US2963088A - Completion of tubeless wells - Google Patents

Completion of tubeless wells Download PDF

Info

Publication number
US2963088A
US2963088A US743360A US74336058A US2963088A US 2963088 A US2963088 A US 2963088A US 743360 A US743360 A US 743360A US 74336058 A US74336058 A US 74336058A US 2963088 A US2963088 A US 2963088A
Authority
US
United States
Prior art keywords
zone
perforated
casing
well
fluids
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US743360A
Inventor
Jr Charles B Corley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jersey Production Research Co
Original Assignee
Jersey Production Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jersey Production Research Co filed Critical Jersey Production Research Co
Priority to US743360A priority Critical patent/US2963088A/en
Application granted granted Critical
Publication of US2963088A publication Critical patent/US2963088A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Definitions

  • FIG. 2a FIG. 3.
  • the present invention is directed to a method for completion and working over of wells. More particularly, the invention is directed to completion and working over of tubeless wells. In its more specific aspects, the invention is concerned with a method for completing, working over, and producing from tubeless wells wherein cementing of perforated zones is avoided.
  • the present invention may be briefly described as a method for completing and working over a tubeless well penetrating a plurality of vertically spaced apart producing zones, the well having a casing therein lining the wall.
  • the casing is perforated in the first of said zones and also perforated in a second of the zones vertically spaced below the perforated first zone.
  • a tubular member is lowered in the casing and sealingly positioned therein with its open upper end above and its open lower end below the perforated first zone to isolate the perforated first zone from the perforated sec- Thereafter, well fluids are produced from the perforated second zone through the tubular member and the well casing.
  • well fluids may be produced from the perforated first zone prior to perforating the second zone.
  • well fluids may be produced from the perforated first zone after perforating the second zone and prior to lowering the tubular member.
  • the well fluids produced in accordance with the present invention are suitably oil, gas, water, and the like, and other desirable earth fluids which are usually produced by drilling wells. While hydrocarbons will be produced ordinarily, it is contemplated that the present invention is not limited thereto.
  • the present invention is quite advantageous and useful in that it is unnecessary to provide a tubing in the well and therefore the invention is particularly advantageous in so-called slim hole drilling operations. Moreover, in a method as described herein where tubing is not employed in the well, ordinarily cementing operations may not be accomplished except by lowering the cement in a bailer and then removing the excess cement by bailing or drilling out.
  • One great advantage of the present invention is that it is unnecessary to use cement to seal oil perforated intervals.
  • zone In the present invention where the terminology producing zone or zones is used, it is contemplated that this language shall mean a producing horizon, zone, stratum or strata, formation, sand, and the like from which desirable earth fluids such as liquid or gaseous hydrocarbons or valuable gases such as helium and the like may be obtained.
  • Fig, 1 shows the perforation of a well in an upper zone
  • Fig. 2 shows the well perforated in an upper and a lower zone
  • FIG. 2a illustrates the production from an upper perforated zone while the lower perforated zone is prometed
  • Patented Dec. 6, 1960 Fig. 3 illustratoathe production from a lower zone while theupper zone is isolated by employment of a tubular member
  • Fig. 3a illustrates the production from an intermediate zone after production from two upper zones with the lower zone having emulsion therein prior to perforation.
  • numeral 11 designates a well bore drilled from the earths surface, not shown, to penetrate a plurality of subsurface earth intervals 12, 13, 14, and 15, all of which may be assumed to contain productive quantities of hydrocarbons.
  • a casing string 16 Arranged in the well bore 11 is a casing string 16 which is cemented therein with primary cement 17.
  • the casing 16 is provided with a plurality of landing nipples, supporting or anchoring means 18, 19, 20, and 21, it being noted that the landing nipples 18 to 21 are spaced above the productive intervals 12, 13, 14, and 15, respectively.
  • landing nipples may be of the type illustrated at page 4063 of the Composite Catalog of Oil Field and Pipe Line Equipment, 19th ed., published by World Oil, Gulf Publishing Company, 1952-53.
  • Fig. 1 there is shown lowered on a wire line 22 from the earths surface a perforator 23 which is illustrated as a shaped charge perforator but which may be a bullet gun perforator, a mechanical perforator, or one of the chemical type.
  • a portion of the drilling fluid 24 in and filling the casing 16 is displaced by introducing a body 25 of a clean fluid such as a heat stable emulsion, oil, and the like, which will not contaminate the several producing formations 12 to 15, inclusive, when contacted therewith.
  • the body 25 of the emulsion or clean fluid may suitably be introduced into the well casing 16 in a container or bailer as may be desired to displace the drilling fluid. Since the clean fluid 25 displaces the drilling fluid, it must be of a controllable density and have a Weight and viscosity sufficient to remain in place and displace the drilling fluid.
  • the perforator 23 is then operated in the body 25 to form perforations 26, penetrating the casing 16, cement 17, and the producing zone 14. It may then be desirable to produce from the zone 14 by lowering the hydrostatic head of fluid in the well casing 16 such that the hydrostatic head is less than the pressure of the productive zone 14, which will cause at least a portion of the body 25 and the drilling fluid 24 to be displaced by the producing hydrocarbons. This lowering of the hydrostatic head may be done by swabbing or by reducing the height of the column of fluid in the well such as by bailing as is conventional in the art.
  • the body 25 of the clean emulsion may be retained in the well casing 16 as shown in Fig. 2 and the perforator 23 lowered on wire line 22 to the region of producing zone 15 and again operated to form perforations 27 penetrating the casing 16, cement 17, and the producing zone 15.
  • the hydrostatic head in the well casing 16 may be reduced sufiiciently as outlined above to allow production from zone 14- but insufficiently to allow production from zone 15 with the body of the emulsion being removed to a level below the perforations 26 but not to a level sulficient to expose the perforations 27, it being understood, of course, that the wire line 22 and perforator 23 would be removed from the well casing 16.
  • Production may be terminated from the zone 14 through perforations 26 and production initiated from,
  • zone 15 either before or after zone 14 has been depleted of its productive capacity. It becomes necessary to isolate zone 14 from zone 15 and this is accom plished, as shown in Fig. 3, by lowering a tubular member 28, having wire line 22 attached thereto, by the fishing neck 29 and positioning the tubular member 25 with its upper end in the landing nipple 20 and sealin-gly engaged with the wall of the casing 16 with seal 30 and its lower end positioned in the landing nipple 21 and sealingly engaged withthe wall of the casing 16 with seal 31.
  • the tubular member 28 is open on both ends and provides an opening for production of fluids therethrough and up the casing 16 to the well head. By adjusting the hydrostatic head of fluids in the well, it is now possible to produce from the zone 15 while isolating the zone 14 with the tubular member 28. This may be done by swabbing or by bailing to reduce the height of the column of fluid.
  • Figs. 2 and 20 it will be seen that zones 14 and 15 have been perforated to form perforations 26 and 27 as shown.
  • the body of emulsion 25 has been reduced in level to above the perforations 27 but below the perforations 26 to allow production from the perforations Z6 upwardly through the casing.
  • the tubular member 28 When production is to be had from the perforations 27, the tubular member 28 would be positioned as shown in Fig. 3 and production obtained in accordance therewith.
  • a tubular member such as 35 but of greater length, is placed in the well casing 16 with its lower end positioned on the landing nipple 21 and sealed with the wall of casing 16 and its upper end positioned on the landing nipple 18 and sealed with the wall of casing 16.
  • the hydrostatic head of fluid is reduced or lowered by swabbing or by bailing or by other means well known in the art such as by aerating the column of fluid or by inserting a small pipe string commonly known as a macaroni string of pipe and displacing the fluid in the well with a lighter fluid.
  • the heat stable emulsion employed in the practice of the present invention may suitably be a fluid such as an emulsion of an oily phase and a water phase and the like. Suitable materials have been amply described in Serial No. 567,604, filed February 24, 1956, for Bryan E. Morgan and Gerald G. Priest, now'U.S. Patent 2,805 ,722.
  • the fluids described in Serial No. 567,604 are eminently suitable in the practice of the present invention and comprise a stable emulsion of an oily medium and an aqueous medium which has a controllable density, the density of the emulsion being adjusted by dissolving a weighting agent in one of the phases of the emulsion to produce a solids-free emulsion.
  • Other suitable protective fluids are described in pending application Serial No. 630,266, filed December 24, 1956, for Gerald G. Priest, Bryan E. Morgan and Bertie F. Birdwell, in which an emulsion of an oily phase and an aqueous phase is described and claimed, the emulsion in Serial No.
  • 630,266 being a stable emulsion employing as an emulsifying agent a watersoluble salt of purified lignin sulfonic acid or a watersoluble salt of lignin sulfonic acid containing a certain amount of ash and reducing sugars.
  • Other fluids suitable in the practice of the present invention are described in Serial No. 630,026, entitled Well Completion Fluids and filed December 24, 1956, for Gerald G. Priest, Bryan E. Morgan, Melba L. Lytle, Bertie F. Birdwell and Joseph A. Caldwell. In Serial No.
  • a heat stable, noncorrosive emulsion is described and claimed in which an emulsifying agent is employed and in which the oily phase of the emulsion comprises a substantial amount of tetrachloroethylene, with one of the phases of the emulsion containing a corrosion inhibitor.
  • These several low filtration loss fluids described in the several applications have the characteristic of low filtration rate and further the characteristic of maintaining perforations open and exposed areas in wells protected without damaging or injuring the permeability and porosity of the formation or interval with which they come into contact.
  • the low fluid loss fluids suitable for use in the present invention have the characteristic of low filtration rate and of resisting entrance of other fluids into perforations in or into an earth formation.
  • these fluids do not damage a formation or sand and the like with which they come into contact.
  • These low fluid loss fluids, gels, or emulsions have the further property of forming a cohesive mass which does not readily substantially intermingle or mix with other fluids such as well fluids as exemplified by oil, gas, water and the like.
  • the fluids or emulsions employed suitably have a low fluid loss, a weight at least equal to that of the normal working fluids employed for blowout protection in wells and are free of constituents which might permanently plug the formation or casing perforations.
  • the fluids used in the practice of this invention block ingress of damaging fluids from the well to the formation but allow fluids from the formation to flow into the well bore on adjustment of the differential pressure into the well bore.
  • a method for completing and Working over a tubeless well penetrating a plurality of vertically spaced apart producing zones and having a casing therein which comprises perforating said casing in a. first of said zones and producing well fluids from said perforated first zone, terminating production from said first perforated zone by applying to said perforated first zone fluid pressure greater than the pressure of said perforated first zone and perforating said casing in a second zone vertically spaced below the perforated first Zone, lowering a tubular member in said casing and sealingly positioning it in said casing with its open upper end sealed above and its open lower end sealed below the perforated first zone to isolate the perforated first zone from the perforated second zone, said perforated first zone being isolated while maintaining each of said perforated zones always open to said casing and then producing well fluids from the perforated second zone through the tubular member and the well casing.
  • a method for completing and working over a tubeless well penetrating a plurality of vertically spaced apart producing zones and having a casing therein which comprises perforating said casing in a first and second of said zones while maintaining said zones under control with a hydrostatic head of fluid greater than the pressure of said zones, the second zone being spaced vertically below the first zone, lowering a tubular member in said casing and sealingly positioning it in said casing with its open upper end sealed above and its open lower end sealed below the perforated first zone to isolate the perforated first zone from the perforated second zone, said perforated first zone being isolated while maintaining each of said perforated zones always open to said casing, producing well fluids from the perforated second zone through the tubular member and the well casing, terminating production from the perforated second perforated zone by applying to said perforated second zone fluid pressure greater than the pressure of said perforated second zone, removing the tubular member from the Well, and then producing well fluids from the perforated first zone.
  • a method for completing and working over a tubeless well penetrating a plurality of vertically spaced apart producing zones and having a casing therein which comprises perforating said casing in a first of said zones and producing well fluids from said perforated first zone, terminating production from said first perforated zone by applying to said perforated first zone fluid pressure greater than the pressure of said perforated first zone and perforating said casing in a second zone vertically spaced below the perforated first zone, lowering a tubular memher in said casing and sealingly positioning it in said casing with its open upper end sealed above and its open lower end sealed below the perforated first zone to isolate the perforated first zone from the perforated second zone, said perforated first zone being isolated while maintaining each of said perforated zones always open to said casing producing well fluids from the perforated second zone through the tubular member and the well casing, terminating production from said perforated second perforated zone by applying to said perforated second zone fluid pressure greater than the pressure of
  • a method for completing and Working over a tubeless well penetrating a plurality of vertically spaced apart producing zones and having a casing therein which comprises perforating said casing in a first of said zones and perforating said casing in a second zone vertically spaced below the perforated first zone while maintaining said zones under control with a hydrostatic head of fluid greater than the pressure of said zones, lowering a tubular member in said casing and sealingly positioning it in said casing with its open upper end sealed above and its open lower end sealed below the perforated first zone to isolate the perforated first zone from the perforated second zone, said perforated first zone being isolated While maintaining each of said perforated zones always open to said casing and producing well fluids from the perforated second zone through the tubular member and the well casing.

Description

FIG. 30.
FIG. 2a. FIG. 3.
C. B. CORLEY, JR
Filed June 20. 1958 COMPLETION OF TUBELESS WELLS FIG. 2.
FIG.I
1 ii a Dec. 6, 1960 EMULSION INVENTOR.
CHARLES B. CORLEY JR.,
ATTO N gun a! g K M i EMULSION EMULSION] ond zone.
COMPLETION OF TUBELESS WELLS Charles B. Corley, Jr., Houston, Tex., assignopby me siie assignments, to Jersey Production Research Company, Tulsa, Okla., a corporation of Delaware Filed June 20, 1958, Ser. No. 743,360
I 6 Claims. (Cl. 166-35) The present invention is directed to a method for completion and working over of wells. More particularly, the invention is directed to completion and working over of tubeless wells. In its more specific aspects, the invention is concerned with a method for completing, working over, and producing from tubeless wells wherein cementing of perforated zones is avoided.
The present invention may be briefly described as a method for completing and working over a tubeless well penetrating a plurality of vertically spaced apart producing zones, the well having a casing therein lining the wall. In the present invention the casing is perforated in the first of said zones and also perforated in a second of the zones vertically spaced below the perforated first zone. A tubular member is lowered in the casing and sealingly positioned therein with its open upper end above and its open lower end below the perforated first zone to isolate the perforated first zone from the perforated sec- Thereafter, well fluids are produced from the perforated second zone through the tubular member and the well casing.
In the practice of the present invention well fluids may be produced from the perforated first zone prior to perforating the second zone. Likewise, well fluids may be produced from the perforated first zone after perforating the second zone and prior to lowering the tubular member.
The well fluids produced in accordance with the present invention are suitably oil, gas, water, and the like, and other desirable earth fluids which are usually produced by drilling wells. While hydrocarbons will be produced ordinarily, it is contemplated that the present invention is not limited thereto.
The present invention is quite advantageous and useful in that it is unnecessary to provide a tubing in the well and therefore the invention is particularly advantageous in so-called slim hole drilling operations. Moreover, in a method as described herein where tubing is not employed in the well, ordinarily cementing operations may not be accomplished except by lowering the cement in a bailer and then removing the excess cement by bailing or drilling out. One great advantage of the present invention is that it is unnecessary to use cement to seal oil perforated intervals.
In the present invention where the terminology producing zone or zones is used, it is contemplated that this language shall mean a producing horizon, zone, stratum or strata, formation, sand, and the like from which desirable earth fluids such as liquid or gaseous hydrocarbons or valuable gases such as helium and the like may be obtained.
The present invention will be further illustrated by reference to the drawing in which:
Fig, 1 shows the perforation of a well in an upper zone;
Fig. 2 shows the well perforated in an upper and a lower zone;
' Fig. 2a illustrates the production from an upper perforated zone while the lower perforated zone is prometed;
Patented Dec. 6, 1960 Fig. 3 illustratoathe production from a lower zone while theupper zone is isolated by employment of a tubular member, and
Fig. 3a illustrates the production from an intermediate zone after production from two upper zones with the lower zone having emulsion therein prior to perforation.
Referring now to the drawing in which identical numerals will be employed to designate identical parts, numeral 11 designates a well bore drilled from the earths surface, not shown, to penetrate a plurality of subsurface earth intervals 12, 13, 14, and 15, all of which may be assumed to contain productive quantities of hydrocarbons. Arranged in the well bore 11 is a casing string 16 which is cemented therein with primary cement 17. The casing 16 is provided with a plurality of landing nipples, supporting or anchoring means 18, 19, 20, and 21, it being noted that the landing nipples 18 to 21 are spaced above the productive intervals 12, 13, 14, and 15, respectively. These landing nipples may be of the type illustrated at page 4063 of the Composite Catalog of Oil Field and Pipe Line Equipment, 19th ed., published by World Oil, Gulf Publishing Company, 1952-53. In Fig. 1 there is shown lowered on a wire line 22 from the earths surface a perforator 23 which is illustrated as a shaped charge perforator but which may be a bullet gun perforator, a mechanical perforator, or one of the chemical type. Prior to lowering the perforator 23 on the wire line 22, preferably a portion of the drilling fluid 24 in and filling the casing 16 is displaced by introducing a body 25 of a clean fluid such as a heat stable emulsion, oil, and the like, which will not contaminate the several producing formations 12 to 15, inclusive, when contacted therewith. The body 25 of the emulsion or clean fluid may suitably be introduced into the well casing 16 in a container or bailer as may be desired to displace the drilling fluid. Since the clean fluid 25 displaces the drilling fluid, it must be of a controllable density and have a Weight and viscosity sufficient to remain in place and displace the drilling fluid.
The perforator 23 is then operated in the body 25 to form perforations 26, penetrating the casing 16, cement 17, and the producing zone 14. It may then be desirable to produce from the zone 14 by lowering the hydrostatic head of fluid in the well casing 16 such that the hydrostatic head is less than the pressure of the productive zone 14, which will cause at least a portion of the body 25 and the drilling fluid 24 to be displaced by the producing hydrocarbons. This lowering of the hydrostatic head may be done by swabbing or by reducing the height of the column of fluid in the well such as by bailing as is conventional in the art.
If desired, however, the body 25 of the clean emulsion may be retained in the well casing 16 as shown in Fig. 2 and the perforator 23 lowered on wire line 22 to the region of producing zone 15 and again operated to form perforations 27 penetrating the casing 16, cement 17, and the producing zone 15. If desired the hydrostatic head in the well casing 16 may be reduced sufiiciently as outlined above to allow production from zone 14- but insufficiently to allow production from zone 15 with the body of the emulsion being removed to a level below the perforations 26 but not to a level sulficient to expose the perforations 27, it being understood, of course, that the wire line 22 and perforator 23 would be removed from the well casing 16. Thus, by lightening the column of drilled fluid 24 such as by introducing gas thereto or by swabbing, the hydrostatic head in the well is reduced and the pressure in the productive zones such as 14 and 15 forces the body 25 ahead of the hydrocarbons to the earths surface.
Production may be terminated from the zone 14 through perforations 26 and production initiated from,
zone 15 either before or after zone 14 has been depleted of its productive capacity. It becomes necessary to isolate zone 14 from zone 15 and this is accom plished, as shown in Fig. 3, by lowering a tubular member 28, having wire line 22 attached thereto, by the fishing neck 29 and positioning the tubular member 25 with its upper end in the landing nipple 20 and sealin-gly engaged with the wall of the casing 16 with seal 30 and its lower end positioned in the landing nipple 21 and sealingly engaged withthe wall of the casing 16 with seal 31. It is to be noted that the tubular member 28 is open on both ends and provides an opening for production of fluids therethrough and up the casing 16 to the well head. By adjusting the hydrostatic head of fluids in the well, it is now possible to produce from the zone 15 while isolating the zone 14 with the tubular member 28. This may be done by swabbing or by bailing to reduce the height of the column of fluid.
Referring now to Figs. 2 and 20, it will be seen that zones 14 and 15 have been perforated to form perforations 26 and 27 as shown. The body of emulsion 25 has been reduced in level to above the perforations 27 but below the perforations 26 to allow production from the perforations Z6 upwardly through the casing. When production is to be had from the perforations 27, the tubular member 28 would be positioned as shown in Fig. 3 and production obtained in accordance therewith. Referring now to Fig. 3a, it may be assumed that production has been had sequentially from producing zones 12 and 13 and it is now desired to obtain production from producing zone 14, the production having been had through perforations 32 in zone 12, through perforations 33 in zone 13 and now it is desired to obtain production through perforations 26 in zone 14. To this end a tubular member 35 of suflicient length to extend through zones 12 and 13 is arranged with its upper end sealingly positioned in the landing nipple 18 and sealed adjacent its upper end with seals 36 and its lower end sealingly positioned on the landing nipple 20 and sealed adjacent its lower end with seals 37. It is now possible to produce from zone 14 with zones 12 and 13 isolated. When it is desired to produce from zone 15, which would be perforated as shown in Figs. 2, 2a and 3, a tubular member, such as 35 but of greater length, is placed in the well casing 16 with its lower end positioned on the landing nipple 21 and sealed with the wall of casing 16 and its upper end positioned on the landing nipple 18 and sealed with the wall of casing 16. In each instance in production from a particular zone, the hydrostatic head of fluid is reduced or lowered by swabbing or by bailing or by other means well known in the art such as by aerating the column of fluid or by inserting a small pipe string commonly known as a macaroni string of pipe and displacing the fluid in the well with a lighter fluid.
From the description taken with the drawing, it will be apparent that it is now possible to produce Wells and recomplete in spaced apart productive zones Without requiring the cementing of the wells. Also, it is possible to produce from several zones, using a well without a tubing, which results in a tremendous savings in expensive pipe. Furthermore, the operations such as shown in the description taken with the drawing avoids the use of expensive cement for recompletion operations, the perforated intervals are protected at all times from contaminating fluids and wire line operations may be used without maintaining an expensive derrick and lifting equipment on the well. The invention is, therefore, quite useful and advantageous.
The heat stable emulsion employed in the practice of the present invention may suitably be a fluid such as an emulsion of an oily phase and a water phase and the like. Suitable materials have been amply described in Serial No. 567,604, filed February 24, 1956, for Bryan E. Morgan and Gerald G. Priest, now'U.S. Patent 2,805 ,722.
The fluids described in Serial No. 567,604 are eminently suitable in the practice of the present invention and comprise a stable emulsion of an oily medium and an aqueous medium which has a controllable density, the density of the emulsion being adjusted by dissolving a weighting agent in one of the phases of the emulsion to produce a solids-free emulsion. Other suitable protective fluids are described in pending application Serial No. 630,266, filed December 24, 1956, for Gerald G. Priest, Bryan E. Morgan and Bertie F. Birdwell, in which an emulsion of an oily phase and an aqueous phase is described and claimed, the emulsion in Serial No. 630,266 being a stable emulsion employing as an emulsifying agent a watersoluble salt of purified lignin sulfonic acid or a watersoluble salt of lignin sulfonic acid containing a certain amount of ash and reducing sugars. Other fluids suitable in the practice of the present invention are described in Serial No. 630,026, entitled Well Completion Fluids and filed December 24, 1956, for Gerald G. Priest, Bryan E. Morgan, Melba L. Lytle, Bertie F. Birdwell and Joseph A. Caldwell. In Serial No. 630,026 a heat stable, noncorrosive emulsion is described and claimed in which an emulsifying agent is employed and in which the oily phase of the emulsion comprises a substantial amount of tetrachloroethylene, with one of the phases of the emulsion containing a corrosion inhibitor. These several low filtration loss fluids described in the several applications have the characteristic of low filtration rate and further the characteristic of maintaining perforations open and exposed areas in wells protected without damaging or injuring the permeability and porosity of the formation or interval with which they come into contact. In short, the low fluid loss fluids suitable for use in the present invention have the characteristic of low filtration rate and of resisting entrance of other fluids into perforations in or into an earth formation. In addition, these fluids, particularly those described in the several applications, do not damage a formation or sand and the like with which they come into contact. These low fluid loss fluids, gels, or emulsions have the further property of forming a cohesive mass which does not readily substantially intermingle or mix with other fluids such as well fluids as exemplified by oil, gas, water and the like. The fluids or emulsions employed suitably have a low fluid loss, a weight at least equal to that of the normal working fluids employed for blowout protection in wells and are free of constituents which might permanently plug the formation or casing perforations. Thus, the fluids used in the practice of this invention block ingress of damaging fluids from the well to the formation but allow fluids from the formation to flow into the well bore on adjustment of the differential pressure into the well bore.
The nature and objects of the present invention having been completely described and illustrated, What I wish to claim as new and useful and secure by Letters Patent 1s:
1. A method for completing and Working over a tubeless well penetrating a plurality of vertically spaced apart producing zones and having a casing therein, which comprises perforating said casing in a. first of said zones and producing well fluids from said perforated first zone, terminating production from said first perforated zone by applying to said perforated first zone fluid pressure greater than the pressure of said perforated first zone and perforating said casing in a second zone vertically spaced below the perforated first Zone, lowering a tubular member in said casing and sealingly positioning it in said casing with its open upper end sealed above and its open lower end sealed below the perforated first zone to isolate the perforated first zone from the perforated second zone, said perforated first zone being isolated while maintaining each of said perforated zones always open to said casing and then producing well fluids from the perforated second zone through the tubular member and the well casing.
2. A method for completing and working over a tubeless well penetrating a plurality of vertically spaced apart producing zones and having a casing therein, which comprises perforating said casing in a first and second of said zones while maintaining said zones under control with a hydrostatic head of fluid greater than the pressure of said zones, the second zone being spaced vertically below the first zone, lowering a tubular member in said casing and sealingly positioning it in said casing with its open upper end sealed above and its open lower end sealed below the perforated first zone to isolate the perforated first zone from the perforated second zone, said perforated first zone being isolated while maintaining each of said perforated zones always open to said casing, producing well fluids from the perforated second zone through the tubular member and the well casing, terminating production from the perforated second perforated zone by applying to said perforated second zone fluid pressure greater than the pressure of said perforated second zone, removing the tubular member from the Well, and then producing well fluids from the perforated first zone.
3. A method for completing and working over a tubeless well penetrating a plurality of vertically spaced apart producing zones and having a casing therein, which comprises perforating said casing in a first of said zones and producing well fluids from said perforated first zone, terminating production from said first perforated zone by applying to said perforated first zone fluid pressure greater than the pressure of said perforated first zone and perforating said casing in a second zone vertically spaced below the perforated first zone, lowering a tubular memher in said casing and sealingly positioning it in said casing with its open upper end sealed above and its open lower end sealed below the perforated first zone to isolate the perforated first zone from the perforated second zone, said perforated first zone being isolated while maintaining each of said perforated zones always open to said casing producing well fluids from the perforated second zone through the tubular member and the well casing, terminating production from said perforated second perforated zone by applying to said perforated second zone fluid pressure greater than the pressure of said perforated second zone, removing the tubular member from the well, and then resuming production of well fluids from the perforated first zone.
4. A method for completing and Working over a tubeless well penetrating a plurality of vertically spaced apart producing zones and having a casing therein, which comprises perforating said casing in a first of said zones and perforating said casing in a second zone vertically spaced below the perforated first zone while maintaining said zones under control with a hydrostatic head of fluid greater than the pressure of said zones, lowering a tubular member in said casing and sealingly positioning it in said casing with its open upper end sealed above and its open lower end sealed below the perforated first zone to isolate the perforated first zone from the perforated second zone, said perforated first zone being isolated While maintaining each of said perforated zones always open to said casing and producing well fluids from the perforated second zone through the tubular member and the well casing.
5. A method in accordance with claim 4 in which well fluids are produced from the perforated first zone and production of said well fluids from said perforated first zone is terminated by applying to said perforated first zone fluid pressure greater than the pressure of said perforated first zone prior to perforating the second zone.
6. A method in accordance with claim 4 in which well fluids are produced from the perforated first zone after perforating the second zone and after production from said perforated second zone is terminated by applying to said perforated second zone fluid pressure greater than the pressure of said perforated second zone and prior to lowering the tubular member.
References Cited in the file of this patent UNITED STATES PATENTS 2,693,856 Allen Nov. 9, 1954 2,707,997 Zandmer et al. May 10, 1955 2,776,013 Tausch Jan. 1, 1957 2,805,722 Morgan et al. Sept. 10, 1957 2,811,205 Spearow Oct. 29, 1957 2,856,001 Allen et al Oct. 14, 1958
US743360A 1958-06-20 1958-06-20 Completion of tubeless wells Expired - Lifetime US2963088A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US743360A US2963088A (en) 1958-06-20 1958-06-20 Completion of tubeless wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US743360A US2963088A (en) 1958-06-20 1958-06-20 Completion of tubeless wells

Publications (1)

Publication Number Publication Date
US2963088A true US2963088A (en) 1960-12-06

Family

ID=24988483

Family Applications (1)

Application Number Title Priority Date Filing Date
US743360A Expired - Lifetime US2963088A (en) 1958-06-20 1958-06-20 Completion of tubeless wells

Country Status (1)

Country Link
US (1) US2963088A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3095038A (en) * 1960-10-24 1963-06-25 Jersey Prod Res Co Plural completion of wells
US3130784A (en) * 1961-12-01 1964-04-28 Jersey Prod Res Co Secondary recovery of earth fluids
US3138206A (en) * 1961-09-05 1964-06-23 Jersey Prod Res Co Perforating in wells
US3527302A (en) * 1968-08-09 1970-09-08 Shell Oil Co Apparatus and method for working a well with plural levels of perforations
US20070056750A1 (en) * 2005-06-09 2007-03-15 Schlumberger Technology Corporation Deployable Zonal Isolation System
US10082000B2 (en) * 2012-12-27 2018-09-25 Exxonmobil Upstream Research Company Apparatus and method for isolating fluid flow in an open hole completion

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2693856A (en) * 1952-04-01 1954-11-09 Standard Oil Dev Co Well completion method
US2707997A (en) * 1952-04-30 1955-05-10 Zandmer Methods and apparatus for sealing a bore hole casing
US2776013A (en) * 1954-03-11 1957-01-01 Exxon Research Engineering Co Apparatus for completion in a plurality of hydrocarbon productive strata
US2805722A (en) * 1956-02-24 1957-09-10 Exxon Research Engineering Co Perforation wells
US2811205A (en) * 1956-03-26 1957-10-29 Spearow Ralph Water based oil formation production method
US2856001A (en) * 1956-12-24 1958-10-14 Jersey Prod Res Co Protection of wells

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2693856A (en) * 1952-04-01 1954-11-09 Standard Oil Dev Co Well completion method
US2707997A (en) * 1952-04-30 1955-05-10 Zandmer Methods and apparatus for sealing a bore hole casing
US2776013A (en) * 1954-03-11 1957-01-01 Exxon Research Engineering Co Apparatus for completion in a plurality of hydrocarbon productive strata
US2805722A (en) * 1956-02-24 1957-09-10 Exxon Research Engineering Co Perforation wells
US2811205A (en) * 1956-03-26 1957-10-29 Spearow Ralph Water based oil formation production method
US2856001A (en) * 1956-12-24 1958-10-14 Jersey Prod Res Co Protection of wells

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3095038A (en) * 1960-10-24 1963-06-25 Jersey Prod Res Co Plural completion of wells
US3138206A (en) * 1961-09-05 1964-06-23 Jersey Prod Res Co Perforating in wells
US3130784A (en) * 1961-12-01 1964-04-28 Jersey Prod Res Co Secondary recovery of earth fluids
US3527302A (en) * 1968-08-09 1970-09-08 Shell Oil Co Apparatus and method for working a well with plural levels of perforations
US20070056750A1 (en) * 2005-06-09 2007-03-15 Schlumberger Technology Corporation Deployable Zonal Isolation System
US7870909B2 (en) * 2005-06-09 2011-01-18 Schlumberger Technology Corporation Deployable zonal isolation system
US10082000B2 (en) * 2012-12-27 2018-09-25 Exxonmobil Upstream Research Company Apparatus and method for isolating fluid flow in an open hole completion

Similar Documents

Publication Publication Date Title
US4319635A (en) Method for enhanced oil recovery by geopressured waterflood
USRE38642E1 (en) Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes
US4187909A (en) Method and apparatus for placing buoyant ball sealers
US3455392A (en) Thermoaugmentation of oil production from subterranean reservoirs
US2749989A (en) Method and means of completing a well
US3526280A (en) Method for flotation completion for highly deviated wells
US4057108A (en) Completing wells in deep reservoirs containing fluids that are hot and corrosive
US3587743A (en) Explosively fracturing formations in wells
US4042029A (en) Carbon-dioxide-assisted production from extensively fractured reservoirs
US4529036A (en) Method of determining subterranean formation fracture orientation
US5226495A (en) Fines control in deviated wells
US3353602A (en) Vertical fracture patterns for the recovery of oil of low mobility
US4195690A (en) Method for placing ball sealers onto casing perforations
US3948324A (en) Process for chemically and mechanically limited reservoir acidization
US2938584A (en) Method and apparatus for completing and servicing wells
US2963088A (en) Completion of tubeless wells
US4279307A (en) Natural gas production from geopressured aquifers
Davison et al. Zama acid gas disposal/miscible flood implementation and results
US4090564A (en) Method for increasing the recovery of oil and gas from a water invaded geo-pressured water drive oil reservoir
US2844205A (en) Method for completing and servicing a well
US2818119A (en) Method for completing and working over wells
US9879508B2 (en) Wireline assisted coiled tubing portion and method for operation of such a coiled tubing portion
US3036634A (en) Completion of wells in a plurality of formations
US2837165A (en) Permanent well completion apparatus
US3208533A (en) Completion system for wells