US20070056726A1 - Apparatus, system, and method for in-situ extraction of oil from oil shale - Google Patents

Apparatus, system, and method for in-situ extraction of oil from oil shale Download PDF

Info

Publication number
US20070056726A1
US20070056726A1 US11/531,694 US53169406A US2007056726A1 US 20070056726 A1 US20070056726 A1 US 20070056726A1 US 53169406 A US53169406 A US 53169406A US 2007056726 A1 US2007056726 A1 US 2007056726A1
Authority
US
United States
Prior art keywords
fluid
target zone
production
oil
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/531,694
Inventor
James Shurtleff
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mountain West Energy Inc
Original Assignee
Shurtleff James K
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shurtleff James K filed Critical Shurtleff James K
Priority to US11/531,694 priority Critical patent/US20070056726A1/en
Priority to RU2008112558/03A priority patent/RU2008112558A/en
Priority to PCT/US2006/036026 priority patent/WO2007033371A2/en
Priority to CA002622539A priority patent/CA2622539A1/en
Priority to AU2006290226A priority patent/AU2006290226A1/en
Priority to BRPI0617005-6A priority patent/BRPI0617005A2/en
Publication of US20070056726A1 publication Critical patent/US20070056726A1/en
Priority to IL190166A priority patent/IL190166A0/en
Assigned to MOUNTAIN WEST ENERGY INC. reassignment MOUNTAIN WEST ENERGY INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SHURTLEFF, KEVIN
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well

Definitions

  • This invention relates to the production of oil from oil shale, and more particularly relates to stripping in-situ kerogen from an oil shale formation.
  • the conventional art for removing oil from oil shale is not economical, requiring shale formations with high oil content, and sustained high oil prices.
  • the oil shale deposits in Eastern Utah vary between 10 and 60 gallons of oil per ton of shale formation, and most conventional practices are only projected to be profitable above 25 gallons of oil per ton, meaning many formations are not suitable for these practices. Therefore, commercial oil shale production is not yet available on a large scale.
  • ICP in-situ conversion process
  • the ICP process covers the basic principles needed to remove oil from oil shale. First, the water in the target zone must be removed or displaced to allow the temperature in the target zone to reach the required level. Then, a large amount of thermal energy is required before the oil can be extracted.
  • the ICP process has the disadvantage of requiring a large number of drilled wells, as well as the pumping losses and cooling requirements of the refrigerant wells.
  • strip mining process Another example of a conventional practice for oil shale production is a strip mining process.
  • An oil shale formation is mined and the bulk material treated at the surface to remove the kerogen. While this process is simple, it introduces a number of environmental issues which must be resolved.
  • strip mining itself changes the landscape dramatically, and it can require many years before the land is again available for other purposes.
  • the bulk oil shale material even when stripped of kerogen, may contain oil and chemical residues that present a disposal problem.
  • Another example of a conventional practice for oil shale production is an underground room and pillar mining process.
  • the process is expensive and leaves significant amounts of kerogen in place as support for the mining chambers.
  • the process is only economical in shallow shales (perhaps less than 1000 feet deep) and it requires minimum formation thicknesses of 50 to 100 feet. Again the bulk oil shale material requires disposal in this mining process.
  • the present invention has been developed in response to the present state of the art, and in particular, in response to the problems and needs in the art that have not yet been fully solved by currently available oil shale extraction systems. Accordingly, the present invention has been developed to provide an apparatus, system, and method for extracting oil from oil shale that overcome many or all of the above-discussed shortcomings in the art.
  • the apparatus may include a drilling unit for drilling a well to fluidly communicate with the top and bottom of a target zone of an oil shale formation.
  • the apparatus may also include a stimulation module configured to stimulate the target zone.
  • the apparatus may further include a completion unit configured to position an injection tube substantially at the bottom of the target zone, and an injection unit configured to inject a fluid into the target zone.
  • the injection unit may be configured to inject the fluid into the target zone such that the fluid displaces free water within the target zone.
  • the injected fluid may be commercial natural gas and/or produced natural gas from the well.
  • the apparatus may include a thermal delivery unit configured to heat the fluid such that the heated fluid entrains in-situ kerogen to generate a production fluid.
  • the thermal delivery unit may be configured to heat the fluid at the surface using a solar concentrator and/or a gas burner.
  • the thermal delivery unit may comprise a downhole burner configured to heat the fluid in the well without introducing combustion byproducts into the fluid.
  • the apparatus may include a circulation unit to circulate the fluid through an offset well to preheat the fluid before heating of the fluid by the thermal delivery unit.
  • the apparatus may further include a production module, which maybe a tube, to produce the production fluid.
  • the apparatus may include a treatment module configured to heat the production fluid to a target temperature, add natural gas to provide excess hydrogen if needed, and react the production fluid on a catalytic reactor.
  • the treatment module may thus break the hydrocarbons of the production fluid into smaller, more commercially valuable hydrocarbons.
  • the stimulation module may be further configured to stimulate a second target zone, which may be in the well in a higher location than the first target zone.
  • the completion unit may be configured to position the injection tube substantially at the bottom of the second target zone.
  • the apparatus may further include an isolation unit configured to isolate the well from the first target zone.
  • the injection unit may be further configured to inject the fluid into the second target zone.
  • the thermal delivery unit may be further configured to heat the fluid such that energy of the heated fluid entrains in-situ kerogen within the second target zone to generate the production fluid.
  • a method for extracting oil from oil shale may comprise drilling a well to fluidly communicate with the top and bottom of a target zone.
  • the well may include one or more wells, and the well(s) may be vertical or horizontal wells.
  • the method may further include stimulating the target zone, and positioning an injection tube substantially at the bottom of the target zone.
  • the method may then include injecting a fluid into the target zone, and heating the fluid such that the heated fluid entrains in-situ kerogen to generate a production fluid.
  • the method may include producing the production fluid.
  • the method may conclude with heating the production fluid to a target temperature and treating the production fluid in a catalytic reactor to reduce the average molecular weight of the entrained kerogen.
  • the method may further comprise adding natural gas to the production fluid such that a minimal amount of hydrogen is available for reaction within the catalytic
  • the method may include positioning a production tube substantially at the top of the target zone, where producing the production fluid comprises flowing the production fluid up the production tubing.
  • the method may include setting a production casing through the oil shale formation, and perforating the production casing substantially near the bottom of the target zone, perforating the production casing substantially near the top of the target zone.
  • positioning the injection tube further comprises positioning the injection tube within the production casing, and producing the production fluid may comprise flowing the production fluid up the annulus formed between the production casing and the injection tubing.
  • Flowing the production fluid up the annulus formed between the production casing and the injection tubing may include positioning a production tube within the annulus, and producing the production fluid up the production tube.
  • a system for in-situ extraction of oil from oil shale.
  • the system may include a three-phase separator configured to separate a production fluid into oil, water, and natural gas, and fluid coupling configured to deliver separated water to a water disposal system, to deliver separated oil to an oil storage facility, and to deliver separated natural gas to a natural gas storage facility.
  • the system may further include a drilling unit for drilling a well to fluidly communicate with the top and bottom of a target zone of an oil shale formation.
  • the system may also include a stimulation module configured to stimulate the target zone.
  • the system may further include a completion unit configured to position an injection tube substantially at the bottom of the target zone, and an injection unit configured to inject a fluid into the target zone.
  • the injection unit may be configured to inject the fluid into the target zone such that the fluid displaces free water within the target zone.
  • the injected fluid may be commercial natural gas and/or produced natural gas from the well.
  • the system may further include a production module, which maybe a tube, to produce the production fluid.
  • the system may include a treatment module configured to heat the production fluid to a target temperature, add natural gas to provide excess hydrogen if needed, and react the production fluid on a catalytic reactor. The treatment module may thus break the hydrocarbons of the production fluid into smaller, more commercially valuable hydrocarbons.
  • the system may also include a condensing module configured to cool the reacted production fluid and deliver the cooled fluid to the three-phase separator.
  • FIG. 1 is a schematic block diagram depicting one embodiment of a system for removing oil from oil shale in accordance with the present invention
  • FIG. 2 is a schematic block diagram depicting one embodiment of at least one fluid conduit to a top of a target zone and a bottom of a target zone of an oil shale formation;
  • FIG. 3 is a schematic block diagram depicting one embodiment of a treatment module in accordance with the present invention.
  • FIG. 4 is a schematic block diagram depicting one embodiment of a downhole burner in accordance with the present invention.
  • FIG. 5 is an illustration of one embodiment of a second target zone in accordance with the present invention.
  • FIG. 6 is a schematic block diagram depicting an alternate embodiment of a at least one fluid conduit to a top and a bottom of a target zone in accordance with the present invention
  • FIG. 7 is a schematic block diagram depicting one embodiment of heating a hydrocarbon gas in accordance with the present invention.
  • FIG. 8A is a schematic block diagram depicting one embodiment of a first and second horizontal well segment in accordance with the present invention.
  • FIG. 8B is a schematic block diagram depicting an alternate embodiment of a first and second horizontal well segment in accordance with the present invention.
  • FIG. 9 is a schematic block diagram depicting one embodiment of a first, second, and third horizontal well segment in accordance with the present invention.
  • FIG. 10A is an illustration of a well spacing in accordance with the present invention.
  • FIG. 10B is an illustration of an alternate well spacing in accordance with the present invention.
  • FIG. 11 is an illustration of a thermodynamic equilibrium chart for heavy hydrocarbons in the absence of excess hydrogen
  • FIG. 12 is an illustration of a thermodynamic equilibrium chart for heavy hydrocarbons in the presence of excess hydrogen
  • FIG. 13 is a schematic flow diagram of a method for extracting oil from oil shale in accordance with the present invention.
  • FIG. 14A is a schematic flow diagram of a method for extracting oil from an oil shale comprising a first and second target zone in accordance with the present invention
  • FIG. 14B is a schematic flow diagram of a method for extracting oil from an oil shale comprising a first and second target zone in accordance with the present invention
  • FIG. 15A is a schematic flow diagram of a method for extracting oil from an oil shale, the method comprising drilling at least one horizontal well segment, in accordance with the present invention.
  • FIG. 15B is a schematic flow diagram of a method for extracting oil from an oil shale, the method comprising drilling at least one horizontal well segment, in accordance with the present invention.
  • FIG. 1 is a schematic block diagram depicting one embodiment of a system 100 for removing oil from oil shale in accordance with the present invention.
  • the system 100 may comprise a three-phase separator 102 configured to separate a production fluid into oil, water, and natural gas.
  • the system 100 may further include fluid coupling 104 configured to deliver separated water to a water disposal system 106 , to deliver separated oil to an oil storage facility 108 , and to deliver separated natural gas to a natural gas storage facility 110 .
  • the system 100 may further comprise a drilling unit 112 configured to drill at least one fluid conduit to a top of a target zone and a bottom of the target zone of an oil shale formation.
  • the fluid conduit(s) to a top of a target zone and a bottom of the target zone of an oil shale formation may comprise a well 114 .
  • the well 114 may comprise one or more vertical wells 114 , and/or one or more horizontal wells 114 .
  • the target zone may comprise a region within an oil shale formation from which the system 100 will remove the oil from the oil shale. Some of the details of one embodiment of a well 114 are shown in FIG. 2 for clarity.
  • the drilling unit 112 may comprise a coiled-tubing drilling unit, or a standard drilling rig.
  • the system 100 may further comprise a stimulation module 116 .
  • the stimulation module 116 may comprise an explosive device, a hydraulic fracturing unit, a matrix acid unit, and/or other stimulation units known in the art.
  • the stimulation module 116 comprises an explosive device configured to detonate within the target zone, and create a semi-spherical fractured region around the wellbore of the well 114 , with approximately a 90 foot radius and a 45 foot height.
  • the stimulation module 116 may comprise multiple explosive devices depending upon the fracture capability of a given device, and the size of the intended target zone.
  • the system 100 may further comprise a completion unit 118 configured to position an injection tube substantially at the bottom of the target zone. Positioning as used herein describes the placement and positioning of the injection tube outlet, where the injection tube inlet may be at the wellhead of the well 114 , at the surface, on a coiled tubing unit, or at some other location depending upon the specific embodiment of the invention.
  • the completion unit 118 may comprise a workover rig, a completion rig, or a coiled tubing unit. Any other type of tubing placement equipment suitable to place injection tubing in the well 114 is considered a completion unit 118 within the scope of the invention.
  • the system 100 may have an injection unit 120 configured to inject a fluid 122 into the target zone.
  • the fluid 122 may comprise any gas compatible with the formation, and may typically comprise natural gas, nitrogen, water vapor, and carbon dioxide. Without limitation, the fluid 122 may also comprise carbon monoxide, helium, hydrogen, argon, neon, methane, ethane, propane, butane, and the like.
  • the injection unit 120 may be configured to inject the fluid 122 into the target zone such that the fluid 122 displaces free water within the target zone 210 (see FIG. 2 ).
  • the fluid 122 is injected at a pressure higher than a fluid pressure of the formation and lower than a fracture pressure of the formation.
  • an oil shale formation comprises a fluid formation pressure of about 1300 psig, and a fracture pressure of about 2100 psig, at a formation depth of about 3000 feet.
  • the injection pressure for displacement of free water is measured at the formation depth (the “downhole pressure”). It is within the skill of one in the art to estimate the downhole pressure from the surface pressure, or to place a downhole pressure device in formations where small differences between the fracturing pressure and the formation fluid pressure require greater accuracy than surface estimates allow.
  • the system 100 may include a thermal delivery unit 124 configured to heat the fluid 122 such that the heated fluid 122 entrains in-situ kerogen to generate a production fluid 126 .
  • the system 100 may include a treatment module 128 configured to heat the production fluid 126 to a target temperature and to react the production fluid 126 in a catalytic reactor. Further details of one embodiment of a treatment module 128 are provided in reference to FIG. 3 .
  • the system 100 may further include a condensing module 130 configured to cool the production fluid 126 and to deliver the reacted production fluid 126 to the three-phase separator 102 .
  • the thermal delivery unit 124 may be configured to heat the fluid 122 at the surface as shown in the embodiment of FIG. 1 , or to heat the fluid 122 closer to the target zone, for example within the well 114 .
  • the thermal delivery unit 124 may include an oil heater 132 configured to receive heat from a natural gas burner 134 , and/or from a solar concentrator 136 .
  • the thermal delivery unit 124 may further include a heat exchanger 138 configured to transfer the heat from the oil heater 132 to the fluid 122 .
  • the unit 124 may cycle oil from an oil sump 140 , through the oil heater 132 , and through the heat exchanger 138 , before returning the oil to the oil sump 140 .
  • Other methods of collecting heat from the natural gas burner 134 and/or the solar concentrator 136 are known in the art, and these are contemplated within the scope of the invention.
  • the heated fluid 122 entrains in-situ kerogen over a period of time.
  • the fluid 122 begins heating the formation from the well 114 outward into the target zone 210 of the formation.
  • the kerogen breaks down, releases from the oil shale, and is entrained into the fluid 122 to generate the production fluid 126 .
  • the entire target zone 210 treated by the injection of the fluid 122 becomes substantially depleted of kerogen, and the oil cut of the production fluid 126 drops to the point where further operation of the system 100 to remove oil from the oil shale is no longer economical.
  • the fluid 122 is injected at 2,300 cubic feet per minute, and approximately 60% of the in-situ kerogen from the target zone is estimated to be extracted from a well 114 draining a 0.72 acre area, with a 100 foot thick target zone, within one year.
  • the exact temperatures, injection rates, and depletion times depend upon the characteristics of the individual formation and kerogen within that formation, the specific costs of drilling, heating, and pumping the fluid 122 and are calculations within the skill of one in the art in light of the disclosures herein.
  • temperatures below 300 degrees C. may not break down and entrain kerogen except in oil shale formations where the kerogen may have a very low base molecular weight. Consequently, the system 100 operates with a preferred temperature for the fluid above 300 degrees C. Economic considerations such as the desired time to produce a target zone to depletion may drive the temperature determination even higher than 400 degrees C. which will break down and entrain most kerogens. These determinations can be made from a simple core sample test of the oil shale formation and the economics of a given embodiment of the system 100 , and are within the skill of one in the art.
  • the system 100 may include a production module (shown in FIG. 2 ) configured to produce the production fluid 126 from the formation to the surface.
  • producing the production fluid 126 means flowing the production fluid 126 to the surface, either through the inherent pressure within the fluid 126 , or through artificial means such as pumping or the like.
  • the natural gas storage facility 110 may be configured to provide natural gas to the natural gas burner 134 , to provide natural gas to the injection unit 120 , perhaps through the heat exchanger 138 , and to provide natural gas to the treatment module 128 .
  • the natural gas storage facility 110 may be connected to an external gas source through a control valve 142 , and may be configured to receive gas from the external gas source, or to deliver excess produced gas to the external gas source.
  • the system 100 may comprise various temperature, pressure, and fluid density sensors, control valves, and electronic or other controls to utilize these features. These sensors and controls are known in the art, and are omitted from the system 100 shown in FIG. 1 to avoid obfuscating features of the illustrated embodiment of the invention.
  • FIG. 2 is a schematic block diagram depicting one embodiment of at least one fluid conduit 114 to a top of a target zone and a bottom of a target zone of an oil shale formation, where the at least one fluid conduit in FIG. 2 comprises a well 114 .
  • the features shown in FIG. 2 indicate functional relationships only and are not drawn to scale. For example, the depth of the oil shale formation 212 from the surface may vary from near the surface to several thousand feet.
  • the well 114 may include a wellhead 202 configured to allow the introduction and expulsion of fluids from the well 114 , and to contain any pressure from the well 114 .
  • the well 114 may form a fluid conduit 204 to the top of a target zone 210 of an oil shale formation 212 , and a fluid conduit 206 to the bottom of the target zone 210 of the oil shale formation 212 .
  • the stimulation module 116 may be configured to stimulate the target zone 210 , and thereby create at least one stimulated region 214 .
  • a fractured semi-spherical region 214 is created from an explosive fracturing device. Where the target zone 210 is taller than the stimulated region 214 from a single explosive device, multiple explosions may be used to stimulate as much of the target zone 210 as economic considerations dictate.
  • the stimulation module 116 created two stimulated regions 214 each about 45 feet tall and 90-foot radius, where the target zone 210 is about 100 feet thick (tall) and 200 feet in diameter.
  • the well 114 may include a production module 216 configured to produce the production fluid 126 .
  • the production module 216 may be a production tube 216 positioned substantially at the top of the target zone 210 . Ideally, the production module 216 will draw fluid from the target zone 210 at the top of the target zone 210 , but design considerations and physical constraints of the system 100 may require the production module 216 to draw fluid from above or below the top of the target zone without detriment to the functioning of the present invention.
  • the exact placement of the end of the production tube 216 may be uncertain to within a range of several feet without the use of expensive logging tools to place the end of the tube 216 .
  • the invention does not require that such error be accounted for.
  • the system 100 may be designed such that a second target zone (refer to FIG. 5 ) will be completed above the first target zone 210 at a later time.
  • the placement of the production tube 216 may be 10 feet (or more) above or below the top of the target zone 210 to allow for a cement plug or other isolation mechanism to isolate the first and second target zones. These allowances are within the margin indicated by a production tube 216 positioned substantially at the top of the target zone 210 .
  • the system 100 may include an injection tube 218 positioned within the well 114 substantially at the bottom of the target zone 210 of the oil shale formation 212 . As with the production tube 216 , the exact placement of the injection tube 218 is not critical, although ideally a position at the bottom of the target zone 210 is desirable.
  • the injection unit 120 may further comprise isolation 220 within the well 114 , such that injected fluid 122 enters the target zone 210 .
  • the isolation 220 may comprise a cement plug, a pair of bridge plugs—one at the top and one at the bottom of the region 220 —or the like.
  • the fluid 122 comprises a fluid heated at the surface
  • the injection tube 218 comprises a vacuum insulated tube.
  • the vacuum insulated tubing may comprise a k-factor of 0.006 to 0.02 BTU/hr-ft-degF, or about 5000 times lower than the k-factor of standard production steel tubing.
  • the fluid 122 may be heated at the surface using combusted natural gas ( 134 , 132 , 138 ), a solar concentrator 136 , and/or through recirculation of the fluid 122 through an offset depleted well (see FIG. 7 ).
  • the well 114 may include an upper isolation 222 configured to prevent exposure of the backside of the production tube 216 to the production fluid 126 .
  • the upper isolation 222 is not necessary for the proper function of the invention, but in some embodiments the upper isolation 222 may be desirable to protect the production tube 216 from unnecessary exposure to contaminants.
  • FIG. 2 illustrates an open-hole completion, or a producing well 114 without casing set through the target zone 210 .
  • the well 114 may be a cased well, as indicated by an embodiment of a well 114 illustrated in FIG. 6 .
  • FIG. 3 is a schematic block diagram depicting one embodiment of a treatment module 128 in accordance with the present invention.
  • the treatment module 128 may be configured to heat the production fluid 126 to a target temperature and to react the production fluid in a catalytic reactor 302 . This reduces the average molecular weight of the entrained kerogen in the production fluid 126 .
  • a typical kerogen will exceed twenty carbons per hydrocarbon molecule, although the extracted kerogen will also produce a significant amount of natural gas which is generally considered one to four carbons per molecule.
  • Hydrocarbons roughly around ten carbons per molecule are generally much more commercially desirable than the large hydrocarbons over twenty carbons per molecule.
  • the treatment module 128 receives natural gas 304 from the natural gas storage facility 110 , combusts the natural gas in a burner 306 , and heats the production fluid 126 in a heat exchanger 308 with the combusted gas 310 .
  • the amount of gas 304 to be combusted will depend upon the mass and heat capacity of the production fluid 126 , the energy in the gas 304 , the efficiency of the burner 306 and heat exchanger 308 , and the target temperature.
  • the sensors and controls to implement the heating controls are known in the art and not described herein to avoid obscuring aspects of the invention.
  • the treatment module 128 may include scrubbing contaminants from the production fluid 126 before treating the production fluid 126 in the catalytic reactor 302 .
  • contaminants which may be present in the production fluid 126 are sulfur compounds, nitrogen compounds, and heavy metals or metalloids such as arsenic.
  • the scrubbing may be performed before or after heating the production fluid 126 in the heat exchanger 308 , although separating before heating may lower the heat burden of the heat exchanger 308 .
  • Various scrubbing systems are known in the art.
  • the treatment module 128 may be configured to react the production fluid 126 in a catalytic reactor 302 after heating.
  • a standard platinum-based catalyst may be used in the catalytic reactor 302 , although many catalytic systems are known that lower the activation energy of the hydrocarbon cracking reaction and thereby reduce the time to thermodynamic equilibrium. These systems are contemplated within the scope of the invention.
  • Catalyst selection and sizing of the reactor 302 depends upon the specific composition of the production fluid 126 . The catalyst and sizing selections are within the skill of one in the art, and can be determined for a particular production fluid 126 with simple and straightforward field experiments.
  • the treatment module 128 may add natural gas 304 to the production fluid 126 before heating in the heat exchanger 308 .
  • a preferred ratio is at least one free methane for each large hydrocarbon molecule, or about 5% by weight methane.
  • the ratios for specific embodiments vary with the compositions of the available natural gas 304 , the production fluid 126 , the target temperature, and the catalyst type and loading on the reactor 302 , and can be calculated by one of skill in the art based on the data for the contemplated embodiment and the disclosures herein.
  • FIG. 4 is a schematic block diagram depicting one embodiment of a downhole burner 402 in accordance with the present invention.
  • the thermal delivery unit 124 may comprise a downhole burner 402 configured to heat the fluid 122 within the at least one fluid conduit (the well 114 ) to the bottom of the target zone 210 .
  • the downhole burner 402 may combust a heating fluid 404 within the well 114 .
  • the heating fluid 404 may comprise a mixture of natural gas and oxygen (or air).
  • the burner 402 may pass the combusted heating fluid 406 through a heat exchanger 408 to heat the fluid 122 in the injection tube 218 .
  • a downhole burner 402 may be combined with surface heating of the thermal conduit fluid 124 and/or vacuum insulated tubing 218 .
  • the combination is especially appropriate with passive heating mechanisms such as the use of solar concentrators 136 and recirculation through an offset well (see FIG. 7 ).
  • the majority of the injection tube 218 comprises vacuum insulated tubing, while the tube section exposed to the heat exchanger 408 comprises standard tubing.
  • FIG. 5 is an illustration of one embodiment of a second target zone 502 in accordance with the present invention.
  • the stimulation module 116 may be further configured to stimulate 514 the second target zone 502
  • the completion unit 118 may be further configured to position the injection tube 218 substantially at the bottom of the second target zone 502 .
  • the system 100 may further comprise an isolation unit (not shown) configured to isolate 504 the portion of the fluid conduit 114 in fluid communication with the first target zone 210 from the portion of the fluid conduit 114 in fluid communication with the second target zone 502 .
  • the isolation unit may comprise a cementing unit configured to place a cement plug 504 , and/or a completion unit 118 to place a bridge plug 504 .
  • the injection unit 120 may inject the fluid 122 into the second target zone 502 .
  • the thermal delivery unit 124 heats the fluid 122 such that the energy of the heated fluid 122 entrains in-situ kerogen in the fluid 122 to generate the production fluid 126 .
  • the completion unit 118 may be configured to isolate 522 the production tube 216 from the wellbore above the second target zone 502 , and to isolate 520 the injection tube 218 from the production tube 216 such that the injected fluid 122 flows through the second target zone 502 .
  • the injection tube 218 maybe configured to inject the fluid 122 above or below a prior isolation 222 for the first target zone 210 .
  • the injection tube 218 is shown in the example injecting the fluid 122 below the previous isolation 222 .
  • FIG. 6 is a schematic block diagram depicting an alternate embodiment of at least one fluid conduit 114 to a top and a bottom of a target zone 210 in accordance with the present invention.
  • the primary difference in the embodiment of FIG. 6 from the embodiment of FIG. 2 is that the embodiment of FIG. 2 is an open-hole completion while the embodiment of FIG. 6 is a completion with casing 602 set within the target zone 210 , and wherein the fluid communication between the fluid conduit(s) 114 to the top and bottom of the target zone 210 comprises perforations 204 , 206 through the casing 602 (and supporting cement layer, if any) and into the target zone 210 .
  • the stimulation module 116 may comprise a hydraulic fracturing unit configured to fracture the target zone 210 and enhance the flow of the fluid 122 into the target zone 210 .
  • the stimulation module 116 may comprise an explosive device.
  • the system 100 may be configured such that the drilling unit 112 drills through the target zone 210 , the stimulation module 116 stimulates the target zone 210 with an explosion, the completion unit 118 sets casing 602 across the target zone 210 , cements the casing 602 , and forms perforations 204 , 206 through the casing 602 .
  • the stimulation module 116 may be further configured to stimulate the target zone 210 near the wellbore to connect the perforations 204 , 206 to the stimulated target zone 210 .
  • the near wellbore stimulation may involve a hydraulic fracturing treatment, a matrix acid treatment, or the like to reconnect the perforations 204 , 206 to the previously fractured target zone 210 .
  • the production module 216 may flow the production fluid 126 directly up the annulus between the injection tubing 218 and the casing 602 .
  • the production fluid 126 is flowed up a production tube 216 within the annulus between the injection tubing 218 and the casing 602 .
  • FIG. 7 is a schematic block diagram depicting one embodiment of heating a fluid 122 in accordance with the present invention.
  • the system 100 may comprise a circulation unit (not shown) configured to circulate the fluid 122 through an offset well 702 near the production well 114 .
  • the offset well 702 may comprise a depleted zone 704 , which may be a zone within an oil shale formation 212 which may already be depleted of production products, or kerogen.
  • offset indicates a well connected to a depleted zone 704 that is not the target zone 210 intended for production.
  • the well connected to the target zone 210 may be called the producing well.
  • the offset well may be an adjacent well to the producing well, a well completely across the field from the producing well, or a separate horizontal branch within the producing well, where the separate horizontal branch is in fluid communication with the depleted zone 704 , but is fluidly isolated—except for the intended delivery of the heated fluid 124 from the injection unit 120 —from the target zone 210 .
  • the fluid 122 may then be further heated in the system 100 or injected by the injection unit 120 .
  • the base temperature in the formation 704 is often much higher than the ambient surface temperature, and a significant savings in thermal energy costs can be achieved through heating the fluid 122 according to the embodiment of FIG. 7 .
  • FIG. 8A is a schematic block diagram depicting one embodiment of a first 802 and second 804 horizontal well segment in accordance with the present invention.
  • the horizontal well segments 802 , 804 share many features with the vertical well 114 descriptions of FIGS. 2 and 6 , including the function of the stimulation module 116 and other features. Therefore, the description of FIG. 8A should be read to be additive to those descriptions, and only to highlight a few differences that may be present in embodiments of the present invention that utilize one or more horizontal well segments.
  • the at least one fluid conduit 114 may comprise a first horizontal well segment 802 and a second horizontal well segment 804 .
  • the first horizontal well segment 802 may be in fluid communication with the top of the target zone 210
  • the second horizontal well segment 804 may be in fluid communication with the bottom of the target zone 210 .
  • the system 100 may comprise an injection tube 218 positioned substantially at the bottom of the target zone 210 , and a production tube 216 positioned substantially at the top of the target zone 210 .
  • the system 100 may further include a second target zone 502 .
  • the system 100 may include a first isolation unit 806 and a second isolation unit 808 configured such that the injection tube 218 and production tubes 216 are fluidly isolated from the second production zone 502 .
  • the well 114 completion of FIG. 8A maybe an openhole completion or a cased completion wherein the casing 602 is perforated.
  • the first target zone 210 may comprise a horizontal width equivalent to the thickness (height) of the first target zone 210 .
  • Such parameters are desirable because the fluid 122 injected at the injection tube 218 into the first target zone 210 generally propagates as a normally distributed curve within the target zone 210 , reaching a horizontal width approximately equal to the height of the target zone 210 by the time the fluid 122 propagates to the height of the target zone 210 (see FIG. 10 ).
  • the horizontal length of the first and second horizontal segments 802 , 804 may be 225 feet, and the height of the target zone 210 may be 100 feet.
  • splitting the oil shale formation 212 into two target zones 210 , 502 of 112.5 feet each with none of the oil shale formation left completely untreated will yield better oil recovery than two target zones 210 , 502 of 100 feet each, with 25 feet of the oil shale formation left untreated.
  • the horizontal length of the first and second horizontal segments 802 , 804 may be 200 feet, and the height of the target zone 210 may be 100 feet.
  • splitting the oil shale formation 212 into three target zones 210 , 502 , (not pictured) axially along the horizontal segments 802 , 804 may yield better economic recovery from the well 114 than two target zones 210 , 502 at 100 feet each.
  • target zone width is greater than the target zone height
  • the oil recovery will be lower, but the unit cost of production will be lower.
  • the target zone width is lower than the target zone height
  • the oil recovery will be higher, but the unit cost of production will be higher.
  • the selection of target zone 210 , 502 lengths along the horizontal segments 802 , 804 of the well is a similar exercise to determining the economic well spacing in embodiments using a vertical well 114 , discussed later. These economic considerations are within the skill of one in the art to determine optimal target zone 210 , 502 spacing based upon the production costs associated with a particular embodiment of the system 100 , the oil content of the formation 212 , and the disclosures herein, including the discussions referencing FIGS. 10A and 10B .
  • FIG. 8B is a schematic block diagram depicting an alternate embodiment of a first and second horizontal well segment 802 , 804 in accordance with the present invention.
  • FIG. 8B illustrates an embodiment where the first horizontal well segment 802 is associated with a first well 114 , and the second horizontal well segment 804 is associated with a second well 810 .
  • the information relating to the embodiment of FIG. 8A otherwise applies to the embodiment of FIG. 8B , and is not included to avoid unnecessary repetition.
  • FIG. 9 is a schematic block diagram depicting one embodiment of a first, second, and third horizontal well segment 802 , 804 , 902 in accordance with the present invention.
  • the embodiment of FIG. 9 may be used to develop two target zones 210 , 502 utilizing horizontal well segments 802 , 804 , 902 wherein the target zones 210 , 502 are aligned vertically, i.e. one target zone is above the other.
  • the drilling unit 112 may be further configured to drill a third horizontal segment 902 fluidly coupled to the top of the second target zone 502 .
  • the first horizontal segment 802 may be in fluid communication with the bottom of the second target zone 502 .
  • the stimulation module 116 may stimulate the second target zone 502 .
  • the completion unit 118 may position the injection tube 218 substantially at the bottom of the second target zone 502 .
  • the injection unit 120 may inject the fluid 122 into the second target zone 502 .
  • the thermal delivery unit 124 may heat the fluid 122 such that the heated fluid entrains in-situ kerogen from the second target zone 502 to generate the production fluid 126 .
  • the isolation unit (not shown) may be further configured to isolate the fluid conduit 114 from the first target zone 210 , for example by placing a cement plug and/or a bridge plug in the second horizontal segment 804 .
  • the production module 216 may be configured to produce the production fluid 126 .
  • the first target zone 210 and second target zone 502 may both be produced in a similar manner to the embodiment shown and described in relation to FIG. 8A , wherein the injection tube 218 is positioned substantially at the bottom of the first target zone 210 and/or second target zone 502 , and a production tube 216 , or flow area within a casing 602 annulus, receives the fluid 122 substantially at the top of the first target zone 210 and/or second target zone 502 .
  • Each target zone 210 , 502 may be divided into additional axially oriented target zones as illustrated in FIG. 8A .
  • the system 100 may be configured to produce the second target zone 502 upon the substantial depletion of the first target zone 210 .
  • injection units 220 , injection tubes 218 , and production modules 216 would allow the simultaneous production of multiple target zones 210 , 502 even within the same well 114 .
  • simultaneous production is merely practicing multiple embodiments of the invention simultaneously, and is considered within the scope of the invention.
  • FIG. 10A is an illustration of a well spacing 1002 in accordance with the present invention.
  • FIG. 10A illustrates a first well 114 and a second well 1014 that may comprise adjacent wells within an oil shale field.
  • the wells in the embodiment of FIG. 10A comprise a spacing 1002 , or horizontal offset, of 200 feet, and a target zone thickness (TZT) 1004 of 100 feet.
  • the injected gas 122 propagates through the formation 212 in a curve 1006 , 1008 that approximates a normal distribution where the one-half width of each curve 1006 , 1008 at the top of the target zone 210 is approximately equal to the TZT 1004 .
  • the free water (if any) within the propagation curve 1006 , 1008 inside the target zone 210 is displaced by the injected fluid 122 , and heating of the target zone 210 can be achieved.
  • the area above the injected gas 122 propagation curve 1006 , 1008 will be the primary area wherein kerogen is stripped from the target zone 210 and where the associated well 114 , 1014 will produce from.
  • One example of a target zone 210 is overlaid on the propagation curve 1006 in FIG. 10A to illustrate how the target zone 210 and propagation curve 1006 may relate to each other.
  • an unproduced area 1010 between the first well 114 and the second well 1014 is created due to the shape of the gas propagation 1006 , 1008 through the formation 212 .
  • the spacing 1002 of the embodiment of FIG. 10A ensures that little or no formation 212 volume is produced by more than one well, because there is little or no overlap between the first propagation curve 1006 and the second propagation curve 1008 .
  • the spacing 1002 of FIG. 10A will optimizing the drilling and production costs per unit of oil produced.
  • the spacing 1002 of FIG. 10A is appropriate where drilling and production costs dominate the economics of the system 100 .
  • FIG. 10B is an illustration of an alternate well spacing 1002 in accordance with the present invention.
  • FIG. 10B illustrates a first well 114 and a second well 1014 that may comprise adjacent wells within an oil shale field.
  • the wells in the embodiment of FIG. 10B comprise a spacing 1002 of 50 feet, and a TZT 1004 of 100 feet.
  • an unproduced area 1010 between the first well 114 and the second well 1014 is created due to the shape of the gas propagation 1006 , 1008 through the formation 212 .
  • the unproduced area 1010 for the embodiment of FIG. 10B is clearly small relative to the embodiment of FIG. 10A .
  • a redundantly produced area 1012 between the first well 114 and the second well 1014 is created due to the shape of the gas propagation 1006 , 1008 through the formation 212 and the close proximity of the wells 114 , 1014 .
  • the embodiment of FIG. 10B approximates the maximum recovery from the formation 212 , as bringing the wells 114 , 1014 closer would yield little reduction in the unproduced area 1010 while significantly increasing the redundantly produced area 1012 .
  • FIG. 11 is an illustration of a thermodynamic equilibrium chart for heavy hydrocarbons in the absence of excess hydrogen. As indicated by FIG. 11 , heavier hydrocarbons, above 30 carbons per molecule, are favored in the absence of excess hydrogen. FIG. 11 illustrates that a treatment module 128 operating in the absence of excess hydrogen is not expected to crack most formation kerogen compositions into smaller hydrocarbon molecules.
  • FIG. 12 is an illustration of a thermodynamic equilibrium chart for heavy hydrocarbons in the presence of excess hydrogen. As indicated by FIG. 12 , lighter hydrocarbons, around 10 carbons per molecule, are favored in the presence of excess hydrogen. Significant improvements in light hydrocarbon yield are achieved at all temperatures above about 65 degrees C. for the hydrocarbon mix illustrated in FIG. 12 , indicating that excess hydrocarbon is sufficient to favor light hydrocarbons at all reasonable operating temperatures. However, the reaction kinetics of cracking a heavy hydrocarbon indicate that temperatures for the catalytic reactor 302 need to be much higher than the minimum required to favor light hydrocarbons thermodynamically.
  • the exact temperatures required for an economically acceptable reaction speed in hydrocarbon cracking depend upon the composition of the kerogen in the production fluid 126 , the selected catalyst, the physical makeup of the catalytic reactor (size of the reactor, catalyst loading, catalyst bead pore size), and the flow rates of the production fluid 126 . These determinations are within the skill of on in the art for selecting a target temperature. A temperature requirement for a typical system 100 will be greater than 350 degrees C. As with almost all catalytic systems, some straightforward testing, within the skill of one in the art, is required to determine a target temperature for a specific production fluid 126 composition.
  • the schematic flow chart diagrams herein are generally set forth as logical flow chart diagrams. As such, the depicted order and labeled steps are indicative of one embodiment of the presented method. Other steps and methods may be conceived that are equivalent in function, logic, or effect to one or more steps, or portions thereof, of the illustrated method. Additionally, the format and symbols employed are provided to explain the logical steps of the method and are understood not to limit the scope of the method. Although various arrow types and line types may be employed in the flow chart diagrams, they are understood not to limit the scope of the corresponding method. Indeed, some arrows or other connectors may be used to indicate only the logical flow of the method. For instance, an arrow may indicate a waiting or monitoring period of unspecified duration between enumerated steps of the depicted method. Additionally, the order in which a particular method occurs may or may not strictly adhere to the order of the corresponding steps shown.
  • FIG. 13 is a schematic flow diagram of a method 1300 for extracting oil from oil shale in accordance with the present invention.
  • the method 1300 may begin with a drilling unit 112 drilling 1302 at least one fluid conduit to a top of a target zone 210 and a bottom of the target zone 210 of an oil shale formation 212 .
  • the stimulating module 116 may stimulate 1304 the target zone 210 .
  • a completion unit 118 may position 1306 an injection tube 218 substantially at the bottom of the target zone 210 , and a position 1308 a production tube 216 substantially at the top of the target zone 210 .
  • the method 1300 may include an injection unit 120 injecting 1310 fluid 122 into the target zone 210 .
  • Injecting 1310 the fluid 122 into the target zone 210 may include injecting the fluid 122 at a pressure greater than the formation fluid pressure, and lower than the formation fracture pressure, such that the fluid 122 displaces free water within the formation.
  • a thermal delivery unit 124 may heat 132 the fluid 122 with a downhole burner 402 to generate a production fluid 126 with entrained kerogen.
  • the production module 216 may produce 1314 the production fluid 126 .
  • the method 1300 may further include a treatment module 128 heating 1316 the production fluid 126 to a target temperature, and treating 1318 the production fluid 126 in a catalytic reactor 302 to reduce the average molecular weight of the entrained kerogen. Treating 1318 the production fluid 126 may further include adding natural gas from a natural gas storage facility 110 to the production fluid 126 such that a minimum estimated amount of hydrogen is available for reaction within the catalytic reactor 302 .
  • FIG. 14A is a schematic flow diagram of a method 1400 for extracting oil from an oil shale comprising a first and second target zone 210 , 502 in accordance with the present invention.
  • the method 1400 may begin with a drilling unit 112 drilling 1402 at least one fluid conduit to a top and a bottom of a target zone 210 .
  • a completion unit 118 may set 1404 a production casing 602 across the target zone 210 , and perforate 1406 the casing 602 substantially at the top and at the bottom of the target zone 210 .
  • the stimulation module 116 may stimulate 1408 the target zone 210 .
  • a completion unit 118 may position 1410 an injection tube 218 in the casing 602 substantially at the bottom of the target zone 210 .
  • a circulation unit (not shown) may circulate 1412 the fluid 122 through an offset well 702 with a depleted zone 704 .
  • a thermal delivery unit 124 may heat 1414 the fluid 122 with a solar concentrator 136 , and a gas burner 134 .
  • the method 1400 may include an injection unit 120 injecting 1416 the fluid 122 into the target zone 210 , where the fluid may heat and entrain kerogen within the target zone 210 to generate a production fluid 126 .
  • a production tube 116 may produce 1418 the production fluid 126 .
  • the method 1400 may continue with a stimulation module 116 stimulating 1420 a second target zone 502 .
  • An isolation unit (not shown) may isolate the first target zone 210 .
  • a completion unit 118 may position 1424 the injection tube 118 substantially at the bottom of the second target zone 502 .
  • a circulation unit (not shown) may circulate 1426 the fluid 122 through an offset well 702 with a depleted zone 704 .
  • a thermal delivery unit 124 may heat 1428 the fluid 122 with a solar concentrator 136 , and a gas burner 134 .
  • An injection unit 120 may inject 1430 the fluid 122 into the second target zone 502 where the fluid 122 may heat and entrain kerogen within the second target zone 502 to generate a production fluid 126 .
  • the production tube 116 may produce 1432 the production fluid 126 .
  • FIG. 15A is a schematic flow diagram of a method 1500 for extracting oil from an oil shale.
  • the method 1500 may begin with a drilling unit 112 drilling 1502 a first horizontal well segment 802 in fluid communication with the top of a target zone 210 , and a second horizontal well segment 804 in fluid communication with the bottom of the target zone 210 .
  • the method 1500 may include a stimulation module 116 stimulating 1504 the target zone 210 , and a completion unit 118 positioning 1506 an injection tube 218 substantially at the bottom of the target zone 210 .
  • the method 1500 may include an injection unit 120 injecting 1508 fluid 122 into the target zone 210 , and a thermal delivery unit 124 heating 15 10 the fluid 122 such that the heated fluid 122 entrains kerogen to generate a production fluid 126 .
  • the method 1500 may include a production tube 216 producing 1512 the production fluid 126 .
  • the method 1500 may continue with the drilling unit 112 drilling 1514 a third horizontal well segment 902 in fluid communication with a top of a second target zone 502 , where the first horizontal well segment 802 is in fluid communication with the bottom of the second target zone 502 .
  • the stimulation module 116 may stimulate 1516 the second target zone 502 .
  • the completion unit 118 may position 1518 an injection tube 218 substantially at the bottom of the second target zone 502 .
  • the method 1500 may include an isolation unit (not shown) isolating 1520 the fluid conduit in communication with the first target zone 804 from the fluid conduits in communication with the second target zone 802 , 902 .
  • the method 1500 may include the injection unit 120 injecting 1508 fluid 122 into the second target zone 502 , and a thermal delivery unit 124 heating 1510 the fluid 122 such that the heated fluid 122 entrains kerogen to generate a production fluid 126 .
  • the method 1500 may include a production tube 216 producing 1512 the production fluid 126 .
  • the invention provides a system, method, and apparatus for in-situ extraction of oil from an oil shale.
  • the invention overcomes previous limitations in the art by providing an energy efficient process utilizing inexpensive completion techniques to produce the oil in an environmentally sound manner.

Abstract

An apparatus, system, and method are disclosed for in-situ extraction of oil from oil shale. The method comprises drilling a fluid conduit in fluid communication with a top and a bottom of a target zone within an oil shale formation. The method includes stimulating the target zone. The method further includes injecting a heated fluid into the bottom of the target zone such that the heated fluid entrains the kerogen within the target zone into the injected fluid to generate a production fluid. The method concludes with producing the production fluid, containing the in-situ kerogen, from the top of the target zone to the surface.

Description

    CROSS-REFERENCES TO RELATED APPLICATIONS
  • This application claims the benefit of U.S. Provisional Patent Application No. 60/716,647 entitled “Apparatus, system, and method for extracting kerogen from shale with a recirculating fluid” and filed on Sep. 14, 2005 for Kevin Shurtleff, which is incorporated herein by reference. This application also claims the benefit of U.S. Provisional Patent Application No. 60/820,256 entitled “Apparatus, system, and method for in-situ extraction of oil from oil shale” and filed on Jul. 25, 2006 for Kevin Shurtleff, which is incorporated herein by reference.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • This invention relates to the production of oil from oil shale, and more particularly relates to stripping in-situ kerogen from an oil shale formation.
  • 2. Description of the Related Art
  • One of the last great untapped fossil fuel resources is oil from oil shale. Traditional oil production methods do not pull oil from shale because the oil contained within oil shales is stored as kerogen and will not flow from the shale formation. Kerogen is a high molecular weight hydrocarbon requiring temperatures over 300 degrees C. before it will break down and separate from the formation rock.
  • The conventional art for removing oil from oil shale is not economical, requiring shale formations with high oil content, and sustained high oil prices. For example, the oil shale deposits in Eastern Utah vary between 10 and 60 gallons of oil per ton of shale formation, and most conventional practices are only projected to be profitable above 25 gallons of oil per ton, meaning many formations are not suitable for these practices. Therefore, commercial oil shale production is not yet available on a large scale.
  • One example of a conventional practice for oil shale production is an in-situ conversion process (ICP) developed by Shell. In the ICP process, a large number of wells are drilled around a target zone, and a refrigerant is circulated through these wells to create an ice seal around the target zone and prevent formation water from migrating into the target zone. Then, two wells are drilled into the center of the target zone. The water already within the target zone is pumped out, an electric heater is placed within one of the wells, and oil is pumped out the other well as it is heated.
  • The ICP process covers the basic principles needed to remove oil from oil shale. First, the water in the target zone must be removed or displaced to allow the temperature in the target zone to reach the required level. Then, a large amount of thermal energy is required before the oil can be extracted. The ICP process has the disadvantage of requiring a large number of drilled wells, as well as the pumping losses and cooling requirements of the refrigerant wells.
  • Another example of a conventional practice for oil shale production is a strip mining process. An oil shale formation is mined and the bulk material treated at the surface to remove the kerogen. While this process is simple, it introduces a number of environmental issues which must be resolved. First, strip mining itself changes the landscape dramatically, and it can require many years before the land is again available for other purposes. Second, the bulk oil shale material, even when stripped of kerogen, may contain oil and chemical residues that present a disposal problem.
  • Another example of a conventional practice for oil shale production is an underground room and pillar mining process. The process is expensive and leaves significant amounts of kerogen in place as support for the mining chambers. The process is only economical in shallow shales (perhaps less than 1000 feet deep) and it requires minimum formation thicknesses of 50 to 100 feet. Again the bulk oil shale material requires disposal in this mining process.
  • From the foregoing discussion, it should be apparent that a need exists for an apparatus, system, and method that allows for the economic removal of oil from oil shale. Beneficially, such an apparatus, system, and method would strip the oil from the shale in-situ, and maximize the efficiency of the large amounts of thermal energy required to remove the oil from the shale formation.
  • SUMMARY OF THE INVENTION
  • The present invention has been developed in response to the present state of the art, and in particular, in response to the problems and needs in the art that have not yet been fully solved by currently available oil shale extraction systems. Accordingly, the present invention has been developed to provide an apparatus, system, and method for extracting oil from oil shale that overcome many or all of the above-discussed shortcomings in the art.
  • An apparatus is disclosed for extracting oil from oil shale. The apparatus may include a drilling unit for drilling a well to fluidly communicate with the top and bottom of a target zone of an oil shale formation. The apparatus may also include a stimulation module configured to stimulate the target zone. The apparatus may further include a completion unit configured to position an injection tube substantially at the bottom of the target zone, and an injection unit configured to inject a fluid into the target zone. The injection unit may be configured to inject the fluid into the target zone such that the fluid displaces free water within the target zone. The injected fluid may be commercial natural gas and/or produced natural gas from the well.
  • The apparatus may include a thermal delivery unit configured to heat the fluid such that the heated fluid entrains in-situ kerogen to generate a production fluid. The thermal delivery unit may be configured to heat the fluid at the surface using a solar concentrator and/or a gas burner. The thermal delivery unit may comprise a downhole burner configured to heat the fluid in the well without introducing combustion byproducts into the fluid. In one embodiment, the apparatus may include a circulation unit to circulate the fluid through an offset well to preheat the fluid before heating of the fluid by the thermal delivery unit.
  • The apparatus may further include a production module, which maybe a tube, to produce the production fluid. The apparatus may include a treatment module configured to heat the production fluid to a target temperature, add natural gas to provide excess hydrogen if needed, and react the production fluid on a catalytic reactor. The treatment module may thus break the hydrocarbons of the production fluid into smaller, more commercially valuable hydrocarbons.
  • The stimulation module may be further configured to stimulate a second target zone, which may be in the well in a higher location than the first target zone. The completion unit may be configured to position the injection tube substantially at the bottom of the second target zone. The apparatus may further include an isolation unit configured to isolate the well from the first target zone. The injection unit may be further configured to inject the fluid into the second target zone. The thermal delivery unit may be further configured to heat the fluid such that energy of the heated fluid entrains in-situ kerogen within the second target zone to generate the production fluid.
  • A method is disclosed for extracting oil from oil shale. The method may comprise drilling a well to fluidly communicate with the top and bottom of a target zone. The well may include one or more wells, and the well(s) may be vertical or horizontal wells. The method may further include stimulating the target zone, and positioning an injection tube substantially at the bottom of the target zone. The method may then include injecting a fluid into the target zone, and heating the fluid such that the heated fluid entrains in-situ kerogen to generate a production fluid. The method may include producing the production fluid. The method may conclude with heating the production fluid to a target temperature and treating the production fluid in a catalytic reactor to reduce the average molecular weight of the entrained kerogen. The method may further comprise adding natural gas to the production fluid such that a minimal amount of hydrogen is available for reaction within the catalytic
  • In one embodiment, the method may include positioning a production tube substantially at the top of the target zone, where producing the production fluid comprises flowing the production fluid up the production tubing. The method may include setting a production casing through the oil shale formation, and perforating the production casing substantially near the bottom of the target zone, perforating the production casing substantially near the top of the target zone. Where the method includes a production casing, positioning the injection tube further comprises positioning the injection tube within the production casing, and producing the production fluid may comprise flowing the production fluid up the annulus formed between the production casing and the injection tubing. Flowing the production fluid up the annulus formed between the production casing and the injection tubing may include positioning a production tube within the annulus, and producing the production fluid up the production tube.
  • A system is disclosed for in-situ extraction of oil from oil shale. The system may include a three-phase separator configured to separate a production fluid into oil, water, and natural gas, and fluid coupling configured to deliver separated water to a water disposal system, to deliver separated oil to an oil storage facility, and to deliver separated natural gas to a natural gas storage facility. The system may further include a drilling unit for drilling a well to fluidly communicate with the top and bottom of a target zone of an oil shale formation. The system may also include a stimulation module configured to stimulate the target zone. The system may further include a completion unit configured to position an injection tube substantially at the bottom of the target zone, and an injection unit configured to inject a fluid into the target zone. The injection unit may be configured to inject the fluid into the target zone such that the fluid displaces free water within the target zone. The injected fluid may be commercial natural gas and/or produced natural gas from the well.
  • The system may further include a production module, which maybe a tube, to produce the production fluid. The system may include a treatment module configured to heat the production fluid to a target temperature, add natural gas to provide excess hydrogen if needed, and react the production fluid on a catalytic reactor. The treatment module may thus break the hydrocarbons of the production fluid into smaller, more commercially valuable hydrocarbons. The system may also include a condensing module configured to cool the reacted production fluid and deliver the cooled fluid to the three-phase separator.
  • Reference throughout this specification to features, advantages, or similar language does not imply that all of the features and advantages that may be realized with the present invention should be or are in any single embodiment of the invention. Rather, language referring to the features and advantages is understood to mean that a specific feature, advantage, or characteristic described in connection with an embodiment is included in at least one embodiment of the present invention. Thus, discussion of the features and advantages, and similar language, throughout this specification may, but do not necessarily, refer to the same embodiment.
  • Furthermore, the described features, advantages, and characteristics of the invention may be combined in any suitable manner in one or more embodiments. One skilled in the relevant art will recognize that the invention may be practiced without one or more of the specific features or advantages of a particular embodiment. In other instances, additional features and advantages may be recognized in certain embodiments that may not be present in all embodiments of the invention.
  • These features and advantages of the present invention will become more fully apparent from the following description and appended claims, or may be learned by the practice of the invention as set forth hereinafter.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • In order that the advantages of the invention will be readily understood, a more particular description of the invention briefly described above will be rendered by reference to specific embodiments that are illustrated in the appended drawings. Understanding that these drawings depict only typical embodiments of the invention and are not therefore to be considered to be limiting of its scope, the invention will be described and explained with additional specificity and detail through the use of the accompanying drawings, in which:
  • FIG. 1 is a schematic block diagram depicting one embodiment of a system for removing oil from oil shale in accordance with the present invention;
  • FIG. 2 is a schematic block diagram depicting one embodiment of at least one fluid conduit to a top of a target zone and a bottom of a target zone of an oil shale formation;
  • FIG. 3 is a schematic block diagram depicting one embodiment of a treatment module in accordance with the present invention;
  • FIG. 4 is a schematic block diagram depicting one embodiment of a downhole burner in accordance with the present invention;
  • FIG. 5 is an illustration of one embodiment of a second target zone in accordance with the present invention;
  • FIG. 6 is a schematic block diagram depicting an alternate embodiment of a at least one fluid conduit to a top and a bottom of a target zone in accordance with the present invention;
  • FIG. 7 is a schematic block diagram depicting one embodiment of heating a hydrocarbon gas in accordance with the present invention;
  • FIG. 8A is a schematic block diagram depicting one embodiment of a first and second horizontal well segment in accordance with the present invention;
  • FIG. 8B is a schematic block diagram depicting an alternate embodiment of a first and second horizontal well segment in accordance with the present invention;
  • FIG. 9 is a schematic block diagram depicting one embodiment of a first, second, and third horizontal well segment in accordance with the present invention;
  • FIG. 10A is an illustration of a well spacing in accordance with the present invention;
  • FIG. 10B is an illustration of an alternate well spacing in accordance with the present invention;
  • FIG. 11 is an illustration of a thermodynamic equilibrium chart for heavy hydrocarbons in the absence of excess hydrogen;
  • FIG. 12 is an illustration of a thermodynamic equilibrium chart for heavy hydrocarbons in the presence of excess hydrogen;
  • FIG. 13 is a schematic flow diagram of a method for extracting oil from oil shale in accordance with the present invention;
  • FIG. 14A is a schematic flow diagram of a method for extracting oil from an oil shale comprising a first and second target zone in accordance with the present invention;
  • FIG. 14B is a schematic flow diagram of a method for extracting oil from an oil shale comprising a first and second target zone in accordance with the present invention;
  • FIG. 15A is a schematic flow diagram of a method for extracting oil from an oil shale, the method comprising drilling at least one horizontal well segment, in accordance with the present invention; and
  • FIG. 15B is a schematic flow diagram of a method for extracting oil from an oil shale, the method comprising drilling at least one horizontal well segment, in accordance with the present invention.
  • DETAILED DESCRIPTION OF THE INVENTION
  • It will be readily understood that the components of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations. Thus, the following more detailed description of the embodiments of the apparatus, system, and method of the present invention, as presented in FIGS. 1 through 15B, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
  • Reference throughout this specification to “one embodiment” or “an embodiment” means that a particular feature, structure, or characteristic described in connection with the embodiment is included in at least one embodiment of the present invention. Thus, appearances of the phrases “in one embodiment” or “in an embodiment” in various places throughout this specification are not necessarily all referring to the same embodiment.
  • Furthermore, the described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments. In the following description, numerous specific details are provided, such as examples of materials, fasteners, sizes, lengths, widths, shapes, etc., to provide a thorough understanding of embodiments of the invention. One skilled in the relevant art will recognize, however, that the invention can be practiced without one or more of the specific details, or with other methods, components, materials, etc. In other instances, well-known structures, materials, or operations are not shown or described in detail to avoid obscuring aspects of the invention.
  • FIG. 1 is a schematic block diagram depicting one embodiment of a system 100 for removing oil from oil shale in accordance with the present invention. The system 100 may comprise a three-phase separator 102 configured to separate a production fluid into oil, water, and natural gas. The system 100 may further include fluid coupling 104 configured to deliver separated water to a water disposal system 106, to deliver separated oil to an oil storage facility 108, and to deliver separated natural gas to a natural gas storage facility 110.
  • The system 100 may further comprise a drilling unit 112 configured to drill at least one fluid conduit to a top of a target zone and a bottom of the target zone of an oil shale formation. The fluid conduit(s) to a top of a target zone and a bottom of the target zone of an oil shale formation may comprise a well 114. The well 114 may comprise one or more vertical wells 114, and/or one or more horizontal wells 114. The target zone may comprise a region within an oil shale formation from which the system 100 will remove the oil from the oil shale. Some of the details of one embodiment of a well 114 are shown in FIG. 2 for clarity. The drilling unit 112 may comprise a coiled-tubing drilling unit, or a standard drilling rig.
  • The system 100 may further comprise a stimulation module 116. The stimulation module 116 may comprise an explosive device, a hydraulic fracturing unit, a matrix acid unit, and/or other stimulation units known in the art. In one example, the stimulation module 116 comprises an explosive device configured to detonate within the target zone, and create a semi-spherical fractured region around the wellbore of the well 114, with approximately a 90 foot radius and a 45 foot height. The stimulation module 116 may comprise multiple explosive devices depending upon the fracture capability of a given device, and the size of the intended target zone.
  • The system 100 may further comprise a completion unit 118 configured to position an injection tube substantially at the bottom of the target zone. Positioning as used herein describes the placement and positioning of the injection tube outlet, where the injection tube inlet may be at the wellhead of the well 114, at the surface, on a coiled tubing unit, or at some other location depending upon the specific embodiment of the invention. The completion unit 118 may comprise a workover rig, a completion rig, or a coiled tubing unit. Any other type of tubing placement equipment suitable to place injection tubing in the well 114 is considered a completion unit 118 within the scope of the invention.
  • The system 100 may have an injection unit 120 configured to inject a fluid 122 into the target zone. The fluid 122 may comprise any gas compatible with the formation, and may typically comprise natural gas, nitrogen, water vapor, and carbon dioxide. Without limitation, the fluid 122 may also comprise carbon monoxide, helium, hydrogen, argon, neon, methane, ethane, propane, butane, and the like. The injection unit 120 may be configured to inject the fluid 122 into the target zone such that the fluid 122 displaces free water within the target zone 210 (see FIG. 2). In one embodiment, the fluid 122 is injected at a pressure higher than a fluid pressure of the formation and lower than a fracture pressure of the formation. In one example, an oil shale formation comprises a fluid formation pressure of about 1300 psig, and a fracture pressure of about 2100 psig, at a formation depth of about 3000 feet.
  • The injection pressure for displacement of free water is measured at the formation depth (the “downhole pressure”). It is within the skill of one in the art to estimate the downhole pressure from the surface pressure, or to place a downhole pressure device in formations where small differences between the fracturing pressure and the formation fluid pressure require greater accuracy than surface estimates allow.
  • The system 100 may include a thermal delivery unit 124 configured to heat the fluid 122 such that the heated fluid 122 entrains in-situ kerogen to generate a production fluid 126. The system 100 may include a treatment module 128 configured to heat the production fluid 126 to a target temperature and to react the production fluid 126 in a catalytic reactor. Further details of one embodiment of a treatment module 128 are provided in reference to FIG. 3. The system 100 may further include a condensing module 130 configured to cool the production fluid 126 and to deliver the reacted production fluid 126 to the three-phase separator 102.
  • The thermal delivery unit 124 may be configured to heat the fluid 122 at the surface as shown in the embodiment of FIG. 1, or to heat the fluid 122 closer to the target zone, for example within the well 114. The thermal delivery unit 124 may include an oil heater 132 configured to receive heat from a natural gas burner 134, and/or from a solar concentrator 136. The thermal delivery unit 124 may further include a heat exchanger 138 configured to transfer the heat from the oil heater 132 to the fluid 122. The unit 124 may cycle oil from an oil sump 140, through the oil heater 132, and through the heat exchanger 138, before returning the oil to the oil sump 140. Other methods of collecting heat from the natural gas burner 134 and/or the solar concentrator 136 are known in the art, and these are contemplated within the scope of the invention.
  • The heated fluid 122 entrains in-situ kerogen over a period of time. The fluid 122 begins heating the formation from the well 114 outward into the target zone 210 of the formation. After a period of time, the kerogen breaks down, releases from the oil shale, and is entrained into the fluid 122 to generate the production fluid 126. Eventually, the entire target zone 210 treated by the injection of the fluid 122 becomes substantially depleted of kerogen, and the oil cut of the production fluid 126 drops to the point where further operation of the system 100 to remove oil from the oil shale is no longer economical.
  • In one example for general guidance, using methane at 400 degrees C. as the heated fluid 122, the fluid 122 is injected at 2,300 cubic feet per minute, and approximately 60% of the in-situ kerogen from the target zone is estimated to be extracted from a well 114 draining a 0.72 acre area, with a 100 foot thick target zone, within one year. The exact temperatures, injection rates, and depletion times depend upon the characteristics of the individual formation and kerogen within that formation, the specific costs of drilling, heating, and pumping the fluid 122 and are calculations within the skill of one in the art in light of the disclosures herein.
  • Generally, temperatures below 300 degrees C. may not break down and entrain kerogen except in oil shale formations where the kerogen may have a very low base molecular weight. Consequently, the system 100 operates with a preferred temperature for the fluid above 300 degrees C. Economic considerations such as the desired time to produce a target zone to depletion may drive the temperature determination even higher than 400 degrees C. which will break down and entrain most kerogens. These determinations can be made from a simple core sample test of the oil shale formation and the economics of a given embodiment of the system 100, and are within the skill of one in the art.
  • The system 100 may include a production module (shown in FIG. 2) configured to produce the production fluid 126 from the formation to the surface. In the context of the present invention, producing the production fluid 126 means flowing the production fluid 126 to the surface, either through the inherent pressure within the fluid 126, or through artificial means such as pumping or the like.
  • The natural gas storage facility 110 may be configured to provide natural gas to the natural gas burner 134, to provide natural gas to the injection unit 120, perhaps through the heat exchanger 138, and to provide natural gas to the treatment module 128. The natural gas storage facility 110 may be connected to an external gas source through a control valve 142, and may be configured to receive gas from the external gas source, or to deliver excess produced gas to the external gas source.
  • The system 100 may comprise various temperature, pressure, and fluid density sensors, control valves, and electronic or other controls to utilize these features. These sensors and controls are known in the art, and are omitted from the system 100 shown in FIG. 1 to avoid obfuscating features of the illustrated embodiment of the invention.
  • FIG. 2 is a schematic block diagram depicting one embodiment of at least one fluid conduit 114 to a top of a target zone and a bottom of a target zone of an oil shale formation, where the at least one fluid conduit in FIG. 2 comprises a well 114. The features shown in FIG. 2 indicate functional relationships only and are not drawn to scale. For example, the depth of the oil shale formation 212 from the surface may vary from near the surface to several thousand feet. The well 114 may include a wellhead 202 configured to allow the introduction and expulsion of fluids from the well 114, and to contain any pressure from the well 114. The well 114 may form a fluid conduit 204 to the top of a target zone 210 of an oil shale formation 212, and a fluid conduit 206 to the bottom of the target zone 210 of the oil shale formation 212.
  • The stimulation module 116 may be configured to stimulate the target zone 210, and thereby create at least one stimulated region 214. In one embodiment, a fractured semi-spherical region 214 is created from an explosive fracturing device. Where the target zone 210 is taller than the stimulated region 214 from a single explosive device, multiple explosions may be used to stimulate as much of the target zone 210 as economic considerations dictate. In the example shown in FIG. 2, the stimulation module 116 created two stimulated regions 214 each about 45 feet tall and 90-foot radius, where the target zone 210 is about 100 feet thick (tall) and 200 feet in diameter.
  • The well 114 may include a production module 216 configured to produce the production fluid 126. The production module 216 may be a production tube 216 positioned substantially at the top of the target zone 210. Ideally, the production module 216 will draw fluid from the target zone 210 at the top of the target zone 210, but design considerations and physical constraints of the system 100 may require the production module 216 to draw fluid from above or below the top of the target zone without detriment to the functioning of the present invention.
  • For example, in deep wells the exact placement of the end of the production tube 216 may be uncertain to within a range of several feet without the use of expensive logging tools to place the end of the tube 216. The invention does not require that such error be accounted for. In another example, the system 100 may be designed such that a second target zone (refer to FIG. 5) will be completed above the first target zone 210 at a later time. In the example, the placement of the production tube 216 may be 10 feet (or more) above or below the top of the target zone 210 to allow for a cement plug or other isolation mechanism to isolate the first and second target zones. These allowances are within the margin indicated by a production tube 216 positioned substantially at the top of the target zone 210.
  • The system 100 may include an injection tube 218 positioned within the well 114 substantially at the bottom of the target zone 210 of the oil shale formation 212. As with the production tube 216, the exact placement of the injection tube 218 is not critical, although ideally a position at the bottom of the target zone 210 is desirable. The injection unit 120 may further comprise isolation 220 within the well 114, such that injected fluid 122 enters the target zone 210. The isolation 220 may comprise a cement plug, a pair of bridge plugs—one at the top and one at the bottom of the region 220—or the like.
  • In one embodiment, the fluid 122 comprises a fluid heated at the surface, and the injection tube 218 comprises a vacuum insulated tube. The vacuum insulated tubing may comprise a k-factor of 0.006 to 0.02 BTU/hr-ft-degF, or about 5000 times lower than the k-factor of standard production steel tubing. The fluid 122 may be heated at the surface using combusted natural gas (134, 132, 138), a solar concentrator 136, and/or through recirculation of the fluid 122 through an offset depleted well (see FIG. 7).
  • The well 114 may include an upper isolation 222 configured to prevent exposure of the backside of the production tube 216 to the production fluid 126. The upper isolation 222 is not necessary for the proper function of the invention, but in some embodiments the upper isolation 222 may be desirable to protect the production tube 216 from unnecessary exposure to contaminants.
  • The embodiment of FIG. 2 illustrates an open-hole completion, or a producing well 114 without casing set through the target zone 210. The well 114 may be a cased well, as indicated by an embodiment of a well 114 illustrated in FIG. 6.
  • FIG. 3 is a schematic block diagram depicting one embodiment of a treatment module 128 in accordance with the present invention. The treatment module 128 may be configured to heat the production fluid 126 to a target temperature and to react the production fluid in a catalytic reactor 302. This reduces the average molecular weight of the entrained kerogen in the production fluid 126. A typical kerogen will exceed twenty carbons per hydrocarbon molecule, although the extracted kerogen will also produce a significant amount of natural gas which is generally considered one to four carbons per molecule. Hydrocarbons roughly around ten carbons per molecule are generally much more commercially desirable than the large hydrocarbons over twenty carbons per molecule.
  • In one embodiment, the treatment module 128 receives natural gas 304 from the natural gas storage facility 110, combusts the natural gas in a burner 306, and heats the production fluid 126 in a heat exchanger 308 with the combusted gas 310. The amount of gas 304 to be combusted will depend upon the mass and heat capacity of the production fluid 126, the energy in the gas 304, the efficiency of the burner 306 and heat exchanger 308, and the target temperature. The sensors and controls to implement the heating controls are known in the art and not described herein to avoid obscuring aspects of the invention.
  • The treatment module 128 may include scrubbing contaminants from the production fluid 126 before treating the production fluid 126 in the catalytic reactor 302. Among the contaminants which may be present in the production fluid 126 are sulfur compounds, nitrogen compounds, and heavy metals or metalloids such as arsenic. The scrubbing may be performed before or after heating the production fluid 126 in the heat exchanger 308, although separating before heating may lower the heat burden of the heat exchanger 308. Various scrubbing systems are known in the art.
  • The treatment module 128 may be configured to react the production fluid 126 in a catalytic reactor 302 after heating. A standard platinum-based catalyst may be used in the catalytic reactor 302, although many catalytic systems are known that lower the activation energy of the hydrocarbon cracking reaction and thereby reduce the time to thermodynamic equilibrium. These systems are contemplated within the scope of the invention. Catalyst selection and sizing of the reactor 302 depends upon the specific composition of the production fluid 126. The catalyst and sizing selections are within the skill of one in the art, and can be determined for a particular production fluid 126 with simple and straightforward field experiments.
  • When cracking large hydrocarbon molecules into smaller hydrocarbon molecules, the presence of excess available hydrogen makes smaller hydrocarbons the favored thermodynamic product. To ensure the thermodynamics favor the production of small hydrocarbons, where the production fluid 126 does not contain enough methane and other light-end hydrocarbon gases, the treatment module 128 may add natural gas 304 to the production fluid 126 before heating in the heat exchanger 308. In one embodiment, a preferred ratio is at least one free methane for each large hydrocarbon molecule, or about 5% by weight methane. The ratios for specific embodiments vary with the compositions of the available natural gas 304, the production fluid 126, the target temperature, and the catalyst type and loading on the reactor 302, and can be calculated by one of skill in the art based on the data for the contemplated embodiment and the disclosures herein.
  • FIG. 4 is a schematic block diagram depicting one embodiment of a downhole burner 402 in accordance with the present invention. The thermal delivery unit 124 may comprise a downhole burner 402 configured to heat the fluid 122 within the at least one fluid conduit (the well 114) to the bottom of the target zone 210. The downhole burner 402 may combust a heating fluid 404 within the well 114. The heating fluid 404 may comprise a mixture of natural gas and oxygen (or air). The burner 402 may pass the combusted heating fluid 406 through a heat exchanger 408 to heat the fluid 122 in the injection tube 218.
  • The use of a downhole burner 402 may be combined with surface heating of the thermal conduit fluid 124 and/or vacuum insulated tubing 218. Without limitation, the combination is especially appropriate with passive heating mechanisms such as the use of solar concentrators 136 and recirculation through an offset well (see FIG. 7). In one embodiment, the majority of the injection tube 218 comprises vacuum insulated tubing, while the tube section exposed to the heat exchanger 408 comprises standard tubing.
  • FIG. 5 is an illustration of one embodiment of a second target zone 502 in accordance with the present invention. The stimulation module 116 may be further configured to stimulate 514 the second target zone 502, and the completion unit 118 may be further configured to position the injection tube 218 substantially at the bottom of the second target zone 502. The system 100 may further comprise an isolation unit (not shown) configured to isolate 504 the portion of the fluid conduit 114 in fluid communication with the first target zone 210 from the portion of the fluid conduit 114 in fluid communication with the second target zone 502. The isolation unit may comprise a cementing unit configured to place a cement plug 504, and/or a completion unit 118 to place a bridge plug 504.
  • The injection unit 120 may inject the fluid 122 into the second target zone 502. The thermal delivery unit 124 heats the fluid 122 such that the energy of the heated fluid 122 entrains in-situ kerogen in the fluid 122 to generate the production fluid 126.
  • In the example of FIG. 5, the completion unit 118 may be configured to isolate 522 the production tube 216 from the wellbore above the second target zone 502, and to isolate 520 the injection tube 218 from the production tube 216 such that the injected fluid 122 flows through the second target zone 502. The injection tube 218 maybe configured to inject the fluid 122 above or below a prior isolation 222 for the first target zone 210. The injection tube 218 is shown in the example injecting the fluid 122 below the previous isolation 222.
  • FIG. 6 is a schematic block diagram depicting an alternate embodiment of at least one fluid conduit 114 to a top and a bottom of a target zone 210 in accordance with the present invention. The primary difference in the embodiment of FIG. 6 from the embodiment of FIG. 2 is that the embodiment of FIG. 2 is an open-hole completion while the embodiment of FIG. 6 is a completion with casing 602 set within the target zone 210, and wherein the fluid communication between the fluid conduit(s) 114 to the top and bottom of the target zone 210 comprises perforations 204, 206 through the casing 602 (and supporting cement layer, if any) and into the target zone 210.
  • In the embodiment of FIG. 6, the stimulation module 116 may comprise a hydraulic fracturing unit configured to fracture the target zone 210 and enhance the flow of the fluid 122 into the target zone 210. The stimulation module 116 may comprise an explosive device.
  • In one embodiment of FIG. 6 when the stimulation module 116 comprises an explosive device, the system 100 may be configured such that the drilling unit 112 drills through the target zone 210, the stimulation module 116 stimulates the target zone 210 with an explosion, the completion unit 118 sets casing 602 across the target zone 210, cements the casing 602, and forms perforations 204, 206 through the casing 602. In the example, the stimulation module 116 may be further configured to stimulate the target zone 210 near the wellbore to connect the perforations 204, 206 to the stimulated target zone 210. The near wellbore stimulation may involve a hydraulic fracturing treatment, a matrix acid treatment, or the like to reconnect the perforations 204, 206 to the previously fractured target zone 210.
  • The production module 216 may flow the production fluid 126 directly up the annulus between the injection tubing 218 and the casing 602. In the embodiment of FIG. 6, the production fluid 126 is flowed up a production tube 216 within the annulus between the injection tubing 218 and the casing 602.
  • FIG. 7 is a schematic block diagram depicting one embodiment of heating a fluid 122 in accordance with the present invention. The system 100 may comprise a circulation unit (not shown) configured to circulate the fluid 122 through an offset well 702 near the production well 114. The offset well 702 may comprise a depleted zone 704, which may be a zone within an oil shale formation 212 which may already be depleted of production products, or kerogen. As used herein, offset indicates a well connected to a depleted zone 704 that is not the target zone 210 intended for production. The well connected to the target zone 210 may be called the producing well. The offset well may be an adjacent well to the producing well, a well completely across the field from the producing well, or a separate horizontal branch within the producing well, where the separate horizontal branch is in fluid communication with the depleted zone 704, but is fluidly isolated—except for the intended delivery of the heated fluid 124 from the injection unit 120—from the target zone 210.
  • After circulation through the offset well, the fluid 122 may then be further heated in the system 100 or injected by the injection unit 120. The base temperature in the formation 704 is often much higher than the ambient surface temperature, and a significant savings in thermal energy costs can be achieved through heating the fluid 122 according to the embodiment of FIG. 7.
  • FIG. 8A is a schematic block diagram depicting one embodiment of a first 802 and second 804 horizontal well segment in accordance with the present invention. The horizontal well segments 802, 804 share many features with the vertical well 114 descriptions of FIGS. 2 and 6, including the function of the stimulation module 116 and other features. Therefore, the description of FIG. 8A should be read to be additive to those descriptions, and only to highlight a few differences that may be present in embodiments of the present invention that utilize one or more horizontal well segments.
  • The at least one fluid conduit 114 may comprise a first horizontal well segment 802 and a second horizontal well segment 804. The first horizontal well segment 802 may be in fluid communication with the top of the target zone 210, and the second horizontal well segment 804 may be in fluid communication with the bottom of the target zone 210. The system 100 may comprise an injection tube 218 positioned substantially at the bottom of the target zone 210, and a production tube 216 positioned substantially at the top of the target zone 210.
  • The system 100 may further include a second target zone 502. The system 100 may include a first isolation unit 806 and a second isolation unit 808 configured such that the injection tube 218 and production tubes 216 are fluidly isolated from the second production zone 502. The well 114 completion of FIG. 8A maybe an openhole completion or a cased completion wherein the casing 602 is perforated.
  • The first target zone 210 may comprise a horizontal width equivalent to the thickness (height) of the first target zone 210. Such parameters are desirable because the fluid 122 injected at the injection tube 218 into the first target zone 210 generally propagates as a normally distributed curve within the target zone 210, reaching a horizontal width approximately equal to the height of the target zone 210 by the time the fluid 122 propagates to the height of the target zone 210 (see FIG. 10).
  • However, specific embodiments may vary considerably from this general guideline. For example, the horizontal length of the first and second horizontal segments 802, 804 may be 225 feet, and the height of the target zone 210 may be 100 feet. In such an example, splitting the oil shale formation 212 into two target zones 210, 502 of 112.5 feet each with none of the oil shale formation left completely untreated will yield better oil recovery than two target zones 210, 502 of 100 feet each, with 25 feet of the oil shale formation left untreated. In another example, the horizontal length of the first and second horizontal segments 802, 804 may be 200 feet, and the height of the target zone 210 may be 100 feet. For the purposes of the example, if the oil content of the formation 212 is relatively high, and the price of oil is relatively high, the costs of completing and producing additional target zones within the formation 212 may be lower than the enhanced recovery by using shorter target zones. Therefore, splitting the oil shale formation 212 into three target zones 210, 502, (not pictured) axially along the horizontal segments 802, 804 may yield better economic recovery from the well 114 than two target zones 210, 502 at 100 feet each.
  • Where the target zone width is greater than the target zone height, the oil recovery will be lower, but the unit cost of production will be lower. Where the target zone width is lower than the target zone height, the oil recovery will be higher, but the unit cost of production will be higher. The selection of target zone 210, 502 lengths along the horizontal segments 802, 804 of the well is a similar exercise to determining the economic well spacing in embodiments using a vertical well 114, discussed later. These economic considerations are within the skill of one in the art to determine optimal target zone 210, 502 spacing based upon the production costs associated with a particular embodiment of the system 100, the oil content of the formation 212, and the disclosures herein, including the discussions referencing FIGS. 10A and 10B.
  • FIG. 8B is a schematic block diagram depicting an alternate embodiment of a first and second horizontal well segment 802, 804 in accordance with the present invention. FIG. 8B illustrates an embodiment where the first horizontal well segment 802 is associated with a first well 114, and the second horizontal well segment 804 is associated with a second well 810. The information relating to the embodiment of FIG. 8A otherwise applies to the embodiment of FIG. 8B, and is not included to avoid unnecessary repetition.
  • FIG. 9 is a schematic block diagram depicting one embodiment of a first, second, and third horizontal well segment 802, 804, 902 in accordance with the present invention. The embodiment of FIG. 9 may be used to develop two target zones 210, 502 utilizing horizontal well segments 802, 804, 902 wherein the target zones 210, 502 are aligned vertically, i.e. one target zone is above the other. In the embodiment of FIG. 9, the drilling unit 112 may be further configured to drill a third horizontal segment 902 fluidly coupled to the top of the second target zone 502.
  • The first horizontal segment 802 may be in fluid communication with the bottom of the second target zone 502. The stimulation module 116 may stimulate the second target zone 502. The completion unit 118 may position the injection tube 218 substantially at the bottom of the second target zone 502. The injection unit 120 may inject the fluid 122 into the second target zone 502. The thermal delivery unit 124 may heat the fluid 122 such that the heated fluid entrains in-situ kerogen from the second target zone 502 to generate the production fluid 126. The isolation unit (not shown) may be further configured to isolate the fluid conduit 114 from the first target zone 210, for example by placing a cement plug and/or a bridge plug in the second horizontal segment 804. The production module 216 may be configured to produce the production fluid 126.
  • The first target zone 210 and second target zone 502 may both be produced in a similar manner to the embodiment shown and described in relation to FIG. 8A, wherein the injection tube 218 is positioned substantially at the bottom of the first target zone 210 and/or second target zone 502, and a production tube 216, or flow area within a casing 602 annulus, receives the fluid 122 substantially at the top of the first target zone 210 and/or second target zone 502. Each target zone 210, 502 may be divided into additional axially oriented target zones as illustrated in FIG. 8A. In a further embodiment, the system 100 may be configured to produce the second target zone 502 upon the substantial depletion of the first target zone 210.
  • One of skill in the art will recognize that the proper combination of injection units 220, injection tubes 218, and production modules 216 would allow the simultaneous production of multiple target zones 210, 502 even within the same well 114. Such simultaneous production is merely practicing multiple embodiments of the invention simultaneously, and is considered within the scope of the invention.
  • FIG. 10A is an illustration of a well spacing 1002 in accordance with the present invention. FIG. 10A illustrates a first well 114 and a second well 1014 that may comprise adjacent wells within an oil shale field. The wells in the embodiment of FIG. 10A comprise a spacing 1002, or horizontal offset, of 200 feet, and a target zone thickness (TZT) 1004 of 100 feet. The injected gas 122 propagates through the formation 212 in a curve 1006, 1008 that approximates a normal distribution where the one-half width of each curve 1006, 1008 at the top of the target zone 210 is approximately equal to the TZT 1004.
  • When the fluid 122 is injected at the proper pressure, the free water (if any) within the propagation curve 1006, 1008 inside the target zone 210 is displaced by the injected fluid 122, and heating of the target zone 210 can be achieved. The area above the injected gas 122 propagation curve 1006, 1008 will be the primary area wherein kerogen is stripped from the target zone 210 and where the associated well 114, 1014 will produce from. One example of a target zone 210 is overlaid on the propagation curve 1006 in FIG. 10A to illustrate how the target zone 210 and propagation curve 1006 may relate to each other.
  • In the embodiment of FIG. 10A, an unproduced area 1010 between the first well 114 and the second well 1014 is created due to the shape of the gas propagation 1006, 1008 through the formation 212. However, the spacing 1002 of the embodiment of FIG. 10A ensures that little or no formation 212 volume is produced by more than one well, because there is little or no overlap between the first propagation curve 1006 and the second propagation curve 1008. The spacing 1002 of FIG. 10A will optimizing the drilling and production costs per unit of oil produced. The spacing 1002 of FIG. 10A maybe described as: S =2.0 * TZT, where S equals the well spacing. In one embodiment, the spacing 1002 of FIG. 10A is appropriate where drilling and production costs dominate the economics of the system 100.
  • FIG. 10B is an illustration of an alternate well spacing 1002 in accordance with the present invention. FIG. 10B illustrates a first well 114 and a second well 1014 that may comprise adjacent wells within an oil shale field. The wells in the embodiment of FIG. 10B comprise a spacing 1002 of 50 feet, and a TZT 1004 of 100 feet.
  • In the embodiment of FIG. 10B, an unproduced area 1010 between the first well 114 and the second well 1014 is created due to the shape of the gas propagation 1006, 1008 through the formation 212. The unproduced area 1010 for the embodiment of FIG. 10B is clearly small relative to the embodiment of FIG. 10A. A redundantly produced area 1012 between the first well 114 and the second well 1014 is created due to the shape of the gas propagation 1006, 1008 through the formation 212 and the close proximity of the wells 114, 1014. The embodiment of FIG. 10B approximates the maximum recovery from the formation 212, as bringing the wells 114, 1014 closer would yield little reduction in the unproduced area 1010 while significantly increasing the redundantly produced area 1012. The spacing of the embodiment of FIG. 10B may be described as: S =0.5 *TZT. In one embodiment, the spacing of FIG. 10B is appropriate where the oil content of the formation 212 is high, and the price of oil dominates the economics of the system 100.
  • It is within the skill of one in the art to determine an intermediate well spacing between the embodiment of FIG. 10A and FIG. 10B based on the specific economic factors for a given embodiment of the invention. Further, it is within the skill of one in the art to analogize the fluid propagation shape 1006, 1008 to a horizontal well (refer to FIGS. 8A, 8B, 9) to determine an optimal target zone 210, 502 size selection for a given embodiment of the invention. In some situations, a well spacing 1002 closer than the embodiment of FIG. 10B may be appropriate based on the specific economic factors of a given embodiment of the invention, and such spacing is contemplated within the scope of the invention.
  • FIG. 11 is an illustration of a thermodynamic equilibrium chart for heavy hydrocarbons in the absence of excess hydrogen. As indicated by FIG. 11, heavier hydrocarbons, above 30 carbons per molecule, are favored in the absence of excess hydrogen. FIG. 11 illustrates that a treatment module 128 operating in the absence of excess hydrogen is not expected to crack most formation kerogen compositions into smaller hydrocarbon molecules.
  • FIG. 12 is an illustration of a thermodynamic equilibrium chart for heavy hydrocarbons in the presence of excess hydrogen. As indicated by FIG. 12, lighter hydrocarbons, around 10 carbons per molecule, are favored in the presence of excess hydrogen. Significant improvements in light hydrocarbon yield are achieved at all temperatures above about 65 degrees C. for the hydrocarbon mix illustrated in FIG. 12, indicating that excess hydrocarbon is sufficient to favor light hydrocarbons at all reasonable operating temperatures. However, the reaction kinetics of cracking a heavy hydrocarbon indicate that temperatures for the catalytic reactor 302 need to be much higher than the minimum required to favor light hydrocarbons thermodynamically.
  • The exact temperatures required for an economically acceptable reaction speed in hydrocarbon cracking depend upon the composition of the kerogen in the production fluid 126, the selected catalyst, the physical makeup of the catalytic reactor (size of the reactor, catalyst loading, catalyst bead pore size), and the flow rates of the production fluid 126. These determinations are within the skill of on in the art for selecting a target temperature. A temperature requirement for a typical system 100 will be greater than 350 degrees C. As with almost all catalytic systems, some straightforward testing, within the skill of one in the art, is required to determine a target temperature for a specific production fluid 126 composition.
  • The schematic flow chart diagrams herein are generally set forth as logical flow chart diagrams. As such, the depicted order and labeled steps are indicative of one embodiment of the presented method. Other steps and methods may be conceived that are equivalent in function, logic, or effect to one or more steps, or portions thereof, of the illustrated method. Additionally, the format and symbols employed are provided to explain the logical steps of the method and are understood not to limit the scope of the method. Although various arrow types and line types may be employed in the flow chart diagrams, they are understood not to limit the scope of the corresponding method. Indeed, some arrows or other connectors may be used to indicate only the logical flow of the method. For instance, an arrow may indicate a waiting or monitoring period of unspecified duration between enumerated steps of the depicted method. Additionally, the order in which a particular method occurs may or may not strictly adhere to the order of the corresponding steps shown.
  • FIG. 13 is a schematic flow diagram of a method 1300 for extracting oil from oil shale in accordance with the present invention. The method 1300 may begin with a drilling unit 112 drilling 1302 at least one fluid conduit to a top of a target zone 210 and a bottom of the target zone 210 of an oil shale formation 212. The stimulating module 116 may stimulate 1304 the target zone 210. A completion unit 118 may position 1306 an injection tube 218 substantially at the bottom of the target zone 210, and a position 1308 a production tube 216 substantially at the top of the target zone 210.
  • The method 1300 may include an injection unit 120 injecting 1310 fluid 122 into the target zone 210. Injecting 1310 the fluid 122 into the target zone 210 may include injecting the fluid 122 at a pressure greater than the formation fluid pressure, and lower than the formation fracture pressure, such that the fluid 122 displaces free water within the formation.
  • A thermal delivery unit 124 may heat 132 the fluid 122 with a downhole burner 402 to generate a production fluid 126 with entrained kerogen. The production module 216 may produce 1314 the production fluid 126. The method 1300 may further include a treatment module 128 heating 1316 the production fluid 126 to a target temperature, and treating 1318 the production fluid 126 in a catalytic reactor 302 to reduce the average molecular weight of the entrained kerogen. Treating 1318 the production fluid 126 may further include adding natural gas from a natural gas storage facility 110 to the production fluid 126 such that a minimum estimated amount of hydrogen is available for reaction within the catalytic reactor 302.
  • FIG. 14A is a schematic flow diagram of a method 1400 for extracting oil from an oil shale comprising a first and second target zone 210, 502 in accordance with the present invention. The method 1400 may begin with a drilling unit 112 drilling 1402 at least one fluid conduit to a top and a bottom of a target zone 210. A completion unit 118 may set 1404 a production casing 602 across the target zone 210, and perforate 1406 the casing 602 substantially at the top and at the bottom of the target zone 210.
  • The stimulation module 116 may stimulate 1408 the target zone 210. A completion unit 118 may position 1410 an injection tube 218 in the casing 602 substantially at the bottom of the target zone 210. A circulation unit (not shown) may circulate 1412 the fluid 122 through an offset well 702 with a depleted zone 704. A thermal delivery unit 124 may heat 1414 the fluid 122 with a solar concentrator 136, and a gas burner 134.
  • The method 1400 may include an injection unit 120 injecting 1416 the fluid 122 into the target zone 210, where the fluid may heat and entrain kerogen within the target zone 210 to generate a production fluid 126. A production tube 116 may produce 1418 the production fluid 126.
  • Referring to FIG. 14B, the method 1400 may continue with a stimulation module 116 stimulating 1420 a second target zone 502. An isolation unit (not shown) may isolate the first target zone 210. A completion unit 118 may position 1424 the injection tube 118 substantially at the bottom of the second target zone 502. A circulation unit (not shown) may circulate 1426 the fluid 122 through an offset well 702 with a depleted zone 704. A thermal delivery unit 124 may heat 1428 the fluid 122 with a solar concentrator 136, and a gas burner 134. An injection unit 120 may inject 1430 the fluid 122 into the second target zone 502 where the fluid 122 may heat and entrain kerogen within the second target zone 502 to generate a production fluid 126. The production tube 116 may produce 1432 the production fluid 126.
  • FIG. 15A is a schematic flow diagram of a method 1500 for extracting oil from an oil shale. The method 1500 may begin with a drilling unit 112 drilling 1502 a first horizontal well segment 802 in fluid communication with the top of a target zone 210, and a second horizontal well segment 804 in fluid communication with the bottom of the target zone 210. The method 1500 may include a stimulation module 116 stimulating 1504 the target zone 210, and a completion unit 118 positioning 1506 an injection tube 218 substantially at the bottom of the target zone 210.
  • The method 1500 may include an injection unit 120 injecting 1508 fluid 122 into the target zone 210, and a thermal delivery unit 124 heating 15 10 the fluid 122 such that the heated fluid 122 entrains kerogen to generate a production fluid 126. The method 1500 may include a production tube 216 producing 1512 the production fluid 126. The method 1500 may continue with the drilling unit 112 drilling 1514 a third horizontal well segment 902 in fluid communication with a top of a second target zone 502, where the first horizontal well segment 802 is in fluid communication with the bottom of the second target zone 502.
  • Referring to FIG. 15B, the stimulation module 116 may stimulate 1516 the second target zone 502. The completion unit 118 may position 1518 an injection tube 218 substantially at the bottom of the second target zone 502. The method 1500 may include an isolation unit (not shown) isolating 1520 the fluid conduit in communication with the first target zone 804 from the fluid conduits in communication with the second target zone 802, 902.
  • The method 1500 may include the injection unit 120 injecting 1508 fluid 122 into the second target zone 502, and a thermal delivery unit 124 heating 1510 the fluid 122 such that the heated fluid 122 entrains kerogen to generate a production fluid 126. The method 1500 may include a production tube 216 producing 1512 the production fluid 126.
  • From the foregoing discussion, it is clear that the invention provides a system, method, and apparatus for in-situ extraction of oil from an oil shale. The invention overcomes previous limitations in the art by providing an energy efficient process utilizing inexpensive completion techniques to produce the oil in an environmentally sound manner.
  • The present invention may be embodied in other specific forms without departing from its spirit or essential characteristics. The described embodiments are to be considered in all respects only as illustrative and not restrictive. The scope of the invention is, therefore, indicated by the appended claims rather than by the foregoing description. All changes which come within the meaning and range of equivalency of the claims are to be embraced within their scope.

Claims (36)

1. An apparatus for extracting oil from oil shale, the apparatus comprising:
a drilling unit configured to drill at least one fluid conduit to a top of a target zone and a bottom of the target zone of an oil shale formation;
a stimulation module configured to stimulate the target zone;
a completion unit configured to position an injection tube substantially at the bottom of the target zone;
an injection unit configured to inject a fluid into the target zone;
a thermal delivery unit configured to heat the fluid such that the heated fluid entrains in-situ kerogen to generate a production fluid; and
a production module to produce the production fluid.
2. The apparatus of claim 1, wherein the injection unit is further configured to inject the fluid into the target zone such that the fluid displaces free water within the target zone.
3. The apparatus of claim 1, wherein the thermal delivery unit is further configured to heat the fluid such that the fluid temperature exceeds 300 degrees C. at the bottom of the target zone.
4. The apparatus of claim 1, wherein the thermal delivery unit is further configured to heat the fluid such that the fluid temperature exceeds 400 degrees C. at the bottom of the target zone.
5. The apparatus of claim 1, wherein the thermal delivery unit is further configured to heat the fluid at the surface, and wherein the injection tube comprises a vacuum insulated tube.
6. The apparatus of claim 5, wherein heating the fluid at the surface comprises heating the fluid with at least one solar concentrator.
7. The apparatus of claim 5, wherein heating the fluid at the surface comprises heating the fluid with a natural gas burner.
8. The apparatus of claim 1, wherein the thermal delivery unit comprises a downhole burner configured to heat the fluid within the at least one fluid conduit.
9. The apparatus of claim 1, further comprising a treatment module configured to heat the production fluid to a target temperature and to react the production fluid in a catalytic reactor.
10. The apparatus of claim 9, wherein the target temperature comprises a temperature greater than 350 degrees Celsius.
11. The apparatus of claim 1 wherein the drilling unit comprises a coiled tubing drilling unit.
12. The apparatus of claim 1, wherein the stimulation module comprises an explosive.
13. The apparatus of claim 1, wherein the production module comprises a production tube positioned substantially at the top of the target zone.
14. The apparatus of claim 1, wherein:
the target zone comprises a first target zone;
wherein the stimulation module is further configured to stimulate a second target zone;
wherein the completion unit is further configured to position the injection tube substantially at the bottom of the second target zone;
the apparatus further comprising an isolation unit configured to isolate the at least one fluid conduit from the first target zone;
wherein the injection unit is further configured to inject the fluid into the second target zone; and
wherein the thermal delivery unit is further configured to heat the fluid such that energy of the heated fluid entrains in-situ kerogen within the second target zone to generate the production fluid.
15. The apparatus of claim 14, wherein the isolation unit comprises one of a bridge plug and a cement plug.
16. A method for extracting oil from oil shale, the method comprising:
drilling at least one fluid conduit to a top of a target zone and a bottom of the target zone of an oil shale formation;
stimulating the target zone;
positioning an injection tube substantially at the bottom of the target zone;
injecting a fluid into the target zone;
heating the fluid such that the heated fluid entrains in-situ kerogen to generate a production fluid; and
producing the production fluid.
17. The method of claim 16, wherein injecting fluid into the target zone further comprises injecting the fluid into the target zone at a pressure higher than a formation fluid pressure and lower than a formation fracture pressure, such that the fluid displaces free water within the target zone.
18. The method of claim 16, further comprising heating the production fluid to a target temperature, and treating the production fluid in a catalytic reactor to reduce the average molecular weight of the entrained kerogen.
19. The method of claim 18, further comprising adding natural gas to the production fluid such that a minimal amount of hydrogen is available for reaction within the catalytic reactor.
20. The method of claim 16, further comprising positioning a production tube substantially at the top of the target zone, and wherein producing the production fluid comprises flowing the production fluid up the production tubing.
21. The method of claim 16, further comprising setting a production casing through the oil shale formation, perforating the production casing substantially near the bottom of the target zone, perforating the production casing substantially near the top of the target zone, wherein positioning the injection tube further comprises positioning the injection tube within the production casing, and wherein producing the production fluid comprises flowing the production fluid up the annulus formed between the production casing and the injection tubing.
22. The method of claim 21, wherein flowing the production fluid up the annulus formed by the casing and the injection tube comprises flowing the product up a production tube within the annulus.
23. The method of claim 16, wherein the fluid comprises natural gas.
24. The method of claim 23, wherein heating the fluid comprises at least one member selected from the group consisting of heating the fluid with a solar concentrator, and heating the fluid with a gas burner configured to burn a portion of the production fluid.
25. The method of claim 23, wherein heating the fluid comprises circulating the fluid through a substantially depleted zone in an offset well, the substantially depleted zone comprising a shale formation substantially depleted of kerogen.
26. The method of claim 16, wherein the fluid comprises at least one member selected from the group consisting of methane, ethane, propane, butane, hydrocarbon gas, hydrogen, carbon monoxide, nitrogen, helium, argon, and neon.
27. The method of claim 16, wherein heating the fluid comprises heating the fluid with a downhole burner within the at least one fluid conduit.
28. The method of claim 16, wherein drilling at least one fluid conduit to a top of a target zone and a bottom of the target zone of an oil shale formation comprises drilling a vertical well through the oil shale formation, and wherein the target zone comprises a target zone thickness (TZT).
29. The method of claim 28, wherein the TZT comprises a thickness between 25 feet and 100 feet.
30. The method of claim 28, further comprising drilling a plurality of vertical wells through the oil shale formation, wherein each of the plurality of vertical wells is spaced at a distance between about 0.5 times the TZT and about 2.0 times the TZT.
31. The method of claim 28, wherein the target zone comprises a first target zone, the method further comprising stimulating a second target zone, positioning the injection tube substantially at the bottom of the second target zone, isolating the at least one fluid conduit from the first target zone, injecting the fluid into the second target zone, heating the fluid such that the heated fluid entrains in-situ kerogen within the second target zone to generate a production fluid, and producing the production fluid.
32. The method of claim 16, wherein drilling at least one fluid conduit to a top of a target zone and a bottom of the target zone of an oil shale formation comprises drilling a first horizontal well segment in fluid communication with the top portion of the target zone, and drilling a second horizontal well segment in fluid communication with the bottom portion of the target zone.
33. The method of claim 32, wherein the target zone comprises a horizontal width equal to the height of the target zone.
34. The method of claim 32, wherein the target zone comprises a first target zone, further comprising drilling a third horizontal well segment in fluid communication with the top portion of a second target zone, wherein the first horizontal well segment is in fluid communication with a bottom portion of the second target zone, the method further comprising stimulating the second target zone, positioning the injection tube substantially at the bottom of the second target zone, isolating the at least one fluid conduit from the first target zone, injecting the fluid into the second target zone, heating the fluid such that the heated fluid entrains in-situ kerogen within the second target zone to generate the production fluid, and producing the production fluid.
35. A system for in-situ extraction of oil from oil shale, the system comprising:
a three-phase separator configured to separate a production fluid into oil, water, and natural gas;
fluid coupling configured to deliver separated water to a water disposal system, to deliver separated oil to an oil storage facility, and to deliver separated natural gas to a natural gas storage facility;
a drilling unit configured to drill at least one fluid conduit to a top of a target zone and a bottom of the target zone of an oil shale formation;
a stimulation module configured to stimulate the target zone;
a completion unit configured to position an injection tube substantially at the bottom of the target zone;
an injection unit configure to inject a fluid into the target zone;
a thermal delivery unit configured to heat the fluid such that the heated fluid entrains in-situ kerogen to generate a product fluid;
a production module to produce the production fluid;
a treatment module configured to heat the production fluid to a target temperature and to react the production fluid in a catalytic reactor; and
a condensing module configured to cool the reacted production fluid and to deliver the reacted production fluid to the three-phase separator.
36. The system of claim 35, further comprising an oil heater configured to receive heat from a solar concentrator and to receive heat from a natural gas burner, wherein the thermal delivery unit is further configured to heat the fluid using heat from the oil heater, and wherein the injection tube comprises a vacuum insulated tube.
US11/531,694 2005-09-14 2006-09-13 Apparatus, system, and method for in-situ extraction of oil from oil shale Abandoned US20070056726A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
US11/531,694 US20070056726A1 (en) 2005-09-14 2006-09-13 Apparatus, system, and method for in-situ extraction of oil from oil shale
RU2008112558/03A RU2008112558A (en) 2005-09-14 2006-09-14 INSTALLATION, SYSTEM AND METHOD FOR REMOVING IN-SITU OIL FROM COMBUSTIBLE
PCT/US2006/036026 WO2007033371A2 (en) 2005-09-14 2006-09-14 Apparatus, system, and method for in-situ extraction of oil from oil shale
CA002622539A CA2622539A1 (en) 2005-09-14 2006-09-14 Apparatus, system, and method for in-situ extraction of oil from oil shale
AU2006290226A AU2006290226A1 (en) 2005-09-14 2006-09-14 Apparatus, system, and method for in-situ extraction of oil from oil shale
BRPI0617005-6A BRPI0617005A2 (en) 2005-09-14 2006-09-14 apparatus and method for extracting oil from shale oil and system for in situ extraction of oil from shale oil
IL190166A IL190166A0 (en) 2005-09-14 2008-03-13 Apparatus, system, and method for in-situ extraction of oil from oil shale

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US71664705P 2005-09-14 2005-09-14
US82025606P 2006-07-25 2006-07-25
US11/531,694 US20070056726A1 (en) 2005-09-14 2006-09-13 Apparatus, system, and method for in-situ extraction of oil from oil shale

Publications (1)

Publication Number Publication Date
US20070056726A1 true US20070056726A1 (en) 2007-03-15

Family

ID=37865607

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/531,694 Abandoned US20070056726A1 (en) 2005-09-14 2006-09-13 Apparatus, system, and method for in-situ extraction of oil from oil shale

Country Status (6)

Country Link
US (1) US20070056726A1 (en)
CN (1) CN101292011A (en)
BR (1) BRPI0617005A2 (en)
IL (1) IL190166A0 (en)
RU (1) RU2008112558A (en)
WO (1) WO2007033371A2 (en)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008128252A1 (en) * 2007-04-17 2008-10-23 Shurtleff J Kevin Apparatus, system, and method for in-situ extraction of hydrocarbons
WO2009086551A1 (en) * 2008-01-03 2009-07-09 The Trustees Of Columbia University In The City Of New York Systems and methods for enhancing rates of in situ carbonation of peridotite
US20120037370A1 (en) * 2010-08-10 2012-02-16 Parker Technologies LLC (a Wyoming limited liability company) Well completion and related methods for enhanced recovery of heavy oil
WO2012006257A3 (en) * 2010-07-05 2012-04-26 Glasspoint Solar, Inc. Direct solar steam generation
US8701773B2 (en) 2010-07-05 2014-04-22 Glasspoint Solar, Inc. Oilfield application of solar energy collection
US8887712B2 (en) 2010-07-05 2014-11-18 Glasspoint Solar, Inc. Concentrating solar power with glasshouses
WO2014197969A1 (en) * 2013-06-13 2014-12-18 Force Energy Management Corporation Apparatuses and methods for supplying natural gas to a frac water heater
US20150060073A1 (en) * 2013-09-05 2015-03-05 Saudi Arabian Oil Company Method of using concentrated solar power (csp) for thermal gas well deliquification
US9052121B2 (en) 2011-11-30 2015-06-09 Intelligent Energy, Llc Mobile water heating apparatus
CN104747156A (en) * 2015-03-23 2015-07-01 中国石油天然气股份有限公司 Exploitation method and injection system for oil reservoir of super heavy oil
US20150285048A1 (en) * 2013-01-07 2015-10-08 Glasspoint Solar, Inc. Systems and methods for selectively producing steam from solar collectors and heaters for processes including enhanced oil recovery
US9291367B2 (en) 2010-07-05 2016-03-22 Glasspoint Solar, Inc. Subsurface thermal energy storage of heat generated by concentrating solar power
WO2016060681A1 (en) * 2014-10-17 2016-04-21 Halliburton Energy Services, Inc. Pneumatic heating of self-degassed hydrocarbons in drilling fluid
US9322574B2 (en) 2010-07-05 2016-04-26 Glasspoint Solar, Inc. Concentrating solar power with glasshouses
WO2016167747A1 (en) * 2015-04-14 2016-10-20 Halliburton Energy Services, Inc. Optimized recycling of drilling fluids by coordinating operation of separation units
US20170009561A1 (en) * 2015-07-09 2017-01-12 King Fahd University Of Petroleum And Minerals Hybrid solar thermal enhanced oil recovery system with oxy-fuel combustor
US9874359B2 (en) 2013-01-07 2018-01-23 Glasspoint Solar, Inc. Systems and methods for selectively producing steam from solar collectors and heaters
US9938808B2 (en) 2014-08-19 2018-04-10 Adler Hot Oil Service, LLC Wellhead gas separator system
CN108049856A (en) * 2018-01-30 2018-05-18 程煦 A kind of shale gas exploitation system using heat storage technology
CN108104784A (en) * 2018-01-30 2018-06-01 程煦 A kind of shale gas exploitation system using hot pipe technique
US10063186B2 (en) 2015-06-30 2018-08-28 Glasspoint Solar, Inc. Phase change materials for cooling enclosed electronic components, including for solar energy collection, and associated systems and methods
US10065147B2 (en) 2014-10-23 2018-09-04 Glasspoint Solar, Inc. Gas purification using solar energy, and associated systems and methods
US10197766B2 (en) 2009-02-02 2019-02-05 Glasspoint Solar, Inc. Concentrating solar power with glasshouses
US10288322B2 (en) 2014-10-23 2019-05-14 Glasspoint Solar, Inc. Heat storage devices for solar steam generation, and associated systems and methods
US10323491B2 (en) 2015-09-01 2019-06-18 Glasspoint Solar, Inc. Variable rate steam injection, including via solar power for enhanced oil recovery, and associated systems and methods
US10323200B2 (en) 2016-04-12 2019-06-18 Enservco Corporation System and method for providing separation of natural gas from oil and gas well fluids
US10364978B2 (en) 2016-02-01 2019-07-30 Glasspoint Solar, Inc. Separators and mixers for delivering controlled-quality solar-generated steam over long distances for enhanced oil recovery, and associated systems and methods
US10584567B1 (en) * 2014-12-03 2020-03-10 Farris Mitchell, Sr. Shale gas extraction system
US10767859B2 (en) 2014-08-19 2020-09-08 Adler Hot Oil Service, LLC Wellhead gas heater

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2004288130B2 (en) 2003-11-03 2009-12-17 Exxonmobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales
CN101636555A (en) 2007-03-22 2010-01-27 埃克森美孚上游研究公司 Resistive heater for in situ formation heating
US20080290719A1 (en) 2007-05-25 2008-11-27 Kaminsky Robert D Process for producing Hydrocarbon fluids combining in situ heating, a power plant and a gas plant
US8863839B2 (en) 2009-12-17 2014-10-21 Exxonmobil Upstream Research Company Enhanced convection for in situ pyrolysis of organic-rich rock formations
IT1399626B1 (en) * 2010-04-19 2013-04-26 Eni Spa PROCEDURE TO REDUCE THE VISCOSITY OF HEAVY CRUDES
CN102287175A (en) * 2011-05-13 2011-12-21 中国海洋石油总公司 Method for extracting shale gas and/or shale oil by using heat power
CN102322250A (en) * 2011-08-18 2012-01-18 中国石油天然气股份有限公司 Gas injection aided electric heating oil shale in-situ exploitation simulating device and system
US9004172B2 (en) * 2011-09-01 2015-04-14 Empire Technology Development Llc Systems, materials, and methods for recovering material from bedrock using supercritical argon compositions
US9243482B2 (en) 2011-11-01 2016-01-26 Nem Energy B.V. Steam supply for enhanced oil recovery
ES2600516T3 (en) * 2011-11-01 2017-02-09 Nem Energy B.V. Solar plant for improved oil recovery
CA2845012A1 (en) 2011-11-04 2013-05-10 Exxonmobil Upstream Research Company Multiple electrical connections to optimize heating for in situ pyrolysis
AR092845A1 (en) * 2012-06-13 2015-05-06 Red Leaf Resources Inc OPERATING METHODS TO REDUCE THE ACCUMULATION OF RESIDUAL HYDROCARBONS IN THE PROCESSING OF BITUMINOUS SKISTS
MX355127B (en) * 2012-08-23 2018-04-06 Halliburton Energy Services Inc Star Reduced emissions method for recovering product from a hydraulic fracturing operation.
CA2923681A1 (en) 2013-10-22 2015-04-30 Exxonmobil Upstream Research Company Systems and methods for regulating an in situ pyrolysis process
US9394772B2 (en) 2013-11-07 2016-07-19 Exxonmobil Upstream Research Company Systems and methods for in situ resistive heating of organic matter in a subterranean formation
CN103835683A (en) * 2014-03-11 2014-06-04 广东石油化工学院 Method of extracting shale oil in situ through carbon dioxide
WO2016081104A1 (en) 2014-11-21 2016-05-26 Exxonmobil Upstream Research Company Method of recovering hydrocarbons within a subsurface formation
RU2611873C1 (en) * 2015-08-25 2017-03-01 Владимир Георгиевич Кирячёк Heavy hydrocarbons intraformational molecular modification method and device for its implementation
CN110344797A (en) * 2019-07-10 2019-10-18 西南石油大学 A kind of electric heater unit that underground high temperature is controllable and method
CN110513092B (en) * 2019-09-18 2021-08-27 吉林大学 Catalytic combustion device for assisting oil shale in-situ mining and using method thereof

Citations (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3237689A (en) * 1963-04-29 1966-03-01 Clarence I Justheim Distillation of underground deposits of solid carbonaceous materials in situ
US3241611A (en) * 1963-04-10 1966-03-22 Equity Oil Company Recovery of petroleum products from oil shale
US3242989A (en) * 1961-08-08 1966-03-29 Deutsche Erdoel Ag Apparatus for the extraction of underground bituminous deposits
US3498391A (en) * 1968-10-24 1970-03-03 Charles L Guild Hydraulic cushion block and impact type pile driving hammers
US3503868A (en) * 1967-11-06 1970-03-31 Carl D Shields Method of extracting and converting petroleum from oil shale
US3729396A (en) * 1971-08-30 1973-04-24 American Chem & Refining Co Rhodium plating composition and method for plating rhodium
US3894769A (en) * 1974-06-06 1975-07-15 Shell Oil Co Recovering oil from a subterranean carbonaceous formation
US4001105A (en) * 1974-01-02 1977-01-04 Gifford Ii Phillip H Hydrocracking process for the production of synthetic fuels
US4015664A (en) * 1976-04-14 1977-04-05 Gulf Research & Development Company Shale oil recovery process
US4083604A (en) * 1976-11-15 1978-04-11 Trw Inc. Thermomechanical fracture for recovery system in oil shale deposits
US4140343A (en) * 1977-02-14 1979-02-20 Occidental Oil Shale, Inc. Gas withdrawal from an in situ oil shale retort
US4143917A (en) * 1977-10-11 1979-03-13 Continental Oil Company In-situ retorting of oil shale with in-situ formed arches
US4149752A (en) * 1978-02-13 1979-04-17 Occidental Oil Shale, Inc. Operation of an in situ oil shale retort
US4185871A (en) * 1978-05-23 1980-01-29 Gulf Oil In-situ retorting system
US4185693A (en) * 1978-06-07 1980-01-29 Conoco, Inc. Oil shale retorting from a high porosity cavern
US4194788A (en) * 1978-03-01 1980-03-25 Gulf Oil Corporation Method of forming a rubblized in-situ retort
US4199026A (en) * 1978-07-17 1980-04-22 Standard Oil Company Method for detecting underground conditions
US4320994A (en) * 1979-12-07 1982-03-23 The United States Of America As Represented By The United States Department Of Energy Preparation of grout for stabilization of abandoned in-situ oil shale retorts
US4323121A (en) * 1978-07-17 1982-04-06 Standard Oil Company (Indiana) Method for controlling underground combustion
US4323120A (en) * 1978-07-17 1982-04-06 Standard Oil Company (Indiana) Method for controlling underground combustion
US4366986A (en) * 1980-04-11 1983-01-04 Trw Inc. Controlled retorting methods for recovering shale oil from rubblized oil shale and methods for making permeable masses of rubblized oil shale
US4373581A (en) * 1981-01-19 1983-02-15 Halliburton Company Apparatus and method for radio frequency heating of hydrocarbonaceous earth formations including an impedance matching technique
US4375302A (en) * 1980-03-03 1983-03-01 Nicholas Kalmar Process for the in situ recovery of both petroleum and inorganic mineral content of an oil shale deposit
US4376015A (en) * 1981-08-14 1983-03-08 Chevron Research Company Process for removing arsenic from green coke derived from shale oil
US4378949A (en) * 1979-07-20 1983-04-05 Gulf Oil Corporation Production of shale oil by in-situ retorting of oil shale
US4436153A (en) * 1981-12-31 1984-03-13 Standard Oil Company In-situ combustion method for controlled thermal linking of wells
US4437519A (en) * 1981-06-03 1984-03-20 Occidental Oil Shale, Inc. Reduction of shale oil pour point
US4495032A (en) * 1981-04-17 1985-01-22 Everman Carl G Split hub wheel apparatus
US4495054A (en) * 1980-08-11 1985-01-22 Claflin H Bruce Method of operating a blast furnace to extract carbonaceous oil and gas from bituminous materials
US4502942A (en) * 1983-04-25 1985-03-05 The University Of Akron Enhanced oil recovery from western United States type oil shale using carbon dioxide retorting technique
US4579173A (en) * 1983-09-30 1986-04-01 Exxon Research And Engineering Co. Magnetized drive fluids
US4737267A (en) * 1986-11-12 1988-04-12 Duo-Ex Coproration Oil shale processing apparatus and method
US4815790A (en) * 1988-05-13 1989-03-28 Natec, Ltd. Nahcolite solution mining process
US4824441A (en) * 1987-11-30 1989-04-25 Genesis Research Corporation Method and composition for decreasing emissions of sulfur oxides and nitrogen oxides
US4981131A (en) * 1988-03-14 1991-01-01 Hazard Rowland G Passive motion back support
US5178733A (en) * 1990-06-25 1993-01-12 Nielson Jay P Apparatus for separating oil and precious metals from mined oil-bearing rock material
US5201219A (en) * 1990-06-29 1993-04-13 Amoco Corporation Method and apparatus for measuring free hydrocarbons and hydrocarbons potential from whole core
US5306481A (en) * 1989-02-14 1994-04-26 Manufacturing And Technology Conversion International, Inc. Indirectly heated thermochemical reactor apparatus and processes
US5388456A (en) * 1990-07-05 1995-02-14 Kettel; Dirk Procedure in order to detect the gas potential in sedimentary basins and the oil potential obtained from this
US5868202A (en) * 1997-09-22 1999-02-09 Tarim Associates For Scientific Mineral And Oil Exploration Ag Hydrologic cells for recovery of hydrocarbons or thermal energy from coal, oil-shale, tar-sands and oil-bearing formations
US5895769A (en) * 1994-07-08 1999-04-20 Exxon Research And Engineering Company In-situ crystallized zeolite containing composition (LAI-ISC)
US6015015A (en) * 1995-06-20 2000-01-18 Bj Services Company U.S.A. Insulated and/or concentric coiled tubing
US20020027001A1 (en) * 2000-04-24 2002-03-07 Wellington Scott L. In situ thermal processing of a coal formation to produce a selected gas mixture
US20020029885A1 (en) * 2000-04-24 2002-03-14 De Rouffignac Eric Pierre In situ thermal processing of a coal formation using a movable heating element
US20020030398A1 (en) * 2000-03-13 2002-03-14 Drake Ronald D. Method and system for mining hydrocarbon-containing materials
US20040016676A1 (en) * 2002-07-24 2004-01-29 Newton Jeffrey P. Production of lower molecular weight dydrocarbons
US6684948B1 (en) * 2002-01-15 2004-02-03 Marshall T. Savage Apparatus and method for heating subterranean formations using fuel cells
US20040020642A1 (en) * 2001-10-24 2004-02-05 Vinegar Harold J. In situ recovery from a hydrocarbon containing formation using conductor-in-conduit heat sources with an electrically conductive material in the overburden
US20040031731A1 (en) * 2002-07-12 2004-02-19 Travis Honeycutt Process for the microwave treatment of oil sands and shale oils
US6698515B2 (en) * 2000-04-24 2004-03-02 Shell Oil Company In situ thermal processing of a coal formation using a relatively slow heating rate
US20040040715A1 (en) * 2001-10-24 2004-03-04 Wellington Scott Lee In situ production of a blending agent from a hydrocarbon containing formation
US6981548B2 (en) * 2001-04-24 2006-01-03 Shell Oil Company In situ thermal recovery from a relatively permeable formation
US20060004236A1 (en) * 2002-03-29 2006-01-05 Dreamco, Inc. Method of separating and converting hydrocarbon composites and polymer materials
US6991033B2 (en) * 2001-04-24 2006-01-31 Shell Oil Company In situ thermal processing while controlling pressure in an oil shale formation

Patent Citations (100)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3242989A (en) * 1961-08-08 1966-03-29 Deutsche Erdoel Ag Apparatus for the extraction of underground bituminous deposits
US3241611A (en) * 1963-04-10 1966-03-22 Equity Oil Company Recovery of petroleum products from oil shale
US3237689A (en) * 1963-04-29 1966-03-01 Clarence I Justheim Distillation of underground deposits of solid carbonaceous materials in situ
US3503868A (en) * 1967-11-06 1970-03-31 Carl D Shields Method of extracting and converting petroleum from oil shale
US3498391A (en) * 1968-10-24 1970-03-03 Charles L Guild Hydraulic cushion block and impact type pile driving hammers
US3729396A (en) * 1971-08-30 1973-04-24 American Chem & Refining Co Rhodium plating composition and method for plating rhodium
US4001105A (en) * 1974-01-02 1977-01-04 Gifford Ii Phillip H Hydrocracking process for the production of synthetic fuels
US3894769A (en) * 1974-06-06 1975-07-15 Shell Oil Co Recovering oil from a subterranean carbonaceous formation
US4015664A (en) * 1976-04-14 1977-04-05 Gulf Research & Development Company Shale oil recovery process
US4083604A (en) * 1976-11-15 1978-04-11 Trw Inc. Thermomechanical fracture for recovery system in oil shale deposits
US4140343A (en) * 1977-02-14 1979-02-20 Occidental Oil Shale, Inc. Gas withdrawal from an in situ oil shale retort
US4143917A (en) * 1977-10-11 1979-03-13 Continental Oil Company In-situ retorting of oil shale with in-situ formed arches
US4149752A (en) * 1978-02-13 1979-04-17 Occidental Oil Shale, Inc. Operation of an in situ oil shale retort
US4194788A (en) * 1978-03-01 1980-03-25 Gulf Oil Corporation Method of forming a rubblized in-situ retort
US4185871A (en) * 1978-05-23 1980-01-29 Gulf Oil In-situ retorting system
US4185693A (en) * 1978-06-07 1980-01-29 Conoco, Inc. Oil shale retorting from a high porosity cavern
US4199026A (en) * 1978-07-17 1980-04-22 Standard Oil Company Method for detecting underground conditions
US4323121A (en) * 1978-07-17 1982-04-06 Standard Oil Company (Indiana) Method for controlling underground combustion
US4323120A (en) * 1978-07-17 1982-04-06 Standard Oil Company (Indiana) Method for controlling underground combustion
US4378949A (en) * 1979-07-20 1983-04-05 Gulf Oil Corporation Production of shale oil by in-situ retorting of oil shale
US4320994A (en) * 1979-12-07 1982-03-23 The United States Of America As Represented By The United States Department Of Energy Preparation of grout for stabilization of abandoned in-situ oil shale retorts
US4375302A (en) * 1980-03-03 1983-03-01 Nicholas Kalmar Process for the in situ recovery of both petroleum and inorganic mineral content of an oil shale deposit
US4366986A (en) * 1980-04-11 1983-01-04 Trw Inc. Controlled retorting methods for recovering shale oil from rubblized oil shale and methods for making permeable masses of rubblized oil shale
US4495054A (en) * 1980-08-11 1985-01-22 Claflin H Bruce Method of operating a blast furnace to extract carbonaceous oil and gas from bituminous materials
US4373581A (en) * 1981-01-19 1983-02-15 Halliburton Company Apparatus and method for radio frequency heating of hydrocarbonaceous earth formations including an impedance matching technique
US4495032A (en) * 1981-04-17 1985-01-22 Everman Carl G Split hub wheel apparatus
US4437519A (en) * 1981-06-03 1984-03-20 Occidental Oil Shale, Inc. Reduction of shale oil pour point
US4376015A (en) * 1981-08-14 1983-03-08 Chevron Research Company Process for removing arsenic from green coke derived from shale oil
US4436153A (en) * 1981-12-31 1984-03-13 Standard Oil Company In-situ combustion method for controlled thermal linking of wells
US4502942A (en) * 1983-04-25 1985-03-05 The University Of Akron Enhanced oil recovery from western United States type oil shale using carbon dioxide retorting technique
US4579173A (en) * 1983-09-30 1986-04-01 Exxon Research And Engineering Co. Magnetized drive fluids
US4737267A (en) * 1986-11-12 1988-04-12 Duo-Ex Coproration Oil shale processing apparatus and method
US4824441A (en) * 1987-11-30 1989-04-25 Genesis Research Corporation Method and composition for decreasing emissions of sulfur oxides and nitrogen oxides
US4981131A (en) * 1988-03-14 1991-01-01 Hazard Rowland G Passive motion back support
US4815790A (en) * 1988-05-13 1989-03-28 Natec, Ltd. Nahcolite solution mining process
US5306481A (en) * 1989-02-14 1994-04-26 Manufacturing And Technology Conversion International, Inc. Indirectly heated thermochemical reactor apparatus and processes
US5178733A (en) * 1990-06-25 1993-01-12 Nielson Jay P Apparatus for separating oil and precious metals from mined oil-bearing rock material
US5201219A (en) * 1990-06-29 1993-04-13 Amoco Corporation Method and apparatus for measuring free hydrocarbons and hydrocarbons potential from whole core
US5388456A (en) * 1990-07-05 1995-02-14 Kettel; Dirk Procedure in order to detect the gas potential in sedimentary basins and the oil potential obtained from this
US5895769A (en) * 1994-07-08 1999-04-20 Exxon Research And Engineering Company In-situ crystallized zeolite containing composition (LAI-ISC)
US6015015A (en) * 1995-06-20 2000-01-18 Bj Services Company U.S.A. Insulated and/or concentric coiled tubing
US5868202A (en) * 1997-09-22 1999-02-09 Tarim Associates For Scientific Mineral And Oil Exploration Ag Hydrologic cells for recovery of hydrocarbons or thermal energy from coal, oil-shale, tar-sands and oil-bearing formations
US6869147B2 (en) * 2000-03-13 2005-03-22 Oil Sands Underground Mining, Inc. Method and system for mining hydrocarbon-containing materials
US20030038526A1 (en) * 2000-03-13 2003-02-27 Oil Sands Underground Mining, Inc. Method and system for mining hydrocarbon-containing materials
US20020030398A1 (en) * 2000-03-13 2002-03-14 Drake Ronald D. Method and system for mining hydrocarbon-containing materials
US20020033253A1 (en) * 2000-04-24 2002-03-21 Rouffignac Eric Pierre De In situ thermal processing of a hydrocarbon containing formation using insulated conductor heat sources
US20030051872A1 (en) * 2000-04-24 2003-03-20 De Rouffignac Eric Pierre In situ thermal processing of a coal formation with heat sources located at an edge of a coal layer
US20020029881A1 (en) * 2000-04-24 2002-03-14 De Rouffignac Eric Pierre In situ thermal processing of a hydrocarbon containing formation using conductor in conduit heat sources
US20020033280A1 (en) * 2000-04-24 2002-03-21 Schoeling Lanny Gene In situ thermal processing of a coal formation with carbon dioxide sequestration
US20020033254A1 (en) * 2000-04-24 2002-03-21 Karanikas John Michael In situ thermal processing of a coal formation to control product composition
US20020029882A1 (en) * 2000-04-24 2002-03-14 Rouffignac Eric Pierre De In situ thermal processing of a hydrocarbon containing formation leaving one or more selected unprocessed areas
US20020034380A1 (en) * 2000-04-24 2002-03-21 Maher Kevin Albert In situ thermal processing of a coal formation with a selected moisture content
US20020033257A1 (en) * 2000-04-24 2002-03-21 Shahin Gordon Thomas In situ thermal processing of hydrocarbons within a relatively impermeable formation
US20020033256A1 (en) * 2000-04-24 2002-03-21 Wellington Scott Lee In situ thermal processing of a hydrocarbon containing formation with a selected hydrogen to carbon ratio
US20020035307A1 (en) * 2000-04-24 2002-03-21 Vinegar Harold J. In situ thermal processing of a coal formation, in situ production of synthesis gas, and carbon dioxide sequestration
US20020033255A1 (en) * 2000-04-24 2002-03-21 Fowler Thomas David In situ thermal processing of a hydrocarbon containing formation in a hydrogen-rich environment
US20020036084A1 (en) * 2000-04-24 2002-03-28 Vinegar Harold J. In situ thermal processing of a hydrocarbon containing formation to form a substantially uniform, high permeability formation
US20020036083A1 (en) * 2000-04-24 2002-03-28 De Rouffignac Eric Pierre In situ thermal processing of a hydrocarbon containing formation with heat sources located at an edge of a formation layer
US20020036103A1 (en) * 2000-04-24 2002-03-28 Rouffignac Eric Pierre De In situ thermal processing of a coal formation by controlling a pressure of the formation
US20020038069A1 (en) * 2000-04-24 2002-03-28 Wellington Scott Lee In situ thermal processing of a coal formation to produce a mixture of olefins, oxygenated hydrocarbons, and aromatic hydrocarbons
US20020036089A1 (en) * 2000-04-24 2002-03-28 Vinegar Harold J. In situ thermal processing of a hydrocarbon containing formation using distributed combustor heat sources
US20020038708A1 (en) * 2000-04-24 2002-04-04 Wellington Scott Lee In situ thermal processing of a coal formation to produce a condensate
US20020038705A1 (en) * 2000-04-24 2002-04-04 Wellington Scott Lee In situ thermal processing of a hydrocarbon containing formation to produce a mixture with a selected hydrogen content
US20020038712A1 (en) * 2000-04-24 2002-04-04 Vinegar Harold J. In situ production of synthesis gas from a coal formation through a heat source wellbore
US20020038710A1 (en) * 2000-04-24 2002-04-04 Maher Kevin Albert In situ thermal processing of a hydrocarbon containing formation having a selected total organic carbon content
US20020038711A1 (en) * 2000-04-24 2002-04-04 Rouffignac Eric Pierre De In situ thermal processing of a hydrocarbon containing formation using heat sources positioned within open wellbores
US20020038706A1 (en) * 2000-04-24 2002-04-04 Etuan Zhang In situ thermal processing of a coal formation with a selected vitrinite reflectance
US20020038709A1 (en) * 2000-04-24 2002-04-04 Wellington Scott Lee In situ thermal processing of a hydrocarbon containing formation using a natural distributed combustor
US20030006039A1 (en) * 2000-04-24 2003-01-09 Etuan Zhang In situ thermal processing of a hydrocarbon containing formation with a selected vitrinite reflectance
US20030019626A1 (en) * 2000-04-24 2003-01-30 Vinegar Harold J. In situ thermal processing of a coal formation with a selected hydrogen content and/or selected H/C ratio
US20030024699A1 (en) * 2000-04-24 2003-02-06 Vinegar Harold J. In situ production of synthesis gas from a coal formation, the synthesis gas having a selected H2 to CO ratio
US20020029885A1 (en) * 2000-04-24 2002-03-14 De Rouffignac Eric Pierre In situ thermal processing of a coal formation using a movable heating element
US20020029884A1 (en) * 2000-04-24 2002-03-14 De Rouffignac Eric Pierre In situ thermal processing of a coal formation leaving one or more selected unprocessed areas
US20040015023A1 (en) * 2000-04-24 2004-01-22 Wellington Scott Lee In situ thermal processing of a hydrocarbon containing formation to produce a hydrocarbon condensate
US6994160B2 (en) * 2000-04-24 2006-02-07 Shell Oil Company In situ thermal processing of a hydrocarbon containing formation to produce hydrocarbons having a selected carbon number range
US6994161B2 (en) * 2000-04-24 2006-02-07 Kevin Albert Maher In situ thermal processing of a coal formation with a selected moisture content
US6994168B2 (en) * 2000-04-24 2006-02-07 Scott Lee Wellington In situ thermal processing of a hydrocarbon containing formation with a selected hydrogen to carbon ratio
US6688387B1 (en) * 2000-04-24 2004-02-10 Shell Oil Company In situ thermal processing of a hydrocarbon containing formation to produce a hydrocarbon condensate
US6991031B2 (en) * 2000-04-24 2006-01-31 Shell Oil Company In situ thermal processing of a coal formation to convert a selected total organic carbon content into hydrocarbon products
US6698515B2 (en) * 2000-04-24 2004-03-02 Shell Oil Company In situ thermal processing of a coal formation using a relatively slow heating rate
US6871707B2 (en) * 2000-04-24 2005-03-29 Shell Oil Company In situ thermal processing of a hydrocarbon containing formation with carbon dioxide sequestration
US6702016B2 (en) * 2000-04-24 2004-03-09 Shell Oil Company In situ thermal processing of a hydrocarbon containing formation with heat sources located at an edge of a formation layer
US6708758B2 (en) * 2000-04-24 2004-03-23 Shell Oil Company In situ thermal processing of a coal formation leaving one or more selected unprocessed areas
US6712137B2 (en) * 2000-04-24 2004-03-30 Shell Oil Company In situ thermal processing of a coal formation to pyrolyze a selected percentage of hydrocarbon material
US6712136B2 (en) * 2000-04-24 2004-03-30 Shell Oil Company In situ thermal processing of a hydrocarbon containing formation using a selected production well spacing
US6712135B2 (en) * 2000-04-24 2004-03-30 Shell Oil Company In situ thermal processing of a coal formation in reducing environment
US6866097B2 (en) * 2000-04-24 2005-03-15 Shell Oil Company In situ thermal processing of a coal formation to increase a permeability/porosity of the formation
US20020027001A1 (en) * 2000-04-24 2002-03-07 Wellington Scott L. In situ thermal processing of a coal formation to produce a selected gas mixture
US6981548B2 (en) * 2001-04-24 2006-01-03 Shell Oil Company In situ thermal recovery from a relatively permeable formation
US6991036B2 (en) * 2001-04-24 2006-01-31 Shell Oil Company Thermal processing of a relatively permeable formation
US6991033B2 (en) * 2001-04-24 2006-01-31 Shell Oil Company In situ thermal processing while controlling pressure in an oil shale formation
US6991032B2 (en) * 2001-04-24 2006-01-31 Shell Oil Company In situ thermal processing of an oil shale formation using a pattern of heat sources
US6994169B2 (en) * 2001-04-24 2006-02-07 Shell Oil Company In situ thermal processing of an oil shale formation with a selected property
US20040040715A1 (en) * 2001-10-24 2004-03-04 Wellington Scott Lee In situ production of a blending agent from a hydrocarbon containing formation
US6991045B2 (en) * 2001-10-24 2006-01-31 Shell Oil Company Forming openings in a hydrocarbon containing formation using magnetic tracking
US20040020642A1 (en) * 2001-10-24 2004-02-05 Vinegar Harold J. In situ recovery from a hydrocarbon containing formation using conductor-in-conduit heat sources with an electrically conductive material in the overburden
US6684948B1 (en) * 2002-01-15 2004-02-03 Marshall T. Savage Apparatus and method for heating subterranean formations using fuel cells
US20060004236A1 (en) * 2002-03-29 2006-01-05 Dreamco, Inc. Method of separating and converting hydrocarbon composites and polymer materials
US20040031731A1 (en) * 2002-07-12 2004-02-19 Travis Honeycutt Process for the microwave treatment of oil sands and shale oils
US20040016676A1 (en) * 2002-07-24 2004-01-29 Newton Jeffrey P. Production of lower molecular weight dydrocarbons

Cited By (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008128252A1 (en) * 2007-04-17 2008-10-23 Shurtleff J Kevin Apparatus, system, and method for in-situ extraction of hydrocarbons
US8524152B2 (en) 2008-01-03 2013-09-03 The Trustees Of Columbia University In The City Of New York Systems and methods for enhancing rates of in situ carbonation of peridotite
WO2009086551A1 (en) * 2008-01-03 2009-07-09 The Trustees Of Columbia University In The City Of New York Systems and methods for enhancing rates of in situ carbonation of peridotite
US20100324351A1 (en) * 2008-01-03 2010-12-23 Kelemen Peter B Systems and Methods for Enhancing Rates of In Situ Carbonation of Peridotite
US10197766B2 (en) 2009-02-02 2019-02-05 Glasspoint Solar, Inc. Concentrating solar power with glasshouses
US10584900B2 (en) 2010-07-05 2020-03-10 Glasspoint Solar, Inc. Concentrating solar power with glasshouses
WO2012006257A3 (en) * 2010-07-05 2012-04-26 Glasspoint Solar, Inc. Direct solar steam generation
US8739774B2 (en) 2010-07-05 2014-06-03 Glasspoint Solar, Inc. Direct solar steam generation
US8752542B2 (en) 2010-07-05 2014-06-17 Glasspoint Solar, Inc. Direct solar steam generation
US8887712B2 (en) 2010-07-05 2014-11-18 Glasspoint Solar, Inc. Concentrating solar power with glasshouses
US10082316B2 (en) 2010-07-05 2018-09-25 Glasspoint Solar, Inc. Direct solar steam generation
US8915244B2 (en) 2010-07-05 2014-12-23 Glasspoint Solar, Inc. Concentrating solar power with glasshouses
US9322574B2 (en) 2010-07-05 2016-04-26 Glasspoint Solar, Inc. Concentrating solar power with glasshouses
US8701773B2 (en) 2010-07-05 2014-04-22 Glasspoint Solar, Inc. Oilfield application of solar energy collection
US9897394B2 (en) 2010-07-05 2018-02-20 Glasspoint Solar, Inc. Subsurface thermal energy storage of heat generated by concentrating solar power
US9291367B2 (en) 2010-07-05 2016-03-22 Glasspoint Solar, Inc. Subsurface thermal energy storage of heat generated by concentrating solar power
US9810451B2 (en) 2010-07-05 2017-11-07 Glasspoint Solar, Inc. Oilfield application of solar energy collection
US20120037370A1 (en) * 2010-08-10 2012-02-16 Parker Technologies LLC (a Wyoming limited liability company) Well completion and related methods for enhanced recovery of heavy oil
US9052121B2 (en) 2011-11-30 2015-06-09 Intelligent Energy, Llc Mobile water heating apparatus
US10451310B2 (en) 2011-11-30 2019-10-22 Intelligent Energy, Llc Mobile water heating apparatus
US10411180B2 (en) 2013-01-07 2019-09-10 Glasspoint Solar, Inc. Systems and methods for selectively producing steam from solar collectors and heaters for processes including enhanced oil recovery
US9978925B2 (en) * 2013-01-07 2018-05-22 Glasspoint Solar, Inc. Systems and methods for selectively producing steam from solar collectors and heaters for processes including enhanced oil recovery
EP2920514A4 (en) * 2013-01-07 2016-11-02 Glasspoint Solar Inc Systems and methods for selectively producing steam from solar collectors and heaters for processes including enhanced oil recovery
US9461229B2 (en) 2013-01-07 2016-10-04 Glasspoint Solar, Inc. Systems and methods for selectively producing steam from solar collectors and heaters for processes including enhanced oil recovery
US9200799B2 (en) 2013-01-07 2015-12-01 Glasspoint Solar, Inc. Systems and methods for selectively producing steam from solar collectors and heaters for processes including enhanced oil recovery
US20150285048A1 (en) * 2013-01-07 2015-10-08 Glasspoint Solar, Inc. Systems and methods for selectively producing steam from solar collectors and heaters for processes including enhanced oil recovery
EP3431871A1 (en) * 2013-01-07 2019-01-23 Glasspoint Solar, Inc. System for selectively producing steam from solar collectors and heaters for processes including enhanced oil recovery
US9874359B2 (en) 2013-01-07 2018-01-23 Glasspoint Solar, Inc. Systems and methods for selectively producing steam from solar collectors and heaters
US10591184B2 (en) * 2013-06-13 2020-03-17 1026844 B.C. Ltd. Apparatuses and methods for supplying natural gas to a frac water heater
US11391488B2 (en) * 2013-06-13 2022-07-19 1026844 B.C. Ltd. Apparatuses and methods for supplying natural gas to a frac water heater
WO2014197969A1 (en) * 2013-06-13 2014-12-18 Force Energy Management Corporation Apparatuses and methods for supplying natural gas to a frac water heater
US20150060073A1 (en) * 2013-09-05 2015-03-05 Saudi Arabian Oil Company Method of using concentrated solar power (csp) for thermal gas well deliquification
US9777562B2 (en) * 2013-09-05 2017-10-03 Saudi Arabian Oil Company Method of using concentrated solar power (CSP) for thermal gas well deliquification
US9995122B2 (en) 2014-08-19 2018-06-12 Adler Hot Oil Service, LLC Dual fuel burner
US10767859B2 (en) 2014-08-19 2020-09-08 Adler Hot Oil Service, LLC Wellhead gas heater
US9938808B2 (en) 2014-08-19 2018-04-10 Adler Hot Oil Service, LLC Wellhead gas separator system
US10138711B2 (en) 2014-08-19 2018-11-27 Adler Hot Oil Service, LLC Wellhead gas heater
WO2016060681A1 (en) * 2014-10-17 2016-04-21 Halliburton Energy Services, Inc. Pneumatic heating of self-degassed hydrocarbons in drilling fluid
US10065147B2 (en) 2014-10-23 2018-09-04 Glasspoint Solar, Inc. Gas purification using solar energy, and associated systems and methods
US10288322B2 (en) 2014-10-23 2019-05-14 Glasspoint Solar, Inc. Heat storage devices for solar steam generation, and associated systems and methods
US10584567B1 (en) * 2014-12-03 2020-03-10 Farris Mitchell, Sr. Shale gas extraction system
CN104747156A (en) * 2015-03-23 2015-07-01 中国石油天然气股份有限公司 Exploitation method and injection system for oil reservoir of super heavy oil
US10493383B2 (en) 2015-04-14 2019-12-03 Halliburton Energy Services, Inc. Optimized recycling of drilling fluids by coordinating operation of separation units
WO2016167747A1 (en) * 2015-04-14 2016-10-20 Halliburton Energy Services, Inc. Optimized recycling of drilling fluids by coordinating operation of separation units
GB2552275A (en) * 2015-04-14 2018-01-17 Halliburton Energy Services Inc Optimized recycling of drilling fluids by coordinating operation of separation units
GB2552275B (en) * 2015-04-14 2020-11-18 Halliburton Energy Services Inc Optimized recycling of drilling fluids by coordinating operation of separation units
US10063186B2 (en) 2015-06-30 2018-08-28 Glasspoint Solar, Inc. Phase change materials for cooling enclosed electronic components, including for solar energy collection, and associated systems and methods
US20170009561A1 (en) * 2015-07-09 2017-01-12 King Fahd University Of Petroleum And Minerals Hybrid solar thermal enhanced oil recovery system with oxy-fuel combustor
US9845667B2 (en) * 2015-07-09 2017-12-19 King Fahd University Of Petroleum And Minerals Hybrid solar thermal enhanced oil recovery system with oxy-fuel combustor
US10323491B2 (en) 2015-09-01 2019-06-18 Glasspoint Solar, Inc. Variable rate steam injection, including via solar power for enhanced oil recovery, and associated systems and methods
US10364978B2 (en) 2016-02-01 2019-07-30 Glasspoint Solar, Inc. Separators and mixers for delivering controlled-quality solar-generated steam over long distances for enhanced oil recovery, and associated systems and methods
US10323200B2 (en) 2016-04-12 2019-06-18 Enservco Corporation System and method for providing separation of natural gas from oil and gas well fluids
CN108049856A (en) * 2018-01-30 2018-05-18 程煦 A kind of shale gas exploitation system using heat storage technology
CN108104784A (en) * 2018-01-30 2018-06-01 程煦 A kind of shale gas exploitation system using hot pipe technique

Also Published As

Publication number Publication date
BRPI0617005A2 (en) 2011-07-05
WO2007033371A2 (en) 2007-03-22
CN101292011A (en) 2008-10-22
WO2007033371A3 (en) 2007-05-18
RU2008112558A (en) 2009-10-20
IL190166A0 (en) 2008-08-07

Similar Documents

Publication Publication Date Title
US20070056726A1 (en) Apparatus, system, and method for in-situ extraction of oil from oil shale
US8205674B2 (en) Apparatus, system, and method for in-situ extraction of hydrocarbons
CA2975611C (en) Stimulation of light tight shale oil formations
US3954140A (en) Recovery of hydrocarbons by in situ thermal extraction
US7441603B2 (en) Hydrocarbon recovery from impermeable oil shales
US7921907B2 (en) In situ method and system for extraction of oil from shale
US20080257552A1 (en) Apparatus, system, and method for in-situ extraction of hydrocarbons
CA2797655C (en) Conduction convection reflux retorting process
US4669542A (en) Simultaneous recovery of crude from multiple zones in a reservoir
US20230130169A1 (en) Fracturing Hot Rock
CN102493795A (en) Method for gasification fracturing of liquid nitrogen in hydrocarbon reservoirs
US9534482B2 (en) Thermal mobilization of heavy hydrocarbon deposits
MX2012011315A (en) Improved in-situ combustion recovery process using single horizontal well to produce oil and combustion gases to surface.
AU2006290226A1 (en) Apparatus, system, and method for in-situ extraction of oil from oil shale
RU2271442C2 (en) Gas-hydrate recovery method
CN116950627A (en) Method and system for extracting oil gas from stratum rich in organic matters
CA1048926A (en) Apparatus for recovery of hydrocarbons by in situ thermal extraction

Legal Events

Date Code Title Description
AS Assignment

Owner name: MOUNTAIN WEST ENERGY INC., UTAH

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SHURTLEFF, KEVIN;REEL/FRAME:027525/0885

Effective date: 20111206

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION