US20100064430A1 - Prefabricated shower floor liner for use with solid stone shower floor and method of construction - Google Patents

Prefabricated shower floor liner for use with solid stone shower floor and method of construction Download PDF

Info

Publication number
US20100064430A1
US20100064430A1 US12/283,593 US28359308A US2010064430A1 US 20100064430 A1 US20100064430 A1 US 20100064430A1 US 28359308 A US28359308 A US 28359308A US 2010064430 A1 US2010064430 A1 US 2010064430A1
Authority
US
United States
Prior art keywords
liner
channels
drain
stone
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/283,593
Inventor
Michael J. Goodson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US12/283,593 priority Critical patent/US20100064430A1/en
Publication of US20100064430A1 publication Critical patent/US20100064430A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47KSANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
    • A47K3/00Baths; Douches; Appurtenances therefor
    • A47K3/28Showers or bathing douches
    • A47K3/40Pans or trays

Definitions

  • the present invention relates generally to shower floors and, more particularly, to a shower floor liner used in the construction of a shower floor utilizing solid slab stone, while meeting building plumbing code requirements.
  • Natural stone has become the designer's choice as the preferred material from which to construct long lasting, durable, yet beautiful showers. Natural stone, while having the desirable benefits of beauty and durability, has the inherent characteristic of being porous and having minimal flexural-strength causing stone to fracture when placed under bending loads. It is these two characteristics which must be dealt with when using natural stone as a material for construction of a shower floor.
  • an additional layer of hand laid drypack mortar must be applied on the surface of the waterproof membrane. It is this final drypack layer that provides the finished surface to which tile is glued. Once tile is glued into place, grout (a mixture of Portland cement, water and dye) must be applied to the tile surface, filling all voids remaining between each piece of tile.
  • Gerloff patent 6,571,406 which involves a prefabricated shower module. Also see Hansenkopf publication US 2001/0052148, and German patent publication DE 200 04764 U 1, which relates to the use of a stone shower floor.
  • tile and the grout joints associated with tile installations have the disadvantages of being difficult to maintain (clean), fostering the growth of mold and are subject to cracking, allowing water to easily pass through the finished surface.
  • the focus of the present invention is on the provision of a shower floor liner, the principal objective of which is to permit the use of a solid slab stone in place of stone tile, thereby eliminating the problems attendant the use of stone tile, including the elimination of the need for grout.
  • a further objective of the present invention is to provide a monolithic waterproof barrier which complies, in every respect, with all applicable building codes. Another objective, related to the foregoing, is the elimination of a code requirement that a pre sloped floor be provided.
  • Yet another objective related to the foregoing, is to minimize excessive labor costs associated with typical stone tile installations.
  • Still another objective is to provide both material and method for creating a waterproof barrier, when using a solid stone slab as a shower floor, which will capture and evacuate any fugitive moisture passing through the stone.
  • FIG. 1 is a sectional view of a typical stone tile shower floor with a pre-sloped floor and a waterproof membrane connected to the drain and is illustrative of the prior art stone shower using stone tile;
  • FIG. 2 is a top plan view of a monolithic stone pan, or floor, for use in constructing a stone shower floor in accordance with the present invention, illustrating the structure of a solid slab;
  • FIG. 3 is a sectional view taken through lines 3 - 3 of FIG. 2 ; a stone shower floor with the upper surface sloping to a drain opening;
  • FIG. 4 is a top plan view of a shower floor liner constructed in accordance with the present invention and which makes the use of a monolithic stone slab especially valuable as a shower floor;
  • FIG. 6 is a sectional view illustrating the structure of a solid slab stone shower floor installed in accordance with the present invention.
  • the present invention is the culmination of substantial study and experimentation aimed at exploiting the substantial benefits of using a solid stone slab as a shower pan or floor.
  • FIG. 1 in which the current construction of a shower using stone is illustrated in some detail.
  • the stone currently in use is in the form of tile, with all of its deficiencies, as distinguished from a monolithic stone slab, the employment of which is the focus of the present invention.
  • an array of stone tiles 10 is positioned over a pre-sloped floor 12 and along a side wall 14 .
  • the tiles are secured in any well known manner, such as by dry pack mortar and grout.
  • the procedure for installing a stone tile shower is both tedious and time consuming.
  • the installer must first build the pre-sloped floor, by building the floor with a thin set mortar to slope the floor to the drain 16 . After allowing the mortar to cure for 24 hours, a waterproof member is applied over a pre-sloped floor. Next, the installer applies a layer of dry pack mortar above the waterproof membrane, and, once again, it must set for 24 additional hours. Next, the installer lays the stone tile using any suitable mastic material, and yes, allows it to cure for another 24 hours.
  • Grout is used to fill the voids between the stone tile, and the tile is washed down to remove excess grout.
  • the genesis of the installation of the present invention rests with a stone slab or pan 20 , shown in FIG. 2 .
  • the face of the stone slab 20 is machined to slope toward the drain opening or aperture 24 . It may be roughened slightly to make it non slip.
  • the underside 26 of the slab 20 is flat. It will be appreciated that this stone floor 20 does not require the application of grout as the stone surface is one solid piece. This surface is also much easier to clean and will not foster the growth of mold. Beyond the practical advantages, it is exceptionally pleasing to the eye.
  • the liner 30 is a single unit, molded, or cast, preferably of a plastic material, in any of several well known methods, and the surface is formed with a series of channels 32 each of which slopes to the drain. Adjacent channels define upstanding ribs 33 , the top edges of which collectively define a flat surface 34 which will eventually support a stone floor. All of the channels 32 slope toward a drain opening or aperture 36 , where a drain assembly 40 is positioned for receipt of drain water from the stone slab 20 , and, of course, the liner 30 during use.
  • the channels 32 are divided into four substantially identical groups 38 .
  • Each channel is designed to capture fugitive moisture and direct it to the drain where it is drained away from the installation.
  • the groupings 38 of the channels 32 make it simple to capture moisture where ever it occurs, directing it straight to the drain where it is disposed of in a straight forward manner.
  • the solid slab stone floor 20 is seated over the monolithic liner 30 , where it is supported on the level surface 34 , defined by the supporting ribs 33 .
  • the present invention contemplates an adjunct to the liner 30 in the form of an upstanding splash guard 45 .
  • the splash guard 45 is a flexible liner comprising a single sheet of a flexible moisture impermeable material which is glued about the perimeter of the liner 30 , where it is attached to conventional wall framing 51 . Finish wall 53 , and backer board 52 provide an initial barrier to moisture, and splash guard 45 provides a further barrier to moisture which might otherwise migrate, or condense, to promote mold and rot beneath the installation.
  • FIGS. 5 and 6 as a guide, a proper installation involves initial preparation of a bed of softened thin-set mortar, applied uniformly over the entire area to be covered by liner 30 . Next, install monolithic liner 30 over the entire area of the mortar bed. It is important that liner 30 be installed level. This is accomplished by using a carpenter's level and applying pressure to the high areas of liner 30 while the mortar bed is still wet. The mortar bed is now allowed to cure (harden).

Abstract

A shower installation in which a monolithic stone slab serves as the floor, or pan, of the installation. A liner of plastic material seated beneath the stone slab, the liner in the stone slab each having an aperture therein for receipt of a drain assembly. The liner is formed with an array of channels in the upper surface thereof, all of which slope toward the drain opening in order that fugitive moisture and condensation accumulated beneath the stone slab be directed away from the stone slab and into the drain.

Description

  • The present invention relates generally to shower floors and, more particularly, to a shower floor liner used in the construction of a shower floor utilizing solid slab stone, while meeting building plumbing code requirements.
  • BACKGROUND OF THE INVENTION
  • 1. Field of Invention
  • Bathroom showers were once viewed for the utilitarian purpose of bathing only. In recent years bathrooms have evolved into luxurious retreat locations designed for beauty, comfort and relaxation. This evolution has created demand for beautiful and durable materials for use in all areas of bathroom design. This is particularly true in the case of the shower. The shower, once viewed as simply an area in which to bathe, is now considered an integral part of an overall spa environment designed for comfort, beauty and durability.
  • Natural stone has become the designer's choice as the preferred material from which to construct long lasting, durable, yet beautiful showers. Natural stone, while having the desirable benefits of beauty and durability, has the inherent characteristic of being porous and having minimal flexural-strength causing stone to fracture when placed under bending loads. It is these two characteristics which must be dealt with when using natural stone as a material for construction of a shower floor.
  • Of critical concern when choosing materials and construction methods to build a shower is keeping areas adjacent to and below a shower from accumulating moisture. Building plumbing codes require that a waterproof membrane be installed below any shower floor constructed from porous material. It is the purpose of the waterproof membrane to capture any water which may pass through a porous floor preventing water contamination to surrounding areas. It is a further building code requirement that the waterproof membrane be installed over a pre-sloped floor and the membrane be attached to a drain allowing fugitive moisture to escape.
  • 2. Overview of Prior Art
  • Until recently the construction method for a shower floor when using natural stone as the surface material involved the installation of stone tile [as distinguished from a slab of stone] over the pre-sloped floor. Pre-sloping of the floor to receive the tile can be accomplished by hand troweling thin-set mortar to the desired slope, or by installing a pre-manufactured sloped liner designed to receive tile on its surface. Gerber patent 5,913,777 is an example of this method.
  • In either of the above installation methods, an additional layer of hand laid drypack mortar must be applied on the surface of the waterproof membrane. It is this final drypack layer that provides the finished surface to which tile is glued. Once tile is glued into place, grout (a mixture of Portland cement, water and dye) must be applied to the tile surface, filling all voids remaining between each piece of tile.
  • Further descriptions of the common installation methods for stone tile can be reviewed in Stone World Magazine, July 2008 edition, page 266 entitled “Tips for Stone Shower Installations”.
  • Additional insight as to proper installation of stone tile shower floors can be obtained by a review of the Tile Council of North America (TCNA) illustration B-415. Schulter Systems L.P. of Plattsburg, N.Y. has published a CD demonstrating a method for installing a waterproof barrier in preparation for a tile shower floor.
  • Other techniques for building showers are found in Gerloff patent 6,571,406, which involves a prefabricated shower module. Also see Hansenkopf publication US 2001/0052148, and German patent publication DE 200 04764 U 1, which relates to the use of a stone shower floor.
  • It will be appreciated that all of the above methods and devices are labor intensive and unduly complex to install, while providing minimal protection. Finally, tile and the grout joints associated with tile installations have the disadvantages of being difficult to maintain (clean), fostering the growth of mold and are subject to cracking, allowing water to easily pass through the finished surface.
  • SUMMARY OF THE INVENTION
  • The focus of the present invention is on the provision of a shower floor liner, the principal objective of which is to permit the use of a solid slab stone in place of stone tile, thereby eliminating the problems attendant the use of stone tile, including the elimination of the need for grout.
  • A further objective of the present invention is to provide a monolithic waterproof barrier which complies, in every respect, with all applicable building codes. Another objective, related to the foregoing, is the elimination of a code requirement that a pre sloped floor be provided.
  • Yet another objective related to the foregoing, is to minimize excessive labor costs associated with typical stone tile installations.
  • Still another objective is to provide both material and method for creating a waterproof barrier, when using a solid stone slab as a shower floor, which will capture and evacuate any fugitive moisture passing through the stone.
  • The foregoing objectives and advantages will become apparent from a reading of the Detailed Description of a Preferred Embodiment, in conjunction with the drawings, wherein:
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a sectional view of a typical stone tile shower floor with a pre-sloped floor and a waterproof membrane connected to the drain and is illustrative of the prior art stone shower using stone tile;
  • FIG. 2 is a top plan view of a monolithic stone pan, or floor, for use in constructing a stone shower floor in accordance with the present invention, illustrating the structure of a solid slab;
  • FIG. 3 is a sectional view taken through lines 3-3 of FIG. 2; a stone shower floor with the upper surface sloping to a drain opening;
  • FIG. 4 is a top plan view of a shower floor liner constructed in accordance with the present invention and which makes the use of a monolithic stone slab especially valuable as a shower floor;
  • FIG. 5 is a partial cut away sectional view illustrating the interrelationship of the various elements which make up a shower installation in which the floor is a solid slab stone installed over a pre-sloped floor with the novel liner of the present invention interposed immediately beneath the stone floor; and
  • FIG. 6 is a sectional view illustrating the structure of a solid slab stone shower floor installed in accordance with the present invention.
  • DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT
  • The present invention is the culmination of substantial study and experimentation aimed at exploiting the substantial benefits of using a solid stone slab as a shower pan or floor.
  • With the objectives in mind, reference is made to the drawings and, initially to FIG. 1, in which the current construction of a shower using stone is illustrated in some detail. The stone currently in use is in the form of tile, with all of its deficiencies, as distinguished from a monolithic stone slab, the employment of which is the focus of the present invention.
  • Still referring to FIG. 1, an array of stone tiles 10 is positioned over a pre-sloped floor 12 and along a side wall 14. The tiles are secured in any well known manner, such as by dry pack mortar and grout.
  • The procedure for installing a stone tile shower, such as shown in FIG. 1, is both tedious and time consuming. The installer must first build the pre-sloped floor, by building the floor with a thin set mortar to slope the floor to the drain 16. After allowing the mortar to cure for 24 hours, a waterproof member is applied over a pre-sloped floor. Next, the installer applies a layer of dry pack mortar above the waterproof membrane, and, once again, it must set for 24 additional hours. Next, the installer lays the stone tile using any suitable mastic material, and yes, allows it to cure for another 24 hours.
  • Grout is used to fill the voids between the stone tile, and the tile is washed down to remove excess grout.
  • In rather stark contrast, the use of a monolithic stone slab enhances the beauty of the installation while simplifying the process. The genesis of the installation of the present invention rests with a stone slab or pan 20, shown in FIG. 2. The face of the stone slab 20 is machined to slope toward the drain opening or aperture 24. It may be roughened slightly to make it non slip. The underside 26 of the slab 20 is flat. It will be appreciated that this stone floor 20 does not require the application of grout as the stone surface is one solid piece. This surface is also much easier to clean and will not foster the growth of mold. Beyond the practical advantages, it is exceptionally pleasing to the eye.
  • A key to using a monolithic slab of stone, while meeting all of the code requirements, is the novel liner 30 of the present invention as seen in FIG. 4. The liner 30 is a single unit, molded, or cast, preferably of a plastic material, in any of several well known methods, and the surface is formed with a series of channels 32 each of which slopes to the drain. Adjacent channels define upstanding ribs 33, the top edges of which collectively define a flat surface 34 which will eventually support a stone floor. All of the channels 32 slope toward a drain opening or aperture 36, where a drain assembly 40 is positioned for receipt of drain water from the stone slab 20, and, of course, the liner 30 during use.
  • For efficiency and simplicity in the molding process, the channels 32 are divided into four substantially identical groups 38. Each channel is designed to capture fugitive moisture and direct it to the drain where it is drained away from the installation. The groupings 38 of the channels 32 make it simple to capture moisture where ever it occurs, directing it straight to the drain where it is disposed of in a straight forward manner.
  • Addressing the completed installation as seen in FIGS. 5 and 6, the interrelationship of the various elements is clearly shown. The solid slab stone floor 20 is seated over the monolithic liner 30, where it is supported on the level surface 34, defined by the supporting ribs 33.
  • The present invention contemplates an adjunct to the liner 30 in the form of an upstanding splash guard 45. The splash guard 45 is a flexible liner comprising a single sheet of a flexible moisture impermeable material which is glued about the perimeter of the liner 30, where it is attached to conventional wall framing 51. Finish wall 53, and backer board 52 provide an initial barrier to moisture, and splash guard 45 provides a further barrier to moisture which might otherwise migrate, or condense, to promote mold and rot beneath the installation.
  • The installation thus described is efficiently assembled and integrated into existing conventional construction either as an original construction or as a remodel. With FIGS. 5 and 6 as a guide, a proper installation involves initial preparation of a bed of softened thin-set mortar, applied uniformly over the entire area to be covered by liner 30. Next, install monolithic liner 30 over the entire area of the mortar bed. It is important that liner 30 be installed level. This is accomplished by using a carpenter's level and applying pressure to the high areas of liner 30 while the mortar bed is still wet. The mortar bed is now allowed to cure (harden).
  • It is now time to install the solid slab stone floor 20 on the surface 34, defined by the ribs 33, of the monolithic liner such that the respective drain openings are aligned. Finally, the upstanding flexible liner 45 is attached to the adjacent wall framing 51, and the installation is complete and fully compliant with all codes relevant to the project.
  • It will be appreciated that those skilled in the art may perceive minor variations in the structure and the method of achieving it. It will be understood, however, that such variations are within the contemplation of the invention as defined by the claims wherein:

Claims (12)

1. In a shower facility, a monolithic stone floor, said stone floor having a drain opening therein;
a liner; said liner having an upper flat surface, a drain opening therein, an array of channels formed in said liner, said groves sloping toward said drain opening;
a subfloor, said subfloor having a surface adapted to receive said liner in mating engagement;
and a drain assembly disposed in said drain openings such that fugitive moisture and condensation accumulated below said stone slab is directed to said drain through said channels.
2. The shower facility of claim 1, wherein said drain opening is centrally located and both said drain openings being aligned.
3. The shower facility of claim 1, wherein said stone floor slopes towards said drain opening.
4. The shower facility of claim 1, wherein said channels in said liner slope towards said drain opening in order that fugitive moisture is moved to said drain assembly and there disposed.
5. The shower facility of claim 1, wherein said channels define ribs disposed there between.
6. The shower facility of claim 1, wherein said channels are divided into groupings, said channels in each grouping sloping towards said drain opening.
7. The shower facility of claim 5, said ribs having a top edge and all of said top edges of said ribs defining a level surface.
8. The shower facility of claim 7, wherein said monolithic stone floor rests on said level surface.
9. The method of installing a stone slab as a floor in a shower comprising the steps of:
a. providing a monolithic stone slab having an opening therein, a series of channels sloping towards said opening;
b. providing a liner, said liner formed with an opening and an array of channels formed in the upper surface of said liner, said channels sloping towards said opening;
c. forming a bed of initially softened material for receipt of said liner;
d. pressing said liner into said softened material, leveling said liner, and allowing said bed to cure and harden with said liner in place;
e. affixing said stone slab on the upper surface of said liner such that the openings in each are aligned; and,
f. installing a drain in said openings to receive fugitive moisture and condensation accumulated beneath said slab.
10. The method of claim 9, wherein said liner is formed of a plastic material.
11. The method of claim 9, wherein said channels in said liner being in groupings.
12. The method of claim 9, wherein said channels defining ribs there between, said ribs having upper edges, said upper edges together defining a flat surface.
US12/283,593 2008-09-15 2008-09-15 Prefabricated shower floor liner for use with solid stone shower floor and method of construction Abandoned US20100064430A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/283,593 US20100064430A1 (en) 2008-09-15 2008-09-15 Prefabricated shower floor liner for use with solid stone shower floor and method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/283,593 US20100064430A1 (en) 2008-09-15 2008-09-15 Prefabricated shower floor liner for use with solid stone shower floor and method of construction

Publications (1)

Publication Number Publication Date
US20100064430A1 true US20100064430A1 (en) 2010-03-18

Family

ID=42005901

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/283,593 Abandoned US20100064430A1 (en) 2008-09-15 2008-09-15 Prefabricated shower floor liner for use with solid stone shower floor and method of construction

Country Status (1)

Country Link
US (1) US20100064430A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110258954A1 (en) * 2010-04-23 2011-10-27 Bill Oetting Moisture barrier
US8181288B1 (en) * 2007-06-04 2012-05-22 KBRS Manufacturing, Inc. Waterproof base and methods of fabrication and installation thereof
WO2016058030A1 (en) * 2014-10-15 2016-04-21 Hickory Design Pty Ltd A method of installing a plumbing flange, and a transportable base
US20160174773A1 (en) * 2014-12-19 2016-06-23 Peter Kent Summers Shower Pan and Drain Systems
US10106970B2 (en) 2011-11-18 2018-10-23 Schluter Systems L.P. Tileable drain systems and related methods
US10856702B2 (en) * 2018-05-26 2020-12-08 KurbX LLC Systems and methods for a shower base assembly compatible with residential and commercial construction
US11284751B2 (en) 2018-05-26 2022-03-29 Kurbx, Llc Shower base assembly compatible with residential and commercial construction

Citations (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1017167A (en) * 1907-05-11 1912-02-13 James B Clow & Sons Receptor for shower-baths.
US3606617A (en) * 1969-06-25 1971-09-21 Silvercote Products Inc Bathing fixture
US4602393A (en) * 1985-01-18 1986-07-29 Fiveash Daniel E Bathtub liner
US4630323A (en) * 1985-08-02 1986-12-23 Sage Dennis R Bathtub liner
US4956882A (en) * 1988-12-30 1990-09-18 Cohn Harold S Iii Bath tub liner
US5371980A (en) * 1993-02-17 1994-12-13 Dix; Steven J. Shower liner
US5913777A (en) * 1997-05-12 1999-06-22 Tile Redi, Ltd. Pre-fabricated shower module and method of shower construction
US6155015A (en) * 1999-09-09 2000-12-05 Kirby; Mark E. Method for making a sloped floor
US20010052148A1 (en) * 2000-04-20 2001-12-20 Christina Hasenkopf Bottom element for a shower
US6571406B2 (en) * 2000-12-02 2003-06-03 Michael Gerloff Supporting body for a shower tub
US6643863B1 (en) * 2002-10-30 2003-11-11 Lloyd Gerber Prefabricated shower pan with integrally molded curb reinforcements
US6851133B1 (en) * 2002-12-11 2005-02-08 Walter Wayne Nehring Mold resistant shower enclosure
US20050028270A1 (en) * 2002-12-11 2005-02-10 Nehring Walter Wayne Leak proof shower enclosure support structure
US20060026752A1 (en) * 2004-08-03 2006-02-09 Torres Raymond C Shower receptor
US20060236452A1 (en) * 2005-04-20 2006-10-26 John Polimeno Infinity shower pan
US20070266491A1 (en) * 2006-04-20 2007-11-22 Mark Gann Shower pan
US20080163420A1 (en) * 2005-02-17 2008-07-10 Preissing Dieter Self-Supporting Shower Floor Element Comprising A Film For Sealing The Floor And Walls
US20080184480A1 (en) * 2007-01-30 2008-08-07 Kenneth Adleman Apparatus and method for sloped shower floors
US20080222796A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Method for manufacturing a prefabricated modular shower curb and associated modular shower curb
US20080222793A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Ribbed prefabricated polyurethane shower module
US20080222891A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Method for manufacturing a prefabricated shower module
US20080222797A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Prefabricated shower pan having varying sidewall heights and method of attaching a modular curb
US20080222794A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Method of manufacturing and installation of prefabricated shower bench and associated shower bench
US20080222795A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Drain wall for a prefabricated shower module
US20080276364A1 (en) * 2007-05-07 2008-11-13 Barro James S Manufactured Shower Pan
US20090119831A1 (en) * 2005-10-18 2009-05-14 Grave Robert B Shower assemblies
US7562495B1 (en) * 2005-05-27 2009-07-21 Fairchild Manufacturing Corp. Shower receptor
US20090320204A1 (en) * 2008-06-25 2009-12-31 Wiseman B Christopher Shower pan having no visible drainage means
US20100043136A1 (en) * 2008-08-22 2010-02-25 Boris Michael Shower pan drain assembly system
US20100115865A1 (en) * 2008-09-26 2010-05-13 Steve Donnelly Tile adaptor
US20100263188A1 (en) * 2007-03-17 2010-10-21 Cook Joseph R Shower enclosure design and assembly methods using prefabricated shower benches

Patent Citations (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1017167A (en) * 1907-05-11 1912-02-13 James B Clow & Sons Receptor for shower-baths.
US3606617A (en) * 1969-06-25 1971-09-21 Silvercote Products Inc Bathing fixture
US4602393A (en) * 1985-01-18 1986-07-29 Fiveash Daniel E Bathtub liner
US4630323A (en) * 1985-08-02 1986-12-23 Sage Dennis R Bathtub liner
US4956882A (en) * 1988-12-30 1990-09-18 Cohn Harold S Iii Bath tub liner
US5371980A (en) * 1993-02-17 1994-12-13 Dix; Steven J. Shower liner
US5913777A (en) * 1997-05-12 1999-06-22 Tile Redi, Ltd. Pre-fabricated shower module and method of shower construction
US6155015A (en) * 1999-09-09 2000-12-05 Kirby; Mark E. Method for making a sloped floor
US20010052148A1 (en) * 2000-04-20 2001-12-20 Christina Hasenkopf Bottom element for a shower
US6571406B2 (en) * 2000-12-02 2003-06-03 Michael Gerloff Supporting body for a shower tub
US6643863B1 (en) * 2002-10-30 2003-11-11 Lloyd Gerber Prefabricated shower pan with integrally molded curb reinforcements
US6851133B1 (en) * 2002-12-11 2005-02-08 Walter Wayne Nehring Mold resistant shower enclosure
US20050028270A1 (en) * 2002-12-11 2005-02-10 Nehring Walter Wayne Leak proof shower enclosure support structure
US7296309B2 (en) * 2002-12-11 2007-11-20 Walter Wayne Nehring Leak proof shower enclosure support structure
US20060026752A1 (en) * 2004-08-03 2006-02-09 Torres Raymond C Shower receptor
US20080163420A1 (en) * 2005-02-17 2008-07-10 Preissing Dieter Self-Supporting Shower Floor Element Comprising A Film For Sealing The Floor And Walls
US20060236452A1 (en) * 2005-04-20 2006-10-26 John Polimeno Infinity shower pan
US7562495B1 (en) * 2005-05-27 2009-07-21 Fairchild Manufacturing Corp. Shower receptor
US20090119831A1 (en) * 2005-10-18 2009-05-14 Grave Robert B Shower assemblies
US20070266491A1 (en) * 2006-04-20 2007-11-22 Mark Gann Shower pan
US20080184480A1 (en) * 2007-01-30 2008-08-07 Kenneth Adleman Apparatus and method for sloped shower floors
US20080222793A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Ribbed prefabricated polyurethane shower module
US20080222891A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Method for manufacturing a prefabricated shower module
US20080222797A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Prefabricated shower pan having varying sidewall heights and method of attaching a modular curb
US20080222794A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Method of manufacturing and installation of prefabricated shower bench and associated shower bench
US20080222795A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Drain wall for a prefabricated shower module
US20080222796A1 (en) * 2007-03-17 2008-09-18 Tile Redi, Llc Method for manufacturing a prefabricated modular shower curb and associated modular shower curb
US20100263188A1 (en) * 2007-03-17 2010-10-21 Cook Joseph R Shower enclosure design and assembly methods using prefabricated shower benches
US20080276364A1 (en) * 2007-05-07 2008-11-13 Barro James S Manufactured Shower Pan
US20090320204A1 (en) * 2008-06-25 2009-12-31 Wiseman B Christopher Shower pan having no visible drainage means
US20100043136A1 (en) * 2008-08-22 2010-02-25 Boris Michael Shower pan drain assembly system
US20100115865A1 (en) * 2008-09-26 2010-05-13 Steve Donnelly Tile adaptor

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8181288B1 (en) * 2007-06-04 2012-05-22 KBRS Manufacturing, Inc. Waterproof base and methods of fabrication and installation thereof
US20110258954A1 (en) * 2010-04-23 2011-10-27 Bill Oetting Moisture barrier
US8201287B2 (en) * 2010-04-23 2012-06-19 Bill Oetting Moisture barrier
US10106970B2 (en) 2011-11-18 2018-10-23 Schluter Systems L.P. Tileable drain systems and related methods
WO2016058030A1 (en) * 2014-10-15 2016-04-21 Hickory Design Pty Ltd A method of installing a plumbing flange, and a transportable base
AU2014250650B2 (en) * 2014-10-15 2019-11-28 Hickory Design Pty Ltd A method of installing a plumbing flange, and a transportable base
US20160174773A1 (en) * 2014-12-19 2016-06-23 Peter Kent Summers Shower Pan and Drain Systems
US10856702B2 (en) * 2018-05-26 2020-12-08 KurbX LLC Systems and methods for a shower base assembly compatible with residential and commercial construction
US11284751B2 (en) 2018-05-26 2022-03-29 Kurbx, Llc Shower base assembly compatible with residential and commercial construction

Similar Documents

Publication Publication Date Title
US20100064430A1 (en) Prefabricated shower floor liner for use with solid stone shower floor and method of construction
US6571406B2 (en) Supporting body for a shower tub
US5913777A (en) Pre-fabricated shower module and method of shower construction
CN105358772B (en) Integrated flange bearing discoid pieces of bonding for prefabricated shower disc
US4557004A (en) Waterproof shower module with tile-ready inner surfaces
US8677521B2 (en) Shower floor formers
US5713561A (en) Outdoor structure such as gate post gate wing or fence and method for constructing this
US8230535B2 (en) Shower base apparatus
US8918926B1 (en) One piece shower pan and method of making same
US20110088160A1 (en) Shower floor formers
CA2995216C (en) Wall mounted shower drain
US7562495B1 (en) Shower receptor
CA2731512A1 (en) Underbody element for supporting a shower ground element
US8347426B2 (en) Shower device level with the surrounding ground
WO2007086734A1 (en) Prefab element
EP1857029B1 (en) Floor element and method for making a floor element
UA113649C2 (en) A SYSTEM FOR COVERING A SURFACE AND A METHOD FOR MANUFACTURING THIS SYSTEM
WO1997040245A1 (en) Base for installing tiled coverings and method for use of same
US20040205890A1 (en) Floor drainage construction
KR20200091360A (en) Field fabricated shower system
DE102004049130A1 (en) Method for fitting shower tray into construction using a support frame incorporated into the floor screed for subsequent fitting of the tray and connections
WO2009053185A2 (en) A self-supporting paving for outdoor use
GB2483660A (en) Shower floor installation
US20230098163A1 (en) Reinforced floors for modular bathrooms
KR200358981Y1 (en) Waterproof structure for building floor and slant block for the same

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION