US2783369A - Radio transmitting and receiving signal system - Google Patents

Radio transmitting and receiving signal system Download PDF

Info

Publication number
US2783369A
US2783369A US257794A US25779451A US2783369A US 2783369 A US2783369 A US 2783369A US 257794 A US257794 A US 257794A US 25779451 A US25779451 A US 25779451A US 2783369 A US2783369 A US 2783369A
Authority
US
United States
Prior art keywords
frequency
signal
trains
locomotive
division
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US257794A
Inventor
Edmund H Weber
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BERTHEL K OLSSON
Original Assignee
BERTHEL K OLSSON
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BERTHEL K OLSSON filed Critical BERTHEL K OLSSON
Priority to US257794A priority Critical patent/US2783369A/en
Application granted granted Critical
Publication of US2783369A publication Critical patent/US2783369A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L3/00Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal
    • B61L3/02Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control
    • B61L3/08Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically
    • B61L3/12Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically using magnetic or electrostatic induction; using radio waves
    • B61L3/125Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically using magnetic or electrostatic induction; using radio waves using short-range radio transmission

Definitions

  • This invention relates to railroad signal systems electronically produced and controlled for the purpose of minimizing accidents and for increasing the eiiicient operation and scheduling of all the trains currently running on the tracks of a division or subdivision of the railway system.
  • lt is another object of the invention to provide for the reception of transmitted signals associated with each train on a division or subdivision of a railway system and each emitting the same signal frequency whenever at any given same point in the division or subdivision of said railway system.
  • Another object of the invention is to provide for the reception of signal frequencies emitted from the transmitters of other trains by the receiver of a certain train for beating against the signal frequency of its own transmitter to create a measurable beat indicative of the relative distance within practical limits between it and each of such other trains regardless of their absolute positions in the railway division.
  • a further object of the invention is to provide for automatically controlling the signal frequency of a radio transmitter located upon a train operating within a railroad division so as to indicate to the dispatcher responsible for the scheduled movement of trains within the division by means of radio receiving equipment the exact location of such train.
  • lt is a further object of the invention to provide for radio communicating means utilizing electromagnetic wave frequencies which are automatically varied in accordance with the travel of a train having a locomotive equipped with a transmitter and received by a dispatchers oce for correlating the information so obtained from all trains currently operating within the said division so that the dispatcher can determine absolute locations of each train as well as the distances between them.
  • Another object of the invention is to provide for radio signal equipment located in the cabs of locomotives operating within a railway division which have xed carrier signals upon which signal modulating frequencies may be superimposed and which modulating frequencies vary linearly in accordance with the distance traveled by said trains.
  • a further object of the invention ispto provide for radio signal equipment located in the cabs of railway locomotives which are capable of operating on an assigned radio frequency with a variable supersonic imposed modulating ice frequency, the characteristic of which allows voice transmission to be carried on by the same equipment.
  • a still further object of the invention is to provide radio signaling equipment having in addition thereto a radio intercommunication system for engineers in locomotives operating within a division of a railway whereby the locomotive engineers, in response to warning signals, may communicate with one another and with the dispatchers otiice.
  • Fig. 1 is a physical map of an area of ground including a railway right of way constituting a division.
  • Fig. 2 is a diagrammatic representation of transmitter receiver and supersonic signal vgenerator housed within the cab of a railway locomotive using my signal system.
  • Fig. 3 is a diagrammatic representation of a voice transmitter, voice receiver and a plurality of supersonically modulated carrier receivers together with associated chart recorders.
  • Fig. 4 is a diagrammatic representation of one receiver and chart recorder together with a scanning switch device which may substitute for the plurality of receivers and chart recorders in Fig. 3.
  • Fig. 5 A is a segment ofthe recorder tape taken from one of the receivers and associated chart recorders shown in Fig. 3 during the progress of a locomotive over the division illustrated in the map of Fig. l.
  • Fig. 6 is a segment of the composite chart tape taken from the single chart recorder and signal receiver shown in Fig. 4 showing the visual progress of the same train recorded on the chart of Fig. 5 together with a record of the simultaneous travel of a work train and a second section of the passenger train.
  • Fig. 7 is an enlarged segment of the lower left hand corner of the chart segment shown in Fig. 6 illustrating the sequential travel of the recording pen of the apparatus shown in Fig. 4 to form a composite recording of the time and motion of the individual trains operating on the division.
  • I have indicated a typical railway division in the map of Fig. 1 in which the division points A and E lie 200 miles apart and constitute cities in one of which a head dispatchers office is located and the other of which an assistant dispatchers office is located.
  • Stations B, C and D are typically located along the track constitutingthe division so that in the illustrated map of Fig. 1 the trackagedistance from station A t-o station B is 40 miles, the distance from B to C is 20 miles, the distance from C to D is 35 miles, and the remaining distance from station D to terminal station E is miles. It is, of course, understood that within the main line constituting the division there may be double tracks and sidings which, of course, are within the contemplation of this invention.
  • Spur tracks extending for some distance to the side of the main track and switch yards located at stations such as terminal A are not within the contemplations of this invention since locomotives operating therein are not traveling at such speeds as to constitute hazards to each other and furthermore are subject to rigid control and supervision of a local nature to minimize'accidents from collision.
  • the main ditliculty which must be surmounted in the operation of the plurality of locomotives within a railway division is that of scheduling so as to avoid having two trains traveling at high speed on the same track coming towards one another or one train at high speed approach-V ing another in a stationary position on the same track.
  • My invention seeks to utilize by a simple electronic phenomenon means for placing the responsibility of avoiding collisions upon the shoulders of the locomotive engineers themselves since they are the best equipped, both from the standpoint of time and interest in the well-being of the train. I have thus sought to minimize the number of hands through which train orders must go in making decisions where there is immediate danger of disaster.. It is-not my intention vto revamp thetsystems of control which are extant in the railway worldtoday but rather to supplement them with a positive and foolproof means of double check-ing thescheduleand ⁇ actualV whereabouts of trains in thevicinity of other trains so ⁇ as to give the engineers in the locomotives of'such trains ampleV time to draw their own conclusions as to the proper course of conduct to follow and thereby avoiding the consequences of disastrous collisions. It is within the contemplation of this invention to provide for such extreme conditions that two-approaching trains may even halt their forward progress in sufcient time to avoid collision ata point where no station, outdoor signaldevices or sidings exist.
  • the equipment constituting my invention is largely electronic and may be included entirely within the confines of a locomotive cab although-it is possible to have my railway signal system located elsewhere in the' train and operated by the conductor, for example, who would in turn instruct the engineer when an emergency arises. It is also within the contemplation of the invention to equip some locomotives with less than the entire amount of complete radio equipment thereby to warn but one of two engineers, thus effecting a certain measure of safeguard. lt is thought that railway companies employing the system will prefer to have the double-check heretofore mentioned whereby each .engineer of bothlocomo.- tives in the same vicinity ⁇ have equal-knowledgeof the whereabouts of the other.
  • a transmitter 10 as shown in Fig. 2 is operated by a battery 11 which likewise energizes all the electronic equipment within the cab.
  • the battery 11 may be supplanted by an electric generator or by electric power the equipment for which is already installed in the locomotive. It is felt, however, that battery operation is to be preferred since failure of .a generating system would disrupt the entire electronic operation of my invention. It is, of course, to be preferred that the battery 11 have means of recharging or replacement at any time.
  • the transmitter itl- may be-of ordinary construction capable of generatinga radio signal of controlled frequency. This signal may be a supersonic modulated carrier signal as more fully described hereafter.
  • Push buttons i2 may be employed to select thc particular carrier signal frequency which will ⁇ be used by the transmitter of the locomotive in question during a particular run on the railroad division. ln order to prevent anaccidental alteration of the preselected carrier signal frequency means not shown may be employed to place the signal frequency selector buttons or similar mechanism, under lock and key at the time the engineer begins his run.
  • the transmitter has a transmitting aerial or antenna 13 from which the carrier signals emanate. This antenna may be directional or non-directional depending on the areas and directions which it is desired to cover during transmission of radio signals from the transmitter 10.
  • a signal generator 14 Electrically connected to the transmitter 10 and also operated by battery 11 is a signal generator 14 which is capable of generating sonic, or, as in the exemplied embodiment, supersonic frequency signals which may then be transmitted as by superimposing them upon the carrier signal generated by the transmitter it).
  • supersonic frequencies as used in this context refers to frequencies above the normal audible range and well below the frequency of the carrier wave where such is used.
  • a variable condenser or other control means 15 for varying the frequency of the signal generated by the supersonic signal generator 14 in a predeterminedV manner.
  • the variable control means 15 is capable of acting upon the supersonic generator for varying the frequency of the supersonic signal through a predetermined scale of values by physical movement of the control.
  • a cyclometer On the ordinary locomotive there is an instrument .16 called a cyclometer which is directly driven through a linkage such as cable 17 to the wheel 1S which may be one of the truck wheels on a truck mechanism i9 of the locomotive.
  • Linkage 20 extends from the cyclometer to a speed reducer 21. If so desired, the cyclometer 16 may not be employed but the linkage 29 may co-extend with 17 so as to form a direct driving connection with the speed reducer 21.
  • a driving connection 22 connects the speed reducer 21 with reversing mcchanism 23 such that the take-oi linkage 24 may be operated at the same speed ratio in either direction to drive the variable control 15 on the supersonic signal generator i4.
  • a clutch device 25 is interposed in the drive linkage 24 for resetting the variable control 15 at the beginning of cach run and at various check points along the division whenever it becomes necessary to adjust and correct for misalignment or other cause of inaccurate transiation of the rotating wheel 18 on the road track 26 to linearly vary the control 15.
  • the reduced speed of the linkage 24 attached to the variable control 15 as compared to the speed of wheels 18 is such an infinitesimal ratio that the entire run of the locomotive having the truck 19 and wheels .18v from the beginning of the division to the terminal thereof (such as from the point A on the map of Fig.
  • a useful rate of change of supersonic frequency is 100 cycles for each mile traversed.
  • a frequency of 20,000 cycles may arbitrarily be selected to correspond with the beginning division point A and a frequency of 40,000 cycles assigned to the end of the division at point E, each mile of the 200 mile division corresponding to a hundred cycle change in supersonic frequency.
  • variable control 15 all locomotives traveling on this division will have theirrsupersonic signal generators controlled by variable control 15 such that they will emit the same frequency of supersonic signal Whenever at that same point along the division.
  • variable control 15 When a train is running in a direction from division point A to terminal E the rotation of linkage 24 will be in one direction and when the train is running from division point E to terminal A the reversing mechanism 23 will be changed so as to operate the linkage 24 at the same speed in the opposite direction and the cycle change occurring in the supersonic signal generator 14 will be from 40,000 cycles back to 20,000 cycles, but always having a fixed value for any given point on the division.
  • At intervals along the track of the division may be placed indicia such as sign posts bearing the absolute value of the number of cycles corresponding to the checkpoint position along the tracks on the division.
  • indicia such as sign posts bearing the absolute value of the number of cycles corresponding to the checkpoint position along the tracks on the division.
  • the assigned supersonic frequency would be 24,000 cycles with point A assigned 20,000 cycles and point E assigned 40,000 cycles.
  • point D would have an assigned supersonic frequency of 29,500.
  • the locomotive engineer passes any particular checkpoint he may refer to a dial associated with the variable control 1S on the supersonic generator or to a meter 27 which will indicate visually the absolute value of the supersonic frequency which is presently being generated by the supersonic genera-tor 14.
  • this value is an excess of the assigned value at the particular check-point which he then is passing he will manually adjust the clutch device 25 so as to set back the variable control 15 to produce the corresponding frequency as shown by meter 27 and thereby correspond to the correct assigned frequency for-the check-point.
  • his visual indication of the frequency as shown on meter 27 is lower than that required by the check point he will manually adjust the clutch in the opposite direction luntil the two values coincide.
  • the clutch device 25 may thus operate much in the same manner as the setting of the hands of a clock to the proper posi-tion without interfering with the subsequent continued operation of the device.
  • an electronic receiver 23 having a receiving antenna 29 which may be of a Vdirectional or a non-directional construction as desired.
  • a loudspeaker 40 may be connected to the receiver 28 so as to give the locomotive engineer means for receiving audibly a signal from the electronic receiver 28.
  • the receiver 2S is capable of receiving the supersonic signal generated and transmitted by other locomotives on the division through antenna 29 and is also capable of receivintT a small low power portion of its own supersonic signal through the conductor 4l which will set up a beat frequency with the supersonic signal of any other locomotive in the vicinity which may be measured and indicated by a meter 42 indicating the frequency value of the beats between the supersonic signals of the 4two locomotives in question.
  • This beat frequency likewise may be translated into an audible sound through speaker 40 so as to indicate the value of the lbeat frequency when it becomes low enough to fall within the audible range thereby indicating that another locomotive is within some predetermined distance such as 10 miles by way of example.
  • Other means responsive to the beat frequency such as a warning light which may ash at a predetermined beat frequency may be substituted or employed in addi tion to those devices already described.
  • the beat signal will lessen in value as shown by the beat frequency meter 42 and may be further evidenced by a lowering of the tone generatedv 'siding (always having its supersonic generator operating) and a moving train passes the stationary train on the main track the signal will acquire a zero beat at the exact point at which they pass, the tone again increasing after pass ing so as to continuously apprise the engineers of the relative distance separating them.
  • the 'signal strength of the ⁇ supersonic signal produced by generators 14 in the various locomotive -cabs are more strongly received by the near locomotive and less strongly received by those farther away.
  • lt is a-lso an inherent feature of my invention that the beat frequency as well as the audible manifestation of the beat frequency, will always measure the relative :distance between two locomotives regardless of where they are actually located on the entire length of the division.
  • a tive mile separation near the division point E yon the map of Fig. l will be evidenced by the same values of sound and the same meter reading, either expressed in beat cycles or directly as miles as a five mile separation at another location as in the vicinity of station C on the same division.
  • Thi-s l is true despite the fact that the absolute values of the supersonic signal in terms of cycles are different for each of the locomotives at the respectively different station locations.
  • a scanning switch 43 including a variable condenser or electronic tuning device which may be attached to receiver 28 and rotatable or reciprocable as required by such driving mechanism as motor 44 through linkage 45 t-o continuously scan the signals transmitted by all the Ktrains on a division or all the classes of trains on one division as may be applicable to completely protect scanning mechanism can sequentially contact each of thev plurality of wave lengths each assigned to a train or to a class of trains.
  • 10 carrier wave leng-ths are a useful number and may be assigned in such a manner that 5 of the wave bands may be given t-o 5 classes of trains moving in one direction on the railway division and the remaining 5 assigned to classes of trains moving in the opposite direction.
  • a practical example of the assignmen-t of wave lengths is the division of trains into passenger trains on regular schedule, passenger extras, through freight trains, local freight trains and work trains. Assuming that l0 carrier frequencies are used, a band width, including a guard band between channels, of .50 megacycle would -be a useful sepa-ration.
  • Such band width would allow l5 kilocycles frequency modulation of the carrier signal in either direction from the zero refer-ence line which amounts to a total band wid-th of 30 kilocycles leaving a'guard band of 20 kilocycles between channels.
  • a frequency of 278.5() megacycles were employed as the lower limit of the 10 frequencies chosen the upper ⁇ or 10th band frequency would be 23.95 megacycles.
  • the scanning Iswitch 43 is so constructed that they will hold each channel of the 10 carrier frequency wave bands for a period just long enough to make a firm impressi-on upon the engineer observing the signals but not so long as to unduly prolong the time for a complete cycle of the switch 43 through the l() channels and back to the iirst.
  • the reason for this latter limitation is that in case the engineer misses an impression where a train is traveling at a high rate of speed towards him in the vicinity of his own travel, several minutes translated into distances traveled may bring the trains into extremely close proximity before the engineers may be fully apprised of the danger.
  • a practical time limit has thus been established in the neighborhood of 3 seconds for each transmitted wave length scanned by scanning switch 43.
  • the entire cycle of scanning would comprise 30 seconds.
  • a train traveling at 60 miles an hour would travel a half mile during the scanning cycle. Since it is only the beat frequencies which the engineer hears or sees on the dial arranged for that purpose, he will normally have no impression whatsoever from any of the 10 bands scanned by the switch 43 until a train comes within some predetermined distance such as 10 or 20 miles. In extreme cases there may be several trains within this distance in which case he will receive 3 second periods of audible tones whenever the scanner 43 is operative followed by other 3 second periods of silence for those trains not operating on so far distant as not to create an audible beat. The lowest of the audible tones will be obvious to him and will so identify the carrier band of the train which is nearest to him.
  • the engineer of each train will obviously want to communicate with the other and tind out if this proximity of the trains to each other is natural or unnatural and to decide what course should be pursued to best complete their individual schedules with the least amount of interference to the other.
  • the communication is accomplished as follows: One of the two engineers picks up his microphone 46 which is normally disconnected from the transmitter it? by the open switch 47 which interrupts the circuit through conductors 48 and 49.
  • the switch or contact 47 is connected in doublepole 'fashion to switch 5@ both of which operate simultaneously and may be controlled as by a thumb button or other ordinary switch handle closely associated with the microphone 46.
  • the microphone 46 When the double-pole switch is closed the microphone 46 is connected for use with the transmitter 10 and simultaneously with the closing of the switch 50 a relay 51 is energized so as to throw the closed switch 52 in the motor circuit to open position thereby interrupting the rotary movement of the motor 44 and the scanning of switch 43.
  • the engineer can thus close the double-pole switch 47-50 after receiving an audible impression from the locomotive to which is assigned a particular carrier wave length having a superimposed modulated frequency indicating unusual nearness. Since the impression will last for several seconds the immediate interruption of the motor 44 will stop the scanning switch 43 before the 3 second span has been traversed by scanner 43 and the receiving mechanism will be held in tuned cooperation with the desired carrier wave length.
  • the dispatchers office may be equipped with a voice transmitter 6i) which may be tunned to the carrier wave lengths of any of the trains operating L mitter may have push button selectors or a dial selector (not shown) which is common to voice transmitters.
  • the microphone 61 is employed in the usual manner to generate an audio signal for transmission from antenna 62.
  • a receiving set 63 bearing an antenna 64 and connected to a loud speaker 65 which receiving set likewise is tunable to the various carrier wave lengths of the transmitters located on the individual locomotives. Since the dispatcher has cut in on one of the wave lengths being scanned by the locomotive scanning switch on its receiver the engineer can then stop the motor 44 in Fig.
  • a signal frequency to which the voice receiver 63 can be tuned may be established in the dispatchers office.
  • Each of the receivers would be permanently tuned to the carrier wave length of a locomotive so as to give a running recorded chart of its movement on the division.
  • a section of the tape 69 such as is used in these recorders is illustrated in Fig. 5.
  • the tape 69 is slowly progressing in an upwardly direction so that the hours signified at the left hand side of the tape pass a lixed point in the recorder at the exact time indicated thereon.
  • the width of the tape corresponds to the mileage distance of the total division from beginning point A to the other terminal E as indicated on the map of Fig. 1.
  • Corresponding to the mileage figures extending across the tape are the kilocycle values of supersonic frequencies matching the mileage figures.
  • a locomotive may have a carrier signal assigned it to be detected by receiver No. 1.
  • the supersonic modulation imposed upon the carrier signal will vary as heretofore described but the carrier will remain a constant-value so as to be constantly received by receiver No. 1.
  • the chart recorder has recording means such as an ink point or pen commonly used in such devices, The pen will respond to the change in supersonic wave frequency so as to cause it to move across the tape between the kilocycle values of 20 to 40 as have been arbitrarily selected for the fanciful division shown in Fig. l.
  • the progress of the train as recorded on tape 69 in Fig. 5 is from terminal E to terminal A and beginning at 7:08 a. rn.
  • the slope of the line across the chart indicates the rate of speed.
  • the dispatcher thus can observe that the train traveled at a uniform rate of speed from station E to station D and in between the remaining stations traveled at a uniform speed slightly less than that between the stations E and D.
  • the average speed may be determined by the slope of a straight line drawn between the intersection of the ink line with station E and the intersection of the same line with the line indicating station A.
  • the signal picked up by this composite receiver 73 through antenna 74 is thus recorded by chart recorder 75 to form a composite record on the tape 76 as illustrated in Fig. 6.
  • This chart or tape shows three types of trains and their complete schedule over a period of time ranging from 6:30 in the morning to 1:00 p. m. in the afternoon.
  • a single ink line is produced by the single recording device but the time periods selected by the scanning switch are such as to make several dotted lines indicating the relative positions of all trains rather than a single line for but one train.
  • the path of the recorded line is illustrated in Fig. 7 which is an enlarged portion of the recordings of Fig. 6 in the time period including l0 oclock in the morning to 11:30 in the same morning.
  • the scanning device 70 causes the needle or pen 80 on the chart recorder 75 to rst indicate for a small interval a portion of the travel of the second section as shown in Fig. 6. This line is indicated at 77 in Fig. 7.
  • the recording needle or pen 80 then progresses to line 78 and records the progress of the passenger train shown in Fig. 6. After the prescribed interval of recording the pen 80 jumps over to the line 79 which indicates the same predetermined interval of the traveling of the work train whose complete path is shown in Fig. 6.
  • the spaces between the dotted lines may be physically filled in by the dispatcher in order to interpolate the path of each train during its unrecorded interval or may be read visually without the aid of such actual interpolation.
  • a complete composite recording may be made with a single chart recorder coupled with a single receiver scannedA by a scanning mechanism 70 to thereby tune in for short periods of time, the carrier signals of all trains operating on a division at the same time.
  • a radio transmitter associated with each locomotive having as three of the component parts thereof a signal generator for producing radio carrier waves of preselected xed frequency, a generator for producing modulating signals of controlled frequency and a variable control unit for varying the said frequency of the modulating signals with movement of said variable control, driving linkage having a high ratio of reduction physically responsive to travel of said locomotive over said tracks, Vand a connection through said driving linkage with said variable control unit whereby movement -of a locomotive with respect to said tracks will be linearly translated to a change in frequency of said modulating signals.
  • a radio transmitter associated with each locomotive having as Vcomponent parts thereof Ia signal generator for producing carrier waves of preselected fixed frequency, 1a supersonic generator for producing signals of controlled frequency and a variable control unit for varying the said frequency of the supersonic signals with movement of said variable control, and linkage means connected to a locomotive Wheel adapted to roll over the ground and also connected to said variable control whereby movement of -a locomotive with respect to said ground will be linearly translated -to a change in frequency of said supersonic signals.
  • a radio transmitter associated with each locomotive having as component parts thereof a first signal generator for producing modulated carrier waves Within a preselected band, a second signal generator for producing modulating signals of controlled frequency and a variable control unit for varying t-he said frequency of the modulating signals with movement yof said variable control, driving linkage having a high ratio 4of reduction physically responsive to travel of said locomotive over said tracks, and ya connection through said driving linkage with said variable control unit whereby movement of a locomotive with respect to said tracks will be linearly translated to Ia change in frequency of said modulating signals.
  • a railway communication signal system for controlling the scheduling of trains andl for reducing the likelihood of collision between trains comprising, a radio transmitter lassocia-ted with a first ⁇ of said trains for emitting carrier signals of predetermined frequency and with controlled modulating frequency superimposed thereon, means for varying themodulating frequency of said signals linearly with travel-'of said first Ytrain-each point in.
  • a radio transmitter Iassociated with ya second of said trains for emitting signals of predetermined frequency
  • ⁇ -radio receiving means associated with each ofsaid .rst and second trains for-,measuring the beat frequencies between the modulation signal of its own transmitter and the signal of theothertrain whereby the beat frequency between modulating frequencies becomes a measure of the physical distance between said first and second trains.
  • a radio transmitter associated with each locomotive having as component parts thereof a generator for producing a carrier signal, a supersonicA generator for superimposingV on said carrier signal modulating signals of controlled frequency and a variable control unit for varying the said supersonic modulating requency by movement of saidrvariable control, driving linkage having a high ratio of reduction physically re-v sponsive to travel of said locomotive over said tracks, a connection through said driving linkage with said variable control whereby movement of a locomotive with respect to said tracks will be linearly translated to a change of frequency of said modulating signal, and a radio receiver located in a station-,such as a dispatcher-s office for automatically indicating to the dispatcher the position of each locomotive operating within said given area of ground at any given time.
  • a radio transmitter associated with each locomotive-having as component parts thereof a generator for producing a carrier signal a ⁇ generator for producing modulating signals of controlled frequency for super-imposing on said carrier signal and a variable controlA for varying the said modulating frequency by movement of saidvariable.
  • a railway signal system for controlling the scheduling of a multiplicity of trains and locomotives operating on tracks within a given area of ground and for reducing hazards from collision therein the novel combination comprising, a radio transmitter associated with each locomotive having ascomponent parts thereof a signal generator for generating a carrier signal, a supersonic generator for producing modulating signals for superimposing on said carrier signal and a variable con- ⁇ trol for varying the said modulating frequency by movement of the variable control, drivinglinkage having a high ratio of reduction physically responsive to travel of said locomotive over said tracks, a connection through said driving linkage with said variable control whereby movement of a locomotive with respect to said tracks will be linearly translated to a changeL of frequency of said modulatingsignal, a radio receiver located in a dispatchers olce said receiver having a tuning switch scanning device for sequentially receiving the carrier signals together with the modulating signals respectively superimposed thereon for automatically indicating to the dispatcher the absolute position of each locomotive operating within said given area of ground at any given time.
  • ll. ln a railway signal system for facilitating the controlled scheduling of a multiplicity of trains and locomotives operating upon tracks extending between terminals within a given area of ground and for reducing hazards from collision therein, the novel combination comprising, a signal transmitter associated with each locomotive having as two of the component parts thereof a signal generator for producing modulating signals of controlled frequency and a variable controlling mechanism for varying the frequency of the modulation, a ⁇
  • a railway safety signal system for facilitating the controlled schedulingof a multiplicity of trains and locomotives operating over tracks within a given area of ground and for reducing hazards from collision therein, the novel combination comprising, a signal transmitter associated with each locomotive and adapted to produce a carrier signal of preselected frequency, a signal generator associated with said transmitter for superimposing upon said carrier signal a frequency modulation, a variable control mechanism having a movable element for varying the frequency of said modulation, and driving linkage having a high ratio of reduction physically responsive to travel of said locomotive over said tracks and a connection through said driving linkage with said variable control mechanism wherebyl movement of the locomotive with respect to said tracks will be linearly translated to a correspondingchange in frequency of said modulation.
  • a radio transmitter associated with each locomotive having as two of the component parts thereof a generator for producing frequency modulated signals of controlled frequency and a variable control mechanism having a movable element for varying the said frequency specically for each increment of the full extent of said tracks between the terminals thereof, and driving linkage connected to locomotive wheels traveling upon said tracks and also connected with the movable element on said variable control mechanism whereby movement of the locomotive with respect to said tracks will be linearly translated to a corresponding change in frequency of said modulation.

Description

Feb. 26, 1957 l1.v H. WEBER l 2,783,369
RADIO TRANSMITTING AND RECEIVING SIGNAL SYSTEM Filed Nov. 23, 1951 2 Sheets-Sheet 1 Feb. 26, 1957 E, H, WEBER 2,783,369
RADIO TRANSMITTING AND RECEIVING SIGNAL SYSTEM Filed NOV. 25, 1951 2 Sheets-Sheet `I?.
7/ if 70 yZL Moro/2 United States Patent `-O RADIO TRANSMITTING AND RECEIVING SIGNAL SYSTEM Edmund H. Weber, International Falls, Minn., assignor of one-half to Berthel K. Olsson, Fort Francis, Ontario, Canada Application November 23, 1951, Serial No. 257,794
14 Claims. (Cl. 246-30) This invention relates to railroad signal systems electronically produced and controlled for the purpose of minimizing accidents and for increasing the eiiicient operation and scheduling of all the trains currently running on the tracks of a division or subdivision of the railway system.
It is a principal object of this invention to provide means for generating electronic impulses within a train located on tracks of a railway system subject to operational control which varies in a predetermined manner lwith the travel of the train such that for any given location on the divisional tracks of the railway, a characteristic electromagnetic wave signal will be emitted from the transmitter of the train at such location .and the signal will vary linearly with the distance traveled so as to always indicate by its frequency the exact location of such train.
lt is another object of the invention to provide for the reception of transmitted signals associated with each train on a division or subdivision of a railway system and each emitting the same signal frequency whenever at any given same point in the division or subdivision of said railway system.
Another object of the invention is to provide for the reception of signal frequencies emitted from the transmitters of other trains by the receiver of a certain train for beating against the signal frequency of its own transmitter to create a measurable beat indicative of the relative distance within practical limits between it and each of such other trains regardless of their absolute positions in the railway division.
A further object of the invention is to provide for automatically controlling the signal frequency of a radio transmitter located upon a train operating within a railroad division so as to indicate to the dispatcher responsible for the scheduled movement of trains within the division by means of radio receiving equipment the exact location of such train.
lt is a further object of the invention to provide for radio communicating means utilizing electromagnetic wave frequencies which are automatically varied in accordance with the travel of a train having a locomotive equipped with a transmitter and received by a dispatchers oce for correlating the information so obtained from all trains currently operating within the said division so that the dispatcher can determine absolute locations of each train as well as the distances between them.
Another object of the invention is to provide for radio signal equipment located in the cabs of locomotives operating within a railway division which have xed carrier signals upon which signal modulating frequencies may be superimposed and which modulating frequencies vary linearly in accordance with the distance traveled by said trains.
A further object of the invention ispto provide for radio signal equipment located in the cabs of railway locomotives which are capable of operating on an assigned radio frequency with a variable supersonic imposed modulating ice frequency, the characteristic of which allows voice transmission to be carried on by the same equipment.
A still further object of the invention is to provide radio signaling equipment having in addition thereto a radio intercommunication system for engineers in locomotives operating within a division of a railway whereby the locomotive engineers, in response to warning signals, may communicate with one another and with the dispatchers otiice.
These and other objects and advantages of my invention will more fully `appear'from the following `description made in connection with the accompanying drawings wherein like reference characters refer to similar parts throughout the several views and in which:
Fig. 1 is a physical map of an area of ground including a railway right of way constituting a division.
Fig. 2 is a diagrammatic representation of transmitter receiver and supersonic signal vgenerator housed within the cab of a railway locomotive using my signal system.
Fig. 3 is a diagrammatic representation of a voice transmitter, voice receiver and a plurality of supersonically modulated carrier receivers together with associated chart recorders.
Fig. 4 is a diagrammatic representation of one receiver and chart recorder together with a scanning switch device which may substitute for the plurality of receivers and chart recorders in Fig. 3.
Fig. 5 Ais a segment ofthe recorder tape taken from one of the receivers and associated chart recorders shown in Fig. 3 during the progress of a locomotive over the division illustrated in the map of Fig. l.
Fig. 6 is a segment of the composite chart tape taken from the single chart recorder and signal receiver shown in Fig. 4 showing the visual progress of the same train recorded on the chart of Fig. 5 together with a record of the simultaneous travel of a work train and a second section of the passenger train.'
Fig. 7 is an enlarged segment of the lower left hand corner of the chart segment shown in Fig. 6 illustrating the sequential travel of the recording pen of the apparatus shown in Fig. 4 to form a composite recording of the time and motion of the individual trains operating on the division.
Referring more particularly to the drawings, I have indicated a typical railway division in the map of Fig. 1 in which the division points A and E lie 200 miles apart and constitute cities in one of which a head dispatchers office is located and the other of which an assistant dispatchers office is located. Stations B, C and D are typically located along the track constitutingthe division so that in the illustrated map of Fig. 1 the trackagedistance from station A t-o station B is 40 miles, the distance from B to C is 20 miles, the distance from C to D is 35 miles, and the remaining distance from station D to terminal station E is miles. It is, of course, understood that within the main line constituting the division there may be double tracks and sidings which, of course, are within the contemplation of this invention. Spur tracks extending for some distance to the side of the main track and switch yards located at stations such as terminal A are not within the contemplations of this invention since locomotives operating therein are not traveling at such speeds as to constitute hazards to each other and furthermore are subject to rigid control and supervision of a local nature to minimize'accidents from collision. The main ditliculty which must be surmounted in the operation of the plurality of locomotives within a railway division is that of scheduling so as to avoid having two trains traveling at high speed on the same track coming towards one another or one train at high speed approach-V ing another in a stationary position on the same track.
The enormous weight of the locomotive together with such cars as it may be hauling, is such as to create a momentum making it impossible for the engineer to come to a complete stop from full speed in sometimes as short a distance as two miles. Where all trains operate on a strict schedule and no trouble such as inclement weather or mechanical breakdowns cause the trains to become late the entire operation of the trains on a railway division may easily be controlled at the head dispatchers oce so as to have trains which are meeting or passing arrive on schedule at sidings where one may halt while the other one passes on the main line without entailing a long wait for the train which must pull on to the siding. However, since weather conditions and mechanical di'iculties cannot be foreseen it becomes the duty of the dispatcher to watch constantly the schedules of all trains operating within the division and to be able to give new trainV orders which are picked up by the locomotive engineers as they pass through various stations which may change their schedule and cause them to lose a great deal of time waiting on sidings while another train passes through on the main line. Where time is short and a train might experience difficulty in getting to the next siding before an on-coming train passes through, it is customary for the engineer to exercise his judgment. Where caution dictates he must pull his train upon the siding and wait for the other train to pass by. Since the engineer has no direct knowledge of where the other locomotives are at any given time, except through relayed communication with the dispatchers oice in some railway systems, which in any event is a slow means of obtaining information, the human element very often enters in and through misjudgment of either of two engineers, of the dispatcher, or of a station agent along the division line, a disastrous and costly collision may occur. When such disaster occurs it is almost always with a loss of life and property damage extending into thousands and sometimes hundreds of thousands of dollars.
My invention seeks to utilize by a simple electronic phenomenon means for placing the responsibility of avoiding collisions upon the shoulders of the locomotive engineers themselves since they are the best equipped, both from the standpoint of time and interest in the well-being of the train. I have thus sought to minimize the number of hands through which train orders must go in making decisions where there is immediate danger of disaster.. It is-not my intention vto revamp thetsystems of control which are extant in the railway worldtoday but rather to supplement them with a positive and foolproof means of double check-ing thescheduleand` actualV whereabouts of trains in thevicinity of other trains so` as to give the engineers in the locomotives of'such trains ampleV time to draw their own conclusions as to the proper course of conduct to follow and thereby avoiding the consequences of disastrous collisions. It is within the contemplation of this invention to provide for such extreme conditions that two-approaching trains may even halt their forward progress in sufcient time to avoid collision ata point where no station, outdoor signaldevices or sidings exist.
The equipment constituting my invention is largely electronic and may be included entirely within the confines of a locomotive cab although-it is possible to have my railway signal system located elsewhere in the' train and operated by the conductor, for example, who would in turn instruct the engineer when an emergency arises. It is also within the contemplation of the invention to equip some locomotives with less than the entire amount of complete radio equipment thereby to warn but one of two engineers, thus effecting a certain measure of safeguard. lt is thought that railway companies employing the system will prefer to have the double-check heretofore mentioned whereby each .engineer of bothlocomo.- tives in the same vicinity` have equal-knowledgeof the whereabouts of the other. In detailed description the equipment thus installed in one of the cabs is as follows, it being understood that all locomotives may be similarly equipped: A transmitter 10 as shown in Fig. 2 is operated by a battery 11 which likewise energizes all the electronic equipment within the cab. The battery 11 may be supplanted by an electric generator or by electric power the equipment for which is already installed in the locomotive. It is felt, however, that battery operation is to be preferred since failure of .a generating system would disrupt the entire electronic operation of my invention. It is, of course, to be preferred that the battery 11 have means of recharging or replacement at any time. The transmitter itl-may be-of ordinary construction capable of generatinga radio signal of controlled frequency. This signal may be a supersonic modulated carrier signal as more fully described hereafter. Push buttons i2 may be employed to select thc particular carrier signal frequency which will `be used by the transmitter of the locomotive in question during a particular run on the railroad division. ln order to prevent anaccidental alteration of the preselected carrier signal frequency means not shown may be employed to place the signal frequency selector buttons or similar mechanism, under lock and key at the time the engineer begins his run. The transmitter has a transmitting aerial or antenna 13 from which the carrier signals emanate. This antenna may be directional or non-directional depending on the areas and directions which it is desired to cover during transmission of radio signals from the transmitter 10. Electrically connected to the transmitter 10 and also operated by battery 11 is a signal generator 14 which is capable of generating sonic, or, as in the exemplied embodiment, supersonic frequency signals which may then be transmitted as by superimposing them upon the carrier signal generated by the transmitter it). It is to be understood that supersonic frequencies as used in this context refers to frequencies above the normal audible range and well below the frequency of the carrier wave where such is used. In conjunction with the supersonic signal generator 14 is a variable condenser or other control means 15 for varying the frequency of the signal generated by the supersonic signal generator 14 in a predeterminedV manner. There are several means which r may be employed to create this controlled variation in supersonic frequencies such as variable capacitance, inductance or resistance. In each case, the variable control means 15 is capable of acting upon the supersonic generator for varying the frequency of the supersonic signal through a predetermined scale of values by physical movement of the control.
On the ordinary locomotive there is an instrument .16 called a cyclometer which is directly driven through a linkage such as cable 17 to the wheel 1S which may be one of the truck wheels on a truck mechanism i9 of the locomotive. Linkage 20 extends from the cyclometer to a speed reducer 21. If so desired, the cyclometer 16 may not be employed but the linkage 29 may co-extend with 17 so as to form a direct driving connection with the speed reducer 21. A driving connection 22 connects the speed reducer 21 with reversing mcchanism 23 such that the take-oi linkage 24 may be operated at the same speed ratio in either direction to drive the variable control 15 on the supersonic signal generator i4. A clutch device 25 is interposed in the drive linkage 24 for resetting the variable control 15 at the beginning of cach run and at various check points along the division whenever it becomes necessary to adjust and correct for misalignment or other cause of inaccurate transiation of the rotating wheel 18 on the road track 26 to linearly vary the control 15. The reduced speed of the linkage 24 attached to the variable control 15 as compared to the speed of wheels 18 is such an infinitesimal ratio that the entire run of the locomotive having the truck 19 and wheels .18v from the beginning of the division to the terminal thereof (such as from the point A on the map of Fig. l to the point E 200 miles away) will actuate the variable control of the supersonic signal generator 14 through a relatively small physical distance so as to modify linearly the frequency of the supersonic signal through a predetermined range. By way of example, a useful rate of change of supersonic frequency is 100 cycles for each mile traversed. In terms of supersonic frequencies a frequency of 20,000 cycles may arbitrarily be selected to correspond with the beginning division point A and a frequency of 40,000 cycles assigned to the end of the division at point E, each mile of the 200 mile division corresponding to a hundred cycle change in supersonic frequency. It is to be noted that all locomotives traveling on this division will have theirrsupersonic signal generators controlled by variable control 15 such that they will emit the same frequency of supersonic signal Whenever at that same point along the division. When a train is running in a direction from division point A to terminal E the rotation of linkage 24 will be in one direction and when the train is running from division point E to terminal A the reversing mechanism 23 will be changed so as to operate the linkage 24 at the same speed in the opposite direction and the cycle change occurring in the supersonic signal generator 14 will be from 40,000 cycles back to 20,000 cycles, but always having a fixed value for any given point on the division.
At intervals along the track of the division may be placed indicia such as sign posts bearing the absolute value of the number of cycles corresponding to the checkpoint position along the tracks on the division. By way of example, for point B on the map of Fig. 1 the assigned supersonic frequency would be 24,000 cycles with point A assigned 20,000 cycles and point E assigned 40,000 cycles. Likewise, by way of further illustration point D would have an assigned supersonic frequency of 29,500. As the locomotive engineer passes any particular checkpoint he may refer to a dial associated with the variable control 1S on the supersonic generator or to a meter 27 which will indicate visually the absolute value of the supersonic frequency which is presently being generated by the supersonic genera-tor 14. lf this value is an excess of the assigned value at the particular check-point which he then is passing he will manually adjust the clutch device 25 so as to set back the variable control 15 to produce the corresponding frequency as shown by meter 27 and thereby correspond to the correct assigned frequency for-the check-point. Likewise, if his visual indication of the frequency as shown on meter 27 is lower than that required by the check point he will manually adjust the clutch in the opposite direction luntil the two values coincide. The clutch device 25 may thus operate much in the same manner as the setting of the hands of a clock to the proper posi-tion without interfering with the subsequent continued operation of the device.
Also energized by the battery 11 is an electronic receiver 23 having a receiving antenna 29 which may be of a Vdirectional or a non-directional construction as desired. A loudspeaker 40 may be connected to the receiver 28 so as to give the locomotive engineer means for receiving audibly a signal from the electronic receiver 28. The receiver 2S is capable of receiving the supersonic signal generated and transmitted by other locomotives on the division through antenna 29 and is also capable of receivintT a small low power portion of its own supersonic signal through the conductor 4l which will set up a beat frequency with the supersonic signal of any other locomotive in the vicinity which may be measured and indicated by a meter 42 indicating the frequency value of the beats between the supersonic signals of the 4two locomotives in question. This beat frequency likewise may be translated into an audible sound through speaker 40 so as to indicate the value of the lbeat frequency when it becomes low enough to fall within the audible range thereby indicating that another locomotive is within some predetermined distance such as 10 miles by way of example. Other means responsive to the beat frequency, such as a warning light which may ash at a predetermined beat frequency may be substituted or employed in addi tion to those devices already described. If the trains are approaching one another the beat signal will lessen in value as shown by the beat frequency meter 42 and may be further evidenced by a lowering of the tone generatedv 'siding (always having its supersonic generator operating) and a moving train passes the stationary train on the main track the signal will acquire a zero beat at the exact point at which they pass, the tone again increasing after pass ing so as to continuously apprise the engineers of the relative distance separating them. There is an attribute of my invention inherent in that the 'signal strength of the `supersonic signal produced by generators 14 in the various locomotive -cabs are more strongly received by the near locomotive and less strongly received by those farther away. lt is a-lso an inherent feature of my invention that the beat frequency as well as the audible manifestation of the beat frequency, will always measure the relative :distance between two locomotives regardless of where they are actually located on the entire length of the division. Thus a tive mile separation near the division point E yon the map of Fig. l will be evidenced by the same values of sound and the same meter reading, either expressed in beat cycles or directly as miles as a five mile separation at another location as in the vicinity of station C on the same division. Thi-s lis true despite the fact that the absolute values of the supersonic signal in terms of cycles are different for each of the locomotives at the respectively different station locations.
We have now been considering the relative movements of only two locomotives on the division without regard to any other locomotives which may also 'be operating at the same time. In order to be constantly apprised of the relative positions 4of any locomotives which may be near enough to cause any `degree of concern I have provided for a scanning switch 43 including a variable condenser or electronic tuning device which may be attached to receiver 28 and rotatable or reciprocable as required by such driving mechanism as motor 44 through linkage 45 t-o continuously scan the signals transmitted by all the Ktrains on a division or all the classes of trains on one division as may be applicable to completely protect scanning mechanism can sequentially contact each of thev plurality of wave lengths each assigned to a train or to a class of trains. By way of example, it 'has been found that 10 carrier wave leng-ths are a useful number and may be assigned in such a manner that 5 of the wave bands may be given t-o 5 classes of trains moving in one direction on the railway division and the remaining 5 assigned to classes of trains moving in the opposite direction. More specifically, a practical example of the assignmen-t of wave lengths is the division of trains into passenger trains on regular schedule, passenger extras, through freight trains, local freight trains and work trains. Assuming that l0 carrier frequencies are used, a band width, including a guard band between channels, of .50 megacycle would -be a useful sepa-ration. Such band width would allow l5 kilocycles frequency modulation of the carrier signal in either direction from the zero refer-ence line which amounts to a total band wid-th of 30 kilocycles leaving a'guard band of 20 kilocycles between channels. Thus, if a frequency of 278.5() megacycles were employed as the lower limit of the 10 frequencies chosen the upper `or 10th band frequency would be 23.95 megacycles. The scanning Iswitch 43 is so constructed that they will hold each channel of the 10 carrier frequency wave bands for a period just long enough to make a firm impressi-on upon the engineer observing the signals but not so long as to unduly prolong the time for a complete cycle of the switch 43 through the l() channels and back to the iirst. The reason for this latter limitation is that in case the engineer misses an impression where a train is traveling at a high rate of speed towards him in the vicinity of his own travel, several minutes translated into distances traveled may bring the trains into extremely close proximity before the engineers may be fully apprised of the danger. A practical time limit has thus been established in the neighborhood of 3 seconds for each transmitted wave length scanned by scanning switch 43. Thus, in the example cited the entire cycle of scanning would comprise 30 seconds. A train traveling at 60 miles an hour would travel a half mile during the scanning cycle. Since it is only the beat frequencies which the engineer hears or sees on the dial arranged for that purpose, he will normally have no impression whatsoever from any of the 10 bands scanned by the switch 43 until a train comes within some predetermined distance such as 10 or 20 miles. In extreme cases there may be several trains within this distance in which case he will receive 3 second periods of audible tones whenever the scanner 43 is operative followed by other 3 second periods of silence for those trains not operating on so far distant as not to create an audible beat. The lowest of the audible tones will be obvious to him and will so identify the carrier band of the train which is nearest to him. The engineer of each train will obviously want to communicate with the other and tind out if this proximity of the trains to each other is natural or unnatural and to decide what course should be pursued to best complete their individual schedules with the least amount of interference to the other. The communication is accomplished as follows: One of the two engineers picks up his microphone 46 which is normally disconnected from the transmitter it? by the open switch 47 which interrupts the circuit through conductors 48 and 49. The switch or contact 47 is connected in doublepole 'fashion to switch 5@ both of which operate simultaneously and may be controlled as by a thumb button or other ordinary switch handle closely associated with the microphone 46. When the double-pole switch is closed the microphone 46 is connected for use with the transmitter 10 and simultaneously with the closing of the switch 50 a relay 51 is energized so as to throw the closed switch 52 in the motor circuit to open position thereby interrupting the rotary movement of the motor 44 and the scanning of switch 43. The engineer can thus close the double-pole switch 47-50 after receiving an audible impression from the locomotive to which is assigned a particular carrier wave length having a superimposed modulated frequency indicating unusual nearness. Since the impression will last for several seconds the immediate interruption of the motor 44 will stop the scanning switch 43 before the 3 second span has been traversed by scanner 43 and the receiving mechanism will be held in tuned cooperation with the desired carrier wave length. When the engineer begins to speak into the microphone 46 snatches of conversation will be heard by the other engineer when his scanning device contacts the carrier wave length received from the locomotive of the tirst engineer. He then likewise can close his double pole switch 47-50 at the` proper point in the scanning cycle and established voice communication with the first engineer. it is to be noted that relay 5i will also open the closed switch 52a which opens the circuit to the signal generator thus interrupting the.
propagation of a signal which will beat with that of the other engineer and interfere with intelligibility.
Although the signal systemwhich has been described thus far will'greatly aid in minimizing accidents through intercommunication between locomotives, I may'further improve the railway signal system by providing for cornmunication between the locomotive engineers and the dispatchers ofce as well. Thus, it is possible for the dispatcher to have a continuous record of all trains operating in his division and to be able to selectively cornmunicate with any engineer as he desires. Where the dispatcher has fullknowledge of the positions and rates of speed of each of the trains, he is thereby able to change train orders in a much shorter time than if he were to receivethe positions of trains from local station agents, correlate the information, re-schedule certain trains, relay the information to the station agents and finally have the station agents hand the engineers of the locomotives their new orders as the train passes the station.V Many serious collisions have occurred because the last possible station for communication had already been passed by the engineer and there was no further means of reaching him. In such tragic circumstances it is not uncommon `for the station agent who has knowledge of an impending collision to send out wrecking crews and ambulances welt in advance of the collision which is certain to occur.
Referring to Fig. 3, the dispatchers office may be equipped with a voice transmitter 6i) which may be tunned to the carrier wave lengths of any of the trains operating L mitter may have push button selectors or a dial selector (not shown) which is common to voice transmitters. The microphone 61 is employed in the usual manner to generate an audio signal for transmission from antenna 62. To complete the communication there is a receiving set 63 bearing an antenna 64 and connected to a loud speaker 65 which receiving set likewise is tunable to the various carrier wave lengths of the transmitters located on the individual locomotives. Since the dispatcher has cut in on one of the wave lengths being scanned by the locomotive scanning switch on its receiver the engineer can then stop the motor 44 in Fig. 2 so as to maintain contact with the carrier wave employed by the dispatchers transmitter and in turn can establish through one of his selector buttons 12 a signal frequency to which the voice receiver 63 can be tuned. Also, in the dispatchers office may be placed, a plurality of receivers 6o bearing antennae 67 and each having a chart recorder 68 which may be similar to the strip chart recorder manufactured by Leeds and Northrop called the Speedornax Recorder, sometimes used by the U. S. Weather Bureau. Each of the receivers would be permanently tuned to the carrier wave length of a locomotive so as to give a running recorded chart of its movement on the division. A section of the tape 69 such as is used in these recorders is illustrated in Fig. 5. In this instance the tape 69 is slowly progressing in an upwardly direction so that the hours signified at the left hand side of the tape pass a lixed point in the recorder at the exact time indicated thereon. The width of the tape corresponds to the mileage distance of the total division from beginning point A to the other terminal E as indicated on the map of Fig. 1. Corresponding to the mileage figures extending across the tape are the kilocycle values of supersonic frequencies matching the mileage figures.
Thus, by way of illustration a locomotive may have a carrier signal assigned it to be detected by receiver No. 1. The supersonic modulation imposed upon the carrier signalwill vary as heretofore described but the carrier will remain a constant-value so as to be constantly received by receiver No. 1. The chart recorder has recording means such as an ink point or pen commonly used in such devices, The pen will respond to the change in supersonic wave frequency so as to cause it to move across the tape between the kilocycle values of 20 to 40 as have been arbitrarily selected for the fanciful division shown in Fig. l. The progress of the train as recorded on tape 69 in Fig. 5 is from terminal E to terminal A and beginning at 7:08 a. rn. arriving at station D at 8:25, remaining at this station until 8:45 then proceeding to station C where it arrives at 9:20, remaining until 9:35 then proceeding again to station B arriving at 9:55 and leaving at 10:10 and finally proceeding to terminal A where it arrives at 10:55. The slope of the line across the chart indicates the rate of speed. The dispatcher thus can observe that the train traveled at a uniform rate of speed from station E to station D and in between the remaining stations traveled at a uniform speed slightly less than that between the stations E and D. The average speed, of course, may be determined by the slope of a straight line drawn between the intersection of the ink line with station E and the intersection of the same line with the line indicating station A.
Where there are a large number of locomotives operating on a division at the same time it may be inconvenient for the dispatcher to shift his attention one at a time to all the receivers which, under the system illustrated in Fig. 3, amounts to one receiver and recorder in the dispatchers oice for each locomotive. Where it is inconvenient for him to watch such a great plurality of recorders l have provided for a single receiver and recording mechanism having a scanning switch 70 as shown in Fig. 4. The scanning switch is driven by motor 71 through drive cable 72 and covers the range ot' carrier signals emanating from each locomotive in the same manner as the scanning switch 43 sequentially scans the carrier signals of other locomotives. The signal picked up by this composite receiver 73 through antenna 74 is thus recorded by chart recorder 75 to form a composite record on the tape 76 as illustrated in Fig. 6. This chart or tape shows three types of trains and their complete schedule over a period of time ranging from 6:30 in the morning to 1:00 p. m. in the afternoon. A single ink line is produced by the single recording device but the time periods selected by the scanning switch are such as to make several dotted lines indicating the relative positions of all trains rather than a single line for but one train. The path of the recorded line is illustrated in Fig. 7 which is an enlarged portion of the recordings of Fig. 6 in the time period including l0 oclock in the morning to 11:30 in the same morning. It may thus be seen that the scanning device 70 causes the needle or pen 80 on the chart recorder 75 to rst indicate for a small interval a portion of the travel of the second section as shown in Fig. 6. This line is indicated at 77 in Fig. 7. The recording needle or pen 80 then progresses to line 78 and records the progress of the passenger train shown in Fig. 6. After the prescribed interval of recording the pen 80 jumps over to the line 79 which indicates the same predetermined interval of the traveling of the work train whose complete path is shown in Fig. 6. As may be seen from viewing the composite line chart of Fig. 7 the spaces between the dotted lines may be physically filled in by the dispatcher in order to interpolate the path of each train during its unrecorded interval or may be read visually without the aid of such actual interpolation. In any event a complete composite recording may be made with a single chart recorder coupled with a single receiver scannedA by a scanning mechanism 70 to thereby tune in for short periods of time, the carrier signals of all trains operating on a division at the same time.
It may thus be seen that I have established a railroad signal system which will save many lives and prevent damage to a great deal of personal property. In addition to the saving of lives and property, the system when ex- 10 tended and coupled with the dispatchers otce will also enable a faster and more eicient controlling and scheduling of the trains operating on a railway division thus saving considerable time in the transportation of passengers and goods. Itis also possible to eliminate many of the intermediate station agents whose duties would become superuous when my system is employed. -Other than such curtailment of personnel, my system can easily be adapted to those already employed in present day practice by the majority of railroads.
It will, of course, be understood that various changes may be made in the form, details, arrangement and proportions of the parts without departing from the scope of my invention.
What I claim is:
l. In a railway signal system for controlling the scheduling of a multiplicity =of trains and locomotives operating lon tracks within a given area of ground and for reducing hazards from collision therein, the novel combination comprising a radio transmitter associated with each locomotive having as three of the component parts thereof a signal generator for producing radio carrier waves of preselected xed frequency, a generator for producing modulating signals of controlled frequency and a variable control unit for varying the said frequency of the modulating signals with movement of said variable control, driving linkage having a high ratio of reduction physically responsive to travel of said locomotive over said tracks, Vand a connection through said driving linkage with said variable control unit whereby movement -of a locomotive with respect to said tracks will be linearly translated to a change in frequency of said modulating signals.
2. In a railway signal lsystem for controlling the scheduling of a multiplicity of trains land locomotives operating within a given area of ground and for reducing hazards from collision therein the novel combination comprising, a radio transmitter associated with each locomotive having as Vcomponent parts thereof Ia signal generator for producing carrier waves of preselected fixed frequency, 1a supersonic generator for producing signals of controlled frequency and a variable control unit for varying the said frequency of the supersonic signals with movement of said variable control, and linkage means connected to a locomotive Wheel adapted to roll over the ground and also connected to said variable control whereby movement of -a locomotive with respect to said ground will be linearly translated -to a change in frequency of said supersonic signals.
3. In a railway signal system for controlling the schedtiling of a multiplicity -of trains and locomotives operating on tracks within a given area of ground |and for reducing hazards from collision therein the novel combination comprising, a radio transmitter associated with each locomotive having as component parts thereof a first signal generator for producing modulated carrier waves Within a preselected band, a second signal generator for producing modulating signals of controlled frequency and a variable control unit for varying t-he said frequency of the modulating signals with movement yof said variable control, driving linkage having a high ratio 4of reduction physically responsive to travel of said locomotive over said tracks, and ya connection through said driving linkage with said variable control unit whereby movement of a locomotive with respect to said tracks will be linearly translated to Ia change in frequency of said modulating signals.
4. A railway communication signal system for controlling the scheduling of trains andl for reducing the likelihood of collision between trains comprising, a radio transmitter lassocia-ted with a first `of said trains for emitting carrier signals of predetermined frequency and with controlled modulating frequency superimposed thereon, means for varying themodulating frequency of said signals linearly with travel-'of said first Ytrain-each point in. the travel of said lirst traincorresponding to a prede-V termined signal modulation frequency, a radio transmitter Iassociated with ya second of said trains for emitting signals of predetermined frequency, means 4for varying the frequency of modulation of said signals linearly with travel of said second train each -point in the travel of said second train corresponding to the same said predetermined' signal modulation-frequency, and `-radio receiving means associated with each ofsaid .rst and second trains for-,measuring the beat frequencies between the modulation signal of its own transmitter and the signal of theothertrain whereby the beat frequency between modulating frequencies becomes a measure of the physical distance between said first and second trains.
5. A raliwaycommunicationsignalsystem for controlling the scheduling of trains and for reducing the likelihood of collision between trains comprising, a radio transmitter associated with a lirst of said trains for emitting frequency modulated signals of preselected fixed carrier frequencyv and on which modulating signals of variable frequency are superimposed, means for varying the frequency of said modulating signals linearly with travel of said first train each point in the travel of said first train corresponding to a predetermined specic modulating frequency, a radio :transmitter associated with a secondof said trains for emitting frequency modulated signals of preselected hiredy carrier frequency and on which modulating signals of variable frequency are superimposed, means for varying the frequency of saidfmodulating sig nals linearly with travel of said second traine-ach point in the travel of said second train corresponding to the same said predetermined specific modulating frequency, and radio receiving means associated with each of said first and second trains for measuring the. beat frequency between the modulating signal of its own transmitter andv the modulating signal of the transmitter of the other train whereby the beat frequency becomes a measure of the physical distancebetween said lirst and second trains.
6. In a railway signal system for facilitating the scheduling of a multiplicity of trains and locomotives operating on tracks within a given area of ground and which reduces hazards from collision therein the novel combination comprising, a radio transmitter associated with each locomotive having as component parts thereof a generator for producing a carrier signal, a supersonicA generator for superimposingV on said carrier signal modulating signals of controlled frequency and a variable control unit for varying the said supersonic modulating requency by movement of saidrvariable control, driving linkage having a high ratio of reduction physically re-v sponsive to travel of said locomotive over said tracks, a connection through said driving linkage with said variable control whereby movement of a locomotive with respect to said tracks will be linearly translated to a change of frequency of said modulating signal, and a radio receiver located in a station-,such as a dispatcher-s office for automatically indicating to the dispatcher the position of each locomotive operating within said given area of ground at any given time.
7. The subject matter of claim 6 in which said radio receiver in said dispatchers office operates in conjunction with a recording device for plotting the progress-of each locomotive within said area of ground against time.
8. In a railway signal system for controlling the scheduiing of a multiplicity of trains and locomotives operating on tracks within a given area of ground and which reduces hazards from collision, therein the novel combination comprising, a radio transmitter associated with each locomotive-having as component parts thereof a generator for producing a carrier signal a` generator for producing modulating signals of controlled frequency for super-imposing on said carrier signal and a variable controlA for varying the said modulating frequency by movement of saidvariable. control,.driving linkage hav- `ing a high ratio of reduction physically responsive to travel of said locomotive-over said tracks, a connection through said drivingzlinkage with said variable control whereby movement of a locomotive with respect to said tracks will be linearly translated to a change of frequency of said modulating signal anda battery of radio receivers located in a dispatchers ndice for simultaneously automatically indicating to the dispatcher the absolute position of each locomotive operating within said given area of ground at any given time.
9. ln a railway signal system for controlling the scheduling of a multiplicity of trains and locomotives operating on tracks within a given area of ground and for reducing hazards from collision therein the novel combination comprising, a radio transmitter associated with each locomotive having ascomponent parts thereof a signal generator for generating a carrier signal, a supersonic generator for producing modulating signals for superimposing on said carrier signal and a variable con-` trol for varying the said modulating frequency by movement of the variable control, drivinglinkage having a high ratio of reduction physically responsive to travel of said locomotive over said tracks, a connection through said driving linkage with said variable control whereby movement of a locomotive with respect to said tracks will be linearly translated to a changeL of frequency of said modulatingsignal, a radio receiver located in a dispatchers olce said receiver having a tuning switch scanning device for sequentially receiving the carrier signals together with the modulating signals respectively superimposed thereon for automatically indicating to the dispatcher the absolute position of each locomotive operating within said given area of ground at any given time.
l). The subject matter set forth in claim 8 in which the sequentially received modulating signal of each locomotive is visually recorded.
ll. ln a railway signal system for facilitating the controlled scheduling of a multiplicity of trains and locomotives operating upon tracks extending between terminals within a given area of ground and for reducing hazards from collision therein, the novel combination comprising, a signal transmitter associated with each locomotive having as two of the component parts thereof a signal generator for producing modulating signals of controlled frequency and a variable controlling mechanism for varying the frequency of the modulation, a`
signal receiver associated with one of said locomotives for scanning sequentially the-transmitted signal of each of the other locomotives and mixing with its own generated modulating signal whereby an intermittent beat signal will be created with the signals of eachof saidother locomotives indicative of the relative distances between the one locomotive and each ofthe others, and linkage mechanism connected to a wheel of a locomotive on the tracks on the ground and also connectedv to saidvariable control mechanism whereby movement of a locomotive with respect to said tracks will be linearly translated to a modulation of frequency of said signals.
l2. ln a railway safety signal system for facilitating the controlled schedulingof a multiplicity of trains and locomotives operating over tracks within a given area of ground and for reducing hazards from collision therein, the novel combination comprising, a signal transmitter associated with each locomotive and adapted to produce a carrier signal of preselected frequency, a signal generator associated with said transmitter for superimposing upon said carrier signal a frequency modulation, a variable control mechanism having a movable element for varying the frequency of said modulation, and driving linkage having a high ratio of reduction physically responsive to travel of said locomotive over said tracks and a connection through said driving linkage with said variable control mechanism wherebyl movement of the locomotive with respect to said tracks will be linearly translated to a correspondingchange in frequency of said modulation.
13. In a railway signal system for facilitating the controlled scheduling of a multiplicity of trains and locomotives operating upon tracks extending between terminals within a given area of ground and for reducing hazards from collision therein, the novel combination comprising, a radio transmitter associated with each locomotive having as two of the component parts thereof a generator for producing frequency modulated signals of controlled frequency and a variable control mechanism having a movable element for varying the said frequency specically for each increment of the full extent of said tracks between the terminals thereof, and driving linkage connected to locomotive wheels traveling upon said tracks and also connected with the movable element on said variable control mechanism whereby movement of the locomotive with respect to said tracks will be linearly translated to a corresponding change in frequency of said modulation.
14. The subject matter as set forth in claim 13, and visible indicia at a plurality of check points positioned along said tracks and between said terminals said indicia having a specic frequency for each position whereby the engineer of each locomotive may check his indicated frequency with the actual frequencies as specified by said indicia.
References Cited in the le of this patent UNITED STATES PATENTS 1,278,221 Rowntree Sept. 10, 1918 1,747,041 Alexanderson Feb. 11, 1930 1,804,770 Hershfield May 12, 1931 2,460,597 Rodgers Feb. 1, 1949 2,480,160 Poyloy Aug. 30, 1949
US257794A 1951-11-23 1951-11-23 Radio transmitting and receiving signal system Expired - Lifetime US2783369A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US257794A US2783369A (en) 1951-11-23 1951-11-23 Radio transmitting and receiving signal system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US257794A US2783369A (en) 1951-11-23 1951-11-23 Radio transmitting and receiving signal system

Publications (1)

Publication Number Publication Date
US2783369A true US2783369A (en) 1957-02-26

Family

ID=22977773

Family Applications (1)

Application Number Title Priority Date Filing Date
US257794A Expired - Lifetime US2783369A (en) 1951-11-23 1951-11-23 Radio transmitting and receiving signal system

Country Status (1)

Country Link
US (1) US2783369A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3038066A (en) * 1957-07-02 1962-06-05 Barry Leonard Dodge Train to train and track to train control
US3229660A (en) * 1960-05-10 1966-01-18 Singer Inc H R B Apparatus to control steering, speed and coating application of pavement marker
US3268727A (en) * 1964-03-25 1966-08-23 Gibbs & Hill Inc Computer control for transit system
US3318260A (en) * 1963-12-13 1967-05-09 Forrest W Gillespie Automatic railway
US5574469A (en) * 1994-12-21 1996-11-12 Burlington Northern Railroad Company Locomotive collision avoidance method and system
US20060227008A1 (en) * 2005-03-31 2006-10-12 Bryant Jason D Emergency vehicle proximity warning system
US20070225878A1 (en) * 2006-03-20 2007-09-27 Kumar Ajith K Trip optimization system and method for a train
US20130297199A1 (en) * 2006-03-20 2013-11-07 General Electric Company System and method for predicting a vehicle route using a route network database
US8903573B2 (en) 2006-03-20 2014-12-02 General Electric Company Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable
US8924049B2 (en) 2003-01-06 2014-12-30 General Electric Company System and method for controlling movement of vehicles
US9156477B2 (en) 2006-03-20 2015-10-13 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US9669851B2 (en) 2012-11-21 2017-06-06 General Electric Company Route examination system and method
US9682716B2 (en) 2012-11-21 2017-06-20 General Electric Company Route examining system and method
US9689681B2 (en) 2014-08-12 2017-06-27 General Electric Company System and method for vehicle operation
US9702715B2 (en) 2012-10-17 2017-07-11 General Electric Company Distributed energy management system and method for a vehicle system
US9733625B2 (en) 2006-03-20 2017-08-15 General Electric Company Trip optimization system and method for a train
US9828010B2 (en) 2006-03-20 2017-11-28 General Electric Company System, method and computer software code for determining a mission plan for a powered system using signal aspect information
US9834237B2 (en) 2012-11-21 2017-12-05 General Electric Company Route examining system and method
US10308265B2 (en) 2006-03-20 2019-06-04 Ge Global Sourcing Llc Vehicle control system and method
US10569792B2 (en) 2006-03-20 2020-02-25 General Electric Company Vehicle control system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1278221A (en) * 1915-07-14 1918-09-10 Nat Pneumatic Co Railway block system.
US1747041A (en) * 1928-10-27 1930-02-11 Gen Electric Speed-indicating system
US1804770A (en) * 1930-01-16 1931-05-12 Standard Oil Co Structure for signs
US2460597A (en) * 1945-08-04 1949-02-01 Philco Corp Position indication and control system
US2480160A (en) * 1945-06-27 1949-08-30 Standard Telephones Cables Ltd Signaling system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1278221A (en) * 1915-07-14 1918-09-10 Nat Pneumatic Co Railway block system.
US1747041A (en) * 1928-10-27 1930-02-11 Gen Electric Speed-indicating system
US1804770A (en) * 1930-01-16 1931-05-12 Standard Oil Co Structure for signs
US2480160A (en) * 1945-06-27 1949-08-30 Standard Telephones Cables Ltd Signaling system
US2460597A (en) * 1945-08-04 1949-02-01 Philco Corp Position indication and control system

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3038066A (en) * 1957-07-02 1962-06-05 Barry Leonard Dodge Train to train and track to train control
US3229660A (en) * 1960-05-10 1966-01-18 Singer Inc H R B Apparatus to control steering, speed and coating application of pavement marker
US3318260A (en) * 1963-12-13 1967-05-09 Forrest W Gillespie Automatic railway
US3268727A (en) * 1964-03-25 1966-08-23 Gibbs & Hill Inc Computer control for transit system
US5574469A (en) * 1994-12-21 1996-11-12 Burlington Northern Railroad Company Locomotive collision avoidance method and system
US8924049B2 (en) 2003-01-06 2014-12-30 General Electric Company System and method for controlling movement of vehicles
US20060227008A1 (en) * 2005-03-31 2006-10-12 Bryant Jason D Emergency vehicle proximity warning system
US9733625B2 (en) 2006-03-20 2017-08-15 General Electric Company Trip optimization system and method for a train
US20130297199A1 (en) * 2006-03-20 2013-11-07 General Electric Company System and method for predicting a vehicle route using a route network database
US8903573B2 (en) 2006-03-20 2014-12-02 General Electric Company Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable
US20070225878A1 (en) * 2006-03-20 2007-09-27 Kumar Ajith K Trip optimization system and method for a train
US9156477B2 (en) 2006-03-20 2015-10-13 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US10569792B2 (en) 2006-03-20 2020-02-25 General Electric Company Vehicle control system and method
US8725326B2 (en) * 2006-03-20 2014-05-13 General Electric Company System and method for predicting a vehicle route using a route network database
US10308265B2 (en) 2006-03-20 2019-06-04 Ge Global Sourcing Llc Vehicle control system and method
US9828010B2 (en) 2006-03-20 2017-11-28 General Electric Company System, method and computer software code for determining a mission plan for a powered system using signal aspect information
US9702715B2 (en) 2012-10-17 2017-07-11 General Electric Company Distributed energy management system and method for a vehicle system
US9834237B2 (en) 2012-11-21 2017-12-05 General Electric Company Route examining system and method
US9682716B2 (en) 2012-11-21 2017-06-20 General Electric Company Route examining system and method
US9669851B2 (en) 2012-11-21 2017-06-06 General Electric Company Route examination system and method
US9689681B2 (en) 2014-08-12 2017-06-27 General Electric Company System and method for vehicle operation

Similar Documents

Publication Publication Date Title
US2783369A (en) Radio transmitting and receiving signal system
US2762913A (en) Railway train proximity warning system
US4220946A (en) Device for controlling the running of urban transport vehicles
US4207569A (en) Railroad radio frequency waveguide
US3888437A (en) Vehicle control systems
EP1861303B1 (en) Communication, monitor and control apparatus, and related method, for railway traffic
US2535162A (en) Position indication and control system for moving objects or vehicles
KR101065164B1 (en) Point Machine control Device using radio communication in low density section and Method thereof
US3544788A (en) Position indication and control system for rail vehicle
US2636113A (en) Fixed route vehicular location and communicating system
US1816628A (en) Train stopping and speed controlling mechanism
WO2003027706A1 (en) Method and device for locating vehicles by means of the doppler shift of mobile radio signals
GB936592A (en) Improvements in or relating to signalling systems
US2606281A (en) System of transmitting signal indications from railway signaling devices to vehiclesand for controlling same
RU2429153C1 (en) Locomotive automatic signalling system
US1993497A (en) Method and means for reporting interference with vehicles
US2480160A (en) Signaling system
CN114475707A (en) Train control system capable of meeting requirement that C3 high-speed rail motor train unit operates by utilizing universal speed line in a roundabout mode
US1800972A (en) Train stopping and speed-controlling mechanism
DE936339C (en) Arrangement for the monitoring of vehicles, in particular for the end-of-train signaling of railway trains
US3297868A (en) Railway crossing signal systems
US3354306A (en) Hot-box detector
JP2000318612A (en) Automatic guide broadcast device and starting system of automatic guide display device
EA042034B1 (en) SYSTEM OF INTERVAL REGULATION OF TRAIN TRAFFIC ON THE BASIS OF INTERACTION VIA RADIO CHANNELS
US2178284A (en) Annunciating apparatus