US20170080563A1 US14/918,557 US201514918557A US2017080563A1 US 20170080563 A1 US20170080563 A1 US 20170080563A1 US 201514918557 A US201514918557 A US 201514918557A US 2017080563 A1 US2017080563 A1 US 2017080563A1
Authority
US
United States
Prior art keywords
wafer
robot
time
cluster tool
unloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US14/918,557
Other versions
US9618930B1 (en
Inventor
Naiqi Wu
Yan Qiao
MengChu Zhou
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Macau Univ of Science and Technology
Original Assignee
Macau Univ of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Macau Univ of Science and Technology filed Critical Macau Univ of Science and Technology
Priority to US14/918,557 priority Critical patent/US9618930B1/en
Assigned to MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY reassignment MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ZHOU, MENGCHU, QIAO, Yan, WU, NAIQI
Publication of US20170080563A1 publication Critical patent/US20170080563A1/en
Application granted granted Critical
Publication of US9618930B1 publication Critical patent/US9618930B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41885Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J9/00Programme-controlled manipulators
    • B25J9/16Programme controls
    • B25J9/1656Programme controls characterised by programming, planning systems for manipulators
    • B25J9/1669Programme controls characterised by programming, planning systems for manipulators characterised by special application, e.g. multi-arm co-operation, assembly, grasping
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/67005Apparatus not specifically provided for elsewhere
    • H01L21/67011Apparatus for manufacture or treatment
    • H01L21/67155Apparatus for manufacturing or treating in a plurality of work-stations
    • H01L21/67201Apparatus for manufacturing or treating in a plurality of work-stations characterized by the construction of the load-lock chamber
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/67005Apparatus not specifically provided for elsewhere
    • H01L21/67242Apparatus for monitoring, sorting or marking
    • H01L21/67276Production flow monitoring, e.g. for increasing throughput
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67739Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations into and out of processing chamber
    • H01L21/67742Mechanical parts of transfer devices
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67739Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations into and out of processing chamber
    • H01L21/67745Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations into and out of processing chamber characterized by movements or sequence of movements of transfer devices
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/68Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for positioning, orientation or alignment
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/39Robotics, robotics to robotics hand
    • G05B2219/39536Planning of hand motion, grasping
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/45Nc applications
    • G05B2219/45031Manufacturing semiconductor wafers

Definitions

  • the present invention generally relates to scheduling a cluster tool, where the cluster tool has a single-arm robot for wafer handling, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint.
  • the present invention relates to a method for scheduling a start-up process for a single-arm cluster tool with wafer residency time constraints.
  • wafers are processed in cluster tools with a single-wafer processing technology.
  • Such technology allows manufacturers to process wafers one by one at each process module (PM) in cluster tools.
  • PM process module
  • These tools can provide a reconfigurable, flexible and efficient environment, leading to better quality control and reduced lead time [Bader et al., 1990; and Burggraaf, 1995].
  • a cluster tool there are several process modules (PMs), an aligner, a wafer handling robot, and loadlocks (LLs) for wafer cassette loading/unloading. All these modules are mechanically linked together in a radial way and computer-controlled.
  • the robot in the center of the tool can have a single arm or dual arms, thus resulting in a single- or a dual-arm cluster tool as respectively shown in FIGS. 1A and 1B .
  • a cluster tool can be operated consecutively without being interrupted such that it can operate in a steady state for most of time.
  • Great efforts have been made in its modeling and performance evaluation [Chan et al., 2011; Ding et al., 2006; Perkinston et al., 1994; Perkinston et al., 1996; Venkatesh et al., 1997; Wu and Zhou, 2010a; Yi et al., 2008; Zuberek, 2001; and Lee et al., 2014]. It is found that, under the steady state, a cluster tool operates in two different regions: transport and process-bound ones.
  • a strict constraint on the wafer sojourn time in a PM called residency time constraint must be considered in scheduling a cluster tool [Kim et al., 2003; Lee and Park, 2005; Rostami et al., 2001; and Yoon and Lee, 2005].
  • Such a constraint requires that a wafer should be unloaded from a PM within a limited time after being processed; otherwise, the wafer would be damaged due to the high temperature and residual chemical gas in the PM.
  • no buffer between PMs in a cluster tool makes it complicated to schedule the tool to satisfy wafer residency time constraints.
  • the present invention provides a method for scheduling a cluster tool.
  • the cluster tool comprises a single-arm robot for wafer handling, a LL for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint.
  • the method includes scheduling a start-up process for the cluster tool.
  • the start-up process is developed based on Scheduling Algorithm 1 and the LPM model detailed below.
  • the method further includes scheduling a steady-state process according to results obtained in the start-up process.
  • FIG. 1A depicts an example of a cluster tool having a single-arm robot.
  • FIG. 1B depicts an example of a cluster tool having a dual-arm robot.
  • FIG. 2 depicts a Petri net (PN) for the steady state of a single-arm cluster tool according to [Wu et al., 2008].
  • PN Petri net
  • FIG. 3 depicts a Petri net for the start-up process of a single-arm cluster tool.
  • FIG. 4 shows the simulation results for Example 1.
  • FIG. 5 shows the simulation results for Example 2.
  • a PN model is developed for the start-up process of a single-arm cluster tool in Section A.
  • Section B recalls the schedulability conditions and scheduling analysis for single-arm cluster tools [Wu et al., 2008].
  • a scheduling algorithm and a linear programming model are developed for the start-up transient process scheduling in Section C.
  • N n n being a positive integer
  • PNs are widely used in modeling, analysis, and control of discrete-event systems, process industry, and robotic control systems [Zhou and DiCesare, 1991; Zhou et al., 1992 and 1995; Tang et al., 1995; Simon et al., 1998; Caloini et al., 1998; Zhou and Jeng, 1998; Wu and Zhou, 2001 and 2004; Liao et al., 2004; Ferrarini and Piroddi, 2008; Jung and Lee, 2012; Wu et al., 2008b; and Liu et al., 2013].
  • Zhou and Venkatesh the present work adopts a finite capacity PN to model a single-arm cluster tool.
  • is an input function
  • O P ⁇ T ⁇ N is an output function
  • M P ⁇ N is a marking representing the number of tokens in places with M 0 being the initial marking
  • K P ⁇ N ⁇ 0 ⁇ is a capacity function where K(p) represents the largest number of tokens that p can hold at a time.
  • the transition enabling and firing rules can be found in [Wu and Zhou, 2009].
  • Timed t i1 , i ⁇ N n models loading a wafer into Step i
  • t 01 models loading a completed wafer into a LL.
  • Timed t i2 , i ⁇ N n models unloading a wafer from Step i
  • t 02 models unloading a raw wafer from a LL.
  • Timed transition y i , i ⁇ N n ⁇ 2 ⁇ 0 ⁇ represents the robot's moving from Steps i+2 to i without carrying a wafer; while transitions y n ⁇ 1 and y n represent the robot's moving from a LL to Step n-1 and Steps 1 to n, respectively.
  • Timed transition x i , i ⁇ N n ⁇ 1 ⁇ 0 ⁇ models the robot's moving from Steps i to i+1 with a wafer held
  • x n models the robot's moving from Steps n to 0.
  • p i 's and q i 's are denoted by , z ij 's by ⁇ , and r's by .
  • the PN model for a single-arm cluster tool is shown in FIG. 2 .
  • a backward strategy is also used to operate the single-arm cluster tool for the start-up process.
  • M s0 denote the initial state.
  • the robot unloads a wafer from the LLs, moves to Step 1, and loads this wafer into Step 1.
  • M s1 denote the state of the system when the robot finishes the robot task of loading the wafer into Step 1.
  • Step 1 the robot should wait there till this wafer is completed.
  • the robot unloads this wafer from Step 1 as soon as possible, moves to Step 2, loads this wafer into Step 2, returns to the LLs and unloads a raw wafer from the LLs, moves to Step 1, and loads the raw wafer into Step 1.
  • Step 1 and Step 2 both have one wafer being processed.
  • M 52 denote the state of the system at this time.
  • the tool would reach a state that the Step i, i ⁇ N d and d ⁇ n, has one wafer being processed and Step i, d ⁇ i ⁇ n, is empty.
  • Step i, d ⁇ i ⁇ n is empty.
  • a PN model is developed shown in FIG. 3 .
  • Transition y d represents the robot's moving from Steps 1 to d.
  • y 0 is enabled and can fire. It can be seen that firing y o leads the PN to a dead marking, or the PN is deadlock-prone. Then, a control policy is introduced to make it deadlock-free.
  • Steps 1 and 2 both have one wafer being processed and the robot stays at Step 1.
  • the following transitions firing sequence is: firing y 2 (moving to Step 2) ⁇ firing t 22 (unloading a wafer from Step 2) ⁇ firing x 2 (moving from Steps 2 to 3) ⁇ firing t 31 (loading the wafer into Step 3) ⁇ firing y 1 (moving from Steps 3 to 1) ⁇ firing t 12 (unloading a wafer from Step 1) ⁇ firing x 1 (moving from Steps 1 to 2) ⁇ firing t 21 (loading the wafer into Step 2) ⁇ firing y 0 (moving from Steps 2 to 0) ⁇ firing t 02 (unloading a wafer from Step 0) ⁇ firing x 0 (moving from Steps 0 to 1) ⁇ firing t 11 (loading the wafer into Step 1).
  • transitions and places are associated with time.
  • denotes the time for the robot task of moving with or without carrying a wafer.
  • Time a i is used to denote the time taken for completing a wafer at a step. It is assumed that the time taken for the robot's unloading a wafer from a step and loading a wafer into a step/LL is same and denoted by ⁇ .
  • Transition t 02 models the robot's unloading a wafer from the LLs and aligning a wafer. Therefore, the time associated with t 02 is ⁇ 0 that is different from ⁇ .
  • the robot's waiting time (denoted by ⁇ i ) in q i is determined by a schedule and can be a real number in [ ⁇ ), or ⁇ i ⁇ [0, ⁇ ).
  • the detailed explanation of temporal features is summarized in Table 1.
  • the deadlock-freeness does not mean that the PNs shown in FIGS. 2 and 3 are live, because a token in p i cannot stay there beyond a given time interval.
  • ⁇ i be the sojourn time of a token in p i and ⁇ i the longest time for which a wafer can stay in p i after it is processed.
  • the liveness of the PN model is defined as follows.
  • Definition 1 The PN models in FIGS. 2 and 3 for single-arm cluster tools with residency time constraints are live, if 1) at any marking with a token in p 1 , ⁇ i ⁇ N n , and when t i2 fires a i ⁇ i ⁇ a i + ⁇ i holds; 2) at any marking with a token in p i , i ⁇ N d and d ⁇ n, and when t i2 fires a i ⁇ i ⁇ a i + ⁇ i holds, respectively.
  • ⁇ iL a i +4 ⁇ +3 ⁇ + ⁇ i ⁇ 1 , i ⁇ N n ⁇ 1 ⁇ (1)
  • the upper permissive cycle time at Step i is
  • ⁇ 1L a i +4 ⁇ +3 ⁇ + ⁇ i ⁇ 1 + ⁇ i , i ⁇ N n ⁇ 1 ⁇ .
  • ⁇ 1L a 1 +3 ⁇ + ⁇ 0 +3 ⁇ + ⁇ 0 .
  • ⁇ 1U a 1 +3 ⁇ + 0 +3 ⁇ + ⁇ 0 + ⁇ 1 .
  • iL a i +4 ⁇ +3 ⁇ , i ⁇ N n ⁇ 1 ⁇ , (5)
  • iU a i +4 ⁇ +3 ⁇ + ⁇ i , i ⁇ N n ⁇ 1 ⁇ , (6)
  • the robot cycle time is given by
  • ⁇ , ⁇ , and ⁇ 0 are all deterministic, only ⁇ d , d ⁇ N n ⁇ 0 ⁇ , are changeable, i.e., ⁇ 1 is deterministic and ⁇ 2 can be regulated.
  • ⁇ 1 is deterministic
  • ⁇ 2 can be regulated.
  • Theorem 1 max ⁇ iU and ⁇ 1 ⁇ iU , i ⁇ N n , a single-arm cluster tool with residency time constraints is schedulable.
  • ⁇ i - 1 ⁇ 0 , i ⁇ F ⁇ max - ( a 1 + ⁇ 1 + 3 ⁇ ⁇ + ⁇ 0 + 3 ⁇ ⁇ ) , 1 ⁇ E ⁇ max - ( a i + ⁇ i + 4 ⁇ ⁇ + 3 ⁇ ⁇ ) , 1 ⁇ E ⁇ ⁇ 2 , 3 , 4 , ... ⁇ , n ⁇ . ( 13 )
  • Theorem 2 If [ 1L , 1U ] ⁇ [ 2L , 2U ] ⁇ . . . ⁇ [ nL , nU ] ⁇ , IU ⁇ max , i ⁇ E ⁇ , iU ⁇ max , i ⁇ F, and ⁇ i ⁇ F. ⁇ i ⁇ 1 + ⁇ 1 ⁇ max , a single-arm cluster tool with residency time constraints is schedulable with ⁇ i ⁇ 1 , i ⁇ N n , being set by (13).
  • the cluster tool is idle.
  • the robot unloads a wafer from the LLs, moves to Step 1, and loads this wafer into Step 1.
  • M s1 is reached. From states M s0 to M s1 , it takes ( ⁇ 0 + ⁇ + ⁇ ) time units. Then, the robot should wait there for a 1 time units before the wafer in Step 1 is completed.
  • Step 2 unloads this wafer from Step 1 as soon as possible, moves to Step 2, loads this wafer into the Step 2, returns to the LLs and unloads a raw wafer from the LLs, moves to Step 1, and loads the raw wafer into Step 1.
  • Step 1 and 2 have one wafer being processed and M s2 is reached. From M s1 to M s25 it takes ( ⁇ 1 + ⁇ 0 +3 ⁇ +3 ⁇ ) time units.
  • transition firing (activities) sequence must be executed: Firing t i2 (time ⁇ ) ⁇ x i (time ⁇ ) ⁇ t (i ⁇ 1)1 (time ⁇ ) ⁇ y i ⁇ 1 (time ⁇ ) ⁇ robot waiting in q i ⁇ 1 (time ⁇ i ⁇ 1 ) ⁇ t (i ⁇ 1)2 (time ⁇ ) ⁇ x i ⁇ 1 (time ⁇ ) ⁇ t i1 (time ⁇ ) ⁇ processing a wafer at Step i (time ⁇ i ) ⁇ t i2 (time ⁇ ) again.
  • EQNS. (5)-(8) present the workload balance information that affects the existence of a feasible schedule. It follows from (2) and (6) that ⁇ iU > iU if ⁇ i ⁇ >0. It implies that, by making ⁇ i ⁇ 1 >0, the cycle time of Step i is increased without increasing the wafer sojourn time. Thus, it is possible to adjust the robot waiting time such that the permissive wafer so journeyn time ranges among the steps are balanced to some extent to guarantee the feasibility. To do so, we need to know how ⁇ i should be calculated. The wafer sojourn time at p i depends on the robot tasks and the workloads of the steps. From the PN model shown in FIG.
  • Step i Firing y d ⁇ 1 ⁇ waiting in q d ⁇ 1 ⁇ firing t (d ⁇ 1)2 ⁇ firing x d ⁇ 1 ⁇ firing t d1 ⁇ firing y d ⁇ 2 ⁇ waiting in q d ⁇ 2 ⁇ firing t (d ⁇ 2)2 ⁇ firing x d ⁇ 2 ⁇ firing t (d ⁇ 1)1 ⁇ . . .
  • wafer W 2 is unloaded by the robot from Step i: Firing y d ⁇ waiting in q d ⁇ firing t d2 ⁇ firing x d ⁇ firing t (d+1)1 ⁇ firing y (d ⁇ 1) ⁇ waiting in q (d ⁇ 1) ⁇ firing t (d ⁇ 1)2 ⁇ firing x d ⁇ 1 ⁇ firing t d1 ⁇ . . .
  • ⁇ sd(d+1) and ⁇ sd(d+1)1 denote the robot task time for transferring the tool from states M sd to M s(d+1) with and without robot waiting time considered, respectively.
  • Feasibility is an essential requirement for scheduling a transient process of a cluster tool.
  • the cluster tool is idle.
  • Steps 1 to n have one wafer being processed, respectively.
  • the robot tasks are determined.
  • Proposition 1 A start-up process of a single-arm cluster tool with wafer residency time constraints is schedulable if there exists the robot waiting time setting during the period from M s0 to M sn such that the wafer residency time constraint at each step is satisfied.
  • a single-arm cluster tool has n steps, n>2:
  • the tool operates according to the PN model in FIG. 3 and CP 2 .
  • Theorem 3 For a single-arm cluster tool with wafer residency time constraints, if max ⁇ iU , ⁇ 1 ⁇ iU , i ⁇ N n , a schedule obtained by Scheduling Algorithm 1 is feasible.
  • the robot performs ⁇ i such that the cluster tool can successfully go through the start-up process from M s0 to M s2 without violating any residency time constraints. Also, it takes
  • 2 ⁇ 0 +4 ⁇ +4 ⁇ +a 1 time units for the start-up process.
  • Theorem 4 For a single-arm cluster tool with wafer residency time constraints, if max ⁇ iU , ⁇ 1 ⁇ iU , i ⁇ N n , a schedule obtained by Scheduling Algorithm 1 for the start-up process is optimal.
  • Step k where the wafer sojourn time is less than a k . This means the wafer at Step k cannot be processed. If dmax ⁇ sd(d+1)1 , a better schedule for the process from M sd to M s(d+1) , 2 ⁇ d ⁇ n, cannot be found because ⁇ sd(d+1)1 cannot be shortened. Therefore, the obtained schedule by Algorithm 1 for the process from M sd to M s(d+1) , 2 ⁇ d ⁇ n, is also optimal. Hence, theorem holds.
  • LPM Linear Programming Model
  • t i2 d t (i+2)1 d + ⁇ + ⁇ i d + ⁇ , 1 ⁇ i ⁇ d ⁇ 1 and 1 ⁇ d ⁇ n ⁇ 1, (22)
  • t i2 d t (i+2)1 d + ⁇ + ⁇ i d + ⁇ , 1 ⁇ i ⁇ n ⁇ 2 and d ⁇ ⁇ n, n+ 1 ⁇ , (27)
  • t 02 d t 21 d + ⁇ + ⁇ 0 d + ⁇ 0 , d ⁇ ⁇ n, n+ 1 ⁇ , (30)
  • the robot task sequence for the start-up process from M s0 to M s2 is ⁇ 1 . Then, the system is operated with the backward strategy based on the PN model in FIG. 2 . For a tool with n>2 processing steps, the robot task sequence for the start-up process from M s0 to M s2 is also ⁇ 1 . Then, the system will run according to the PN model in FIG. 3 till it reaches state M sn . In the following operations, the system is operated by the backward strategy based on the PN model in FIG. 2 . Notice that the robot task sequence for the start-up process of the two cases is known in advance. However, the robot waiting time is unknown.
  • the schedule for the start-up process is determined.
  • Objective (18) in LPM is to minimize the total robot waiting time.
  • Constraints (19) and (21) give the time for completing the robot task of loading a wafer into a step.
  • Constraints (20) and (22)-(24) represent the time for completing the robot task of unloading a wafer from a step.
  • Constraints (25) and (26) mean the time for completing the robot task of loading a wafer into a step
  • Constraints (27)-(30) indicate the time for completing the robot task of unloading a wafer from a step.
  • Constraint (31) makes sure that the robot waiting time is same for the different cycle under the steady state.
  • Constraint (32) means that the robot waiting time is no less than zero. With wafer residency time constraints being considered, Constraint (33) is used to guarantee such constraints to be satisfied. In this way, a schedule for the start-up process could be obtained by this model.
  • a schedule can be obtained by setting the robot waiting time as: 1)
  • the robot waiting time ⁇ i n and ⁇ i n+1 , 0 ⁇ i ⁇ n can be determined by LPM.
  • the simulation result is shown in FIG. 4 . It shows that it takes 521s for the start-up process.
  • LPM is used to find an optimal and feasible schedule for the start-up process.
  • the present invention is developed based on the theoretical development in Sections A-C above.
  • An aspect of the present invention is to provide a computer-implemented method for scheduling a cluster tool.
  • the cluster tool comprises a single-arm robot for wafer handling, a LL for wafer cassette loading and unloading, and n process modules each for performing a wafer-processing step with a wafer residency time constraint where the ith process module, i ⁇ N n , is used for performing Step i of the n wafer-processing steps for each wafer.
  • the cluster tool is said to comprise a LL, it is understood that in the present invention, the cluster tool can have one or more LLs.
  • the method includes scheduling a start-up process for the cluster tool.
  • the start-up process is developed based on Scheduling Algorithm 1.
  • ⁇ j , j ⁇ ⁇ 0, 1, . . . , d ⁇ is a robot waiting time used in the state M sd for the robot to wait before unloading a wafer in Step j from the robot to the (j+l)th process module.
  • the method further includes scheduling the steady-state process based on the results obtained in the start-up process.
  • values of ⁇ 0 , ⁇ 1 , . . . , and ⁇ d are determined, in which ⁇ j , j ⁇ ⁇ 0, 1, . . . , n ⁇ , is a robot waiting time, used in a steady state of the cluster tool, for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module.
  • the start-up process is further developed based on the LPM model.
  • [ 1L , 1U ] ⁇ [ 2L , 2U ] ⁇ . . . ⁇ [ nL , nU ]
  • d ⁇ is a robot waiting time used in the state M sd for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module.
  • M sn denotes that n instances of a wafer unloading from the robot to any one of the n process modules have occurred since the system start-up.
  • the embodiments disclosed herein may be implemented using general purpose or specialized computing devices, computer processors, or electronic circuitries including but not limited to digital signal processors (DSP), application specific integrated circuits (ASIC), field programmable gate arrays (FPGA), and other programmable logic devices configured or programmed according to the teachings of the present disclosure.
  • DSP digital signal processors
  • ASIC application specific integrated circuits
  • FPGA field programmable gate arrays
  • Computer instructions or software codes running in the general purpose or specialized computing devices, computer processors, or programmable logic devices can readily be prepared by practitioners skilled in the software or electronic art based on the teachings of the present disclosure.
  • the method disclosed herein can be implemented in a single-arm cluster tool if the cluster tool includes one or more processors.
  • the one or more processors are configured to execute a process of scheduling the cluster tool according to one of the embodiments of the disclosed method.

Abstract

Due to the trend of using larger wafer diameter and smaller lot size, cluster tools need to switch from processing one lot of wafers to another frequently. It leads to more transient periods in wafer fabrication. Their efficient scheduling and control problems become more and more important. It becomes difficult to solve such problems, especially when wafer residency time constraints must be considered. This work develops a Petri net model to describe the behavior during the start-up transient processes of a single-arm cluster tool. Then, based on the model, for the case that the difference of workloads among the steps is not too large and can be properly balanced, a scheduling algorithm to find an optimal feasible schedule for the start-up process is given. For other cases schedulable at the steady state, a linear programming model is developed to find an optimal feasible schedule for the start-up process.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims the benefit of U.S. Provisional Patent Application No. 62/221,034, filed on Sep. 20, 2015, which is incorporated by reference herein in its entirety.
  • LIST OF ABBREVIATIONS
  • CP control policy
  • LL loadlock
  • LPM linear programming model
  • PM process module
  • PN Petri net
  • BACKGROUND
  • 1. Field of the invention
  • The present invention generally relates to scheduling a cluster tool, where the cluster tool has a single-arm robot for wafer handling, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint. In particular, the present invention relates to a method for scheduling a start-up process for a single-arm cluster tool with wafer residency time constraints.
  • LIST OF REFERENCES
  • There follows a list of references that are occasionally cited in the specification. Each of the disclosures of these references is incorporated by reference herein in its entirety.
      • M. Bader, R. Hall and G. Strasser, “Integrated processing equipment,” Solid State Technol., vol. 33, no. 5, pp. 149-154, 1990.
      • P. Burggraaf, “Coping with the high cost of wafer fabs.” Semiconductor International, vol. 38, pp. 45-50, 1995.
      • A. Caloini, G. A. Magnani and M. Pezzè, “A technique for designing robotic control systems based on Petri nets,” IEEE Transactions on Control Systems and Technology, vol. 6, no. 1, pp. 72-87, 1998.
      • W. K. V. Chan, J. Yi and S. Ding, “Optimal scheduling of multicluster tools with constant robot moving times, part I: two-cluster analysis,” IEEE Transactions on Automation Science and Engineering, vol. 8, no. 1, pp. 5-16, January 2011.
      • S. Ding, J. Yi and M. Zhang, “Scheduling multi-cluster tools: An integrated event graph and network model approach,” IEEE Transactions on Semiconductor Manufacturing, vol. 19, no. 3, pp. 339-351, August 2006.
      • L. Ferrarini and L. Piroddi, “Modeling and control of fluid transportation operations in production plants with Petri nets,” IEEE Transactions on Control Systems and Technology, vol. 16, no. 5, pp. 1090-1098, 2008.
      • D. Liu, Z. W. Li and M. C. Zhou, “Hybrid Liveness-Enforcing Policy for Generalized Petri Net Models of Flexible Manufacturing Systems,” IEEE Transactions on Systems, Man, and Cybernetics: Systems, vol. 43, no. 1, pp. 85-97, January 2013.
      • C. Jung and T.-E. Lee, “An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems,” IEEE Transactions on Semiconductor Manufacturing, vol. 25, no. 2, pp. 186-199, 2012.
      • T. K. Kim, C. Jung and T. E. Lee, “Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation” International Journal of Production Research, vol. 50, no. 10, pp. 2785-2795, May 2012.
      • D. K. Kim, T. E. Lee and H. J. Kim, “Optimal scheduling of transient cycles for single-armed cluster tools,” in Proceedings of the 2013 IEEE International Conference on Automation Science and Engineering, Madison, Wis., USA, August 2013a.
      • H. J. Kim, J. H. Lee, C. Jung and T. E. Lee, “Scheduling cluster tools with ready time constraints for consecutive small lots,” IEEE Transactions on Automation Science and Engineering, vol. 10, no. 1, pp. 145-159, January 2013b.
      • H. J. Kim, J. H. Lee and T. E. Lee, “Noncyclic scheduling of cluster tools with a branch and bound algorithm,” IEEE Transactions on Automation Science and Engineering, vol. 12 , no. 2, pp. 690-700, April 2015.
      • J.-H. Kim, T.-E. Lee, H.-Y. Lee and D.-B. Park, “Scheduling analysis of timed-constrained dual-armed cluster tools,” IEEE Transactions on Semiconductor Manufacturing, vol. 16, no. 3, 521-534, 2003.
      • J. H. Lee, H. J. Kim and T. E. Lee, “Scheduling transient periods of dual-armed cluster tools,” in Proceedings of the 2012 IEEE International Conference on Mechatronics and Automation, Chengdu, China, pp. 1569-1574, August 2012.
      • J. H. Lee, H. J. Kim and T. E. Lee, “Scheduling lot switching operations for cluster tools,” IEEE Transactions on Semiconductor Manufacturing, vol. 26, no. 4, pp. 592-601, 2013.
      • J. H. Lee, H. J. Kim and T. E. Lee, “Scheduling cluster tools for concurrent processing of two wafer types,” IEEE Transactions on Automation Science Engineering, vol. 11, no. 2, pp. 525-536, 2014.
      • T.-E. Lee, H.-Y. Lee and Y.-H. Shin, “Workload balancing and scheduling of a single-armed cluster tool,” in Proceedings of the 5th APIEMS Conference, Gold Coast, Australia, pp. 1-15, 2004.
      • T.-E. Lee and S.-H. Park, “An extended event graph with negative places and tokens for timed window constraints,” IEEE Transactions on Automation Science and Engineering, vol. 2, no. 4, pp. 319-332, 2005.
      • D-Y. Liao, M. D. Jeng and M. C. Zhou, “Petri net modeling and Lagrangian relaxation approach to vehicle scheduling in 300 mm semiconductor manufacturing,” in Proc. 2004 IEEE Conf Robot. Autom., New Orleans, La., 2004, pp. 5301-5306.
      • M.-J. Lopez and S.-C. Wood, “Systems of multiple cluster tools—configuration, reliability, and performance,” IEEE Transactions on Semiconductor Manufacturing, vol. 16, no. 2, pp. 170-178, 2003.
      • T. L. Perkinson, P. K. Maclarty, R. S. Gyurcsik and R. K. Cavin, III, “Single-wafer cluster tools performance: An analysis of throughput,” IEEE Transactions on Semiconductor Manufacturing, vol. 7, no. 2, pp. 369-373, May 1994.
      • T. L. Perkinston, R. S. Gyurcsik and P. K. Maclarty, “Single-wafer cluster tool performance: An analysis of effects of redundant chambers and revisitation sequences on throughput,” IEEE Transactions on Semiconductor Manufacturing, vol. 9, no. 2, pp. 384-400. May 1996.
      • Y. Qiao, N. Q. Wu and M. C. Zhou, “Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation,” IEEE Transactions on Semiconductor manufacturing, vol. 25, no. 3, pp. 432-446, 2012a.
      • Y. Qiao, N. Q. Wu and M. C. Zhou, “Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation,” IEEE Transactions on Automation Science and Engineering, vol. 9, no. 3, pp. 564-577, 2012b.
      • Y. Qiao, N. Q. Wu and M. C. Zhou, “A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting” IEEE Transactions on Semiconductor Manufacturing, vol. 26, no. 1, pp. 100-110, Februar 2013.
      • S. Rostami, B. Hamidzadeh and D. Camporese, “An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints,” IEEE Transactions on Robotics and Automation, vol. 17, pp. 609-618, 2001.
      • D. Simon, E. C. Castaneda and P. Freedman, “Design and analysis of synchronization for real-time closed-loop control in robotics,” IEEE Transactions on Control Systems and Technology, vol. 6, no. 4, pp. 445-461, 1998.
      • Raymond Tang, Grantham K. H. Pang and Stephen S. Woo, “A continuous fuzzy Petri net tool for intelligent process monitoring and control,” IEEE Transactions on Control Systems and Technology, vol. 3, no. 3, pp. 318-329, 1995.
      • S. Venkatesh, R. Davenport, P. Foxhoven and J. Nulman, “A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots,” IEEE Transactions on Semiconductor Manufacturing, vol. 10, no. 4, pp. 418-424, November 1997.
      • N. Q. Wu, C. B. Chu, F. Chu and M. C. Zhou, “A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints,” IEEE Transactions on Semiconductor Manufacturing, vol. 21, no. 2, pp. 224-237, 2008a.
      • N. Q. Wu and M. C. Zhou, “Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems”, IEEE Transactions on Robotics and Automation, vol. 17, no. 5, pp. 657-668, 2001.
      • N. Q. Wu and M. C. Zhou, “Modeling and deadlock control of automated guided vehicle systems,” IEEE/ASME Transactions on Mechatronics, vol. 9, no. 1, pp. 50-57, 2004.
      • N. Q. Wu and M. C. Zhou, System modeling and control with resource-oriented Petri nets, CRC Press, Taylor & Francis Group, New York, October 2009.
      • N. Q. Wu and M. C. Zhou, “Colored time Petri nets for modeling and analysis of cluster tools,” Asian Journal of Control, vol. 12, no. 3, pp. 253-266, 2010a.
      • N. Q. Wu and M. C. Zhou, “A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis,” IEEE Transactions on Automation Science and Engineering, vol. 7, no. 2, 303-315, 2010b.
  • N. Q. Wu, M. C. Zhou and Z. W. Li, “Resource-oriented Petri net for deadlock avoidance in flexible assembly systems,” IEEE Transactions on System, Man, & Cybernetics, Part A, vol. 38, no. 1, pp. 56-69, 2008b.
      • U. Wikborg and T. E. Lee, “Noncyclic scheduling for timed discrete event systems with application to single-armed cluster tools using Pareto-optimal optimization,” IEEE Transactions on Automation Science and Engineering, vol. 10, no. 3, pp. 689-710, July 2013.
      • J. Yi, S. Ding and M. Zhang, “Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach,” IEEE Transactions on Automation Science and Engineering, vol. 5, no. 2, pp. 321-336, April 2008.
      • H. J. Yoon and D. Y. Lee, “On-line scheduling of integrated single-wafer processing tools with temporal constraints,” IEEE Transactions on Semiconductor Manufacturing, vol. 18, no. 3, pp. 390-398, 2005.
      • M. Zhou and F. DiCesare, “Parallel and sequential mutual exclusions for Petri net modeling of manufacturing systems with shared resources,” IEEE Transactions on Robotics and Automation, vol. 7, no. 4, pp. 515-527, 1991.
      • M. Zhou, F. DiCesare and A. Desrochers, “A hybrid methodology for synthesis of Petri nets for manufacturing systems,” IEEE Transactions on Robotics and Automation, vol. 8, pp. 350-361, 1992.
      • M. C. Zhou and M. D. Jeng, “Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: a Petri net approach,” IEEE Transactions on Semiconductor Manufacturing, vol. 11, no. 3, pp. 333-357, 1998.
      • M. C. Zhou and K. Venkatesh, Modeling, simulation and control of flexible manufacturing systems: A Petri net approach, World Scientific, Singapore, 1998.
      • M. C. Zhou, C.-H. Wang and X. Y. Zhao, “Automating mason's rule and its application to analysis of stochastic Petri nets,” IEEE Transactions on Control Systems and Technology, vol. 3, no. 2, pp. 238-244, 1995.
      • W. M. Zuberek, “Timed Petri nets in modeling and analysis of cluster tools,” IEEE Transaction on Robotics & Automation Magazine, vol. 17, no. 5, pp.562-575, October 2001.
  • 2. Description of the Related Art
  • In semiconductor manufacturing, wafers are processed in cluster tools with a single-wafer processing technology. Such technology allows manufacturers to process wafers one by one at each process module (PM) in cluster tools. These tools can provide a reconfigurable, flexible and efficient environment, leading to better quality control and reduced lead time [Bader et al., 1990; and Burggraaf, 1995]. In a cluster tool, there are several process modules (PMs), an aligner, a wafer handling robot, and loadlocks (LLs) for wafer cassette loading/unloading. All these modules are mechanically linked together in a radial way and computer-controlled. The robot in the center of the tool can have a single arm or dual arms, thus resulting in a single- or a dual-arm cluster tool as respectively shown in FIGS. 1A and 1B.
  • With two LLs, a cluster tool can be operated consecutively without being interrupted such that it can operate in a steady state for most of time. Great efforts have been made in its modeling and performance evaluation [Chan et al., 2011; Ding et al., 2006; Perkinston et al., 1994; Perkinston et al., 1996; Venkatesh et al., 1997; Wu and Zhou, 2010a; Yi et al., 2008; Zuberek, 2001; and Lee et al., 2014]. It is found that, under the steady state, a cluster tool operates in two different regions: transport and process-bound ones. For the former, its robot is always busy and the robot task time in a cycle determines its cycle time; while for the latter, its robot has idle time in a robot task cycle and thus the processing time of its PMs dominates its cycle time. Since the robot moving time from one PM to another is much shorter than wafer processing time [Kim et al., 2003], a backward scheduling is optimal for single-arm cluster tools [Lee et al., 2004; and Lopez and Wood, 2003]. For a dual-arm cluster tool, a swap strategy is efficient [Venkatesh et al., 1997] for it can simplify robot tasks and thus reduces cycle time.
  • For some wafer fabrication processes, a strict constraint on the wafer sojourn time in a PM called residency time constraint must be considered in scheduling a cluster tool [Kim et al., 2003; Lee and Park, 2005; Rostami et al., 2001; and Yoon and Lee, 2005]. Such a constraint requires that a wafer should be unloaded from a PM within a limited time after being processed; otherwise, the wafer would be damaged due to the high temperature and residual chemical gas in the PM. However, no buffer between PMs in a cluster tool makes it complicated to schedule the tool to satisfy wafer residency time constraints. Methods are presented in [Kim et al., 2003; Lee and Park, 2005; and Rostami et al., 2001] to solve this scheduling problem and find an optimal periodic schedule for dual-arm cluster tools. Necessary and sufficient schedulability conditions are proposed for both single- and dual-arm cluster tools and if schedulable, closed-form scheduling algorithms are derived to find the optimal cyclic schedules [Wu et al., 2008a; and Wu and Zhou, 2010b].
  • Due to the trends of larger wafer diameter and smaller lot sizes, cluster tools need to switch from processing one lot of wafers to another one frequently. This leads to more transient periods in wafer fabrication, which includes start-up and close-down processes. Their efficient scheduling and control problems become more and more important. They become very difficult to solve especially when wafer residency time constraints must be considered. Although most existing studies [Chan et al., 2011; Ding et al., 2006; Perkinston et al., 1994; Perkinston et al., 1996; Venkatesh et al., 1997; Wu and Zhou, 2010a; Yi et al., 2008; Zuberek, 2001; Qiao et al., 2012a and 2012b; Qiao et al., 2013; and Lee et al., 2014] aim at finding an optimal periodical schedule, few researches focus on scheduling for transient states [Lee et al., 2012 and 2013; Kim et al., 2012, 2013a, 2013b, and 2013c; and Wikborg and Lee, 2013] despite their increasing importance. In [Kim et al., 2012], with a given robot task sequence, the transient period for the start-up and close-down processes is minimized for a dual-arm cluster tool. In [Kim et al., 2013a, and Wikborg and Lee, 2013], scheduling methods are proposed for noncyclic scheduling problem for single-arm cluster tools. With small batch, lot switching occurs frequently. Thus, studies are conducted and techniques are developed for scheduling lot switching processes for both single and dual-arm cluster tools [Lee et al., 2012 and 2013; and Kim et al., 2013b and 2013c].
  • However, all the above studies about scheduling a transient process in a cluster tool are not applicable for a single-arm cluster tool with wafer residency time constraints, which are not considered in [Lee et al., 2012 and 2013; Kim et al., 2013a, 2013b, and 2013c; and Wikborg and Lee, 2013]. Such constraints can make an optimal schedule for a transient process without residency time constraints considered infeasible. With wafer residency time constraints, Kim et al. [2012] propose scheduling methods to minimize the transient period for the start-up and close-down processes for dual-arm cluster tools. Since different scheduling strategies are required to schedule single-arm cluster tools. Their research results cannot be used to find an optimal feasible transient process for residency time-constrained single-arm cluster tools.
  • There is a need in the art to derive a solution to this optimal feasible transient process and to develop a method for scheduling a single-arm cluster tool based on the derived optimal solution.
  • SUMMARY OF THE INVENTION
  • The present invention provides a method for scheduling a cluster tool. The cluster tool comprises a single-arm robot for wafer handling, a LL for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint.
  • The method includes scheduling a start-up process for the cluster tool. The start-up process is developed based on Scheduling Algorithm 1 and the LPM model detailed below.
  • Preferably, the method further includes scheduling a steady-state process according to results obtained in the start-up process.
  • Other aspects of the present invention are disclosed as illustrated by the embodiments hereinafter.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1A depicts an example of a cluster tool having a single-arm robot.
  • FIG. 1B depicts an example of a cluster tool having a dual-arm robot.
  • FIG. 2 depicts a Petri net (PN) for the steady state of a single-arm cluster tool according to [Wu et al., 2008].
  • FIG. 3 depicts a Petri net for the start-up process of a single-arm cluster tool.
  • FIG. 4 shows the simulation results for Example 1.
  • FIG. 5 shows the simulation results for Example 2.
  • DETAILED DESCRIPTION
  • A PN model is developed for the start-up process of a single-arm cluster tool in Section A. Section B recalls the schedulability conditions and scheduling analysis for single-arm cluster tools [Wu et al., 2008]. Then, a scheduling algorithm and a linear programming model are developed for the start-up transient process scheduling in Section C.
  • Hereinafter, the notation Nn, n being a positive integer, denotes a set containing positive integers from 1 to n, i.e. Nn={1, 2, . . . , n}.
  • A. PETRI NET MODELING AND CONTROL A.1. Finite Capacity Petri Nets
  • As an effective tool, PNs are widely used in modeling, analysis, and control of discrete-event systems, process industry, and robotic control systems [Zhou and DiCesare, 1991; Zhou et al., 1992 and 1995; Tang et al., 1995; Simon et al., 1998; Caloini et al., 1998; Zhou and Jeng, 1998; Wu and Zhou, 2001 and 2004; Liao et al., 2004; Ferrarini and Piroddi, 2008; Jung and Lee, 2012; Wu et al., 2008b; and Liu et al., 2013]. Following Zhou and Venkatesh [1998], the present work adopts a finite capacity PN to model a single-arm cluster tool. It is defined as PN=(P, T, I, O, M, K), where P={p1, p2, . . . , pm} is a finite set of places; T={t1, t2, . . . , tn} is a finite set of transitions with P∩T≠Ø and P∩T=Ø; I:P×T→N={0, 1, 2, . . . } is an input function; O: P×T→N is an output function; M: P→N is a marking representing the number of tokens in places with M0 being the initial marking; and K: P→N\{0} is a capacity function where K(p) represents the largest number of tokens that p can hold at a time.
  • The preset of transition t is the set of all input places to t, i.e. t={p: p∈P and I(p, t)>0}. Its postset is the set of all output places from t, i.e., t={p: p∈P and O(p, t)>0}. Similarly, p's preset p={t∈T: O(p, t)>0} and postset p={t∈T: I(p, t)>0}. The transition enabling and firing rules can be found in [Wu and Zhou, 2009].
  • A.2. PN Model for Cluster Tools
  • In the present work, it is assumed that there are n≧2 steps in a cluster tool and only one PM serves for each step. Let (PM1, PM2, . . . , PMn) denote the wafer flow pattern, where PMi, i ∈ Nn, represents a process model being used to process wafers at Step i. Thus, a wafer needs to be processed at PM1−PMn sequentially before it is completed. Wu et al. [2008a] developed a PN model and conducted the steady periodical scheduling analysis for a single-arm cluster tool with wafer residency time constraints. We briefly introduce their PN model next.
  • In such a PN model, Step i is modeled by timed place pi with K(pi)=1, i ∈ Nn. The LLs are treated just as a processing step called Step 0. Since the LLs can hold all the wafers in a tool, they are modeled by p0 with K(p0)=∝. The robot is modeled by place r with K(r)=1, meaning that it has only one arm and can hold one wafer at a time. When M(r)=1, it represents that the robot arm is available. When M(pi)=1, i ∈ Nn, a wafer is being processed in the PM for Step i. When the robot arrives at Step i for unloading a wafer, the wafer may be under way. Then, it has to wait there for some time. Timed place qi, i ∈ Nn, is added to model the robot's waiting at Step i before unloading a wafer there and M(qi)=1 means that the robot is waiting at Step i. Note that the explicit representation of a robot wait as a place is critically important to deal with residency time constraints. Non-timed place zij is used to model the state at which it is ready to load a wafer to Step i or the wafer unloading from Step i ends. Transitions are used to model the robot tasks. Timed ti1, i ∈ Nn, models loading a wafer into Step i, and t01 models loading a completed wafer into a LL. Timed ti2, i ∈ Nn, models unloading a wafer from Step i, and t02 models unloading a raw wafer from a LL. Timed transition yi, i ∈ Nn−2∪{0}, represents the robot's moving from Steps i+2 to i without carrying a wafer; while transitions yn−1 and yn represent the robot's moving from a LL to Step n-1 and Steps 1 to n, respectively. Timed transition xi, i ∈ Nn−1∪{0}, models the robot's moving from Steps i to i+1 with a wafer held, and xn models the robot's moving from Steps n to 0. Pictorially, pi's and qi's are denoted by
    Figure US20170080563A1-20170323-P00001
    , zij's by ◯, and r's by
    Figure US20170080563A1-20170323-P00002
    . Then, the PN model for a single-arm cluster tool is shown in FIG. 2.
  • At the steady state, every process module has one wafer being processed, i.e., Σi=1 n K(pi) wafers are being processed. For the PN model in FIG. 2, consider marking M with M(pi)=1, i ∈ Nn, and M(r)=1. At this marking, y0 is enabled and firing y0 leads the PN to a dead marking, or the PN is deadlock-prone. Thus, according to [Wu et al., 2008], a control policy is proposed to make it deadlock-free.
  • Control Policy 1 (CP1): At any M of the PN model in FIG. 2, yi, i ∈ Nn−1∪{0}, is said to be control-enabled if M(pi+1)=0; and yn is said to be control-enabled if M(pi)=1, i ∈ Nn.
  • Before a cluster tool reaches its steady state, it must experience a start-up process. For a single-arm cluster tool, because the processing time is much longer than the robot task time, a backward strategy is found to be optimal [Lee et al., 2004; and Lopez and Wood, 2003]. Thus, a backward strategy is also used to operate the single-arm cluster tool for the start-up process. At the initial state, there is no wafers being processed in the tool, or the tool is empty. Let Ms0 denote the initial state. When the tool starts to work, the robot unloads a wafer from the LLs, moves to Step 1, and loads this wafer into Step 1. Let Ms1 denote the state of the system when the robot finishes the robot task of loading the wafer into Step 1. Then, the robot should wait there till this wafer is completed. After the wafer is processed, the robot unloads this wafer from Step 1 as soon as possible, moves to Step 2, loads this wafer into Step 2, returns to the LLs and unloads a raw wafer from the LLs, moves to Step 1, and loads the raw wafer into Step 1. At this time, Step 1 and Step 2 both have one wafer being processed. Thus, let M52 denote the state of the system at this time. In the following operations of the system, the tool would reach a state that the Step i, i ∈Nd and d<n, has one wafer being processed and Step i, d<i≦n, is empty. To model this state, a PN model is developed shown in FIG. 3.
  • The places in the PN model in FIG. 3 have the same meanings as the ones in FIG. 2. Transitions ti1, ∈ Nd+1, d<n and d≧2, ti2, i ∈ Nd∪{0}, d<n and d≧2, xi, i ∈ Nd∪{0}, d<n and d≧2, and yi, i ∈ Nd−1∪{0}, d<n and d≧2, in the PN model in FIG. 3 also have the same meanings as the ones in FIG. 2. Transition yd represents the robot's moving from Steps 1 to d. Because Step i, i ∈ Nd, d<n and d≧2, has one wafer being processed and Step i, d<i≦n, is empty, we have M(pi)=K(pi), i ∈ Nd, d<n and d≧2, and M(r)=1. At the marking shown in FIG. 3, y0 is enabled and can fire. It can be seen that firing yo leads the PN to a dead marking, or the PN is deadlock-prone. Then, a control policy is introduced to make it deadlock-free.
  • Control Policy 2 (CP2): For the PN model in FIG. 3, yi, i ∈ Nd∪{0}, d<n and d≧2, is said to be control-enabled if M(pi+1)=0.
  • With CP2, the start-up process could be described by running the PN model in FIG. 3 shown as follows. At the state Ms2, Steps 1 and 2 both have one wafer being processed and the robot stays at Step 1. To describe the state Ms2, we can set d=2 in the PN model and Ms2(pi)=K(pi), i ∈ N2, and Ms2(r)=1 holds. According to CP2, the following transitions firing sequence is: firing y2 (moving to Step 2)→firing t22 (unloading a wafer from Step 2)→firing x2 (moving from Steps 2 to 3)→firing t31 (loading the wafer into Step 3)→firing y1 (moving from Steps 3 to 1)→firing t12 (unloading a wafer from Step 1)→firing x1 (moving from Steps 1 to 2)→firing t21 (loading the wafer into Step 2)→firing y0 (moving from Steps 2 to 0)→firing t02 (unloading a wafer from Step 0)→firing x0 (moving from Steps 0 to 1)→firing t11 (loading the wafer into Step 1). At this time, the system reaches state Ms3 such that Ms3(pi)=K(pi), i ∈ N3, and Ms3(r)=1 hold. Then, we can set d=3 in the PN model. According to CP2, the PN model can evolve to state Ms4 with Ms4(pi)=K(pi), i ∈ N4, and Ms4(r)=1. Similarly, with the PN model in FIG. 3 and CP2, the PN model can evolve to state Msn with Msn(pi)=K(pi), i ∈ Nn, and Msn(r)=1. At this time, the cluster tool is full of wafers and it reaches the steady state.
  • A.3. Activity Time Modeling
  • In the PN models in FIGS. 2 and 3, to describe the temporal aspect of a cluster tool, both transitions and places are associated with time. We use μ to denote the time for the robot task of moving with or without carrying a wafer. Time ai is used to denote the time taken for completing a wafer at a step. It is assumed that the time taken for the robot's unloading a wafer from a step and loading a wafer into a step/LL is same and denoted by α. Transition t02 models the robot's unloading a wafer from the LLs and aligning a wafer. Therefore, the time associated with t02 is α0 that is different from α. The robot's waiting time (denoted by ωi) in qi is determined by a schedule and can be a real number in [∝), or ωi ∈[0, ∝). The detailed explanation of temporal features is summarized in Table 1.
  • TABLE 1
    The Time Durations Associated with Transitions and Places
    Allowed
    Transition time
    or place Actions duration
    ti1 Robot loads a wafer into Step i, i∈Nn∪{0} α
    ti2 Robot unloads a wafer from Step i, i∈Nn
    t02 Robot unloads a wafer from a LL and aligns it α0
    yi Robot moves from a step to another without μ
    carrying a wafer
    xi Robot moves from a step to another with a wafer
    carried
    pi A wafer being processed in pi, i∈Nn ai
    qi robot waits before unloading a wafer from Step i, ωi
    i∈Nn∪{0}
    zij No activity is associated
  • With wafer residency time constraints, the deadlock-freeness does not mean that the PNs shown in FIGS. 2 and 3 are live, because a token in pi cannot stay there beyond a given time interval. Let τi be the sojourn time of a token in pi and δi the longest time for which a wafer can stay in pi after it is processed. Then, the liveness of the PN model is defined as follows.
  • Definition 1: The PN models in FIGS. 2 and 3 for single-arm cluster tools with residency time constraints are live, if 1) at any marking with a token in p1, ∀i ∈ Nn, and when ti2 fires ai≦τi≦aii holds; 2) at any marking with a token in pi, i ∈Nd and d<n, and when ti2 fires ai≦τi≦aii holds, respectively.
  • B. SCHEDULABILITY CONDITIONS
  • Before scheduling the start-up process, we recall the necessary and sufficient schedulability conditions of a single-arm cluster tool with wafer residency time constraints under the steady state derived in [Wu et al., 2008].
  • B.1. Timeliness Analysis for the Steady State
  • It follows from [Wu et al., 2008] that, to complete the processing of a wafer at Step i, i ∈ Nn−1, it takes τi+4α+3μ+ωi−1 time units, where τi should be within [ai, aii]. With only one PM at Step i, i ∈ Nn, we have that the lower permissive cycle time at Step i is

  • θiL =a i+4α+3μ+ωi−1 , i ∈ N n\{1}  (1)
  • The upper permissive cycle time at Step i is

  • θ1L =a i+4α+3μ+ωi−1i , i ∈ N n\{1}.   (2)
  • For Step 1, the lower one is

  • θ1L =a 1+3α+α0+3μ+ω0.   (3)
  • Its upper one is

  • θ1U =a 1+3α+0+3μ+ω01.   (4)
  • It follows from (1)-(4) that the robot waiting time ωi, E ∈ Nn−1∪{0}, affects the permissive wafer sojourn time. Thus, by carefully regulating them, one can change the permissive range among the steps. By removing them from the above expressions, we obtain the lower and upper workloads with no robot waiting for each step as follows:

  • Figure US20170080563A1-20170323-P00003
    iL =a i+4α+3μ, i ∈ N n\{1},   (5)

  • Figure US20170080563A1-20170323-P00003
    iU =a i+4α+3μ+δi , i ∈ N n\{1},   (6)

  • Figure US20170080563A1-20170323-P00003
    1L =a i+3α+α0+3μ  (7)

  • and

  • Figure US20170080563A1-20170323-P00003
    1U =a 1+3α+α0+3μ+δ1,   (8)
  • where
    Figure US20170080563A1-20170323-P00003
    jL and
    Figure US20170080563A1-20170323-P00003
    jU are the lower and the upper workloads, respectively, for Step j, j ∈ Nn.
  • To schedule a single-arm cluster tool with residency time constraints, one has to ensure ai≦τi≦aii. Hence, we need to know how τi is calculated. According to [Wu et al., 2008], we have that
  • τ i = 2 ( n + 1 ) μ + ( 2 n + 1 ) α + α 0 + d = 0 n ω d - ( 4 α + 3 μ + ω i - 1 ) = ψ - ( 4 α + 3 μ + ω i - 1 ) , i N n \ { 1 } and ( 9 ) τ 1 = 2 ( n + 1 ) μ + ( 2 n + 1 ) α + α 0 + d = 0 n ω d - ( 3 α + α 0 + 3 μ + ω 0 ) = ψ - ( 3 α + α 0 + 3 μ + ω 0 ) . ( 10 )
  • The robot cycle time is given by

  • ψ=2(n+1 )μ+(2n+1)α+α0d=0 nωd12   (11)
  • where ψ1=2(n+1)μ+(2n+1)α+α0 is a known constant and ψ2d=0 nωd is to be decided by a schedule. It should be pointed out that ψ is independent of the ωi's. Let θ11+3α+α0+3μ+ω0 and θii+4α+3μ+ωi−1, i ∈ Nn−{1}, denote the cycle time for Step i, i ∈ Nn. Then, it can be seen that, by making ωi−1>0, the cycle time of Step i is increased without increasing the wafer sojourn time. Thus, it is possible to adjust the robot waiting time to balance the wafer sojourn time among the steps such that a feasible schedule can be obtained. For a periodic schedule in a steady state, we have

  • θ=θ12= . . . =θn=ψ.   (12)
  • In (11), μ, α, and α0 are all deterministic, only ωd, d ∈ Nn∪{0}, are changeable, i.e., ψ1 is deterministic and ψ2 can be regulated. Thus, based on the PN model shown in FIG. 2, one can schedule a single-arm cluster tool with residency time constraints by appropriately regulating ωd, d ∈ Nn∪{0}, such that (12) holds and at the same time the wafer residency time constraints are fully satisfied.
  • B.2. Schedulability Conditions for the Steady State Scheduling
  • To find a feasible cyclic schedule, the key is to know under what conditions there exists θ such that the system is schedulable. Notice that, in (5)-(8),
    Figure US20170080563A1-20170323-P00001
    iL and
    Figure US20170080563A1-20170323-P00001
    iU denote the lower and upper bounds of θi, respectively. Let
    Figure US20170080563A1-20170323-P00001
    max=max{
    Figure US20170080563A1-20170323-P00001
    iL, i ∈Nn}. Then, Wu et al. [2008] establish the following schedulability conditions.
  • Theorem 1:
    Figure US20170080563A1-20170323-P00004
    max
    Figure US20170080563A1-20170323-P00004
    iU and ψ1
    Figure US20170080563A1-20170323-P00004
    iU, i ∈ Nn, a single-arm cluster tool with residency time constraints is schedulable.
  • For this case, when
    Figure US20170080563A1-20170323-P00004
    max
    Figure US20170080563A1-20170323-P00004
    iU and ψ1
    Figure US20170080563A1-20170323-P00004
    max, i ∈ Nn, the tool is process-bound. When
    Figure US20170080563A1-20170323-P00004
    iL≦ψ1
    Figure US20170080563A1-20170323-P00004
    iU, i ∈ Nn, a tool is transport-bound. With
    Figure US20170080563A1-20170323-P00004
    max
    Figure US20170080563A1-20170323-P00004
    iU, i ∈ Nn, the difference of the workloads among the steps is not too large. Thus, by properly setting ωi's, the workloads among the steps can be balanced such that there is a feasible cyclic schedule. It follows from [Wu et al., 2008] that, in this case, one can simply set ωi=0, i ∈ Nn−1∪{0}, and ωn=max{
    Figure US20170080563A1-20170323-P00004
    max−ψ1, 0} such that ψ=max{
    Figure US20170080563A1-20170323-P00004
    max, ψ1} holds. In this way, a feasible schedule is found. Further, it is optimal in terms of cycle time.
  • By Theorem 1, to make the tool schedulable requires that the workloads among the steps are not too large, i.e. [
    Figure US20170080563A1-20170323-P00004
    1L,
    Figure US20170080563A1-20170323-P00004
    1U]∩[
    Figure US20170080563A1-20170323-P00004
    2L,
    Figure US20170080563A1-20170323-P00004
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00004
    nL,
    Figure US20170080563A1-20170323-P00004
    nU]≠Ø. However, sometimes we have [
    Figure US20170080563A1-20170323-P00004
    1L,
    Figure US20170080563A1-20170323-P00004
    1U]∩[
    Figure US20170080563A1-20170323-P00004
    2L,
    Figure US20170080563A1-20170323-P00004
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00004
    nL,
    Figure US20170080563A1-20170323-P00004
    nU]≠Ø. In this case, let E={i|i ∈ Nn,
    Figure US20170080563A1-20170323-P00004
    iU<
    Figure US20170080563A1-20170323-P00004
    max} and F=Nn\E. It follows from [Wu et al., 2008] that the time for completing a wafer at Step i can be increased by setting ωi−1>0 without changing sojourn time τi. Hence, a cluster tool may be made schedulable even if the workloads among the steps are not well balanced. To do so, we balance the workloads among the steps by setting ωi−1's as follows:
  • ω i - 1 = { 0 , i F ϑ max - ( a 1 + δ 1 + 3 α + α 0 + 3 μ ) , 1 E ϑ max - ( a i + δ i + 4 α + 3 μ ) , 1 E { 2 , 3 , 4 , , n } . ( 13 )
  • Theorem 2: If [
    Figure US20170080563A1-20170323-P00004
    1L,
    Figure US20170080563A1-20170323-P00004
    1U]∩[
    Figure US20170080563A1-20170323-P00004
    2L,
    Figure US20170080563A1-20170323-P00004
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00004
    nL,
    Figure US20170080563A1-20170323-P00004
    nU]≠Ø,
    Figure US20170080563A1-20170323-P00004
    IU<
    Figure US20170080563A1-20170323-P00004
    max, i ∈ E≠Ø,
    Figure US20170080563A1-20170323-P00004
    iU
    Figure US20170080563A1-20170323-P00004
    max, i ∈ F, and Σi∈F.ωi−11
    Figure US20170080563A1-20170323-P00004
    max, a single-arm cluster tool with residency time constraints is schedulable with ωi−1, i ∈ Nn, being set by (13).
  • In this case, with the robot waiting time ωi−1, i ∈Nn, being set by (13), without changing τi, θi for completing a wafer at Step i can be increased such that the workload among the steps can be properly balanced. Notice that, by (13), the robot waiting time ωi−1, i ∈ Nn, is set, and then let ωn=
    Figure US20170080563A1-20170323-P00004
    max−(ψ1i∈Eωi−1) such that ψ=θmax hold. Thus, a feasible schedule is obtained and the cycle time is optimal. According to [Wu et al., 2008], the conditions given by Theorems 1 and 2 are the necessary and sufficient schedulability conditions for a single-arm cluster tool with residency time constraints. In the next section, we conduct the start-up process scheduling analysis for the system.
  • C. START-UP PROCESS SCHEDULING C.1. Temporal Properties in Start-up Process
  • At the initial state denoted by Ms0, the cluster tool is idle. When the tool starts to work, the robot unloads a wafer from the LLs, moves to Step 1, and loads this wafer into Step 1. At this time, Ms1 is reached. From states Ms0 to Ms1, it takes (α0+μ+α) time units. Then, the robot should wait there for a1 time units before the wafer in Step 1 is completed. Then, (α0+3α+3μ) time units would be taken for performing the following robot task sequence: unloads this wafer from Step 1 as soon as possible, moves to Step 2, loads this wafer into the Step 2, returns to the LLs and unloads a raw wafer from the LLs, moves to Step 1, and loads the raw wafer into Step 1. At this time, both Steps 1 and 2 have one wafer being processed and Ms2 is reached. From Ms1 to Ms25 it takes (α10+3α+3μ) time units.
  • Observing the PN model shown in FIG. 3, we have that Msd(pi)=K(pi), i ∈ Nd and 2≦d≦n−2, and Msd(r)=1. With CP2, the PN model can evolve to state Ms(d+1) with Ms(d+1)(pi)=K(pi), i ∈Nd+1, and Ms(d+1)(r)=1, and then to Ms(d+2) with Ms(d+2)(pi)=K(pi), i ∈ Nd+2, and Ms(d+2)(r)=1. During the evolution from Ms(d+1) to Ms(d+2), the robot should sequentially go to Steps (d+1), d, . . . , and 1 for unloading the processed wafers. Thus, with wafer residency time constraints, it is necessary to know how much time is needed to complete the processing of a wafer at Step i, i ∈Nd+1. Notice that the wafers unloaded from Step i, i ∈Nd+1, during the period from Ms(d+1) to Ms(d+2) are all the ones loaded into Step i, i ∈ Nd+1, during the period from Msd to Ms(d+1). Thus, from the PN model in FIG. 3, CP2, and the period from Msd to Ms(d+2), to complete the processing of a wafer in Step i, i ∈Nd+1, the following transition firing (activities) sequence must be executed: Firing ti2 (time α)→xi (time μ)→t(i−1)1 (time α)→yi−1 (time μ)→robot waiting in qi−1 (time ωi−1)→t(i−1)2 (time α)→xi−1 (time μ)→ti1 (time α)→processing a wafer at Step i (time τi)→ti2 (time α) again. In this way, a cycle is completed and it takes (τi+4α+3μ+ωi−1) time units to complete a wafer. In fact, for a wafer unloaded from Step i, i ∈ Nd, during the period from Msd to Ms(d+1), 2≦d<n, it also takes (τi+4α+3μ+ωi−1) time units to complete this wafer. Notice that τi should be within [ai, aii]. When τi=ai, we have the lower permissive time to complete a wafer at Step i, i ∈Nd\{1}, which equals to the one given by (1). When τi=aii, we have the upper permissive time to complete a wafer at Step i, which equals to the one given by (2). For Step 1, the lower and upper permissive time to complete a wafer equals to the ones in (3) and (4), respectively. Then, if the robot waiting time is removed from (1)-(4), the lower and upper workloads without robot waiting for each step can be obtained via (5)-(8), respectively.
  • EQNS. (5)-(8) present the workload balance information that affects the existence of a feasible schedule. It follows from (2) and (6) that θiU>
    Figure US20170080563A1-20170323-P00001
    iU if ωi−>0. It implies that, by making ωi−1>0, the cycle time of Step i is increased without increasing the wafer sojourn time. Thus, it is possible to adjust the robot waiting time such that the permissive wafer sojourn time ranges among the steps are balanced to some extent to guarantee the feasibility. To do so, we need to know how τi should be calculated. The wafer sojourn time at pi depends on the robot tasks and the workloads of the steps. From the PN model shown in FIG. 3 and CP2, during the evolutions from Ms(d−1) to Msd, a wafer (W1) is loaded by the robot into Step i: Firing yd−1→waiting in qd−1→firing t(d−1)2→firing xd−1→firing td1→firing yd−2→waiting in qd−2→firing t(d−2)2→firing xd−2→firing t(d−1)1→ . . . →firing yi→waiting in qi→firing ti2 with unloading a wafer from Step i→firing xi→firing t(i+1)→firing yi−1→waiting in qi−1→firing t(i−1)2→firing ti−1→firing ti1 to load wafer W1 into Step i→ . . . →y1→waiting in q1→firing t12→x1→firing t21→firing y0→waiting in q0→firing t02→firing x0→firing t11. Then, from the PN model shown in FIG. 3 and CP2, during the evolutions from Msd to Ms(d+1), wafer W2 is unloaded by the robot from Step i: Firing yd→waiting in qd→firing td2→firing xd→firing t(d+1)1→firing y(d−1)→waiting in q(d−1)→firing t(d−1)2→firing xd−1→firing td1→ . . . →firing yi→waiting in qi→firing ti2 to unload wafer W1 from Step i→firing xi→firing t(i+1)1→firing yi−1→waiting in qi−1→firing t(i−1)2→firing xi−1→firing ti1→ . . . →y1→waiting in q1→firing t12→x1→firing t21→firing y0→waiting in q0→firing t02→firing x0→firing t11. Thus, from the above PN evolutions we have that, during the evolution from Msd to Ms(d+1), 2≦d<n, the wafer sojourn time in p1, i ∈Nd, is given by
  • τ 1 = 2 ( d + 1 ) μ + ( 2 d + 1 ) α + α 0 + j = 0 d ω j - ( 3 α + α 0 + 3 μ + ω 0 ) and ( 14 ) τ i = 2 ( d + 1 ) μ + ( 2 d + 1 ) α + α 0 + j = 0 d ω j - ( 4 α + 3 μ + ω i - 1 ) , 1 < i d . ( 15 )
  • Let ψsd(d+1) and ψsd(d+1)1 denote the robot task time for transferring the tool from states Msd to Ms(d+1) with and without robot waiting time considered, respectively. Thus, we have
  • ψ sd ( d + 1 ) = 2 ( d + 1 ) μ + ( 2 d + 1 ) α + α 0 + j = 0 d ω j and ( 16 ) ψ sd ( d + 1 ) 1 = 2 ( d + 1 ) μ + ( 2 d + 1 ) α + α 0 . ( 17 )
  • It follows from (14)-(17) that to schedule the transient process of a residency-time constrained single-arm cluster tool is to appropriately regulate ωj, j ∈ Nd∪{0}, such that the wafer residency time constraints at each step are all satisfied.
  • C.2. Scheduling for Start-up Process
  • Feasibility is an essential requirement for scheduling a transient process of a cluster tool. As we have mentioned that, at initial state Ms0, the cluster tool is idle. When the tool reaches states Ms1 to Msn, Steps 1 to n have one wafer being processed, respectively. For the start-up process, the robot tasks are determined. Thus, we just need to determine the robot waiting time during the period from Ms0 to Msn to find a feasible schedule for the start-up process. Then, we have the following schedulability proposition.
  • Proposition 1: A start-up process of a single-arm cluster tool with wafer residency time constraints is schedulable if there exists the robot waiting time setting during the period from Ms0 to Msn such that the wafer residency time constraint at each step is satisfied.
  • With Proposition 1, we know that it is necessary to propose a method to regulate the robot waiting time during the period from Ms0 to Msn such that the cluster tool can enter the desired steady state from the initial state without violating the wafer residency time constraints.
  • In a cluster tool, it is reasonable to assume that there are more than one processing step. For the tool with two processing steps, the start-up process from Ms0 to Ms2 could be described by a robot task sequence σ1: Unloading a raw wafer (W2) from the LLs (time α0)→moving to Step 1 (time μ)→loading wafer W2 into Step 1 (time α)→waiting at Step 1 for ω1=a1 time units→unloading wafer W2 from Step 1 (time α)→moving to Step 2 (time μ)→loading wafer W2 into Step 2 (time α)→moving to the LLs (time μ)→waiting at the LLs for ω0 time units→unloading a raw wafer (W3) from the LLs (time α0)→moving to Step 1(time μ)→loading wafer W3 into Step 1 (time α). At this time, the system reaches state Ms2. In σ1, only robot waiting time ω0 is unknown. Let |σ1| denote the time needed to perform sequence σ1. Thus, |σ1|=2α0+4α+4μ+a10. Therefore, for the single-arm cluster tool, to obtain a feasible start-up schedule is to determine the robot waiting time ω0. For the single-arm cluster tool with n>2 processing steps, during the process from Ms0 to Ms2, the robot task sequence is also σ1. Then, the system keeps working according to the PN model in FIG. 3 and CP2 till it reaches state Msn. For this case, the robot waiting time is also unknown during the process from Ms0 to Msn. Let
    Figure US20170080563A1-20170323-P00005
    max=max{
    Figure US20170080563A1-20170323-P00005
    iL, i ∈ Nd}. To solve the scheduling problem, the following algorithm is developed.
  • Scheduling Algorithm 1: If
    Figure US20170080563A1-20170323-P00005
    max
    Figure US20170080563A1-20170323-P00005
    iU and ψ1
    Figure US20170080563A1-20170323-P00005
    iU, i ∈ Nn, the robot waiting time is set as follows.
  • Situation 1: A single-arm cluster tool has two steps:
      • 1) During the process from Ms0 to Ms2, the tool operates according to the robot task sequence σi and set ω0=0 and ω1=1 1.
  • Situation 2: A single-arm cluster tool has n steps, n>2:
      • 1) During the process from Ms0 to Ms2, the performance of the tool is same as the one regulated by 1) in Situation 1;
      • 2) During the process from Msd to Ms(d+1), 2≦d<n, the tool operates according to the PN model in FIG. 3 and CP2 and set ωi=0, i ∈ Nd−1∪{0}, and ωd=max {
        Figure US20170080563A1-20170323-P00005
        dmax−ψsd(d+1)1, 0}.
  • In this case, there are two situations. For Situation 1, there are two steps in a single-arm cluster tool. Then, during the start-up process from Ms0 to Ms2, the tool operates according to the robot task sequence σ1, and the robot waiting time ω0 and ω1 in σ1 can be set as ω0=0 and ω1=a1. With Ms2 being reached, the system reaches its steady state. For Situation 2, a single-arm cluster tool has n steps, n>2. From Ms0 to Ms2, the performance of the tool is same as the one regulated by 1) in Situation 1. Then, during the process from Msd to Ms(d+1), 2≦d<n, the tool operates according to the PN model in FIG. 3 and CP2. At the same time, the robot waiting time is set as ωi=0, i ∈ Nd−1∪{0}, and ωd=max{
    Figure US20170080563A1-20170323-P00005
    dmax−ψsd(d+1)1, 0} such that ψsd(d+1)=max{
    Figure US20170080563A1-20170323-P00005
    dmax, ψsd(d+1)1}. When the tool reaches state Msn, the system reaches its steady state. Then, by the PN model in FIG. 2 and CP1, the system operates with the backward strategy. By Scheduling Algorithm 1, a schedule could be found for the start-up process. Then, the next question is if this obtained schedule is feasible. The following theorem answers it.
  • Theorem 3: For a single-arm cluster tool with wafer residency time constraints, if
    Figure US20170080563A1-20170323-P00006
    max
    Figure US20170080563A1-20170323-P00006
    iU, ψ1
    Figure US20170080563A1-20170323-P00006
    iU, i ∈ Nn, a schedule obtained by Scheduling Algorithm 1 is feasible.
  • Proof Consider Situation 1. For the start-up process from Ms0 to Ms2, the robot performs the robot tasks σ1. It is easy to find that wafer W2 can be unloaded from Step 1 without violating the residency time constraints. Then, W3 is delivered to Step 2. When Ms2 is reached, the system enters its desired steady state. Consider Situation 2. By 1) for Situation 2 of Algorithm 1, similarly, the robot can perform the robot tasks ch such that the cluster tool can reach Ms2 from Mso without violating the wafer residency time constraints. Then, by 2) for Situation 2 of Algorithm 1, the tool operates according to the PN model in FIG. 3 and CP2 during the process from Msd to Ms(d+1), 2≦d<n. At the same time, ωi=0, i ∈ Nd−1∪{0}, and ωd=max{
    Figure US20170080563A1-20170323-P00006
    dmaxψsd(d+1)1, 0}. It follows from (14) and (15) that τ1=2(d+1)μ+(2d+1)α+α0j=0 dωj−(3α+α0+3μ+ω0)=2(d+1)μ+(2d+1)α+α0+max{
    Figure US20170080563A1-20170323-P00006
    max−ψsd(d+1)1, 0}−(3α+α0+3μ) and τi=2(d+1)μ+(2d+1)α+α0j=0 dωj−(4α+3μ+ωi−1)=2(d+1)μ+(2d+1)α+α0+max{
    Figure US20170080563A1-20170323-P00006
    dmax−ψsd(d+1)1, 0}−(4α+α3μ), 1<i≦d, hold, respectively. Then, there are two cases. Case 1:
    Figure US20170080563A1-20170323-P00006
    dmax≦ψsd(d+1)1. Then, we have τ1=2(d+1)μ+(2d+1)α+α0+
    Figure US20170080563A1-20170323-P00006
    dmax−ψsd(d+1)1−(3α+α0+3μ) and τi=2(d+1)μ+(2d+1)α+α0+
    Figure US20170080563A1-20170323-P00006
    max−ψsd(d−1)1−(4α++3μ), 1<i≦d, hold. Then, by (17) and
    Figure US20170080563A1-20170323-P00006
    max
    Figure US20170080563A1-20170323-P00006
    iU, i ∈ Nn, we have
    Figure US20170080563A1-20170323-P00006
    1L−(3α+α0+3μ)≦τ1=
    Figure US20170080563A1-20170323-P00006
    dmax−(3α+α0+3μ)≦
    Figure US20170080563A1-20170323-P00006
    1U−(3α+α0+3μ) and
    Figure US20170080563A1-20170323-P00006
    iL−(4α+3μ)≦τi=
    Figure US20170080563A1-20170323-P00006
    dmax−4α+3μ)≦
    Figure US20170080563A1-20170323-P00006
    iU−(4α+3μ), 1<i≦d. Thus, it follows from (5)-(8) that a1=
    Figure US20170080563A1-20170323-P00006
    1L−(3α+α0+3μ)≦τ1
    Figure US20170080563A1-20170323-P00006
    1U−(3α+α0+3μ)=a11 and ai=
    Figure US20170080563A1-20170323-P00006
    iL−(4α+3μ)≦τi
    Figure US20170080563A1-20170323-P00006
    1U−(4α++3μ)=aii, 1<i≦d, hold. Case 2:
    Figure US20170080563A1-20170323-P00006
    dmaxsd(d+1)1. Then, from (17), we have τ1=2(d+1)μ+(2d+1)α+α0−(3α+α0+3μ)=ψsd(d+1)1−(3α+α0+3μ) and τi=2(d+1)μ+(2d+1)α+α0−(4α+3μ)=ψsd(d+1)1−(4α+3μ), 1<i≦d, hold. By the assumption of ψ1
    Figure US20170080563A1-20170323-P00006
    iU, i ∈ Nn, we have τ1sd(d−1)1−(3α+α0+3μ)<ψ1−(3α+α0+3μ)≦≦
    Figure US20170080563A1-20170323-P00006
    1U−(3α+α0+3μ) and τisd(d+1)1−(4α+3μ)<ψ1−(4α+3μ)≦
    Figure US20170080563A1-20170323-P00006
    iU−(4α+3μ), 1<i≦d. Then, it follows from (5)-(8),
    Figure US20170080563A1-20170323-P00006
    max
    Figure US20170080563A1-20170323-P00006
    iU, i ∈ Nn, and
    Figure US20170080563A1-20170323-P00006
    dmaxsd(d+1)1 that a1=
    Figure US20170080563A1-20170323-P00006
    1L−(3α+α0+3μ)≦
    Figure US20170080563A1-20170323-P00006
    dmax−(3α+α0+3μ)<τ1sd(d+1)1−(3α+α0+3μ)<
    Figure US20170080563A1-20170323-P00006
    1U−(3α+α0+3μ)=a11 and ai=
    Figure US20170080563A1-20170323-P00006
    iL−(4α+3μ)≦
    Figure US20170080563A1-20170323-P00007
    dmax−(4α+3μ)<τisd(d+1)1−(4α+3μ)<
    Figure US20170080563A1-20170323-P00007
    iU−(4α+3μ)=aii, 1<i≦d. Therefore, during the start-up process from Ms0 to Ms2, the wafer residency time constraints at each step are all satisfied. Hence, the theorem holds.
  • In the case of Situation 1, by Algorithm 1, the robot performs σi such that the cluster tool can successfully go through the start-up process from Ms0 to Ms2 without violating any residency time constraints. Also, it takes |σ1|=2α0+4α+4μ+a1 time units for the start-up process. In the case of Situation 2, by Algorithm 1, the schedule is same as the one before Ms2 is reached. Then, by Algorithm 1, we need to dynamically adjust the robot waiting time at step d during the process from Msd to Ms(d+1), 2≦d<n, such that ψsd(d+1)=max{
    Figure US20170080563A1-20170323-P00007
    dmax, ψsd(d+1)1}. Thus, it takes |σ1|+Σd=2 n−1 max(
    Figure US20170080563A1-20170323-P00007
    d max, ψsd(d+1)1) time units for the start-up process. For a single-arm cluster tool with n≧2 steps, when Msn is reached, the system enters its desired steady state. In the following evolution, the system operates with the backward strategy. Based on Theorem 1, for the steady state scheduling, a feasible and optimal schedule is obtained by setting ωi=0, i ∈Nn−1∪{0}, and ωn=max{
    Figure US20170080563A1-20170323-P00007
    max−ψ1, 0} such that ψ=max{
    Figure US20170080563A1-20170323-P00007
    max, ψ1} holds. Then, the following theorem proves its optimality.
  • Theorem 4: For a single-arm cluster tool with wafer residency time constraints, if
    Figure US20170080563A1-20170323-P00007
    max
    Figure US20170080563A1-20170323-P00007
    iU, ψ1
    Figure US20170080563A1-20170323-P00007
    iU, i ∈ Nn, a schedule obtained by Scheduling Algorithm 1 for the start-up process is optimal.
  • Proof Situation 1: For the start-up process from Ms0 to Ms2, the robot performs the robot tasks σ1. If there be a schedule better than the one obtained by Algorithm 1, it must be that the robot waiting time ω1 is shortened because of ω0=0. However, if ω1 is less than a1, the wafer being processed at Step 1 cannot be processed. Therefore, for Situation 1, the obtained schedule by Algorithm 1 is optimal. For Situation 2, similar to Situation 1, the obtained schedule by Algorithm 1 for the process from Ms0 to Ms2 is optimal. It follows from Theorem 3 that during the process from Msd to Ms(d+1), 2 s≦d<n, we have τ1=2(d+1)μ+(2d+1)α+α0+max{
    Figure US20170080563A1-20170323-P00007
    dmax−ψsd(d+1)1, 0}−(3α+α0+3μ) and τi=2(d+1)μ+(2d+1)α+α0+max{
    Figure US20170080563A1-20170323-P00007
    dmax−ψsd(d−1)1, 0}−(4α+3μ), 1<i≦d, hold, respectively. It is assumed that
    Figure US20170080563A1-20170323-P00007
    dmax=
    Figure US20170080563A1-20170323-P00007
    kL, 1≦k≦d. Then, we have τ1=2(d+1)μ+(2d+1)α+α0+max{
    Figure US20170080563A1-20170323-P00007
    1L−ψsd(d+1)1, 0}−(3α+α0+3μ)
    Figure US20170080563A1-20170323-P00007
    dmax=
    Figure US20170080563A1-20170323-P00007
    1L and τk=2(d+1)μ+(2d+1)α+α0+max{
    Figure US20170080563A1-20170323-P00007
    kL−ψsd(d+1)1, 0}−(4α+3μ) if
    Figure US20170080563A1-20170323-P00007
    dmax=
    Figure US20170080563A1-20170323-P00007
    kL, 1<k≦d. If
    Figure US20170080563A1-20170323-P00007
    dmax≧ψsd(d+1)1, we have
    Figure US20170080563A1-20170323-P00007
    dmaxsd(d+1) by Algorithm 1. By (17) and (5)-(8), we have τ1=
    Figure US20170080563A1-20170323-P00007
    1L−(3α+α0+3μ)=a1 if
    Figure US20170080563A1-20170323-P00007
    dmax=
    Figure US20170080563A1-20170323-P00007
    1L and τk=
    Figure US20170080563A1-20170323-P00007
    kL−(4α+3μ)=ak if
    Figure US20170080563A1-20170323-P00008
    dmax=
    Figure US20170080563A1-20170323-P00008
    kL, 1<k≦d, hold. This means that it takes ψsd(d+1)=
    Figure US20170080563A1-20170323-P00008
    kL time units for the process from Msd to Ms(d+1), 2≦d n. Thus, for the process from Msd to Ms(d+1), 2 s≦d<n, the wafer sojourn time just equals to ak at Step k. If there exists a schedule for the process from Msd to Ms(d+1), 2≦d<n, better than the one obtained by Algorithm 1, there must exist Step k where the wafer sojourn time is less than ak. This means the wafer at Step k cannot be processed. If
    Figure US20170080563A1-20170323-P00008
    dmaxsd(d+1)1, a better schedule for the process from Msd to Ms(d+1), 2≦d<n, cannot be found because ψsd(d+1)1 cannot be shortened. Therefore, the obtained schedule by Algorithm 1 for the process from Msd to Ms(d+1), 2≦d<n, is also optimal. Hence, the theorem holds.
  • By Theorem 3, the workloads among the steps are properly balanced, i.e. [
    Figure US20170080563A1-20170323-P00008
    1L,
    Figure US20170080563A1-20170323-P00008
    1U]∩[
    Figure US20170080563A1-20170323-P00008
    2L,
    Figure US20170080563A1-20170323-P00008
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00008
    nL,
    Figure US20170080563A1-20170323-P00008
    nU]≠Ø. However, there is also another case with [
    Figure US20170080563A1-20170323-P00008
    1L,
    Figure US20170080563A1-20170323-P00008
    1U] ∩[
    Figure US20170080563A1-20170323-P00008
    2L,
    Figure US20170080563A1-20170323-P00008
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00008
    nL,
    Figure US20170080563A1-20170323-P00008
    nU]=Ø. Under the steady state, the cycle time is a constant. Then, a feasible schedule could be found by setting ωi−1>0, i ∈ E, to reduce the wafer sojourn time i without changing the time for completing a wafer at Step i [Wu et al., 2008]. For the transient process, we have: 1) wafers are processed at Step i, i ∈ E, during the process from Msd to Ms(d+1) and Ms(d+1) to Ms(d+2), 2≦d≦n−2, respectively; 2) the time taken for the process from Msd to Ms(d+1) and Ms(d+1) to Ms(d+2) may be different. Thus, the key to find a feasible and optimal schedule for the process from Msd to Ms(d+2) is to dynamically adjust the robot waiting time ωi−1. However, increasing and decreasing ωi−1 would decrease and increase the wafer sojourn time τi, respectively. This makes it difficult to guarantee the feasibility and optimality at the same time. Thus, a linear programming model is developed to solve this problem. Let tij d and ωi d denote the time when firing tij completes and the robot waiting at Step i before unloading a wafer during the process from Msd to Ms(d+1), respectively. Then, we have a linear programming model.
  • Linear Programming Model (LPM): If [
    Figure US20170080563A1-20170323-P00008
    1L,
    Figure US20170080563A1-20170323-P00008
    1U]∩[
    Figure US20170080563A1-20170323-P00008
    2L,
    Figure US20170080563A1-20170323-P00008
    2U] . . . ∩[
    Figure US20170080563A1-20170323-P00008
    nL,
    Figure US20170080563A1-20170323-P00008
    nU]=Ø and the system checked by Theorem 2 is schedulable under the steady state, then a schedule can be found by the following LPM:
  • min d = 1 n i = 0 d ω i d ( 18 )
  • subject to

  • t 11 00+μ+α,   (19)

  • t 12 1 =t 11 01 1+α,   (20)

  • t i1 d =t (i=1)2 0+μ+α, 1≦i≦d+1 and 1≦d≦n−1,   (21)

  • t i2 d =t (i+2)1 d+μ+ωi d+α, 1≦i≦d−1 and 1≦d≦n−1,   (22)

  • t 02 d =t (d+2)1 d+μ+ω0 d0, 1≦d≦n−1,   (23)

  • t d2 d =t 11 d−1+μ+ωd d+α, 1≦d≦n−1,   (24)

  • t i1 d =t (i+1)2 d+μ+α, 1≦i≦n and d ∈ {n,n+1},   (25)

  • t 01 d =t n2 d +μα, ∈ {n, n+1},   (26)

  • t i2 d =t (i+2)1 d+μ+ωi d+α, 1≦i≦n−2 and d ∈ {n, n+1},   (27)

  • t (n−1)2 d =t 01 d+μ+ωn−1 d +α, d ∈ {n, n+1},   (28)

  • t n2 d =t 11 d−1+μ+ωn d +α, d ∈ {n, n+1},   (29)

  • t 02 d =t 21 d+μ+ω0 d0 , d ∈ {n, n+1},   (30)

  • ωi nl n+1, 0≦i≦n   (31)
  • d = 1 n i = 0 d ω i d 0 , ( 32 )
    and

  • a i ≦t i2 d −α−t i1 d−1 ≦a ii, 1≦i≦d and 1≦d≦n+1.   (33)
  • For a single-arm cluster tool with two processing steps, the robot task sequence for the start-up process from Ms0 to Ms2 is σ1. Then, the system is operated with the backward strategy based on the PN model in FIG. 2. For a tool with n>2 processing steps, the robot task sequence for the start-up process from Ms0 to Ms2 is also σ1. Then, the system will run according to the PN model in FIG. 3 till it reaches state Msn. In the following operations, the system is operated by the backward strategy based on the PN model in FIG. 2. Notice that the robot task sequence for the start-up process of the two cases is known in advance. However, the robot waiting time is unknown. If the waiting time during the process from Ms0 to Msn is determined, the schedule for the start-up process is determined. Objective (18) in LPM is to minimize the total robot waiting time. Constraints (19) and (21) give the time for completing the robot task of loading a wafer into a step. Constraints (20) and (22)-(24) represent the time for completing the robot task of unloading a wafer from a step. After Msn is reached, the cluster tool enters its steady state and operates by the backward strategy based on the PN model in FIG. 2 and CP1. Then, when the first robot task cycle for the steady state is completed, state Ms(n+1) is reached. When the second robot task cycle for the steady state is completed, state Ms(n+2) is reached. Thus, for the first and second cycles for the steady state, Constraints (25) and (26) mean the time for completing the robot task of loading a wafer into a step, and Constraints (27)-(30) indicate the time for completing the robot task of unloading a wafer from a step. Constraint (31) makes sure that the robot waiting time is same for the different cycle under the steady state. Constraint (32) means that the robot waiting time is no less than zero. With wafer residency time constraints being considered, Constraint (33) is used to guarantee such constraints to be satisfied. In this way, a schedule for the start-up process could be obtained by this model.
  • For the case with [
    Figure US20170080563A1-20170323-P00009
    1L,
    Figure US20170080563A1-20170323-P00009
    1U]∩[
    Figure US20170080563A1-20170323-P00009
    2L,
    Figure US20170080563A1-20170323-P00009
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00009
    nL,
    Figure US20170080563A1-20170323-P00009
    nU]=Ø, Theorem 2 gives schedulability conditions to check if the system is schedulable. Thus, it gives rise to a question that, for the case with [
    Figure US20170080563A1-20170323-P00009
    1L,
    Figure US20170080563A1-20170323-P00009
    1U]∩[
    Figure US20170080563A1-20170323-P00009
    2L,
    Figure US20170080563A1-20170323-P00009
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00009
    nL,
    Figure US20170080563A1-20170323-P00009
    nU]=Ø, if the system checked by Theorem 2 is schedulable, can a feasible schedule be obtained by LPM? To answer it, a schedule can be obtained by setting the robot waiting time as: 1) For the tool with two processing steps, the robot waiting time can be set as ω0 d=max{
    Figure US20170080563A1-20170323-P00009
    max
    Figure US20170080563A1-20170323-P00009
    1U, 0}, d ∈ {1, 2}, ω1 1, =a1, ω1 2=max{
    Figure US20170080563A1-20170323-P00009
    max
    Figure US20170080563A1-20170323-P00009
    2U, 0}, and ω2 2=
    Figure US20170080563A1-20170323-P00009
    max−ψ1−(ω0 21 2); and 2) For the tool with more than n>2 processing steps, the robot waiting time can be set as ωi d=max{
    Figure US20170080563A1-20170323-P00009
    max
    Figure US20170080563A1-20170323-P00009
    (i+1)U, 0}, 0≦i≦n−1 and 2≦d≦n+1, ω1 1=a1, and ωd d=
    Figure US20170080563A1-20170323-P00009
    max−ψ1−Σi=0 d−1ωi d, 2≦d≦n+1. It is easy to verify that this schedule is in the feasible region of LPM. Therefore, if the system is schedulable according to Theorem 2's conditions, a feasible and optimal schedule can be obtained by LPM. For the first and second cycles for the steady state, the robot waiting time ωi n and ωi n+1, 0≦i≦n, can be determined by LPM. Then, in the following operations of the system under the steady state, the robot waiting time is also set as ωii n, 0≦i≦n−1, and ωn=
    Figure US20170080563A1-20170323-P00009
    max−Σi=0 n−1ωi. Thus, another question is if the schedule for the steady state is feasible and optimal? The following theorem answers it.
  • Theorem 5: For a single-arm cluster tool with [
    Figure US20170080563A1-20170323-P00009
    1L,
    Figure US20170080563A1-20170323-P00009
    1U]∩[
    Figure US20170080563A1-20170323-P00009
    2L,
    Figure US20170080563A1-20170323-P00008
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00009
    nL,
    Figure US20170080563A1-20170323-P00009
    nU]=Ø, with the PN in FIG. 2 and CP1, if a schedule for the steady state is given by setting ωil n, 0≦i≦n−1, and ωn=
    Figure US20170080563A1-20170323-P00010
    max−Σi=0 n−1ωi, where ωi n, 0≦i≦n−1, is obtained by LPM, then such a schedule is feasible and optimal.
  • Proof By LPM, during the processes from Msn to Ms(n+1) and Ms(n+1) to Ms(n+2), the robot waiting time is ωii n, 0≦i≦n. Then, the cycle time for the processes from Msn to Ms(n+1) and Ms(n+1) to Ms(n+2) should be ψ=
    Figure US20170080563A1-20170323-P00010
    max. If there exists a schedule with the cycle time ψ<
    Figure US20170080563A1-20170323-P00010
    max and it is assumed that
    Figure US20170080563A1-20170323-P00010
    max=
    Figure US20170080563A1-20170323-P00010
    kL, k≠1 holds, it follows from (9) that τk=[2(n+1)μ+(2n+1)α+α0d=0 nωd]−(4α+3μ+ωk−1)=ψ−(4α+3μ+ωk−1)<
    Figure US20170080563A1-20170323-P00010
    kL−(4α+3μ+ωk−1)
    Figure US20170080563A1-20170323-P00010
    kL−(4α+3μ). Then, from (5), we have τk<
    Figure US20170080563A1-20170323-P00010
    kL−(4α+3μ)32 ak. This means that the wafer at Step k is not completed. Similarly, if there exists a schedule with the cycle time ψ<
    Figure US20170080563A1-20170323-P00010
    max and
    Figure US20170080563A1-20170323-P00010
    max=
    Figure US20170080563A1-20170323-P00010
    1L holds, we have τ1<a1. Therefore, the cycle time for the processes from Msn to Ms(n+1) and Ms(n+1) to Ms(n+2) should be ψ=
    Figure US20170080563A1-20170323-P00010
    max. This implies that Σi=0 nω1=
    Figure US20170080563A1-20170323-P00010
    max−ψ1. Thus, based on LPM and Theorem 2, this theorem holds and the cycle time of the system for the steady state is
    Figure US20170080563A1-20170323-P00010
    max.
  • Up to now, for the case that the workloads among the steps can be properly balanced, i.e. [
    Figure US20170080563A1-20170323-P00010
    1L,
    Figure US20170080563A1-20170323-P00010
    1U]∩[
    Figure US20170080563A1-20170323-P00010
    2L,
    Figure US20170080563A1-20170323-P00010
    2U] ∩ . . . ∩ [
    Figure US20170080563A1-20170323-P00010
    nL,
    Figure US20170080563A1-20170323-P00010
    nU]=Ø, a scheduling algorithm is proposed to find the optimal schedule for the start-up process such that the single-arm cluster tool can enter its steady state optimally. For the case that the differences of the workloads among the steps are too large such that [
    Figure US20170080563A1-20170323-P00010
    1L,
    Figure US20170080563A1-20170323-P00010
    1U]∩[
    Figure US20170080563A1-20170323-P00010
    2L,
    Figure US20170080563A1-20170323-P00010
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00010
    nL,
    Figure US20170080563A1-20170323-P00010
    nU]=Ø, a linear programming model is developed to find a feasible and optimal schedule to transfer a single-arm cluster tool from the initial state to a steady one. Notice that Scheduling Algorithm 1 consists of several expressions and LPM is a linear programming model. Therefore, it is very computationally efficient to use the proposed methods to find a feasible and optimal schedule for the start-up process for single-arm cluster tools with wafer residency time constraints.
  • D. EXAMPLES Example 1
  • The flow pattern is (PM1, PM2, PM3, PM4, PM5). It takes 5s for the robot to unload a wafer from a PM and to load a wafer to a PM/LL (α=5s), 10s to unload a wafer from the LLs and align it (α0=10s), and 2s to move between PMs/LLs (μ=2s). It needs 90s, 100s, 100s, 105s, and 115s for a PM at Steps 1-5 to process a wafer (a1=90s, a2=100s, a3=100s, a4=105s, and a5=115s), respectively. After being processed, a wafer at Steps 1-4 can stay there for 20s (δ12345=20s).
  • It follows from (5)-(8) that, we have
    Figure US20170080563A1-20170323-P00011
    1L=121s,
    Figure US20170080563A1-20170323-P00011
    1U=141s,
    Figure US20170080563A1-20170323-P00011
    2L=126s,
    Figure US20170080563A1-20170323-P00011
    2U=146s,
    Figure US20170080563A1-20170323-P00011
    3L=126s,
    Figure US20170080563A1-20170323-P00011
    3U=146s,
    Figure US20170080563A1-20170323-P00011
    4L=131s,
    Figure US20170080563A1-20170323-P00011
    4U=151s,
    Figure US20170080563A1-20170323-P00011
    5L=141s,
    Figure US20170080563A1-20170323-P00011
    5U=161s, and ψ1=89s. By Theorem 1, the single-arm cluster tool is schedulable. For the steady state, an optimal and feasible schedule is obtained by setting ω0234=0s and ω5=52s. Then, the cycle time of the system under the steady state is 141s. For this example, the workloads among the steps are properly balanced, i.e. [
    Figure US20170080563A1-20170323-P00011
    1L,
    Figure US20170080563A1-20170323-P00011
    1U]∩[
    Figure US20170080563A1-20170323-P00011
    2L,
    Figure US20170080563A1-20170323-P00011
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00011
    nL,
    Figure US20170080563A1-20170323-P00011
    nU]≠Ø. Thus, an optimal and feasible schedule can be found by Algorithm 1 for the start-up process. This example belongs to Situation 2 of Algorithm 1. Therefore, the robot waiting time during the start-up process is set as follows: 1) During the process from Ms0 to Ms2, ω0=0s and ω1=90s; 2) During the process from Ms2 to Ms3, ω01=0 s and ω2=79s; 3) During the process from Ms3 to Ms4, ω012=0s and ω3=65s; 4) During the process from Ms4 to Ms5, ω0123=0s and ω4=56s. In this way, an optimal and feasible schedule is obtained for the start-up process. The simulation result is shown in FIG. 4. It shows that it takes 521s for the start-up process.
  • In [Wu et al., 2008], a method is proposed to transfer the system to enter its steady state from the initial state. It puts a virtual token (wafer) in places p2−pn and none at p1 in FIG. 2, i.e. M0(pi)=1, i ∈Nn−{1}, and M0(p1)=0 at the initial state. Then, by running the PN model with a schedule obtained by the scheduling algorithm in [Wu et al., 2008], when all the virtual wafers go out of the system, the steady state is reached. It takes 563s for the start-up process. Therefore, by the method as disclosed herein in the present work, the time taken for the start-up process is reduced by 8.1% compared with the method in [Wu et al., 2008].
  • Example 2
  • The flow pattern is (PM1, PM2, PM3, PM4). α=5s, α0=10s, μ=2s, a1=85s, a2=85s, a3=110s, a4=120s, and δ1234=20s hold.
  • It follows from (5)-(8) that, we have
    Figure US20170080563A1-20170323-P00011
    1L=116s,
    Figure US20170080563A1-20170323-P00011
    1U=136s,
    Figure US20170080563A1-20170323-P00011
    2L=111s,
    Figure US20170080563A1-20170323-P00011
    2U=131s,
    Figure US20170080563A1-20170323-P00011
    3L=136s,
    Figure US20170080563A1-20170323-P00011
    3U=156s,
    Figure US20170080563A1-20170323-P00011
    4L=146s,
    Figure US20170080563A1-20170323-P00011
    4U=166s, and ψ1=75s. By Theorem 2, the single-arm cluster tool is schedulable. For the steady state, an optimal and feasible schedule is obtained by setting ω0=10s, ω1=15s, ω23=0s, and ω4=46s. Then, the cycle time of the system under the steady state is 146s. For this example, differences between the workloads among the steps are too large and [
    Figure US20170080563A1-20170323-P00011
    1L,
    Figure US20170080563A1-20170323-P00011
    1U]∩[
    Figure US20170080563A1-20170323-P00011
    2L,
    Figure US20170080563A1-20170323-P00011
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00011
    nL,
    Figure US20170080563A1-20170323-P00011
    nU]=Øholds. Thus, LPM is used to find an optimal and feasible schedule for the start-up process. With LPM, the robot waiting time during the start-up process is set as follows: 1) During the process from Ms0 to Ms2, ω00 1=10s and ω11 1=85s; 2) During the process from Ms2 to Ms3, ω00 2=0s, ω11 2=15s and ω22 2=54s; 3) During the process from Ms3 to Ms4, ω00 3=10s, ω11 3=15s, ω22 3=0s, and ω33 360s. Then, the tool enters its steady state and it is scheduled by setting ω00 4=10s, ω11 4=15s, ω232 43 4=0s, and ω44 4=46s. In this way, an optimal and feasible schedule is obtained for the start-up process. The simulation result is shown in FIG. 5. It shows that it takes 405s for the start-up process. However, with the existing method in [Wu et al., 2008], it takes 455s for the start-up process. Thus, the time taken for this start-up process is reduced by 11%.
  • E. THE PRESENT INVENTION
  • The present invention is developed based on the theoretical development in Sections A-C above.
  • An aspect of the present invention is to provide a computer-implemented method for scheduling a cluster tool. The cluster tool comprises a single-arm robot for wafer handling, a LL for wafer cassette loading and unloading, and n process modules each for performing a wafer-processing step with a wafer residency time constraint where the ith process module, i ∈Nn, is used for performing Step i of the n wafer-processing steps for each wafer. Note that although the cluster tool is said to comprise a LL, it is understood that in the present invention, the cluster tool can have one or more LLs.
  • The method includes scheduling a start-up process for the cluster tool. The start-up process has plural system states Msi, i=0, 1, . . . , n−1, where Ms0 is an initial state of system start-up, and Msi, 1≦i≦n−1 denotes that i instances of a wafer unloading from the robot to any one of the n process modules have occurred since the system start-up.
  • Advantageously, the start-up process is developed based on Scheduling Algorithm 1. When
    Figure US20170080563A1-20170323-P00001
    max
    Figure US20170080563A1-20170323-P00001
    1U and ψ1
    Figure US20170080563A1-20170323-P00001
    IU, i=1, 2, . . . , n, values of ω0, ω1, . . . , ωd for each of the system states Msd, d=0, 1, . . . n−1, are determined. As mentioned above, ωj, j ∈ {0, 1, . . . , d}, is a robot waiting time used in the state Msd for the robot to wait before unloading a wafer in Step j from the robot to the (j+l)th process module. According to Scheduling Algorithm 1, the values of ω0, ω1, . . . , and ωd are determined by: setting ω0=0 and ω1=a1 for the states Ms0 and Ms1; and setting ωi=0, i ∈Nd−1∪{0}, and ωd=max{
    Figure US20170080563A1-20170323-P00001
    dmax−ψsd(d+1)1, 0} for the state Msd, 2≦d≦n−1 when n>2.
  • As a steady-state process follows the start-up process, preferably the method further includes scheduling the steady-state process based on the results obtained in the start-up process. In particular, values of ω0, ω1, . . . , and ωd are determined, in which ωj, j ∈ {0, 1, . . . , n}, is a robot waiting time, used in a steady state of the cluster tool, for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module. As indicated in Section B.2 above, one option is to set ωi=0, i ∈Nn−1∪{0}, and ωn=max{
    Figure US20170080563A1-20170323-P00012
    max−ψ1, 0}.
  • Also advantageously, the start-up process is further developed based on the LPM model. When [
    Figure US20170080563A1-20170323-P00012
    1L,
    Figure US20170080563A1-20170323-P00012
    1U]∩[
    Figure US20170080563A1-20170323-P00012
    2L,
    Figure US20170080563A1-20170323-P00012
    2U]∩ . . . ∩[
    Figure US20170080563A1-20170323-P00012
    nL,
    Figure US20170080563A1-20170323-P00012
    nU]=Ø, values of ω0 d, ω1 d, . . . , ωd d for each of the system states Msd, d=0, 1, . . . , n−1, are determined, where ωj d, j ∈{0, 1, . . . d}, is a robot waiting time used in the state Msd for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module. The values of ω0 d, ω1 d, . . . , and ωd d, d=0, 1, . . . , n, are numerically optimized such that (18) is minimized subject to constraints (19)-(33). For the steady-state process, Theorem 5 indicates that one option is to set ωii n, 0≦i≦n−1, and ωn=
    Figure US20170080563A1-20170323-P00012
    max−Σi=0 n−1ωi for use in the state Msn and thereafter. Similarly, Msn denotes that n instances of a wafer unloading from the robot to any one of the n process modules have occurred since the system start-up.
  • The embodiments disclosed herein may be implemented using general purpose or specialized computing devices, computer processors, or electronic circuitries including but not limited to digital signal processors (DSP), application specific integrated circuits (ASIC), field programmable gate arrays (FPGA), and other programmable logic devices configured or programmed according to the teachings of the present disclosure. Computer instructions or software codes running in the general purpose or specialized computing devices, computer processors, or programmable logic devices can readily be prepared by practitioners skilled in the software or electronic art based on the teachings of the present disclosure.
  • In particular, the method disclosed herein can be implemented in a single-arm cluster tool if the cluster tool includes one or more processors. The one or more processors are configured to execute a process of scheduling the cluster tool according to one of the embodiments of the disclosed method.
  • The present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiment is therefore to be considered in all respects as illustrative and not restrictive. The scope of the invention is indicated by the appended claims rather than by the foregoing description, and all changes that come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.

Claims (14)

1. A computer-implemented method for scheduling a cluster tool, the cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, n process modules each for performing a wafer-processing step with a wafer residency time constraint where the ith process module, i ∈ {1, 2, . . . , n}, is used for performing Step i of the n wafer-processing steps for each wafer, and a specialized processor configured to control the robot, the loadlock, and the process modules through execution of the method, the method comprising:
when
Figure US20170080563A1-20170323-P00001
max
Figure US20170080563A1-20170323-P00001
iU and ψ1
Figure US20170080563A1-20170323-P00001
iU, i=1, 2, . . . , n, determining, by the specialized processor, values of ω0, ω1, . . . , ωd for each of plural system states Msd, d=0, 1, . . . n−1, of the cluster tool, where Mst, 1≦i≦n−1 denotes that i instances of a wafer unloading from the robot to any one of the n process modules have occurred since system start-up, and ωj, j ∈{0, 1, . . . d}, is a robot waiting time used in the state Msd for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module;
wherein the determining of ω0, ω1, . . . , ωd for each of the system states Msd, d=0, 1, . . . , n−1, comprises:
setting, by the specialized processor, ω0=0 and ω1=a1 for the states Ms0 and Ms1);
where:

Figure US20170080563A1-20170323-P00001
max=max{
Figure US20170080563A1-20170323-P00001
iL, i ∈ Nn};

ψ1=2(n+1)μ+(2n+1 )α+α0

Figure US20170080563A1-20170323-P00001
iU =a i+4α+3μ+δi , i ∈ N n\{1};

Figure US20170080563A1-20170323-P00001
1U =a i+3α+α0+3μ+δ1;

Figure US20170080563A1-20170323-P00001
1L =a i+4α+μ, i ∈ N n\{1};

Figure US20170080563A1-20170323-P00001
1L =a 1+3α+α0+3μ;
ai, i ∈ Nn, is a time that a wafer is processed in the ith process module;
δi is the wafer residency time constraint of Step i, given by a pre-determined longest time for which a wafer in the ith process module is allowed to stay therein after this wafer is processed;
α is a time of loading a wafer to or unloading the wafer to the robot in Step i;
μ is a time of the robot moving from one wafer-processing step to another;
α0 is a time of the robot unloading a wafer from the loadlock and aligning the same; and
Nm={1 ,2, . . . ,} for a positive integer m.
2. The method of claim 1, wherein the determining of ω0, ω1, . . . , ωd for each of the system states Msd, d=0, 1, . . . , n−1, further comprises:
setting ωi=0, i ∈ Nd−1∪{0}, and ωd=max{
Figure US20170080563A1-20170323-P00001
dmax−ψsd(d+1)1, 0} for the state Msd, 2≦d≦n−1 when n>2;
where:

Figure US20170080563A1-20170323-P00001
dmax=max{
Figure US20170080563A1-20170323-P00001
iL, i ∈ Nd}; and

ψsd(d+1)1=2(d+1)μ+(2d+1)α+α0.
3. The method of claim 2, further comprising:
when
Figure US20170080563A1-20170323-P00001
max
Figure US20170080563A1-20170323-P00001
iU and ψ1
Figure US20170080563A1-20170323-P00001
iU, i=1, 2, . . . , n, setting, by the specialized processor, ωi=0, i ∈ Nn−1∪{0}, and ωn=max{
Figure US20170080563A1-20170323-P00001
max−ψ10} for use in a state Msn and thereafter, where Msn denotes that n instances of a wafer unloading from the robot to any one of the n process modules have occurred since system start-up, and ωj, j ∈ {0, 1, . . . n}, is a robot waiting time, used in a steady state of the cluster tool, for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module.
4. The method of claim 3, further comprising:
when [
Figure US20170080563A1-20170323-P00001
1L,
Figure US20170080563A1-20170323-P00001
1U], ∩[
Figure US20170080563A1-20170323-P00001
2L,
Figure US20170080563A1-20170323-P00001
2U]∩ . . . ∩[
Figure US20170080563A1-20170323-P00001
nL,
Figure US20170080563A1-20170323-P00001
nU]Ø, determining, by the specialized processor, values of ω0 d, ω1 d, . . . , ωd d for each of the system states Msd, d=0,1, . . . , n−1, where ωj d, j ∈ {0, 1, . . . , d}, is a robot waiting time used in the state Msd for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module;
wherein the determining of ω0 d, ω1 d, . . . , ωd d for each of the system states Msd, d=0, 1, . . . , n, comprises:
numerically optimizing the values of ω0 d, ω1 d, . . . , ωd d such that
d = 1 n i = 0 d ω i d
is minimized subject to:

t 11 00+μ+α,

t 12 1 =t 11 01 1+α,

t i1 d =t (i=1)2 0+μ+α, 1≦i≦d+1 and 1≦d≦n−1,

t i2 d =t (i+2)1 d+μ+ωi d+α, 1≦i≦d−1 and 1≦d≦n−1,

t 02 d =t (d+2)1 d+μ+ω0 d0, 1≦d≦n−1,

t d2 d =t 11 d−1+μ+ωd d+α, 1≦d≦n−1,

t i1 d =t (i+1)2 d+μ+α, 1≦i≦n and d ∈ {n,n+1},

t 01 d =t n2 d +μα, ∈ {n, n+1},

t i2 d =t (i+2)1 d+μ+ωi d+α, 1≦i≦n−2 and d ∈ {n, n+1},

t (n−1)2 d =t 01 d+μ+ωn−1 d +α, d ∈ {n, n+1},

t n2 d =t 11 d−1+μ+ωn d +α, d ∈ {n, n+1},

t 02 d =t 21 d+μ+ω0 d0 , d ∈ {n, n+1},

ωi nl n+1, 0≦i≦n
d = 1 n i = 0 d ω i d 0 ;
and

a i ≦t i2 d −α−t i1 d−1 ≦a ii, 1≦i≦d and 1≦d≦n+1;
where:
ti1 d denotes a time when the robot completes loading a wafer into Step i, i ∈ Nn∪{0};
ti2 d a time when the robot completes unloading a wafer from Step i, i ∈ Nn;
t02 d denotes a time when the robot completes unloading the loadlock and aligning the same; and
ωj d, j ∈ Nn and d ∈ {n, n+1}, is a robot waiting time used in a state Msd for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module, the state Msd denoting that d instances of a wafer unloading from the robot to any one of the n process modules have occurred since system start-up.
5. The method of claim 4, further comprising:
when [
Figure US20170080563A1-20170323-P00013
1L,
Figure US20170080563A1-20170323-P00013
1U]∩[
Figure US20170080563A1-20170323-P00013
2L,
Figure US20170080563A1-20170323-P00013
2U]∩ . . . ∩[
Figure US20170080563A1-20170323-P00013
nL,
Figure US20170080563A1-20170323-P00013
nU]=Ø, by the specialized processor, ωii n, 0≦i≦n−1, and ωn=
Figure US20170080563A1-20170323-P00013
max−Σt=0 n−1ωi for use in the state Msn and thereafter.
6. A computer-implemented method for scheduling a cluster tool, the cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, n process modules each for performing a wafer-processing step with a wafer residency time constraint where the ith process module, i ∈ {1, 2, . . . , n}, is used for performing Step i of the n wafer-processing steps for each wafer, and a specialized processor configured to control the robot, the loadlock, and the process modules through execution of the method, the method comprising:
when [
Figure US20170080563A1-20170323-P00013
1L,
Figure US20170080563A1-20170323-P00013
1U]∩[
Figure US20170080563A1-20170323-P00013
2L,
Figure US20170080563A1-20170323-P00013
2U]∩ . . . ∩[
Figure US20170080563A1-20170323-P00013
nL,
Figure US20170080563A1-20170323-P00013
nU]=Ø, determining, by the specialized processor, values of ω0 d, ω1 d, . . . , ωd d for each of plural system states Msd, d=0,1, . . . , n−1, of the cluster tool, where Ms1, 1≦i≦n−1 denotes that i instances of a wafer unloading from the robot to any one of the n process modules have occurred since system start-up, and ωj d, j ∈ {0, 1, . . . d}, is a robot waiting time used in the state Msd for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module;
wherein the determining of ω0 d, ω1 d, . . . ωd d for each of the system states Msd, d=0, 1, . . . , n, comprises:
numerically optimizing the values of ω0 d, ω1 d, . . . , ωd d such that
d = 1 n i = 0 d ω i d
is minimized subject to:

t 11 00+μ+α,

t 12 1 =t 11 01 1+α,

t i1 d =t (i=1)2 0+μ+α, 1≦i≦d+1 and 1≦d≦n−1,

t i2 d =t (i+2)1 d+μ+ωi d+α, 1≦i≦d−1 and 1≦d≦n−1,

t 02 d =t (d+2)1 d+μ+ω0 d0, 1≦d≦n−1,

t d2 d =t 11 d−1+μ+ωd d+α, 1≦d≦n−1,

t i1 d =t (i+1)2 d+μ+α, 1≦i≦n and d ∈ {n,n+1},

t 01 d =t n2 d +μα, ∈ {n, n+1},

t i2 d =t (i+2)1 d+μ+ωi d+α, 1≦i≦n−2 and d ∈ {n, n+1},

t (n−1)2 d =t 01 d+μ+ωn−1 d +α, d ∈ {n, n+1},

t n2 d =t 11 d−1+μ+ωn d +α, d ∈ {n, n+1},

t 02 d =t 21 d+μ+ω0 d0 , d ∈ {n, n+1},

ωi nl n+1, 0≦i≦n
d = 1 n i = 0 d ω i d 0 ;
and

a i ≦t i2 d −α−t i1 d−1 ≦a ii, 1≦i≦d and 1≦d≦n+1.

where:

Figure US20170080563A1-20170323-P00001
iU =a i+4α+3μ+δi , i ∈ N n\{1};
Figure US20170080563A1-20170323-P00014
1U =a 1+3α+α0+3μ+δ1;
Figure US20170080563A1-20170323-P00014
iL=ai+4α+3μ, i ∈Nn\{1};
Figure US20170080563A1-20170323-P00014
1L=a1+3α+α0+3μ;
ti1 d denotes a time when the robot completes loading a wafer into Step i, i ∈ Nn∪{0};
ti2 d denotes a time when the robot completes unloading a wafer from Step i, i ∈ Nn;
t02 d denotes a time when the robot completes unloading the loadlock and aligning the same;
ωj d, j ∈ Nn and d ∈ {n, n+1}, is a robot waiting time used in a state Msd for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module, the state Msd denoting that d instances of a wafer unloading from the robot to any one of the n process modules have occurred since system start-up;
ai, i ∈ Nn, is a time that a wafer is processed in the ith process module;
δi is the wafer residency time constraint of Step i, given by a pre-determined longest time for which a wafer in the ith process module is allowed to stay therein after this wafer is processed;
α is a time of loading a wafer to or unloading the wafer to the robot in Step i;
μ is a time of the robot moving from one wafer-processing step to another;
α0 is a time of the robot unloading a wafer from the loadlock and aligning the same; and
Nm={1, 2, . . . , m} for a positive integer m.
7. The method of claim 6, further comprising:
when [
Figure US20170080563A1-20170323-P00014
1L,
Figure US20170080563A1-20170323-P00014
1U]∩[
Figure US20170080563A1-20170323-P00014
2L,
Figure US20170080563A1-20170323-P00014
2U]∩ . . . ∩[
Figure US20170080563A1-20170323-P00014
nL,
Figure US20170080563A1-20170323-P00014
nU]=Ø, setting, by the processor, ωii n, 0≦i≦n−1, and ωn=
Figure US20170080563A1-20170323-P00014
max−Σi=0 n−1ωi for use in the state Msn and thereafter, where ωj, j ∈ {0, 1, . . . n}, is a robot waiting time, used in a steady state of the cluster tool, for the robot to wait before unloading a wafer in Step j from the robot to the (j+1)th process module.
8. A cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint, wherein the cluster tool further comprises one or more specialized processors configured to execute a process of scheduling the cluster tool according to the method of claim 1.
9. A cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint, wherein the cluster tool further comprises one or more specialized processors configured to execute a process of scheduling the cluster tool according to the method of claim 2.
10. A cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint, wherein the cluster tool further comprises one or more specialized processors configured to execute a process of scheduling the cluster tool according to the method of claim 3.
11. A cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint, wherein the cluster tool further comprises one or more specialized processors configured to execute a process of scheduling the cluster tool according to the method of claim 4.
12. A cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint, wherein the cluster tool further comprises one or more specialized processors configured to execute a process of scheduling the cluster tool according to the method of claim 5.
13. A cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint, wherein the cluster tool further comprises one or more specialized processors configured to execute a process of scheduling the cluster tool according to the method of claim 6.
14. A cluster tool comprising a single-arm robot for wafer handling, a loadlock for wafer cassette loading and unloading, and plural process modules each for performing a wafer-processing step with a wafer residency time constraint, wherein the cluster tool further comprises one or more specialized processors configured to execute a process of scheduling the cluster tool according to the method of claim 7.
US14/918,557 2015-09-20 2015-10-20 Scheduling start-up process for time-constrained single-arm cluster tools Active US9618930B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/918,557 US9618930B1 (en) 2015-09-20 2015-10-20 Scheduling start-up process for time-constrained single-arm cluster tools

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201562221034P 2015-09-20 2015-09-20
US14/918,557 US9618930B1 (en) 2015-09-20 2015-10-20 Scheduling start-up process for time-constrained single-arm cluster tools

Publications (2)

Publication Number Publication Date
US20170080563A1 true US20170080563A1 (en) 2017-03-23
US9618930B1 US9618930B1 (en) 2017-04-11

Family

ID=58276430

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/918,557 Active US9618930B1 (en) 2015-09-20 2015-10-20 Scheduling start-up process for time-constrained single-arm cluster tools

Country Status (1)

Country Link
US (1) US9618930B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170083008A1 (en) * 2015-09-20 2017-03-23 Macau University Of Science And Technology Optimal One-Wafer Scheduling of Single-Arm Multi-Cluster Tools with Tree-Like Topology
US20170083010A1 (en) * 2015-09-20 2017-03-23 Macau University Of Science And Technology Optimally Scheduling of Close-down Process for Single-arm Cluster Tools with Wafer Residency Time Constraints
US20170083009A1 (en) * 2015-09-20 2017-03-23 Macau University Of Science And Technology Petri Net-Based Optimal One-Wafer Cyclic Scheduling of Treelike Hybrid Multi-Cluster Tools
US20190096724A1 (en) * 2016-09-28 2019-03-28 Beijing Naura Microelectronics Equipment Co., Ltd Method and system for scheduling apparatuses on production line
WO2022145106A1 (en) * 2020-12-28 2022-07-07 東京ロボティクス株式会社 Operation schedule generation device, method, program, and system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6122566A (en) * 1998-03-03 2000-09-19 Applied Materials Inc. Method and apparatus for sequencing wafers in a multiple chamber, semiconductor wafer processing system
US6418356B1 (en) * 1998-12-31 2002-07-09 Silicon Valley Group, Inc. Method and apparatus for resolving conflicts in a substrate processing system
US20020147960A1 (en) * 2001-01-26 2002-10-10 Applied Materials, Inc. Method and apparatus for determining scheduling for wafer processing in cluster tools with integrated metrology and defect control
US6738681B2 (en) * 2002-04-26 2004-05-18 Trecenti Technologies, Inc. Method for manufacturing semiconductor device, semiconductor manufacturing apparatus, and method for controlling transfer in production line
US6768930B2 (en) * 1998-12-31 2004-07-27 Asml Holding N.V. Method and apparatus for resolving conflicts in a substrate processing system
US20140099176A1 (en) * 2012-10-10 2014-04-10 Hitachi High-Technologies Corporation Vacuum processing apparatus and vacuum processing method
US9223307B1 (en) * 2015-01-12 2015-12-29 Macau University Of Science And Technology Method for scheduling single-arm cluster tools with wafer revisiting and residency time constraints
US9227318B1 (en) * 2015-01-12 2016-01-05 Macau University Of Science And Technology Optimal buffer space configuration and scheduling for single-arm multi-cluster tools
US9333645B1 (en) * 2015-01-12 2016-05-10 Macau University Science and Technology Optimization of start-up transient processes for dual-armed cluster tools with wafer revisiting

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6122566A (en) * 1998-03-03 2000-09-19 Applied Materials Inc. Method and apparatus for sequencing wafers in a multiple chamber, semiconductor wafer processing system
US6418356B1 (en) * 1998-12-31 2002-07-09 Silicon Valley Group, Inc. Method and apparatus for resolving conflicts in a substrate processing system
US6768930B2 (en) * 1998-12-31 2004-07-27 Asml Holding N.V. Method and apparatus for resolving conflicts in a substrate processing system
US20020147960A1 (en) * 2001-01-26 2002-10-10 Applied Materials, Inc. Method and apparatus for determining scheduling for wafer processing in cluster tools with integrated metrology and defect control
US6738681B2 (en) * 2002-04-26 2004-05-18 Trecenti Technologies, Inc. Method for manufacturing semiconductor device, semiconductor manufacturing apparatus, and method for controlling transfer in production line
US20140099176A1 (en) * 2012-10-10 2014-04-10 Hitachi High-Technologies Corporation Vacuum processing apparatus and vacuum processing method
US9223307B1 (en) * 2015-01-12 2015-12-29 Macau University Of Science And Technology Method for scheduling single-arm cluster tools with wafer revisiting and residency time constraints
US9227318B1 (en) * 2015-01-12 2016-01-05 Macau University Of Science And Technology Optimal buffer space configuration and scheduling for single-arm multi-cluster tools
US9333645B1 (en) * 2015-01-12 2016-05-10 Macau University Science and Technology Optimization of start-up transient processes for dual-armed cluster tools with wafer revisiting

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Kim et al,"Schedule Restoration for Single-Armed Cluster Tools", IEEE Transactions on Semiconductor Manufacturing, 2014, Volume 27; Issue 3; Pages 388-399. *
Wu et al, "Petri Net-Based Scheduling of Single-Arm Cluster Tools with Reentrant Atomic Layer Deposition Processes", IEEE Transaction on Automation Science and Engineering, 2011; Volume 8; Issue 1; Pages 42-55. *
Yi et al, "Steady-State Throughput and Scheduling Analysis of Multi-Cluster Tools for Semiconductor Manufacturing: A Decompositon Approach", Proceedings of the 2005 IEEE International Conference on Robotics and Automation, 2005; Pages 292-298. *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170083008A1 (en) * 2015-09-20 2017-03-23 Macau University Of Science And Technology Optimal One-Wafer Scheduling of Single-Arm Multi-Cluster Tools with Tree-Like Topology
US20170083010A1 (en) * 2015-09-20 2017-03-23 Macau University Of Science And Technology Optimally Scheduling of Close-down Process for Single-arm Cluster Tools with Wafer Residency Time Constraints
US20170083009A1 (en) * 2015-09-20 2017-03-23 Macau University Of Science And Technology Petri Net-Based Optimal One-Wafer Cyclic Scheduling of Treelike Hybrid Multi-Cluster Tools
US10001772B2 (en) * 2015-09-20 2018-06-19 Macau University Of Science And Technology Optimally scheduling of close-down process for single-arm cluster tools with wafer residency time constraints
US10001773B2 (en) * 2015-09-20 2018-06-19 Macau University Of Science And Technology Optimal one-wafer scheduling of single-arm multi-cluster tools with tree-like topology
US10073444B2 (en) * 2015-09-20 2018-09-11 Macau University Of Science And Technology Petri net-based optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools
US20190096724A1 (en) * 2016-09-28 2019-03-28 Beijing Naura Microelectronics Equipment Co., Ltd Method and system for scheduling apparatuses on production line
WO2022145106A1 (en) * 2020-12-28 2022-07-07 東京ロボティクス株式会社 Operation schedule generation device, method, program, and system

Also Published As

Publication number Publication date
US9618930B1 (en) 2017-04-11

Similar Documents

Publication Publication Date Title
US9618930B1 (en) Scheduling start-up process for time-constrained single-arm cluster tools
Qiao et al. Scheduling and control of startup process for single-arm cluster tools with residency time constraints
Jung et al. An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
Wu et al. Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
Lee et al. Scheduling lot switching operations for cluster tools
Lee et al. Scheduling cluster tools for concurrent processing of two wafer types
US10001772B2 (en) Optimally scheduling of close-down process for single-arm cluster tools with wafer residency time constraints
US9223307B1 (en) Method for scheduling single-arm cluster tools with wafer revisiting and residency time constraints
Yang et al. Petri net-based polynomially complex approach to optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in semiconductor manufacturing
Qiao et al. Schedulability and scheduling analysis of dual-arm cluster tools with wafer revisiting and residency time constraints based on a novel schedule
Pan et al. A novel algorithm for wafer sojourn time analysis of single-arm cluster tools with wafer residency time constraints and activity time variation
US9333645B1 (en) Optimization of start-up transient processes for dual-armed cluster tools with wafer revisiting
Pan et al. Scheduling and analysis of start-up transient processes for dual-arm cluster tools with wafer revisiting
Kim et al. Non-cyclic scheduling of a wet station
Ko et al. Scheduling dual-armed cluster tools for concurrent processing of multiple wafer types with identical job flows
US10001773B2 (en) Optimal one-wafer scheduling of single-arm multi-cluster tools with tree-like topology
CN110850819A (en) Single-arm combination equipment scheduling method, system, mobile terminal and storage medium
Zhu et al. Scheduling of single-arm multi-cluster tools to achieve the minimum cycle time
US10073444B2 (en) Petri net-based optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools
Sun et al. Cycle time analysis for wafer revisiting process in scheduling of single-arm cluster tools
US20170083000A1 (en) Petri Net-based Scheduling of Time Constrained Single-arm Cluster Tools with Wafer Revisiting
Wu et al. Modeling, analysis, scheduling, and control of cluster tools in semiconductor fabrication
Pan et al. Modeling and scheduling of cluster tools dealing with wafer revisiting: a brief review
Yuan et al. Scheduling of time-constrained single-arm cluster tools with purge operations in wafer fabrications
Qiao et al. Modeling and analysis of dual-arm cluster tools for wafer fabrication with revisiting

Legal Events

Date Code Title Description
AS Assignment

Owner name: MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY, MACAU

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WU, NAIQI;QIAO, YAN;ZHOU, MENGCHU;SIGNING DATES FROM 20151009 TO 20151010;REEL/FRAME:036838/0635

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2551); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

Year of fee payment: 4