US2952318A - Sand packing a formation - Google Patents

Sand packing a formation Download PDF

Info

Publication number
US2952318A
US2952318A US395031A US39503153A US2952318A US 2952318 A US2952318 A US 2952318A US 395031 A US395031 A US 395031A US 39503153 A US39503153 A US 39503153A US 2952318 A US2952318 A US 2952318A
Authority
US
United States
Prior art keywords
sand
well
formation
tubing string
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US395031A
Inventor
Harold B Ritch
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dow Chemical Co
Original Assignee
Dow Chemical Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dow Chemical Co filed Critical Dow Chemical Co
Priority to US395031A priority Critical patent/US2952318A/en
Application granted granted Critical
Publication of US2952318A publication Critical patent/US2952318A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells

Definitions

  • the present invention relates to methods of treating wells especially those yielding oil. It more particularly concerns an improved method of treating wells penetrating a producing formation from which earth particles are carried into the well with the produced fluid and cause operating difliculties.
  • the well preferably is first put under hydrostatic control as by filling the well hole with a liquid, such as drilling mud, oil, water, or brine, if not already filled.
  • a liquid such as drilling mud, oil, water, or brine
  • the first stage of the method is begun as by determining the feeding pressure of the formation to be treated. This may be accomplished by providing the well with a tubing string and packer, the latter being set either in the open hole or casing as the case may be above the formation to be treated. After setting the packer, liquid is injected into the tubing string under suflicient pressure to displace at least a portion of the liquid below the packer into and thereby breaking down or fracturing the formation.
  • the pressure required may be noted together with the injection rate, thereby ascertaining a feeding rate for the liquid use and the pressure required to make an injection into the formation.
  • the liquid in the tubing string and in the well hole below the packer is displaced, if necessary, as by releasing the packer, injecting a displacing liquid down the tubing while releasing liquid from the casing until it is calculated, from the dimensions of the tubing, that the advancing end of the displacing liquid column is below the packen.
  • the foregoing displacing operation is performed in order to clear the tubing string and well hole below the packer of drilling mud, if such be present, otherwise this operation may be omitted.
  • sand-laden liquid preferably oil, the sand being present in the proportions of about 125 pounds more or less per barrel of oil.
  • sand-laden liquid preferably oil, the sand being present in the proportions of about 125 pounds more or less per barrel of oil.
  • sand-laden oil e.g. oil, brine, or water, or preferably oil
  • sand-free liquid e.g. oil, brine, or water, or preferably oil
  • the second stage is similar to the first and comprises the same steps, viz. injecting a sand-laden liquid, e.g. oil+sand in the proportions of 125 pounds of sand, more or less, per barrel of oil, into the earth formation below the packer until the injection pressure indicates that the sand is straining out of the oil filling the well hole and obstructing the injection into the formation.
  • a sand-laden liquid e.g. oil+sand in the proportions of 125 pounds of sand, more or less, per barrel of oil
  • the sand-laden oil then remaining in the tubing string and well hole below the packer is displaced from the well as before as by releasing the packer and injecting into the tubing string a suitable sand-free liquid, e.g. oil or brine, in amount sufficient to circulate the sand out of the well, leaving the well hole and tubing string free of sand-laden oil and the well underhydrostatic control.
  • stages or injections of sand-laden liquid followed by flushing out the well hole with a sand-free liquid are made in the same manner as in the previously described stages, the number of stages being determined in part at least by the magnitude of the pressure required to displace the sand-laden liquid into the earth without sand straining out of the carrying liquid while the injection is being made, and by the observation of wether or not the amount of sand injected in any stage is substantial, e.g. at least pounds.
  • Each stage results in the injected sand being displaced further into the formation away from the well hole forming a filtering medium through which the liquid produced from the earth formation may pass without carrying earth particles into the well.
  • a suitable screen liner may be set in the hole if necessary to hold the injected sand in place. This may be accomplished by withdrawing the tubing string and securing a detachable section of screen liner to the lower end and then rerunning the tubing string into the well. In rerunning the tubing string with the attached screen liner, it is desirable to inject oil or other liquid into the annulus between the tubing and easing,
  • Fig. l is a schematic view of a well in vertical section showing an apparatus in place in the well in carrying out the method.
  • Fig. 2 is a similar view to that of Fig. 1 showing a completion of the method.
  • the well as shown in Fig. 1 comprises a pay formation 1 penetrated by a well bore 2 which is lined with a casing 3, the casing being cemented in place with cement 4.
  • the casing has a slotted section 5 opposite the formation 1.
  • the well is provided with a tubing string 6 near the lower end of which is a conventional packer 7 which is capable of being seated against the casing and released as needed by manipulating the tubing as understood in the art.
  • the tubing string may be provided with a pressure gauge 8 for indicating injection pressures.
  • the removable casing head 9 may be provided with an outlet 10 having a valve 11.
  • Fig. 2 the well of Fig. l is shown with the tubing string and packer removed and a liner 12 having a screen section 13 placed in the bottom of the well opposite the pay formation.
  • the pay formation adjacent to the well hole is shown packed with filter sand (Ottawa sand) 14 which also fills the annular space 15 between the screen section 13 and the well bore 2.
  • the following example is illustrative of the practice of the method on a conventional oil well using the apparatus illustrated in the drawing:
  • the well treated had a total depth of 4209 feet (in the Chareton pool in St. Mary Parish, Louisiana) with a pay formation 1 of fine sand extending from 4196 feet to 4205 feet, the slotted section 5 of the casing being opposite the pay formation.
  • the well was filled with salt water 16 so as to maintain hydrostatic control of the well.
  • the tubing string 6 with the packer 7 was lowered into the salt water until the lower end 17 of the tubing string was 4 feet above the top 18 of the formation '1 and the packer 7 was 28 feet above the lower end of the tubing.
  • the packer When it was anticipated that the sand-laden oil was about to reach the well hole the packer was seated as indicated at 19 and a further quantity of 12 barrels of sand-laden oil was injected into the tubing string. This was followed by 10 barrels of oil and 24 barrels of salt water.
  • the maximum pressure recorded by the pressure gauge 8 was 1700 psi. and sand was displaced into the formation thus completing the first stage of the treatment.
  • the second stage was similar to the first and was commenced by unseatin-g the packer 7 and circulating salt water down the tubing string and out the valve 11 so as to wash out any sand left in the well hole from the first stage.
  • the packer was then seated as at 19 and 24 barrels of oil uniformly mixed with 3000 pounds of 20-40 mesh Ottawa sand was injected into the tubing, the injection being discontinued when the pressure rose to 1900 p.s.i. indicating that sand was being strained out at the face of the well hole blocking further injection.
  • the packer 7 was then unseated and the well hole flushed with sand-free liquid in preparation for a third stage. In this about 40 barrels of oil uniformly mixed with 5000 pounds of 2040 mesh Ottawa sand was injected as in the other stages, the injection being discontinued when the tubing pressure reached 2000 psi. which indicated that the sand was no longer entering the formation but was instead being strained out and deposited in the well hole.
  • the packer 7 was released and the tubing string and well hole were flushed with sand-free oil in preparation for a fourth stage.
  • the fourth stage about 31 barrels of sand-laden oil containing 3900 pounds of 20-40 mesh Ottawa sand was injected, the injection being discontinued when the tubing pressure reached 3000 p.s.i.
  • the successive injections of sand into the formation produced the compact sand mass indicated by numeral 20 in the portion of the formation adjacent to the slotted section 5.
  • the packer 7 was unseated and salt water was injected into the casing through valve 11 while allowing the sand-laden oil remaining in the tubing string to be flushed out while the tubing string was lowered to a depth of 4196 feet, that is, to the top 18 of the pay formation.
  • the tubing string was raised 40 feet and a quantity of sand and water was introduced into the tubing so as to make a deposit of sand in the well hole to a depth of about 30 feet above the slotted section 5.
  • the tubing string with the attached packer was then removed from the well hole and a 10 foot screen assembly (shown in Fig. 2 as No.
  • each of the injections of the sand-laden liquid may and usually does vary one from the other and depends upon whether or not the formation will accept the sandladen liquid without screening out or straining out at the face of the formation or in the slots or openings of the well liner if such be in the well hole.
  • the occurrence of the straining out is made evident to the operator by a sharply rising pressure as the injection proceeds, or adiminishing injection rate at constant injection pressure.
  • the size of the sand particles to use this may vary over a considerable range and is selected preferably w-ith due regard for the size of earth particles to be retained in the formation.
  • a size of from about 20 to 40 mesh is generally suitable.
  • the liquid used as a carrying medium for the sand is preferably an oil having a considerable viscosity, such as refined oil, so as to facilitate holding the sand in suspension while making the injection. Lease oil may be used.
  • the method of treating a well penetrating a fluid producing formation from which earth particles are carried into the well by the produced fluid so as to retain the earth particles in the formation during production which comprises making successive injections of a sandladenliquid into the well and thence into the formation through a perforate liner therein, each injection being discontinued when there is a rise in the injection pressure indicating that sand is straining out of the sandladen liquid at the face of the formation, and flushing the well hole of the sand strained out of the sand-laden liquid at the face of the formation between the injections.

Description

Sept. 13, 1960 H. B, RITCH SAND PACKING A FORMATION Filed Nov. 30, 1953 1N VEN TOR /ch "HIPLL' Mm Hora/o B. R/
W ZM
ATTORNEYS.
ite States Patent SAND PACKING A FORMATION Harold B. Ritch, New Orleans, La., assignor to The Dow Chemical Company, Midland, Mich., a corporation of Delaware Filed Nov. 30, 1953, Ser. No. 395,031
3 Claims. (Cl. 166-15) The present invention relates to methods of treating wells especially those yielding oil. It more particularly concerns an improved method of treating wells penetrating a producing formation from which earth particles are carried into the well with the produced fluid and cause operating difliculties.
, It is a common experience in oil and gas production to encounter producing formations from which 'earth particles are continually being carried by the produced The invention is predicated upon the discovery that by making successive injections of a sand-laden liquid into the producing formation a compact filter bed is formed adjacent to the well hole by which earth particles are prevented from being carried with the produced fluid into the well. The invention then consists of the improved well treating method herein fully described and particularly pointed out in the claims.
In accordance with the invention, the well preferably is first put under hydrostatic control as by filling the well hole with a liquid, such as drilling mud, oil, water, or brine, if not already filled. Once the well is filled, the first stage of the method is begun as by determining the feeding pressure of the formation to be treated. This may be accomplished by providing the well with a tubing string and packer, the latter being set either in the open hole or casing as the case may be above the formation to be treated. After setting the packer, liquid is injected into the tubing string under suflicient pressure to displace at least a portion of the liquid below the packer into and thereby breaking down or fracturing the formation. While making this injection, the pressure required may be noted together with the injection rate, thereby ascertaining a feeding rate for the liquid use and the pressure required to make an injection into the formation. -After the feeding pressure is determined, the liquid in the tubing string and in the well hole below the packer is displaced, if necessary, as by releasing the packer, injecting a displacing liquid down the tubing while releasing liquid from the casing until it is calculated, from the dimensions of the tubing, that the advancing end of the displacing liquid column is below the packen. The foregoing displacing operation is performed in order to clear the tubing string and well hole below the packer of drilling mud, if such be present, otherwise this operation may be omitted. After the well hole and tubing string are filled with a suitable liquid, such as oil, water, or brine, there is injected into the tubing string sand-laden liquid preferably oil, the sand being present in the proportions of about 125 pounds more or less per barrel of oil. As the injection of sand-laden liquid proceeds, the feeding or injection pressure rises and eventually the injection is disconof 20-40 mesh Ottawa sand, for example.
tinned when the injection pressure rise indicates'sand is being strained out of the carrying liquid and lodging in the well hole blocking the injection. In such injection, there may be used as much as 3000 pounds, or more, When the introduction of sand-laden oil is discontinued because of pressure build up and sand straining out at the face of the formation, the packer is unseated and sand-free liquid, e.g. oil, brine, or water, or preferably oil, is introduced into the tubing string so as to displace the sandladen oil from the tubing string and well hole below the packer out of the well, thereby leaving the well hole below the packer and the tubing string filled with sandfree liquid and maintaining control of the well. This concludes the first stage of the treatment.
The second stage is similar to the first and comprises the same steps, viz. injecting a sand-laden liquid, e.g. oil+sand in the proportions of 125 pounds of sand, more or less, per barrel of oil, into the earth formation below the packer until the injection pressure indicates that the sand is straining out of the oil filling the well hole and obstructing the injection into the formation. The sand-laden oil then remaining in the tubing string and well hole below the packer is displaced from the well as before as by releasing the packer and injecting into the tubing string a suitable sand-free liquid, e.g. oil or brine, in amount sufficient to circulate the sand out of the well, leaving the well hole and tubing string free of sand-laden oil and the well underhydrostatic control. This concludes the second stage.
Additional stages or injections of sand-laden liquid followed by flushing out the well hole with a sand-free liquid are made in the same manner as in the previously described stages, the number of stages being determined in part at least by the magnitude of the pressure required to displace the sand-laden liquid into the earth without sand straining out of the carrying liquid while the injection is being made, and by the observation of wether or not the amount of sand injected in any stage is substantial, e.g. at least pounds. Each stage results in the injected sand being displaced further into the formation away from the well hole forming a filtering medium through which the liquid produced from the earth formation may pass without carrying earth particles into the well.
I After the desired number of stages of sand injections have been made, a suitable screen liner may be set in the hole if necessary to hold the injected sand in place. This may be accomplished by withdrawing the tubing string and securing a detachable section of screen liner to the lower end and then rerunning the tubing string into the well. In rerunning the tubing string with the attached screen liner, it is desirable to inject oil or other liquid into the annulus between the tubing and easing,
' withdrawn. It will be understood that in the matter of removing the sand which becomes strained out of the carrying liquid and deposited in the well hole as each stage approaches the finish this may be circulated out of the well in any suitable manner while maintaining hydrostatic control of the well, if necessary. The method aforementioned of releasing the packer and injecting a sand-free liquid into the tubing string while allowing the displaced material to escape from the casing head is generally the most satisfactory. Nevertheless, if desired, the circulation can be accomplished by making the injection of sand-free liquid down the casing or annulus and allowing the displaced material to escape at the head of the tubing string. This method has the advantage that the tubing string may be lowered to the bottom of the well hole so as to facilitate the removal of any sand which may be lodged on the bottom of the well hole.
The invention may be further explained in connection with the accompanying drawing which diagrammatically illustrates a mode of practicing the invention.
In the said drawing, Fig. l is a schematic view of a well in vertical section showing an apparatus in place in the well in carrying out the method.
Fig. 2 is a similar view to that of Fig. 1 showing a completion of the method.
Referring to the drawing in detail, the well as shown in Fig. 1 comprises a pay formation 1 penetrated by a well bore 2 which is lined with a casing 3, the casing being cemented in place with cement 4. The casing has a slotted section 5 opposite the formation 1. The well is provided with a tubing string 6 near the lower end of which is a conventional packer 7 which is capable of being seated against the casing and released as needed by manipulating the tubing as understood in the art. The tubing string may be provided with a pressure gauge 8 for indicating injection pressures. The removable casing head 9 may be provided with an outlet 10 having a valve 11.
In Fig. 2, the well of Fig. l is shown with the tubing string and packer removed and a liner 12 having a screen section 13 placed in the bottom of the well opposite the pay formation. The pay formation adjacent to the well hole is shown packed with filter sand (Ottawa sand) 14 which also fills the annular space 15 between the screen section 13 and the well bore 2.
The following example is illustrative of the practice of the method on a conventional oil well using the apparatus illustrated in the drawing: The well treated had a total depth of 4209 feet (in the Chareton pool in St. Mary Parish, Louisiana) with a pay formation 1 of fine sand extending from 4196 feet to 4205 feet, the slotted section 5 of the casing being opposite the pay formation. In carrying out the method, the well was filled with salt water 16 so as to maintain hydrostatic control of the well. Then the tubing string 6 with the packer 7 was lowered into the salt water until the lower end 17 of the tubing string was 4 feet above the top 18 of the formation '1 and the packer 7 was 28 feet above the lower end of the tubing. After lowering, the tubing string, the packer was seated against the casing 3 as indicated in dotted outline 19. A test was then made to determine whether the slotted section of the casing would accept fluid. This was done by injecting several barrels of salt water down the tubing with valve 11 closed. This injection proceeded without undue pressure rise on the tubing, thereby indicating that the slotted section 5 allowed the passage of liquid into the formation 1. The packer 7 was then unseated and then 10 barrels of lease oil was injected into the tubing string followed by 12 barrels of sandladen oil containing 1500 pounds of 2040 mesh Ottawa sand. During the foregoing injections, salt water was allowed to escape from the casing by opening valve 11. When it was anticipated that the sand-laden oil was about to reach the well hole the packer was seated as indicated at 19 and a further quantity of 12 barrels of sand-laden oil was injected into the tubing string. This was followed by 10 barrels of oil and 24 barrels of salt water. The maximum pressure recorded by the pressure gauge 8 was 1700 psi. and sand was displaced into the formation thus completing the first stage of the treatment. The second stage was similar to the first and was commenced by unseatin-g the packer 7 and circulating salt water down the tubing string and out the valve 11 so as to wash out any sand left in the well hole from the first stage. The packer was then seated as at 19 and 24 barrels of oil uniformly mixed with 3000 pounds of 20-40 mesh Ottawa sand was injected into the tubing, the injection being discontinued when the pressure rose to 1900 p.s.i. indicating that sand was being strained out at the face of the well hole blocking further injection. The packer 7 was then unseated and the well hole flushed with sand-free liquid in preparation for a third stage. In this about 40 barrels of oil uniformly mixed with 5000 pounds of 2040 mesh Ottawa sand was injected as in the other stages, the injection being discontinued when the tubing pressure reached 2000 psi. which indicated that the sand was no longer entering the formation but was instead being strained out and deposited in the well hole. The packer 7 was released and the tubing string and well hole were flushed with sand-free oil in preparation for a fourth stage. In the fourth stage, about 31 barrels of sand-laden oil containing 3900 pounds of 20-40 mesh Ottawa sand was injected, the injection being discontinued when the tubing pressure reached 3000 p.s.i. The successive injections of sand into the formation produced the compact sand mass indicated by numeral 20 in the portion of the formation adjacent to the slotted section 5. Following the fourth stage of sand injection, the packer 7 was unseated and salt water was injected into the casing through valve 11 while allowing the sand-laden oil remaining in the tubing string to be flushed out while the tubing string was lowered to a depth of 4196 feet, that is, to the top 18 of the pay formation. After the successive sand injections were completed, the tubing string was raised 40 feet and a quantity of sand and water was introduced into the tubing so as to make a deposit of sand in the well hole to a depth of about 30 feet above the slotted section 5. The tubing string with the attached packer was then removed from the well hole and a 10 foot screen assembly (shown in Fig. 2 as No. '12 detached from the tubing string) of 45 mesh screen wasdetachably attached to the lower end of the tubing string which was then run into the well until the bottom of the screen rested upon the top of the sand column in the well. Salt water was then injected into the casing at the same time the tubing string was lowered further, thereby washing the screen section 13 into place and leaving sand in the well hole between the screen section and the casing as indicated by numeral 14. Thereafter the tubing string was detached from the screen section 12 which was left in the well hole, as shown in Fig. 2. The well so-treated was put into production and tested for a 2.5 months period for sand. :It was found that the well delivered sand-free oil at a satisfactory rate through the injected sand mass 20, whereas prior to the treatment the well hole and subsurface pumping equipment in the well became sanded up and the well could not be operated satisfactorily.
It is manifest from the foregoing example that the size of each of the injections of the sand-laden liquid may and usually does vary one from the other and depends upon whether or not the formation will accept the sandladen liquid without screening out or straining out at the face of the formation or in the slots or openings of the well liner if such be in the well hole. The occurrence of the straining out is made evident to the operator by a sharply rising pressure as the injection proceeds, or adiminishing injection rate at constant injection pressure. On the appearance of such retardation in injection rate or sharp, build up of injection pressure, the injection is discontinued as aforesaid and the well hole is flushed out so as to clear the face of the formation and slots of the liner, if present, of sand particles and permit another injection to be made of sand-laden liquid. In general from 3 to 5 stages of injection will accomplish the desired results but a greater number of injections may be made if the formation will accept them without immediate straining out of the sand from the carrying liquid.
As to the size of the sand particles to use, this may vary over a considerable range and is selected preferably w-ith due regard for the size of earth particles to be retained in the formation. A size of from about 20 to 40 mesh is generally suitable.
The liquid used as a carrying medium for the sand is preferably an oil having a considerable viscosity, such as refined oil, so as to facilitate holding the sand in suspension while making the injection. Lease oil may be used.
I claim:
1. The method of treating a well penetrating a fluid producing formation from which earth particles are carried into the well by the produced fluid so as to retain the earth particles in the formation during production which comprises making successive injections of a sandladenliquid into the well and thence into the formation through a perforate liner therein, each injection being discontinued when there is a rise in the injection pressure indicating that sand is straining out of the sandladen liquid at the face of the formation, and flushing the well hole of the sand strained out of the sand-laden liquid at the face of the formation between the injections.
2. The method according to claim 1 including setting a screen in the well hole after the last injection of sandladen liquid and packing sand in the annular space between the said screen and the liner of the well hole.
3. The method according to claim 1 in which the number of injections is from 3 to 5, inclusive.
References Cited in the file of this patent UNITED STATES PATENTS 2,308,072 Granger Jan. 12, 1943 2,354,570 Benckenstein July 25, 1944 2,356,769 Layne Aug. 22, 1944 2,596,843 Farris May 13, 1952 2,651,369 Abendroth et a1. Sept. 8, 1953
US395031A 1953-11-30 1953-11-30 Sand packing a formation Expired - Lifetime US2952318A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US395031A US2952318A (en) 1953-11-30 1953-11-30 Sand packing a formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US395031A US2952318A (en) 1953-11-30 1953-11-30 Sand packing a formation

Publications (1)

Publication Number Publication Date
US2952318A true US2952318A (en) 1960-09-13

Family

ID=23561416

Family Applications (1)

Application Number Title Priority Date Filing Date
US395031A Expired - Lifetime US2952318A (en) 1953-11-30 1953-11-30 Sand packing a formation

Country Status (1)

Country Link
US (1) US2952318A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3695355A (en) * 1970-01-16 1972-10-03 Exxon Production Research Co Gravel pack method
US4051900A (en) * 1974-06-13 1977-10-04 Dale Hankins Propping material for hydraulic fracturing
US4498543A (en) * 1983-04-25 1985-02-12 Union Oil Company Of California Method for placing a liner in a pressurized well
US4969523A (en) * 1989-06-12 1990-11-13 Dowell Schlumberger Incorporated Method for gravel packing a well
US4979565A (en) * 1989-11-30 1990-12-25 Mobil Oil Corporation Method to improve well performance in gravel packed wells
US5058677A (en) * 1990-09-20 1991-10-22 Chevron Research And Technology Company Two-step method for horizontal gravel packing
US5330005A (en) * 1993-04-05 1994-07-19 Dowell Schlumberger Incorporated Control of particulate flowback in subterranean wells
US5501275A (en) * 1993-04-05 1996-03-26 Dowell, A Division Of Schlumberger Technology Corporation Control of particulate flowback in subterranean wells
US6528157B1 (en) 1995-11-01 2003-03-04 Borden Chemical, Inc. Proppants with fiber reinforced resin coatings
US20060166834A1 (en) * 2004-02-10 2006-07-27 Halliburton Energy Services, Inc. Subterranean treatment fluids comprising substantially hydrated cement particulates
US20080110619A1 (en) * 2004-02-10 2008-05-15 Roddy Craig W Methods of using substantially hydrated cement particulates in subterranean applications
US20090124522A1 (en) * 2004-02-10 2009-05-14 Roddy Craig W Cement Compositions and Methods Utilizing Nano-Hydraulic Cement
US20090139719A1 (en) * 2004-02-10 2009-06-04 Halliburton Energy Services, Inc. Cement-based particulates and methods of use
US8322424B2 (en) 2007-04-05 2012-12-04 Schlumberger Technology Corporation Use of a chopper mechanism to add fibers to a well
US8476203B2 (en) 2007-05-10 2013-07-02 Halliburton Energy Services, Inc. Cement compositions comprising sub-micron alumina and associated methods
US8586512B2 (en) 2007-05-10 2013-11-19 Halliburton Energy Services, Inc. Cement compositions and methods utilizing nano-clay
US8685903B2 (en) 2007-05-10 2014-04-01 Halliburton Energy Services, Inc. Lost circulation compositions and associated methods
US9199879B2 (en) 2007-05-10 2015-12-01 Halliburton Energy Serives, Inc. Well treatment compositions and methods utilizing nano-particles
US9206344B2 (en) 2007-05-10 2015-12-08 Halliburton Energy Services, Inc. Sealant compositions and methods utilizing nano-particles
US9512351B2 (en) 2007-05-10 2016-12-06 Halliburton Energy Services, Inc. Well treatment fluids and methods utilizing nano-particles

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2308072A (en) * 1941-05-27 1943-01-12 Paul H Granger Method of cementing oil wells
US2354570A (en) * 1941-03-28 1944-07-25 Benckenstein Charles Height Process of increasing permeability of sands and strata
US2356769A (en) * 1939-12-04 1944-08-29 Leslie A Layne Washing gravel out of perforate well casings
US2596843A (en) * 1949-12-31 1952-05-13 Stanolind Oil & Gas Co Fracturing formations in wells
US2651369A (en) * 1952-02-25 1953-09-08 Standard Oil Dev Co Gravel packing apparatus and method for arranging same in well casings

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2356769A (en) * 1939-12-04 1944-08-29 Leslie A Layne Washing gravel out of perforate well casings
US2354570A (en) * 1941-03-28 1944-07-25 Benckenstein Charles Height Process of increasing permeability of sands and strata
US2308072A (en) * 1941-05-27 1943-01-12 Paul H Granger Method of cementing oil wells
US2596843A (en) * 1949-12-31 1952-05-13 Stanolind Oil & Gas Co Fracturing formations in wells
US2651369A (en) * 1952-02-25 1953-09-08 Standard Oil Dev Co Gravel packing apparatus and method for arranging same in well casings

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3695355A (en) * 1970-01-16 1972-10-03 Exxon Production Research Co Gravel pack method
US4051900A (en) * 1974-06-13 1977-10-04 Dale Hankins Propping material for hydraulic fracturing
US4498543A (en) * 1983-04-25 1985-02-12 Union Oil Company Of California Method for placing a liner in a pressurized well
US4969523A (en) * 1989-06-12 1990-11-13 Dowell Schlumberger Incorporated Method for gravel packing a well
US4979565A (en) * 1989-11-30 1990-12-25 Mobil Oil Corporation Method to improve well performance in gravel packed wells
US5058677A (en) * 1990-09-20 1991-10-22 Chevron Research And Technology Company Two-step method for horizontal gravel packing
US5330005A (en) * 1993-04-05 1994-07-19 Dowell Schlumberger Incorporated Control of particulate flowback in subterranean wells
US5439055A (en) * 1993-04-05 1995-08-08 Dowell, A Division Of Schlumberger Technology Corp. Control of particulate flowback in subterranean wells
US5501275A (en) * 1993-04-05 1996-03-26 Dowell, A Division Of Schlumberger Technology Corporation Control of particulate flowback in subterranean wells
US6528157B1 (en) 1995-11-01 2003-03-04 Borden Chemical, Inc. Proppants with fiber reinforced resin coatings
US20090139719A1 (en) * 2004-02-10 2009-06-04 Halliburton Energy Services, Inc. Cement-based particulates and methods of use
US20080110619A1 (en) * 2004-02-10 2008-05-15 Roddy Craig W Methods of using substantially hydrated cement particulates in subterranean applications
US7424913B2 (en) * 2004-02-10 2008-09-16 Halliburton Energy Services, Inc. Methods of using substantially hydrated cement particulates in subterranean applications
US20090124522A1 (en) * 2004-02-10 2009-05-14 Roddy Craig W Cement Compositions and Methods Utilizing Nano-Hydraulic Cement
US20060166834A1 (en) * 2004-02-10 2006-07-27 Halliburton Energy Services, Inc. Subterranean treatment fluids comprising substantially hydrated cement particulates
US8183186B2 (en) 2004-02-10 2012-05-22 Halliburton Energy Services, Inc. Cement-based particulates and methods of use
US9512346B2 (en) 2004-02-10 2016-12-06 Halliburton Energy Services, Inc. Cement compositions and methods utilizing nano-hydraulic cement
US9018147B2 (en) 2004-02-10 2015-04-28 Halliburton Energy Services, Inc. Cement-based particulates and methods of use
US8322424B2 (en) 2007-04-05 2012-12-04 Schlumberger Technology Corporation Use of a chopper mechanism to add fibers to a well
US9016377B2 (en) 2007-04-05 2015-04-28 Schlumberger Technology Corporation Use of a chopper mechanism to add fibers to a well
US8741818B2 (en) 2007-05-10 2014-06-03 Halliburton Energy Services, Inc. Lost circulation compositions and associated methods
US8685903B2 (en) 2007-05-10 2014-04-01 Halliburton Energy Services, Inc. Lost circulation compositions and associated methods
US8940670B2 (en) 2007-05-10 2015-01-27 Halliburton Energy Services, Inc. Cement compositions comprising sub-micron alumina and associated methods
US8603952B2 (en) 2007-05-10 2013-12-10 Halliburton Energy Services, Inc. Cement compositions and methods utilizing nano-clay
US8586512B2 (en) 2007-05-10 2013-11-19 Halliburton Energy Services, Inc. Cement compositions and methods utilizing nano-clay
US9199879B2 (en) 2007-05-10 2015-12-01 Halliburton Energy Serives, Inc. Well treatment compositions and methods utilizing nano-particles
US9206344B2 (en) 2007-05-10 2015-12-08 Halliburton Energy Services, Inc. Sealant compositions and methods utilizing nano-particles
US8476203B2 (en) 2007-05-10 2013-07-02 Halliburton Energy Services, Inc. Cement compositions comprising sub-micron alumina and associated methods
US9512351B2 (en) 2007-05-10 2016-12-06 Halliburton Energy Services, Inc. Well treatment fluids and methods utilizing nano-particles
US9512352B2 (en) 2007-05-10 2016-12-06 Halliburton Energy Services, Inc. Well treatment fluids and methods utilizing nano-particles
US9765252B2 (en) 2007-05-10 2017-09-19 Halliburton Energy Services, Inc. Sealant compositions and methods utilizing nano-particles

Similar Documents

Publication Publication Date Title
US2952318A (en) Sand packing a formation
EP0553269A4 (en)
CA1152888A (en) Sand control method employing special hydraulic fracturing technique
US2787455A (en) Method for developing cavities in salt or other soluble rock
CA1228804A (en) Hydraulic fracturing method employing special sand control technique
US5178218A (en) Method of sand consolidation with resin
US3489222A (en) Method of consolidating earth formations without removing tubing from well
US2119563A (en) Method of and means for flowing oil wells
RU2107813C1 (en) Device for treating strata of ground or rock mass
US6651741B2 (en) Method of increasing productivity of oil, gas and hydrogeological wells
US2693854A (en) Formation of zones of high permeability in low permeability formations
US5862863A (en) Dual completion method for oil/gas wells to minimize water coning
US5536115A (en) Generating multiple hydraulic fractures in earth formations for waste disposal
US3455387A (en) Well completion technique and apparatus for use therewith
US2888988A (en) Method of treating earth formations
US2356769A (en) Washing gravel out of perforate well casings
US3118499A (en) Secondary recovery procedure
US5199766A (en) Cavity induced stimulation of coal degasification wells using solvents
RU2504650C1 (en) Method of development of flooded oil deposit
US3743021A (en) Method for cleaning well perforations
US2087297A (en) Method of shutting off water sands in wells
US5165475A (en) Method for the control of solids accomanying hydrocarbon production from subterranean formations
US4249833A (en) Method of depressurizing a leached salt cavern
SU1709076A1 (en) Method of filtration well completion
US5027899A (en) Method of gravel packing a well