at the lower end of the auger trough 240 and maintains the anchoring augers R in proper position within the auger trough 240 as such augers are being driven into the earthen surface by the motor M and drive shaft 24.
  • the sleeve portion 240a is pivotally movable as indicated by the arrow 24% (FIG, 7) to allow insertionof new anchoring augers R after completion of a preceding anchoring operation.
  • Such anchoring augers would be removed from the storage space beneath the upper support plate 30 by the diver and inserted within the auger trough 240, subsequent to which the sleeve portion 240a would be closed (FIG. 7) to maintain the auger R in proper position during insertion.
  • FIG. 8 In an installation platform l-3 (FIG. 8) of the present invention like structure performing like functions to the installation sled previously set forth bears like reference numerals to such structure previously set forth.
  • the motor M is mounted between an upper support plate 30 and a lower support plate 320 which are spaced with respect to each other by a plurality of support members 322.
  • the motor M rotates the drive shaft 34in order to drive the anchoring augers R into the earthen floor adjacent the pipeline P in order to anchor such pipeline to the earthen floor. Additional anchoring augers R may be suspended from and stored beneath the support plate 320, for reasons previously set forth.
  • a bathysphere B is mounted with the upper support platform 30 on a plurality of support legs 321.
  • the bathysphere B provides submarine housing and life support for an equipment operator who may sit within the bathysphere B (as shown in phantom in FIG. 8) and operate controls to control the motor M and the anchoring operations or other operations performed by the installation platform I-3.
  • the bathsphere B has an entry tunnel or housing 340 formed at the upper surface thereof through which the operator may enter the bathysphere B. The entry tunnel 340 is subsequently closed after the operator enters, and the cable C is mounted with respect to the bathysphere B to lower the bathysphere B and installation platform [-3 into position adjacent the pipeline P.
  • the vessel V is moved into position adjacent the pipeline P to be anchored, and vessel V is anchored relative to such work piece, and the anchors 15a and the positoning cables 15, and the work body or work platform, any. of the installation sleds previously set forth, is then lowered into the desired operating position adjacent the work piece pipeline P.
  • the control and regulating system S
  • a method of anchoring a submarine pipeline beneath a body of water comprising the steps of:
  • said step of controlling relative movement including:
  • An apparatus for controlling offshore work operations beneath a body of water comprising:
  • bathysphere means mounted with said platform means for permitting submarine control and observation of the work operations.
  • said means responsive to said means for sensing for regulating movement including: adjustment means responsive to said means for sensing for controlling said winch means wherein relative movement between the vessel and said platform means is controlled to permit stabilized work operation.
  • a cable for supporting said work platform and piston means for stabilizing and controlling the position of said work platfon'n with respect to the vessel to adjust the tension and torsion in the cable.
  • cable means movably supported by the transporting vessel and having weight means secured to one end and having the other end secured to the work platform for stabilizing said work platform with respect to the vessel to adjust tension in the cable means.
  • a method for controlling and stabilizing work operations beneath a body of water comprising the steps of:
  • step of controlling further includes the step of:

Abstract

A new and improved system, apparatus and method for performing operations on the floor of the sea or other underwater locations utilizes a combination of tension devices for maintaining work bodies in desired positions while also permitting viewing of such underwater operations by remote control television camera or other operations.

Description

nited States Patent [1 1 Cannon et a1.
[ Dec. 3, 1.974
[ APPARATUS AND METHOD FOR OFFSHORE OPERATIONS [75] Inventors: Glyn E. Cannon; James R. Kruger;
Theodore A. Short; Benjamin L. Jolbe, all of Houston, Tex
[73] Assignee: Seascope Services, Inc., Houston,
. Tex.
[22] Filed: May 18, 1973 [21] Appl. No.: 361,810
Related US. Application Data [63] Continuation of Ser. No, 184,728, Sept. 29, 1971,
abandoned.
[52] US. Cl. 61/69 R, 61/723 [51] Int. Cl. F161 l/00 [58] Field of Search 61/69, 72.3, 72.4, 46,
[56] References Cited UNITED STATES PATENTS 3,014,984 12/1961 Jacobson 61/69 R X 3,411,306 11/1968 Mosby 61/724 3,427,812 2/1969 Hollander 61/723 Primary ExaminerJ. Karl Bell Attorney, Agent, or Firm-Pravel & Wilson 57 ABSTRACT A new and improved system, apparatus and method for performing operations on the floor of the sea or other underwater locations utilizes a combination of tension devices for maintaining work bodies in desired positions while also permitting viewing of such underwater operations by remote control television camera or other operations.
20 Claims, 9 Drawing Figures APPARATUS AND METHOD FOR OFFSHORE OPERATIONS CROSS-REFERENCE WITH RELATED APPLICATIONS This is a continuation of my copending application Ser. No. 184,728, filed Sept. 29, 1971, entitled Apparatus and Method for Offshore Operations now abandoned.
BACKGROUND OF THE INVENTION 2. Description of the Prior Art In the prior art apparatus and methods foroffshore 'work operations such as anchoring offshore pipelines,
salvage, exploration, repair and the like, such as those of U.S. Pat. Nos. 2,355,086; 3,014,984; 3,324,239; and 3,427,812, stability of the work body or platform with respect to the support ship was difficult to achieve. Consequently, control of the position of the work body or platform with respect to the submarine work operations, was difficult to maintain and achieve, making the work operations expensive, time-consuming, and hazardous. Observation and control of the work operations was also hampered and impaired due to the imprecise control and positioning of the work platform.
SUMMARY OF THE INVENTION Briefly, the present invention provides a new and improved method and apparatus for offshore submarine work operations, such as anchoring pipeline beneath a body of water, salvage, repair, exploration, and the like, wherein a sled or work platformor body is lowered from a marine vessel into a position adjacent the work operation, and the work is performed beneath the body of water while the position of, and relative movement between, the vessel and the work operation and work platform is controlled in .order to permit stability of the platform during work operations. Relative movement between the vessel, the pipeline or other work piece, and the work platform is controlled by sensing the position of the vessel with respect to the pipeline and regulating movement of the work platform in response to the sensed position of the vessel.
When anchoring submarine pipeline, the augers used in anchoring may be stored with the work or installation sled and accessible to the submarine installing operations in order that anchoring operations need not be interrupted for new augers for the next anchoring operation to be lowered from the vessel after a preceding anchoring operation. The augers may be driven vertically or obliquely into the earthen floor beneath the body of water, and the pipeline may be buried by entrenching the pipeline prior to anchoring it.
It is an object of the present invention to provide a new and improved method and apparatus for offshore operations.
It is an object of the present invention to provide a new and improved method and apparatus for offshore work operations beneath a body of water with improved stability of such work operations.
It is an object of the present invention to provide a new and improved method and apparatus for anchoring pipeline beneath a body of water.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. I. is an elevation view of an apparatus of the present invention for installing submarine anchors and anchoring submarine pipeline;
FIG. 2 is an elevation view of an alternative apparatus of the present invention for installing submarine anchors anad anchoring submarine pipeline;
FIG. 3 is a cross-sectional view taken along the line 33 of FIG. 4;
' FIG. 4 is an elevation view of the apparatus of FIG. 2 with the parts thereof in slightly different positions;
FIG. 5 is an elevation view, partly schematic, of the means for controlling the relative position and alignment between the apparatus of FIG. 1 of the present invention and the work being performed;
FIG. 6 is an elevation view of an alternative apparatus for installing submarine anchors;
FIG. 7 is an isometric view of a portion of the apparatus of FIG. 6;
FIG. 8 is an elevation view of an alternative apparatus for anchoring submarine pipeline; and
FIG. 9 is a schematic block diagram of the control system of the present invention for controlling relative movement of the work platform and the underwater work operation.
DESCRIPTION OF THE PREFERRED v EMBODIMENT In the drawings, the letter A designates generally the apparatus of the present invention for controlling offshore work operations, such as undersea search, salvage, exploration, repair, or recovery. For example, in the embodiment set forth in the accompanying drawings, a submarine pipeline P, which carries oil, gas, or other gases or fluids, is anchored to the submarine earthen floor or surface beneath a body of water, such as an ocean, sea, lake, river, or the like. It should be understood that the item submarine when used in connection with the description of the present invention includes and refers to objects beneath any of such bodies of water.
The apparatus A includes a work platform, which is an anchoring installation platform I when anchoring pipeline. The platform I is suspended from a marine vessel such as a barge, ship, boat, floating or fixed platform, or the like by a cable C. When the platform 1 engages the submarine earthen floor, such platform functions as a sled. The tension in the cable C is controlled, in a manner to be more evident hereinbelow, in order to regulate relative movement between the vessel and the work platform I and the pipeline P. It should be understood that other work bodies or work platforms are used when performing other types of offshore operations such as salvage, repair, or exploration, and relative movement of same is controlled by the method and apparatus of the system of the present invention in a like manner to the control of the movement and position of the work platform I to be set forth hereinbelow.
. The cable C is stored with a tension control winch 10 of the control system S and extracted therefrom as the workplatform I is lowered from the vessel to a position adjacent the pipeline P in order to anchor such pipeline to the earthen floor beneath the body of water. The winch is mounted at a suitable location with the vessel V. The cable C passes from the winch over a pulley 11 mounted with the vessel V at a suitable location and attaches with a bridle 12 to mount the work platform I with the vessel V.
The control system S of the present invention controls and regulates relative movement of the work platform I with respect to the work piece during offshore operations, for example, the installation platform I and the pipeline P during anchoring operations in order that movement of the surface vessel V is not transferred to the work platform I. As has been previously set forth, control of the movement and position of other types of work bodies or work platforms and offshore operations can be performed by the apparatus A and system S of the present invention. In the embodiment illustrated in H0. 2 an alternative work platform l-1 anchors the pipeline P to the earthen surface beneath the body of water. However, it should be understood that the control system S may be used to regulate and control the position of and relative movement between the vessel V and each of the alternative installation sleds set forth herein, and of other work platforms and work sleds, as has been previously set forth.
One or two maximum positoning cables 15 each of which is stored at one end in a reel 16 mounted with the vessel V, and passes over a pulley 18 mounted with the work platform I. The cables 15 have anchors 15a mounted at the ends thereof opposite the reel 16, and are used for horizontal control and positioning the work platform l with respect to the pipeline P after the vessel V has moved into the vicinity of the submarine work operation to be performed.
An additional positioning and control cable 17, stored on a reel 17b and passing over a pulley 17a mounted with a support arm 17c on the vessel V, has an anchor mounted at the opposite end thereof which is lowered into position to assist in controlling and maintaining the vessel V in the desired position relative to the pipeline P during anchoring operations. The anchors at the ends of the positioning cables 15 and 17 are positioned in the body of water or on the earthen floor beneath the body of water in order to control and maintain the work platform I in the desired position with respect to the pipeline P and the vessel V during anchoring operations.
The control system S controls and regulates relative movement of the work platform with respect to the pipeline P when the vessel V has been moved into position in the desired location relative to the pipeline P.
A sensing and control section 300 (FIG. 9) of the control and regulation system S which regulates and controls relative movement between the vessel V and the installation sled or work platform I and the work piece or pipeline P senses the position of the work platform relative to the earthen floor beneath the body of water and compensates for movement of the vessel V with respect to the installation sled l and pipeline P by controlling the tension in the controlled tension winch system 10 (FIGS. 1 and 9), to provide safe and stable offshore work operations with the platform I.
A transducer 310 mounted with the platform I receives an electrical signal from a sonar set 312 and transmits such signal into the body of water in order to sense the position of the work platform 1 relative to a sonar target, which may be the floor beneath the body of water or an object upon which work operations are being performed. The transducer 310 receives the return signal from the floor or object beneath the body of water and converts such signal into an electrical signal and furnishes such signal to the sonar set 312.
The sonar set 312 provides an electrical output indication of the position of the platform I with respect to the floor of the body of water or object and furnishes such electrical signal to an alternating current-direct current converter 314 which receives the electrical signal indicative of the relative position of the platform I with respect to the pipeline P and the floor of the body of water and converts such into a direct current amplitude. A potentiometer or other suitable means for manually adjusting the amplitude of the direct current signal formed by the converter 314 may be provided, if desired.
The converter 314 furnishes an electrical signal to a solenoid 316 which mechanically adjusts the flow of air from a pneumatic pressure or air supply source 320 by means of a valve 318 or other suitable structure. Other means which control the flow of pressurized air from a pneumatic pressure source in response to the amplitude of a direct current signal may be used, if desired. The controlled tension winch system 10 is thus pneumatically controlled and hydraulically operated and adjusts the tension in the cable C in accordance with controls furnished through the valve 318 from the air supply 320 under control of the sonar set 312 and converter 314 and solenoid 316.
A diesel-driven hydraulic power source 322 drives the controlled tension winch system 10b y means of a hydraulic fluid furnished through a fluid conduit 323. A hydraulic speed and reversing control system 324 which controls and regulates the flow of hydraulic fluid through the conduit 323 is provided to control the speed and reversing of the direction of operation of the winch system 10. An air-operated switch 321 receives pressurized air from the valve 318 and furnishes a sig nal indicative of a change in the relative position of the work platform l with respect to the pipeline P to the hydraulic speed and reversing control 324 in order to permit the hydraulic power supply 322 to adjust the tension in the winch 10in accordance with the control signal provided by the sonar 312, converter 314, and the pneumatically-operated valve 318 controlled by the solenoid 316.
A water-cooling system 325 is provided and provides cooling water flowing through the winch 131 in the interior thereof to prevent excess heat from resulting from the movement and adjusting the tension in the cable C by the winch 10 for safety and like purposes.
A cable 20 of a control system S-l (FIGS. 1 and 5) is attached at one end thereof to the work platform I. The cable 20 is stored in a winch 22 with the vessel V, and passes from the winch 22 over pulleys 21a, 21b, 23a, 23b, 24, and 27 to work platform. The winch 22 reels in and passes out the cable 20 as the work platform I is raised and lowered from the vessel V into position with respect to the submarine work operation. The cable 20 passes from the winch 22 over pulleys 21a, 21b, 27, 23a, 23b, and 24 into the water and to the work platform. The cable 20 provides a second attachment means for connecting the platform I with the vessel V and prevents torsion or twisting of the work platform in relation to the heading of the vessel V. The double attachment of the platform I with the vessel V causes the platform I to move in conjunction with the vessel V and reduce torsion or twisting in the cable C. Additionally, the cable could be mounted with and controlled by a winch of like structure and function to the winch 22, if desired. I
A thruster D may be mounted with the vessel V, and may be, for example, an outboard motor or other suitable means for causing movement of a marine vessel,
in order to adjust the position of the vessel V with respect to the pipeline P should the tension and torsion of the cable C become unduly large. A similar thruster may be mounted with the work platform I, if desired.
An alternative means for controlling and maintaining positioning of the work platform I with respect to the pipeline P, illustrated in phantom in the drawings (FIG. 1), comprises a cable which is attached to the work platform I and passes over the pulley 24 to a dead weight W which is suspended in the body of water from the vessel V by the cable 25. When the alternative means for controlling relative movement is used, the dead weight W and the work platform I are movable with respect to the vessel V in order that movement of the vessel V does not cause movement of the work platform I. In this manner, wind, surface currents, tides, rough weather, or choppy waves-at the surface of the body of water do not cause unstable and unsafe anchoring operations at the work platform I. As the vessel V moves with therough water, the weight W will remain substantially stationary and cause the cable 25 and the platform I to remain substantially stationary, allowing the platform I to remain stable with respect to the pipeline P.
In the system S-l (FIGS. 1 and 5) for controlling relative movement of the work platform I with respect to the pipeline p, the cable 20 absorbs the movement of the surface vessel V so that such movement is not imparted to the cable 20 and the work platform I. The cable 20 is stored in the winch 22 and passes over the pulleys 21a, 21b, 27, 23a, and 23b to pulley 24 which is fixedlymounted with respect to the vessel V. The cable 20 passes from the pulley 24 to the work platform I in order to stabilize anchoring operations. The pulleys 21b and 234 are rotatably mounted with respect to a support arm 28a. The support arm 28a is mounted at the upper end of a piston rod 28b attached to a piston within a pneumatic cylinder 28. The pneumatic pressure in the cylinder 28 is controlled to cause relative movement of the piston rod 28b and the pulleys 21b and 23a mounted therewith, in order to limit relative vertical movement of the work platform I in relation to movement of the vessel V as has been previously set forth. The piston 28 may alternatively be operated hydraulically rather than pneumatically, if desired.
The work platform I includes an upper support plate 30 (FIG. ll) mounted serving as a motor support platform and having mounted therewith a plurality of downwardly extending support legs 31. The bridle 12 is mounted at the corners of the upper surface of the upper support plate 30. A storage space 32 is formed beneath the support plate 3@ and between the support I arms 31 for reasons to be more evident hereinbelow.
Cross-braces 33 may be used, if desired, to strengthen and support arms 31 and the support plate 30.
The motor support plate 30 is preferably formed from a suitably strong wire mesh in order to permit passageof water therethrough as the platform is lowered and moved in the water. The plate 30 has a plurality of drive motors M mounted therewith. The drive motors M may be hydraulically driven or electrically driven and receive operating power from the vessel at the surface of the body of water through suitable conduits.
Each of the motors M drives a drive shaft 34 (FIG. 3)
which is mounted with a housing 34a. When the motors drive the shafts 34 in a first direction of rotation, the
shaft 34- is driven downwardly towards the pipeline P and the earthen floor beneath the body of water.
An anchoring auger R is mounted at a lower end of each of the drive shafts 34 and is driven into the earthen floor adjacent the pipeline P by the motor M. A U-shaped bracket, collar, or yoke 35 is mounted with the anchoring augers R at outwardly extending flange members 35a (Flg. 3) on each side thereof. The anchoring auger R may be a single or multi-helix anchoring auger, as desired. The collar 35 holds the pipeline P firmly in place against the earthern floor beneath the body of water, and prevents undue movement that could create stress and strain on the pipeline P which might result in rupture of the pipeline and pollution of the body of water by the fluid escaping from the pipeline P. It should be understood that belts, loops, or other suitable types of retaining devices to secure the pipeline P may be used to anchor the pipeline P to the earthen floor.
A plurality of fluid conduits 36, each having a jet stinger or suction system 36a formed at the lower end thereof are mounted with a support leg 31. The jets 36a at the ends of the conduits 36 point downwardly and inwardly toward the earthen surface adjacent the pipeline P and spray and fluidize the earthen surface with gas or liquid under pressure or in suction in order that the pipeline P may be uncovered or the covering earth removed to allow the bracket 35 to be installed beneath the earthen floor of the body of water to anchor the pipeline P.
The storage space 32 (FIG. 1) serves as a storage area space for a plurality of anchoring augers R, wherein such augers R are suspended from beneath the upper support platform 20 by hooks, clamps, or other suitable structure. The storage of the augers R in the storage space 32 permits a plurality of anchoring augers R to be stored with the work platform I and lowered with the platform I to a position adjacent the pipeline P. In this manner, the augers R are available for further anchoring operation upon completion of a prior anchoring operation by removal from the storage space 32 by the diver or by remote control equipment or by other anchoring equipment operators. In this manner, it is not necessary, as was the case in the prior art, that anchoring operations be interrupted in order that the anchoring augers for the next drilling operation be lowered from the vessel to the work platform.
. A rail member 37 supports and connects the downwa'rdly-extending support legs 31 at the lower ends of said members. A rear yoke member 36 extends between the rail members 37 at the rear ends thereof to connect same for strength and support.
In order to observe the anchoring operations being performed by the apparatus A, a television camera T (FIGS. 11 and 2) is mounted with the strut or support leg 31 of the work platform I in a position wherein observation of the anchoring operation with the anchoring auger R may be performed. Suitable illumination sources in order to illuminate the body of water and submarine earthen floor beneath the body of water in which the anchoring or other operation is taking place are also provided. The television camera T and the illumination sources receive electrical power from the support vessel through suitable conduits, and the television camera T returns a television picture of the anchoring operation to personnel aboard the vessel in order to monitor and control the anchoring operations, and remotely control such, if desired.
In an alternative work platform or installation sled I-l of the present invention (FIGS. 24), like structure and parts performing like functions to the structure and parts of the installation sled I bear like reference numerals.
The cable C is stored in the vessel V and extracted therefrom as the installation sled I-l is lowered from the vessel to a position adjacent the pipeline P. A reel 110 is rotatably mounted at an axle 110a thereof with respect to the installation sled I at a spindle llOb mounted to an upper support plate 120 of the installation sled [-1. A cable 111 is stored with the reel 110 and is attached at a motor support plate 112, for reasons to be set forth hereinbelow.
The upper support plate 120 is mounted to the bridle 12 at its corners and is mounted above a middle support platform 112 by a plurality of upwardly extending support arms 121. A storagespace 123 is formed between the support plate 120, the middle support platform 122 and the support arms 121 for reasons previously set forth. Cross braces may be used, if desired, to strengthen the support arms 121 and the support plate 120. The motor support platform 1 12 has the drive motors M mounted therewith.
When the motors M are driving the anchoring augers R into the submarine earthen floor, the motor support plate 112 is lowered by the cable 111 to permit such anchoring operation.
A plurality of support legs 126 support the platform 122 above a lower platform 128. The lower platform 128 is preferably formed from a wire mesh, for reasons previously set forth, and has an aperture formed therein to permit passage of the housing 34 and the drive shafts 34a therethrough. The aperture formed in the lower support platform 128 is of sufficient dimension to permit the passage therethrough of the pipeline anchoring collar or yoke 35 which anchors the pipeline P in place.
The anchoring auger R is mounted at a lower end of each of the drive shafts 34 and is driven into the earthen floor adjacent the pipeline P by the motor M. The U-shaped collar or yoke 35 is mounted with the anchoring augers R at outwardly-extending flange members 35a (FIG. 3) on each side thereof.
A plurality of fluid conduits 130, each having a jet 130a formed at the lower end thereof are mounted beneath the lower support platform 128. The jets 130a at the ends of the conduits 130 point downwardly and inwardly towards the earthen surface adjacent the pipeline P and spray and fluidize the earthen surface for reasons previously set forth.
A plurality of struts 134 support the lower platform 128 above a pair of runners 136 which extend longitudinally with respect to the pipeline F when the apparatus A is mounted adjacent the pipeline for anchoring operations. The runners 136 engage the earthen surface beneath the body of water and support the apparatus A above the pipeline P (FIG. 3). A longitudinal support brace 136a extends between the ends of the runner 136 and provides support for the runners 136. A lateral support brace 137 extends between the runners 136 (FIG. 3) to provide further structural support for the installation sled I at each end thereof. A plurality of angular support braces 138 are mounted between the lower support platform 128 and the inner section of the runners 136 and the lateral support braces 137 to provide further strength and support and stability for the installation sled [-1 during anchoring operations.
As previously set forth with respect to the storage space 23, the storage space 123 (FIG. 2) in a like manner, serves as a storage area space for a plurality of anchoring augers, wherein such augers R are suspended from beneath the upper support platform 20 by hooks, clamps, or other suitable structure.
A pair of guide bars G extend forwardly from the runners 136 in the installation sled L1 in the direction of the longitudinal axis of the pipeline P. A plurality of yokes or collars 140 are formed extending between the guide bars G above the pipeline P. Wheels or rollers 141 are mounted with the yokes 140 and engage the exterior surface of the pipe P and support and guide the installation sled I-l as such sled is being moved along the pipeline P between anchoring operations. An eyelet 140a is formed in the top surface of the yokes 140 to permit passage therethrough of a tow line or cable 143. The tow line or cable 143 is attached with the installation sled I-l at the runners 36 in order that the installation sled I-1 may be moved along the pipeline P after completion of each anchoring operation to a position for beginning of a new anchoring operation, as will be more evident hereinbelow. Alternately, the tow line may be attached to an eyelet 144 formed in an upwardly-extending front member 145 of the guide bar G in order that the installation sled [-1 may be towed along the pipeline P between anchoring operations.
In order to observe the anchoring operations being performed by the apparatus A, the television camera T (FIGS. 2 and 3) is mounted with the strut 134 of the installation sled l-l in a position wherein observation of the anchoring operation with the anchoring auger R may be performed.
When the pipeline P to be anchored has been recently installed, jet stringers or suction systems similar to jets 30 and 130 may be mounted with the guide bar G to fluidize and soften the submarine earthen floor in order to entrench the pipeline P as such pipeline is being anchored by the augers R and brackets 35.
An installation sled I-2 (FIGS. 6 and 7) drives the anchoring augers R obliquely into the ocean floor adjacent the pipeline P being anchored beneath the body of water. The installation sled I-2 may be used to anchor wire mesh belts circumferentially encircling the pipeline P when such belts are used to anchor the pipeline P, and in addition may be used to anchor collars or other suitable anchoring structure to the earthen floor to anchor the pipeline P.
In the installation sled I-2 like structure to that of the installation sleds previously set forth, performing like functions to such structure bear like reference numerals. The installation sled I-2 is suspended from the marine vessel V by the bridle 12 and the cable C whose tension is controlled by the control system S to control and regulate relative movement between the sled l-2 and the vessel, as has been previously set forth or towed as shown in [-1 (FIG. 2):
The upper support plate 30 is mounted with a lower support plate 222 by a plurality of support members 31 which are strengthened by supporting cross braces 221. A plurality of additional anchoring augers R may be suspended from the upper support plate 30 or otherwise suitably stored in the space between the upper support plate 30 and the lower support plate 222 in order that anchoring operations may continue without requiring time to be consumed in order to lower additional augers from the vessel, as has been previously set forth.
The struts 134, the runners l36, the longitudinal support braces 136a, the lateral support braces 137 and the angular support braces 138 mounted with the lower support plate 222 of the installation sled l-2 are like in structure and function to the like numbered structure of the installation sled l-l (FIGS. 2-4).
An auger trough 240 which maintains the anchoring augers R in the proper position during insertion thereof into the earthen surface by the motor M and drive shaft 24 is mounted with the lower support plate 282 of the installation sled l-2 by a mounting sleeve 24]. An elevation adjusting crank 241a is mounted with the mounting sleeve 241 to adjust the elevation of the auger trough 240 with respect to the earthen floor and accordingly vary the angle or insertion of the anchoring augers R with respect to the earthen floor (as indicated by an arrow 249) from an oblique to a substantially vertical angle.
The auger trough 241) is pivotally mounted at a mounting flange 242 by a pin 242a to a sleeve 237. The sleeve 237 is slidably movable with respect to the lateral support brace 37 as indicated by the arrow 250 (FIG. 7) in order to allow anchoring augers R to be inserted on either or both sides of the pipeline P to anchor such pipeline. The pivotal connection between the auger'trough 240 and the sleeve 237 permits the angle of placement of the auger trough 240 with respect to the earthen surface to be varied by movement of the elevation adjusting crank 241a and the mounting sleeve 241.
A pivotally'movable sleeve portion 2400 is formed at the lower end of the auger trough 240 and maintains the anchoring augers R in proper position within the auger trough 240 as such augers are being driven into the earthen surface by the motor M and drive shaft 24. The sleeve portion 240a is pivotally movable as indicated by the arrow 24% (FIG, 7) to allow insertionof new anchoring augers R after completion of a preceding anchoring operation. Such anchoring augers would be removed from the storage space beneath the upper support plate 30 by the diver and inserted within the auger trough 240, subsequent to which the sleeve portion 240a would be closed (FIG. 7) to maintain the auger R in proper position during insertion.
In an installation platform l-3 (FIG. 8) of the present invention like structure performing like functions to the installation sled previously set forth bears like reference numerals to such structure previously set forth. The motor M is mounted between an upper support plate 30 and a lower support plate 320 which are spaced with respect to each other by a plurality of support members 322. The motor M rotates the drive shaft 34in order to drive the anchoring augers R into the earthen floor adjacent the pipeline P in order to anchor such pipeline to the earthen floor. Additional anchoring augers R may be suspended from and stored beneath the support plate 320, for reasons previously set forth.
A bathysphere B is mounted with the upper support platform 30 on a plurality of support legs 321. The bathysphere B provides submarine housing and life support for an equipment operator who may sit within the bathysphere B (as shown in phantom in FIG. 8) and operate controls to control the motor M and the anchoring operations or other operations performed by the installation platform I-3. The bathsphere B has an entry tunnel or housing 340 formed at the upper surface thereof through which the operator may enter the bathysphere B. The entry tunnel 340 is subsequently closed after the operator enters, and the cable C is mounted with respect to the bathysphere B to lower the bathysphere B and installation platform [-3 into position adjacent the pipeline P. A front operating control window 341 mounted with the bathysphere B by a window housiong 341a and side windows 342 formed with the bathysphere B in order that the operator may observe and control the equipment operations of the installation platform l-3 from within the bathysphere B, The operator within the bathysphere B may thus observe and control and monitor the anchoring operations of other offshore operations being performed by the installation platform l-3.
in the operation of the present invention, the vessel V is moved into position adjacent the pipeline P to be anchored, and vessel V is anchored relative to such work piece, and the anchors 15a and the positoning cables 15, and the work body or work platform, any. of the installation sleds previously set forth, is then lowered into the desired operating position adjacent the work piece pipeline P. The control and regulating system S,
including the controlled tension winch 10 and cable C,
the motor M and the drive shaft 34 in order to anchor a collar, belt, or other suitable attaching structure about the pipeline P to anchor such pipeline.
The foregoing disclosure and description of the invention are illustrative and explanatory thereof, and various changes in the size, shape, and materials, as well as in the details of the illustrated construction may be made without departing from the spirit of the inven-- tion.
We claim:
1. A method of anchoring a submarine pipeline beneath a body of water, comprising the steps of:
lowering a work platform from a transporting marine vessel to a submerged position adjacent the pipeline;
anchoring the pipeline with the earthen floor beneath the body of water;
automatically controlling relative movement between the work platform and the pipeline during anchoring; and
said step of controlling relative movement including:
a. sensing the position of the work platform relative to the pipeline; and b. limiting movement of the work platform with respect to the pipeline in accordance with the results of said step of sensing, whereby a stable anchoring operation independent of transporting vessel movement may be performed. 2. The method of claim 1, further including the step of:
monitoring the anchoring operations in order to determine if such operations are proceeding properly.
3. The method of claim 1, further including the step of:
storing a plurality of anchoring augers with the work platform wherein such augers are available in the submerged position adjacent the pipeline for the next anchoring operation after a preceding operation is completed, permitting the performance of a second anchoring operation without returning the work platform to the transporting marine vessel. 4. The method of claim 1, further including the step of:
entrenching the pipeline preceding said step of anchoring wherein the pipeline is anchored beneath the earthen floor of the body of water. 5. The method of claim 1, further including the step of:
uncovering the pipeline preceding said step of anchoring wherein the pipeline is firmly anchored with the earthen floor of the body of water. 6. An apparatus for controlling offshore work operations beneath a body of water, comprising:
' a. platform means for lowering from a transporting vessel to a submerged position adjacent the location of the work operation;
b. means mounted with said platform means for performing the offshore work operations; and
c. means for permitting relative movement between the transporting vessel and said work platform means comprising:
1. means for sensing the position of said platform means relative to an object or the floor of the body of water; and
2. means responsive to said means for sensing for regulating movement of said platform means with respect to the object or the floor of the body of water whereby said platform means is maintained in the desired position and movement of said transport vessel at the surface does not induce movement of the work platform relative to the pipeline.
7. The structure of claim 6, further including:
means for monitoring the work operations in order to insure that such operations are proceeding properly.
-8. The structure of claim 6, wherein said means for performing offshore work operations comprises:
a. auger means for anchoring a pipeline with a submaring earthen surface; and
b. motor means for driving said auger means into the earthen surface.
9. The structure of claim 8, wherein said platform includes:
means for storing a plurality of said auger means wherein said auger means are available without delay after completion of a prior anchoring operation to permit continuing anchoring operations.
10. The structure of claim 8, further including:
means for entrenching the pipeline wherein the pipeline is anchored beneath the earthen floor of the body of water. i
11. The structure of claim 8, further including:
means for uncovering the pipeline wherein firm anchoring of the pipeline with the earthen floor is obtained.
12. The structure of claim 8, further including:
means for positioning said auger means to be driven vertically into the earthen surface.
13. The structure of claim 8, further including:
means for positioning said auger means to be driven obliquely into the earthen surface.
14. The structure of claim 8, further including:
means for fluidizing the earthen surface beneath said auger means to facilitate uncovering and entrenching of the pipeline.
15. The structure of claim 6, further including:
bathysphere means mounted with said platform means for permitting submarine control and observation of the work operations.
16. The structure of claim 6, further including:
means for lowering said platform means from the vessel, comprising: cable means for suspending said platform means; winch means for adjusting the tension in said cable means; and
said means responsive to said means for sensing for regulating movement including: adjustment means responsive to said means for sensing for controlling said winch means wherein relative movement between the vessel and said platform means is controlled to permit stabilized work operation.
17. The structure of claim 6, further including:
a cable for supporting said work platform and piston means for stabilizing and controlling the position of said work platfon'n with respect to the vessel to adjust the tension and torsion in the cable.
18. The structure of claim 6, further including:
cable means movably supported by the transporting vessel and having weight means secured to one end and having the other end secured to the work platform for stabilizing said work platform with respect to the vessel to adjust tension in the cable means.
19. A method for controlling and stabilizing work operations beneath a body of water, comprising the steps of:
sensing the position of the work platform relative to an object or the earthen floor beneath the body of water; and
regulating movement of the vessel with respect to the work platform in accordance with the results of said step of sensing, whereby stable and safe work operations may be performed.
20. The method of claim 19, wherein said step of controlling further includes the step of:
controlling relative horizontal movement between the transporting vessel and the work platform. I

Claims (21)

1. A method of anchoring a submarine pipeline beneath a body of water, comprising the steps of: lowering a work platform from a transporting marine vessel to a submerged position adjacent the pipeline; anchoring the pipeline with the earthen floor beneath the body of water; automatically controlling relative movement between the work platform and the pipeline during anchoring; and said step of controlling relative movement including: a. sensing the position of the work platform relative to the pipeline; and b. limiting movement of the work platform with respect to the pipeline in accordance with the results of said step of sensing, whereby a stable anchoring operation independent of transporting vessel movement may be performed.
2. The method of claim 1, further including the step of: monitoring the anchoring operations in order to determine if such operations are proceeding properly.
2. means responsive to said means for sensing for regulating movement of said platform means with respect to the object or the floor of the body of water whereby said platform means is maintained in the desired position and movement of said transport vessel at the surface does not induce movement of the work platform relative to the pipeline.
3. The method of claim 1, further including the step of: storing a plurality of anchoring augers with the work platform wherein such augers are available in the submerged position adjacent the pipeline for the next anchoring operation after a preceding operation is completed, permitting the performance of a second anchoring operation without returning the work platform to the transporting marine vessel.
4. The method of claim 1, further including the step of: entrenching the pipeline preceding said step of anchoring wherein the pipeline is anchored beneath the earthen floor of the body of water.
5. The method of claim 1, further including the step of: uncovering the pipeline preceding said step of anchoring wherein the pipeline is firmly anchored with the earthen floor of the body of water.
6. An apparatus for controlling offshore work operations beneath a body of water, comprising: a. platform means for lowering from a transporting vessel to a submerged position adjacent the location of the work operation; b. means mounted with said platform means for performing the offshore work operations; and c. means for permitting relative movement between the transporting vessel and said work platform means comprising:
7. The structure of claim 6, further including: means for monitoring the work operations in order to insure that such operations are proceeding properly.
8. The structure of claim 6, wherein said means for performing offshore work operations comprises: a. auger means for anchoring a pipeline with a submaring earthen surface; and b. motor means for driving said auger means into the earthen surface.
9. The structure of claim 8, wherein said platform includes: means for storing a plurality of said auger means wherein said auger means are available without delay after completion of a prior anchoring operation to permit continuing anchoring operations.
10. The structure of claim 8, further including: means for entrenching the pipeline wherein the pipeline is anchored beneath the earthen floor of the body of water.
11. The structure of claim 8, further including: means for uncovering the pipeline wherein firm anchoring of the pipeline with the earthen floor is obtained.
12. The structure of claim 8, further including: means for positioning said auger means to be driven vertically into the earthen surface.
13. The structure of claim 8, further including: means for positioning said auger means to be driven obliquely into the earthen surface.
14. The structure of claim 8, further including: means for fluidizing the earthen surface beneath said auger means to facilitate uncovering and entrenching of the pipeline.
15. The structure of claim 6, further including: bathysphere means mounted with said platform means for permitting submarine control and observation of the work operations.
16. The structure of claim 6, further including: means for lowering said platform means from the vessel, comprising: cable means for suspending said platform means; winch means for adjusting the tension in said cable means; and said means responsive to said means for sensing for regulating movement including: adjustment means responsive to said means for sensing for controlling said winch means wherein relative movement between the vessel and said platform means is controlled to permit stabilized work operation.
17. The structure of claim 6, further including: a cable for supporting said work platform and piston means for stabilizing and controlling the position of said work platform with respect to the vessel to adjust the tension and torsion in the cable.
18. The structure of claim 6, further including: cable means movably supported by the transporting vessel and having weight means secured to one end and having the other end secured to the work platform for stabilizing said work platform with respect to the vessel tO adjust tension in the cable means.
19. A method for controlling and stabilizing work operations beneath a body of water, comprising the steps of: lowering a work platform from a transporting marine vessel to a position adjacent the location of the work operations; performing the work operation; controlling relative movement between the transporting vessel and the work platform for stabilizing the position of the work platform during the work operations; and said step of controlling relative movement including: sensing the position of the work platform relative to an object or the earthen floor beneath the body of water; and regulating movement of the vessel with respect to the work platform in accordance with the results of said step of sensing, whereby stable and safe work operations may be performed.
20. The method of claim 19, wherein said step of controlling further includes the step of: controlling relative horizontal movement between the transporting vessel and the work platform.
US00361810A 1971-09-29 1973-05-18 Apparatus and method for offshore operations Expired - Lifetime US3851492A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US00361810A US3851492A (en) 1971-09-29 1973-05-18 Apparatus and method for offshore operations

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US18472871A 1971-09-29 1971-09-29
US00361810A US3851492A (en) 1971-09-29 1973-05-18 Apparatus and method for offshore operations

Publications (1)

Publication Number Publication Date
US3851492A true US3851492A (en) 1974-12-03

Family

ID=26880419

Family Applications (1)

Application Number Title Priority Date Filing Date
US00361810A Expired - Lifetime US3851492A (en) 1971-09-29 1973-05-18 Apparatus and method for offshore operations

Country Status (1)

Country Link
US (1) US3851492A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3983708A (en) * 1974-07-02 1976-10-05 Schlumberger Technology Corporation Methods and apparatus for placing underwater guide lines
US3991584A (en) * 1975-01-31 1976-11-16 Western Gear Corporation Shock absorbing and retracting system for pipe laying vessel
US4147455A (en) * 1977-01-18 1979-04-03 Snamprogetti S.P.A. Adjustable apparatus for supporting a pipeline laid on deep waters and for impressing thereto a preselected geometrical configuration
FR2464880A1 (en) * 1979-09-15 1981-03-20 British Petroleum Co Diving structure and method of deploying this structure
US4479741A (en) * 1981-05-04 1984-10-30 Snamprogetti S.P.A. Device for laying underground or digging up subsea conduits
US4699191A (en) * 1985-06-21 1987-10-13 Amtel, Inc Hose coupling mechanism
US4708178A (en) * 1985-06-21 1987-11-24 Amtel, Inc. Fluid coupling system
US4720213A (en) * 1987-03-16 1988-01-19 Oceaneering International, Inc. Apparatus for inspecting, cleaning and/or performing other tasks in connection with a welded joint
WO1999050527A1 (en) * 1998-03-27 1999-10-07 Single Buoy Moorings Inc. Riser tensioning construction
US6290432B1 (en) 1999-04-06 2001-09-18 Williams Field Services Gulf Coast Company, L.P. Diverless subsea hot tap system
US6290431B1 (en) 1999-04-06 2001-09-18 Williams Field Services Gulf Coast Company, L.P. Diverless subsea hot tap system with lateral pipe tie-in
US6435771B1 (en) * 2000-11-27 2002-08-20 Benton F. Baugh Method for attaching subsea manifold to pipeline tee
US6648562B1 (en) 2001-06-08 2003-11-18 Charles D. Calkins Apparatus for tapping a hole in a pipeline
US6719496B1 (en) * 1997-11-01 2004-04-13 Shell Oil Company ROV installed suction piles
US20070177944A1 (en) * 2006-01-31 2007-08-02 Subsea 7 Ltd. Apparatus and Method for Laying Down, Abandoning, and Recovering a Pipe on the Sea Floor
US20080062269A1 (en) * 2006-09-12 2008-03-13 U.W.G. Limited Underwater visual inspection
US7650944B1 (en) * 2003-07-11 2010-01-26 Weatherford/Lamb, Inc. Vessel for well intervention
ITMI20111779A1 (en) * 2011-09-30 2013-03-31 Saipem Spa METHOD AND SYSTEM TO FIX A PIPE ON THE BED OF A WATER BODY
US20130223938A1 (en) * 2011-08-23 2013-08-29 Bauer Maschinen Gmbh Underwater work assembly and method for anchoring thereof
US20150192221A1 (en) * 2012-07-20 2015-07-09 J.F. Karsten Beheer B.V. Method for laying a pipeline
WO2015128733A1 (en) * 2014-02-25 2015-09-03 Technip France Multi-cable subsea lifting system
US20210229782A1 (en) * 2020-01-27 2021-07-29 Other Lab, Llc Vehicle for installing anchors in an underwater substrate

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3014984A (en) * 1958-11-10 1961-12-26 Irenus C Jacobson Underwater television device
US3411306A (en) * 1965-07-07 1968-11-19 Zapata Off Shore Company Apparatus for laying submerged pipe
US3427812A (en) * 1966-07-13 1969-02-18 Chance Co Ab Method and apparatus for anchoring offshore pipelines

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3014984A (en) * 1958-11-10 1961-12-26 Irenus C Jacobson Underwater television device
US3411306A (en) * 1965-07-07 1968-11-19 Zapata Off Shore Company Apparatus for laying submerged pipe
US3427812A (en) * 1966-07-13 1969-02-18 Chance Co Ab Method and apparatus for anchoring offshore pipelines

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6789981B2 (en) 1908-09-09 2004-09-14 Single Buoy Moorings, Inc. Riser tensioning construction
US3983708A (en) * 1974-07-02 1976-10-05 Schlumberger Technology Corporation Methods and apparatus for placing underwater guide lines
US3991584A (en) * 1975-01-31 1976-11-16 Western Gear Corporation Shock absorbing and retracting system for pipe laying vessel
US4147455A (en) * 1977-01-18 1979-04-03 Snamprogetti S.P.A. Adjustable apparatus for supporting a pipeline laid on deep waters and for impressing thereto a preselected geometrical configuration
FR2464880A1 (en) * 1979-09-15 1981-03-20 British Petroleum Co Diving structure and method of deploying this structure
US4286896A (en) * 1979-09-15 1981-09-01 The British Petroleum Company Limited Diving structure and method of deployment of the structure
US4479741A (en) * 1981-05-04 1984-10-30 Snamprogetti S.P.A. Device for laying underground or digging up subsea conduits
US4699191A (en) * 1985-06-21 1987-10-13 Amtel, Inc Hose coupling mechanism
US4708178A (en) * 1985-06-21 1987-11-24 Amtel, Inc. Fluid coupling system
US4720213A (en) * 1987-03-16 1988-01-19 Oceaneering International, Inc. Apparatus for inspecting, cleaning and/or performing other tasks in connection with a welded joint
AU594911B2 (en) * 1987-03-16 1990-03-15 Oceaneering International, Inc. Apparatus for inspecting, cleaning and/or performing other tasks in connection with a welded joint
US6719496B1 (en) * 1997-11-01 2004-04-13 Shell Oil Company ROV installed suction piles
WO1999050527A1 (en) * 1998-03-27 1999-10-07 Single Buoy Moorings Inc. Riser tensioning construction
AU742012B2 (en) * 1998-03-27 2001-12-13 Single Buoy Moorings Inc. Riser tensioning construction
US6517291B1 (en) 1998-03-27 2003-02-11 Single Buoy Moorings Inc. Riser tensioning construction
US6290432B1 (en) 1999-04-06 2001-09-18 Williams Field Services Gulf Coast Company, L.P. Diverless subsea hot tap system
US6290431B1 (en) 1999-04-06 2001-09-18 Williams Field Services Gulf Coast Company, L.P. Diverless subsea hot tap system with lateral pipe tie-in
US6435771B1 (en) * 2000-11-27 2002-08-20 Benton F. Baugh Method for attaching subsea manifold to pipeline tee
US6648562B1 (en) 2001-06-08 2003-11-18 Charles D. Calkins Apparatus for tapping a hole in a pipeline
US7650944B1 (en) * 2003-07-11 2010-01-26 Weatherford/Lamb, Inc. Vessel for well intervention
US7507055B2 (en) * 2006-01-31 2009-03-24 Subsea 7 Ltd. Apparatus and method for laying down, abandoning, and recovering a pipe on the sea floor
US20070177944A1 (en) * 2006-01-31 2007-08-02 Subsea 7 Ltd. Apparatus and Method for Laying Down, Abandoning, and Recovering a Pipe on the Sea Floor
US20080062269A1 (en) * 2006-09-12 2008-03-13 U.W.G. Limited Underwater visual inspection
US20130223938A1 (en) * 2011-08-23 2013-08-29 Bauer Maschinen Gmbh Underwater work assembly and method for anchoring thereof
US8911180B2 (en) * 2011-08-23 2014-12-16 Bauer Maschinen Gmbh Underwater work assembly and method for anchoring thereof
US9243721B2 (en) 2011-09-30 2016-01-26 Saipem S.P.A. Method and system for securing a pipeline to the bed of a body of water
ITMI20111779A1 (en) * 2011-09-30 2013-03-31 Saipem Spa METHOD AND SYSTEM TO FIX A PIPE ON THE BED OF A WATER BODY
WO2013046184A1 (en) * 2011-09-30 2013-04-04 Saipem S.P.A. Method and system for securing a pipeline to the bed of a body of water
AU2012317208B2 (en) * 2011-09-30 2016-10-20 Saipem S.P.A Method and system for securing a pipeline to the bed of a body of water
US20150192221A1 (en) * 2012-07-20 2015-07-09 J.F. Karsten Beheer B.V. Method for laying a pipeline
US9683679B2 (en) * 2012-07-20 2017-06-20 J.F. Karsten Beheer B.V. Method for laying a pipeline
WO2015128733A1 (en) * 2014-02-25 2015-09-03 Technip France Multi-cable subsea lifting system
US10294088B2 (en) 2014-02-25 2019-05-21 Technip France Multi-cable subsea lifting system
US20210229782A1 (en) * 2020-01-27 2021-07-29 Other Lab, Llc Vehicle for installing anchors in an underwater substrate
US11565779B2 (en) * 2020-01-27 2023-01-31 Other Lab, Llc Vehicle for installing anchors in an underwater substrate

Similar Documents

Publication Publication Date Title
US3851492A (en) Apparatus and method for offshore operations
US5593249A (en) Diverless flowline connection system
US3321925A (en) Deep water lay barge and method
US4643614A (en) Method and apparatus for the installation of a hose between a platform and a submerged buoy
US3267682A (en) Method of submarine pipe laying
US3822559A (en) Controlled yield stinger
US5044827A (en) Method for recovering wet buckled pipe
US2910835A (en) Pipe laying apparatus and method
US6009825A (en) Recoverable system for mooring mobile offshore drilling units
US6935262B2 (en) Method for lowering an object to an underwater installation site using an ROV
US5507596A (en) Underwater work platform support system
US4445804A (en) Method and apparatus for remote recovery of submerged pipelines
US3204417A (en) Underwater pipe laying apparatus
US3479830A (en) Anchoring machine
US2770950A (en) Submarine cable installation
KR20150038743A (en) Method, apparatus and system for attaching an anchor member to a floor of a body of water
US3786642A (en) Method and apparatus for entrenching submerged elongate structures
US4041719A (en) Method and apparatus for connecting submarine pipelines
US3690112A (en) Method and apparatus for attaching pipelines to offshore structures
US4484838A (en) Method and apparatus for installing anodes at underwater locations on offshore platforms
US6536743B2 (en) Fixed umbilical cable flotation docking head
US3835656A (en) Method and apparatus for supplying temporary buoyancy to an underwater pipeline
US3677310A (en) Method for connection of an underwater riser to a floating facility
US3698348A (en) Method and apparatus for subsurface towing of flowlines
US4433938A (en) Method and apparatus for lowering and positioning a pipe line onto the bottom of a deep water