US3393736A - Well completion method - Google Patents

Well completion method Download PDF

Info

Publication number
US3393736A
US3393736A US573080A US57308066A US3393736A US 3393736 A US3393736 A US 3393736A US 573080 A US573080 A US 573080A US 57308066 A US57308066 A US 57308066A US 3393736 A US3393736 A US 3393736A
Authority
US
United States
Prior art keywords
formation
particles
well
casing
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US573080A
Inventor
Robert J Goodwin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gulf Research and Development Co
Original Assignee
Gulf Research and Development Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gulf Research and Development Co filed Critical Gulf Research and Development Co
Priority to US573080A priority Critical patent/US3393736A/en
Application granted granted Critical
Publication of US3393736A publication Critical patent/US3393736A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/025Consolidation of loose sand or the like round the wells without excessively decreasing the permeability thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0078Nozzles used in boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators
    • E21B43/114Perforators using direct fluid action on the wall to be perforated, e.g. abrasive jets

Definitions

  • ABSTRACT F THE DISCLOSURE A method of completing a well having casing set through an incompetent fluid-bearing formation in which openings are cut in the casing, a cavity having a width substantially larger than the width of the opening in the casing is cut in the incompetent formation by means of van abrasive-laden fluid, and thereafter the cavity is filled with solid particles which are bonded together to form a permeable coherent mass.
  • underground formations containing valuable fluids are referred to as incompetent formations because they are unconsolidated or so weakly consolidated that the pressure drop at the unsupported, exposed face of the formation resulting from the flow of formation fluids toward the well exceeds the strength of the formation and causes particles of the formation to break loose and ow into the well.
  • the flow of sand into the well may plug the well and make necessary frequent work over of the well to maintain production. If the underground formation is under high pressure, the sand from the formation may travel through well equipment at high velocities and cause severe erosion of the well equipment.
  • One method that has been widely used to prevent sanding of wells penetrating incompetent formations is to pack gravel between the face of the formation and a slotted liner set in the well.
  • the gravel supports the formation and obstructs flow of sand to the well.
  • the liner prevents ow of the gravel into the well.
  • An important objection to the use of gravel packs and liners to prevent flow of sand into a well is the high cost of the liner and the packer required to seal the space between the upper end of the liner and the casing. Moreover, it is difficult to fill completely the space behind the liner. Sand can then shift to plug the gravel pack and thereby reduce the wells productivity.
  • the casing is cemented in place by displacing a slurry of cement downwardly through the casing, around the lower end of the casing, and upwardly through the annulus between the casing and the borehole wall.
  • the casing and its surrounding cement sheath isolate the productive formations from other formations penetrated by the well and, in the case of incompetent formations, provide support for the incompetent formation immediately adjacent the well.
  • the casing is perforated through the potentially productive formation to vallow flow from the formation into the well,
  • the usual method of perforating the casing is by means of shaped charges of explosives which form slender holes extending from the casing a short distance outwardly into the formation. The holes taper to a point at their outer end.
  • This invention resides in a method of completing a well penetrating an incompetent, fluid-bearing formation 3,393,736 Patented July 23, 1968 ICC in which casing is cemented in the formation to control ⁇ movement of sand from the formation into the Well.
  • An opening is cut in the casing and adjacent formation by means of a high-velocity stream of a uid containing entrained abrasive particles to form a cavity having a width near its outer end substantially larger than the diameter of the opening in the casing.
  • a granular material is displaced through the openings in the casing into the cavity cut by the abrasive stream, and particles of the granular material are cemented together to form ⁇ a unitary permeable mass expanding outwardly from the outer surface of the casing.
  • FIGURE l is a vertical sectional view of a portion of a well penetrating an incompetent formation showing nozzles supported in the well while openings are cut in the casing and cavities are cut in the surrounding formation.
  • FIGURE 2 is a vertical sectional view of the well illustrated in FIGURE 1 after the cavities in the incompetent formation have been cut to the desired size and solid particles have been displaced into the cavities to form a unitary mass supporting the exposed face of the incompetent formation.
  • FIGURE l the lower end of a well indicated generally by reference numeral 10 is shown with casing 12 extending through an incompetent, fluid-bearing formation 14 to a total depth 16.
  • Casing 12 is cemented in place in the usual manner by displacement of cement downwardly through the casing and upwardly through the annulus between the casing and the borehole wall to form a cement sheath 18 surrounding the casing 12.
  • perforations 20 are cut through the casing 12 and cement sheath 18, and enlarged cavities 22 are cut in the formation adjacent the perforations 20 by means of a highvelocity stream of a fluid containing entrained abrasive particles.
  • a slurry of abrasive particles in a liquid is used and the cutting medium will hereafter be referred to as a slurry.
  • the slurray is pumped down the well through tubing 24 and is discharged through nozzles mounted in a suitable nozzle head 26 to erode holes through the casing and surrounding cement sheath.
  • the abrasive slurry discharged from nozzle head 26 is directed outwardly in a thin, high-velocity stream to cut a cavity 22 in the surrounding formation.
  • the slurry is diverted at the outer end of the cavity and returns through the perforations 20 to the borehole of the well.
  • the return ow of the slurry to the perofrations 20 enlarges the cavity to a width substantially larger than the perforations 20 and erodes cement from the casing adjacent the perforations.
  • the slurry of liquid then flows upwardly through the annulus and is discharged from the well at the surface. To obtain the desired enlargement of the cavity, flow back into the Well is essential; hence, space must be provided between the nozzle and the casing to allow the backllow.
  • FIGURE 1 of the drawings shows a well with two perforations 20 and cavities 22.
  • Other perforations and cavities ⁇ can be cut at intervals throughout the incompetent oilbearing formation 14 to provide any ldesired number of openings in the casing.
  • a single notch extending for the full circumference of the casing and a circular cavity extending outwardly into the formation from the notch is cut by rotating in a horizontal plane the nozzle head from w-hich the abrasive slurry is discharged.
  • Suitable apparatus for cutting the notch in the casing and the surrounding -cavity is illustrated in U.S. Patent No. 3,254,720 of I. L. Huitt et al.
  • An abrasive slurry is discharged from the nozzles until cavities 22 of a desired size are formed as illustrated in FIGURE 2 of the drawings.
  • the tubing 24 and nozzle head 26 are withdrawn from the well.
  • a slurry of solid particles 28 suspended in a liquid is pumped down the well and into the cavities 22.
  • the liquid lters outwardly through the surrounding formation 14 and deposits the particles in the cavity 22.
  • Pumping of the slurry of liquid and solid particles is continued until the particles ll the cavities 22.
  • Another method of placing the gravel is to close the annulus surrounding tubing 24 and displace a slurry of gravel through the tubing 24 and nozzle head 26 and into the cavities 22.
  • the particles 2S are bonded together to form a substantially unitary permeable mass completely lling the cavities 22 and thereby providing support for the exposed faces of the incompetent formation 14 forming the walls of the cavities 22.
  • the particles are provided with a coating of a resin-forming liquid or semiliquid material capable of setting into a resin which is insoluble in water and oil before they are suspended in a liquid and pumped down the well.
  • the coating on the particles may contain sufficient catalyst to cause the coating to set to a hard, strong resin at the conditions of temperature and pressure existing in the formation 14 or may be 0f a material that will set to form the desired strong bon-d without a catalyst.
  • Another method of bonding the particles together to form the desired strong unitary mass is to coat the particles with a resin-forming material which will set to form a strong resin insoluble in water and oil on cont-act with a suitable catalyst and thereafter displacing the catalyst -down the well and outwardly from the well into the cavities 22 to cause the desired setting of the coating.
  • the substantially unitary permeable mass of particles 28 can also be obtained by displacing uncoated solid particles into the cavities 22 and then displacing a resinforming liquid down the well and through the mass of particles in the cavities 22 to coat the outer surfaces of the particles.
  • the resin-forming liquid is followed by a liquid immiscible with the resin-forming liquid to displace that liquid, except for a coating on the particles, 4from the cavities 22. If the resin-forming liquid is one that will set at conditions of temperature and pressure existing in the cavities 22 to form a resin, pressure is maintained on the well until the resin-forming liquid sets to bond the particles together. If the resin-forming lliquid will set only on contact with a catalyst, the catalyst is suspended in a liquid and displaced through the cavities.
  • the particles should have a relatively narrow range of particle sizes such that the spaces between them are small enough to prevent ow of formation particles through the unitary mass of particles 28.
  • the solid particles should be generally granular in shape and resistant to deformation when subjected to uid pressure to prevent matting into a substantially impermeable mass. Suitable solid particles for use in this invention are granular particles o-f black walnut shells, peach pits, coke, sand, and the like.
  • the particles, like the resin, should have a low solubility in the formation fluids and the 'liquid used to transport the particles into the cavities 22.
  • a preferred resin-forming liquid for bonding the particles together is a partially condensed mixture of phenol and lformaldehyde.
  • Other resins suitable for bonding the particles are, for example, furfuryl alcohol resins,
  • the large diameter near the outer end of the cavities produced by the abrasive slurry has several advantages over the cavities produced by shaped charges used in perforating the casing. Because of the large size of the resultant unitary mass of bonded particles, the mass has substantial strength :and is not easily broken. It cannot be forced back through the perforations 20. Because of the large size of the cavity, the area of the incompetent formation in contact with the unitary mass of particles is large and the rate of flow of formation fluids from the face of the incompetent formation into the cavity is relatively low. Hence, the pressure drop and forces tending to break particles from the formation are relatively small. In contrast, the cavity produced by a shaped charge tapers outwardly and is relatively small. These factors encourage the displacement of the bonded particles back into the well and breaking of particles from the incompetent formation.
  • the smallest portion of the hydraulic jet cut opening is in the casing and the largest portion is in the formation.
  • the casing wall around the opening forms a strong bridge or support for the consolidated mass, and the consolidated mass is unsupported over only the narrow opening in the casing.
  • a method of controlling the movement of sand in a well having casing set through an incompetent formation comprising cutting an opening in the casing in the interval of the incompetent formation, discharging from a nozzle aligned with the opening and mounted on tubing extending down the well a high-velocity stream of an abrasive slurry outwardly through the opening to cut in the incompetent formation, a cavity having a width near its outer end substantially larger than the width of the opening in the casing, circulating the slurry and entrained particles cut from the formation during the cutting of the cavity upwardly through the well, displacing solid particles downwardly through the well and out into the cavity cut in the formation to fill the cavity, and bonding the particles to form a permeable coherent mass.
  • a method as set forth in claim 1 in which said particles are granular and have a lcoating thereon settable to form a resin on contact with a catalyst, and the catalyst is displaced through the particle-lled cavity to cause setting of the resin-forming coating.
  • a method as set forth in claim 1 in which after filling the cavity with solid particles a resin-forming liquid is displaced down the well through the cavity to coat the particles with the resin-forming material, an inert liquid is displaced down the well and through the cavity to remove the resin-forming liquid from the spaces between the particles, and conditions in the cavity are maintained to cause formation of the resin to bond the particles.
  • a method as set forth in claim 1 in which the abrasive slurry is disch-arged from a nozzle supported within the casing to cut an opening in the casing, and the discharging of the abrasive slurry from the nozzle is continued to cut the cavity in the formation.
  • a method as set forth in claim 1 in which the nozzle is supported within the casing in the interval of the incompetent formation, the abrasive slurry is discharged from the nozzle, the nozzle is rotated about a vertical axis to cut a notch through the casing and extending completely around the casing, and the discharge of abrasive slurry and rotation of the nozzle is continued to cut a cavity extending 360 around the casing.
  • a method of completing a well in an incompetent formation comprising drilling Ia borehole through the incompetent formation, setting casing through the incompetent formation, cutting an opening in the casing in the interval of the incompetent formation, discharging from a nozzle aligned with the opening and mounted on tubing extending down the well a high-velocity stream of an abrasive slurry outwardly through the opening to cut in the formation adjacent the opening a cavity having a width near its outer end substantially larger than the Width of the opening in the casing, circulating the slurry and entrained particles cut from the formation during the cutting of the cavity upwardly through the well, displacing a liquid having solid particles suspended therein downwardly through the well and into the cavity to fill the cavity, bonding the particles to form a permeable coherent mass supporting the walls of the cavity, and maintaining the pressure within the borehole of the well throughout the drilling, setting of casing, cutting of the cavity, cavity filling and bonding steps higher than the formation pressure.

Description

July 23, 1968 R. J. GOODWIN 3,393,736
I l WELL CCMPLETION METHOD l Filed Aug.. 17, 196e United States Patent O 3,393,736 WELL COMPLETION METHOD Robert J. Goodwin, Oakmont, Pa., assignor to'Gulf Research & Development Company, Pittsburgh, Pa., a corporation of Delaware f Filed Aug. 17, 1966, Ser. No. 573,080 9 Claims. (Cl. 166-12) ABSTRACT F THE DISCLOSURE A method of completing a well having casing set through an incompetent fluid-bearing formation in which openings are cut in the casing, a cavity having a width substantially larger than the width of the opening in the casing is cut in the incompetent formation by means of van abrasive-laden fluid, and thereafter the cavity is filled with solid particles which are bonded together to form a permeable coherent mass.
This invention relates to a method of completing a well, and more particularly to the prevention of ow of sand into a well having casing set through an incompetent, fluid-bearing formation.
Many underground formations containing valuable fluids, such as oil or natural gas, are referred to as incompetent formations because they are unconsolidated or so weakly consolidated that the pressure drop at the unsupported, exposed face of the formation resulting from the flow of formation fluids toward the well exceeds the strength of the formation and causes particles of the formation to break loose and ow into the well. The flow of sand into the well may plug the well and make necessary frequent work over of the well to maintain production. If the underground formation is under high pressure, the sand from the formation may travel through well equipment at high velocities and cause severe erosion of the well equipment.
One method that has been widely used to prevent sanding of wells penetrating incompetent formations is to pack gravel between the face of the formation and a slotted liner set in the well. The gravel supports the formation and obstructs flow of sand to the well. The liner prevents ow of the gravel into the well. An important objection to the use of gravel packs and liners to prevent flow of sand into a well is the high cost of the liner and the packer required to seal the space between the upper end of the liner and the casing. Moreover, it is difficult to fill completely the space behind the liner. Sand can then shift to plug the gravel pack and thereby reduce the wells productivity.
It is desirable after a well has been drilled to its total depth to set casing through the potentially productive formations. The casing is cemented in place by displacing a slurry of cement downwardly through the casing, around the lower end of the casing, and upwardly through the annulus between the casing and the borehole wall. The casing and its surrounding cement sheath isolate the productive formations from other formations penetrated by the well and, in the case of incompetent formations, provide support for the incompetent formation immediately adjacent the well. The casing is perforated through the potentially productive formation to vallow flow from the formation into the well, The usual method of perforating the casing is by means of shaped charges of explosives which form slender holes extending from the casing a short distance outwardly into the formation. The holes taper to a point at their outer end.
This invention resides in a method of completing a well penetrating an incompetent, fluid-bearing formation 3,393,736 Patented July 23, 1968 ICC in which casing is cemented in the formation to control `movement of sand from the formation into the Well. An opening is cut in the casing and adjacent formation by means of a high-velocity stream of a uid containing entrained abrasive particles to form a cavity having a width near its outer end substantially larger than the diameter of the opening in the casing. A granular material is displaced through the openings in the casing into the cavity cut by the abrasive stream, and particles of the granular material are cemented together to form `a unitary permeable mass expanding outwardly from the outer surface of the casing.
In the drawings:
FIGURE l is a vertical sectional view of a portion of a well penetrating an incompetent formation showing nozzles supported in the well while openings are cut in the casing and cavities are cut in the surrounding formation.
FIGURE 2 is a vertical sectional view of the well illustrated in FIGURE 1 after the cavities in the incompetent formation have been cut to the desired size and solid particles have been displaced into the cavities to form a unitary mass supporting the exposed face of the incompetent formation.
Referring to FIGURE l, the lower end of a well indicated generally by reference numeral 10 is shown with casing 12 extending through an incompetent, fluid-bearing formation 14 to a total depth 16. Casing 12 is cemented in place in the usual manner by displacement of cement downwardly through the casing and upwardly through the annulus between the casing and the borehole wall to form a cement sheath 18 surrounding the casing 12.
In the completion of the well by this invention, perforations 20 are cut through the casing 12 and cement sheath 18, and enlarged cavities 22 are cut in the formation adjacent the perforations 20 by means of a highvelocity stream of a fluid containing entrained abrasive particles. Preferably, a slurry of abrasive particles in a liquid is used and the cutting medium will hereafter be referred to as a slurry. The slurray is pumped down the well through tubing 24 and is discharged through nozzles mounted in a suitable nozzle head 26 to erode holes through the casing and surrounding cement sheath. The abrasive slurry discharged from nozzle head 26 is directed outwardly in a thin, high-velocity stream to cut a cavity 22 in the surrounding formation. The slurry is diverted at the outer end of the cavity and returns through the perforations 20 to the borehole of the well. The return ow of the slurry to the perofrations 20 enlarges the cavity to a width substantially larger than the perforations 20 and erodes cement from the casing adjacent the perforations. The slurry of liquid then flows upwardly through the annulus and is discharged from the well at the surface. To obtain the desired enlargement of the cavity, flow back into the Well is essential; hence, space must be provided between the nozzle and the casing to allow the backllow.
FIGURE 1 of the drawings shows a well with two perforations 20 and cavities 22. Other perforations and cavities `can be cut at intervals throughout the incompetent oilbearing formation 14 to provide any ldesired number of openings in the casing. In a preferred method of this invention, a single notch extending for the full circumference of the casing and a circular cavity extending outwardly into the formation from the notch is cut by rotating in a horizontal plane the nozzle head from w-hich the abrasive slurry is discharged. Suitable apparatus for cutting the notch in the casing and the surrounding -cavity is illustrated in U.S. Patent No. 3,254,720 of I. L. Huitt et al.
An abrasive slurry is discharged from the nozzles until cavities 22 of a desired size are formed as illustrated in FIGURE 2 of the drawings. After the cavities are cut, the tubing 24 and nozzle head 26 are withdrawn from the well. A slurry of solid particles 28 suspended in a liquid is pumped down the well and into the cavities 22. The liquid lters outwardly through the surrounding formation 14 and deposits the particles in the cavity 22. Pumping of the slurry of liquid and solid particles is continued until the particles ll the cavities 22. Another method of placing the gravel is to close the annulus surrounding tubing 24 and displace a slurry of gravel through the tubing 24 and nozzle head 26 and into the cavities 22. Ordinarily, an increase in t-he pressure on the liquid at a constant pumping rate will indicate when the cavities have .been filled. Filling the cavities with gravel can also be accomplished by pumping a slurry containing a measured volume of gravel adequate to fill the Icavities down the well and into the cavities at a slow rate to avoid parting the formation.
The particles 2S are bonded together to form a substantially unitary permeable mass completely lling the cavities 22 and thereby providing support for the exposed faces of the incompetent formation 14 forming the walls of the cavities 22. In a preferred method of bonding t-he particles 28 together, the particles are provided with a coating of a resin-forming liquid or semiliquid material capable of setting into a resin which is insoluble in water and oil before they are suspended in a liquid and pumped down the well. The coating on the particles may contain sufficient catalyst to cause the coating to set to a hard, strong resin at the conditions of temperature and pressure existing in the formation 14 or may be 0f a material that will set to form the desired strong bon-d without a catalyst. Another method of bonding the particles together to form the desired strong unitary mass is to coat the particles with a resin-forming material which will set to form a strong resin insoluble in water and oil on cont-act with a suitable catalyst and thereafter displacing the catalyst -down the well and outwardly from the well into the cavities 22 to cause the desired setting of the coating.
The substantially unitary permeable mass of particles 28 can also be obtained by displacing uncoated solid particles into the cavities 22 and then displacing a resinforming liquid down the well and through the mass of particles in the cavities 22 to coat the outer surfaces of the particles. The resin-forming liquid is followed by a liquid immiscible with the resin-forming liquid to displace that liquid, except for a coating on the particles, 4from the cavities 22. If the resin-forming liquid is one that will set at conditions of temperature and pressure existing in the cavities 22 to form a resin, pressure is maintained on the well until the resin-forming liquid sets to bond the particles together. If the resin-forming lliquid will set only on contact with a catalyst, the catalyst is suspended in a liquid and displaced through the cavities.
To maintain the desired permeability of the unitary mass of bonded particles, the particles should have a relatively narrow range of particle sizes such that the spaces between them are small enough to prevent ow of formation particles through the unitary mass of particles 28. Particles having a size in the range of 20 to 80 imesh, and preferably 40 to 60 mesh, are preferred. Fine particles such as particles having a size smaller than 100 mesh should be avoided. The solid particles should be generally granular in shape and resistant to deformation when subjected to uid pressure to prevent matting into a substantially impermeable mass. Suitable solid particles for use in this invention are granular particles o-f black walnut shells, peach pits, coke, sand, and the like. The particles, like the resin, should have a low solubility in the formation fluids and the 'liquid used to transport the particles into the cavities 22.
A preferred resin-forming liquid for bonding the particles together is a partially condensed mixture of phenol and lformaldehyde. Other resins suitable for bonding the particles are, for example, furfuryl alcohol resins,
urea-formaldehyde resins, epoxy resins, and alkyd resins. Details of bonding particles into a permeable mass are described in U.S. Patent No. 2,823,753 of Henderson et al.
It is an important advantage of this invention that the pressure in the well is maintained higher than the formation pressure during t-he drilling, cementing of casing, cutting of the cavity, displacement of the particles 28 into the cavity, and setting of the resin-forming coating on the particles. Thus, the incompetent formation is supported throughout the drilling and well completion to avoid movement of formation particles.
When an yabrasive slurry is used to cut a cavity to be packed with gravel, much of the formation that is damaged during drilling is removed from the well as the cavity is cut. Other methods of cutting notches such as gun or shaped charges do not remove the damaged formation.
The large diameter near the outer end of the cavities produced by the abrasive slurry has several advantages over the cavities produced by shaped charges used in perforating the casing. Because of the large size of the resultant unitary mass of bonded particles, the mass has substantial strength :and is not easily broken. It cannot be forced back through the perforations 20. Because of the large size of the cavity, the area of the incompetent formation in contact with the unitary mass of particles is large and the rate of flow of formation fluids from the face of the incompetent formation into the cavity is relatively low. Hence, the pressure drop and forces tending to break particles from the formation are relatively small. In contrast, the cavity produced by a shaped charge tapers outwardly and is relatively small. These factors encourage the displacement of the bonded particles back into the well and breaking of particles from the incompetent formation.
In contrast to bullet and jet perforations, the smallest portion of the hydraulic jet cut opening is in the casing and the largest portion is in the formation. The casing wall around the opening forms a strong bridge or support for the consolidated mass, and the consolidated mass is unsupported over only the narrow opening in the casing.
One of the advantages of this method is that the incompetent formation can be treated without the necessity of any reduction in the internal diameter of the well bore. Perforated liners or screens `are not required. Hence, upper zones of multiple completions can be treated according to this invention without interfering with subsequent operations at a lower level in the well.
I claim:
1. A method of controlling the movement of sand in a well having casing set through an incompetent formation comprising cutting an opening in the casing in the interval of the incompetent formation, discharging from a nozzle aligned with the opening and mounted on tubing extending down the well a high-velocity stream of an abrasive slurry outwardly through the opening to cut in the incompetent formation, a cavity having a width near its outer end substantially larger than the width of the opening in the casing, circulating the slurry and entrained particles cut from the formation during the cutting of the cavity upwardly through the well, displacing solid particles downwardly through the well and out into the cavity cut in the formation to fill the cavity, and bonding the particles to form a permeable coherent mass.
2. A method as set forth in claim 1 in which said particles have a resin-forming coating thereon, and the coating sets to form a resin while the particles are in the cavity.
3. A method as set forth in claim 1 in which said particles have a resin-forming coating thereon adapted to set at conditions of temperature and pressure in the incompetent formation, and the well is shut in until the coating sets to bond the particles into the permeable coherent mass.
4. A method as set forth in claim 1 in which said particles are granular and have a lcoating thereon settable to form a resin on contact with a catalyst, and the catalyst is displaced through the particle-lled cavity to cause setting of the resin-forming coating.
5. A method as set forth in claim 1 in which after filling the cavity with solid particles a resin-forming liquid is displaced down the well through the cavity to coat the particles with the resin-forming material, an inert liquid is displaced down the well and through the cavity to remove the resin-forming liquid from the spaces between the particles, and conditions in the cavity are maintained to cause formation of the resin to bond the particles.
6. A method as set forth in claim 1 in which the abrasive slurry is disch-arged from a nozzle supported within the casing to cut an opening in the casing, and the discharging of the abrasive slurry from the nozzle is continued to cut the cavity in the formation.
7. A method as set forth in claim 1 in which the nozzle is supported within the casing in the interval of the incompetent formation, the abrasive slurry is discharged from the nozzle, the nozzle is rotated about a vertical axis to cut a notch through the casing and extending completely around the casing, and the discharge of abrasive slurry and rotation of the nozzle is continued to cut a cavity extending 360 around the casing.
8. A method as set forth in claim 1 in which the particles have a size in the range of to 80 mesh.
9. A method of completing a well in an incompetent formation comprising drilling Ia borehole through the incompetent formation, setting casing through the incompetent formation, cutting an opening in the casing in the interval of the incompetent formation, discharging from a nozzle aligned with the opening and mounted on tubing extending down the well a high-velocity stream of an abrasive slurry outwardly through the opening to cut in the formation adjacent the opening a cavity having a width near its outer end substantially larger than the Width of the opening in the casing, circulating the slurry and entrained particles cut from the formation during the cutting of the cavity upwardly through the well, displacing a liquid having solid particles suspended therein downwardly through the well and into the cavity to fill the cavity, bonding the particles to form a permeable coherent mass supporting the walls of the cavity, and maintaining the pressure within the borehole of the well throughout the drilling, setting of casing, cutting of the cavity, cavity filling and bonding steps higher than the formation pressure.
References Cited UNITED STATES PATENTS 2,315,496 4/ 1943 Boynton 166-35 X 2,758,653 8/1956 Desbrow 166--222 X 2,823,753 2/1958 Henderson et al. 166-33 X 2,986,538 5/1961 Nesbitt et al. 166-12 X 2,990,016 6/1961 Goins et al. 166-2'9 3,175,613 3/1965 Hough et al. 166-35 3,209,826 10/1965 Young 166-33 3,255,819 6/1966 Scott et al. 166-21 3,327,783 6/1967 Ayers 166-33 3,336,980 8/1967 Rike 166-35 X OTHER REFERENCES Uren, Lester C., Petroleum Production Engineering: Oil Field Development, McGraw-Hill, ANew York, 4th ed., 1956, pp. 721 and 722.
CHARLES E. OCONNELL, Primary Examiner.
I. A. CALVERT, Assistant Examiner.
US573080A 1966-08-17 1966-08-17 Well completion method Expired - Lifetime US3393736A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US573080A US3393736A (en) 1966-08-17 1966-08-17 Well completion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US573080A US3393736A (en) 1966-08-17 1966-08-17 Well completion method

Publications (1)

Publication Number Publication Date
US3393736A true US3393736A (en) 1968-07-23

Family

ID=24290561

Family Applications (1)

Application Number Title Priority Date Filing Date
US573080A Expired - Lifetime US3393736A (en) 1966-08-17 1966-08-17 Well completion method

Country Status (1)

Country Link
US (1) US3393736A (en)

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3674090A (en) * 1970-09-18 1972-07-04 Schlumberger Technology Corp Methods for inhibiting the entrance of loose formation materials into a well bore
US3695355A (en) * 1970-01-16 1972-10-03 Exxon Production Research Co Gravel pack method
US3973627A (en) * 1971-10-18 1976-08-10 Sun Oil Company (Delaware) Wellbore gravel pack method
US4047569A (en) * 1976-02-20 1977-09-13 Kurban Magomedovich Tagirov Method of successively opening-out and treating productive formations
US4114691A (en) * 1977-10-14 1978-09-19 Texaco Inc. Method for controlling sand in thermal recovery of oil from tar sands
US4114687A (en) * 1977-10-14 1978-09-19 Texaco Inc. Systems for producing bitumen from tar sands
US4350203A (en) * 1980-11-28 1982-09-21 Texaco Inc. Well production system to prevent cave-in and sloughing in unconsolidated formations
US4553596A (en) * 1982-10-27 1985-11-19 Santrol Products, Inc. Well completion technique
US4785884A (en) * 1986-05-23 1988-11-22 Acme Resin Corporation Consolidation of partially cured resin coated particulate material
EP0377806A2 (en) * 1989-01-09 1990-07-18 Halliburton Company Method for setting well casing using a resin coated particulate
US5058676A (en) * 1989-10-30 1991-10-22 Halliburton Company Method for setting well casing using a resin coated particulate
US5145013A (en) * 1989-07-21 1992-09-08 Oryx Energy Company Sand control with resin and explosive
US5327970A (en) * 1993-02-19 1994-07-12 Penetrator's, Inc. Method for gravel packing of wells
US5337825A (en) * 1992-09-09 1994-08-16 Uma Ltd. Method of oil well productivity increase
US5360292A (en) * 1993-07-08 1994-11-01 Flow International Corporation Method and apparatus for removing mud from around and inside of casings
US5366015A (en) * 1993-11-12 1994-11-22 Halliburton Company Method of cutting high strength materials with water soluble abrasives
US5381631A (en) * 1993-04-15 1995-01-17 Flow International Corporation Method and apparatus for cutting metal casings with an ultrahigh-pressure abrasive fluid jet
US5422183A (en) * 1993-06-01 1995-06-06 Santrol, Inc. Composite and reinforced coatings on proppants and particles
US5425994A (en) * 1992-08-04 1995-06-20 Technisand, Inc. Resin coated particulates comprissing a formaldehyde source-metal compound (FS-MC) complex
US5499678A (en) * 1994-08-02 1996-03-19 Halliburton Company Coplanar angular jetting head for well perforating
US5837656A (en) * 1994-07-21 1998-11-17 Santrol, Inc. Well treatment fluid compatible self-consolidating particles
US20060289167A1 (en) * 2005-06-22 2006-12-28 Surjaatmadja Jim B Methods and apparatus for multiple fracturing of subterranean formations
WO2007054708A1 (en) * 2005-11-10 2007-05-18 Halliburton Energy Services, Inc. Methods for treating a subterranean formation with a curable composition using a jetting tool
US20080000637A1 (en) * 2006-06-29 2008-01-03 Halliburton Energy Services, Inc. Downhole flow-back control for oil and gas wells by controlling fluid entry
US20180021922A1 (en) * 2015-02-18 2018-01-25 Ant Applied New Technologies Ag Water-abrasive cutting system
US10697263B2 (en) 2017-11-15 2020-06-30 Terydon, Inc. Centering device for a utility tool in a tube or pipe
US10774606B2 (en) 2017-11-15 2020-09-15 Terydon, Inc. Down well pipe cutting device
US10781652B2 (en) 2017-11-15 2020-09-22 Terydon, Inc. Method for cutting a tube or pipe
US11002095B2 (en) 2017-11-15 2021-05-11 Terydon, Inc. Down well pipe cutter having a plurality of cutting heads
US11280155B2 (en) * 2019-03-13 2022-03-22 Halliburton Energy Services, Inc. Single trip wellbore cleaning and sealing system and method
US11692425B2 (en) * 2020-08-04 2023-07-04 Schlumberger Technology Corporation Method and downhole apparatus to accelerate wormhole initiation and propagation during matrix acidizing of a subterranean rock formation
WO2024015057A1 (en) * 2022-07-13 2024-01-18 Schlumberger Technology Corporation Method and downhole apparatus for matrix acidizing of a subterranean rock formation

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2315496A (en) * 1938-11-28 1943-04-06 Boynton Alexander Perforator for wells
US2758653A (en) * 1954-12-16 1956-08-14 Floyd H Desbrow Apparatus for penetrating and hydraulically eracturing well formations
US2823753A (en) * 1955-12-27 1958-02-18 Dow Chemical Co Method of treating wells
US2986538A (en) * 1958-10-13 1961-05-30 Lyle E Nesbitt Particulate resin-coated composition
US2990016A (en) * 1957-02-26 1961-06-27 Gulf Oil Corp Method of and composition for sealing lost circulation in wells
US3175613A (en) * 1960-08-26 1965-03-30 Jersey Prod Res Co Well perforating with abrasive fluids
US3209826A (en) * 1963-02-25 1965-10-05 Halliburton Co Sand consolidation method
US3255819A (en) * 1963-08-15 1966-06-14 Continental Oil Co Method and apparatus for improving the bond between a well conduit and cement
US3327783A (en) * 1964-03-16 1967-06-27 Dow Chemical Co Consolidation in incompetent stratum
US3336980A (en) * 1967-02-09 1967-08-22 Exxon Production Research Co Sand control in wells

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2315496A (en) * 1938-11-28 1943-04-06 Boynton Alexander Perforator for wells
US2758653A (en) * 1954-12-16 1956-08-14 Floyd H Desbrow Apparatus for penetrating and hydraulically eracturing well formations
US2823753A (en) * 1955-12-27 1958-02-18 Dow Chemical Co Method of treating wells
US2990016A (en) * 1957-02-26 1961-06-27 Gulf Oil Corp Method of and composition for sealing lost circulation in wells
US2986538A (en) * 1958-10-13 1961-05-30 Lyle E Nesbitt Particulate resin-coated composition
US3175613A (en) * 1960-08-26 1965-03-30 Jersey Prod Res Co Well perforating with abrasive fluids
US3209826A (en) * 1963-02-25 1965-10-05 Halliburton Co Sand consolidation method
US3255819A (en) * 1963-08-15 1966-06-14 Continental Oil Co Method and apparatus for improving the bond between a well conduit and cement
US3327783A (en) * 1964-03-16 1967-06-27 Dow Chemical Co Consolidation in incompetent stratum
US3336980A (en) * 1967-02-09 1967-08-22 Exxon Production Research Co Sand control in wells

Cited By (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3695355A (en) * 1970-01-16 1972-10-03 Exxon Production Research Co Gravel pack method
US3674090A (en) * 1970-09-18 1972-07-04 Schlumberger Technology Corp Methods for inhibiting the entrance of loose formation materials into a well bore
US3973627A (en) * 1971-10-18 1976-08-10 Sun Oil Company (Delaware) Wellbore gravel pack method
US4047569A (en) * 1976-02-20 1977-09-13 Kurban Magomedovich Tagirov Method of successively opening-out and treating productive formations
US4114691A (en) * 1977-10-14 1978-09-19 Texaco Inc. Method for controlling sand in thermal recovery of oil from tar sands
US4114687A (en) * 1977-10-14 1978-09-19 Texaco Inc. Systems for producing bitumen from tar sands
US4350203A (en) * 1980-11-28 1982-09-21 Texaco Inc. Well production system to prevent cave-in and sloughing in unconsolidated formations
US4553596A (en) * 1982-10-27 1985-11-19 Santrol Products, Inc. Well completion technique
US4785884A (en) * 1986-05-23 1988-11-22 Acme Resin Corporation Consolidation of partially cured resin coated particulate material
EP0377806A2 (en) * 1989-01-09 1990-07-18 Halliburton Company Method for setting well casing using a resin coated particulate
EP0377806A3 (en) * 1989-01-09 1991-04-10 Halliburton Company Method for setting well casing using a resin coated particulate
US5145013A (en) * 1989-07-21 1992-09-08 Oryx Energy Company Sand control with resin and explosive
US5058676A (en) * 1989-10-30 1991-10-22 Halliburton Company Method for setting well casing using a resin coated particulate
US5425994A (en) * 1992-08-04 1995-06-20 Technisand, Inc. Resin coated particulates comprissing a formaldehyde source-metal compound (FS-MC) complex
US5337825A (en) * 1992-09-09 1994-08-16 Uma Ltd. Method of oil well productivity increase
US5327970A (en) * 1993-02-19 1994-07-12 Penetrator's, Inc. Method for gravel packing of wells
US5381631A (en) * 1993-04-15 1995-01-17 Flow International Corporation Method and apparatus for cutting metal casings with an ultrahigh-pressure abrasive fluid jet
US5422183A (en) * 1993-06-01 1995-06-06 Santrol, Inc. Composite and reinforced coatings on proppants and particles
US5597784A (en) * 1993-06-01 1997-01-28 Santrol, Inc. Composite and reinforced coatings on proppants and particles
US5360292A (en) * 1993-07-08 1994-11-01 Flow International Corporation Method and apparatus for removing mud from around and inside of casings
US5366015A (en) * 1993-11-12 1994-11-22 Halliburton Company Method of cutting high strength materials with water soluble abrasives
US5955144A (en) * 1994-07-21 1999-09-21 Sanatrol, Inc. Well treatment fluid compatible self-consolidation particles
US5837656A (en) * 1994-07-21 1998-11-17 Santrol, Inc. Well treatment fluid compatible self-consolidating particles
US5948734A (en) * 1994-07-21 1999-09-07 Sanatrol, Inc. Well treatment fluid compatible self-consolidating particles
US5499678A (en) * 1994-08-02 1996-03-19 Halliburton Company Coplanar angular jetting head for well perforating
US20060289167A1 (en) * 2005-06-22 2006-12-28 Surjaatmadja Jim B Methods and apparatus for multiple fracturing of subterranean formations
US7431090B2 (en) 2005-06-22 2008-10-07 Halliburton Energy Services, Inc. Methods and apparatus for multiple fracturing of subterranean formations
WO2007054708A1 (en) * 2005-11-10 2007-05-18 Halliburton Energy Services, Inc. Methods for treating a subterranean formation with a curable composition using a jetting tool
US20080000637A1 (en) * 2006-06-29 2008-01-03 Halliburton Energy Services, Inc. Downhole flow-back control for oil and gas wells by controlling fluid entry
US20180021922A1 (en) * 2015-02-18 2018-01-25 Ant Applied New Technologies Ag Water-abrasive cutting system
US10525569B2 (en) * 2015-02-18 2020-01-07 Ant Applied New Technologies Ag Water-abrasive cutting system
US10781652B2 (en) 2017-11-15 2020-09-22 Terydon, Inc. Method for cutting a tube or pipe
US10774606B2 (en) 2017-11-15 2020-09-15 Terydon, Inc. Down well pipe cutting device
US10697263B2 (en) 2017-11-15 2020-06-30 Terydon, Inc. Centering device for a utility tool in a tube or pipe
US11002095B2 (en) 2017-11-15 2021-05-11 Terydon, Inc. Down well pipe cutter having a plurality of cutting heads
US11168529B2 (en) 2017-11-15 2021-11-09 Terydon, Inc. Method for a centering device for a utility tool in a pipe or tube
US11286738B2 (en) 2017-11-15 2022-03-29 Terydon, Inc. Method for cutting a tube or pipe
US11414944B2 (en) 2017-11-15 2022-08-16 Terydon, Inc. Down well pipe cutter having a plurality of cutting heads
US11280155B2 (en) * 2019-03-13 2022-03-22 Halliburton Energy Services, Inc. Single trip wellbore cleaning and sealing system and method
US11692425B2 (en) * 2020-08-04 2023-07-04 Schlumberger Technology Corporation Method and downhole apparatus to accelerate wormhole initiation and propagation during matrix acidizing of a subterranean rock formation
WO2024015057A1 (en) * 2022-07-13 2024-01-18 Schlumberger Technology Corporation Method and downhole apparatus for matrix acidizing of a subterranean rock formation

Similar Documents

Publication Publication Date Title
US3393736A (en) Well completion method
US2970645A (en) Producing multiple fractures in a well
US5964289A (en) Multiple zone well completion method and apparatus
EP0426427B1 (en) Well completion method
US5105886A (en) Method for the control of solids accompanying hydrocarbon production from subterranean formations
US6761218B2 (en) Methods and apparatus for improving performance of gravel packing systems
US5226749A (en) Waste disposal in hydraulically fractured earth formations
US5375661A (en) Well completion method
CA1228804A (en) Hydraulic fracturing method employing special sand control technique
US3814187A (en) Subsurface formation plugging
US5875843A (en) Method for vertically extending a well
US4917188A (en) Method for setting well casing using a resin coated particulate
US3224506A (en) Subsurface formation fracturing method
US2708876A (en) Ring detonation process for increasing productivity of oil wells
US3347314A (en) Methods for well completion
US4114691A (en) Method for controlling sand in thermal recovery of oil from tar sands
US4124074A (en) Method for forming a gravel pack in tar sands
US3437143A (en) Formation consolidation
US3235007A (en) Multilayer propping of fractures
US3088520A (en) Producing fluid from an unconsolidated subterranean reservoir
US2083625A (en) Method of depositing foraminate beds around well casings
US3692114A (en) Fluidized sandpacking
US3743021A (en) Method for cleaning well perforations
US5165475A (en) Method for the control of solids accomanying hydrocarbon production from subterranean formations
US1530221A (en) Process and apparatus for increasing the recovery of petroleum from wells