US20070151173A1 - Method of constructing structures with seismically-isolated base - Google Patents

Method of constructing structures with seismically-isolated base Download PDF

Info

Publication number
US20070151173A1
US20070151173A1 US11/322,590 US32259005A US2007151173A1 US 20070151173 A1 US20070151173 A1 US 20070151173A1 US 32259005 A US32259005 A US 32259005A US 2007151173 A1 US2007151173 A1 US 2007151173A1
Authority
US
United States
Prior art keywords
rigid diaphragm
footings
barrier
construction
rigid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/322,590
Inventor
Boake Paugh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US11/322,590 priority Critical patent/US20070151173A1/en
Publication of US20070151173A1 publication Critical patent/US20070151173A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories

Definitions

  • This invention relates generally to a method of constructing structures with a seismically-isolated base, in particular, a method of constructing structures supported on base-isolation devices.
  • the building codes used in the U.S. were based on one of three model codes: the Building Officials and Code Administrators International, Inc. (BOCA) National Building Code (NBC); the Southern Building Code Congress International, Inc. (SBCCI) Standard Building Code (SBC); and International Conference of Building Official's Uniform Building Code (ICBO's UBC).
  • BOCA, ICBO and SBCCI recently formed the International Code Council® (ICC) and produced the International Building Code® (IBC), a single, unified family of building codes, for use throughout the U.S.
  • the three model codes were merged into one in an effort to integrate the most current earthquake knowledge and seismic design technology into the building codes.
  • BIDs Base isolation devices
  • BIDs are known for their ability to isolate building and structures from seismic activity or ground vibrations caused by heavy equipment. Most BIDs also damp the movement. BIDs are not limited to any particular physical structure but incorporate a variety of different mechanisms and means to accomplish their isolation and damping functions. BIDs are generally anchored to a footing or foundation from which they support the base of a structure. A rigid diaphragm often serves as the base of a building and generally includes a framed concrete slab with inlaid reinforcing steel bars (often referred to as “reinforcing steel ” or “rebars”), as shown in FIGS. 2 a - 2 f . In a seismically-isolated structure or building, the rigid diaphragm is designed to span between the BIDs and withstand vertical loads.
  • BIDs can be installed either during construction of a new structure or in retrofitting of an existing structure.
  • BIDS has often been limited to “critical structures” such as hospitals and selected government facilities, leaving most single family homes, low rise apartments and condominiums, particularly those of light wood frame construction in the Western United States, vulnerable to earthquake damage. This problem is compounded by the fact that construction methods for light wood frame structures follow generally similar formats. Since construction budgets and schedules are often closely monitored, the construction industry disfavors disruptions or deviations from those methods that would increase cost or prolong construction schedules even if they render the structure safer and more earthquake-proof.
  • Houses may be lifted for a number of reasons, including increasing crawl space, correcting for settling of soil below the house, elevating for flood protection and elevating for earthquake retrofitting.
  • Most houses are separated from their foundations, raised on hydraulic jacks, and held by temporary supports while a new or extended foundation is constructed below.
  • the size and number of jacks, as well as the number and layout of the temporary lifting beam or plate, depend on the size, shape and size of house being lifted.
  • elevating a structure such as a single family home, low rise apartments and condominiums, is known, the process can be expensive and dangerous.
  • Walls may crack during the move and detailed calculations of allowable bearing pressures should be made to ensure proper use of supporting beams or plates during the elevation process.
  • a popular guideline allows for lifting a house no more than 1/16 inch per day, the process can also be extremely time-consuming. As such, lifting an older house or building or one after construction has been completed for purposes of earthquake retrofitting, even if the house or building is smaller, can be logistically and/or economically prohibitive for the owner.
  • Access to the BIDS for inspection post installation is desirable to ensure the integrity of the BIDS over the lifetime of the building and after any significant seismic event.
  • the construction of basement or subbasement has often precluded the use of BIDS in almost all by the most crucial of newly constructed buildings.
  • the installation of BIDS in a new construction having a basement is possible, there is usually a significant increase in construction time and expenses stemming from the additional excavation and construction materials, such as for a subbasement to provide space and continued access to the BIDS and falsework to provide temporary support to the basement floor during construction.
  • a method of constructing a structure or building that allows for the installation of BIDs between with minimal deviations from generally known and accepted grading, ground preparation and construction practices and procedures.
  • the method should also avoid or at least minimize delays in construction of the structure above the base or foundation and minimize the risk of damage to the structure.
  • the method should facilitate use of known or readily available technology and means to accomplish the installation of BIDs so as to minimize labor, material, cost and time.
  • the present invention provides a seismically-isolated structure and a method of constructing same.
  • the seismically-isolated structure has a rigid diaphragm, a plurality of footings each positioned at least partially under the rigid diaphragm, and a plurality of base-isolation devices each positioned between a footing and the rigid diaphragm, wherein the rigid diaphragm was constructed in situ above the footings generally below its final elevation.
  • a barrier is positioned between the rigid diaphragm and at least the footings to prevent bonding between the rigid diaphragm and the footings.
  • the barrier which may be structural or chemical or a combination thereof, may also span between the footings if appropriate.
  • each footing is configured with a recessed formation that accommodates a lifting device, and a surface for mounting a base-isolation device.
  • each footing has a surface for mounting a base-isolation device, it is the rigid diaphragm this is configured with recessed formations to accommodate the lifting devices. In either embodiment, there is access to the base isolation device after installation for inspection and maintenance purposes.
  • the method of constructing a seismically-isolated structure includes providing footings in the ground, positioning a barrier between footings and a rigid diaphragm, constructing the rigid diaphragm on the barrier, elevating the rigid diaphragm, and installing base isolation devices between the footings and the rigid diaphragm.
  • the method includes pouring concrete of the rigid diaphragm on the barrier which may be structural, chemical or a combination thereof, to prevent bonding of the rigid diaphragm with at least the footings, if not also to prevent bonding with the ground spanning between the footings.
  • the method also includes constructing above the rigid diaphragm before elevating the rigid diaphragm and providing recessed formations in either the footings or the rigid diaphragm to accommodate lifting devices used to lift the rigid diaphragm.
  • the footings are configured to support the base isolation devices that are mounted below the rigid diaphragm and to allow access to the base isolation devices for inspection and maintenance subsequent to construction of the structure.
  • the present invention also provides for a structure having a basement that is built on a rigid diaphragm supported on base isolation devices. Footings and a concrete slab spanning therebetween form a subbasement surface on which a barrier is placed and the rigid diaphragm is formed thereon.
  • the present invention offers many advantages, including general adherence to known construction methods, costs and timelines for structures of comparable size and complexity, but provides for a structure that incorporates base-isolation devices for better adaptation against earthquakes or other types of seismic activity or ground vibrations.
  • FIG. 1 is a cross section view of one embodiment of construction with a seismically-isolated base in accordance with the present invention
  • FIG. 2 a is a top plan view of a known rigid diaphragm of the prior art
  • FIG. 2 b is a cross section view of one embodiment of the rigid diaphragm of FIG. 2 a taken along line 2 b - 2 b;
  • FIG. 2 c is a detailed view of a portion of the cross section view of FIG. 2 b.
  • FIG. 2 d is a cross section view of an alternative embodiment of the rigid diaphragm of FIG. 2 a;
  • FIG. 2 e is a detailed view of a portion of the cross-section view of FIG. 2 d;
  • FIG. 2 f is a perspective view of the rigid diaphragm of FIG. 2 d;
  • FIG. 3 a is a top plan view of the construction of FIG. 1 ;
  • FIG. 3 b is a detailed view of a portion of FIG. 3 , showing a rigid diaphragm and a barrier, each with a recessed formation, above a footing;
  • FIG. 4 is a cross section view of the construction of FIG. 1 before elevation of the rigid diaphragm, using a sheet barrier spanning the surface on which the rigid diaphragm is formed;
  • FIG. 5 is a cross section view of the construction of FIG. 1 , before elevation of the rigid diaphragm, using a granular barrier spanning the surface on which the rigid diaphragm is formed;
  • FIG. 6 is a cross section view of the construction of FIG. 1 , before elevation of the rigid diaphragm, using a combination of a chemical barrier and a granular barrier below the rigid diaphragm.
  • FIG. 7 a is a cross section view of a footing of FIG. 3 a , configured with a step, during construction of the rigid diaphragm;
  • FIG. 7 b is a cross section view of the footing of FIG. 7 a , showing the installation of a lifting device following removal of a filler element and an exposed barrier portion;
  • FIG. 7 c is a cross section view of the footing of FIG. 7 b , showing elevation of the rigid diaphragm and installation of a BID;
  • FIG. 8 a is a cross section view of a another footing of FIG. 3 a , that is below a recessed formation formed in the rigid diaphragm, showing installation of a lifting device;
  • FIG. 8 b is a cross section view of the footing of FIG. 8 a , showing elevation of the rigid diaphragm, removal of the barrier and installation of a BID;
  • FIG. 9 a is a cross section view of another embodiment of construction with a seismically-isolated basement in accordance with the present invention.
  • FIG. 9 b is a cross section view of the construction of FIG. 9 a before elevation of the rigid diaphragm.
  • FIG. 10 is a top plan view of the construction of FIG. 9 a.
  • FIG. 1 Shown in FIG. 1 is a construction site with a structure S constructed in accordance with the present invention.
  • the structure S has a rigid diaphragm 12 that is supported on a plurality of base isolation devices (BIDs) 14 , which in turn are supported on footings 16 positioned in ground 18 .
  • BIDs base isolation devices
  • the structure S is generally isolated from seismic activity or vibration that occurs in the ground 18 surrounding the footings 16 .
  • the rigid diaphragm 12 is a structure that is rigid in its own plane. As illustrated in FIGS. 2 a - 2 e , rigid diaphragms 12 of the prior art are generally rectangular and constructed of concrete 20 with reinforcing steel 22 . FIGS. 2 b and 2 c show one embodiment and FIGS. 2 d and 2 e show another embodiment. It is understood by one of ordinary skill in the art that the rigid diaphragm may be configured differently and be reinforced with different materials.
  • a suitable construction of a rigid diaphragm may be a post-tensioned concrete slab where post-tensioning is a method of reinforcing concrete, masonry, and other structural elements by prestressing during their construction phase for the purpose of counteracting the anticipated external loads that they will encounter.
  • the rigid diaphragm is designed to carry a dead load (weight of rigid diaphragm itself and structure(s) thereon) and live loads (people and their property on the rigid diaphragm and structure), as well as horizontal loads from wind or seismic forces applied to the structure
  • a dead load weight of rigid diaphragm itself and structure(s) thereon
  • live loads people and their property on the rigid diaphragm and structure
  • the ground 18 and rough grading thereof at the construction site generally around and below the structure S are prepared using conventional engineering and construction methods.
  • the footings 16 are constructed using conventional engineering and construction methods.
  • the footings have a size, configuration and strength (including load bearing ability) adapted for the subsequent installation and use of BIDs 14 and lifting devices.
  • the footings 16 of this disclosed embodiment have a generally rectangular cross section and are discontinuous from each other in block form. Referring also to FIG. 3 a , a footing 16 is positioned generally under each corner 30 of the rigid diaphragm 12 and along edge 31 of the rigid diaphragm.
  • the footings can be described as being positioned within the “field” of the rigid diaphragm, such as where there is sufficient overlap between the rigid diaphragm and each of the footings for each footing to simultaneously accommodate at least a lifting device and a BID, as discussed below in further detail.
  • the footing 16 may have a different cross-section, for example, a circular cross-section, and they may also be continuous and extend along below opposing edges of the rigid diaphragm.
  • the footings 16 a and 16 f may be connected and footings 16 c and 16 d may be connected.
  • the footings may be positioned anywhere underneath the rigid diaphragm so long as they remain accessible for installation and removal of the lifting devices and BIDs as discussed further below.
  • the width of the footing may be substantially greater than the width of vertical walls 32 above it (see FIG. 1 ).
  • each footing 16 is constructed with sufficient strength or load bearing ability at the placement of a BID 14 so that it can bear horizontal and verticals loads, the latter including at least the vertical load of the BID, as well as the respective vertical load of the structure S borne by the BID.
  • each footing is formed with a generally flat upper surface 34 on which a BID can be mounted to the underside of the rigid diaphragm 12 at a corner 30 or an edge 31 .
  • BIDs are not limited to any particular type or structure since a variety of devices that provide seismic isolation and damping are known.
  • Known BIDs and the like include those disclosed in U.S. Pat. Nos. 6,324,795, 6,318,031, 5,970,666, 4,942,703 and/or 4,644,714, the entire contents of which are incorporated by reference herein.
  • the rigid diaphragm 12 of the structure S is well supported from below by a plurality of BIDs each of which is generally centrally supported on a footing. Each footing has a portion that is directly below the rigid diaphragm. As described below in further detail, the rigid diaphragm is formed in situ at an elevation near is its final elevation so as to minimize the construction labor, time and cost involved in rendering the structure S less susceptible to earthquake damage.
  • a method of construction of the structure S begins with preparation of the ground 18 , including rough grading to a selected height h, as shown in FIG. 1 .
  • Excavations 36 and other preparations are made in the ground for the formation or placement of the footings 16 .
  • concrete is poured into framed excavations to form the footings 16 , although it is understood that the footings 16 may be formed elsewhere and transported to the excavations 36 .
  • the flat surfaces 34 of the footings 16 are formed to be generally level with the ground 18 at height h such that the ground 18 and the flat surfaces 34 form a generally flat supporting surface 38 for the formation of the rigid diaphragm 12 , as described further below.
  • the surfaces 34 of the footings may also be above or below the grade 18 as desired or appropriate.
  • a barrier or bond breaker 40 is placed on at least the flat surfaces 34 of the footings 16 .
  • the barrier may be structural or chemical in nature, or a combination thereof, and depending on factors including the type of barrier used and the type of ground spanning between the footings, the barrier may cover not only the flat surfaces 34 but the generally flat supporting surface 38 defined by the both the flat surfaces 34 of the footings and the ground 18 spanning therebetween.
  • the barrier 40 serves to separate the rigid diaphragm 12 from at least the footing 16 , if not also the ground 18 when appropriate, and prevents formation of bonds therebetween. Where the ground spanning between the footings has dirt or debris or is otherwise of a nature that does not bond significantly with concrete, the barrier need not cover the ground.
  • the barrier 40 prevents adhesion between the rigid diaphragm 12 and the footing 18 and/or the ground 18 while the concrete cures.
  • the barrier 40 may be a tarp 40 ′ ( FIG. 4 ), for example, a 2-3 mm thick polyethylene sheet, sheets of plywood or steel plates 40 a and 40 b ( FIG. 3 ), sand, gravel or other granular particles 40 ′′ ( FIG. 4 ).
  • the present invention allows the rigid diaphragm 12 to be advantageously formed in situ. That is, the rigid diaphragm 12 is formed above the footing 16 and a relatively minimal distance below its final elevation in the completed structure, where the ground 18 and the footing 16 advantageously serve as the supporting surface 38 for the rigid diaphragm 12 during its formation and curing. As such, the rigid diaphragm need not be transported from a remote location nor is temporary falsework needed to support the rigid diaphragm while it cures, which minimizes disruption to construction schedules and limits additional construction costs.
  • construction of the structure S on the rigid diaphragm 12 can begin as soon as about one day after pouring of the concrete of the rigid diaphragm 12 so long as the concrete of the rigid diaphragm has reached sufficient strength to support the load of such construction.
  • construction of the structure S on the rigid diaphragm 12 can begin before the rigid diaphragm has reached its designated or allowable strength (which includes not only the strength to support the load of such construction and other vertical and horizontal loads, but to withstand carrying such loads “on points”, that is to be supported at localized areas only, for example, only by its corners and edge regions).
  • the rigid diaphragms such as those that are formed at another location, such rigid diaphragms are generally not transported until they can withstand at least the stress and strain of being lifted and moved.
  • such rigid diaphragms are typically not placed on “points” until well into their curing period.
  • the rigid diaphragm 12 of the present invention need not be transported from a remote location (and therefore avoids the delay in waiting for the concrete to cure sufficiently to be able to endure such transport), and construction of the structure S can begin well before the rigid diaphragm 12 reaches its designated or allowable strength. Accordingly, construction of the vertical walls 32 or other structures above the rigid diaphragm may begin generally after about one day after pouring of the concrete of the rigid diaphragm 12 , so long as the concrete has cured to sufficient strength to carry the load of such construction. Moreover, construction of the structure S may continue on the rigid diaphragm 12 while the rigid diaphragm 12 cures to its designed or allowable strength, which may take about 28 days or more. In accordance with the present invention, the surface 38 supporting the rigid diaphragm enables such early construction.
  • lifting devices 42 are used to elevate (elevate, raise and lift, used interchangeably herein) the rigid diaphragm for installation of the BIDs 14 between the footings 16 and the rigid diaphragm 12 .
  • Hydraulic or mechanical lifting devices are known, particularly those used to lift structures and buildings. Suitable systems, including the Synchronous Lifting Systems 4-to-64 Point, are available from Enerpac Hydraulic Technology (Milwaukee, Wis.).
  • Use of the barrier 40 between at least the rigid diaphragm 12 and the footing 16 allows the rigid diaphragm 12 to be readily separated from the footings 16 and lifted by such hydraulic or mechanical lifting devices.
  • the lifting devices 42 are placed under the rigid diaphragm 12 generally around its corner and edge regions 30 and 31 , as shown in FIG. 3 a .
  • Recessed formations 60 and 61 are formed in either the footings or the rigid diaphragm to accommodate the lifting devices.
  • a step 60 c FIGS. 7 a , 7 b and 7 c ) can be provided in footing 16 c to provide a cavity 63 c between the footing 16 c and the rigid diaphragm 12 to receive a lifting device 42 c .
  • the recessed formation is created by any suitable means, as understood by one of ordinary skill in the art, when the footing is formed. As shown in FIG.
  • the step 60 c has a width that is less than half of the coextensive dimension of the footing, and a length that extends at least beyond the edge 31 of the rigid diaphragm, if not completely to the outer edge of the footing. This configuration allows the cavity to be readily accessible from the perimeter of the rigid diaphragm.
  • the cavity 63 c may be occupied by a filler element 70 c (e.g., a wooden, styrofoam or plywood block) to support the barrier and the rigid diaphragm and/or to act as a barrier (if its material is suitably nonadhesive to concrete) and prevent concrete from the rigid diaphragm from entering or settling in the cavity.
  • a filler element 70 c e.g., a wooden, styrofoam or plywood block
  • the filler element 70 c may be unnecessary. But if the barrier is nonrigid, such as a tarp, the filler element 70 c should be placed inside the cavity 63 c to occupy it and to support the barrier and the rigid diaphragm.
  • the filler element 70 c is first removed from the cavity 63 c . Because the step 60 c in the illustrated embodiment extends to the outer edge of the footing 16 c , this is accomplished easily by sliding the filler element 70 c outwardly from the cavity until the filler element clears the perimeters of the rigid diaphragm 12 and the barrier 40 . Any portion of the barrier 40 under the rigid diaphragm that is exposed in the cavity 63 c can be removed (e.g., by cutting, sawing, tearing, dissolving, etc.) to expose the underside of the rigid diaphragm.
  • the lifting device 42 c is then placed on the step 60 c of the footing 12 c under the rigid diaphragm 12 and actuated to raise the rigid diaphragm 12 to at least its final elevation or higher, as shown in FIG. 7 b .
  • a BID 14 c is installed between the rigid diaphragm 12 and the surface 34 c of the footing 16 c and the lifting device 42 c is removed from the cavity.
  • the step 60 c is sized to allow removal of the filler element and the barrier from the cavity and to allow installation, operation and removal of the lifting device 42 c.
  • FIG. 8 a illustrates a recessed formation 61 , such as a pocket 61 a , formed in the edge 31 of the rigid diaphragm 12 .
  • a bridge member 68 e.g., a reaction beam 69 a , traverses the pocket 61 a and provides a location under which the lifting device 42 a is positioned to raise the rigid diaphragm 12 .
  • the reaction beam 69 a is anchored (temporarily or permanently) to the rigid diaphragm 12 at generally opposing locations across the pocket 60 a .
  • the lifting device 42 a is then actuated to raise the rigid diaphragm 12 to at least its final elevation or higher, as shown in FIG. 8 b , at which time the barrier 40 is freed for removal.
  • the recessed formation may also be a hole 61 ′ in the rigid diaphragm 12 , as shown in broken lines in FIG. 3 b.
  • the barrier 40 in this embodiment can be configured with its own pocket to follow the outline of the pocket 61 of the rigid diaphragm 12 so that the upper surface 34 of the footing 16 is exposed. Accordingly, the barrier 40 is not pinned under the lifting device 42 after the rigid diaphragm 12 is lifted, allowing the barrier 40 to be removed.
  • a BID 14 is installed between the rigid diaphragm and the surface 34 of the footing 16 .
  • a crawl space 48 of height H spanning at least the height of the BIDs is formed between the ground 18 and the rigid diaphragm 12 .
  • Additional foundations 52 near the footings 16 and the edge of the rigid diaphragm 12 can be provided as desired or appropriate, along with flashings 80 to cover any seismic gap between the structure and the grading and foundation.
  • FIG. 1 has the structure S supported on the rigid diaphragm 12 that is generally isolated from seismic activity or vibration in the ground 18 .
  • the BIDs 14 isolate the rigid diaphragm 12 and the structure S from seismic forces in the ground 18 .
  • the BIDs 14 may be inspected via the crawl space 48 .
  • FIG. 9 a An alternative embodiment of a structure S' built in accordance with the present invention is shown in FIG. 9 a .
  • the structure includes a subbasement SB below ground level with subterranean retaining vertical walls 100 , and footings 116 and concrete ground slabs 118 therebetween to line the subbasement.
  • upper surface 134 of the footings 116 and the concrete slabs 118 form a generally flat surface 138 on which a rigid diaphragm 112 can be formed.
  • FIG. 9 a An alternative embodiment of a structure S' built in accordance with the present invention is shown in FIG. 9 a .
  • the foregoing description generally applies for elements with similar reference numerals.
  • the structure includes a subbasement SB below ground level with subterranean retaining vertical walls 100 , and footings 116 and concrete ground slabs 118 therebetween to line the subbasement.
  • upper surface 134 of the footings 116 and the concrete slabs 118 form a generally flat surface 138
  • a barrier 140 is placed on top of the generally flat surface 134 to prevent adhesion between the surface 138 and the rigid diaphragm 112 and concrete is poured on the barrier to form the rigid diaphragm.
  • construction above the rigid diaphragm 112 e.g., vertical walls 132
  • the rigid diaphragm When the rigid diaphragm has reached is designed strength or when it can support the vertical and horizontal loads placed on it the rigid diaphragm can be lifted in the aforementioned manner by lifting devices 142 that are accommodated by recessed formations including either steps 160 in the footings or pockets 161 in the rigid diaphragm for the removal of the barrier 140 and the installation of the BIDs 114 (see FIG. 10 ) As such, the structure S′, inclusive of its basement, is isolated from seismic activity or vibration in the ground. A crawl space 148 allows inspection of the BIDs.

Abstract

A seismically isolated structure and a method of constructing same provide a rigid diaphragm, a plurality of footings each positioned at least partially under the rigid diaphragm, and a plurality of base isolation devices each positioned between a footing and the rigid diaphragm, wherein the rigid diaphragm was constructed in situ above the footings generally below its final elevation. A barrier is positioned between the rigid diaphragm and at least the footings to prevent bonding between the rigid diaphragm and the footings. The barrier, which may be structural or chemical or a combination thereof, may also span between the footings if appropriate.

Description

    FIELD OF INVENTION
  • This invention relates generally to a method of constructing structures with a seismically-isolated base, in particular, a method of constructing structures supported on base-isolation devices.
  • BACKGROUND OF INVENTION
  • The building codes used in the U.S. were based on one of three model codes: the Building Officials and Code Administrators International, Inc. (BOCA) National Building Code (NBC); the Southern Building Code Congress International, Inc. (SBCCI) Standard Building Code (SBC); and International Conference of Building Official's Uniform Building Code (ICBO's UBC). However, BOCA, ICBO and SBCCI recently formed the International Code Council® (ICC) and produced the International Building Code® (IBC), a single, unified family of building codes, for use throughout the U.S. The three model codes were merged into one in an effort to integrate the most current earthquake knowledge and seismic design technology into the building codes.
  • Scientists began studying earthquakes as early as 1880, but gathering meaningful and accurate seismic activity data proved difficult due to the irregularity of earthquake events and long intervals of inactivity therebetween. Only the more recent 1971 San Fernando earthquake and 1979 Imperial Valley earthquake helped develop a better understanding of building behavior and the effects of earthquakes on buildings.
  • It is now appreciated that it costs much less to prepare for earthquakes than it does to repair the damage afterward. According to research by National Earthquake Hazards Reduction Program (NEHRP), the costs of providing seismic-resistant features for the protection of life rarely exceed two percent of the construction costs for new buildings. However, the focus o n building safety measures has been more toward preventing fatalities than preventing structural damage. For example, Section 1626.1 of the 1997 UBC states that the purpose of the earthquake provisions is primarily to safeguard against major structural failures and loss of life, not to limit damage or maintain function. Similarly, the 1997 NEHRP indicates that its design earthquake ground motion levels could result in both nonstructural and structural damage. In fact, engineers recognize that new buildings could sustain so much damage in a severe earthquake that they may have to be demolished and rebuilt, yet still not collapse. While there is no question that there exist the necessary engineering expertise and technology to design and build highly earthquake-resistant structures, the cost would be prohibitive. As such, economic considerations have been balanced against minimum safety levels.
  • Base isolation devices (“BIDs”) are known for their ability to isolate building and structures from seismic activity or ground vibrations caused by heavy equipment. Most BIDs also damp the movement. BIDs are not limited to any particular physical structure but incorporate a variety of different mechanisms and means to accomplish their isolation and damping functions. BIDs are generally anchored to a footing or foundation from which they support the base of a structure. A rigid diaphragm often serves as the base of a building and generally includes a framed concrete slab with inlaid reinforcing steel bars (often referred to as “reinforcing steel ” or “rebars”), as shown in FIGS. 2 a-2 f. In a seismically-isolated structure or building, the rigid diaphragm is designed to span between the BIDs and withstand vertical loads.
  • BIDs can be installed either during construction of a new structure or in retrofitting of an existing structure. However, the use of BIDS has often been limited to “critical structures” such as hospitals and selected government facilities, leaving most single family homes, low rise apartments and condominiums, particularly those of light wood frame construction in the Western United States, vulnerable to earthquake damage. This problem is compounded by the fact that construction methods for light wood frame structures follow generally similar formats. Since construction budgets and schedules are often closely monitored, the construction industry disfavors disruptions or deviations from those methods that would increase cost or prolong construction schedules even if they render the structure safer and more earthquake-proof.
  • Methods for raising structures, including buildings and houses are also known. Houses may be lifted for a number of reasons, including increasing crawl space, correcting for settling of soil below the house, elevating for flood protection and elevating for earthquake retrofitting. During the elevation process, most houses are separated from their foundations, raised on hydraulic jacks, and held by temporary supports while a new or extended foundation is constructed below. The size and number of jacks, as well as the number and layout of the temporary lifting beam or plate, depend on the size, shape and size of house being lifted. Thus, while elevating a structure, such as a single family home, low rise apartments and condominiums, is known, the process can be expensive and dangerous. Walls may crack during the move and detailed calculations of allowable bearing pressures should be made to ensure proper use of supporting beams or plates during the elevation process. Moreover, since a popular guideline allows for lifting a house no more than 1/16 inch per day, the process can also be extremely time-consuming. As such, lifting an older house or building or one after construction has been completed for purposes of earthquake retrofitting, even if the house or building is smaller, can be logistically and/or economically prohibitive for the owner.
  • Access to the BIDS for inspection post installation is desirable to ensure the integrity of the BIDS over the lifetime of the building and after any significant seismic event. As such, the construction of basement or subbasement has often precluded the use of BIDS in almost all by the most crucial of newly constructed buildings. While the installation of BIDS in a new construction having a basement is possible, there is usually a significant increase in construction time and expenses stemming from the additional excavation and construction materials, such as for a subbasement to provide space and continued access to the BIDS and falsework to provide temporary support to the basement floor during construction.
  • Accordingly, there is a desire for a method of constructing a structure or building that allows for the installation of BIDs between with minimal deviations from generally known and accepted grading, ground preparation and construction practices and procedures. The method should also avoid or at least minimize delays in construction of the structure above the base or foundation and minimize the risk of damage to the structure. Moreover, the method should facilitate use of known or readily available technology and means to accomplish the installation of BIDs so as to minimize labor, material, cost and time.
  • SUMMARY OF THE INVENTION
  • The present invention provides a seismically-isolated structure and a method of constructing same. The seismically-isolated structure has a rigid diaphragm, a plurality of footings each positioned at least partially under the rigid diaphragm, and a plurality of base-isolation devices each positioned between a footing and the rigid diaphragm, wherein the rigid diaphragm was constructed in situ above the footings generally below its final elevation. To that end, a barrier is positioned between the rigid diaphragm and at least the footings to prevent bonding between the rigid diaphragm and the footings. The barrier, which may be structural or chemical or a combination thereof, may also span between the footings if appropriate. In one embodiment, each footing is configured with a recessed formation that accommodates a lifting device, and a surface for mounting a base-isolation device. In another embodiment, whereas each footing has a surface for mounting a base-isolation device, it is the rigid diaphragm this is configured with recessed formations to accommodate the lifting devices. In either embodiment, there is access to the base isolation device after installation for inspection and maintenance purposes.
  • The method of constructing a seismically-isolated structure includes providing footings in the ground, positioning a barrier between footings and a rigid diaphragm, constructing the rigid diaphragm on the barrier, elevating the rigid diaphragm, and installing base isolation devices between the footings and the rigid diaphragm. The method includes pouring concrete of the rigid diaphragm on the barrier which may be structural, chemical or a combination thereof, to prevent bonding of the rigid diaphragm with at least the footings, if not also to prevent bonding with the ground spanning between the footings. The method also includes constructing above the rigid diaphragm before elevating the rigid diaphragm and providing recessed formations in either the footings or the rigid diaphragm to accommodate lifting devices used to lift the rigid diaphragm. Moreover, the footings are configured to support the base isolation devices that are mounted below the rigid diaphragm and to allow access to the base isolation devices for inspection and maintenance subsequent to construction of the structure.
  • The present invention also provides for a structure having a basement that is built on a rigid diaphragm supported on base isolation devices. Footings and a concrete slab spanning therebetween form a subbasement surface on which a barrier is placed and the rigid diaphragm is formed thereon.
  • The present invention offers many advantages, including general adherence to known construction methods, costs and timelines for structures of comparable size and complexity, but provides for a structure that incorporates base-isolation devices for better adaptation against earthquakes or other types of seismic activity or ground vibrations.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • These and other features and advantages of the present invention will be better understood by reference to the following detailed description when considered in conjunction with the accompanying drawings wherein:
  • FIG. 1 is a cross section view of one embodiment of construction with a seismically-isolated base in accordance with the present invention;
  • FIG. 2 a is a top plan view of a known rigid diaphragm of the prior art
  • FIG. 2 b is a cross section view of one embodiment of the rigid diaphragm of FIG. 2 a taken along line 2 b-2 b;
  • FIG. 2 c is a detailed view of a portion of the cross section view of FIG. 2 b.
  • FIG. 2 d is a cross section view of an alternative embodiment of the rigid diaphragm of FIG. 2 a;
  • FIG. 2 e is a detailed view of a portion of the cross-section view of FIG. 2 d;
  • FIG. 2 f is a perspective view of the rigid diaphragm of FIG. 2 d;
  • FIG. 3 a is a top plan view of the construction of FIG. 1;
  • FIG. 3 b is a detailed view of a portion of FIG. 3, showing a rigid diaphragm and a barrier, each with a recessed formation, above a footing;
  • FIG. 4 is a cross section view of the construction of FIG. 1 before elevation of the rigid diaphragm, using a sheet barrier spanning the surface on which the rigid diaphragm is formed;
  • FIG. 5 is a cross section view of the construction of FIG. 1, before elevation of the rigid diaphragm, using a granular barrier spanning the surface on which the rigid diaphragm is formed;
  • FIG. 6 is a cross section view of the construction of FIG. 1, before elevation of the rigid diaphragm, using a combination of a chemical barrier and a granular barrier below the rigid diaphragm.
  • FIG. 7 a is a cross section view of a footing of FIG. 3 a, configured with a step, during construction of the rigid diaphragm;
  • FIG. 7 b is a cross section view of the footing of FIG. 7 a, showing the installation of a lifting device following removal of a filler element and an exposed barrier portion;
  • FIG. 7 c is a cross section view of the footing of FIG. 7 b, showing elevation of the rigid diaphragm and installation of a BID;
  • FIG. 8 a is a cross section view of a another footing of FIG. 3 a, that is below a recessed formation formed in the rigid diaphragm, showing installation of a lifting device;
  • FIG. 8 b is a cross section view of the footing of FIG. 8 a, showing elevation of the rigid diaphragm, removal of the barrier and installation of a BID; and
  • FIG. 9 a. is a cross section view of another embodiment of construction with a seismically-isolated basement in accordance with the present invention;
  • FIG. 9 b is a cross section view of the construction of FIG. 9 a before elevation of the rigid diaphragm; and
  • FIG. 10 is a top plan view of the construction of FIG. 9 a.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Shown in FIG. 1 is a construction site with a structure S constructed in accordance with the present invention. The structure S has a rigid diaphragm 12 that is supported on a plurality of base isolation devices (BIDs) 14, which in turn are supported on footings 16 positioned in ground 18. As such, the structure S is generally isolated from seismic activity or vibration that occurs in the ground 18 surrounding the footings 16.
  • As understood by one of ordinary skill in the art, the rigid diaphragm 12 is a structure that is rigid in its own plane. As illustrated in FIGS. 2 a-2 e, rigid diaphragms 12 of the prior art are generally rectangular and constructed of concrete 20 with reinforcing steel 22. FIGS. 2 b and 2 c show one embodiment and FIGS. 2 d and 2 e show another embodiment. It is understood by one of ordinary skill in the art that the rigid diaphragm may be configured differently and be reinforced with different materials. For example, another suitable construction of a rigid diaphragm may be a post-tensioned concrete slab where post-tensioning is a method of reinforcing concrete, masonry, and other structural elements by prestressing during their construction phase for the purpose of counteracting the anticipated external loads that they will encounter. Regardless of the embodiment, the rigid diaphragm is designed to carry a dead load (weight of rigid diaphragm itself and structure(s) thereon) and live loads (people and their property on the rigid diaphragm and structure), as well as horizontal loads from wind or seismic forces applied to the structure A nonlimiting example of a suitable embodiment of a rigid diaphragm for use as a floor or base of the structure S is illustrated in FIG. 2 f.
  • Referring to back to FIG. 1, the ground 18 and rough grading thereof at the construction site generally around and below the structure S are prepared using conventional engineering and construction methods. The footings 16 are constructed using conventional engineering and construction methods. The footings have a size, configuration and strength (including load bearing ability) adapted for the subsequent installation and use of BIDs 14 and lifting devices. The footings 16 of this disclosed embodiment have a generally rectangular cross section and are discontinuous from each other in block form. Referring also to FIG. 3 a, a footing 16 is positioned generally under each corner 30 of the rigid diaphragm 12 and along edge 31 of the rigid diaphragm. In more general terms, the footings can be described as being positioned within the “field” of the rigid diaphragm, such as where there is sufficient overlap between the rigid diaphragm and each of the footings for each footing to simultaneously accommodate at least a lifting device and a BID, as discussed below in further detail. As understood by one of ordinary skill in the art, the footing 16 may have a different cross-section, for example, a circular cross-section, and they may also be continuous and extend along below opposing edges of the rigid diaphragm. For example, in FIG. 3 a, the footings 16 a and 16 f may be connected and footings 16 c and 16 d may be connected. Moreover, the footings may be positioned anywhere underneath the rigid diaphragm so long as they remain accessible for installation and removal of the lifting devices and BIDs as discussed further below. In accordance with conventional construction methods, the width of the footing may be substantially greater than the width of vertical walls 32 above it (see FIG. 1).
  • As shown in FIG. 1, each footing 16 is constructed with sufficient strength or load bearing ability at the placement of a BID 14 so that it can bear horizontal and verticals loads, the latter including at least the vertical load of the BID, as well as the respective vertical load of the structure S borne by the BID. To that end, each footing is formed with a generally flat upper surface 34 on which a BID can be mounted to the underside of the rigid diaphragm 12 at a corner 30 or an edge 31.
  • It is understood by one of ordinary skill in the art that the BIDs are not limited to any particular type or structure since a variety of devices that provide seismic isolation and damping are known. Known BIDs and the like include those disclosed in U.S. Pat. Nos. 6,324,795, 6,318,031, 5,970,666, 4,942,703 and/or 4,644,714, the entire contents of which are incorporated by reference herein.
  • As shown in FIG. 3 a, the rigid diaphragm 12 of the structure S is well supported from below by a plurality of BIDs each of which is generally centrally supported on a footing. Each footing has a portion that is directly below the rigid diaphragm. As described below in further detail, the rigid diaphragm is formed in situ at an elevation near is its final elevation so as to minimize the construction labor, time and cost involved in rendering the structure S less susceptible to earthquake damage.
  • In accordance with the present invention, a method of construction of the structure S begins with preparation of the ground 18, including rough grading to a selected height h, as shown in FIG. 1. Excavations 36 and other preparations are made in the ground for the formation or placement of the footings 16. Generally, concrete is poured into framed excavations to form the footings 16, although it is understood that the footings 16 may be formed elsewhere and transported to the excavations 36. The flat surfaces 34 of the footings 16 are formed to be generally level with the ground 18 at height h such that the ground 18 and the flat surfaces 34 form a generally flat supporting surface 38 for the formation of the rigid diaphragm 12, as described further below. However, it is understood by one of ordinary skill in the art that the surfaces 34 of the footings may also be above or below the grade 18 as desired or appropriate.
  • When the footings 16 have sufficiently cured or are otherwise at a stage where they have reached a sufficient strength or load bearing ability, the rigid diaphragm 12 may be formed above it. In accordance with the present invention, a barrier or bond breaker 40 is placed on at least the flat surfaces 34 of the footings 16. The barrier may be structural or chemical in nature, or a combination thereof, and depending on factors including the type of barrier used and the type of ground spanning between the footings, the barrier may cover not only the flat surfaces 34 but the generally flat supporting surface 38 defined by the both the flat surfaces 34 of the footings and the ground 18 spanning therebetween.
  • Because the rigid diaphragm 12 is formed on the supporting surface 38, the barrier 40 serves to separate the rigid diaphragm 12 from at least the footing 16, if not also the ground 18 when appropriate, and prevents formation of bonds therebetween. Where the ground spanning between the footings has dirt or debris or is otherwise of a nature that does not bond significantly with concrete, the barrier need not cover the ground.
  • In particular, where the rigid diaphragm 12 is formed from concrete poured in situ (that is, poured on site onto the barrier 40, above the footings 16 and the ground 18), the barrier 40 prevents adhesion between the rigid diaphragm 12 and the footing 18 and/or the ground 18 while the concrete cures. The barrier 40 may be a tarp 40′ (FIG. 4), for example, a 2-3 mm thick polyethylene sheet, sheets of plywood or steel plates 40 a and 40 b (FIG. 3), sand, gravel or other granular particles 40″ (FIG. 5), chemical coating (e.g., a bond-breaker) or sealant 40′″ that is brushed, poured, sprayed, spread and/or otherwise applied to the surface 38 of the footings 16, and/or combinations of the foregoing (FIG. 6), that can prevent adhesion of the concrete of the rigid diaphragm 12 to the footing 16 and the ground 18 but still provide the generally flat support surface 38. It is understood by one of ordinary skill in the art that multiple plywood, plates or tarps may be adjoining or nonadjoining depending on the nature of the support surface 38. It may also be preferable for the barrier 40 spanning the surface 38 to have a generally uniform thickness, or provide a generally a flat surface 38.
  • Regardless of the type(s) of barrier used, the present invention allows the rigid diaphragm 12 to be advantageously formed in situ. That is, the rigid diaphragm 12 is formed above the footing 16 and a relatively minimal distance below its final elevation in the completed structure, where the ground 18 and the footing 16 advantageously serve as the supporting surface 38 for the rigid diaphragm 12 during its formation and curing. As such, the rigid diaphragm need not be transported from a remote location nor is temporary falsework needed to support the rigid diaphragm while it cures, which minimizes disruption to construction schedules and limits additional construction costs.
  • Many variables affect the length of time a concrete slab needs to cure and the length of time during which curing can be expected. Some of the more common variables include cement—water mix ratio, cement-sand ratio, particle size distribution, presence of accelerators, curing compounds, environmental conditions, location of vapor membrane, and exposure to water during curing. Notwithstanding these numerous factors, a typical period for the concrete to cure may be a minimum of 28 days under normal conditions. However, in accordance with the present invention, construction of the structure S on the rigid diaphragm 12 can begin as soon as about one day after pouring of the concrete of the rigid diaphragm 12 so long as the concrete of the rigid diaphragm has reached sufficient strength to support the load of such construction.
  • In keeping with the present invention, construction of the structure S on the rigid diaphragm 12 can begin before the rigid diaphragm has reached its designated or allowable strength (which includes not only the strength to support the load of such construction and other vertical and horizontal loads, but to withstand carrying such loads “on points”, that is to be supported at localized areas only, for example, only by its corners and edge regions). With conventional rigid diaphragms such as those that are formed at another location, such rigid diaphragms are generally not transported until they can withstand at least the stress and strain of being lifted and moved. Moreover, such rigid diaphragms are typically not placed on “points” until well into their curing period.
  • In contrast, the rigid diaphragm 12 of the present invention need not be transported from a remote location (and therefore avoids the delay in waiting for the concrete to cure sufficiently to be able to endure such transport), and construction of the structure S can begin well before the rigid diaphragm 12 reaches its designated or allowable strength. Accordingly, construction of the vertical walls 32 or other structures above the rigid diaphragm may begin generally after about one day after pouring of the concrete of the rigid diaphragm 12, so long as the concrete has cured to sufficient strength to carry the load of such construction. Moreover, construction of the structure S may continue on the rigid diaphragm 12 while the rigid diaphragm 12 cures to its designed or allowable strength, which may take about 28 days or more. In accordance with the present invention, the surface 38 supporting the rigid diaphragm enables such early construction.
  • After the rigid diaphragm 12 has reached its designed or allowable strength, for example, about 28 days or so, but typically before construction of the structure S is completed, lifting devices 42 are used to elevate (elevate, raise and lift, used interchangeably herein) the rigid diaphragm for installation of the BIDs 14 between the footings 16 and the rigid diaphragm 12. Hydraulic or mechanical lifting devices are known, particularly those used to lift structures and buildings. Suitable systems, including the Synchronous Lifting Systems 4-to-64 Point, are available from Enerpac Hydraulic Technology (Milwaukee, Wis.). Use of the barrier 40 between at least the rigid diaphragm 12 and the footing 16 allows the rigid diaphragm 12 to be readily separated from the footings 16 and lifted by such hydraulic or mechanical lifting devices.
  • To lift the rigid diaphragm, the lifting devices 42 are placed under the rigid diaphragm 12 generally around its corner and edge regions 30 and 31, as shown in FIG. 3 a. Recessed formations 60 and 61 are formed in either the footings or the rigid diaphragm to accommodate the lifting devices. For example, a step 60 c (FIGS. 7 a, 7 b and 7 c) can be provided in footing 16 c to provide a cavity 63 c between the footing 16 c and the rigid diaphragm 12 to receive a lifting device 42 c. The recessed formation is created by any suitable means, as understood by one of ordinary skill in the art, when the footing is formed. As shown in FIG. 3 a, the step 60 c has a width that is less than half of the coextensive dimension of the footing, and a length that extends at least beyond the edge 31 of the rigid diaphragm, if not completely to the outer edge of the footing. This configuration allows the cavity to be readily accessible from the perimeter of the rigid diaphragm.
  • Before the barrier 40 is placed on the footing 16 c and construction of the rigid diaphragm 12, the cavity 63 c may be occupied by a filler element 70 c (e.g., a wooden, styrofoam or plywood block) to support the barrier and the rigid diaphragm and/or to act as a barrier (if its material is suitably nonadhesive to concrete) and prevent concrete from the rigid diaphragm from entering or settling in the cavity. If the barrier 40 is plywood or a steel plate that is sufficiently rigid to support the rigid diaphragm, the filler element 70 c may be unnecessary. But if the barrier is nonrigid, such as a tarp, the filler element 70 c should be placed inside the cavity 63 c to occupy it and to support the barrier and the rigid diaphragm.
  • As shown in FIG. 7 b, when it comes time to elevate the rigid diaphragm, the filler element 70 c is first removed from the cavity 63 c. Because the step 60 c in the illustrated embodiment extends to the outer edge of the footing 16 c, this is accomplished easily by sliding the filler element 70 c outwardly from the cavity until the filler element clears the perimeters of the rigid diaphragm 12 and the barrier 40. Any portion of the barrier 40 under the rigid diaphragm that is exposed in the cavity 63 c can be removed (e.g., by cutting, sawing, tearing, dissolving, etc.) to expose the underside of the rigid diaphragm. The lifting device 42 c is then placed on the step 60 c of the footing 12 c under the rigid diaphragm 12 and actuated to raise the rigid diaphragm 12 to at least its final elevation or higher, as shown in FIG. 7 b. A BID 14 c is installed between the rigid diaphragm 12 and the surface 34 c of the footing 16 c and the lifting device 42 c is removed from the cavity. In view of the foregoing, it is understood by one of ordinary skill in the art that the step 60 c is sized to allow removal of the filler element and the barrier from the cavity and to allow installation, operation and removal of the lifting device 42 c.
  • As an alternative to the recessed formations 60 in the footings, FIG. 8 a illustrates a recessed formation 61, such as a pocket 61 a, formed in the edge 31 of the rigid diaphragm 12. A bridge member 68, e.g., a reaction beam 69 a, traverses the pocket 61 a and provides a location under which the lifting device 42 a is positioned to raise the rigid diaphragm 12. The reaction beam 69 a is anchored (temporarily or permanently) to the rigid diaphragm 12 at generally opposing locations across the pocket 60 a. The lifting device 42 a is then actuated to raise the rigid diaphragm 12 to at least its final elevation or higher, as shown in FIG. 8 b, at which time the barrier 40 is freed for removal. It is understood that the recessed formation may also be a hole 61′ in the rigid diaphragm 12, as shown in broken lines in FIG. 3 b.
  • As shown in FIG. 3 b, the barrier 40 in this embodiment can be configured with its own pocket to follow the outline of the pocket 61 of the rigid diaphragm 12 so that the upper surface 34 of the footing 16 is exposed. Accordingly, the barrier 40 is not pinned under the lifting device 42 after the rigid diaphragm 12 is lifted, allowing the barrier 40 to be removed. A BID 14 is installed between the rigid diaphragm and the surface 34 of the footing 16.
  • When the BIDs 14 have been properly installed such that the rigid diaphragm 12 is supported on points by the BIDs as shown in FIG. 1, the lifting devices 42 are removed. A crawl space 48 of height H spanning at least the height of the BIDs is formed between the ground 18 and the rigid diaphragm 12. Additional foundations 52 near the footings 16 and the edge of the rigid diaphragm 12 can be provided as desired or appropriate, along with flashings 80 to cover any seismic gap between the structure and the grading and foundation.
  • Accordingly, the construction of FIG. 1 has the structure S supported on the rigid diaphragm 12 that is generally isolated from seismic activity or vibration in the ground 18. During an earthquake, the BIDs 14 isolate the rigid diaphragm 12 and the structure S from seismic forces in the ground 18. After a seismic activity, the BIDs 14 may be inspected via the crawl space 48.
  • An alternative embodiment of a structure S' built in accordance with the present invention is shown in FIG. 9 a. The foregoing description generally applies for elements with similar reference numerals. The structure includes a subbasement SB below ground level with subterranean retaining vertical walls 100, and footings 116 and concrete ground slabs 118 therebetween to line the subbasement. In accordance with a feature of the present invention, upper surface 134 of the footings 116 and the concrete slabs 118 form a generally flat surface 138 on which a rigid diaphragm 112 can be formed. As shown in FIG. 9 b, a barrier 140 is placed on top of the generally flat surface 134 to prevent adhesion between the surface 138 and the rigid diaphragm 112 and concrete is poured on the barrier to form the rigid diaphragm. As described hereinabove, construction above the rigid diaphragm 112 (e.g., vertical walls 132) may begin as soon as about one day after pouring of the concrete and well before the rigid diaphragm is elevated., provided the rigid diaphragm has cured to a strength sufficient to support the construction. When the rigid diaphragm has reached is designed strength or when it can support the vertical and horizontal loads placed on it the rigid diaphragm can be lifted in the aforementioned manner by lifting devices 142 that are accommodated by recessed formations including either steps 160 in the footings or pockets 161 in the rigid diaphragm for the removal of the barrier 140 and the installation of the BIDs 114 (see FIG. 10) As such, the structure S′, inclusive of its basement, is isolated from seismic activity or vibration in the ground. A crawl space 148 allows inspection of the BIDs.
  • The preceding description has been presented with reference to presently preferred embodiments of the invention. Workers skilled in the art and technology to which this invention pertains will appreciate that alterations and changes to the described structure may be practiced without meaningfully departing from the principal, spirit and scope of this invention. Moreover, the drawings may not be to scale. Accordingly, the foregoing description should not be read as pertaining only to the precise structures described and illustrated in the accompanying drawings, but rather should be read consistent with and as support for the following claims which are to have their fullest and fairest scope.

Claims (27)

1. A method of constructing a seismically-isolated structure having a rigid diaphragm supported on base isolation devices, comprising:
providing at least a footing in ground;
positioning a barrier between footings and rigid diaphragm;
Constructing the rigid diaphragm on the barrier;
elevating the rigid diaphragm; and
installing the base isolation devices between the footing and the rigid diaphragm.
2. A method of construction according to claim 1, wherein construction above the rigid diaphragm begins before raising the rigid diaphragm.
3. A method of construction according to claim 1, wherein the footing is positioned within a field of the rigid diaphragm.
4. A method of construction according to claim 1, wherein the barrier includes a tarp.
5. A method of construction according to claim 1, wherein the barrier includes sheets of plywood.
6. A method of construction according to claim 1, wherein the barrier includes a layer of sand.
7. A method of construction according to claim 1, wherein the barrier is chemical.
8. A method of construction according to claim 1, wherein the footing is constructed from concrete.
9. A method of construction according to claim 1, wherein the footing has a recessed formation that receives a lifting device.
10. A method of construction according to claim 1, wherein the rigid diaphragm has a recessed formation that receives a lifting device.
11. A method of construction according to claim 10, wherein the barrier has its recessed formation for the recessed formation of the rigid diaphragm.
12. A method of construction according to claim 1, wherein the rigid diaphragm is formed from concrete.
13. A method of construction according to claim 1, wherein the rigid diaphragm is reinforced with steel.
14. A method of construction according to claim 1, wherein the construction above the rigid diaphragm begins before raising of the rigid diaphragm.
15. A method of constructing a seismically-isolated structure, comprising:
providing concrete footings in ground;
laying a barrier above footings;
constructing a concrete rigid diaphragm above the barrier;
elevating the rigid diaphragm to its final elevation;
constructing above the rigid diaphragm before raising the rigid diaphragm to its final elevation; and
installing base isolation devices between footings and rigid diaphragm.
16. A method of construction according to claim 15, wherein construction above the rigid diaphragm comprises light wood frame construction.
17. A method of construction according to claim 15, wherein the footings are in block form.
18. A method of construction according to claim 15, wherein an upper surface of each footing and ground spanning between the footings form a generally flat surface on which the rigid diaphragm is formed.
19. A method of construction according to claim 15, wherein an upper surface of each footing and ground spanning between the footings form a generally flat surface on which the rigid diaphragm is supported before being raised to its final elevation.
20. A construction, comprising:
a structure having a rigid diaphragm;
a plurality of footings each positioned at least partially under the rigid diaphragm;
a plurality of base-isolation devices each positioned between the rigid diaphragm and a footing;
wherein the rigid diaphragm was constructed above the footings below its final elevation
21. A construction of claim 20, further comprising a barrier positioned between the rigid diaphragm and the footings during construction of the rigid diaphragm.
22. A construction of claim 21, wherein the barrier extends between the footings.
23. A method of constructing a rigid diaphragm for use in a seismically-isolated structure:
providing footings;
providing a barrier on the footings; and
constructing the rigid diaphragm on the barrier.
24. A method of constructing of claim 23, further comprising:
forming a generally flat surface on each footings to serve as a supporting surface for the rigid diaphragm as it cures.
25. A method of constructing of claim 23, wherein the barrier is rigid.
26. A method of constructing of claim 23, wherein the barrier is chemical.
27. A method of constructing of claim 23, wherein the barrier is granular.
US11/322,590 2005-12-30 2005-12-30 Method of constructing structures with seismically-isolated base Abandoned US20070151173A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/322,590 US20070151173A1 (en) 2005-12-30 2005-12-30 Method of constructing structures with seismically-isolated base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/322,590 US20070151173A1 (en) 2005-12-30 2005-12-30 Method of constructing structures with seismically-isolated base

Publications (1)

Publication Number Publication Date
US20070151173A1 true US20070151173A1 (en) 2007-07-05

Family

ID=38222883

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/322,590 Abandoned US20070151173A1 (en) 2005-12-30 2005-12-30 Method of constructing structures with seismically-isolated base

Country Status (1)

Country Link
US (1) US20070151173A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010016974A1 (en) * 2008-08-08 2010-02-11 David Noble Inhabitable space frames
US20100140147A1 (en) * 2007-05-23 2010-06-10 Peter Martin Olsen Vibrating screen panel
US20110236696A1 (en) * 2010-03-25 2011-09-29 Winky Lai High strength rebar
ITBO20100732A1 (en) * 2010-12-13 2012-06-14 Giuseppe Guerriero Mancinelli PROCEDURE FOR THE INSTALLATION OF SEISMIC INSULATORS IN A BUILDING ALREADY BUILDED
EP2778291A1 (en) * 2013-03-13 2014-09-17 HOCHTIEF Solutions AG Method for producing a foundation panel that eliminates the effect of earthquakes for at least one building
US9222276B2 (en) 2014-04-30 2015-12-29 Larry Ellsworth Stenswick Seismic isolation system
JP2016056612A (en) * 2014-09-10 2016-04-21 住環境株式会社 Foundation structure of horizontally repairable building
JP2018178614A (en) * 2017-04-18 2018-11-15 株式会社竹中工務店 Construction method
US10954671B2 (en) * 2017-08-02 2021-03-23 Hitachi-Ge Nuclear Energy, Ltd. Vibration isolation supporting structure and vibration isolation system

Citations (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1689642A (en) * 1928-10-30 Sectional built portable house
US3105252A (en) * 1960-08-24 1963-10-01 Merriman Bros Inc Slidable and rotatable bearing support
US3349418A (en) * 1965-07-20 1967-10-31 Gen Tire & Rubber Co Low friction structural bearing
US3479786A (en) * 1968-11-08 1969-11-25 George J Kreier Jr Method for making low cost large thin concrete panels in seamless reinforced plastic molds
US3944242A (en) * 1974-11-08 1976-03-16 Eubank Marcus P Pre-stressed, pre-fabricated concrete supporting structure for a mobile home
US4065895A (en) * 1976-06-23 1978-01-03 Shank Richard S Wood building construction
US4104356A (en) * 1977-01-26 1978-08-01 Joseph Paul Deutsch Tilt-up panel bracket
US4171194A (en) * 1977-03-25 1979-10-16 Italiana Prefabbricazione Edile S.P.A. Plant for the production of concrete elements
US4238137A (en) * 1978-04-26 1980-12-09 American Bearing Company, Inc. Slide bearing
US4393568A (en) * 1979-04-16 1983-07-19 Ramon Navarro Method for attaching wooden forms to a concrete surface
US4644714A (en) * 1985-12-02 1987-02-24 Earthquake Protection Systems, Inc. Earthquake protective column support
US4921741A (en) * 1988-06-21 1990-05-01 Carlisle Tire & Rubber Company Recreation surface and tile fastening scheme
US4942703A (en) * 1989-06-19 1990-07-24 Nicolai Charles M Earthquake-proof absorption system for buildings or the like
US4953658A (en) * 1989-06-07 1990-09-04 Ohbayashi Corporation Seismic isolator
US5091235A (en) * 1990-05-04 1992-02-25 E. I. Du Pont De Nemours And Company Laminated sill wrap assembly for providing an air infiltration barrier
US5131195A (en) * 1989-02-10 1992-07-21 Patrice Bellavista Earthquake-resistant insulator for buildings
US5359816A (en) * 1990-03-16 1994-11-01 Permahome (Steel Constructions) Ltd. Buildings and methods of constructing buildings
US5403414A (en) * 1991-09-18 1995-04-04 Corston; Charles Method and apparatus for construction of flooring to prevent squeaks
US5564237A (en) * 1993-08-04 1996-10-15 Yoneda; Ryozo Earthquake resisting support construction for structures
US5682712A (en) * 1993-11-24 1997-11-04 Mm Systems Of Arizona Steel-rubber seismic isolation bearing
US5761856A (en) * 1995-08-04 1998-06-09 Oiles Corporation Vibration isolation apparatus
US5845457A (en) * 1994-03-18 1998-12-08 Rebuild World Rbw S.A. Floor, method for manufacturing it, and building including at least one such floor
US5875589A (en) * 1996-12-10 1999-03-02 Minnesota Mining And Manufacturing Company Structures having damped floors and a method of damping floors
US5904010A (en) * 1997-06-10 1999-05-18 Energy Research, Inc. Elastomeric seismic isolation bearing and method
US5950396A (en) * 1997-03-19 1999-09-14 Fosdick, Jr.; Frank D. Method and apparatus for producing and erecting precast concrete walls using sawing
US5970666A (en) * 1996-12-11 1999-10-26 Mitsubishi Steel Mfg. Co., Ltd Large-scale high strength seismic isolator
US6067757A (en) * 1999-02-17 2000-05-30 Olson; Timothy Tilt-up concrete panel and forming system therefore
US6085474A (en) * 1998-03-16 2000-07-11 Mizuno; Tsutomu Device for minimizing earthquake shocks to a small building
US6182416B1 (en) * 1999-07-23 2001-02-06 Thomas L. Brackin Tilt-up wall panel construction method and form blocks
US6213444B1 (en) * 1999-03-11 2001-04-10 United Silicon Incorporated Vibration damper
US6289640B1 (en) * 1999-07-09 2001-09-18 Nippon Pillar Packing Co., Ltd. Seismic isolation sliding support bearing system
US6318031B1 (en) * 1998-11-19 2001-11-20 Nakamura Bussan Co., Ltd. Base structure of building and construction method thereof
US6324795B1 (en) * 1999-11-24 2001-12-04 Ever-Level Foundation Systems, Inc. Seismic isolation system between floor and foundation comprising a ball and socket joint and elastic or elastomeric element
US6364274B1 (en) * 1999-11-18 2002-04-02 Mitsubishi Steel Mfg. Co., Ltd. Seismic isolator for exhibits
US20020145093A1 (en) * 2000-11-29 2002-10-10 Aztec Concrete Accessories, Inc. Tilt-up concrete form brace
US20020166295A1 (en) * 2001-05-08 2002-11-14 Shustov Valentin N. Earthquake-protective building buffer
US6546679B1 (en) * 2002-02-04 2003-04-15 Todd E. Bushberger Self-adhesive protectant for insulated building foundation
US6578332B2 (en) * 2000-12-14 2003-06-17 Todd E. Bushberger Foundation seal
US20030159371A1 (en) * 2002-02-27 2003-08-28 Kiichi Yatani Support structure for isolating earthquake motions
US20040003548A1 (en) * 2002-07-02 2004-01-08 Structural Design Engineers Framed structures with coupled girder system and method for dissipating seismic energy
US6688073B2 (en) * 2001-01-30 2004-02-10 Chameleon Cast Wall System Llc Method of forming a composite panel
US6702247B2 (en) * 2001-07-31 2004-03-09 Fukuvi Usa, Inc. Tilt-up construction chamfers
US20040045230A1 (en) * 2002-09-05 2004-03-11 Grant Hocking Seismic base isolation by electro-osmosis during an earthquake event
US20040123530A1 (en) * 2002-12-30 2004-07-01 Luis Dorfmann Seismic and vibration isolation system
US6790520B1 (en) * 1997-11-12 2004-09-14 Collins & Aikman Products Co. Vibration dampening laminate
US20040245255A1 (en) * 2003-06-09 2004-12-09 Copley James D. Plastic lined concrete tanks equipped with waterstop systems
US20050086877A1 (en) * 2003-10-28 2005-04-28 Jean-Claude Bloch-Fortea Anti-Seismic system
US20050138870A1 (en) * 2001-12-26 2005-06-30 Shinji Ishimura Base isolation device for structure
US20060272226A1 (en) * 2003-03-07 2006-12-07 Robinson William H Self-centring sliding bearing
US7171787B2 (en) * 2003-06-24 2007-02-06 Ch2M Hill Inc. Rectangular tilt-up concrete tank construction
US7219474B2 (en) * 2001-02-21 2007-05-22 Onecrete Pty Ltd. Load bearing building panel

Patent Citations (56)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1689642A (en) * 1928-10-30 Sectional built portable house
US3105252A (en) * 1960-08-24 1963-10-01 Merriman Bros Inc Slidable and rotatable bearing support
US3349418A (en) * 1965-07-20 1967-10-31 Gen Tire & Rubber Co Low friction structural bearing
US3479786A (en) * 1968-11-08 1969-11-25 George J Kreier Jr Method for making low cost large thin concrete panels in seamless reinforced plastic molds
US3944242A (en) * 1974-11-08 1976-03-16 Eubank Marcus P Pre-stressed, pre-fabricated concrete supporting structure for a mobile home
US4065895A (en) * 1976-06-23 1978-01-03 Shank Richard S Wood building construction
US4104356A (en) * 1977-01-26 1978-08-01 Joseph Paul Deutsch Tilt-up panel bracket
US4171194A (en) * 1977-03-25 1979-10-16 Italiana Prefabbricazione Edile S.P.A. Plant for the production of concrete elements
US4238137A (en) * 1978-04-26 1980-12-09 American Bearing Company, Inc. Slide bearing
US4393568A (en) * 1979-04-16 1983-07-19 Ramon Navarro Method for attaching wooden forms to a concrete surface
US4644714A (en) * 1985-12-02 1987-02-24 Earthquake Protection Systems, Inc. Earthquake protective column support
US4921741A (en) * 1988-06-21 1990-05-01 Carlisle Tire & Rubber Company Recreation surface and tile fastening scheme
US5131195A (en) * 1989-02-10 1992-07-21 Patrice Bellavista Earthquake-resistant insulator for buildings
US4953658A (en) * 1989-06-07 1990-09-04 Ohbayashi Corporation Seismic isolator
US4942703A (en) * 1989-06-19 1990-07-24 Nicolai Charles M Earthquake-proof absorption system for buildings or the like
US5359816A (en) * 1990-03-16 1994-11-01 Permahome (Steel Constructions) Ltd. Buildings and methods of constructing buildings
US5091235A (en) * 1990-05-04 1992-02-25 E. I. Du Pont De Nemours And Company Laminated sill wrap assembly for providing an air infiltration barrier
US5403414A (en) * 1991-09-18 1995-04-04 Corston; Charles Method and apparatus for construction of flooring to prevent squeaks
US5564237A (en) * 1993-08-04 1996-10-15 Yoneda; Ryozo Earthquake resisting support construction for structures
US5682712A (en) * 1993-11-24 1997-11-04 Mm Systems Of Arizona Steel-rubber seismic isolation bearing
US5797228A (en) * 1993-11-24 1998-08-25 Tekton Seismic isolation bearing
US5845457A (en) * 1994-03-18 1998-12-08 Rebuild World Rbw S.A. Floor, method for manufacturing it, and building including at least one such floor
US5761856A (en) * 1995-08-04 1998-06-09 Oiles Corporation Vibration isolation apparatus
US5875589A (en) * 1996-12-10 1999-03-02 Minnesota Mining And Manufacturing Company Structures having damped floors and a method of damping floors
US5970666A (en) * 1996-12-11 1999-10-26 Mitsubishi Steel Mfg. Co., Ltd Large-scale high strength seismic isolator
US5950396A (en) * 1997-03-19 1999-09-14 Fosdick, Jr.; Frank D. Method and apparatus for producing and erecting precast concrete walls using sawing
US5904010A (en) * 1997-06-10 1999-05-18 Energy Research, Inc. Elastomeric seismic isolation bearing and method
US6790520B1 (en) * 1997-11-12 2004-09-14 Collins & Aikman Products Co. Vibration dampening laminate
US6085474A (en) * 1998-03-16 2000-07-11 Mizuno; Tsutomu Device for minimizing earthquake shocks to a small building
US6318031B1 (en) * 1998-11-19 2001-11-20 Nakamura Bussan Co., Ltd. Base structure of building and construction method thereof
US6067757A (en) * 1999-02-17 2000-05-30 Olson; Timothy Tilt-up concrete panel and forming system therefore
US6213444B1 (en) * 1999-03-11 2001-04-10 United Silicon Incorporated Vibration damper
US6289640B1 (en) * 1999-07-09 2001-09-18 Nippon Pillar Packing Co., Ltd. Seismic isolation sliding support bearing system
US6182416B1 (en) * 1999-07-23 2001-02-06 Thomas L. Brackin Tilt-up wall panel construction method and form blocks
US6364274B1 (en) * 1999-11-18 2002-04-02 Mitsubishi Steel Mfg. Co., Ltd. Seismic isolator for exhibits
US6324795B1 (en) * 1999-11-24 2001-12-04 Ever-Level Foundation Systems, Inc. Seismic isolation system between floor and foundation comprising a ball and socket joint and elastic or elastomeric element
US20020145093A1 (en) * 2000-11-29 2002-10-10 Aztec Concrete Accessories, Inc. Tilt-up concrete form brace
US6578332B2 (en) * 2000-12-14 2003-06-17 Todd E. Bushberger Foundation seal
US6688073B2 (en) * 2001-01-30 2004-02-10 Chameleon Cast Wall System Llc Method of forming a composite panel
US7219474B2 (en) * 2001-02-21 2007-05-22 Onecrete Pty Ltd. Load bearing building panel
US20020166295A1 (en) * 2001-05-08 2002-11-14 Shustov Valentin N. Earthquake-protective building buffer
US6929234B2 (en) * 2001-07-31 2005-08-16 Fukuvi Usa, Inc. Tilt-up construction chamfers
US6702247B2 (en) * 2001-07-31 2004-03-09 Fukuvi Usa, Inc. Tilt-up construction chamfers
US20050138870A1 (en) * 2001-12-26 2005-06-30 Shinji Ishimura Base isolation device for structure
US6546679B1 (en) * 2002-02-04 2003-04-15 Todd E. Bushberger Self-adhesive protectant for insulated building foundation
US20030159371A1 (en) * 2002-02-27 2003-08-28 Kiichi Yatani Support structure for isolating earthquake motions
US20040003548A1 (en) * 2002-07-02 2004-01-08 Structural Design Engineers Framed structures with coupled girder system and method for dissipating seismic energy
US6792720B2 (en) * 2002-09-05 2004-09-21 Geosierra Llc Seismic base isolation by electro-osmosis during an earthquake event
US20040045230A1 (en) * 2002-09-05 2004-03-11 Grant Hocking Seismic base isolation by electro-osmosis during an earthquake event
US20040123530A1 (en) * 2002-12-30 2004-07-01 Luis Dorfmann Seismic and vibration isolation system
US20060272226A1 (en) * 2003-03-07 2006-12-07 Robinson William H Self-centring sliding bearing
US20040245255A1 (en) * 2003-06-09 2004-12-09 Copley James D. Plastic lined concrete tanks equipped with waterstop systems
US7111751B2 (en) * 2003-06-09 2006-09-26 The Crom Corporation Plastic lined concrete tanks equipped with waterstop systems
US7171787B2 (en) * 2003-06-24 2007-02-06 Ch2M Hill Inc. Rectangular tilt-up concrete tank construction
US20050086877A1 (en) * 2003-10-28 2005-04-28 Jean-Claude Bloch-Fortea Anti-Seismic system
US7243466B2 (en) * 2003-10-28 2007-07-17 Jean-Claude Bloch-Fortea Anti-seismic system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100140147A1 (en) * 2007-05-23 2010-06-10 Peter Martin Olsen Vibrating screen panel
US8256623B2 (en) 2007-05-23 2012-09-04 Ludowici Australia Pty. Ltd. Vibrating screen panel
WO2010016974A1 (en) * 2008-08-08 2010-02-11 David Noble Inhabitable space frames
US20110146166A1 (en) * 2008-08-08 2011-06-23 David Noble Inhabitable space frames
US8286392B2 (en) 2008-08-08 2012-10-16 David Noble Inhabitable space frames
US20110236696A1 (en) * 2010-03-25 2011-09-29 Winky Lai High strength rebar
ITBO20100732A1 (en) * 2010-12-13 2012-06-14 Giuseppe Guerriero Mancinelli PROCEDURE FOR THE INSTALLATION OF SEISMIC INSULATORS IN A BUILDING ALREADY BUILDED
EP2778291A1 (en) * 2013-03-13 2014-09-17 HOCHTIEF Solutions AG Method for producing a foundation panel that eliminates the effect of earthquakes for at least one building
US9222276B2 (en) 2014-04-30 2015-12-29 Larry Ellsworth Stenswick Seismic isolation system
JP2016056612A (en) * 2014-09-10 2016-04-21 住環境株式会社 Foundation structure of horizontally repairable building
JP2018178614A (en) * 2017-04-18 2018-11-15 株式会社竹中工務店 Construction method
US10954671B2 (en) * 2017-08-02 2021-03-23 Hitachi-Ge Nuclear Energy, Ltd. Vibration isolation supporting structure and vibration isolation system

Similar Documents

Publication Publication Date Title
US20070151173A1 (en) Method of constructing structures with seismically-isolated base
Arya et al. Guidelines for earthquake resistant non-engineered construction
Dizhur et al. Building typologies and failure modes observed in the 2015 Gorkha (Nepal) earthquake
Kam et al. Seismic performance of reinforced concrete buildings in the 22 February Christchurch (Lyttleton) earthquake
Vintzileou et al. Seismic behaviour of the historical structural system of the island of Lefkada, Greece
EP1629160A1 (en) A structure and method for prefabricated construction
CN103790295A (en) Reinforced concrete stair structure and construction method thereof
Melkumyan et al. Retrofitting by base isolation of existing buildings in Armenia and in Romania and comparative analysis of innovative vs. conventional retrofitting
CN209855277U (en) Conversion layer structure for underground added layer of existing building
Ongaretto et al. Wood-based solutions to improve quality and safety against seismic events in conservation of historical buildings
WO2002066757A9 (en) A load bearing building panel
Abdel-Aty Proposals for seismic retrofitting of timber roofs to enhance their in-plane stiffness and diaphragm action at historical masonry buildings in Cairo
EP2241690A2 (en) Insulated foundation element for mounting on precast base foundation
JP4228308B2 (en) Reinforcement method for existing floors and seismic isolation method for existing buildings
Melkumyan Base and roof isolation for earthquake retrofitting and protection of existing buildings in Armenia
JP2007070860A (en) Base isolation structure of building, its construction method and maintenance method
Tripura et al. Failure analysis of earthen, masonry and concrete buildings during the 2017 Tripura earthquake
Liu et al. Prefabrication construction in residential building of Vanke real estate company China
Hausler Housing reconstruction and retrofitting after the 2001 Kachchh, Gujarat Earthquake
Panganti Precast Element's Erection & Installation at Site-A Case Study
Melkumyan Comparison of innovative base isolation retrofitting technology with conventional retrofitting of existing buildings
Fregonese et al. The 2012 earthquake: an abacus of surveys and interventions in Mantua churches
CN202850561U (en) Combined house
Melkumyan Assessment of the seismic risk in the City of Yerevan and its mitigation by application of innovative seismic isolation technologies
Traykova et al. Simple strengthening techniques for Non-Engineered buildings against seismic actions

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION