US20100300675A1 - Permeability flow balancing within integral screen joints - Google Patents

Permeability flow balancing within integral screen joints Download PDF

Info

Publication number
US20100300675A1
US20100300675A1 US12/476,859 US47685909A US2010300675A1 US 20100300675 A1 US20100300675 A1 US 20100300675A1 US 47685909 A US47685909 A US 47685909A US 2010300675 A1 US2010300675 A1 US 2010300675A1
Authority
US
United States
Prior art keywords
tubular
baffles
open hole
thermally assisted
downhole system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/476,859
Inventor
Michael H. Johnson
Namhyo Kim
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baker Hughes Holdings LLC
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Priority to US12/476,859 priority Critical patent/US20100300675A1/en
Assigned to BAKER HUGHES INCORPORATED reassignment BAKER HUGHES INCORPORATED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: JOHNSON, MICHAEL H., KIM, NAMHYO
Priority to PCT/US2010/034758 priority patent/WO2010141198A2/en
Publication of US20100300675A1 publication Critical patent/US20100300675A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]

Definitions

  • Viscous hydrocarbon recovery is a segment of the overall hydrocarbon recovery industry that is increasingly important from the standpoint of global hydrocarbon reserves and associated product cost.
  • SAGD Steam Assisted Gravity Drainage
  • Other wellbore systems however where there is a significant horizontal or near horizontal length of the wellbore system present profile challenges both for heat distribution and for production. In some cases, similar issues arise even in vertical systems.
  • inflow and outflow profiles are desired to be as uniform as possible relative to the particular borehole. This should enhance efficiency as well as avoid early water breakthrough. Breakthrough is clearly inefficient as hydrocarbon material is likely to be left in situ rather than being produced. Profiles are important in all well types but it will be understood that the more viscous the target material the greater the difficulty in maintaining a uniform profile.
  • a thermally assisted downhole system including a tubular configured to be disposed within an open hole borehole, the tubular being intended to be exposed to a heated fluid; and a plurality of open hole anchors spaced along the tubular and engagable with the open hole, the anchors restricting longitudinal thermal growth of the tubular when engaged with the open hole.
  • a thermally assisted downhole system including a tubular within an open hole borehole, the tubular being exposed to a heated fluid; and a plurality of open hole anchors spaced along the tubular and engaged with the open hole, the anchors restricting longitudinal thermal growth of the tubular.
  • FIG. 1 is a schematic view of a wellbore system in a viscous hydrocarbon reservoir
  • FIG. 2 is a chart illustrating a change in fluid profile over a length of the borehole with and without permeability control.
  • borehole 12 is the steam injection borehole and borehole 14 is the hydrocarbon recovery borehole but the disclosure should not be understood as limiting the possibilities to such.
  • the discussion herein however will address the boreholes as illustrated.
  • Steam injected in borehole 12 heats the surrounding formation 16 thereby reducing the viscosity of the stored hydrocarbons and facilitating gravity drainage of those hydrocarbons.
  • Horizontal or other highly deviated well structures like those depicted tend to have greater fluid movement into and to of the formation at a heel 18 of the borehole than at a toe 20 of the borehole due simply to fluid dynamics.
  • one or more of the boreholes is configured with one or more permeability control devices 32 that are each configured differently with respect to permeability or pressure drop in flow direction in or out of the tubular.
  • the devices 32 nearest the heel 18 or 28 will have the least permeability while permeability will increase in each device 32 sequentially toward the toe 20 and 30 .
  • the permeability of the device 32 closest to toe 20 or 30 will be the greatest. This will tend to balance outflow of injected fluid and inflow of production fluid over the length of the borehole 12 and 14 because the natural pressure drop of the system is opposite that created by the configuration of permeability devices as described.
  • Permeability and/or pressure drop devices 32 usable in this configuration include inflow control devices such as product family number H48688 commercially available from Baker Oil Tools, Houston Tex., beaded matrix flow control configurations such as those disclosed in U.S. Ser. Nos. 61/052,919, 11/875,584 and 12/144,730, 12/144,406 and 12/171,707 the disclosures of which are incorporated herein by reference, or other similar devices. Adjustment of pressure drop across individual permeability devices is possible in accordance with the teaching hereof such that the desired permeability over the length of the borehole 12 or 14 as described herein is achievable. Referring to FIG. 2 , a chart of the flow of fluid over the length of borehole 12 is shown without permeability control and with permeability control. The representation is stark with regard to the profile improvement with permeability control.
  • Formation pressure can be determined/measured in a number of known ways. Pressure at the heel of the borehole and pressure at the toe should also be determined/measured. This can be determined in known ways.
  • a flow profile whether into or out of the completion is dictated by the ⁇ P at each location and the pressure inside the completion is dictated by the head of pressure associated with the column of fluid extending to the surface. The longer the column, the higher the pressure. It follows, then, that greater resistance to inflow will occur at the toe of the borehole than at the heel of the completion.
  • permeability control is distributed such that pressure drop at a toe of the borehole is in the range of about 25% to less than 1% whereas pressure drop at the heel of the borehole is about 30% or more. In one embodiment the pressure drop at the heel is less than 45% and at the toe less than about 25%.
  • Permeability control devices distributed between the heel and the toe will in some embodiments have individual pressure drop values between the percentage pressure drop at the toe and the percentage pressure drop at the heel. Moreover, in some embodiments the distribution of pressure drops among the permeability devices is linear while in other embodiments the distribution may follow a curve or may be discontinuous to promote inflow of fluid from areas of the formation having larger volumes of desirable liberatable fluid and reduced inflow of fluid from areas of the formation having smaller volumes of desirable liberatable fluid.
  • Open hole anchors 42 such as Baker Oil Tools WBAnchorTM may be employed in the borehole to anchor the tubing 40 . This is helpful in that the tubing 40 experiences a significant change in thermal load and hence a significant amount of thermal expansion during well operations. Unchecked, the thermal expansion can cause damage to other downhole structures or to the tubing string 40 itself thereby affecting efficiency and production of the well system.
  • one or more open hole anchors 42 are used to ensure that the tubing string 40 is restrained from excessive movement. Because the total length of mobile tubing string is reduced by the interposition of open hole anchor(s) 42 , excess extension cannot occur.
  • three open hole anchors 42 are employed and are spaced by about 90 to 120 ft from one another but could in some particular applications be positioned more closely and even every 30 feet (at each pipe joint).
  • the spacing interval is also applicable to longer runs with each open hole anchor being spaced about 90-120 ft from the next.
  • the exact spacing amount between anchors is not limited to that noted in this illustrated embodiment but rather can be any distance that will have the desired effect of reducing thermal expansion related wellbore damage. In addition the spacing can be even or uneven as desired.
  • the determination of distance between anchors must take into account.
  • the anchor length, pattern, or the number of anchor points per foot in order to adjust the anchoring effect to optimize performance based on formation type and formation strength tubular dimensions and material.
  • the tubing string 40 , 50 or both is configured with one or more baffles 60 .
  • Baffles 60 are effective in both deterring loss of steam to formation cracks such as that illustrated in FIG. 1 as numeral 62 and in causing produced fluid to migrate through the intended permeability device 32 .
  • the injector borehole, such as 12 is provided with one or more baffles 60 .
  • the baffles may be of any material having the ability to withstand the temperature at which the particular steam is injected into the formation.
  • a metal deformable seal such as one commercially known as a z-seal and available from Baker Oil Tools, Houston Tex., may be employed.
  • metal deformable seals are normally intended to create a high pressure high temperature seal against a metal casing within which the seal is deployed, for the purposes taught in this disclosure, it is not necessary for the metal deformable seal to create an actual seal. That stated however, there is also no prohibition to the creation of a seal but rather then focus is upon the ability of the configuration to direct steam flow with relatively minimal leakage. In the event that an actual seal is created with the open hole formation, the intent to minimize leakage will of course be met. In the event that a seal is not created but substantially all of the steam applied to a particular region of the wellbore is delivered to that portion of the formation then the baffle will have done its job and achieved this portion of the intent of this disclosure.
  • the baffles are also of use in that the drawdown of individual portions of the well can be balanced better with the baffles so that fluids from a particular area are delivered to the borehole in that area and fluids from other areas do not migrate in the annulus to the same section of the borehole but rather will enter at their respective locations. This ensures that profile control is maintained and also that where breakthrough does occur, a particular section of the borehole can be bridged and the rest will still produce target fluid as opposed to breakthrough fluid since annular flow will be inhibited by the baffles.
  • baffles are placed about 100 ft or 3 liner joints apart but as noted with respect to the open hole anchors, this distance is not fixed but may be varied to fit the particular needs of the well at issue.
  • baffles may be even or may be uneven and in some cases the baffles will be distributed as dictated by formation condition such that for example cracks in the formation will be taken into account so that a baffle will be positioned on each side of the crack when considered along the length of the tubular.

Abstract

A thermally assisted downhole system including a tubular configured to be disposed within an open hole borehole, the tubular being intended to be exposed to a heated fluid; a plurality of open hole anchors spaced along the tubular and engagable with the open hole, the anchors restricting longitudinal thermal growth of the tubular when engaged with the open hole.

Description

    BACKGROUND
  • Viscous hydrocarbon recovery is a segment of the overall hydrocarbon recovery industry that is increasingly important from the standpoint of global hydrocarbon reserves and associated product cost. In view hereof, there is increasing pressure to develop new technologies capable of producing viscous reserves economically and efficiently. Steam Assisted Gravity Drainage (SAGD) is one technology that is being used and explored with good results in some wellbore systems. Other wellbore systems however where there is a significant horizontal or near horizontal length of the wellbore system present profile challenges both for heat distribution and for production. In some cases, similar issues arise even in vertical systems.
  • Both inflow and outflow profiles (e.g. production and stimulation) are desired to be as uniform as possible relative to the particular borehole. This should enhance efficiency as well as avoid early water breakthrough. Breakthrough is clearly inefficient as hydrocarbon material is likely to be left in situ rather than being produced. Profiles are important in all well types but it will be understood that the more viscous the target material the greater the difficulty in maintaining a uniform profile.
  • Another issue in conjunction with SAGD systems is that the heat of steam injected to facilitate hydrocarbon recovery is sufficient to damage downhole components due to thermal expansion of the components. This can increase expenses to operators and reduce recovery of target fluids. Since viscous hydrocarbon reserves are likely to become only more important as other resources become depleted, configurations and methods that improve recovery of viscous hydrocarbons from earth formations will continue to be well received by the art.
  • SUMMARY
  • A thermally assisted downhole system including a tubular configured to be disposed within an open hole borehole, the tubular being intended to be exposed to a heated fluid; and a plurality of open hole anchors spaced along the tubular and engagable with the open hole, the anchors restricting longitudinal thermal growth of the tubular when engaged with the open hole.
  • A thermally assisted downhole system including a tubular within an open hole borehole, the tubular being exposed to a heated fluid; and a plurality of open hole anchors spaced along the tubular and engaged with the open hole, the anchors restricting longitudinal thermal growth of the tubular.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Referring now to the drawings wherein like elements are numbered alike in the several figures:
  • FIG. 1 is a schematic view of a wellbore system in a viscous hydrocarbon reservoir;
  • FIG. 2 is a chart illustrating a change in fluid profile over a length of the borehole with and without permeability control.
  • DETAILED DESCRIPTION
  • Referring to FIG. 1, the reader will recognize a schematic illustration of a portion of a SAGD wellbore system 10 configured with a pair of boreholes 12 and 14. Generally, borehole 12 is the steam injection borehole and borehole 14 is the hydrocarbon recovery borehole but the disclosure should not be understood as limiting the possibilities to such. The discussion herein however will address the boreholes as illustrated. Steam injected in borehole 12 heats the surrounding formation 16 thereby reducing the viscosity of the stored hydrocarbons and facilitating gravity drainage of those hydrocarbons. Horizontal or other highly deviated well structures like those depicted tend to have greater fluid movement into and to of the formation at a heel 18 of the borehole than at a toe 20 of the borehole due simply to fluid dynamics. An issue associated with this property is that the toe 20 will suffer reduced steam application from that desired while heel 18 will experience more steam application than that desired, for example. The change in the rate of fluid movement is relatively linear (declining flow) when querying the system at intervals with increasing distance from the heel 18 toward the toe 20. The same is true for production fluid movement whereby the heel 28 of the production borehole 14 will pass more of the target hydrocarbon fluid than the toe 30 of the production borehole 14. This is due primarily to permeability versus pressure drop along the length of the borehole 12 or 14. The system 10 as illustrated alleviates this issue as well as others noted above.
  • According to the teaching herein, one or more of the boreholes (represented by just two boreholes 12 and 14 for simplicity in illustration) is configured with one or more permeability control devices 32 that are each configured differently with respect to permeability or pressure drop in flow direction in or out of the tubular. The devices 32 nearest the heel 18 or 28 will have the least permeability while permeability will increase in each device 32 sequentially toward the toe 20 and 30. The permeability of the device 32 closest to toe 20 or 30 will be the greatest. This will tend to balance outflow of injected fluid and inflow of production fluid over the length of the borehole 12 and 14 because the natural pressure drop of the system is opposite that created by the configuration of permeability devices as described. Permeability and/or pressure drop devices 32 usable in this configuration include inflow control devices such as product family number H48688 commercially available from Baker Oil Tools, Houston Tex., beaded matrix flow control configurations such as those disclosed in U.S. Ser. Nos. 61/052,919, 11/875,584 and 12/144,730, 12/144,406 and 12/171,707 the disclosures of which are incorporated herein by reference, or other similar devices. Adjustment of pressure drop across individual permeability devices is possible in accordance with the teaching hereof such that the desired permeability over the length of the borehole 12 or 14 as described herein is achievable. Referring to FIG. 2, a chart of the flow of fluid over the length of borehole 12 is shown without permeability control and with permeability control. The representation is stark with regard to the profile improvement with permeability control.
  • In order to determine the appropriate amount of permeability for particular sections of the borehole 12 or 14, one needs to determine the pressure in the formation over the length of the horizontal borehole. Formation pressure can be determined/measured in a number of known ways. Pressure at the heel of the borehole and pressure at the toe should also be determined/measured. This can be determined in known ways. Once both formation pressure and pressures at locations within the borehole have been ascertained, the change in pressure (ΔP) across the completion can be determined for each location where pressure within the completion has been or is tested. Mathematically this is expressed as ΔP location=P formation−P location where the locations may be the heel, the toe or any other point of interest.
  • A flow profile whether into or out of the completion is dictated by the ΔP at each location and the pressure inside the completion is dictated by the head of pressure associated with the column of fluid extending to the surface. The longer the column, the higher the pressure. It follows, then, that greater resistance to inflow will occur at the toe of the borehole than at the heel of the completion. In accordance with the teaching hereof permeability control is distributed such that pressure drop at a toe of the borehole is in the range of about 25% to less than 1% whereas pressure drop at the heel of the borehole is about 30% or more. In one embodiment the pressure drop at the heel is less than 45% and at the toe less than about 25%. Permeability control devices distributed between the heel and the toe will in some embodiments have individual pressure drop values between the percentage pressure drop at the toe and the percentage pressure drop at the heel. Moreover, in some embodiments the distribution of pressure drops among the permeability devices is linear while in other embodiments the distribution may follow a curve or may be discontinuous to promote inflow of fluid from areas of the formation having larger volumes of desirable liberatable fluid and reduced inflow of fluid from areas of the formation having smaller volumes of desirable liberatable fluid.
  • Referring back to FIG. 1, a tubing string 40 and 50 are illustrated in boreholes 12 and 14 respectively. Open hole anchors 42, such as Baker Oil Tools WBAnchor™ may be employed in the borehole to anchor the tubing 40. This is helpful in that the tubing 40 experiences a significant change in thermal load and hence a significant amount of thermal expansion during well operations. Unchecked, the thermal expansion can cause damage to other downhole structures or to the tubing string 40 itself thereby affecting efficiency and production of the well system. In order to overcome this problem, one or more open hole anchors 42 are used to ensure that the tubing string 40 is restrained from excessive movement. Because the total length of mobile tubing string is reduced by the interposition of open hole anchor(s) 42, excess extension cannot occur. In one embodiment, three open hole anchors 42, as illustrated, are employed and are spaced by about 90 to 120 ft from one another but could in some particular applications be positioned more closely and even every 30 feet (at each pipe joint). The spacing interval is also applicable to longer runs with each open hole anchor being spaced about 90-120 ft from the next. Moreover, the exact spacing amount between anchors is not limited to that noted in this illustrated embodiment but rather can be any distance that will have the desired effect of reducing thermal expansion related wellbore damage. In addition the spacing can be even or uneven as desired. The determination of distance between anchors must take into account. The anchor length, pattern, or the number of anchor points per foot in order to adjust the anchoring effect to optimize performance based on formation type and formation strength tubular dimensions and material.
  • Finally in one embodiment, the tubing string 40, 50 or both is configured with one or more baffles 60. Baffles 60 are effective in both deterring loss of steam to formation cracks such as that illustrated in FIG. 1 as numeral 62 and in causing produced fluid to migrate through the intended permeability device 32. More specifically, and taking the functions one at a time, the injector borehole, such as 12, is provided with one or more baffles 60. The baffles may be of any material having the ability to withstand the temperature at which the particular steam is injected into the formation. In one embodiment, a metal deformable seal such as one commercially known as a z-seal and available from Baker Oil Tools, Houston Tex., may be employed. And while metal deformable seals are normally intended to create a high pressure high temperature seal against a metal casing within which the seal is deployed, for the purposes taught in this disclosure, it is not necessary for the metal deformable seal to create an actual seal. That stated however, there is also no prohibition to the creation of a seal but rather then focus is upon the ability of the configuration to direct steam flow with relatively minimal leakage. In the event that an actual seal is created with the open hole formation, the intent to minimize leakage will of course be met. In the event that a seal is not created but substantially all of the steam applied to a particular region of the wellbore is delivered to that portion of the formation then the baffle will have done its job and achieved this portion of the intent of this disclosure. With respect to production, the baffles are also of use in that the drawdown of individual portions of the well can be balanced better with the baffles so that fluids from a particular area are delivered to the borehole in that area and fluids from other areas do not migrate in the annulus to the same section of the borehole but rather will enter at their respective locations. This ensures that profile control is maintained and also that where breakthrough does occur, a particular section of the borehole can be bridged and the rest will still produce target fluid as opposed to breakthrough fluid since annular flow will be inhibited by the baffles. In one embodiment baffles are placed about 100 ft or 3 liner joints apart but as noted with respect to the open hole anchors, this distance is not fixed but may be varied to fit the particular needs of the well at issue. The distance between baffles may be even or may be uneven and in some cases the baffles will be distributed as dictated by formation condition such that for example cracks in the formation will be taken into account so that a baffle will be positioned on each side of the crack when considered along the length of the tubular.
  • While preferred embodiments have been shown and described, various modifications and substitutions may be made thereto without departing from the spirit and scope of the invention. Accordingly, it is to be understood that the present invention has been described by way of illustration and not limitation.

Claims (12)

1. A thermally assisted downhole system comprising:
a tubular configured to be disposed within an open hole borehole, the tubular being intended to be exposed to a heated fluid; and
a plurality of open hole anchors spaced along the tubular and engagable with the open hole, the anchors restricting longitudinal thermal growth of the tubular when engaged with the open hole.
2. A thermally assisted downhole system as claimed in claim 1 further including one or more baffles disposed along the longitudinal extent of the tubular, the baffles being of sufficient size and thermal resistance to withstand and divert applied heated fluid.
3. A thermally assisted downhole system as claimed in claim 1 wherein the plurality of open hole anchors are spaced evenly.
4. A thermally assisted downhole system as claimed in claim 1 wherein the open hole anchors are spaced unevenly.
5. A thermally assisted downhole system as claimed in claim 1 wherein the space between each of the plurality of open hole anchors is selected to prevent movement of a liner relative to the wellbore during temperature or pressure changes.
6. A thermally assisted downhole system as claimed in claim 1 further including one or more baffles disposed along the longitudinal extent of the tubular, the baffles being of sufficient size and thermal resistance to withstand and divert applied heated fluid.
7. A thermally assisted downhole system as claimed in claim 1 wherein the one or more baffles are a plurality of baffles spaced evenly along the tubular.
8. A thermally assisted downhole system as claimed in claim 1 wherein the one or more baffles are a plurality of baffles spaced unevenly along the tubular.
9. A thermally assisted downhole system as claimed in claim 1 wherein the one or more baffles are a plurality of baffles spaced as dictated by formation condition.
10. A thermally assisted downhole system comprising:
a tubular within an open hole borehole, the tubular being exposed to a heated fluid; and
a plurality of open hole anchors spaced along the tubular and engaged with the open hole, the anchors restricting longitudinal thermal growth of the tubular.
11. A thermally assisted downhole system as claimed in claim 10 further including one or more baffles disposed along the longitudinal extent of the tubular, the baffles being of sufficient size and thermal resistance to withstand and divert applied heated fluid.
12. A thermally assisted downhole system as claimed in claim 2 wherein the thermally assisted downhole system is a SAGD system.
US12/476,859 2009-06-02 2009-06-02 Permeability flow balancing within integral screen joints Abandoned US20100300675A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US12/476,859 US20100300675A1 (en) 2009-06-02 2009-06-02 Permeability flow balancing within integral screen joints
PCT/US2010/034758 WO2010141198A2 (en) 2009-06-02 2010-05-13 Permeability flow balancing within integral screen joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/476,859 US20100300675A1 (en) 2009-06-02 2009-06-02 Permeability flow balancing within integral screen joints

Publications (1)

Publication Number Publication Date
US20100300675A1 true US20100300675A1 (en) 2010-12-02

Family

ID=43218901

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/476,859 Abandoned US20100300675A1 (en) 2009-06-02 2009-06-02 Permeability flow balancing within integral screen joints

Country Status (2)

Country Link
US (1) US20100300675A1 (en)
WO (1) WO2010141198A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9243472B1 (en) 2014-08-13 2016-01-26 Geodynamics, Inc. Wellbore plug isolation system and method
US9752406B2 (en) 2014-08-13 2017-09-05 Geodynamics, Inc. Wellbore plug isolation system and method
US10180037B2 (en) 2014-08-13 2019-01-15 Geodynamics, Inc. Wellbore plug isolation system and method

Citations (97)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1362552A (en) * 1919-05-19 1920-12-14 Charles T Alexander Automatic mechanism for raising liquid
US1488753A (en) * 1923-03-15 1924-04-01 Kelly William Well strainer
US1649524A (en) * 1927-11-15 Oil ahd water sepakatos for oil wells
US1915867A (en) * 1931-05-01 1933-06-27 Edward R Penick Choker
US1984741A (en) * 1933-03-28 1934-12-18 Thomas W Harrington Float operated valve for oil wells
US2089477A (en) * 1934-03-19 1937-08-10 Southwestern Flow Valve Corp Well flowing device
US2119563A (en) * 1937-03-02 1938-06-07 George M Wells Method of and means for flowing oil wells
US2214064A (en) * 1939-09-08 1940-09-10 Stanolind Oil & Gas Co Oil production
US2257523A (en) * 1941-01-14 1941-09-30 B L Sherrod Well control device
US2391609A (en) * 1944-05-27 1945-12-25 Kenneth A Wright Oil well screen
US2412841A (en) * 1944-03-14 1946-12-17 Earl G Spangler Air and water separator for removing air or water mixed with hydrocarbons, comprising a cartridge containing a wadding of wooden shavings
US2762437A (en) * 1955-01-18 1956-09-11 Egan Apparatus for separating fluids having different specific gravities
US2810352A (en) * 1956-01-16 1957-10-22 Eugene D Tumlison Oil and gas separator for wells
US3131764A (en) * 1961-12-11 1964-05-05 Baker Oil Tools Inc High temperature packer for well bores
US3273641A (en) * 1966-09-20 Method and apparatus for completing wells
US3322199A (en) * 1965-02-03 1967-05-30 Servco Co Apparatus for production of fluids from wells
US3326291A (en) * 1964-11-12 1967-06-20 Zandmer Solis Myron Duct-forming devices
US3385367A (en) * 1966-12-07 1968-05-28 Kollsman Paul Sealing device for perforated well casing
US3398795A (en) * 1965-08-16 1968-08-27 Otis Eng Co Retrievable well packers
US3419089A (en) * 1966-05-20 1968-12-31 Dresser Ind Tracer bullet, self-sealing
US3451477A (en) * 1967-06-30 1969-06-24 Kork Kelley Method and apparatus for effecting gas control in oil wells
US3675714A (en) * 1970-10-13 1972-07-11 George L Thompson Retrievable density control valve
US3739845A (en) * 1971-03-26 1973-06-19 Sun Oil Co Wellbore safety valve
US3791444A (en) * 1973-01-29 1974-02-12 W Hickey Liquid gas separator
US3951338A (en) * 1974-07-15 1976-04-20 Standard Oil Company (Indiana) Heat-sensitive subsurface safety valve
US4173255A (en) * 1978-10-05 1979-11-06 Kramer Richard W Low well yield control system and method
US4287952A (en) * 1980-05-20 1981-09-08 Exxon Production Research Company Method of selective diversion in deviated wellbores using ball sealers
US4491186A (en) * 1982-11-16 1985-01-01 Smith International, Inc. Automatic drilling process and apparatus
US4497714A (en) * 1981-03-06 1985-02-05 Stant Inc. Fuel-water separator
US4572295A (en) * 1984-08-13 1986-02-25 Exotek, Inc. Method of selective reduction of the water permeability of subterranean formations
US4573638A (en) * 1983-06-22 1986-03-04 Wahlco, Inc. Injection probe
US4649996A (en) * 1981-08-04 1987-03-17 Kojicic Bozidar Double walled screen-filter with perforated joints
US4974674A (en) * 1989-03-21 1990-12-04 Westinghouse Electric Corp. Extraction system with a pump having an elastic rebound inner tube
US4998585A (en) * 1989-11-14 1991-03-12 Qed Environmental Systems, Inc. Floating layer recovery apparatus
US5333684A (en) * 1990-02-16 1994-08-02 James C. Walter Downhole gas separator
US5337821A (en) * 1991-01-17 1994-08-16 Aqrit Industries Ltd. Method and apparatus for the determination of formation fluid flow rates and reservoir deliverability
US5355956A (en) * 1992-09-28 1994-10-18 Halliburton Company Plugged base pipe for sand control
US5384046A (en) * 1991-07-02 1995-01-24 Heinrich Fiedler Gmbh & Co Kg Screen element
US5435395A (en) * 1994-03-22 1995-07-25 Halliburton Company Method for running downhole tools and devices with coiled tubing
US5435393A (en) * 1992-09-18 1995-07-25 Norsk Hydro A.S. Procedure and production pipe for production of oil or gas from an oil or gas reservoir
US5597042A (en) * 1995-02-09 1997-01-28 Baker Hughes Incorporated Method for controlling production wells having permanent downhole formation evaluation sensors
US5609204A (en) * 1995-01-05 1997-03-11 Osca, Inc. Isolation system and gravel pack assembly
US5673751A (en) * 1991-12-31 1997-10-07 Stirling Design International Limited System for controlling the flow of fluid in an oil well
US5803179A (en) * 1996-12-31 1998-09-08 Halliburton Energy Services, Inc. Screened well drainage pipe structure with sealed, variable length labyrinth inlet flow control apparatus
US5831156A (en) * 1997-03-12 1998-11-03 Mullins; Albert Augustus Downhole system for well control and operation
US5873410A (en) * 1996-07-08 1999-02-23 Elf Exploration Production Method and installation for pumping an oil-well effluent
US5881809A (en) * 1997-09-05 1999-03-16 United States Filter Corporation Well casing assembly with erosion protection for inner screen
US6068015A (en) * 1996-08-15 2000-05-30 Camco International Inc. Sidepocket mandrel with orienting feature
US6112815A (en) * 1995-10-30 2000-09-05 Altinex As Inflow regulation device for a production pipe for production of oil or gas from an oil and/or gas reservoir
US6112817A (en) * 1997-05-06 2000-09-05 Baker Hughes Incorporated Flow control apparatus and methods
US6253861B1 (en) * 1998-02-25 2001-07-03 Specialised Petroleum Services Limited Circulation tool
US6273194B1 (en) * 1999-03-05 2001-08-14 Schlumberger Technology Corp. Method and device for downhole flow rate control
US6305470B1 (en) * 1997-04-23 2001-10-23 Shore-Tec As Method and apparatus for production testing involving first and second permeable formations
US6367547B1 (en) * 1999-04-16 2002-04-09 Halliburton Energy Services, Inc. Downhole separator for use in a subterranean well and method
US6371210B1 (en) * 2000-10-10 2002-04-16 Weatherford/Lamb, Inc. Flow control apparatus for use in a wellbore
US20020125009A1 (en) * 2000-08-03 2002-09-12 Wetzel Rodney J. Intelligent well system and method
US6505682B2 (en) * 1999-01-29 2003-01-14 Schlumberger Technology Corporation Controlling production
US6516888B1 (en) * 1998-06-05 2003-02-11 Triangle Equipment As Device and method for regulating fluid flow in a well
US6530431B1 (en) * 2000-06-22 2003-03-11 Halliburton Energy Services, Inc. Screen jacket assembly connection and methods of using same
US6622794B2 (en) * 2001-01-26 2003-09-23 Baker Hughes Incorporated Sand screen with active flow control and associated method of use
US6635732B2 (en) * 1999-04-12 2003-10-21 Surgidev Corporation Water plasticized high refractive index polymer for ophthalmic applications
US6667029B2 (en) * 1999-07-07 2003-12-23 Isp Investments Inc. Stable, aqueous cationic hydrogel
US6679324B2 (en) * 1999-04-29 2004-01-20 Shell Oil Company Downhole device for controlling fluid flow in a well
US6692766B1 (en) * 1994-06-15 2004-02-17 Yissum Research Development Company Of The Hebrew University Of Jerusalem Controlled release oral drug delivery system
US6699611B2 (en) * 2001-05-29 2004-03-02 Motorola, Inc. Fuel cell having a thermo-responsive polymer incorporated therein
US6699503B1 (en) * 1992-09-18 2004-03-02 Yamanuchi Pharmaceutical Co., Ltd. Hydrogel-forming sustained-release preparation
US20040052689A1 (en) * 1999-08-17 2004-03-18 Porex Technologies Corporation Self-sealing materials and devices comprising same
US6722437B2 (en) * 2001-10-22 2004-04-20 Schlumberger Technology Corporation Technique for fracturing subterranean formations
US20040144544A1 (en) * 2001-05-08 2004-07-29 Rune Freyer Arrangement for and method of restricting the inflow of formation water to a well
US20040159447A1 (en) * 2003-02-19 2004-08-19 Bissonnette H. Steven By-pass valve mechanism and method of use hereof
US6786285B2 (en) * 2001-06-12 2004-09-07 Schlumberger Technology Corporation Flow control regulation method and apparatus
US6817416B2 (en) * 2000-08-17 2004-11-16 Abb Offshore Systems Limited Flow control device
US6830104B2 (en) * 2001-08-14 2004-12-14 Halliburton Energy Services, Inc. Well shroud and sand control screen apparatus and completion method
US6831044B2 (en) * 2000-07-27 2004-12-14 Vernon George Constien Product for coating wellbore screens
US20050016732A1 (en) * 2003-06-20 2005-01-27 Brannon Harold Dean Method of hydraulic fracturing to reduce unwanted water production
US6896049B2 (en) * 2000-07-07 2005-05-24 Zeroth Technology Ltd. Deformable member
US20050126776A1 (en) * 2003-12-10 2005-06-16 Russell Thane G. Wellbore screen
US20050189119A1 (en) * 2004-02-27 2005-09-01 Ashmin Lc Inflatable sealing assembly and method for sealing off an inside of a flow carrier
US20060048942A1 (en) * 2002-08-26 2006-03-09 Terje Moen Flow control device for an injection pipe string
US20060076150A1 (en) * 2004-07-30 2006-04-13 Baker Hughes Incorporated Inflow control device with passive shut-off feature
US7032675B2 (en) * 2003-10-06 2006-04-25 Halliburton Energy Services, Inc. Thermally-controlled valves and methods of using the same in a wellbore
US20060108114A1 (en) * 2001-12-18 2006-05-25 Johnson Michael H Drilling method for maintaining productivity while eliminating perforating and gravel packing
US20060118296A1 (en) * 2001-03-20 2006-06-08 Arthur Dybevik Well device for throttle regulation of inflowing fluids
US20070039741A1 (en) * 2005-08-22 2007-02-22 Hailey Travis T Jr Sand control screen assembly enhanced with disappearing sleeve and burst disc
US20070181299A1 (en) * 2005-01-26 2007-08-09 Nexen Inc. Methods of Improving Heavy Oil Production
US7290610B2 (en) * 2005-04-29 2007-11-06 Baker Hughes Incorporated Washpipeless frac pack system
US20070289749A1 (en) * 2006-06-15 2007-12-20 Wood Edward T Anchor system for packers in well injection service
US7360593B2 (en) * 2000-07-27 2008-04-22 Vernon George Constien Product for coating wellbore screens
US7367399B2 (en) * 2003-10-06 2008-05-06 Halliburton Energy Services, Inc. Loop systems and methods of using the same for conveying and distributing thermal energy into a wellbore
US20080135249A1 (en) * 2006-12-07 2008-06-12 Fripp Michael L Well system having galvanic time release plug
US7398822B2 (en) * 2005-05-21 2008-07-15 Schlumberger Technology Corporation Downhole connection system
US20080169099A1 (en) * 2007-01-15 2008-07-17 Schlumberger Technology Corporation Method for Controlling the Flow of Fluid Between a Downhole Formation and a Base Pipe
US7469743B2 (en) * 2006-04-24 2008-12-30 Halliburton Energy Services, Inc. Inflow control devices for sand control screens
US20090057014A1 (en) * 2007-08-28 2009-03-05 Richard Bennett M Method of using a Drill In Sand Control Liner
US20090101342A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Permeable Medium Flow Control Devices for Use in Hydrocarbon Production
US20090139717A1 (en) * 2007-12-03 2009-06-04 Richard Bennett M Multi-Position Valves for Fracturing and Sand Control and Associated Completion Methods
US7784550B2 (en) * 2006-11-21 2010-08-31 Swelltec Limited Downhole apparatus with a swellable connector

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6712154B2 (en) * 1998-11-16 2004-03-30 Enventure Global Technology Isolation of subterranean zones
US8011438B2 (en) * 2005-02-23 2011-09-06 Schlumberger Technology Corporation Downhole flow control with selective permeability

Patent Citations (99)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1649524A (en) * 1927-11-15 Oil ahd water sepakatos for oil wells
US3273641A (en) * 1966-09-20 Method and apparatus for completing wells
US1362552A (en) * 1919-05-19 1920-12-14 Charles T Alexander Automatic mechanism for raising liquid
US1488753A (en) * 1923-03-15 1924-04-01 Kelly William Well strainer
US1915867A (en) * 1931-05-01 1933-06-27 Edward R Penick Choker
US1984741A (en) * 1933-03-28 1934-12-18 Thomas W Harrington Float operated valve for oil wells
US2089477A (en) * 1934-03-19 1937-08-10 Southwestern Flow Valve Corp Well flowing device
US2119563A (en) * 1937-03-02 1938-06-07 George M Wells Method of and means for flowing oil wells
US2214064A (en) * 1939-09-08 1940-09-10 Stanolind Oil & Gas Co Oil production
US2257523A (en) * 1941-01-14 1941-09-30 B L Sherrod Well control device
US2412841A (en) * 1944-03-14 1946-12-17 Earl G Spangler Air and water separator for removing air or water mixed with hydrocarbons, comprising a cartridge containing a wadding of wooden shavings
US2391609A (en) * 1944-05-27 1945-12-25 Kenneth A Wright Oil well screen
US2762437A (en) * 1955-01-18 1956-09-11 Egan Apparatus for separating fluids having different specific gravities
US2810352A (en) * 1956-01-16 1957-10-22 Eugene D Tumlison Oil and gas separator for wells
US3131764A (en) * 1961-12-11 1964-05-05 Baker Oil Tools Inc High temperature packer for well bores
US3326291A (en) * 1964-11-12 1967-06-20 Zandmer Solis Myron Duct-forming devices
US3322199A (en) * 1965-02-03 1967-05-30 Servco Co Apparatus for production of fluids from wells
US3398795A (en) * 1965-08-16 1968-08-27 Otis Eng Co Retrievable well packers
US3419089A (en) * 1966-05-20 1968-12-31 Dresser Ind Tracer bullet, self-sealing
US3385367A (en) * 1966-12-07 1968-05-28 Kollsman Paul Sealing device for perforated well casing
US3451477A (en) * 1967-06-30 1969-06-24 Kork Kelley Method and apparatus for effecting gas control in oil wells
US3675714A (en) * 1970-10-13 1972-07-11 George L Thompson Retrievable density control valve
US3739845A (en) * 1971-03-26 1973-06-19 Sun Oil Co Wellbore safety valve
US3791444A (en) * 1973-01-29 1974-02-12 W Hickey Liquid gas separator
US3951338A (en) * 1974-07-15 1976-04-20 Standard Oil Company (Indiana) Heat-sensitive subsurface safety valve
US4173255A (en) * 1978-10-05 1979-11-06 Kramer Richard W Low well yield control system and method
US4287952A (en) * 1980-05-20 1981-09-08 Exxon Production Research Company Method of selective diversion in deviated wellbores using ball sealers
US4497714A (en) * 1981-03-06 1985-02-05 Stant Inc. Fuel-water separator
US4649996A (en) * 1981-08-04 1987-03-17 Kojicic Bozidar Double walled screen-filter with perforated joints
US4491186A (en) * 1982-11-16 1985-01-01 Smith International, Inc. Automatic drilling process and apparatus
US4573638A (en) * 1983-06-22 1986-03-04 Wahlco, Inc. Injection probe
US4572295A (en) * 1984-08-13 1986-02-25 Exotek, Inc. Method of selective reduction of the water permeability of subterranean formations
US4974674A (en) * 1989-03-21 1990-12-04 Westinghouse Electric Corp. Extraction system with a pump having an elastic rebound inner tube
US4998585A (en) * 1989-11-14 1991-03-12 Qed Environmental Systems, Inc. Floating layer recovery apparatus
US5333684A (en) * 1990-02-16 1994-08-02 James C. Walter Downhole gas separator
US5337821A (en) * 1991-01-17 1994-08-16 Aqrit Industries Ltd. Method and apparatus for the determination of formation fluid flow rates and reservoir deliverability
US5384046A (en) * 1991-07-02 1995-01-24 Heinrich Fiedler Gmbh & Co Kg Screen element
US5673751A (en) * 1991-12-31 1997-10-07 Stirling Design International Limited System for controlling the flow of fluid in an oil well
US5435393A (en) * 1992-09-18 1995-07-25 Norsk Hydro A.S. Procedure and production pipe for production of oil or gas from an oil or gas reservoir
US6699503B1 (en) * 1992-09-18 2004-03-02 Yamanuchi Pharmaceutical Co., Ltd. Hydrogel-forming sustained-release preparation
US5355956A (en) * 1992-09-28 1994-10-18 Halliburton Company Plugged base pipe for sand control
US5435395A (en) * 1994-03-22 1995-07-25 Halliburton Company Method for running downhole tools and devices with coiled tubing
US6692766B1 (en) * 1994-06-15 2004-02-17 Yissum Research Development Company Of The Hebrew University Of Jerusalem Controlled release oral drug delivery system
US5609204A (en) * 1995-01-05 1997-03-11 Osca, Inc. Isolation system and gravel pack assembly
US5597042A (en) * 1995-02-09 1997-01-28 Baker Hughes Incorporated Method for controlling production wells having permanent downhole formation evaluation sensors
US6112815A (en) * 1995-10-30 2000-09-05 Altinex As Inflow regulation device for a production pipe for production of oil or gas from an oil and/or gas reservoir
US5873410A (en) * 1996-07-08 1999-02-23 Elf Exploration Production Method and installation for pumping an oil-well effluent
US6068015A (en) * 1996-08-15 2000-05-30 Camco International Inc. Sidepocket mandrel with orienting feature
US5803179A (en) * 1996-12-31 1998-09-08 Halliburton Energy Services, Inc. Screened well drainage pipe structure with sealed, variable length labyrinth inlet flow control apparatus
US5831156A (en) * 1997-03-12 1998-11-03 Mullins; Albert Augustus Downhole system for well control and operation
US6305470B1 (en) * 1997-04-23 2001-10-23 Shore-Tec As Method and apparatus for production testing involving first and second permeable formations
US6112817A (en) * 1997-05-06 2000-09-05 Baker Hughes Incorporated Flow control apparatus and methods
US5881809A (en) * 1997-09-05 1999-03-16 United States Filter Corporation Well casing assembly with erosion protection for inner screen
US6253861B1 (en) * 1998-02-25 2001-07-03 Specialised Petroleum Services Limited Circulation tool
US6516888B1 (en) * 1998-06-05 2003-02-11 Triangle Equipment As Device and method for regulating fluid flow in a well
US6505682B2 (en) * 1999-01-29 2003-01-14 Schlumberger Technology Corporation Controlling production
US6273194B1 (en) * 1999-03-05 2001-08-14 Schlumberger Technology Corp. Method and device for downhole flow rate control
US6635732B2 (en) * 1999-04-12 2003-10-21 Surgidev Corporation Water plasticized high refractive index polymer for ophthalmic applications
US6367547B1 (en) * 1999-04-16 2002-04-09 Halliburton Energy Services, Inc. Downhole separator for use in a subterranean well and method
US6679324B2 (en) * 1999-04-29 2004-01-20 Shell Oil Company Downhole device for controlling fluid flow in a well
US6667029B2 (en) * 1999-07-07 2003-12-23 Isp Investments Inc. Stable, aqueous cationic hydrogel
US20040052689A1 (en) * 1999-08-17 2004-03-18 Porex Technologies Corporation Self-sealing materials and devices comprising same
US6530431B1 (en) * 2000-06-22 2003-03-11 Halliburton Energy Services, Inc. Screen jacket assembly connection and methods of using same
US6896049B2 (en) * 2000-07-07 2005-05-24 Zeroth Technology Ltd. Deformable member
US7360593B2 (en) * 2000-07-27 2008-04-22 Vernon George Constien Product for coating wellbore screens
US6831044B2 (en) * 2000-07-27 2004-12-14 Vernon George Constien Product for coating wellbore screens
US20020125009A1 (en) * 2000-08-03 2002-09-12 Wetzel Rodney J. Intelligent well system and method
US6817416B2 (en) * 2000-08-17 2004-11-16 Abb Offshore Systems Limited Flow control device
US6371210B1 (en) * 2000-10-10 2002-04-16 Weatherford/Lamb, Inc. Flow control apparatus for use in a wellbore
US6622794B2 (en) * 2001-01-26 2003-09-23 Baker Hughes Incorporated Sand screen with active flow control and associated method of use
US20060118296A1 (en) * 2001-03-20 2006-06-08 Arthur Dybevik Well device for throttle regulation of inflowing fluids
US7185706B2 (en) * 2001-05-08 2007-03-06 Halliburton Energy Services, Inc. Arrangement for and method of restricting the inflow of formation water to a well
US20040144544A1 (en) * 2001-05-08 2004-07-29 Rune Freyer Arrangement for and method of restricting the inflow of formation water to a well
US6699611B2 (en) * 2001-05-29 2004-03-02 Motorola, Inc. Fuel cell having a thermo-responsive polymer incorporated therein
US6786285B2 (en) * 2001-06-12 2004-09-07 Schlumberger Technology Corporation Flow control regulation method and apparatus
US6830104B2 (en) * 2001-08-14 2004-12-14 Halliburton Energy Services, Inc. Well shroud and sand control screen apparatus and completion method
US6722437B2 (en) * 2001-10-22 2004-04-20 Schlumberger Technology Corporation Technique for fracturing subterranean formations
US20060108114A1 (en) * 2001-12-18 2006-05-25 Johnson Michael H Drilling method for maintaining productivity while eliminating perforating and gravel packing
US20060048942A1 (en) * 2002-08-26 2006-03-09 Terje Moen Flow control device for an injection pipe string
US20040159447A1 (en) * 2003-02-19 2004-08-19 Bissonnette H. Steven By-pass valve mechanism and method of use hereof
US20050016732A1 (en) * 2003-06-20 2005-01-27 Brannon Harold Dean Method of hydraulic fracturing to reduce unwanted water production
US7367399B2 (en) * 2003-10-06 2008-05-06 Halliburton Energy Services, Inc. Loop systems and methods of using the same for conveying and distributing thermal energy into a wellbore
US7032675B2 (en) * 2003-10-06 2006-04-25 Halliburton Energy Services, Inc. Thermally-controlled valves and methods of using the same in a wellbore
US7258166B2 (en) * 2003-12-10 2007-08-21 Absolute Energy Ltd. Wellbore screen
US20050126776A1 (en) * 2003-12-10 2005-06-16 Russell Thane G. Wellbore screen
US20050189119A1 (en) * 2004-02-27 2005-09-01 Ashmin Lc Inflatable sealing assembly and method for sealing off an inside of a flow carrier
US20060076150A1 (en) * 2004-07-30 2006-04-13 Baker Hughes Incorporated Inflow control device with passive shut-off feature
US20070181299A1 (en) * 2005-01-26 2007-08-09 Nexen Inc. Methods of Improving Heavy Oil Production
US7290610B2 (en) * 2005-04-29 2007-11-06 Baker Hughes Incorporated Washpipeless frac pack system
US7398822B2 (en) * 2005-05-21 2008-07-15 Schlumberger Technology Corporation Downhole connection system
US20070039741A1 (en) * 2005-08-22 2007-02-22 Hailey Travis T Jr Sand control screen assembly enhanced with disappearing sleeve and burst disc
US7469743B2 (en) * 2006-04-24 2008-12-30 Halliburton Energy Services, Inc. Inflow control devices for sand control screens
US20070289749A1 (en) * 2006-06-15 2007-12-20 Wood Edward T Anchor system for packers in well injection service
US7784550B2 (en) * 2006-11-21 2010-08-31 Swelltec Limited Downhole apparatus with a swellable connector
US20080135249A1 (en) * 2006-12-07 2008-06-12 Fripp Michael L Well system having galvanic time release plug
US20080169099A1 (en) * 2007-01-15 2008-07-17 Schlumberger Technology Corporation Method for Controlling the Flow of Fluid Between a Downhole Formation and a Base Pipe
US20090057014A1 (en) * 2007-08-28 2009-03-05 Richard Bennett M Method of using a Drill In Sand Control Liner
US20090101342A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Permeable Medium Flow Control Devices for Use in Hydrocarbon Production
US20090139717A1 (en) * 2007-12-03 2009-06-04 Richard Bennett M Multi-Position Valves for Fracturing and Sand Control and Associated Completion Methods

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9243472B1 (en) 2014-08-13 2016-01-26 Geodynamics, Inc. Wellbore plug isolation system and method
WO2016025048A1 (en) * 2014-08-13 2016-02-18 Geodynamics, Inc. Wellbore plug isolation system and method
US9752406B2 (en) 2014-08-13 2017-09-05 Geodynamics, Inc. Wellbore plug isolation system and method
US9835006B2 (en) 2014-08-13 2017-12-05 Geodynamics, Inc. Wellbore plug isolation system and method
US10180037B2 (en) 2014-08-13 2019-01-15 Geodynamics, Inc. Wellbore plug isolation system and method
US10480276B2 (en) 2014-08-13 2019-11-19 Geodynamics, Inc. Wellbore plug isolation system and method
US10612340B2 (en) 2014-08-13 2020-04-07 Geodynamics, Inc. Wellbore plug isolation system and method

Also Published As

Publication number Publication date
WO2010141198A2 (en) 2010-12-09
WO2010141198A3 (en) 2011-04-21

Similar Documents

Publication Publication Date Title
CA2763735C (en) Permeability flow balancing within integral screen joints
US9803469B2 (en) Method for controlling fluid interface level in gravity drainage oil recovery processes with crossflow
US20100300194A1 (en) Permeability flow balancing within integral screen joints and method
Sugden et al. Special considerations in the design optimization of the production casing in high-rate, multistage-fractured shale wells
RU2527972C1 (en) Method (versions) and control system of operating temperatures in wellbore
US8132624B2 (en) Permeability flow balancing within integral screen joints and method
CA2970199A1 (en) Flow control devices in sw-sagd
US20100300675A1 (en) Permeability flow balancing within integral screen joints
US9279315B2 (en) Injection well and method for drilling and completion
US20100300674A1 (en) Permeability flow balancing within integral screen joints
US11933149B2 (en) Fluid flow control in a hydrocarbon recovery operation
EP2670940B1 (en) Methods of maintaining sufficient hydrostatic pressure in multiple intervals of a wellbore in a soft formation
US9273542B2 (en) Method for controlling fluid interface level in gravity drainage oil recovery processes with crossflow
RU2599118C1 (en) Method for development of high-viscosity oil deposit

Legal Events

Date Code Title Description
AS Assignment

Owner name: BAKER HUGHES INCORPORATED, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:JOHNSON, MICHAEL H.;KIM, NAMHYO;REEL/FRAME:022845/0276

Effective date: 20090617

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION