US20100129152A1 - Method of covering an area with a layer of compressible material - Google Patents

Method of covering an area with a layer of compressible material Download PDF

Info

Publication number
US20100129152A1
US20100129152A1 US12/277,840 US27784008A US2010129152A1 US 20100129152 A1 US20100129152 A1 US 20100129152A1 US 27784008 A US27784008 A US 27784008A US 2010129152 A1 US2010129152 A1 US 2010129152A1
Authority
US
United States
Prior art keywords
area
elevation
asphalt
foundation
over
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/277,840
Inventor
Arthur Taylor
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Trimble Inc
Original Assignee
Trimble Navigation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Trimble Navigation Ltd filed Critical Trimble Navigation Ltd
Priority to US12/277,840 priority Critical patent/US20100129152A1/en
Assigned to TRIMBLE NAVIGATION LIMITED reassignment TRIMBLE NAVIGATION LIMITED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: TAYLOR, ARTHUR
Priority to DE102009044581A priority patent/DE102009044581A1/en
Publication of US20100129152A1 publication Critical patent/US20100129152A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/07Apparatus combining measurement of the surface configuration of paving with application of material in proportion to the measured irregularities

Definitions

  • Asphalt paving is widely used to for roadbeds, parking lots, and other surfaces where a relatively smooth, durable surface is needed.
  • a foundation surface such as a roadbed
  • asphalt A mat of hot asphalt concrete, commonly and hereinafter referred to as asphalt, is laid over the foundation surface with an asphalt paving machine that slowly moves over the area.
  • asphalt a mat of hot asphalt concrete, commonly and hereinafter referred to as asphalt
  • a roller or other compression machine compresses the asphalt and produces a relatively smooth finish on the top surface of the asphalt layer.
  • compressing the asphalt mat finish the top surface of the asphalt layer it also compresses the roadbed and forces the irregularities of the roadbed into the asphalt. Additionally, compressing the asphalt presses together the mineral aggregate particles in the asphalt mixture to enhance the structural integrity of the final asphalt layer.
  • the asphalt paving operation produce a predefined upper surface elevation contour over the paved area.
  • the foundation on which the asphalt is to be laid may be a layer of crushed rock or other material, or in some cases an appropriately graded earth roadbed. Such surfaces typically have irregularities, and commonly it is desired that these irregularities not be reflected in the final top surface of the asphalt layer.
  • the method includes the steps of determining the elevation of the foundation surface over the area, and determining the difference between the elevation of the foundation surface and the desired elevation over the area.
  • a mat of asphalt is deposited over the area.
  • the mat has a thickness that varies over the area, with the mat being thicker in the areas having a lower foundation elevation and thinner in the areas having a higher foundation elevation, such that the mat is sufficiently thick to allow for compression of the mat over the area to the desired elevation.
  • the mat of asphalt is compressed during one or more compression operations such that the upper surface of the mat has the desired elevation over the area.
  • the step of determining the elevation of the foundation surface over the area may comprise the steps of scanning the contour of the foundation surface over the area, and storing the results of the scanning operation.
  • the step of scanning the contour of the foundation surface over the area may include the step of using a laser scanning device to determine the elevation of the foundation at a plurality of points spaced over the area.
  • the step of scanning the contour of the foundation surface over the area may include the step of using a GNSS survey device to determine the elevation of the foundation at a plurality of points spaced over the area.
  • the step of scanning the contour of the foundation surface over the area may include the step of scanning the foundation from a scanner mounted on the asphalt paving machine to determine the elevation of the foundation at a plurality of points spaced over the area ahead of the asphalt paving machine while the asphalt paving machine is depositing an asphalt mat of varying thickness.
  • the step of scanning the contour of the foundation surface over the area may include the step of scanning the foundation from a scanner mounted on a vehicle that travels ahead of the asphalt paving machine to determine the elevation of the foundation surface at a plurality of points spaced over the area.
  • the step of depositing a mat of asphalt over the area may comprise the step of depositing a mat which has a thickness that is substantially 1.25 times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area.
  • the step of depositing a mat of asphalt over the area may comprise the step of depositing a mat which has a thickness that is substantially a constant K times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area.
  • the method may further comprise the steps of determining the elevation of the upper surface of the mat after compression, and adjusting the value of K to compensate for determined offset from the desired elevation of the upper surface over the area.
  • the step of determining the elevation of the upper surface of the mat after compression may include the step of measuring the elevation of the upper surface of the mat after compression with a laser scanner directed to the surface behind the compacting machine.
  • the step of adjusting the value of K to compensate for determined offset from the desired elevation of the upper surface over the area may comprise the step of computing an adjusted value for K as the ratio of the thickness of the uncompressed asphalt mat deposited on the foundation surface to the thickness of the compressed asphalt mat.
  • the method may further comprise the step of determining the thickness of the compressed asphalt mat by subtracting the elevation of the foundation surface at a point in the area from the elevation of the upper surface of the mat after compression at the same point in the area.
  • a method of covering an area with a compressible material to a desired elevation using a machine that deposits a layer of the compressible material of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation comprises the steps of determining the elevation of the foundation surface over the area, and determining the difference between the elevation of the foundation surface and the desired elevation over the area.
  • a layer of compressible material is deposited over the area.
  • the layer has an upper surface that varies in elevation over the area, with the layer upper surface being higher in the areas having a lower foundation elevation and lower in the areas having a higher foundation elevation.
  • the layer is sufficiently thick to allow for compression of the layer of compressible material over the area to the desired elevation.
  • the layer of compressible material is compressed during one or more compression operations such that the upper surface of the layer after compression has the desired elevation over the area.
  • the step of determining the elevation of the foundation surface over the area may comprise the step of scanning the contour of the foundation surface over the area, and storing the results of the scanning operation.
  • the step scanning the contour of the foundation surface over the area may include the step of using a laser scanning device to determine the elevation of the foundation at a plurality of points spaced over the area.
  • the step scanning the contour of the foundation surface over the area may include the step of using a GNSS survey device to determine the elevation of the foundation at a plurality of points spaced over the area.
  • the step of scanning the contour of the foundation surface over the area may include the step of scanning the foundation from a scanner mounted on the machine that deposits a layer of the compressible material to determine the elevation of the foundation at a plurality of points spaced over the area ahead of the machine while the machine is depositing a compressible material layer of varying thickness.
  • the step of scanning the contour of the foundation surface over the area may include the step of scanning the foundation from a scanner mounted on a vehicle that travels ahead of the machine that deposits the compressible material to determine the elevation of the foundation at a plurality of points spaced over the area.
  • the step of depositing a layer of compressible material over the area may comprise the step of depositing a layer which has a thickness that is substantially 1.25 times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area.
  • the step of depositing a layer of compressible material over the area may comprise the step of depositing a layer which has a thickness that is substantially a constant K times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area.
  • the method may further comprise the steps of determining the elevation of the upper surface of the layer after compression, and adjusting the value of K to compensate for any offset from the desired elevation of the upper surface over the area.
  • the step of determining the elevation of the upper surface of the layer after compression may include the step of measuring the elevation of the upper surface of the layer after compression with a laser scanner directed to the surface behind the compacting machine.
  • the step of adjusting the value of K to compensate for any offset from the desired elevation of the upper surface over the area may comprise the step of computing an adjusted value for K as the ratio of the thickness of the uncompressed compressible material layer to the thickness of the compressed compressible material layer.
  • the method may further comprise the step of determining the thickness of the compressed compressible material layer by subtracting the elevation of the foundation surface at a point in the area from the elevation of the upper surface of the layer after compression at the same point in the area.
  • FIG. 1A is a diagrammatic longitudinal sectional view of an area, such as a road bed, showing a foundation surface over which compressible material has been laid to a desired grade or elevation;
  • FIG. 1B is a diagrammatic sectional view, similar to FIG. 1A , showing the compaction and fill levels achieved in multiple paving steps;
  • FIG. 1C is a diagrammatic sectional view, similar to FIG. 1B , showing compaction levels
  • FIG. 1D is a diagrammatic sectional view, similar to FIG. 1C , useful in explaining the method of the present invention
  • FIG. 1E is a diagrammatic sectional view, similar to FIG. 1D , useful in explaining the manner in which the volume of the asphalt dispensed and applied is controlled.
  • FIG. 2 is a diagrammatic view of an asphalt paving system.
  • FIG. 1A illustrates a road 10 that has been paved with asphalt 12 to a desired grade 14 along its top surface 15 .
  • FIG. 1A is taken along a vertical plane that extends longitudinally along the center of the road 10 and thus illustrates elevation variations that occur along the length of the road.
  • the asphalt 12 has been paved over a foundation 16 defining a foundation surface 18 .
  • the top surface 15 of the asphalt 12 is shown as essentially flat even though the surface 18 of the foundation 16 varies significantly. To achieve this, the thickness of the asphalt mat 12 varies significantly along the road 10 .
  • a short segment of the road such as that shown in FIG. 1A , may be horizontal, the inclination of the road will vary along its length.
  • FIG. 1B shows a road 10 in section, in a view similar to that of FIG. 1A , and is useful in understanding the prior art paving process. Corresponding elements have been given the same reference numerals in all of the drawings.
  • FIG. 1B illustrates the process of paving a road in which an asphalt mat or layer of uniform thickness 20 is deposited on the upper surface 18 of foundation 16 . After the asphalt mat 12 is deposited, it is compressed to a thickness 22 . It will be noted that a surface 14 ′ results from compression that is below the desired grade 15 . At this point, additional layers of asphalt are deposited on the surface 14 ′ in the lower elevation areas and compacted.
  • At least one additional layer of asphalt is then applied over the entire area and compacted to bring the multiple layers of asphalt up to the desired elevation 15 .
  • FIG. 1C a paving process similar to that of FIG. 1B is shown.
  • the initial layer of asphalt applied to the foundation brings the pre-compacted elevation of the asphalt mat up to the desired grade.
  • the mat is compacted, all portions of the surface 14 ′ are below the desired grade.
  • the asphalt mat 12 has a pre-compression thickness 20 that is sufficient to result in the highest portions of the compressed mat 12 achieving the desired elevation. In both cases, however, the compressed mat 12 has portions that have a below grade top surface, and that must be filled in with additional asphalt in additional steps.
  • FIG. 1D illustrates a method by which the appropriate amount of asphalt can be deposited as a mat having a thickness 20 that varies over the surface of the roadbed.
  • an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on the foundation surface, and then use a compacting machine to compact the asphalt to the desired elevation
  • the existing elevation of the foundation surface level 18 of the foundation 16 must be determined over the area to be paved.
  • the difference, ⁇ H G-F between the elevation H F of the foundation surface 18 and the desired elevation H G over the area is determined.
  • a mat 12 is deposited over the area.
  • the mat 12 has a thickness 20 that varies over the area, with the mat being thicker in the areas having a lower foundation elevation and thinner in the areas having a higher foundation elevation.
  • the mat thickness is selected such that it is sufficiently thick to allow for compression of the mat over the area to the desired elevation in one or more compression operations. It has been found that by depositing a mat with a thickness that is approximately 25% greater than would be the case with an incompressible mat, the mat can be compressed in a single compression operation, or in a reduced number of compression operations, such that the upper surface 14 of the mat is uniformly at the desired elevation 15 over the area.
  • the method contemplates the deposition of an asphalt mat that has a thickness adjusted to be approximately 1.25 H G-F .
  • the step of determining the elevation of the foundation surface 18 over the area may comprise the steps of scanning the contour of the foundation surface 14 over the area, and storing the results of the scanning operation. The mapped surface contour can then be used later in developing the appropriate thickness for the mat of asphalt before the mat is applied.
  • the step of scanning the contour of the foundation surface 18 over the area may include the step of using a laser scanning device 40 ( FIG. 2 ) to determine the elevation of the foundation at a plurality of points spaced over the area. This data may be stored in memory 41 .
  • the step of scanning the contour of the foundation surface over the area may include the step of using a GNSS survey device, such as receiver 42 , to determine the elevation of the foundation at a plurality of points spaced over the area.
  • the elevation of the paving machine 43 may be determined by use of the GNSS receiver with the elevation of the foundation surface with respect to the machine 43 determined with the scanner 40 .
  • the GNSS receiver then permits the elevation of the foundation to be referenced to a coordinate system that matches the grade plans for the road.
  • the elevation of the foundation surface may be mapped by other known survey techniques.
  • the step of scanning the contour of the foundation surface 18 over the area to be paved may include the step of scanning the foundation from a scanner 40 that is mounted on the asphalt paving machine 43 to determine the elevation of the foundation 18 at a plurality of points spaced over the area ahead of the asphalt paving machine, while the asphalt paving machine is depositing an asphalt mat of varying thickness.
  • the scanner 40 may be mounted on a vehicle that travels ahead of the asphalt paving machine.
  • the overfill of 25% is an approximation that may need to be altered depending on the particular makeup of the asphalt material being used, on its temperature, and on other factors. It may, therefore, be necessary to adjust the amount of overfill to compensate for such variations. It is contemplated that a mat which has a thickness that is substantially a constant K times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area may be deposited. If the factors that determine the percentage of overfill should change during a paving operation, it may be desirable to change the constant K also during the paving operation.
  • the step of determining the elevation of the upper surface 14 of the mat 12 after compression may include the step of measuring the elevation of the upper surface of the mat after compression with a laser scanner 44 directed to the surface of the mat behind the compacting machine. More specifically, the output from the laser scanner 14 and the output from a GNSS receiver 46 are used to determine the elevation of the surface 14 at specific points behind the compacting machine 48 .
  • the step of adjusting the value of K to compensate for determined offset from the desired elevation of the upper surface over the area comprises the step of computing an adjusted value for K as the ratio of the thickness of the uncompressed asphalt mat deposited on the foundation surface to the thickness of the compressed asphalt mat.
  • the thickness of the compressed asphalt mat is determined by subtracting the elevation of the foundation surface at a point in the area, as measured by sensor 40 , from the elevation of the upper surface of the mat after compression at the same point in the area.
  • paving methods are described above in the context of asphalt concrete paving, these methods may be used in conjunction with applying and compressing a layer of any type, and then compacting the compressible material. It will be further appreciated that although these methods are described in the context of changing the amount of overfill along the length of a roadway as the roadway is being paved to compensate for variations in the elevation of the foundation in the direction of the roadway, this same method may also be used to adjust the level of overfill across the width of the roadway to compensate for variations in the elevation of the foundation across the roadway. In order to make such an adjustment, of course, it is necessary that the asphalt paving machine have a screed arrangement that controls variations in the elevation of the deposited asphalt across the direction of machine travel.
  • FIG. 1E illustrates the manner in which the volume of the asphalt material being dispensed along the roadbed or other area is determined.
  • the dispensed differential volume of the asphalt at a differential point x i along the roadway is:
  • the paving machine therefore determines the volume of asphalt that is to be deposited on the foundation surface as the paving machine moves along foundation surface 18 .
  • This volume of material is ejected from the paver 43 and the elevation of the asphalt behind the paver 43 is determined by a screed 47 following the paving machine 43 .
  • the asphalt is deposited by a dispensing unit 48 in the disperser under control of control unit 50 .
  • the present system determines the true height of the base foundation of the roadbed that is to be filled in with asphalt, and that this elevation measurement is taken so that it is in the same coordinate system as the desired road model. It will be appreciated that the system of FIG. 2 measures the actual level of compaction and then takes this into account in dispensing the asphalt so that the compaction process produces a compacted asphalt service at the desired level in a single operation without adding additional layers of asphalt and with a reduced number of compaction cycles.

Abstract

A method of covering an area with a compressible material, such as asphalt, to a desired elevation using a machine that deposits a layer of the compressible material of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation, includes the steps of determining the elevation of the foundation surface over the area, and determining the difference between the elevation of the foundation surface and the desired elevation over the area. A layer of the compressible material is deposited over the area. The layer has an upper surface that varies in elevation over the area, with the layer upper surface being higher in the areas having a lower foundation elevation and lower in the areas having a higher foundation elevation. The layer is sufficiently thick to allow for compression of the layer of compressible material over the area to the desired elevation. The layer of compressible material is compressed during one or more compression operations such that the upper surface of the layer after compression is uniformly at the desired elevation over the area.

Description

    CROSS-REFERENCE TO RELATED APPLICATION
  • Not applicable.
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not applicable.
  • BACKGROUND OF THE INVENTION
  • Asphalt paving is widely used to for roadbeds, parking lots, and other surfaces where a relatively smooth, durable surface is needed. Typically, the contour of a foundation surface, such as a roadbed, is prepared with a motor grader or other machine. A mat of hot asphalt concrete, commonly and hereinafter referred to as asphalt, is laid over the foundation surface with an asphalt paving machine that slowly moves over the area. After the mat of hot asphalt is deposited on the roadbed, a roller or other compression machine compresses the asphalt and produces a relatively smooth finish on the top surface of the asphalt layer. Not only does compressing the asphalt mat finish the top surface of the asphalt layer, it also compresses the roadbed and forces the irregularities of the roadbed into the asphalt. Additionally, compressing the asphalt presses together the mineral aggregate particles in the asphalt mixture to enhance the structural integrity of the final asphalt layer.
  • Typically it is desired that the asphalt paving operation produce a predefined upper surface elevation contour over the paved area. The foundation on which the asphalt is to be laid may be a layer of crushed rock or other material, or in some cases an appropriately graded earth roadbed. Such surfaces typically have irregularities, and commonly it is desired that these irregularities not be reflected in the final top surface of the asphalt layer. In the past it has been common to deposit an asphalt mat having a uniform pre-compression thickness. The thickness of the mat is chosen so that when the mat is subsequently compressed, the high spots of the mat are at or near the desired elevations. The low portions of the compressed mat are then filled in with additional asphalt material and the compression step repeated. It will be appreciated, however, that making multiple passes with an asphalt paving machine and a compacting roller over portions of the area to be paved is time consuming and expensive. It is seen that there is a need for a method of depositing asphalt or other compressible material in which only a single deposit step, and a reduced number of compression steps are needed to achieve the desired elevation level for the upper surface of the compressed asphalt or compressible material layer.
  • SUMMARY OF THE INVENTION
  • This need is met by a method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation. The method includes the steps of determining the elevation of the foundation surface over the area, and determining the difference between the elevation of the foundation surface and the desired elevation over the area. A mat of asphalt is deposited over the area. The mat has a thickness that varies over the area, with the mat being thicker in the areas having a lower foundation elevation and thinner in the areas having a higher foundation elevation, such that the mat is sufficiently thick to allow for compression of the mat over the area to the desired elevation. The mat of asphalt is compressed during one or more compression operations such that the upper surface of the mat has the desired elevation over the area.
  • The step of determining the elevation of the foundation surface over the area may comprise the steps of scanning the contour of the foundation surface over the area, and storing the results of the scanning operation. The step of scanning the contour of the foundation surface over the area may include the step of using a laser scanning device to determine the elevation of the foundation at a plurality of points spaced over the area. The step of scanning the contour of the foundation surface over the area may include the step of using a GNSS survey device to determine the elevation of the foundation at a plurality of points spaced over the area. The step of scanning the contour of the foundation surface over the area may include the step of scanning the foundation from a scanner mounted on the asphalt paving machine to determine the elevation of the foundation at a plurality of points spaced over the area ahead of the asphalt paving machine while the asphalt paving machine is depositing an asphalt mat of varying thickness. The step of scanning the contour of the foundation surface over the area may include the step of scanning the foundation from a scanner mounted on a vehicle that travels ahead of the asphalt paving machine to determine the elevation of the foundation surface at a plurality of points spaced over the area.
  • The step of depositing a mat of asphalt over the area may comprise the step of depositing a mat which has a thickness that is substantially 1.25 times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area. The step of depositing a mat of asphalt over the area may comprise the step of depositing a mat which has a thickness that is substantially a constant K times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area. The method may further comprise the steps of determining the elevation of the upper surface of the mat after compression, and adjusting the value of K to compensate for determined offset from the desired elevation of the upper surface over the area. The step of determining the elevation of the upper surface of the mat after compression may include the step of measuring the elevation of the upper surface of the mat after compression with a laser scanner directed to the surface behind the compacting machine. The step of adjusting the value of K to compensate for determined offset from the desired elevation of the upper surface over the area may comprise the step of computing an adjusted value for K as the ratio of the thickness of the uncompressed asphalt mat deposited on the foundation surface to the thickness of the compressed asphalt mat. The method may further comprise the step of determining the thickness of the compressed asphalt mat by subtracting the elevation of the foundation surface at a point in the area from the elevation of the upper surface of the mat after compression at the same point in the area.
  • A method of covering an area with a compressible material to a desired elevation using a machine that deposits a layer of the compressible material of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation, comprises the steps of determining the elevation of the foundation surface over the area, and determining the difference between the elevation of the foundation surface and the desired elevation over the area. A layer of compressible material is deposited over the area. The layer has an upper surface that varies in elevation over the area, with the layer upper surface being higher in the areas having a lower foundation elevation and lower in the areas having a higher foundation elevation. The layer is sufficiently thick to allow for compression of the layer of compressible material over the area to the desired elevation. The layer of compressible material is compressed during one or more compression operations such that the upper surface of the layer after compression has the desired elevation over the area.
  • The step of determining the elevation of the foundation surface over the area may comprise the step of scanning the contour of the foundation surface over the area, and storing the results of the scanning operation. The step scanning the contour of the foundation surface over the area may include the step of using a laser scanning device to determine the elevation of the foundation at a plurality of points spaced over the area. The step scanning the contour of the foundation surface over the area may include the step of using a GNSS survey device to determine the elevation of the foundation at a plurality of points spaced over the area. The step of scanning the contour of the foundation surface over the area may include the step of scanning the foundation from a scanner mounted on the machine that deposits a layer of the compressible material to determine the elevation of the foundation at a plurality of points spaced over the area ahead of the machine while the machine is depositing a compressible material layer of varying thickness. The step of scanning the contour of the foundation surface over the area may include the step of scanning the foundation from a scanner mounted on a vehicle that travels ahead of the machine that deposits the compressible material to determine the elevation of the foundation at a plurality of points spaced over the area.
  • The step of depositing a layer of compressible material over the area may comprise the step of depositing a layer which has a thickness that is substantially 1.25 times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area. The step of depositing a layer of compressible material over the area may comprise the step of depositing a layer which has a thickness that is substantially a constant K times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area. The method may further comprise the steps of determining the elevation of the upper surface of the layer after compression, and adjusting the value of K to compensate for any offset from the desired elevation of the upper surface over the area. The step of determining the elevation of the upper surface of the layer after compression may include the step of measuring the elevation of the upper surface of the layer after compression with a laser scanner directed to the surface behind the compacting machine. The step of adjusting the value of K to compensate for any offset from the desired elevation of the upper surface over the area may comprise the step of computing an adjusted value for K as the ratio of the thickness of the uncompressed compressible material layer to the thickness of the compressed compressible material layer. The method may further comprise the step of determining the thickness of the compressed compressible material layer by subtracting the elevation of the foundation surface at a point in the area from the elevation of the upper surface of the layer after compression at the same point in the area.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1A is a diagrammatic longitudinal sectional view of an area, such as a road bed, showing a foundation surface over which compressible material has been laid to a desired grade or elevation;
  • FIG. 1B is a diagrammatic sectional view, similar to FIG. 1A, showing the compaction and fill levels achieved in multiple paving steps;
  • FIG. 1C is a diagrammatic sectional view, similar to FIG. 1B, showing compaction levels;
  • FIG. 1D is a diagrammatic sectional view, similar to FIG. 1C, useful in explaining the method of the present invention;
  • FIG. 1E is a diagrammatic sectional view, similar to FIG. 1D, useful in explaining the manner in which the volume of the asphalt dispensed and applied is controlled; and
  • FIG. 2 is a diagrammatic view of an asphalt paving system.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • FIG. 1A illustrates a road 10 that has been paved with asphalt 12 to a desired grade 14 along its top surface 15. FIG. 1A is taken along a vertical plane that extends longitudinally along the center of the road 10 and thus illustrates elevation variations that occur along the length of the road. The asphalt 12 has been paved over a foundation 16 defining a foundation surface 18. The top surface 15 of the asphalt 12 is shown as essentially flat even though the surface 18 of the foundation 16 varies significantly. To achieve this, the thickness of the asphalt mat 12 varies significantly along the road 10. Several points should be noted. First, although a short segment of the road, such as that shown in FIG. 1A, may be horizontal, the inclination of the road will vary along its length. Second, although the description here defines control of the paving operation along the length of the road, a control across the width of the road is also utilized and described, below.
  • FIG. 1B shows a road 10 in section, in a view similar to that of FIG. 1A, and is useful in understanding the prior art paving process. Corresponding elements have been given the same reference numerals in all of the drawings. FIG. 1B illustrates the process of paving a road in which an asphalt mat or layer of uniform thickness 20 is deposited on the upper surface 18 of foundation 16. After the asphalt mat 12 is deposited, it is compressed to a thickness 22. It will be noted that a surface 14′ results from compression that is below the desired grade 15. At this point, additional layers of asphalt are deposited on the surface 14′ in the lower elevation areas and compacted. At least one additional layer of asphalt is then applied over the entire area and compacted to bring the multiple layers of asphalt up to the desired elevation 15. In FIG. 1C, a paving process similar to that of FIG. 1B is shown. In the process of FIG. 1B, the initial layer of asphalt applied to the foundation brings the pre-compacted elevation of the asphalt mat up to the desired grade. Once the mat is compacted, all portions of the surface 14′ are below the desired grade. In the FIG. 1C paving process, on the other hand, the asphalt mat 12 has a pre-compression thickness 20 that is sufficient to result in the highest portions of the compressed mat 12 achieving the desired elevation. In both cases, however, the compressed mat 12 has portions that have a below grade top surface, and that must be filled in with additional asphalt in additional steps.
  • FIG. 1D illustrates a method by which the appropriate amount of asphalt can be deposited as a mat having a thickness 20 that varies over the surface of the roadbed. In order to pave an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on the foundation surface, and then use a compacting machine to compact the asphalt to the desired elevation, the existing elevation of the foundation surface level 18 of the foundation 16 must be determined over the area to be paved. The difference, ΔHG-F, between the elevation HF of the foundation surface 18 and the desired elevation HG over the area is determined. A mat 12 is deposited over the area. The mat 12 has a thickness 20 that varies over the area, with the mat being thicker in the areas having a lower foundation elevation and thinner in the areas having a higher foundation elevation. The mat thickness is selected such that it is sufficiently thick to allow for compression of the mat over the area to the desired elevation in one or more compression operations. It has been found that by depositing a mat with a thickness that is approximately 25% greater than would be the case with an incompressible mat, the mat can be compressed in a single compression operation, or in a reduced number of compression operations, such that the upper surface 14 of the mat is uniformly at the desired elevation 15 over the area. In other words, the method contemplates the deposition of an asphalt mat that has a thickness adjusted to be approximately 1.25 HG-F.
  • The step of determining the elevation of the foundation surface 18 over the area may comprise the steps of scanning the contour of the foundation surface 14 over the area, and storing the results of the scanning operation. The mapped surface contour can then be used later in developing the appropriate thickness for the mat of asphalt before the mat is applied. The step of scanning the contour of the foundation surface 18 over the area may include the step of using a laser scanning device 40 (FIG. 2) to determine the elevation of the foundation at a plurality of points spaced over the area. This data may be stored in memory 41. The step of scanning the contour of the foundation surface over the area may include the step of using a GNSS survey device, such as receiver 42, to determine the elevation of the foundation at a plurality of points spaced over the area. It will be appreciated that the elevation of the paving machine 43 may be determined by use of the GNSS receiver with the elevation of the foundation surface with respect to the machine 43 determined with the scanner 40. The GNSS receiver then permits the elevation of the foundation to be referenced to a coordinate system that matches the grade plans for the road. It will be further appreciated that the elevation of the foundation surface may be mapped by other known survey techniques. The step of scanning the contour of the foundation surface 18 over the area to be paved may include the step of scanning the foundation from a scanner 40 that is mounted on the asphalt paving machine 43 to determine the elevation of the foundation 18 at a plurality of points spaced over the area ahead of the asphalt paving machine, while the asphalt paving machine is depositing an asphalt mat of varying thickness. Alternatively, the scanner 40 may be mounted on a vehicle that travels ahead of the asphalt paving machine.
  • FIG. 1D illustrates depositing a mat of asphalt 12 over the area which has a thickness 20 that varies over the area, with the mat being thicker in the areas having a lower foundation elevation with respect to desired grade elevation and thinner in the areas having a higher foundation elevation with respect to desired grade elevation. It has been determined that depositing a mat 12 which has a thickness 20 that is substantially 1.25 times the difference between the desired elevation 15 and the elevation of the foundation surface 16 at each of a plurality of points spaced over the area compensates for compression of the mat. It will be noted that at each of the points xi the overfill is approximately 25% of the fill height to the desired grade. In other words, HFILL=1.25 ΔHG-F for each value of xi. It will be appreciated, however, that the overfill of 25% is an approximation that may need to be altered depending on the particular makeup of the asphalt material being used, on its temperature, and on other factors. It may, therefore, be necessary to adjust the amount of overfill to compensate for such variations. It is contemplated that a mat which has a thickness that is substantially a constant K times the difference between the desired elevation and the elevation of the foundation surface at each of a plurality of points spaced over the area may be deposited. If the factors that determine the percentage of overfill should change during a paving operation, it may be desirable to change the constant K also during the paving operation. This may be accomplished by determining the elevation of the upper surface 14 of the mat 12 after compression, and adjusting the value of K to compensate for the offset from the desired elevation of the upper surface over the area. The step of determining the elevation of the upper surface 14 of the mat 12 after compression may include the step of measuring the elevation of the upper surface of the mat after compression with a laser scanner 44 directed to the surface of the mat behind the compacting machine. More specifically, the output from the laser scanner 14 and the output from a GNSS receiver 46 are used to determine the elevation of the surface 14 at specific points behind the compacting machine 48. The step of adjusting the value of K to compensate for determined offset from the desired elevation of the upper surface over the area comprises the step of computing an adjusted value for K as the ratio of the thickness of the uncompressed asphalt mat deposited on the foundation surface to the thickness of the compressed asphalt mat. The thickness of the compressed asphalt mat is determined by subtracting the elevation of the foundation surface at a point in the area, as measured by sensor 40, from the elevation of the upper surface of the mat after compression at the same point in the area.
  • It will be appreciated that although the paving methods are described above in the context of asphalt concrete paving, these methods may be used in conjunction with applying and compressing a layer of any type, and then compacting the compressible material. It will be further appreciated that although these methods are described in the context of changing the amount of overfill along the length of a roadway as the roadway is being paved to compensate for variations in the elevation of the foundation in the direction of the roadway, this same method may also be used to adjust the level of overfill across the width of the roadway to compensate for variations in the elevation of the foundation across the roadway. In order to make such an adjustment, of course, it is necessary that the asphalt paving machine have a screed arrangement that controls variations in the elevation of the deposited asphalt across the direction of machine travel.
  • FIG. 1E illustrates the manner in which the volume of the asphalt material being dispensed along the roadbed or other area is determined. The dispensed differential volume of the asphalt at a differential point xi along the roadway is:

  • Volume=(Width)(H FINAL −H FOUNDATION)(Δx i)(1.25)
  • The paving machine therefore determines the volume of asphalt that is to be deposited on the foundation surface as the paving machine moves along foundation surface 18. This volume of material is ejected from the paver 43 and the elevation of the asphalt behind the paver 43 is determined by a screed 47 following the paving machine 43. The asphalt is deposited by a dispensing unit 48 in the disperser under control of control unit 50.
  • It will be appreciated that the present system determines the true height of the base foundation of the roadbed that is to be filled in with asphalt, and that this elevation measurement is taken so that it is in the same coordinate system as the desired road model. It will be appreciated that the system of FIG. 2 measures the actual level of compaction and then takes this into account in dispensing the asphalt so that the compaction process produces a compacted asphalt service at the desired level in a single operation without adding additional layers of asphalt and with a reduced number of compaction cycles.
  • Other aspects, objects, and advantages of the embodiments can be obtained from a study of the drawings, the disclosure, and the appended claims.

Claims (24)

1. A method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation, comprising the steps of:
determining the elevation of the foundation surface over the area,
determining the difference between the elevation of the foundation surface and the desired elevation over the area,
depositing a mat of asphalt over the area, said mat having a thickness that varies over the area, with the mat being thicker in the areas having a lower foundation elevation and thinner in the areas having a higher foundation elevation, said mat being sufficiently thick to allow for compression of said mat over said area to said desired elevation, said mat having a thickness that is substantially a constant K times the difference between the desired elevation and the elevation of said foundation surface at each of a plurality of points spaced over said area,
compressing said mat of asphalt during one or more compression operations such that the upper surface of said mat is uniformly at said desired elevation over said area,
determining the elevation of the upper surface of said mat after compression, and
adjusting the value of K to compensate for determined offset from the desired elevation of the upper surface over said area.
2. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 1, in which the step of determining the elevation of the foundation surface over the area comprises the steps of scanning the contour of said foundation surface over said area, and storing the results of the scanning operation.
3. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 2, in which the step of scanning the contour of said foundation surface over said area includes the step of using a laser scanning device to determine the elevation of said foundation at a plurality of points spaced over said area.
4. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 2, in which the step of scanning the contour of said foundation surface over said area includes the step of using a GNSS survey device to determine the elevation of said foundation at a plurality of points spaced over said area.
5. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 2, in which the step of scanning the contour of said foundation surface over said area includes the step of scanning said foundation from a scanner mounted on said asphalt paving machine to determine the elevation of said foundation at a plurality of points spaced over said area ahead of said asphalt paving machine while said asphalt paving machine is depositing an asphalt mat of varying thickness.
6. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 2, in which the step of scanning the contour of said foundation surface over said area includes the step of scanning said foundation from a scanner mounted on a vehicle that travels ahead of said asphalt paving machine to determine the elevation of said foundation surface at a plurality of points spaced over said area.
7. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 1, in which the step of depositing a mat of asphalt over the area, said mat having a thickness that varies over the area, with the mat being thicker in the areas having a lower foundation elevation and thinner in the areas having a higher foundation elevation, comprises the step of depositing a mat which has a thickness that is substantially 1.25 times the difference between the desired elevation and the elevation of said foundation surface at each of a plurality of points spaced over said area.
8. (canceled)
9. (canceled)
10. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 1, in which the step of determining the elevation of the upper surface of said mat after compression includes the step of measuring the elevation of the upper surface of said mat after compression with a laser scanner directed to the surface behind the compacting machine.
11. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 1, in which the step of adjusting the value of K to compensate for determined offset from the desired elevation of the upper surface over said area comprises the step of computing an adjusted value for K as the ratio of the thickness of the uncompressed asphalt mat deposited on the foundation surface to the thickness of the compressed asphalt mat.
12. The method of paving an area with asphalt to a desired elevation using an asphalt paving machine that deposits a mat of asphalt of a controlled thickness on a foundation surface, and then using a compacting machine to compact the asphalt to the desired elevation according to claim 11, further comprising the step of determining the thickness of the compressed asphalt mat by subtracting the elevation of the foundation surface at a point in the area from the elevation of the upper surface of said mat after compression at the same point in the area.
13. A method of covering an area with a compressible material to a desired elevation using a machine that deposits a layer of the compressible material of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation, comprising the steps of:
determining the elevation of the foundation surface over the area,
determining the difference between the elevation of the foundation surface and the desired elevation over the area,
depositing a layer of compressible material over the area, said layer having an upper surface that varies in elevation over the area, with the layer upper surface being higher in the areas having a lower foundation elevation and lower in the areas having a higher foundation elevation, said layer being sufficiently thick to allow for compression of said layer of compressible material over said area to said desired elevation, said layer having a thickness that is substantially a constant K times the difference between the desired elevation and the elevation of said foundation surface at each of a plurality of points spaced over said area,
compressing said layer of compressible material during one or more compression operations such that the upper surface of said layer after compression is uniformly at said desired elevation over said area,
determining the elevation of the upper surface of said layer after compression, and
adjusting the value of K to compensate for any offset from the desired elevation of the upper surface over said area.
14. The method of covering an area with compressible material to a desired elevation using a machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 13, in which the step of determining the elevation of the foundation surface over the area comprises the step of scanning the contour of said foundation surface over said area, and storing the results of the scanning operation.
15. The method of covering an area with compressible material to a desired elevation using a machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 14, in which the step scanning the contour of said foundation surface over said area includes the step of using a laser scanning device to determine the elevation of said foundation at a plurality of points spaced over said area.
16. The method of covering an area with compressible material to a desired elevation using a machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 14, in which the step scanning the contour of said foundation surface over said area includes the step of using a GNSS survey device to determine the elevation of said foundation at a plurality of points spaced over said area.
17. The method of covering an area with compressible material to a desired elevation using a machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 14, in which the step of scanning the contour of said foundation surface over said area includes the step of scanning said foundation from a scanner mounted on said machine that deposits a layer of the compressible material to determine the elevation of said foundation at a plurality of points spaced over said area ahead of said machine while said machine is depositing a compressible material layer of varying thickness.
18. The method of covering an area with compressible material to a desired elevation using a machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 14, in which the step of scanning the contour of said foundation surface over said area includes the step of scanning said foundation from a scanner mounted on a vehicle that travels ahead of said machine that deposits the compressible material to determine the elevation of said foundation at a plurality of points spaced over said area.
19. The method of covering an area with compressible material to a desired elevation using a compressible material machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 13, in which the step of depositing a layer of compressible material over the area, said layer having an upper surface that varies in elevation over the area, with the upper surface of the layer being higher in the areas having a lower foundation elevation and lower in the areas having a higher foundation elevation, comprises the step of depositing a layer which has a thickness that is substantially 1.25 times the difference between the desired elevation and the elevation of said foundation surface at each of a plurality of points spaced over said area.
20. (canceled)
21. (canceled)
22. The method of covering an area with compressible material to a desired elevation using a machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 13, in which the step of determining the elevation of the upper surface of said layer after compression includes the step of measuring the elevation of the upper surface of said layer after compression with a laser scanner directed to the surface behind the compacting machine.
23. The method of covering an area with compressible material to a desired elevation using a machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 13, in which the step of adjusting the value of K to compensate for any offset from the desired elevation of the upper surface over said area comprises the step of computing an adjusted value for K as the ratio of the thickness of the uncompressed compressible material layer to the thickness of the compressed compressible material layer.
24. The method of covering an area with compressible material to a desired elevation using a machine that deposits a layer of controlled thickness on a foundation surface, and then using a compacting machine to compact the compressible material to the desired elevation according to claim 23, further comprising the step of determining the thickness of the compressed compressible material layer by subtracting the elevation of the foundation surface at a point in the area from the elevation of the upper surface of said layer after compression at the same point in the area.
US12/277,840 2008-11-25 2008-11-25 Method of covering an area with a layer of compressible material Abandoned US20100129152A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US12/277,840 US20100129152A1 (en) 2008-11-25 2008-11-25 Method of covering an area with a layer of compressible material
DE102009044581A DE102009044581A1 (en) 2008-11-25 2009-11-18 A method of covering a surface with a layer of compressible material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/277,840 US20100129152A1 (en) 2008-11-25 2008-11-25 Method of covering an area with a layer of compressible material

Publications (1)

Publication Number Publication Date
US20100129152A1 true US20100129152A1 (en) 2010-05-27

Family

ID=42145792

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/277,840 Abandoned US20100129152A1 (en) 2008-11-25 2008-11-25 Method of covering an area with a layer of compressible material

Country Status (2)

Country Link
US (1) US20100129152A1 (en)
DE (1) DE102009044581A1 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953312A (en) * 2011-08-22 2013-03-06 约瑟夫福格勒公司 Road paver with measuring device
US8395542B2 (en) 2010-08-27 2013-03-12 Trimble Navigation Limited Systems and methods for computing vertical position
US8794867B2 (en) 2011-05-26 2014-08-05 Trimble Navigation Limited Asphalt milling machine control and method
WO2016061031A1 (en) * 2014-10-14 2016-04-21 Caterpillar Inc. System and method for validating compaction of a work site
US9903078B2 (en) * 2016-02-08 2018-02-27 The Florida International University Board Of Trustees Three dimensional paving
GB2554872A (en) * 2016-10-07 2018-04-18 Kelly Anthony A compaction compensation system
US9988773B2 (en) * 2014-03-18 2018-06-05 Moba Mobile Automation Ag Road paver having layer thickness detecting device and method
US20180282576A1 (en) * 2015-05-22 2018-10-04 Kao Corporation Material for waterproof layers
US20190136467A1 (en) * 2017-11-03 2019-05-09 Bomag Gmbh Measuring paving layer thickness by means of a road roller
WO2019200376A1 (en) * 2018-04-13 2019-10-17 Gomaco Corporation Three-dimensional bridge deck finisher
GB2579132A (en) * 2016-10-07 2020-06-10 Kelly Anthony A compaction compensation system
EP3851584A1 (en) 2020-01-16 2021-07-21 Joseph Vögele AG Road finisher with compression control
CN114517435A (en) * 2022-04-02 2022-05-20 湖南大禹神工防水科技有限公司 Emulsified asphalt coating device and construction method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016207841B4 (en) 2016-05-06 2018-01-04 Moba Mobile Automation Aktiengesellschaft Layer thickness measuring device and method for coating thickness measurement
DE102016225502B4 (en) 2016-12-19 2019-01-03 Moba Mobile Automation Ag Measuring system for coating thickness detection
DE102017012123A1 (en) * 2017-12-29 2019-07-04 Bomag Gmbh Method for determining a layer thickness applied or removed by a construction machine and construction machine
EP4183922A1 (en) * 2021-11-18 2023-05-24 Joseph Vögele AG Levelling controller adaption by means of floor profile analysis

Citations (65)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3953145A (en) * 1973-07-11 1976-04-27 Laserplane Corporation Laser beam control system for earthworking or similar machines
US4393606A (en) * 1980-08-30 1983-07-19 Friedrich Wilh. Schwing Gmbh Excavator with laser position indicator
US4467652A (en) * 1980-11-26 1984-08-28 Geodynamik H. Thurner Ab Procedure and device for compaction measurement
US4473319A (en) * 1982-04-27 1984-09-25 Surface Dynamics Inc. Controlled resurfacing of roads and the like
US4647247A (en) * 1980-12-03 1987-03-03 Geodynamik H. Thurner Ab Method of compacting a material layer and a compacting machine for carrying out the method
US4854769A (en) * 1987-02-26 1989-08-08 Kajima Corporation System for paving inclined and/or curved surfaces
US4870601A (en) * 1984-11-19 1989-09-26 Geodynamik H. Thurner Ab Method to estimate the degree of compaction obtained at compaction and means to measure the degree of compaction for carrying out the method
US4914593A (en) * 1988-06-09 1990-04-03 Spectra Physics Method for automatic depth control for earth moving and grading
US4918608A (en) * 1988-06-09 1990-04-17 Middleton Christopher O Method for automatic depth control for earth moving and grading
US4924374A (en) * 1988-06-09 1990-05-08 Spectra Physics Method for automatic position control of a tool
US4926948A (en) * 1989-06-28 1990-05-22 Spectra Physics, Inc. Method and apparatus for controlling motorgrader cross slope cut
US5005652A (en) * 1989-02-24 1991-04-09 John Kelly (Lasers) Limited Method of producing a contoured work surface
US5107932A (en) * 1991-03-01 1992-04-28 Spectra-Physics Laserplane, Inc. Method and apparatus for controlling the blade of a motorgrader
US5129803A (en) * 1988-05-24 1992-07-14 Shimizu Construction Co., Ltd. Concrete leveling machine
US5184293A (en) * 1988-06-09 1993-02-02 Spectra Physics Apparatus for automatic depth control for earth moving and grading
US5227865A (en) * 1990-12-26 1993-07-13 Kabushiki Kaisha Toshiba BiCMOS sense amplifier having input waiting state
US5235511A (en) * 1988-06-09 1993-08-10 Spectra-Physics, Inc. Method for automatic depth control for earth moving and grading
US5375663A (en) * 1993-04-01 1994-12-27 Spectra-Physics Laserplane, Inc. Earthmoving apparatus and method for grading land providing continuous resurveying
US5393167A (en) * 1990-11-14 1995-02-28 Niigata Engineering Co., Ltd. Method for controlling the thickness of pavement and setting the conditions for automatic control of the leveling machine
US5401115A (en) * 1993-03-10 1995-03-28 Cedarapids, Inc. Paver with material supply and mat grade and slope quality control apparatus and method
US5493494A (en) * 1993-12-08 1996-02-20 Caterpillar, Inc. Method and apparatus for operating compacting machinery relative to a work site
US5510889A (en) * 1993-09-30 1996-04-23 Herr; William J. Highway profile measuring system
US5549412A (en) * 1995-05-24 1996-08-27 Blaw-Knox Construction Equipment Corporation Position referencing, measuring and paving method and apparatus for a profiler and paver
US5602741A (en) * 1994-02-18 1997-02-11 Trimble Navigation Limited Centimeter accurate global positioning system receiver for on-the-fly real-time kinematic measurement and control
US5727900A (en) * 1993-10-14 1998-03-17 Geodynamik H. Thurner Ab Control of a compacting machine with a measurement of the characteristics of the ground material
US5746539A (en) * 1995-06-28 1998-05-05 Sandia National Laboratories Rapid road repair vehicle
US5838277A (en) * 1994-05-20 1998-11-17 Trimble Navigation Limited GPS-based controller module
US5862501A (en) * 1995-08-18 1999-01-19 Trimble Navigation Limited Guidance control system for movable machinery
US5924493A (en) * 1998-05-12 1999-07-20 Caterpillar Inc. Cycle planner for an earthmoving machine
US5942679A (en) * 1993-04-29 1999-08-24 Geodynamik Ht Aktiebolag Compaction index
US5967695A (en) * 1995-02-27 1999-10-19 Wacker Werke Gmbh & Co. Kg Vehicle for repairing road surfaces
US5987379A (en) * 1997-10-30 1999-11-16 Trimble Navigation Limited Creation and monitoring of variable buffer zones
US6027282A (en) * 1996-11-14 2000-02-22 Moba-Mobile Automation Gmbh Device and method for controlling the application height of a road finisher
US6079333A (en) * 1998-06-12 2000-06-27 Trimble Navigation Limited GPS controlled blaster
US6112145A (en) * 1999-01-26 2000-08-29 Spectra Precision, Inc. Method and apparatus for controlling the spatial orientation of the blade on an earthmoving machine
US6253160B1 (en) * 1999-01-15 2001-06-26 Trimble Navigation Ltd. Method and apparatus for calibrating a tool positioning mechanism on a mobile machine
US6299934B1 (en) * 1999-02-22 2001-10-09 Trimble Navigation Limited Global positioning system controlled paint sprayer
US6330503B1 (en) * 1999-02-22 2001-12-11 Trimble Navigation Limited Global positioning system controlled staking apparatus
US6371566B1 (en) * 1997-12-19 2002-04-16 Wirtgen Gmbh Process and device for milling off traffic areas
US6400452B1 (en) * 1998-05-22 2002-06-04 Trimble Navigation, Ltd Three dimensional laser control and tracking system
US6421627B1 (en) * 1997-11-28 2002-07-16 Spectra Precision Ab Device and method for determining the position of a working part
US6433866B1 (en) * 1998-05-22 2002-08-13 Trimble Navigation, Ltd High precision GPS/RTK and laser machine control
US6452684B1 (en) * 1998-06-10 2002-09-17 Road Ware B.V. Device for determining the contour of a road surface
US6530720B1 (en) * 1999-01-27 2003-03-11 Trimble Navigation Limited Transducer arrangement for screed control
US6672797B1 (en) * 1999-01-27 2004-01-06 Trimble Navigation Limited Linear transducer arrangement
US6691437B1 (en) * 2003-03-24 2004-02-17 Trimble Navigation Limited Laser reference system for excavating machine
US6799922B2 (en) * 2003-02-13 2004-10-05 Advanced Paving Technologies, Inc. Asphalt delivery and compaction system
US6954999B1 (en) * 2004-12-13 2005-10-18 Trimble Navigation Limited Trencher guidance via GPS
US6988849B1 (en) * 2004-09-17 2006-01-24 Zimmerman Harold M Pothole repair machine
US7003386B1 (en) * 1997-11-28 2006-02-21 Trimble Ab Device and method for determining the position of a working part
US20060274930A1 (en) * 2005-06-02 2006-12-07 Institut National D'optique Vision system and a method for scanning a traveling surface to detect surface defects thereof
US7168174B2 (en) * 2005-03-14 2007-01-30 Trimble Navigation Limited Method and apparatus for machine element control
US7172363B2 (en) * 2004-08-31 2007-02-06 Caterpillar Paving Products Inc Paving machine output monitoring system
US20070052950A1 (en) * 2004-07-13 2007-03-08 Trimble Navigation Limited Navigation system using both GPS and laser reference
US7245999B2 (en) * 2005-01-31 2007-07-17 Trimble Navigation Limited Construction machine having location based auto-start
USRE39834E1 (en) * 1998-10-27 2007-09-11 Michigan Technological University Apparatus and method for three-dimensional contouring
US20080056820A1 (en) * 2006-09-06 2008-03-06 Hall David R Paved Surface Reconditioning System
US20080063473A1 (en) * 2006-09-07 2008-03-13 Congdon Thomas M Method of operating a compactor machine via path planning based on compaction state data and mapping information
US20080133062A1 (en) * 2006-12-01 2008-06-05 Trimble Navigation Limited Interface for retrofitting a manually controlled machine for automatic control
US7399139B2 (en) * 1998-10-27 2008-07-15 Somero Enterprises, Inc. Apparatus and method for three-dimensional contouring
US7400267B1 (en) * 1995-06-08 2008-07-15 Western Strategic Products, Llc Methods for determining need for treating a vehicle travel surface
US7484911B2 (en) * 2006-08-08 2009-02-03 Caterpillar Inc. Paving process and machine with feed forward material feed control system
US7559718B2 (en) * 1999-01-27 2009-07-14 Trimble Navigation Limited Transducer arrangement
US20090178816A1 (en) * 2008-01-15 2009-07-16 C/O Trimble Navigation Limited Loader elevation control system
US7681192B2 (en) * 2005-01-31 2010-03-16 Caterpillar Trimble Control Technologies Llc Location-centric project data delivery system for construction

Patent Citations (72)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3953145A (en) * 1973-07-11 1976-04-27 Laserplane Corporation Laser beam control system for earthworking or similar machines
US4393606A (en) * 1980-08-30 1983-07-19 Friedrich Wilh. Schwing Gmbh Excavator with laser position indicator
US4467652A (en) * 1980-11-26 1984-08-28 Geodynamik H. Thurner Ab Procedure and device for compaction measurement
US4647247A (en) * 1980-12-03 1987-03-03 Geodynamik H. Thurner Ab Method of compacting a material layer and a compacting machine for carrying out the method
US4473319A (en) * 1982-04-27 1984-09-25 Surface Dynamics Inc. Controlled resurfacing of roads and the like
US4870601A (en) * 1984-11-19 1989-09-26 Geodynamik H. Thurner Ab Method to estimate the degree of compaction obtained at compaction and means to measure the degree of compaction for carrying out the method
US4854769A (en) * 1987-02-26 1989-08-08 Kajima Corporation System for paving inclined and/or curved surfaces
US5129803A (en) * 1988-05-24 1992-07-14 Shimizu Construction Co., Ltd. Concrete leveling machine
US4914593B1 (en) * 1988-06-09 1995-01-17 Spectra Physics Method for automatic depth control for earth moving and grading
US4918608B1 (en) * 1988-06-09 1996-07-02 Christopher O Middleton Method for automatic depth control for earth moving and grading
US4918608A (en) * 1988-06-09 1990-04-17 Middleton Christopher O Method for automatic depth control for earth moving and grading
US5184293A (en) * 1988-06-09 1993-02-02 Spectra Physics Apparatus for automatic depth control for earth moving and grading
US4924374A (en) * 1988-06-09 1990-05-08 Spectra Physics Method for automatic position control of a tool
US5235511A (en) * 1988-06-09 1993-08-10 Spectra-Physics, Inc. Method for automatic depth control for earth moving and grading
US4924374B1 (en) * 1988-06-09 1995-07-18 Spectra Physics Method for automatic position control of a tool
US4914593A (en) * 1988-06-09 1990-04-03 Spectra Physics Method for automatic depth control for earth moving and grading
US5005652A (en) * 1989-02-24 1991-04-09 John Kelly (Lasers) Limited Method of producing a contoured work surface
US4926948A (en) * 1989-06-28 1990-05-22 Spectra Physics, Inc. Method and apparatus for controlling motorgrader cross slope cut
US5393167A (en) * 1990-11-14 1995-02-28 Niigata Engineering Co., Ltd. Method for controlling the thickness of pavement and setting the conditions for automatic control of the leveling machine
US5227865A (en) * 1990-12-26 1993-07-13 Kabushiki Kaisha Toshiba BiCMOS sense amplifier having input waiting state
US5107932A (en) * 1991-03-01 1992-04-28 Spectra-Physics Laserplane, Inc. Method and apparatus for controlling the blade of a motorgrader
US5401115A (en) * 1993-03-10 1995-03-28 Cedarapids, Inc. Paver with material supply and mat grade and slope quality control apparatus and method
US5375663A (en) * 1993-04-01 1994-12-27 Spectra-Physics Laserplane, Inc. Earthmoving apparatus and method for grading land providing continuous resurveying
US5942679A (en) * 1993-04-29 1999-08-24 Geodynamik Ht Aktiebolag Compaction index
US5510889A (en) * 1993-09-30 1996-04-23 Herr; William J. Highway profile measuring system
US5727900A (en) * 1993-10-14 1998-03-17 Geodynamik H. Thurner Ab Control of a compacting machine with a measurement of the characteristics of the ground material
US5493494A (en) * 1993-12-08 1996-02-20 Caterpillar, Inc. Method and apparatus for operating compacting machinery relative to a work site
US5602741A (en) * 1994-02-18 1997-02-11 Trimble Navigation Limited Centimeter accurate global positioning system receiver for on-the-fly real-time kinematic measurement and control
US5838277A (en) * 1994-05-20 1998-11-17 Trimble Navigation Limited GPS-based controller module
US5967695A (en) * 1995-02-27 1999-10-19 Wacker Werke Gmbh & Co. Kg Vehicle for repairing road surfaces
US5549412A (en) * 1995-05-24 1996-08-27 Blaw-Knox Construction Equipment Corporation Position referencing, measuring and paving method and apparatus for a profiler and paver
US7400267B1 (en) * 1995-06-08 2008-07-15 Western Strategic Products, Llc Methods for determining need for treating a vehicle travel surface
US5746539A (en) * 1995-06-28 1998-05-05 Sandia National Laboratories Rapid road repair vehicle
US5862501A (en) * 1995-08-18 1999-01-19 Trimble Navigation Limited Guidance control system for movable machinery
US6027282A (en) * 1996-11-14 2000-02-22 Moba-Mobile Automation Gmbh Device and method for controlling the application height of a road finisher
US5987379A (en) * 1997-10-30 1999-11-16 Trimble Navigation Limited Creation and monitoring of variable buffer zones
US7139662B2 (en) * 1997-11-28 2006-11-21 Trimble Ab Device and method for determining the position of a working part
US6421627B1 (en) * 1997-11-28 2002-07-16 Spectra Precision Ab Device and method for determining the position of a working part
US7003386B1 (en) * 1997-11-28 2006-02-21 Trimble Ab Device and method for determining the position of a working part
US6371566B1 (en) * 1997-12-19 2002-04-16 Wirtgen Gmbh Process and device for milling off traffic areas
US5924493A (en) * 1998-05-12 1999-07-20 Caterpillar Inc. Cycle planner for an earthmoving machine
US6433866B1 (en) * 1998-05-22 2002-08-13 Trimble Navigation, Ltd High precision GPS/RTK and laser machine control
US6400452B1 (en) * 1998-05-22 2002-06-04 Trimble Navigation, Ltd Three dimensional laser control and tracking system
US6452684B1 (en) * 1998-06-10 2002-09-17 Road Ware B.V. Device for determining the contour of a road surface
US6079333A (en) * 1998-06-12 2000-06-27 Trimble Navigation Limited GPS controlled blaster
USRE39834E1 (en) * 1998-10-27 2007-09-11 Michigan Technological University Apparatus and method for three-dimensional contouring
US7399139B2 (en) * 1998-10-27 2008-07-15 Somero Enterprises, Inc. Apparatus and method for three-dimensional contouring
US6253160B1 (en) * 1999-01-15 2001-06-26 Trimble Navigation Ltd. Method and apparatus for calibrating a tool positioning mechanism on a mobile machine
US6112145A (en) * 1999-01-26 2000-08-29 Spectra Precision, Inc. Method and apparatus for controlling the spatial orientation of the blade on an earthmoving machine
US6530720B1 (en) * 1999-01-27 2003-03-11 Trimble Navigation Limited Transducer arrangement for screed control
US6672797B1 (en) * 1999-01-27 2004-01-06 Trimble Navigation Limited Linear transducer arrangement
US6729796B1 (en) * 1999-01-27 2004-05-04 Trimble Navigation Limited Transducer arrangement for screed control
US7559718B2 (en) * 1999-01-27 2009-07-14 Trimble Navigation Limited Transducer arrangement
US6299934B1 (en) * 1999-02-22 2001-10-09 Trimble Navigation Limited Global positioning system controlled paint sprayer
US6330503B1 (en) * 1999-02-22 2001-12-11 Trimble Navigation Limited Global positioning system controlled staking apparatus
US6799922B2 (en) * 2003-02-13 2004-10-05 Advanced Paving Technologies, Inc. Asphalt delivery and compaction system
US6691437B1 (en) * 2003-03-24 2004-02-17 Trimble Navigation Limited Laser reference system for excavating machine
US20070052950A1 (en) * 2004-07-13 2007-03-08 Trimble Navigation Limited Navigation system using both GPS and laser reference
US7172363B2 (en) * 2004-08-31 2007-02-06 Caterpillar Paving Products Inc Paving machine output monitoring system
US6988849B1 (en) * 2004-09-17 2006-01-24 Zimmerman Harold M Pothole repair machine
US6954999B1 (en) * 2004-12-13 2005-10-18 Trimble Navigation Limited Trencher guidance via GPS
US7245999B2 (en) * 2005-01-31 2007-07-17 Trimble Navigation Limited Construction machine having location based auto-start
US7295911B1 (en) * 2005-01-31 2007-11-13 Dietsch Christopher M Construction machine having location-based project data files
US7681192B2 (en) * 2005-01-31 2010-03-16 Caterpillar Trimble Control Technologies Llc Location-centric project data delivery system for construction
US7168174B2 (en) * 2005-03-14 2007-01-30 Trimble Navigation Limited Method and apparatus for machine element control
US7552539B2 (en) * 2005-03-14 2009-06-30 Trimble Navigation Limited Method and apparatus for machine element control
US20060274930A1 (en) * 2005-06-02 2006-12-07 Institut National D'optique Vision system and a method for scanning a traveling surface to detect surface defects thereof
US7484911B2 (en) * 2006-08-08 2009-02-03 Caterpillar Inc. Paving process and machine with feed forward material feed control system
US20080056820A1 (en) * 2006-09-06 2008-03-06 Hall David R Paved Surface Reconditioning System
US20080063473A1 (en) * 2006-09-07 2008-03-13 Congdon Thomas M Method of operating a compactor machine via path planning based on compaction state data and mapping information
US20080133062A1 (en) * 2006-12-01 2008-06-05 Trimble Navigation Limited Interface for retrofitting a manually controlled machine for automatic control
US20090178816A1 (en) * 2008-01-15 2009-07-16 C/O Trimble Navigation Limited Loader elevation control system

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8395542B2 (en) 2010-08-27 2013-03-12 Trimble Navigation Limited Systems and methods for computing vertical position
US8794867B2 (en) 2011-05-26 2014-08-05 Trimble Navigation Limited Asphalt milling machine control and method
US8961065B2 (en) 2011-05-26 2015-02-24 Trimble Navigation Limited Method of milling asphalt
US9039320B2 (en) 2011-05-26 2015-05-26 Trimble Navigation Limited Method of milling asphalt
US9290894B2 (en) 2011-08-22 2016-03-22 Joseph Vogele Ag Road paver with measuring device
CN102953312A (en) * 2011-08-22 2013-03-06 约瑟夫福格勒公司 Road paver with measuring device
CN109537412A (en) * 2011-08-22 2019-03-29 约瑟夫福格勒公司 Road spreading machine with measuring device
US9988773B2 (en) * 2014-03-18 2018-06-05 Moba Mobile Automation Ag Road paver having layer thickness detecting device and method
US10227738B2 (en) * 2014-03-18 2019-03-12 Moba Mobile Automation Ag Road paver having layer thickness detecting device, and method for detecting the thickness of an applied material layer
WO2016061031A1 (en) * 2014-10-14 2016-04-21 Caterpillar Inc. System and method for validating compaction of a work site
US9423332B2 (en) 2014-10-14 2016-08-23 Caterpillar Inc. System and method for validating compaction of a work site
US20180282576A1 (en) * 2015-05-22 2018-10-04 Kao Corporation Material for waterproof layers
US9903078B2 (en) * 2016-02-08 2018-02-27 The Florida International University Board Of Trustees Three dimensional paving
GB2579132A (en) * 2016-10-07 2020-06-10 Kelly Anthony A compaction compensation system
GB2579132B (en) * 2016-10-07 2021-07-21 Kelly Anthony A compaction compensation system
GB2554872A (en) * 2016-10-07 2018-04-18 Kelly Anthony A compaction compensation system
GB2554872B (en) * 2016-10-07 2019-12-04 Kelly Anthony A compaction compensation system
US10704211B2 (en) * 2017-11-03 2020-07-07 Bomag Gmbh Measuring paving layer thickness by means of a road roller
US20190136467A1 (en) * 2017-11-03 2019-05-09 Bomag Gmbh Measuring paving layer thickness by means of a road roller
WO2019200376A1 (en) * 2018-04-13 2019-10-17 Gomaco Corporation Three-dimensional bridge deck finisher
US10829898B2 (en) 2018-04-13 2020-11-10 Gomaco Corporation Three-dimensional bridge deck finisher
US11686053B2 (en) 2018-04-13 2023-06-27 Gomaco Corporation Three-dimensional bridge deck finisher
EP3851584A1 (en) 2020-01-16 2021-07-21 Joseph Vögele AG Road finisher with compression control
US20210222379A1 (en) * 2020-01-16 2021-07-22 Joseph Voegele Ag Road paver with compaction control
US11746479B2 (en) * 2020-01-16 2023-09-05 Joseph Voegele Ag Road paver with compaction control
CN114517435A (en) * 2022-04-02 2022-05-20 湖南大禹神工防水科技有限公司 Emulsified asphalt coating device and construction method

Also Published As

Publication number Publication date
DE102009044581A1 (en) 2010-06-10

Similar Documents

Publication Publication Date Title
US20100129152A1 (en) Method of covering an area with a layer of compressible material
CN1764757B (en) Method for depositing asphalt mattress on a surface for laying
US9903078B2 (en) Three dimensional paving
US7591608B2 (en) Checking density while compacting
US5735634A (en) Road finisher and a method of applying surface layers
US7172363B2 (en) Paving machine output monitoring system
US3841777A (en) Paving vibratory finishing machine having a device for constant compaction of the deposited layer
CN109750580B (en) Method for measuring thickness of pavement layer through road roller, road roller and road roller system
CN113136772B (en) Road paver with compaction control
CN102277817A (en) Asphalt wave roads construction method
CN101736678A (en) Method for covering area with compressible material layer
CN115075097A (en) Method for paving road surface and asphalt paving system
CN106351086B (en) A kind of construction operation method and its system and device of tunnel railway roadbed
US11255057B2 (en) Screed assembly for road paving machines, and a method for repaving road surfaces
US2170330A (en) Asphalt laying apparatus
CN110438861B (en) Double-color asphalt pavement structure and construction process thereof
CN113174815A (en) 3D intelligent digital paving compaction system and compaction method for pavement construction
US4407604A (en) Method and device for laying roadmaking material in a roadway
Akpinar et al. Longitudinal joint construction for hot mix asphalt pavements
US11834797B2 (en) Automatic smoothness control for asphalt paver
JP2909633B2 (en) Construction method of roller compacted concrete pavement and its leveling machine.
CN112982098B (en) Material density measurement for paver applications
HU192594B (en) Method for producing base of topping or plain covering
JPH10183513A (en) Paving method
JP2022017066A (en) Hump construction method and formwork for hump construction

Legal Events

Date Code Title Description
AS Assignment

Owner name: TRIMBLE NAVIGATION LIMITED, CALIFORNIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:TAYLOR, ARTHUR;REEL/FRAME:022091/0805

Effective date: 20090105

STCB Information on status: application discontinuation

Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION