US2685378A - Method for handling drill pipe - Google Patents

Method for handling drill pipe Download PDF

Info

Publication number
US2685378A
US2685378A US112200A US11220049A US2685378A US 2685378 A US2685378 A US 2685378A US 112200 A US112200 A US 112200A US 11220049 A US11220049 A US 11220049A US 2685378 A US2685378 A US 2685378A
Authority
US
United States
Prior art keywords
derrick
pipe
block
drill
traveling block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US112200A
Inventor
Albert L Stone
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Standard Oil Development Co
Original Assignee
Standard Oil Development Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Standard Oil Development Co filed Critical Standard Oil Development Co
Priority to US112200A priority Critical patent/US2685378A/en
Application granted granted Critical
Publication of US2685378A publication Critical patent/US2685378A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/02Rod or cable suspensions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole

Definitions

  • the conventional method for removing the pipe from the derrick involves the steps of raising the drill stem by means of the heavy traveling block until a stand of pipe is above the rotary table, then setting slips tosupport the drill pipe While the traveling block is in its upper position, unscrewingthe lower end of the stand from the balance of the drill stem, raising it slightly with the traveling block, then as a final operation, racking the pipe by swinging it over to the side or" the derrick and lowering it to the floor mat. After the stand has been racked, the traveling block may be disengaged from the stand and started down to repeat the cycle.
  • the stand of pipe When returning the pipe into the borehole the stand of pipe is picked up by the heavy duty traveling block and 'moved to the center of the derrick, and the lower end is then screwed to the portion of the drill stem in the borehole which is supported by slips.
  • the drill stem is picked up by the traveling block, the slips released, the drill stem lowered with the traveling block until the end of the added section is a foot or two above the rotary table at which time the slips are set to suspend the 'drill stein, the traveling block is released from the drill stem and then run up along the vertical axis of the derrick preparatory to lifting another stand of pipe from racking position to the center of the derrick.
  • the double crown 'bloc'kisshiftable so that the path of travel 'of the unloaded traveling block is to one side of the vertical axis of the derrick and the double crown block is shifted to move this travelblock to the axis of the derrick when it takes a load.
  • the double crown block In'another'embodirnent the double crown block is stationary and the two traveling blocks are held in position by guide members attached to the derrick.
  • heavy duty drilling. equipment is' used for handling the full weight of the "drill stem and also for handling the stands of pipe being racked the derrick, I
  • the present application is directed to a method for handling drill pipe in a conventional drilling derrick having the usual single crown block and single uaveiin pitck which increases the speed with which the arm Stem; may be withdrawn from and returned into the well.
  • FIG. 1, 2, 3, and 4 are a series of figures illustrating one embodiment of the apparatus suitable for the practice of the method of the present ap plication and showing the equipment in several positions;
  • Figs. 5 and 6 are figures illustrating another embodiment of apparatus suitable for practicing the method of the present application showing the equipment in two different positions;
  • Fig. 7 is a simplified showing of another embodiment of equipment suitable for practicing the method of the present invention.
  • Fig. 8 is a simplified view showing another embodiment of equipment which may be substituted for a. portion of the apparatus of Figs. 5 and 6;
  • Fig. 9 is a fragmentary view showing another embodiment of the apparatus which may be substituted for a portion of the apparatus of Figs. 5 and 6 in the practice of the present invention.
  • Fig. 10 is a view taken along XX of Fig. 9.
  • a conventional drilling derrick A is provided with a conventional crown block B, traveling block C and draw works D
  • a traveling block deflector E a means F for moving the upper end of sections of drill F
  • a means G for movin the lower end of sections of drill and lifting means H are mounted in the derrick.
  • the derrick A is provided with a usual rotary table H.
  • a racking mat i2 is arranged on the fioor of the derrick for receiving the lower ends of sections of drill pipe.
  • a pipe rack i3 is mounted in the derrick for receiving the upper ends of the drill pipe racked in the derrick. Since racking mats and pipe racks are well known to the art, the details of construction of these members are not shown in the drawing.
  • Drilling line 16 is arranged to suspend traveling block C from crown block B and in turn is attached to the draw works D.
  • traveling block deflector E consists of a wire line I1 having its upper end secured at the top of derrick A to anchor It.
  • the wire line is passed through a sheave l9 mounted on the side of traveling block C and then runs over a sheave 28 mounted below the derrick floor.
  • the lower end of line I! is secured to a reel 2
  • unreeling or slackening line H traveling block C is allowed to hang at the axis of the derrick as shown in Figs. 1 and 2.
  • the traveling block is pulled from the axis of the derrick to one side thereof.
  • the traveling block may be moved in a controlled manner between the axis and the side of the derrick either while being moved vertically or while being held against vertical movement by the draw works.
  • Upper pipe handling means F is adapted for grasping or embracing a section of drill pipe and for moving it in a rectilinear path between the axis of the drilling derrick and the side of the derrick on which this assembly is mounted.
  • lower pipe racking assembly G is adapted for grasping the lower end of a section of drill pipe and for moving it in a rectilinear path between the axis of the derrick and the side thereof.
  • member G cooperates with lifting means H, which may be a hydraulic cylinder with a piston therein having a wire line 23 attached thereto, to serve an auxiliary elevator capable of lifting a section of drill pipe. Details of construction of devices adapted to be used as assemblies F, G, and H are shown in my copending applications Serial No.
  • Figs. 1, 2, 3, and 4 preceding in sequence to the right from Figs. 1 to 4, illustrate the practice of the method of the present invention when removing the drill stem from the well.
  • Fig. 1 the heavy duty traveling block E is shown in its lower position with the elevators 15 attached to the drill stem.
  • Slips 2 3 are shown in position in the rotary for supporting the drill stem.
  • Fig. 2 the slips have been removed and the drill stem has been pulled upward to expose a stand of pipe.
  • the traveling block moves along the axis of the drilling derrick when pulling the drill stem.
  • Fig. 2 shows the traveling block in its upper position with a stand of the drill stem above the r0- tary table. When the drill stem has reached this position slips, not shown in Fig.
  • Fig. 3 shows slips 24 set to hold the drill stem.
  • the heavy duty travelin block has been deflected to the side of the derrick and is being moved vertically downwardly at the same time the exposed stand of pipe 25 has been disconnected and is ready to be moved to racking position.
  • Fig. 4 shows the unloaded traveling block near its lower position while the disconnected stand of pipe 25 has been moved over to the side of the derrick and racked with its upper end in rack i3 and its lower end resting on racking mat 12,
  • the heavy duty traveling block C has been allowed to move from the side of the derrick toward the vertical axis thereof and is immediately in the position preceding that shown in Fig.
  • Fig. 4 illustrates the position of the equipment after slips 24 have been set to hold the drill stem and the elevator is has been disconnected therefrom.
  • the traveling block C is being deflected from the vertical axis to the side of derrick A at the same time stand of pipe 25 is being moved from racking position to the axis of the derrick.
  • FIG. 3 shows unloaded traveling block C moving upwardly while deflected to the side of the derrick and stand 25 has been moved to the axis of the derrick and is in a position to be connected to that portion of the aess svs drill stem in the well.
  • Fig. 2'.ShOWS traveling block C in its upper position and moved tolthe axis of the derrick and-connected to -stand 25.
  • In Fig. 1 stand 25 has been loweredinto the borehole and slips 2 l-have been set to hold the weight of the drill stem so that the .elevatorsl5 may be disconnected from the drillstem and'the cycle repeated.
  • the heavy duty hoisting equipment is used efliciently when practicing-the method of the present case.
  • the heavy duty travelingblook is unloaded it is returned to starting position and by deflecting the heavy duty traveling'block from the axis of the derrick while it is being moved from one verticalpoint in-the derrick to another, necessary pipe handlingoperations at the locus of the longitudinal axis-of the derrick are performed bythedrilling crew while using light weight equipment commensurate in size with the loads being handled.
  • the operations'of the-drilling crew and-of the-heavy duty hoisting equipment are synchronized.
  • drilling derrick A is provided with crown' block '3, traveling block C, draw works D, pipe racking assembly F, lower pipe racking assembly G and pipe lifting means H.
  • the derrick is provided with rotary table 1 I, racking mat l2 and pipe rack l3.
  • the traveling block C issuspended by drilling line 16.
  • the travelin block Cis provided with a deflector E.
  • Traveling block deflector Et consistsof a track 30 secured to derrick A by structural members 3!.
  • Track 30 has its upper end parallel with the derrick, the track having a-curve or bend at a point-above pipe rack l3 so that its lowerportion is vertical.
  • a carriage 32 is mounted on track 36 for slidable movement thereon.
  • Carriage 32 is provided with sheaves 33 and the lower end of track 30 is provided with sheave '34.
  • a pull back cable 35 has its upper end secured to anchor member 36 at the top of derrick A, and is threaded around sheave 33 of carriage 32, sheave IQ of traveling block 0, lower sheave 33 of the carriage, then around sheave 34 to reel 31 operated by prime mover 38.
  • the loop or bight in the pull back cable 35 caused by running around sheaves 33, [9 and 34 allows the traveling block to be moved in a. controlled manner between the axis and the side of the derrick either while being moved vertically or while being held against vertical movement by the draw works.
  • cable 35 is reeled in the loop is reduced in size and the traveling block is pulled close to the carriage as shown in Fig. 6.
  • the heavy traveling block C moves to the longitudinal axis of the derrick under the influence of gravity.
  • the carriage 32 can move freely up and down rail 30 as traveling block 0 moves up and down in the derrick. It will be understood that the embodiment of Figs.
  • Fig. 5 shows the equipment in a position corresponding to that shown by the equipment of Fig. 1, while Fig. 6 illustrates the traveling block 0 in-a positionPsome a line H secured to anchor l8-at theto'p of der-' rick -A.
  • the mechanism for tightening or releasing the cable consists of sheaves H], 4
  • sheaves H] mounted on structural members 42 which are secured to derrick A
  • a piston and cylinder assembly '43 having a sheave 44 carried'by thepiston.
  • the traveling-block C will move to-the axis-of the derrick and when it is tightened the traveling block is drawn'over to the sideof the derrick. Accordingly, pipe maybe handled in this assembly when removing drill pipe from or 'returning it into the well in the same 'manner'as previously described in detail in the series of Figs. 1 to 4.
  • Fig. 8 is a showingoi another embodiment of .a track which can 'be substituted for track '30- of Figs. 5 and-6.
  • In'Fig. 8track 33- is straight and extends parallel with the side of the derrick A from its upper to its lower "end. It will be understood that in substituting track 30' for track 30 for Figs. 5 and6, the only'difference inoperation is that asomewhat larger loop "or bight in line I! (not shown in Fig. -8) will be required when the carriage is on a lower portion of a'track.
  • Figs. 9 and 10 show still another embodiment of structure which may be substituted for that of Figs. 5 and'6.
  • Carriage 32 has reel 3''! and prime mover '38 mounted directly thereon.
  • Line 35' has one "end secured to carriage 32' and is looped around sheave 19 of traveling block C.
  • Any suitable means not shown in the drawing, may be provided for supplying power 'to prime mover 38'.
  • prime mover 38 reel 31 may be rotated either to reel in or reel "out line 35 therebyallowing traveling block C either to move along the vertical axis of the derrick or to be deflected laterally away from the axis of the derrick at the option of the operator.
  • the carriage of Figs. 9 and 10 may be used either with the bent rail of Figs. 5 and 6 or the straight rail of Fig. 9.
  • the heavy duty hoistin equipment conventionally used including a conventional derrick, crown block, traveling block and draw works, is employed so that the capital investment in the drilling rig is substantially the same as that heretofore required.
  • the drilling crew may perform various necessary pipe handling operations at the 10- cus of the longitudinal axis of the derrick at the same time.
  • the unloaded traveling block is being returned to a position preparatory to supporting the heavy load of the drill stem for which it is designed. This allows the operation of 7.

Description

A. L. STONE METHOD FOR HANDLING DRILL PIPE Aug. 3, 1954 '3 Sheets-Sheet 1 Filed Aug. 25, 1949 w al-.6
mvsuroa. Albert L. Sfo e,
04! max m x 04m ziomo W JH E g- 3, 1954 A. L. s'roN; 2,685,378
METHOD FOR HANDLING DRILL PIPE Filed Aug. 25, 1949 5 Sheets-Sheet 2 Albert L. Stone 3, 1954 A. STONE METHOD FOR HANDLING DRILL PIPE 3 Sheets-Sheet 3 Filed Aug. 25, 1949 mvnnon. Albert L. Stone, (9
ATTORNEY.
Patented Aug. 3, 1954 UNIT ED STATES PATENT OFFICE 2,68537-8 METHOD FOR HANDLING brim. Tm:
Albert L. Stone, Redondo Beach, cans, assignor,
by mesne assignments, to Standard Oil Development Company, Elizabeth, N. J., a corporation of Delaware Application August-.25, 1949', Serial No. 112,200 3 Claims. (01. 21'4 152) The present application is directed to an improved method for handling drill pipe in the derrick of a drilling well.
It is common to drill deep oil and gas wells by the rotary drilling method. When using this method circulating drilling fluid brings the cutting up from the bottom of the hole, but periodic operations, such as changing the drill bit, requires that the entire string of drill pipe be removed from and subsequently returned into the hole. The lengths of pipe making up the drill stem'are connected together byscrew thread joints and are disconnected in suitable sections, consisting for example ofthree lengths-of pipe known as strands, which are racked in the drilling derrick while the drill stem is being removed from and returned to the borehole.
It is usual to provide a heavy duty derrick provided with a crown block with atraveling block suspended therefrom by the drilling line. A hoist known as the draw works is attached to the drilling line and serves to raise and lower the traveling block along the vertical axis of the derrick. The conventional method for removing the pipe from the derrick involves the steps of raising the drill stem by means of the heavy traveling block until a stand of pipe is above the rotary table, then setting slips tosupport the drill pipe While the traveling block is in its upper position, unscrewingthe lower end of the stand from the balance of the drill stem, raising it slightly with the traveling block, then as a final operation, racking the pipe by swinging it over to the side or" the derrick and lowering it to the floor mat. After the stand has been racked, the traveling block may be disengaged from the stand and started down to repeat the cycle.
When returning the pipe into the borehole the stand of pipe is picked up by the heavy duty traveling block and 'moved to the center of the derrick, and the lower end is then screwed to the portion of the drill stem in the borehole which is supported by slips. After this operation the drill stem is picked up by the traveling block, the slips released, the drill stem lowered with the traveling block until the end of the added section is a foot or two above the rotary table at which time the slips are set to suspend the 'drill stein, the traveling block is released from the drill stem and then run up along the vertical axis of the derrick preparatory to lifting another stand of pipe from racking position to the center of the derrick. When the drill stem is being pulled out of the well or returned into the well; the heavy d rty hoisting equipment which includes the traveling block, crown block and draw Works is used inefficiently. Necessarily, this equipment cannot be used for heavy duty operations while the drilling crew is occupied with the operation of adding or removing a stand "of pipe from the drillstem. However, after the drilling rew has performed such an operation, the majority of the drilling crew, which are on the derrick floor, are idle while the unloaded traveling block is being moved into position where it will perform a useful function. Ihat is to say, when comingout of the hole, most of the drilling crew is idle while the empty traveling block is being run downward preparatory to pulling the drill stern to expose another stand. Similarly, when going into the hole, most of the drilling crewlis idle while the empty travelingblock is being run upward preparatory to lifting another standof pipe over to the center of the derrick, wh ich operation precedes thesteps of attaching the stand to the drill stern and lowering it into the well,
Proposals have been'made'foraltering this convention'al method of handling pipe. See Sheldon, s. Patent 2,226,947, issued December 31, 1940. In this patie t an unconventional derrick having a double crown block and two traveling blocks i used. With "this arrangement the unloaded traveling block moves downwardly while the loaded traveling block moves upwardly when pulling pipe from metal. Similarly, the unloaded traveling block 'm'oves upwardly while the waded traveling mock sieves dcwnwa'rdl when lowering the drill stem into the well. Tvvo enlbodirn'ents are disclosed. In one embodiment the double crown 'bloc'kisshiftable so that the path of travel 'of the unloaded traveling block is to one side of the vertical axis of the derrick and the double crown block is shifted to move this travelblock to the axis of the derrick when it takes a load. In'another'embodirnent the double crown block is stationary and the two traveling blocks are held in position by guide members attached to the derrick. In both embodiments, heavy duty drilling. equipment is' used for handling the full weight of the "drill stem and also for handling the stands of pipe being racked the derrick, I
The present applicationis directed to a method for handling drill pipe in a conventional drilling derrick having the usual single crown block and single uaveiin pitck which increases the speed with which the arm Stem; may be withdrawn from and returned into the well.
Other objects and advantages of the present invention may be seen from the following description taken with the drawing in which Figs. 1, 2, 3, and 4 are a series of figures illustrating one embodiment of the apparatus suitable for the practice of the method of the present ap plication and showing the equipment in several positions;
Figs. 5 and 6 are figures illustrating another embodiment of apparatus suitable for practicing the method of the present application showing the equipment in two different positions;
Fig. 7 is a simplified showing of another embodiment of equipment suitable for practicing the method of the present invention;
Fig. 8 is a simplified view showing another embodiment of equipment which may be substituted for a. portion of the apparatus of Figs. 5 and 6;
Fig. 9 is a fragmentary view showing another embodiment of the apparatus which may be substituted for a portion of the apparatus of Figs. 5 and 6 in the practice of the present invention; and
Fig. 10 is a view taken along XX of Fig. 9.
Turning now specifically to the drawing and first to the embodiment shown in Figs. 1 to 4 a conventional drilling derrick A is provided with a conventional crown block B, traveling block C and draw works D In addition, a traveling block deflector E, a means F for moving the upper end of sections of drill F, a means G for movin the lower end of sections of drill and lifting means H are mounted in the derrick.
The derrick A is provided with a usual rotary table H. A racking mat i2 is arranged on the fioor of the derrick for receiving the lower ends of sections of drill pipe. A pipe rack i3 is mounted in the derrick for receiving the upper ends of the drill pipe racked in the derrick. Since racking mats and pipe racks are well known to the art, the details of construction of these members are not shown in the drawing.
A hook it is suspended from traveling block E and a pipe elevator i5 is suspended from the hook. Heavy duty hooks and elevators for supporting drilling pipe are well known to the art and for the purpose of simplifying the description the details of construction of these members are not shown. Drilling line 16 is arranged to suspend traveling block C from crown block B and in turn is attached to the draw works D.
In the embodiment shown in Figs. 1 to 4 traveling block deflector E consists of a wire line I1 having its upper end secured at the top of derrick A to anchor It. The wire line is passed through a sheave l9 mounted on the side of traveling block C and then runs over a sheave 28 mounted below the derrick floor. The lower end of line I! is secured to a reel 2| which may be rotated in either direction at the will of an operator by means of prime mover 22. By unreeling or slackening line H, traveling block C is allowed to hang at the axis of the derrick as shown in Figs. 1 and 2. By reeling in or tightening line I! as shown in Fig. 3, the traveling block is pulled from the axis of the derrick to one side thereof. By manipulation of the reel 2! the traveling block may be moved in a controlled manner between the axis and the side of the derrick either while being moved vertically or while being held against vertical movement by the draw works.
Upper pipe handling means F is adapted for grasping or embracing a section of drill pipe and for moving it in a rectilinear path between the axis of the drilling derrick and the side of the derrick on which this assembly is mounted. Similarly, lower pipe racking assembly G is adapted for grasping the lower end of a section of drill pipe and for moving it in a rectilinear path between the axis of the derrick and the side thereof. In addition, member G cooperates with lifting means H, which may be a hydraulic cylinder with a piston therein having a wire line 23 attached thereto, to serve an auxiliary elevator capable of lifting a section of drill pipe. Details of construction of devices adapted to be used as assemblies F, G, and H are shown in my copending applications Serial No. 690,946 entitled Apparatus for Movin Pipe, filed August 16, 1946 and now Patent No. 2,537,607; Serial No. 5,843 entitled Apparatus for Racking Pipe in a Derrick filed February 2, 1948 and now abandoned; Serial No. 98,250 entitled Pipe Racking Apparatus filed June 10, 1949 and now abandoned, and Serial N 0. 98,740 entitled Improved Apparatus for Moving Pipe filed June 13, 1949 and now Patent No. 2,596,828. Since the construction of members F, G, and H is not in itself a part of the present invention, these details have been omitted from the present case.
The series of Figs. 1, 2, 3, and 4, preceding in sequence to the right from Figs. 1 to 4, illustrate the practice of the method of the present invention when removing the drill stem from the well. In Fig. 1 the heavy duty traveling block E is shown in its lower position with the elevators 15 attached to the drill stem. Slips 2 3 are shown in position in the rotary for supporting the drill stem. In Fig. 2 the slips have been removed and the drill stem has been pulled upward to expose a stand of pipe. The traveling block moves along the axis of the drilling derrick when pulling the drill stem. Fig. 2 shows the traveling block in its upper position with a stand of the drill stem above the r0- tary table. When the drill stem has reached this position slips, not shown in Fig. 2, are set in the rotary table to hold the drill pipe. Fig. 3 shows slips 24 set to hold the drill stem. The heavy duty travelin block has been deflected to the side of the derrick and is being moved vertically downwardly at the same time the exposed stand of pipe 25 has been disconnected and is ready to be moved to racking position. Fig. 4 shows the unloaded traveling block near its lower position while the disconnected stand of pipe 25 has been moved over to the side of the derrick and racked with its upper end in rack i3 and its lower end resting on racking mat 12, The heavy duty traveling block C has been allowed to move from the side of the derrick toward the vertical axis thereof and is immediately in the position preceding that shown in Fig. 1 where the elevator I 5 will be attached to the exposed end of the drill stem preparatory to pulling the drill stem to expose another stand of drill pipe. The series of Figs. 1, 2, 3, and 4 also represent the operation of returning the drill stem into the borehole starting at Fig. 4 and going in sequence to the left from Figs. 4 to 1. When considering the figures in this sequence, Fig. 4 illustrates the position of the equipment after slips 24 have been set to hold the drill stem and the elevator is has been disconnected therefrom. The traveling block C is being deflected from the vertical axis to the side of derrick A at the same time stand of pipe 25 is being moved from racking position to the axis of the derrick. Fig. 3 shows unloaded traveling block C moving upwardly while deflected to the side of the derrick and stand 25 has been moved to the axis of the derrick and is in a position to be connected to that portion of the aess svs drill stem in the well. Fig. 2'.ShOWS traveling block C in its upper position and moved tolthe axis of the derrick and-connected to -stand 25. In=Fig. 1 stand 25 has been loweredinto the borehole and slips 2 l-have been set to hold the weight of the drill stem so that the .elevatorsl5 may be disconnected from the drillstem and'the cycle repeated.
From the series of Figs. 'l to 4, inclusive, it will be seen that the heavy duty hoisting equipment is used efliciently when practicing-the method of the present case. As soon as the heavy duty travelingblook is unloaded it is returned to starting position and by deflecting the heavy duty traveling'block from the axis of the derrick while it is being moved from one verticalpoint in-the derrick to another, necessary pipe handlingoperations at the locus of the longitudinal axis-of the derrick are performed bythedrilling crew while using light weight equipment commensurate in size with the loads being handled. By performing the operations-in-this manner the operations'of the-drilling crew and-of the-heavy duty hoisting equipment are synchronized.
Another embodiment-of apparatus suitable for performing the method of the present application is shown in Figs. 5 and 6. In this embodiment drilling derrick A is provided with crown' block '3, traveling block C, draw works D, pipe racking assembly F, lower pipe racking assembly G and pipe lifting means H.
The derrick is provided with rotary table 1 I, racking mat l2 and pipe rack l3. The traveling block C issuspended by drilling line 16. In the embodiment of Figs. 5 and-6 the travelin block Cis provided with a deflector E.
Traveling block deflector Etconsistsof a track 30 secured to derrick A by structural members 3!. Track 30 has its upper end parallel with the derrick, the track having a-curve or bend at a point-above pipe rack l3 so that its lowerportion is vertical. A carriage 32 is mounted on track 36 for slidable movement thereon. Carriage 32 is provided with sheaves 33 and the lower end of track 30 is provided with sheave '34. A pull back cable 35 has its upper end secured to anchor member 36 at the top of derrick A, and is threaded around sheave 33 of carriage 32, sheave IQ of traveling block 0, lower sheave 33 of the carriage, then around sheave 34 to reel 31 operated by prime mover 38. The loop or bight in the pull back cable 35 caused by running around sheaves 33, [9 and 34 allows the traveling block to be moved in a. controlled manner between the axis and the side of the derrick either while being moved vertically or while being held against vertical movement by the draw works. When cable 35 is reeled in the loop is reduced in size and the traveling block is pulled close to the carriage as shown in Fig. 6. When the cable 35 is paid out the loop is increased in size and. the heavy traveling block C moves to the longitudinal axis of the derrick under the influence of gravity. The carriage 32 can move freely up and down rail 30 as traveling block 0 moves up and down in the derrick. It will be understood that the embodiment of Figs. and 6 will be used in controlling the position of traveling block 0 when pulling a stand of drill pipe or when returning a stand of drill pipe into the borehole in exactly the same steps as illustrated for the first described embodiment in the series of Figs. 1 to 4, inclusive. Fig. 5 shows the equipment in a position corresponding to that shown by the equipment of Fig. 1, while Fig. 6 illustrates the traveling block 0 in-a positionPsome a line H secured to anchor l8-at theto'p of der-' rick -A. In this-embodiment-the mechanism for tightening or releasing the cable consists of sheaves H], 4| mounted on structural members 42 which are secured to derrick A and a piston and cylinder assembly '43 having a sheave 44 carried'by thepiston. When cable I! is released the traveling-block C will move to-the axis-of the derrick and when it is tightened the traveling block is drawn'over to the sideof the derrick. Accordingly, pipe maybe handled in this assembly when removing drill pipe from or 'returning it into the well in the same 'manner'as previously described in detail in the series of Figs. 1 to 4.
Fig. 8 is a showingoi another embodiment of .a track which can 'be substituted for track '30- of Figs. 5 and-6. In'Fig. 8track 33- is straight and extends parallel with the side of the derrick A from its upper to its lower "end. It will be understood that in substituting track 30' for track 30 for Figs. 5 and6, the only'difference inoperation is that asomewhat larger loop "or bight in line I! (not shown in Fig. -8) will be required when the carriage is on a lower portion of a'track.
Figs. 9 and 10 show still another embodiment of structure which may be substituted for that of Figs. 5 and'6. Carriage 32 has reel 3''! and prime mover '38 mounted directly thereon. Line 35' has one "end secured to carriage 32' and is looped around sheave 19 of traveling block C. Any suitable means, not shown in the drawing, may be provided for supplying power 'to prime mover 38'. By operation of prime mover 38, reel 31 may be rotated either to reel in or reel "out line 35 therebyallowing traveling block C either to move along the vertical axis of the derrick or to be deflected laterally away from the axis of the derrick at the option of the operator. It is to be understood that the carriage of Figs. 9 and 10 may be used either with the bent rail of Figs. 5 and 6 or the straight rail of Fig. 9.
While I have disclosed specific embodiments suitable for the practice of the present invention, it will be obvious to a workman skilled in the art that other embodiments may be employed for this purpose.
The advantages of the method of the present application will be obvious to a workman skilled in the art. In the method of the present application the heavy duty hoistin equipment conventionally used, including a conventional derrick, crown block, traveling block and draw works, is employed so that the capital investment in the drilling rig is substantially the same as that heretofore required. By deflecting the heavy duty traveling block sothat it is kept away from the axis of the derrick when it is unloaded and being moved between vertically separated points, the drilling crew may perform various necessary pipe handling operations at the 10- cus of the longitudinal axis of the derrick at the same time. the unloaded traveling block is being returned to a position preparatory to supporting the heavy load of the drill stem for which it is designed. This allows the operation of 7. pulling a drill stem or lowering it into the well to be speeded up a minimum of 25 or 30 per cent over the time required when using conventional equipment where the unloaded traveling block remains stationary, while the drilling crew performs pipe handling operations and is moved vertically while the drilling crew is idle.
Having fully described and illustrated the method of the present invention, what I desire to claim as new and useful and to secure by Letters Patent is:
1* In the method of running a sectional drill string into or out of a well, wherein a flexibly suspended travelling block is moved vertically in a derrick in one direction while it supports the drill string and is alternately moved in the opposite direction while it is unloaded, the improvement comprising, controlling the vertical component of movement of the unloaded block by the flexible suspension means while exerting a lateral pull directly on the unloaded block in a predetermined substantially vertical plane which passes through the longitudinal axis of the derrick, whereby to cause said unloaded block to move in a path substantially confined in said plane, the upper and lower ends of said path terminating at the longitudinal axis of the derrick and its intermediate portion being laterally offset from the longitudinal axis of the derrick, and controlling the horizontal component of movement of said unloaded block to maintain it in said path by the continuous exertion of said lateral pull.
2. In the method of running a sectional drill string into or out of a well, wherein a flexibly suspended travelling block is moved vertically in a derrick in one direction while it supports the drill string and is alternately moved in the pposite direction while it is unloaded, the improvement comprising, controlling the vertical component of movement of the unloaded block by the flexible suspension means while exerting a lateral pull directly on the unloaded block in a predetermined substantially vertical plane which passes through the longitudinal axis of the derrick, whereby to cause said unloaded block to move in a path substantially confined in said plane, the upper and lower ends of said path terminating at the longitudinal axis of the derrick and its intermediate portion being laterally offset from the longitudinal axis of the derrick, controlling the horizontal component of movement of said unloaded block to maintain it in said path by the continuous exertion of said lateral pull, and, during the movement of said unloaded block, moving a disconnected pipe section laterally in the derrick toward or away from the side of the derrick opposite the side thereof toward which the block is ofiset.
3. In the method of running a sectional drill string into or out of a well, wherein a flexibly suspended travelling block is moved vertically in a derrick in one direction while it supports the drill string and is alternately moved in the 0pposite direction while it is unloaded, the improvement comprising, controlling the vertical component of movement of the unloaded block by the flexible suspension means while exerting a lateral pull directly on the unloaded block in a predetermined substantially vertical plane which passes through the longitudinal axis of the derrick and which extends substantially in the direction of the axes of the block sheaves, whereby to cause said unloaded block to move in a path substantially confined in said plane, the upper and lower ends of said path terminating at the longitudinal axis of the derrick and its intermediate portion being laterally offset from the longitudinal axis of the derrick, and controlling the horizontal component of movement of said unloaded block to maintain it in said path by the continuous exertion of said lateral pull.
References Cited in the file of this patent UNITED STATES PATENTS Number Name Date 1,634,859 Tibbetts July 5, 1927 2,226,947 Sheldon Dec. 31, 1940 2,416,815 Calhoun Mar. 4, 1947
US112200A 1949-08-25 1949-08-25 Method for handling drill pipe Expired - Lifetime US2685378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US112200A US2685378A (en) 1949-08-25 1949-08-25 Method for handling drill pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US112200A US2685378A (en) 1949-08-25 1949-08-25 Method for handling drill pipe

Publications (1)

Publication Number Publication Date
US2685378A true US2685378A (en) 1954-08-03

Family

ID=22342610

Family Applications (1)

Application Number Title Priority Date Filing Date
US112200A Expired - Lifetime US2685378A (en) 1949-08-25 1949-08-25 Method for handling drill pipe

Country Status (1)

Country Link
US (1) US2685378A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2885096A (en) * 1954-08-09 1959-05-05 Paul A Medearis Pipe-handling apparatus for oil wells
US2999605A (en) * 1954-12-20 1961-09-12 Paul A Medearis Apparatus for moving pipe into and out of an oil well derrick
US3263382A (en) * 1963-04-15 1966-08-02 Mills C Tourtellotte Vertical cantilever flagpole
US3464507A (en) * 1967-07-03 1969-09-02 Westinghouse Air Brake Co Portable rotary drilling pipe handling system
US3507405A (en) * 1967-12-04 1970-04-21 Byron Jackson Inc Block and hook structure positioning and guiding apparatus
US3658298A (en) * 1969-10-14 1972-04-25 United States Steel Corp Drilling rig with shiftable crown blocks
DE2550072A1 (en) * 1974-11-22 1976-05-26 Byron Jackson Inc TRANSPORT DEVICE FOR DRILL PIPES
US20110308808A1 (en) * 2010-02-24 2011-12-22 Devin International, Inc. Coiled Tubing Inline Motion Eliminator Apparatus and Method
US9677345B2 (en) 2015-05-27 2017-06-13 National Oilwell Varco, L.P. Well intervention apparatus and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1634859A (en) * 1924-05-05 1927-07-05 Willard L Burrough Rod rack
US2226947A (en) * 1938-12-31 1940-12-31 Sheldon Waldo Well drilling apparatus
US2416815A (en) * 1946-01-14 1947-03-04 Ingram X Calhoun Drill pipe manipulator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1634859A (en) * 1924-05-05 1927-07-05 Willard L Burrough Rod rack
US2226947A (en) * 1938-12-31 1940-12-31 Sheldon Waldo Well drilling apparatus
US2416815A (en) * 1946-01-14 1947-03-04 Ingram X Calhoun Drill pipe manipulator

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2885096A (en) * 1954-08-09 1959-05-05 Paul A Medearis Pipe-handling apparatus for oil wells
US2999605A (en) * 1954-12-20 1961-09-12 Paul A Medearis Apparatus for moving pipe into and out of an oil well derrick
US3263382A (en) * 1963-04-15 1966-08-02 Mills C Tourtellotte Vertical cantilever flagpole
US3464507A (en) * 1967-07-03 1969-09-02 Westinghouse Air Brake Co Portable rotary drilling pipe handling system
US3507405A (en) * 1967-12-04 1970-04-21 Byron Jackson Inc Block and hook structure positioning and guiding apparatus
US3658298A (en) * 1969-10-14 1972-04-25 United States Steel Corp Drilling rig with shiftable crown blocks
DE2550072A1 (en) * 1974-11-22 1976-05-26 Byron Jackson Inc TRANSPORT DEVICE FOR DRILL PIPES
US20110308808A1 (en) * 2010-02-24 2011-12-22 Devin International, Inc. Coiled Tubing Inline Motion Eliminator Apparatus and Method
US8672039B2 (en) * 2010-02-24 2014-03-18 Devin International, Inc. Coiled tubing inline motion eliminator apparatus and method
US9677345B2 (en) 2015-05-27 2017-06-13 National Oilwell Varco, L.P. Well intervention apparatus and method

Similar Documents

Publication Publication Date Title
US3193116A (en) System for removing from or placing pipe in a well bore
US6857483B1 (en) Drilling device and method for drilling a well
US3063509A (en) Apparatus for handling stands of pipe
US2946464A (en) Apparatus for handling stands of pipe
US3404741A (en) Automated system and drilling rig for continuously and automatically pulling and running a drill-pipe string
US5503234A (en) 2×4 drilling and hoisting system
US2885096A (en) Pipe-handling apparatus for oil wells
US3189093A (en) Well drilling platform
JPH10169355A (en) Composite type pipe lifting device for excavating large water depth
US2685378A (en) Method for handling drill pipe
US2226947A (en) Well drilling apparatus
US1972635A (en) Drilling apparatus
US2615585A (en) Well derrick, rig, and pipe racking apparatus
WO2020024604A1 (en) Submarine drilling rig core-fetching cable device employing two-stroke pushing of cylinder
CN106639918A (en) Suspension device and suspension method of water-secluding pipe system for deepwater well drilling
CN202064840U (en) Four-drill column drill derrick
US2735556A (en) stone
US4951924A (en) Deepwater subsea lowering/lifting system
CN106285517B (en) Oil-well rig establishes root system and method offline with double rat holes
WO1999011518A1 (en) Apparatus for a mobile installation, especially an offshore vessel
US2527255A (en) Well rig
US3143220A (en) Apparatus for handling pipe
CN106639923A (en) Petroleum drilling machine achieving continuous motion of tripping in and tripping out and method for continuous motion of tripping in and tripping out
US2747751A (en) Apparatus for handling pipe in a derrick
US2403081A (en) Portable derrick