Publication numberUS3779025 A
Publication typeGrant
Publication date18 Dec 1973
Filing date7 Oct 1971
Priority date7 Oct 1971
Publication numberUS 3779025 A, US 3779025A, US-A-3779025, US3779025 A, US3779025A
InventorsGodley A, Kruse W
Original AssigneeRaymond Int Inc
Export CitationBiBTeX, EndNote, RefMan
External Links: USPTO, USPTO Assignment, Espacenet
Pile installation
US 3779025 A
Abstract
Piles are installed by driving a tubular lower pile shell section into the ground to a first location beyond which the shell section refuses to penetrate, thereafter, filling the shell with concrete, allowing the concrete to harden and stiffen the shell, and thereafter continuing to drive the concreted shell down to a final bearing depth substantially beyond the first location.
Images(2)
Previous page
Next page
Description  (OCR text may contain errors)

United States Patent [1 1 Godley et a1.

[ PlLE INSTALLATION 3,316,724 5/1967 Tsuzuki 61/56 3,199,300 8/1965 Fiore 61/5352 1,558,127 10/1925 Upson 61/535 2,465,557 3/1949 Thornley... 61/5352 2,920,456 1/1960 Hazak 61/517 3,395,543 8/1968 Rusche (SI/53.7

Primary Examiner-Jacob Shapiro Attorney-J0seph M. Fitzpatrick et. a1.

[5 7] ABSTRACT Piles are installed by driving a tubular lower pile shell section into the ground to a first location beyond which the shell section refuses to penetrate, thereafter, filling the shell with concrete, allowing the concrete to harden and stiffen the shell, and thereafter continuing to drive the concreted shell down to a final bearing depth substantially beyond the first location.

13 Claims, 11 Drawing Figures Den/ms Foes: (Macaw? 0 Ada/M5 &

e We, \m

Emgnmzc 1 81975 snmanrz INVENTORS Aususrvs F? 6001.67 BY [Mu/4M 5X20)? 1 PILE INSTALLATION This invention relates to the formation and driving of piles and more particularly, it concerns novel pile con structions which facilitate installation and provide improved bearing with reduced material costs.

The invention is particularly suited to the formation of cased concrete piles; and the following detailed description of the preferred embodiment of the invention will be made with referenceto the piles of this type.

In general, a cased concrete pile is formed by driving one or more lengths of steel tube or shell to a desired bearing depth, thereafter excavating, if necessary, from the interior of the tube and then filling the tube or shell with concrete.

One difficulty which has been encountered in connection with the formation of cased concrete piles of considerable length is that of driving the tube or shell which forms the pile casing. Because of the high soil resistances encountered in driving to great depths, the tube or shell must have a substantial wall thickness, otherwise it will refuse to penetrate beyond a given depth. This refusal to penetrate may manifest itself in various ways. Firstly, the force transmission characteristics of their shell do not, after a certain depth, provide a proper impedance match between the driver, whether a hammer or a vibrator, and the ground. The shell behaves as a spring and the driving forces instead of passing through the shell and into the ground to displace it, merely compress the shell and it springs back and reflects these forces back to the driver. Secondly, the shell may fail in compression because of insufficient column strength to withstand the driving forces required to reach an ultimate bearing depth. Thirdly, the shell may collapse, that is, it may fail by becoming squeezed in by the effects of ground pressure or by the effects of rocks, boulders or other hard objects within the earth as the shell moves by them. I

While these various types of penetration refusal can be alleviated by the use of thicker walled shells, this approach becomes very expensive. Removable mandrels have been used with some success in the driving of thin walled shells; however, because of limitations on driving rigs, they often cannot readily be built with leads sufficiently high to handle the length of mandrel needed.

The present invention avoids these problems of the prior art and provides easily and simply executed pro cedures for constructing a novel cased concrete pile with improved strength and reduced material requirements. Thus, with the present invention, thick driving tubes are not required, nor are excessively long driving mandrels.

According to the present invention, a thin tubular shell, closed at the bottom, is driven down into the earth to a depth less than the depth at which penetrat ion refusal occurs. The shell is then filled with a castable material, such as concrete, which is allowed to harden and stiffen the shell. The thus-stiffened shell is then driven down beyond the aforesaid location to a finalbearing depth. Because of the stiffening effect of the concrete, the force transmission characteristics of the shell are changed and it becomes capable of directing the hammer or vibrator driving forces into the ground instead of merely reflecting them back to the driving mechanism. Also, the concrete provides col umn strength so that the shell is enabled to withstand the driving forces. The shell, moreover, is not subject to collapse as a result of squeezing or other latent forces encountered during driving.

The present invention is to be distinguished from those prior art operations which involved the driving of empty shells to a final bearing depth and thereafter filling the shells with concrete. In some cases, it was found that the concrete filled shells did not possess the expected load bearing capacity; and they were, therefore, hammered until their loading capacity was reached. In those prior art operations, the shells were either sufficiently stiff or were temporarily stiffened, as by mandrels, to enable them to be driven to final bearing depth. The concrete was placed in the shells only after they had been driven to what was intended as the final bearing depth. Any subsequent driving was undertaken only to reset the shells which may have heaved durin or before pouring of the concrete.

The present invention, on the other hand, involves the driving of a thin shell only to a first location beyond which the shell refuses to penetrate, then concreting the shell to stiffen it, and finally driving the thusstiffened shell to final bearing depth, which is substantially beyond the first location.

According to one embodiment of the present invention, a cased concrete pile is formed by first driving a first length of tube or shell into the ground until its upper end is near ground level. The tube or shell is then filled with a castable material such as concrete and the material is allowed to harden sufficiently to gain some initial strength (e.g., 4 to 5 days in the case of concrete). Thereafter, a second length of tube or shell is connected on top of the first, concretefilled, length; and the two lengths, along with the hardened concrete contained in the lower one, are driven together. Concrete is then poured into the second length and allowed to harden. If the second length is at grade level with the tip at bearing level, the pile may be capped; otherwise, a third length of tube or shell may beconnected and driven down withthe first and second concrete filled tubes ahead of it.

Various further and more specific objects, features and advantages of the invention will appear from the description given below, taken in connection with the accompanying drawings, illustrating by way of example a preferred form of the invention.

In the drawings: 7

FIG. 1 is an elevational view showing a multiple section pile installation, partially cutaway, according to the present invention;

FIGS. 2-6 are elevational section views, partially cut away, illustrating a series of steps in forming the pile installation of FIG. 1;

FIG. 7 is an enlarged fragmentary elevational section view illustrating a pile section connector construction used in the pile installation of FIG. 1;

FIG. 8 is a view similar to FIG. 7, but showing an alternate connector construction;

FIG. 9 is an elevational section view illustrating one form of pile section preassembly in forming the pile installation of FIG. 1;

FIG. 10 is a view similar to FIG. 9, but showing an alternate preassembly construction; and

FIG. 11 is a view similarto FIG. 5, but illustrating the use of a mandrel in driving pile sections.

The pile installation of FIG. 1 comprises a plurality of pile sections 20 extending down into the earth (indicated at 21). These pile sections are arranged in tandem and are coupled together at their ends by means of connector constructions 22. The overall length and cross-sectional size of the pile construction will depend upon the particular soil conditions and on the load to be carried. For example, the overall length of the pile construction may be about I35 feet and its crosssection may be circular with a diameter of about 13 inches.

As can be seen in the lower cutaway portion in FIG. 1, the pile sections 20 each comprise a tubular steel shell 24 which encases a concrete core 26.

Turning now to FIG. 2, it will be seen that the first step in the installation of the pile construction involves driving a first hollow tubular shell section 28 down into the earth 21. The lower end of the shell section 28 is covered with a boot plate 30 to prevent soil from entering up into its lower end. A removable cap block 32 may be provided at the upper end of the shell section 28; and the driving forces may be applied, as indicated at 34, by any known means, such as a hammer. Alternatively, a clamping arrangement may be used in place of the cap block 32 and vibratory forces may be applied to drive the shell section 28 down into the earth.

After the first shell section 24 has been driven to where penetration refusal is experienced, a wet concrete mix 36 is poured into the shell section, as shown in FIG. 3. The concrete mix, which may be a conventional concrete mixture, or a mixture containing an expansion component, is poured through a chute 38 until the shell section 28 is essentially filled. The concrete is then allowed to cure and harden until it attains a substantial portion of its strength. A period of 4 to days will usually suffice.

During the initial stages of curing a portion of the water content of the concrete may rise to the top of the shell section 28. This water may be removed, as by mopping. The resulting void is then filled with a highearly strength grout, as indicated at 40 in FIG. 4. A steel plate 42 is set into the shell section 28 so that it rests upon the grout 40 flush with the upper end of the shell section. The steel plate 42 is preferably welded, as

. at 44, to the upperend of the shell section 28 so that a rigid compact concrete-grout-steel structure results.

After the concrete and grout have hardened and the steel plate 42 has been fixed in place, a second shell section 46 is positioned on top of the first shell section and is secured thereto, as by a connector sleeve 48, as shonw in FIG. 5. Driving forces, indicated at 50, are then applied to the second section 46 to drive the two sections together down into the earth.

Eventually, the two shell sections 28 and 46 are driven to a desired depth whereupon the driving forces are removed, as shown in FIG. 6. Thereafter, the second shell section may be capped off with or without first filling it with concrete; or, in the event that further pile sections are to be added for additional depth, the second shell section 46 may be filled with concrete and grout and after the concrete and grout have hardened the further pile section may be added as abovedescribed and driving resumed.

The connector sleeve 48 is best shown in the em larged view of FIG. 7. As can be seen. the sleeve 48 is of generally tubular configuration and its inner surface is tapered outwardly toward the ends to accept the mating ends of the shell sections 28 and 46. An internal flange 52 extends inwardly a short distance from the center of the sleeve 48. This flange rests upon the upper end of the lower shell section 28 while the lower end of the upper shell section 46, in turn, rests upon the flange 52. It will be seen that this provides solid metalto-metal contact between the shell sections for positive driving.

For some purposes the connector sleeve 48 may be dispensed with and two shell sections 28 and 46 may be welded directly to each other, as indicated at 54 in F IG. 8. When a direct welded connection is employed, the resulting pile construction is enabled to sustain uplift loads. Also, the welded connection permits the use of vibrator-type driving apparatus for all shell sections. Unless the shell sections are positively connected, as by welding, the use of vibrators is limited, for most practical purposes to the lowermost shell section.

FIGS. 9 and 10 show different connector arrangements which may be employed to expedite shell section assembly during pile installation. As can be seen in FIG. 9, the connector sleeve is secured to the upper shell section 46 prior to assembly with the lower shell section 28. This permits partial preassembly in the plant or other remote location so that at the pile installation site, the upper shell section may be assembled onto the lower section simply by setting it with the connector sleeve attached onto the lower shell section. In this case, the upper end of the connector sleeve 48 is dimensioned to have a press fit with the upper shell section 46, while the lower end of the connector sleeve is dimensioned to have a slip fit with the lower shell section 28.

The arrangement of FIG. 10 is reverse to that of FIG. 9 in that the connector sleeve in this case is preassembled onto the lower shell section 28 and is dimensioned to provide a press fit thereon. The upper shell section is then lifted onto the lower shell section and connector sleeve preassembly and is fitted into the upper end of the connector sleeve. The upper end of the connector sleeve, in this case, is dimensioned to provide a slip fit with the upper shell section.

Turning now to FIG. 1 1, it will be seen that a mandrel may be used in driving the upper and lower sections 46 and 28. As can be seen, the mandrel 60 is inserted into the interior of the upper shell section 46, and its lower end rests upon the steel plate 42 of the lower shell section 28. Hammer blows applied to the mandrel 60 are thus transmitted directly to the lower shell section so that the upper shell section 46 need not transmit these driving forces. The length of the mandrel 60 is made slightly greater than that of the upper shell section 46 so that the greater portion of the driving force is applied through the mandrel. However, as the upper shell section 46 stretches under the force of the hammer blows, the upper end of the mandrel contacts the upper end of the shell section 46 and a portion of the hammer energy becomes directed into the upper shell section. In this manner, driving stresses are distributed throughout the pile system and thus the likelihood of shell section rupture during driving is minimized.

The pile installation arrangements described above are characterized by the driving of a shell section containing concrete which has at least partially hardened. It has been found that there is little tendency for the concrete in the shell section to break up since the driving forces are directed primarily in compression of the concrete. Any fracture of the concrete, which may take place during driving, will not affect the load-carrying capabilities of the pile installation since the concrete is contained laterally by the tensile strength of the tubular steel shell section. This lateral support has been found to provide very greatly improved load-bearing capabilities. This can be further improved by use of a concrete mix containing an expansion component. As the concrete hardens, it expands against the walls of the tubular shell and the reaction of these walls produces a lateral squeezing on the concrete; and this, in turn, greatly increases the longitudinal compressive strength of the pile structure.

By providing a concrete shell section, as abovedescribed, continued driving may take place without danger of buckling or collapsing of the shell sections, either by soil restraint or upon impingement against boulders and the like within the earth.

The strength provided to the shell by the concrete enables the use of a thinner wall shell than would normally be required. Actually, in most pile installations using steel encased concrete pile construction, the required shell wall thickness calculated for load bearing is less than that calculated for driving. Thus, by enabling a thinner wall shell section to be driven, the present invention makes possible a more efficient relationship between shell section wall thickness and load spec ifications.

For certain applications, it may be desired to increase the tensile strength of the concrete within the shell sections. This can be done by installing conventional reinforcing steel within the shell section before pouring the concrete; or if desired, small lengths of fiber or short steel wire may be distributed randomly throughout the concrete mix.

Having thus described the invention with particular reference tothe preferred form thereof, it will be obvious to those skilled in the art to which the invention pertains, after understanding the invention, that various changes and modifications may be made therein without departing from the spirit and scope of the in vention, as defined by the claims appended thereto.

What is claimed is:

1. A method of forming a pile in the earth comprising the steps of driving a hollow tube, closed at the bottom, down into the earth to a first location less than the depth at which penetration refusal is experienced, then filling the tube with a flowable castable material to stiffen the tube, allowing the castable material to harden and thereafter further driving the tube with the castable material hardened therein further down substantially beyond said first location to a final bearing 6 depth.

2. A method of forming a pile according to claim 1, wherein the castable material is concrete and said concrete is allowed to harden about four days before said further driving.

3. A method of forming a pile in the earth comprising the steps of driving a first tube down into the earth, filling the tube with a castable material to stiffen same, allowing the castable material to harden, connecting a further tube to the top of the first tube and thereafter driving the tubes together further down into the earth.

4. A method of forming a pile according to claim 3, wherein the castable material is concrete and wherein water which rises to the top of said first tube is removed and replaced with a grout.

5. A method of forming a pile according to claim 3, wherein a steel plate is positioned on top of the castable material prior to connecting said further tube.

6. A method of forming a pile according to claim 3, wherein said further tube is connected by welding its end to the top of said first tube.

7. A method of forming a pile according to claim 6, wherein said tubes are driven together further down into the earth by application of vibratory driving forces.

8. A method of forming a pile according to claim 3, wherein said further tube is connected by means of a connector sleeve.

9. A method of forming a pile according to claim 8, wherein said connector sleeve is preassembled with one of said tubes by a press tit.

10. A method of forming a pile according to claim 9, wherein said connector sleeve is fitted to the other tube with a sliding fit.

11. A method of forming a pile according to claim 3, wherein said further tube, after being driven further down into the earth, is itself-filled with a castable material.

12. A method of forming a pile according to claim 11, wherein the castable material in said further tube is allowed to harden and a third tube is connected to the top of said further tube and all said tubes are together driven still further into the earth.

13. A method of forming a pile according to claim 3, wherein said driving of the tubes together into the earth is undertaken by means of a mandrel extending down the interior of said further tube to engage the castable material in the first tube to distribute the force of driving blows between said tubes.

Patent Citations
Cited PatentFiling datePublication dateApplicantTitle
US1558127 *31 May 192320 Oct 1925Upson Maxwell MSetting composite piles
US1954070 *4 Aug 193210 Apr 1934George CookPile
US2465557 *22 Oct 194529 Mar 1949Thornley Joseph HPile and method of making the same
US2698520 *4 Aug 19524 Jan 1955Pacific Union Metal CompanyConcrete pile joint
US2920456 *24 Apr 195612 Jan 1960Raymond Int IncConcrete piles and methods for forming and installing same
US3199300 *22 May 196110 Aug 1965Foundation Specialties IncPile construction
US3316724 *13 Jan 19642 May 1967Yoshiro TsuzukiConcrete pile joint and method of assembly
US3395543 *7 Jul 19676 Aug 1968Fredric RuscheMethod for driving thin wall pipe piles
Referenced by
Citing PatentFiling datePublication dateApplicantTitle
US3971227 *19 Feb 197427 Jul 1976Raymond International Inc.Installation of expanded base piles
US4027491 *27 Jan 19757 Jun 1977Turzillo Lee AComposite earth drilling auger and method of installing same in situ
US4230425 *19 Mar 197928 Oct 1980Gusev Vladimir AMethod and installation for producing cast-in-situ piles
US4543015 *14 Sep 198324 Sep 1985Kruse William EPile having wedge former
US5419658 *5 Oct 199330 May 1995Wayne DeWittThin-walled pipe driving method for forming piles
US6036404 *15 Apr 199814 Mar 2000Petroleo Brasileiro S.A.-PetrobrasFoundation system for tension leg platforms
US6142709 *18 Mar 19997 Nov 2000Petroleo Brasileiro S.A. - PetrobrasFoundation system for tension leg platforms
US631219517 Nov 19996 Nov 2001Petroleo Brasileiro S.A. PetrobrasMethod of installing foundation for tension leg platform
US6318933 *17 Oct 199620 Nov 2001Petroleo Brasileiro S.A.Foundation system for tension leg platforms
US6468003 *7 Sep 200122 Oct 2002Stanley MerjanComposite pile with tapering lower portion and method for driving pile into granular soil
US64709667 May 200129 Oct 2002Robert Lance CookApparatus for forming wellbore casing
US64972893 Dec 199924 Dec 2002Robert Lance CookMethod of creating a casing in a borehole
US65576407 Jun 20006 May 2003Shell Oil CompanyLubrication and self-cleaning system for expansion mandrel
US65612279 May 200113 May 2003Shell Oil CompanyWellbore casing
US656847124 Feb 200027 May 2003Shell Oil CompanyLiner hanger
US6575240 *24 Feb 200010 Jun 2003Shell Oil CompanySystem and method for driving pipe
US657525015 Nov 200010 Jun 2003Shell Oil CompanyExpanding a tubular element in a wellbore
US663175912 Feb 200214 Oct 2003Shell Oil CompanyApparatus for radially expanding a tubular member
US66317609 May 200114 Oct 2003Shell Oil CompanyTie back liner for a well system
US663176915 Feb 200214 Oct 2003Shell Oil CompanyMethod of operating an apparatus for radially expanding a tubular member
US66344313 Oct 200121 Oct 2003Robert Lance CookIsolation of subterranean zones
US664090310 Mar 20004 Nov 2003Shell Oil CompanyForming a wellbore casing while simultaneously drilling a wellbore
US668494720 Feb 20023 Feb 2004Shell Oil CompanyApparatus for radially expanding a tubular member
US670539512 Feb 200216 Mar 2004Shell Oil CompanyWellbore casing
US671215418 Oct 200130 Mar 2004Enventure Global TechnologyIsolation of subterranean zones
US672591925 Sep 200127 Apr 2004Shell Oil CompanyForming a wellbore casing while simultaneously drilling a wellbore
US673939225 Sep 200125 May 2004Shell Oil CompanyForming a wellbore casing while simultaneously drilling a wellbore
US674584510 Dec 20018 Jun 2004Shell Oil CompanyIsolation of subterranean zones
US6749372 *7 Dec 200115 Jun 2004Qing-Dao XieUnderground shell-pile continuous wall job practice and its special drill
US675827825 Sep 20016 Jul 2004Shell Oil CompanyForming a wellbore casing while simultaneously drilling a wellbore
US682393710 Feb 200030 Nov 2004Shell Oil CompanyWellhead
US68574737 Mar 200222 Feb 2005Shell Oil CompanyMethod of coupling a tubular member to a preexisting structure
US689281925 Sep 200117 May 2005Shell Oil CompanyForming a wellbore casing while simultaneously drilling a wellbore
US696637020 Feb 200222 Nov 2005Shell Oil CompanyApparatus for actuating an annular piston
US696861812 May 200329 Nov 2005Shell Oil CompanyExpandable connector
US697654122 Jan 200320 Dec 2005Shell Oil CompanyLiner hanger with sliding sleeve valve
US70111611 Oct 200214 Mar 2006Shell Oil CompanyStructural support
US70365821 Oct 20022 May 2006Shell Oil CompanyExpansion cone for radially expanding tubular members
US704039620 Feb 20029 May 2006Shell Oil CompanyApparatus for releasably coupling two elements
US70442181 Oct 200216 May 2006Shell Oil CompanyApparatus for radially expanding tubular members
US704422120 Feb 200216 May 2006Shell Oil CompanyApparatus for coupling a tubular member to a preexisting structure
US70480621 Oct 200223 May 2006Shell Oil CompanyMethod of selecting tubular members
US705560818 Apr 20036 Jun 2006Shell Oil CompanyForming a wellbore casing while simultaneously drilling a wellbore
US706314215 Feb 200220 Jun 2006Shell Oil CompanyMethod of applying an axial force to an expansion cone
US70739808 Dec 200311 Jul 2006Stanley MerjanPiling
US70772131 Oct 200218 Jul 2006Shell Oil CompanyExpansion cone for radially expanding tubular members
US710068418 Dec 20025 Sep 2006Enventure Global TechnologyLiner hanger with standoffs
US710068513 Jun 20035 Sep 2006Enventure Global TechnologyMono-diameter wellbore casing
US710806125 Oct 200219 Sep 2006Shell Oil CompanyExpander for a tapered liner with a shoe
US71080725 Mar 200319 Sep 2006Shell Oil CompanyLubrication and self-cleaning system for expansion mandrel
US712135214 Jul 200317 Oct 2006Enventure Global TechnologyIsolation of subterranean zones
US715966519 Jul 20029 Jan 2007Shell Oil CompanyWellbore casing
US71596672 Feb 20049 Jan 2007Shell Oil CompanyMethod of coupling a tubular member to a preexisting structure
US716849910 Sep 200430 Jan 2007Shell Oil CompanyRadial expansion of tubular members
US717202431 Mar 20036 Feb 2007Shell Oil CompanyMono-diameter wellbore casing
US741602713 Aug 200226 Aug 2008Enventure Global Technology, LlcAdjustable expansion cone assembly
US7517170 *27 May 200514 Apr 2009The Chamberlain Group, Inc.Method and apparatus for mounting a barrier operator
US7909542 *6 Nov 200322 Mar 2011Grinaka-Lta LimitedMine support
EP0217995A2 *12 Nov 198515 Apr 1987Soc. PACCAGNELLA S.n.c. di Paccagnella Celso & Co.A device that may be applied to perforating drills for the drilling of foundation holes,and the insertion and stabilization of reinforcement tubes
Classifications
U.S. Classification405/249, 405/233
International ClassificationE02D5/34, E02D5/38
Cooperative ClassificationE02D5/38
European ClassificationE02D5/38