US20080289825A1 - Downhole Mixing Of Encapsulated Plug Components For Primary Cementing A Well - Google Patents

Downhole Mixing Of Encapsulated Plug Components For Primary Cementing A Well Download PDF

Info

Publication number
US20080289825A1
US20080289825A1 US11/955,350 US95535007A US2008289825A1 US 20080289825 A1 US20080289825 A1 US 20080289825A1 US 95535007 A US95535007 A US 95535007A US 2008289825 A1 US2008289825 A1 US 2008289825A1
Authority
US
United States
Prior art keywords
component
density
encapsulated
well
annulus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/955,350
Inventor
Boyce D. Burts, Jr.
Boyce Donald Burts, III
Freddie L. Sabins
Larry Watters
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US11/955,350 priority Critical patent/US20080289825A1/en
Publication of US20080289825A1 publication Critical patent/US20080289825A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/06Inhibiting the setting, e.g. mortars of the deferred action type containing water in breakable containers ; Inhibiting the action of active ingredients
    • C04B40/0666Chemical plugs based on hydraulic hardening materials
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/426Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells for plugging

Abstract

A two part encapsulated cementing system is mixed downhole in a method of primary cementing a well. Using this two part system, one of the components is first placed in the annulus of the well. Next, the other component is placed in the annulus above the first placed component. Densities of the components have been selected such that the density of the second placed component is sufficiently higher then the density of the first placed component to facilitate gravity mixing of the two components as the second placed component moves through the first placed component and in the process activation occurs.

Description

    RELATED APPLICATION DATA
  • This application is a continuation of U.S. patent application Ser. No. 11/162,449, filed Sep. 9, 2005, herein incorporated by reference, which application claimed priority/benefit of U.S. Provisional Patent Application Ser. Nos. 60/608,255, 60/608,256, and 60/608,257, all filed Sep. 9, 2004, and all herein incorporated by reference.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to wells, drilling wells, well operations, to methods, apparatus and products for drilling wells. In another aspect, the present invention relates to wells, cementing wells, and to methods, apparatus and products for cementing wells. In even another aspect, the present invention relates to wells, primary cementing wells, and to methods, apparatus and products for primary cementing wells.
  • 2. Brief Description of the Related Art
  • In the drilling and completion of an oil or gas well, a cementing composition is often introduced in the well bore for cementing pipe string or casing in a process known as primary cementing. In primary cementing, a cementing composition is pumped into the annular space between the walls of the well bore and the casing. The cementing composition sets in the annular space, supporting and positioning the casing, and forming a substantially impermeable barrier/mass or cement sheath. An essential function of cementing is to prevent fluid exchange between the different formation layers through which the hole passes and to control the ingress of fluid into the well, in particular to limit the ingress of water. In production zones, the casing, the cement and the formation are all perforated over a depth of a few centimeters.
  • A variety of cementing compositions exist in the art and have been used for primary cementing. Considerations for selecting a cementing composition include relatively short term concerns, such as set times for the cement slurry, as well as functional and long term concerns such as whether a composition is environmentally acceptable, easily mixable, non-settling under static and dynamic conditions, will develop near one hundred percent placement in the annular space, resist fluid influx, and have the desired density, thickening time, set up time, fluid loss, strength development, and zero free water.
  • A number of patents and patent applications are directed to primary cementing wells, the following of which are only a small few.
  • U.S. Pat. No. 4,768,593, issued Sep. 6, 1988, to Novak discloses This application discloses a process for drilling and primary cementing a well using a drilling fluid containing a polymeric material which may be cemented into a well cement by irradiation with a suitable radioactive source
  • U.S. Pat. No. 5,151,203, issued Sep. 29, 1992, to Riley et al., discloses a composition for and method of performing primary cementing operations. The method comprises the use of a water slurry of a thixotropic cementing composition which rapidly develops sufficient static gel strength to reduce if not eliminate annular gas migration.
  • U.S. Pat. No. 5,327,969, issued Jul. 12, 1994, to Sabins et al., discloses a method of preventing gas migration during primary well cementing. The method basically comprises the steps of displacing a cement slurry into the annulus between a string of pipe to be cemented in a well bore and the walls of the well bore, determining the initial surface pressure in the pipe after the cement slurry is placed in the annulus, displacing additional cement slurry into the annulus as is necessary to make up for losses in the surface pressure due to cement slurry gel strength development and volume reduction whereby the surface pressure is maintained substantially equal to the initial surface pressure until the cement slurry develops a predetermined gel strength sufficient by itself to prevent gas migration, and then allowing the cement slurry to set into a hard impermeable mass in the annulus.
  • U.S. Pat. No. 5,343,950, issued Sep. 6, 1994 to Hale et al., discloses An extended reach well such as the deviated wells typically drilled from offshore platforms is drilled using a drilling fluid comprising blast furnace slag and water which drilling fluid is circulated during the drilling to lay down a filter cake. Thereafter, an activator is added and generally, an alkaline material and additional blast furnace slag, to produce a cementitious slurry which is passed down a casing and up into an annulus to effect primary cementing.
  • U.S. Pat. No. 5,343,951, issued Sep. 6, 1994 to Cowan et al., discloses a slim hole well drilled using a drilling fluid comprising blast furnace slag and water which drilling fluid is circulated during the drilling to lay down a filter cake. Thereafter, an activator is added and generally, an alkaline material and additional blast furnace slag, to produce a cementitious slurry which is passed down a casing and up into an annulus to effect primary cementing.
  • U.S. Pat. No. 5,370,185, issued Dec. 6,1994 to Cowan et al., a cementitious slurry produced by combining an aqueous drilling fluid with a slurry of Portland cement in oil. Generally the drilling fluid is an aqueous drilling fluid containing clay such as prehydrated bentonite. The resulting composition has a particular utility in primary cementing operations for oil wells.
  • U.S. Pat. No. 5,829,523, issued Nov. 3, 1998 to Sabins et al., discloses primary well cementing methods and apparatus. The methods basically comprise the steps of releasing a displacement plug into the casing to be cemented and pumping a first displacement fluid behind the displacement plug while measuring the quantity of the first displacement fluid required to land the displacement plug on a float collar or the like connected near the bottom of the casing, releasing a bottom cementing plug into the casing and pumping a cement slurry behind the bottom cementing plug in a predetermined quantity and then releasing a top cementing plug into the casing and pumping a second displacement fluid behind the top cementing plug in a quantity substantially equal to the measured quantity of the first displacement fluid thereby ensuring that the cement slurry is not under or over displaced in the annulus between the casing and the well bore.
  • U.S. Pat. No. 6,065,539, issued May 23, 2000 to Noik et al., discloses a method of cementing a casing in a well drilled in the ground comprises injecting a liquid material comprising phenol-formol resin from the surface, wherein the resin is modified by means of a determined amount of furfuryl alcohol, and an amount of mineral filler unreactive towards the resin is added. The invention further relates to a thermosetting cementing material comprising phenol-formol resin. The resin is modified by means of an amount of furfuryl alcohol and comprises at least a proportion of an unreactive granular filler.
  • U.S. Pat. No. 6,626,991, issued Sep. 30, 2003 to Drochon et al., discloses a cement slurry for cementing an oil well or the like, the slurry having a density lying in the range 0.9 g/cm.sup.3 to 1.3 g/cm.sup.3, and being constituted by a solid fraction and a liquid fraction, having porosity (volume ratio of liquid fraction over solid fraction) lying in the range 38% to 50%. The solid fraction is constitued by a mixture of lightweight particles, microcement and optionally portland cement and gypsum. Such cements have remarkable mechanical properties due to their very low porosity in spite of having very low density.
  • U.S. Pat. No. 6,776,237, issued Aug. 17, 2004 to Dao et al., discloses lightweight cement compositions and methods of cementing a subterranean zone penetrated by a well bore utilizing the compositions are provided. A lightweight cement composition of the invention is basically comprised of a coarse particulate hydraulic cement, an ultrafine particulate hydraulic cement mixture comprised of slag cement and a Portland or equivalent cement, fly ash, fumed silica, hollow glass spheres and water.
  • U.S. Pat. No. 6,793,730, issued Sep. 21, 2004 to Reddy et al., discloses methods for cementing. The methods are basically comprised of the steps of preparing a cement composition comprised of hydraulic cement, water, gas, surfactants, a cement early strength accelerator and a mildly set retarding cement dispersing agent, placing the cement composition in the annulus between the casing string and the well bore and allowing the cement composition to set into a hard impermeable mass. The cement composition used can alternatively comprise hydraulic cement, a water reducing additive, a dispersing additive, a set accelerating additive and water. Also, the cement composition can be made environmentally benign by using water reducing and dispersing additives, set retarding additives, and compressive strength and set accelerating additives which are environmentally degradable.
  • U.S. Pat. No. 6,892,814, issued May 17, 2005, to Heathman et al., discloses cement comprising barite, a process for preparing such cement, and methods of cementing in a subterranean formation or well bore using such cement are provided. The cement is prepared by introducing coarse barite to the cement, the course barite comprising particles having a particle size primarily greater than about 125 microns. Preferably, 90 percent of the barite particles is greater than about 125 microns in size. The presence of the coarse barite in the cement causes the cement to have a relatively low viscosity. Introducing the barite to the cement also increases the density of the cement, thus rendering the cement capable of controlling high hydrostatic pressures in a well bore.
  • In spite of the advances in the prior art, conventional cement systems suffer from a 6 hour safety margin to dump the slurry; long set times; low shear bond values; long cement lengths, and long wait on cement (WOC) times causing high expense.
  • Thus, there still exists a need in the art for improved methods, apparatus and products for abandoning wells.
  • There also exists a need in the art for improved methods, apparatus and products for plugging abandoned wells.
  • SUMMARY OF THE INVENTION
  • According to one embodiment of the present invention, there is provided a well comprising a well bore and a pipe residing in said well bore forming an annulus between the pipe and well bore; a first component residing in the annulus; and, a second component having a density greater than the density of the first component, and positioned residing in the annulus at a point above the first component that will allow for gravity flow of the second component down into the first component. The first and second components are encapsulated components that upon contact with each other form a cementing plug.
  • According to even another embodiment of the present invention, there is provided a method of conducting primary cementing operations on a well, said well comprising a well bore and a pipe residing in said well bore forming an annulus between the pipe and well bore. The method includes providing a two component separately encapsulated cementing system, each component having a density greater than the density of any well fluid residing in the well. The method also includes selecting a first component and a second component from the group consisting of an A-list of components and a B-list of components, wherein the first component and the second component are different, and the density of the second component is higher than the density of the first component. The method even further includes placing the first component in the annulus. The method still further includes placing the second component in the annulus at a point above the first component that will allow for gravity flow of the second component down into contact with the first component.
  • According to still another embodiment of the present invention, there is provided a method of primary cementing a well comprising a well bore and a pipe residing in said well bore forming an annulus between the pipe and well bore. The method includes providing a two component separately encapsulated cementing system, each component having a density greater than the density of any well fluid residing in the well. The method also includes selecting a first component and a second component from the group consisting of an A-list of components and a B-list of components, wherein the first component and the second component are different, and the density of the second component is higher than the density of the first component. The method even further includes placing the first component in the annulus. The method still further includes placing the second component in the annulus at a point above the first component that will allow for gravity flow of the second component down into contact with the first component. The method yet further includes allowing the first and second components to gravity contact and form a hard impermeable mass.
  • DETAILED DESCRIPTION OF THE INVENTION
  • In the practice of present invention, the cementing composition of the present invention may be utilized in any known cementing method including any of the primary cementing methods disclosed in any of the references cited herein, all of which are herein incorporated by reference. Any known method for placing and/or positioning components of a cementing composition into an annulus may be used herein, all of which are herein incorporated by reference.
  • As used herein, a well generally refers to an underground, substantially vertically-extending well comprising a well bore. Generally, after a well bore is drilled during which the drilling fluid used is circulated through the well bore, the circulation of the drilling fluid is stopped, the well is usually logged and a string of pipe often called a casing, is run in the well bore. Generally the casing extends from the ground surface into the well bore and terminates at a predetermined depth in the well bore. The outer wall of the casing is generally spaced from the inner wall of the well bore to form an annulus. After the casing is set, the drilling fluid in the well bore is conditioned by circulating drilling fluid downwardly through the interior of the pipe and upwardly through the annulus between the exterior of the pipe and the walls of the well bore while removing drilling solids and gas therefrom. After conditioning, both the pipe and annulus are substantially filled with drilling fluid.
  • The next operation performed on the well is generally the step of primary cementing. By the process of primary cementing a hard impermeable barrier mass is formed in the annulus. This mass may also be referred to as a sheath or cement sheath. Primary cementing is carried out for a number of reasons including to prevent migration of fluids in the annulus, to support the casing or liner string, and to protect of the casing from corrosive formation fluids. Any of the number of methods known in the art for placing a cementing composition into an annulus may be used for the primary cementing compositions and methods of the present invention.
  • In general primary cementing is carried out as follows. Generally in primary cementing processes the components of a cementing composition are introduced from a source at the ground surface into the upper end of the casing and flow downwardly through the bottom end of the casing. The components of the cementing composition then flow to the bottom of the well bore where their flow direction is reversed causing them to flow up the annulus, thereby placing the components of the cementing composition in the annulus between the pipe and the walls of the well bore. In the primary cementing processes of the present invention, the components of the cementing composition may be placed into the annulus by any of the number of methods known in the art. The flow and addition of the components of the cementing composition is then terminated and the cementing composition is allowed to set into a hard impermeable mass.
  • The method of the present invention for primary cementing of a well involves the use of a two part primary cementing composition, which is incorporated into known primary cementing methods.
  • The system of the present invention is a two-solid-component, pelletized system. The concept is to separate two or more materials that will mix together with water to form a settable mixture into two encapsulated masses. Neither of the masses will set alone. The encapsulated solids will not disassociate in water for sufficient time to allow them to be dumped into a well bore and fall to the bottom. Once there, the pellets will disassociate and react together with the water in the well to form a settable plug.
  • The present invention will utilize any of the known agglomeration and encapsulation technology to bind and coat powders into pellets that will perform as described.
  • In the present invention, the two powders are pelletized separately to withstand the trip down hole and then release to form a settable mix with water. The encapsulated material is protected from being wetted by well fluids and is of sufficient particle size and density to allow falling through clear well fluids at a rate of at least 1 foot/second. The encapsulation coating degrades with time and/or temp to release components.
  • The table below outlines several pairs sets of two solid components for use in the present invention. While the table is shown with components A and B paired, it is also possible to create pairs by picking one or more from A and one or more from B. Acidic or basic conditions are required for some of the reactions. It is possible to encapsulate NaOH adsorbed onto DE or a salt of an organic acid as a means of providing required pH.
  • Component A Component B
    Na2SiO3 Ca(OH)2
    Na2SiO3 AlOOH
    NaPO3 Ca(OH)2
    CaHPO4 Ca(OH)2
    CaHPO4 Ca(OH)2 + base
    Na2SiO3 silica + acid
    Silica Ca(OH)2 + base
    Silica Alumina + base
    Al2(HPO4)3 Ca(OH)2 + base
    Na2SiO3 NaAlO2
    MgO MgCl2
  • Examples of suitable compositions include Component 1—50% silica flour+15% Ca(OH)2+15% Na2SiO3+20% PVA binder. Component 2—NaOH adsorbed onto DE 12% active.
  • In particular, the two part plugging composition of the present invention comprises one or more components selected from an A-list of components and one or more components selected from a B-list of components. Each component is separately encapsulated. In absence of the encapsulation the components will form a cementing plug.
  • In particular, the two part plugging composition of the present invention comprises a component selected from an A-list of components and a component selected from a B-list of components. Each component is separately encapsulated. In absence of the encapsulation the components will form a hard impermeable mass.
  • The encapsulation on the encapsulated component is designed to degrade upon contact with the well fluid. The timing of the degradation can to tailored to fit the desired well operation. Generally, the first placed component will be allowed sufficient time to settle and degrade. The second placed component should be designed to be degraded by the time it is passing thru the first component.
  • In the present invention, the cementing system not only contains the components, but may optionally include additives to improve thermal stability, control set time, generate expansion, and control fluid loss. The additives may be incorporated into the system directly, or into one or both of the components.
  • While any cementing system may be utilized, it is desired that the system exhibit one or more, preferably several if not all, of the following characteristics: no shrinkage upon set up, maintains (or causes an increase in) the wellhole pressure; hydrophobic; density allows it to fall thru the well fluid at a suitable rate; and non-gas generating (so as not to cause micro channels).
  • In the present invention, accelerated set times are generally less than 12 hours, preferably less than 10 hours, more preferably less than 8 hours, even more preferably less than 6 hours, still more preferably less than 4 hours, and yet more preferably less than 2 hours.
  • The resulting cementing system may bond to the casing and or other formation surfaces in the well. The pipe may have coating of oil or water based drilling mud.
  • The method of the present invention for primary cementing a well, includes any of the known primary cementing methods in which is utilized the two component primary cementing composition as the cementing material. While a generalized primary cementing method is described below, it should be understood that any suitable primary cementing method as is known in the art, including any described above in the background or described in any cited reference (all of which are herein incorporated by reference), may be utilized with the primary cementing composition of the present invention.
  • Generally in the practice of the method of the present invention, one of the components is selected as the first placed component and placed in the annulus, followed by placement of the other component as the second placed component in the annulus at a position above the first component, to allow the second component to gravity flow into the first component.
  • Any suitable apparatus and method for the delivery of the components may be utilized. As non-limiting examples, suitable delivery systems may utilize a dump bailer, coiled tubing and jointed tubing. They require a base to stack up against such as a packer, petal basket or sand plug. While any suitable delivery mechanism can be utilized, more specific non-limiting examples of suitable delivery mechanisms include: dump bailer run on electric line or slick line; pumping through tubing, drillpipe, work strings or any tubulars; allowing fall through fluids via gravity; and pumping into an annullas or pipe without displacing (i.e., “bull heading”).
  • It is crucial that the first and second components have greater densities than the well fluid density. It is also crucial that the second placed component have a density greater than the first placed component so that the second placed component may displace the first component.
  • In some instances the selected first and second components will not have suitable densities, specifically, the densities of the first and second components may not be greater than that of the well fluid, or they may not have the suitable density for the order in which they are desired to be introduced into the annulus, or the densities may not have a suitable enough differential to achieve suitable displacement.
  • The present invention provides for the utilization of weighting agent additives to the first and second components to change the density of those components. Suitable additives to change the density include metal salts, preferably calcium chloride. Other examples of weighting agents include sand, barite, hemitite, calcium carbonate, FeO, MgO, and manganese ore. Sufficient amounts of the additive are utilized to achieve the desired density.
  • In the primary cementing method of the present invention first and second components are provided which have densities greater than the well fluid, with the component to be placed second having a greater density than the component to be placed first. Should the density of the first or second component need adjustment, a weighting agent as discussed above, will be added as necessary. The component with the greater density is then introduced into the annulus and the other component is then placed above the first placed component so that it may spontaneously gravity flow into contact with the first placed fluid. The density difference will allow displacement of the first placed fluid by the second placed fluid and allow for in-situ mixing.
  • It should be appreciated that the rate of displacement and thus in-situ mixing will increase with increasing density differential between the first and second components, and decrease with decreasing density differential between the first and second components.
  • It should also be appreciated that at some point, the density differential between the first and second components is so low as to result in too slow of displacement.
  • On the other hand, it should further be appreciated that at some point, the density differential between the first and second components is so great as to result in too rapid of displacement so as to avoid much mixing.
  • Thus, the density differential should be selected so as to provide fast enough displacement for the primary cementing operation, and to facilitate sufficient in-situ mixing, and this differential can be determined on a case by case basis, for example by observation in clear container and trial and error.
  • Typical densities for the well fluid will be in the range of about 8.33 ppg up to about 20.0 ppg, with typical densities for the components in the range of about 8.33 ppg up to about 22.0 ppg.
  • It should be understood that other well fluid additives as are well known in the art may be incorporated into the first and/or second component, or added before, along with, or after the introduction of the first and/or second component, non-limiting examples of which include surfactants, surface bond enhancers (non-limiting examples include styrene butadiene latex, polyvinal alcohols, resins, other adhesives), emulsifiers, ph control agents, fluid loss additives, gas prevention additive, dispersants, expanding agents, and wetting agents.
  • Although the present invention has been illustrated by preferred reference to two component encapsulated systems, it should be understood that any primary cementing composition having two or more components can be encapsulated and utilized in the present invention.
  • All materials cited herein, including but not limited to any cited patents, publications, articles, books, journals, brochures, are herein incorporated by reference
  • While the illustrative embodiments of the invention have been described with particularity, it will be understood that various other modifications will be apparent to and can be readily made by those skilled in the art without departing from the spirit and scope of the invention. Accordingly, it is not intended that the scope of the claims appended hereto be limited to the examples and descriptions set forth herein but rather that the claims be construed as encompassing all the features of patentable novelty which reside in the present invention, including all features which would be treated as equivalents thereof by those skilled in the art to which this invention pertains.

Claims (14)

1. A method of primary cementing a well comprising a well bore and a pipe residing in the well bore forming an annulus between the pipe and well bore, the method comprising:
(A) providing an encapsulated component A and an encapsulated component B, wherein component A and component B will upon contact form into a hard impermeable mass, and each having a density greater than the density of the well fluid;
(B) selecting a first component and a second component from the group consisting of encapsulated component A and an encapsulated component B, wherein the first component and the second component are different, and the density of the second component is higher than the density of the first component;
(C) placing the first component in the annulus;
(D) placing the second component in the annulus at a point above the first component that will allow for gravity flow of the second component down into contact with the first component.
2. The method of claim 1, wherein steps (C) and (D) are carried out utilizing one or more of a dump bailer; pumping through tubing, drillpipe, work strings or tubulars; gravity flow; and bull heading.
3. The method of claim 1, wherein the first component is the encapsulated component A, and the second component is the encapsulated component B.
4. The method of claim 1, wherein the first component is the encapsulated component B, and the second component is the encapsulated component A.
5. The method of claim 1, wherein the well fluid density is in the range of about 8.33 ppg up to about 20.0 ppg, the encapsulated component A density is in the range of about 8.33 ppg up to about 22.0 ppg, and the encapsulated component B density is in the range of about 8.33 up to about 22.0 ppg.
6. The method of claim 1, wherein component A is selected from the group consisting of Na2SiO3, NaPO3,CaHPO4, Silica, Al2(HPO4)3,and, MgO, and wherein component B is selected from the group consisting of Ca(OH)2, AlOOH, Ca(OH)2+base, silica+acid, Alumina+base, NaAlO2, MgCl2.
7. A method of primary cementing a well comprising a well bore and a pipe residing in the well bore forming an annulus between the pipe and well bore, the method comprising:
(A) providing an encapsulated component A and an encapsulated component B, wherein component A and component B will upon contact form into a hard impermeable mass, and each having a density greater than the density of the well fluid;
(B) selecting a first component and a second component from the group consisting of encapsulated component A and an encapsulated component B, wherein the first component and the second component are different, and the density of the second component is higher than the density of the first component;
(C) placing the first component in the annulus;
(D) placing the second component in the annulus at a point above the first component that will allow for gravity flow of the second component down into contact with the first component; and
(E) allowing the first and second components to gravity contact and form a hard impermeable mass.
8. The method of claim 7, wherein steps (C) and (D) are carried out utilizing one or more of a dump bailer; pumping through tubing, drillpipe, work strings or tubulars; gravity flow; and bull heading.
9. The method of claim 7, wherein the first component is the encapsulated component A, and the second component is the encapsulated component B.
10. The method of claim 7, wherein the first component is the encapsulated component B, and the second component is the encapsulated component A.
11. The method of claim 7, wherein the well fluid density is in the range of about 8.33 ppg up to about 20.0 ppg, the encapsulated component A density is in the range of about 8.33 ppg up to about 22.0 ppg, and the encapsulated component B density is in the range of about 8.33 up to about 22.0 ppg.
12. The method of claim 7, wherein component A is selected from the group consisting of Na2SiO3, NaPO3, CaHPO4, Silica, Al2(HPO4)3, and, MgO, and wherein component B is selected from the group consisting of Ca(OH)2, AlOOH, Ca(OH)2+base, silica+acid, Alumina+base, NaAlO2, MgCl2.
13. A cemented well comprising:
a well bore;
a pipe residing in said well bore forming an annulus between said pipe and well bore;
a first component residing in the annulus; and,
a second component having a density greater than the density of the first component, and residing in the annulus at a point above the first component that will allow for gravity flow of the second component down into the first component, wherein the first component and a second component are selected from the group consisting of encapsulated component A and an encapsulated component B, wherein the first component and the second component are different, and the density of the second component is higher than the density of the first component.
14. A cemented well comprising:
a well bore;
a pipe residing in said well bore forming an annulus between said pipe and well bore;
a first component residing in the annulus; and,
a second component having a density greater than the density of the first component, and in the state of gravity flowing thru the first component, wherein the first component and a second component are selected from the group consisting of encapsulated component A and an encapsulated component B, wherein the first component and the second component are different, and the density of the second component is higher than the density of the first component.
US11/955,350 2004-09-09 2007-12-12 Downhole Mixing Of Encapsulated Plug Components For Primary Cementing A Well Abandoned US20080289825A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/955,350 US20080289825A1 (en) 2004-09-09 2007-12-12 Downhole Mixing Of Encapsulated Plug Components For Primary Cementing A Well

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US60825504P 2004-09-09 2004-09-09
US60825604P 2004-09-09 2004-09-09
US60825704P 2004-09-09 2004-09-09
US16244905A 2005-09-09 2005-09-09
US11/955,350 US20080289825A1 (en) 2004-09-09 2007-12-12 Downhole Mixing Of Encapsulated Plug Components For Primary Cementing A Well

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US16244905A Continuation 2004-09-09 2005-09-09

Publications (1)

Publication Number Publication Date
US20080289825A1 true US20080289825A1 (en) 2008-11-27

Family

ID=39678629

Family Applications (11)

Application Number Title Priority Date Filing Date
US11/162,450 Expired - Fee Related US7886823B1 (en) 2004-09-09 2005-09-09 Well remediation using downhole mixing of encapsulated plug components
US11/162,448 Expired - Fee Related US7409990B1 (en) 2004-09-09 2005-09-09 Downhole mixing of encapsulated plug components for abandoning a well
US11/162,453 Active - Reinstated US8235116B1 (en) 2004-09-09 2005-09-09 Well remediation using surfaced mixed epoxy
US11/162,444 Active - Reinstated US7363976B1 (en) 2004-09-09 2005-09-09 Well remediation using downhole slurry
US11/945,258 Abandoned US20080277117A1 (en) 2004-09-09 2007-11-26 Surfaced mixed epoxy method for abandoning well
US11/948,925 Active - Reinstated US7748455B2 (en) 2004-09-09 2007-11-30 Surfaced mixed epoxy method for primary cementing of a well
US11/948,930 Abandoned US20080264637A1 (en) 2004-09-09 2007-11-30 Surface Mixing of Encapsulated Plug Components for Well Remediationg
US11/955,339 Abandoned US20080289826A1 (en) 2004-09-09 2007-12-12 Downhole Slurry Method For Primary Cementing A Well
US11/955,345 Abandoned US20080289824A1 (en) 2004-09-09 2007-12-12 Primary Well Cementing With Downhole Mixed Epoxy
US11/955,350 Abandoned US20080289825A1 (en) 2004-09-09 2007-12-12 Downhole Mixing Of Encapsulated Plug Components For Primary Cementing A Well
US12/111,948 Abandoned US20090056946A1 (en) 2004-09-09 2008-04-29 Well remediation using downhole slurry

Family Applications Before (9)

Application Number Title Priority Date Filing Date
US11/162,450 Expired - Fee Related US7886823B1 (en) 2004-09-09 2005-09-09 Well remediation using downhole mixing of encapsulated plug components
US11/162,448 Expired - Fee Related US7409990B1 (en) 2004-09-09 2005-09-09 Downhole mixing of encapsulated plug components for abandoning a well
US11/162,453 Active - Reinstated US8235116B1 (en) 2004-09-09 2005-09-09 Well remediation using surfaced mixed epoxy
US11/162,444 Active - Reinstated US7363976B1 (en) 2004-09-09 2005-09-09 Well remediation using downhole slurry
US11/945,258 Abandoned US20080277117A1 (en) 2004-09-09 2007-11-26 Surfaced mixed epoxy method for abandoning well
US11/948,925 Active - Reinstated US7748455B2 (en) 2004-09-09 2007-11-30 Surfaced mixed epoxy method for primary cementing of a well
US11/948,930 Abandoned US20080264637A1 (en) 2004-09-09 2007-11-30 Surface Mixing of Encapsulated Plug Components for Well Remediationg
US11/955,339 Abandoned US20080289826A1 (en) 2004-09-09 2007-12-12 Downhole Slurry Method For Primary Cementing A Well
US11/955,345 Abandoned US20080289824A1 (en) 2004-09-09 2007-12-12 Primary Well Cementing With Downhole Mixed Epoxy

Family Applications After (1)

Application Number Title Priority Date Filing Date
US12/111,948 Abandoned US20090056946A1 (en) 2004-09-09 2008-04-29 Well remediation using downhole slurry

Country Status (1)

Country Link
US (11) US7886823B1 (en)

Families Citing this family (74)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7607482B2 (en) 2005-09-09 2009-10-27 Halliburton Energy Services, Inc. Settable compositions comprising cement kiln dust and swellable particles
US7886823B1 (en) * 2004-09-09 2011-02-15 Burts Jr Boyce D Well remediation using downhole mixing of encapsulated plug components
US8555967B2 (en) 2005-09-09 2013-10-15 Halliburton Energy Services, Inc. Methods and systems for evaluating a boundary between a consolidating spacer fluid and a cement composition
US7743828B2 (en) 2005-09-09 2010-06-29 Halliburton Energy Services, Inc. Methods of cementing in subterranean formations using cement kiln cement kiln dust in compositions having reduced Portland cement content
US9809737B2 (en) 2005-09-09 2017-11-07 Halliburton Energy Services, Inc. Compositions containing kiln dust and/or biowaste ash and methods of use
US9023150B2 (en) 2005-09-09 2015-05-05 Halliburton Energy Services, Inc. Acid-soluble cement compositions comprising cement kiln dust and/or a natural pozzolan and methods of use
US8327939B2 (en) 2005-09-09 2012-12-11 Halliburton Energy Services, Inc. Settable compositions comprising cement kiln dust and rice husk ash and methods of use
US8609595B2 (en) 2005-09-09 2013-12-17 Halliburton Energy Services, Inc. Methods for determining reactive index for cement kiln dust, associated compositions, and methods of use
US7789150B2 (en) * 2005-09-09 2010-09-07 Halliburton Energy Services Inc. Latex compositions comprising pozzolan and/or cement kiln dust and methods of use
US8281859B2 (en) 2005-09-09 2012-10-09 Halliburton Energy Services Inc. Methods and compositions comprising cement kiln dust having an altered particle size
US9006155B2 (en) 2005-09-09 2015-04-14 Halliburton Energy Services, Inc. Placing a fluid comprising kiln dust in a wellbore through a bottom hole assembly
US9051505B2 (en) 2005-09-09 2015-06-09 Halliburton Energy Services, Inc. Placing a fluid comprising kiln dust in a wellbore through a bottom hole assembly
US7607484B2 (en) 2005-09-09 2009-10-27 Halliburton Energy Services, Inc. Foamed cement compositions comprising oil-swellable particles and methods of use
US9150773B2 (en) 2005-09-09 2015-10-06 Halliburton Energy Services, Inc. Compositions comprising kiln dust and wollastonite and methods of use in subterranean formations
US8505630B2 (en) 2005-09-09 2013-08-13 Halliburton Energy Services, Inc. Consolidating spacer fluids and methods of use
US8403045B2 (en) 2005-09-09 2013-03-26 Halliburton Energy Services, Inc. Settable compositions comprising unexpanded perlite and methods of cementing in subterranean formations
US8672028B2 (en) 2010-12-21 2014-03-18 Halliburton Energy Services, Inc. Settable compositions comprising interground perlite and hydraulic cement
US8522873B2 (en) 2005-09-09 2013-09-03 Halliburton Energy Services, Inc. Spacer fluids containing cement kiln dust and methods of use
US8297357B2 (en) 2005-09-09 2012-10-30 Halliburton Energy Services Inc. Acid-soluble cement compositions comprising cement kiln dust and/or a natural pozzolan and methods of use
US8333240B2 (en) 2005-09-09 2012-12-18 Halliburton Energy Services, Inc. Reduced carbon footprint settable compositions for use in subterranean formations
US8307899B2 (en) 2005-09-09 2012-11-13 Halliburton Energy Services, Inc. Methods of plugging and abandoning a well using compositions comprising cement kiln dust and pumicite
US8950486B2 (en) 2005-09-09 2015-02-10 Halliburton Energy Services, Inc. Acid-soluble cement compositions comprising cement kiln dust and methods of use
US9676989B2 (en) 2005-09-09 2017-06-13 Halliburton Energy Services, Inc. Sealant compositions comprising cement kiln dust and tire-rubber particles and method of use
US8505629B2 (en) 2005-09-09 2013-08-13 Halliburton Energy Services, Inc. Foamed spacer fluids containing cement kiln dust and methods of use
US20080224087A1 (en) * 2007-03-14 2008-09-18 Ezell Ryan G Aqueous-Based Insulating Fluids and Related Methods
US20080227665A1 (en) * 2007-03-14 2008-09-18 Ryan Ezell Aqueous-Based Insulating Fluids and Related Methods
US7762329B1 (en) 2009-01-27 2010-07-27 Halliburton Energy Services, Inc. Methods for servicing well bores with hardenable resin compositions
US8936081B2 (en) 2009-04-09 2015-01-20 Schlumberger Technology Corporation Compositions and methods for servicing subterranean wells
MX2012003767A (en) * 2009-09-28 2012-06-12 Halliburton Energy Serv Inc Actuation assembly and method for actuating a downhole tool.
US8714270B2 (en) 2009-09-28 2014-05-06 Halliburton Energy Services, Inc. Anchor assembly and method for anchoring a downhole tool
MX2012003768A (en) * 2009-09-28 2012-07-20 Halliburton Energy Serv Inc Compression assembly and method for actuating downhole packing elements.
WO2011037581A1 (en) * 2009-09-28 2011-03-31 Halliburton Energy Services, Inc. Through tubing bridge plug and installation method for same
US8851174B2 (en) * 2010-05-20 2014-10-07 Clearwater International Llc Foam resin sealant for zonal isolation and methods for making and using same
IT1406671B1 (en) * 2010-12-27 2014-03-07 Eni Spa METHOD FOR RECOVERY OF OIL FROM A FIELD USING MICRO (NANO) FLUIDS STRUCTURED TO RELEASE CONTROLLED BARRIER SUBSTANCES
IT1403889B1 (en) * 2010-12-27 2013-11-08 Eni Spa METHOD FOR THE REDUCTION OF CONING IN OIL-WELLED WELLS BY MEANS OF MICRO (NANO) FLUIDS STRUCTURED WITH RELEASE OF CONTROLLED BARRIER SUBSTANCES
US8490707B2 (en) 2011-01-11 2013-07-23 Schlumberger Technology Corporation Oilfield apparatus and method comprising swellable elastomers
US20130008654A1 (en) * 2011-07-05 2013-01-10 Halliburton Energy Services, Inc. Method for Drilling and Completion Operations with Settable Resin Compositions
US9920234B2 (en) * 2012-01-18 2018-03-20 Maersk Olie Og Gas A/S Sealing fluid for setting a packer
US10053949B2 (en) 2012-03-15 2018-08-21 Magnum Oil Tools International Ltd Cement retainer and squeeze technique
US10023783B2 (en) 2012-06-23 2018-07-17 Pumprock, Llc Compositions and processes for downhole cementing operations
US8387695B1 (en) * 2012-06-23 2013-03-05 Newbasis West Llc Compositions and processes for downhole cementing operations
US10858570B2 (en) 2012-07-17 2020-12-08 Dow Global Technologies Llc Aqueous cement compositions incorporating particles that are activated to control rheology when water soluble portions of the particles are released in the presence of water
BR112015031923A2 (en) 2013-09-04 2017-07-25 Halliburton Energy Services Inc fluid composition and method for treating a well treatment zone
GB2540304A (en) 2014-03-31 2017-01-11 M-I L L C Smart filtrate for strengthening formations
CN104606810A (en) * 2015-01-15 2015-05-13 李丛林 CO2 fire extinguishing system for bus
WO2016167794A2 (en) 2015-04-17 2016-10-20 Halliburton Energy Services, Inc. Composite drill gun
US10214988B2 (en) 2015-08-12 2019-02-26 Csi Technologies Llc Riserless abandonment operation using sealant and cement
EP3196402A1 (en) * 2016-01-22 2017-07-26 Shell Internationale Research Maatschappij B.V. Plugging to-be-abandoned wellbores in the earth
US10174583B2 (en) 2016-06-07 2019-01-08 Csi Technologies Llc Method of placing sealant into an offshore well to abandon a production zone
GB2554371B (en) * 2016-09-22 2019-10-09 Resolute Energy Solutions Ltd Well apparatus and associated methods
WO2018115053A1 (en) * 2016-12-22 2018-06-28 Shell Internationale Research Maatschappij B.V. Method and system for sealing an annular cement sheath surrounding a wellbore tubular
RU2746637C2 (en) * 2017-03-03 2021-04-19 Халлибертон Энерджи Сервисез, Инк. Application of cements based on metal oxides
US10378299B2 (en) 2017-06-08 2019-08-13 Csi Technologies Llc Method of producing resin composite with required thermal and mechanical properties to form a durable well seal in applications
US10428261B2 (en) 2017-06-08 2019-10-01 Csi Technologies Llc Resin composite with overloaded solids for well sealing applications
EP3694949A1 (en) 2017-10-10 2020-08-19 Saudi Arabian Oil Company Thixotropic cement slurry and placement method to cure lost circulation
US11352541B2 (en) 2018-08-30 2022-06-07 Saudi Arabian Oil Company Sealing compositions and methods of sealing an annulus of a wellbore
US11168243B2 (en) 2018-08-30 2021-11-09 Saudi Arabian Oil Company Cement compositions including epoxy resin systems for preventing fluid migration
US10696888B2 (en) 2018-08-30 2020-06-30 Saudi Arabian Oil Company Lost circulation material compositions and methods of isolating a lost circulation zone of a wellbore
WO2020229440A1 (en) 2019-05-15 2020-11-19 Shell Internationale Research Maatschappij B.V. Punch and inject tool for downhole casing and method for use thereof
IT201900014427A1 (en) * 2019-08-08 2021-02-08 Eni Spa METHOD OF SEALING A WELL.
US11827849B2 (en) 2019-08-13 2023-11-28 Xpand Oil & Gas Solutions, Llc Gas generating compositions and uses
EP4025666A1 (en) 2019-09-05 2022-07-13 Saudi Arabian Oil Company Propping open hydraulic fractures
US11370956B2 (en) 2019-12-18 2022-06-28 Saudi Arabian Oil Company Epoxy-based LCM compositions with controlled viscosity and methods of treating a lost circulation zone of a wellbore
US11332656B2 (en) 2019-12-18 2022-05-17 Saudi Arabian Oil Company LCM composition with controlled viscosity and cure time and methods of treating a lost circulation zone of a wellbore
US11193052B2 (en) 2020-02-25 2021-12-07 Saudi Arabian Oil Company Sealing compositions and methods of plugging and abandoning of a wellbore
US11236263B2 (en) 2020-02-26 2022-02-01 Saudi Arabian Oil Company Method of sand consolidation in petroleum reservoirs
US11453816B2 (en) 2020-07-06 2022-09-27 Saudi Arabian Oil Company Accelerated cement compositions and methods for treating lost circulation zones
US11939520B2 (en) 2020-08-12 2024-03-26 Saudi Arabian Oil Company Methods and cement compositions for reducing corrosion of wellbore casings
US11485894B2 (en) 2020-08-17 2022-11-01 Saudi Arabian Oil Company Accelerated cement compositions and methods for top-job cementing of a wellbore to reduce corrosion
US11661489B2 (en) 2020-08-19 2023-05-30 Saudi Arabian Oil Company Foamable resin composition for controlling loss circulation
US11618842B2 (en) 2020-09-08 2023-04-04 Saudi Arabian Oil Company Nanosized dendrimeric epoxy resin to prevent casing-casing annulus pressure issues
US11485898B2 (en) 2020-10-21 2022-11-01 Saudi Arabian Oil Company Environmentally friendly epoxidized vegetable oil based fatty acid esters to prevent loss circulation
US11492537B2 (en) 2021-04-07 2022-11-08 Saudi Arabian Oil Company Nanosized dendrimeric epoxy resin as a loss circulation material
US11827841B2 (en) 2021-12-23 2023-11-28 Saudi Arabian Oil Company Methods of treating lost circulation zones

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6073692A (en) * 1998-03-27 2000-06-13 Baker Hughes Incorporated Expanding mandrel inflatable packer

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3152641A (en) * 1960-01-11 1964-10-13 Sinclair Research Inc Method for polymerizing resin-forming materials in subterranean areas
US3170516A (en) * 1962-06-25 1965-02-23 Jersey Prod Res Co Method of plugging a well bore with a thermosetting resin
US3208530A (en) * 1964-09-14 1965-09-28 Exxon Production Research Co Apparatus for setting bridge plugs
US3958638A (en) * 1975-06-16 1976-05-25 Phillips Petroleum Company Method for altering the permeability of a subterranean formation
US4189002A (en) * 1978-07-07 1980-02-19 The Dow Chemical Company Method for rigless zone abandonment using internally catalyzed resin system
US4921047A (en) * 1989-08-10 1990-05-01 Conoco Inc. Composition and method for sealing permeable subterranean formations
US5343968A (en) * 1991-04-17 1994-09-06 The United States Of America As Represented By The United States Department Of Energy Downhole material injector for lost circulation control
US5276255A (en) * 1992-12-30 1994-01-04 Stark J Norman Cementitious encapsulation of waste materials and/or contaminated soils containing heavy metals, to render them immobile
US5873413A (en) * 1997-08-18 1999-02-23 Halliburton Energy Services, Inc. Methods of modifying subterranean strata properties
US6098711A (en) * 1998-08-18 2000-08-08 Halliburton Energy Services, Inc. Compositions and methods for sealing pipe in well bores
US6234251B1 (en) * 1999-02-22 2001-05-22 Halliburton Energy Services, Inc. Resilient well cement compositions and methods
ID30263A (en) * 1999-04-09 2001-11-15 Shell Int Research METHOD FOR CIRCLE SEALING
US6561269B1 (en) * 1999-04-30 2003-05-13 The Regents Of The University Of California Canister, sealing method and composition for sealing a borehole
US6444316B1 (en) * 2000-05-05 2002-09-03 Halliburton Energy Services, Inc. Encapsulated chemicals for use in controlled time release applications and methods
US7086460B2 (en) * 2003-07-14 2006-08-08 Halliburton Energy Services, Inc. In-situ filters, method of forming same and systems for controlling proppant flowback employing same
US7036586B2 (en) * 2004-01-30 2006-05-02 Halliburton Energy Services, Inc. Methods of cementing in subterranean formations using crack resistant cement compositions
US7156174B2 (en) * 2004-01-30 2007-01-02 Halliburton Energy Services, Inc. Contained micro-particles for use in well bore operations
US7246665B2 (en) * 2004-05-03 2007-07-24 Halliburton Energy Services, Inc. Methods of using settable compositions in a subterranean formation
US7886823B1 (en) * 2004-09-09 2011-02-15 Burts Jr Boyce D Well remediation using downhole mixing of encapsulated plug components

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6073692A (en) * 1998-03-27 2000-06-13 Baker Hughes Incorporated Expanding mandrel inflatable packer

Also Published As

Publication number Publication date
US20080289824A1 (en) 2008-11-27
US7886823B1 (en) 2011-02-15
US20080289826A1 (en) 2008-11-27
US20080264637A1 (en) 2008-10-30
US7409990B1 (en) 2008-08-12
US20090056946A1 (en) 2009-03-05
US7363976B1 (en) 2008-04-29
US20080277117A1 (en) 2008-11-13
US8235116B1 (en) 2012-08-07
US20080264638A1 (en) 2008-10-30
US7748455B2 (en) 2010-07-06

Similar Documents

Publication Publication Date Title
US20080289825A1 (en) Downhole Mixing Of Encapsulated Plug Components For Primary Cementing A Well
US6883609B2 (en) Permeable cements
US6668929B2 (en) Methods and oil-based settable spotting fluid compositions for cementing wells
US9957434B2 (en) Cementitious compositions comprising a non-aqueous fluid and an alkali-activated material
EP1112985B1 (en) Settable oil and gas well fluid compositions
EP2190942B1 (en) Methods of using colloidal silica based gels
US6716282B2 (en) Methods and oil-based settable spotting fluid compositions for cementing wells
US6666268B2 (en) Methods and oil-based settable drilling fluid compositions for drilling and cementing wells
US5398759A (en) Set retarded ultra fine cement compositions and methods
EP2118438B1 (en) Silicate-based wellbore fluid and methods for stabilizing unconsolidated formations
US9494012B2 (en) Foamed cement compositions containing metal silicides usable in subterranean well operations
EP0494739A2 (en) Directional drilling method
EP0572261A1 (en) Set retarded ultra fine cement compositions
EP1614669A1 (en) Reactive sealing compostions for hydrocarbon containing subterranean formations
WO2007003885A2 (en) Methods and materials for zonal isolation
AU2016258729B2 (en) Method of forming a subterranean gas storage vessel
MX2013012179A (en) Use of methylhydroxyethyl cellulose as cement additive.
US20220098467A1 (en) Combination of Fluid Loss Control Additive and Lost Circulation Materials to Control Losses in Formation
US5309997A (en) Well fluid for in-situ borehole repair
US5275511A (en) Method for installation of piles in offshore locations
US5896927A (en) Stabilizing and cementing lateral well bores
EP4206159A1 (en) Water proofing agents for sorel cement in horizontal well applications
JPH0317037B2 (en)

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION