US20050038571A1 - Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems - Google Patents

Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems Download PDF

Info

Publication number
US20050038571A1
US20050038571A1 US10/942,773 US94277304A US2005038571A1 US 20050038571 A1 US20050038571 A1 US 20050038571A1 US 94277304 A US94277304 A US 94277304A US 2005038571 A1 US2005038571 A1 US 2005038571A1
Authority
US
United States
Prior art keywords
energy
curtailment
building
users
human
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/942,773
Inventor
Peter Brickfield
Dirk Mahling
Mark Noyes
David Weaver
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Intercap Capital Partners LLC
Original Assignee
Brickfield Peter J.
Dirk Mahling
Mark Noyes
David Weaver
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=29248142&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=US20050038571(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Brickfield Peter J., Dirk Mahling, Mark Noyes, David Weaver filed Critical Brickfield Peter J.
Priority to US10/942,773 priority Critical patent/US20050038571A1/en
Publication of US20050038571A1 publication Critical patent/US20050038571A1/en
Priority to US11/783,883 priority patent/US20070255461A1/en
Assigned to INTERCAP CAPITAL PARTNERS, LLC reassignment INTERCAP CAPITAL PARTNERS, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WEBGEN SYSTEMS, INC.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Definitions

  • This invention relates generally to systems and methods for managing use of energy, and especially to systems and methods for managing energy use in a complex multi-building context.
  • Multiple-building systems such as commonly owned systems of 30, 60 or more buildings, exist throughout the world today. Examples of such building systems include, e.g., university systems. Multiple building systems may be geographically dispersed. Controlling energy consumption, and costs of energy consumption, in such wide-spread building systems presents challenges. See, e.g., U.S. Pat. No. 6,178,362 issued in 2001 to Woolard et al. (assigned to Silicon Energy Corp.), discussing some of the problems of energy management and energy cost management for commercial users who operate large physical plants.
  • any energy management system reaching a new maximum of peak usage will be expensive and is acknowledged as something to be recognized—and avoided.
  • the human operator may, or may not, be looking at energy data output at a time when the data is surging towards a new peak.
  • Human operators come in a variety of diligence, attentiveness, and ability levels. Human operators tasked with recognizing surges towards new peaks tend to have other tasks, such that they cannot provide a sufficient level of attention and monitoring to recognize every surge towards a new peak.
  • the human operator is essentially incapable in a limited amount of time of consulting or studying the many different energy users (such as energy-using devices or apparatuses such as air-conditioners, etc.) to ascertain the status of each.
  • a human operator practically speaking can do no more than, at best, execute one or more energy-reducing commands—for at least the reason that the luxury of time is not present.
  • the Woolard et al. system seeks to use three dimensional facilities navigation tools, energy consumption analysis processes, TCP/IP communication and a World Wide Web (WWW)-based interface, but it is based on sub-systems each of which “performs operations which permit an employee of the entity to control and manage its facilities including its energy consumption.” Id., column 2, lines 26-29 (emphasis added).
  • a system comprising artificial intelligence is connected to energy-using devices (such as pieces of equipment). Energy consumption advantageously may be monitored and/or manipulated in real time. Artificial intelligence (such as intelligent agents) may be used to evaluate, forecast and/or control energy consumption patterns. From the system comprising artificial intelligence, control signals may be sent to deploy agreed-upon energy-saving strategies at the building and/or device (energy user) level.
  • energy management can be autonomous, artificial-intelligence based, real-time, over the Internet.
  • a significant advantage of the invention is to provide maximum energy curtailment with minimal impact to occupants of buildings in the building system. Maximum energy curtailment may be achieved with no greater than a certain defined level of impact to occupants of buildings in the building system.
  • the invention in a first preferred embodiment provides an energy management system comprising: computer-based monitoring for an adverse energy event in a building system; computer-based recognition of an adverse energy event in the building system; immediate automatic querying of energy users within the building system for energy curtailment possibilities; automatic receipt of responses from queried energy users with energy curtailment possibilities; automatic processing of energy curtailment possibilities into a round-robin curtailment rotation.
  • responses from queried energy users with energy curtailment possibilities are automatically processed by a computer with a set of instructions for evaluating how to enact each respective curtailment possibility of each respective energy user offering a curtailment possibility.
  • the invention provides a method for minimizing and/or eliminating need for human operator attention in energy management of a building system, comprising: non-human, computerized processing of obtained energy data, wherein the obtained energy data is for at least one energy user in the building system, said processing including (A) automatic determination of whether at least one energy-relevant event is present or (B) continual optimization of a setting of the at least one energy user.
  • processing including (A) automatic determination of whether at least one energy-relevant event is present or (B) continual optimization of a setting of the at least one energy user.
  • the invention provides immediately activating an automatic response to the energy-relevant event.
  • At least one intelligent agent from the obtained energy data, actually forecasts the peak; wherein the energy-relevant event is a threat of a new maximum peak, and the immediately activated automatic response includes energy reduction interventions to avoid the new maximum peak.
  • the invention provides a computer-based energy management system, comprising: non-human, computerized processing of obtained energy data, wherein the obtained energy data is for at least one energy user in a building system, said processing including automatic determination of whether at least one energy-relevant event is present; and upon recognition of an automatic determination that at least one energy-relevant event, a non-human, computerized response thereto based upon artificial intelligence reasoning.
  • the invention provides a computer-based round-robin rotation system for energy users, wherein the energy users are under computer-based control and are present in a building system, the round-robin rotation system comprising: a series of computer-based energy curtailment commands to each of a plurality of energy users in the building system, wherein (1) each computer-based energy curtailment command in the series of energy curtailment commands; (a) is specific to the energy user to which the curtailment command is directed; (b) has been derived from an energy curtailment offer provided by the energy user; and/or (c) is based on continually learned and observed characteristics of the energy user; and/or (2) an energy user in the plurality of energy users is grouped with other energy users based on similarity with regard to a certain parameter or parameters.
  • the invention in another preferred embodiment, provides a computer based method of avoiding a new energy peak, comprising: priming a computer-based system with data as to energy peak(s) already reached in a building system; for current energy usage in the building system, obtaining, in real-time, computer-readable data from which to automatically forecast if a new energy peak is approaching; and real-time automatic processing the obtained computer-readable data to forecast whether or not a new energy peak is approaching.
  • the real-time automatic processing of the obtained computer-readable data provides a forecast that a new energy peak is approaching, an immediate, real-time, automatic response is initiated.
  • the invention provides an energy curtailment system comprising an automatically managed round-robin rotation of a plurality of energy curtailment interventions.
  • Each respective energy curtailment intervention within the plurality of energy curtailment interventions may derived from an energy curtailment offer from a to-be-curtailed energy user.
  • a plurality of to-be-curtailed energy users may be included in a single building or in a multi-building system.
  • the invention in yet another embodiment provides a compilation of energy-relevant data, comprising: a stream of energy-related data for at least one individual energy user within a plurality of energy users (such as where the at least one individual energy user is within a multi-building system and separate streams of data are provided for other individual energy users within the multi-building system.)
  • the invention also provides a data analysis method, comprising leveraging a stream of energy-related data for at least one individual energy user within a plurality of energy users, wherein the leveraging includes a comparison against historic data for the device.
  • the leveraging may include computer-based searching for rapid deviation from a historic pattern.
  • Another embodiment of the invention provides a method of determining whether to repair or replace an individual energy user, comprising: reviewing a stream of energy-related data for the individual energy user, wherein the individual energy user is contained within a plurality of energy users.
  • the invention in an additional embodiment provides an energy management system for automatically achieving energy curtailment in a multi-building system, comprising: immediate automatic querying of energy users within the building system for energy curtailment possibilities; automatic receipt of responses from queried energy users with energy curtailment possibilities; automatic processing of energy curtailment possibilities into a round-robin curtailment rotation.
  • each energy user has associated therewith a dedicated neural network, such as a dedicated neural network that continuously learns operating characteristics of said energy user associated with the dedicated neural network, wherein forward and backward reasoning and forecastability are provided.
  • a dedicated neural network such as a dedicated neural network that continuously learns operating characteristics of said energy user associated with the dedicated neural network, wherein forward and backward reasoning and forecastability are provided.
  • examples may be a new peak demand or threat thereof; a human-given directive to curtail a certain amount of energy consumption; and/or an excess increase of energy price in a deregulated market.
  • the adverse or energy-relevant energy event may be a surge or a steady increase towards a new peak demand; at least one recognizable pattern of data that has been learned via artificial intelligence by a computer system doing the monitoring; etc.
  • the computer doing the recognition of an adverse energy event for each recognized pattern of data that is an adverse energy event, reacts with an automatic response based upon reasoning (such as a a querying response to be executed).
  • the monitoring may occur in a context selected from a business-as-usual context; 24 ⁇ 7 permanent load reduction context; and an emergency context.
  • Energy use may be constantly monitored and/or adjusted, said constant monitoring and/or adjustment being non-human, wherein business-as-usual constant adjustment, 24 ⁇ 7 load reduction is provided.
  • the non-human constant monitoring and/or adjustment preferably is by artificial intelligence; and, preferably is to monitor and/or adjust at least one factor that influences energy consumption (such as current weather conditions at and/or approaching an energy-user; occupancy levels of a facility served by an energy-user; market price of energy; weather forecasts; market price forecasts; air quality; air quality forecasts; lighting quality; lighting quality forecasts; plug load patterns; plug load pattern forecasts; etc.).
  • the invention may include and/or provide one or more of the following:
  • the building system may be a single building or at least two buildings.
  • the building or buildings may be, for example, at least one university building; at least one hotel building; at least one hospital building; at least one car dealership building; at least one shopping mall; at lease one government building; at least one chemical processing plant; at least one manufacturing facility; and any combination thereof of buildings.
  • the at least two buildings under management may be geographically dispersed (such as a state's difference apart); and/or commonly owned or not commonly owned. Ownership may be, for example, by a commercial entity, a university, a government, etc.
  • examples of a peak include a kW demand peak, a lighting peak, a carbon dioxide peak, a pollutant peak, etc.
  • the automatic response is non-determinative.
  • the artificial intelligence is that of neural networks; rule-based expert systems; and/or goal-based planning systems.
  • the artificial intelligence reasoning may comprise at least one artificial intelligent agent and, optionally, at any given time, what the artificial intelligence agent is doing may be monitored (such as monitoring by a human viewing what the artificial intelligence agent is doing.).
  • One or more of the following may be provided and/or included: more obtained energy data is processed in a given time period than could be processed by a human being; a non-human, computerized response may be formulated after processing of more information than could be accomplished by a human in whatever processing time has been expended; monthly energy consumption may be reduced for the building system and/or peak load demand charges for the building system are lowered.
  • the aggregation level for the computerized reporting may be at an individual device, at everything in a building, at a set of buildings, or everything commonly owned.
  • the optimal energy-saving command decision may comprise a rotation of energy curtailment that minimizes impact over energy users in the system.
  • the computerized response may include at least one determination based on one or more of: (A) air quality, humidity, pollutants, air flow speed, temperature, and other descriptors of physical properties of air; (B) light direction, light color, ambient temperature, foot candle, kw consumption of light producing equipment, smell of light, and other descriptors of physical properties of light; (C) plug load; motion sensed by motion sensors; carbon dioxide levels; brightness; sound levels; automated device for sensing human presence; motion detectors; light-sensing apparatus; habitation-sensor; (D) chemical or biological warfare agent sensing device (such as a mustard gas sensor, an anthrax sensor, a carbon monoxide sensor, a carbon dioxide sensor, a chlorine gas sensor, a nerve gas sensor, etc.).
  • A air quality, humidity, pollutants, air flow speed, temperature, and other descriptors of physical properties of air
  • B light direction, light color, ambient temperature, foot candle, kw consumption of light producing equipment, smell of light, and other descriptors of physical properties of light
  • examples may be a round-robin system formulated in response to a human request for energy curtailment; a round-robin system implemented under business-as-usual circumstances, etc.
  • a computer may automatically process the responses from queried users, total the respective curtailment possibilities from the queried energy users amounts, determine whether the total of respective curtailment possibilities is sufficiently large, and, (A) if so, proceed to schedule a round-robin energy curtailment rotation pursuant to criteria; and, (B) if not, notify a human user.
  • the round-robin curtailment rotation may be executed and achieve energy consumption reduction.
  • the energy consumption reduction may occur during an energy emergency (such as, e.g., an energy emergency declared by a local independent system operator, a power authority, a utility supplier, or a governmental authority, etc.).
  • An energy emergency such as, e.g., an energy emergency declared by a local independent system operator, a power authority, a utility supplier, or a governmental authority, etc.
  • a round-robin curtailment rotation may be called in order that energy may be sold back into the grid.
  • the computer-readable data may comprise data from the energy users in the building system; from a source selected from sensing devices, electric meters used for billing, and information from individual devices; etc.
  • Demand for each individual device may be forecast based on temperature forecasts; patterns historically observed and learned via artificial intelligence and under continual update; and occupancy where the individual device is provided.
  • querying may be directly or indirectly activated such as querying based on, for example, a request by a local independent system operator, a power authority or a utility supplier.
  • the invention provides optional documentation, such automatic documentation automatically generated of avoidance of a new energy peak, with said automatic documentation being (a) stored in an accessible computer file and/or (b) printed and/or stored in a human operator-friendly format.
  • the invention advantageously makes possible that, if desired, a human operator is not needed. If desired, a human operator may have an optional override right. Also optionally, a human operator may enter a query (such as a query as to current state of one or more devices in a specified building, a query requesting a prediction of effect of proposed control action(s) on an energy bill and/or on comfort, etc.).
  • a human operator may enter a query (such as a query as to current state of one or more devices in a specified building, a query requesting a prediction of effect of proposed control action(s) on an energy bill and/or on comfort, etc.).
  • the invention includes an embodiment wherein no human operator intervention is involved in either the automatic processing to forecast whether or not a new energy peak is approaching nor the immediate, real-time, automatic response to the forecast that a new energy peak is approaching.
  • new energy peaks may be avoided without human operator intervention.
  • Advantageous results (such as energy consumption reduction) mentioned herein may be achieved even when no human is controlling
  • FIG. 1 is a flow chart of an exemplary inventive energy management system which is machine-based and may operate human-free.
  • FIG. 2 is a flow chart of exemplary machine-based energy data receipt and processing, including automatically identifying and responding to an adverse energy event, according to the invention.
  • FIG. 3 is a flow chart of an exemplary machine-based energy curtailment response to an adverse energy event, according to the invention.
  • FIGS. 4A and 4B are examples of schematic diagrams of the relationship of user-set goals to be effectuated by higher level agents and the higher level agents, according to the invention.
  • FIG. 5 is a diagram of an exemplary Internet-based energy management system of three buildings, according to the invention.
  • FIG. 6 is flow chart for an exemplary round robin algorithm for load rotation, according to the invention.
  • FIG. 7 is a chart of an exemplary rotation schedule/matrix example according to the invention, with a load rotation “round robin” approach being shown.
  • FIG. 8 is a graph of Peak Load: exemplary Virtual Meter according to the invention versus Real Meters.
  • the invention is a machine-based energy management system, which may be human-free in operation. Although a human operator is not needed, a human operator is not necessarily precluded from acting in the energy management system.
  • an adverse energy event is monitored-for electronically ( 100 ). If the electronic monitoring 100 detects no adverse energy event, the electronic monitoring for an adverse energy event continues ( 100 A) as more to-be-monitored data is electronically received. If the electronic monitoring 100 electronically detects an adverse energy event 110 , the adverse energy event that has been electronically detected 110 is electronically acted-upon 120 by adjustment of at least some of the plurality of energy users.
  • the monitored-for adverse energy event may be any energy-usage and/or energy-cost related event, for which the received to-be-monitored data may be electronically monitored.
  • an adverse energy event for which the received energy data may be monitored is mentioned the surge towards a new energy peak. It will be recognized and appreciated that a machine, such as computer, may more rapidly calculate and compare numerical information than could a human operator.
  • a machine-based system can more rapidly and accurately arrive at a faster conclusion as to the direction being taken by the energy use in the entire system.
  • the invention may be used in any system including a plurality of energy users, most preferably a system in which the plurality of energy users are dispersed in multiple commercial buildings.
  • the invention provides particular advantage in a multi-commercial building system, because of the difficulties otherwise posed by energy management and energy cost control in such multi-commercial building systems.
  • commercial buildings may be mentioned, e.g., university buildings, factories, hospitals, office buildings, etc. It will be appreciated that not necessarily all energy users in a building are required to participate in the energy management system of the invention.
  • an “energy user” in the present invention may be mentioned any device that requires energy to operate, including but not limited to, e.g., air conditioners, chillers, heating and ventilation, fans, fountain pumps, elevators, other equipment, lighting, etc.
  • the to-be-monitored energy data received electronically from the energy users are any data that are receivable from an energy user in real-time (i.e., embedded) communication with a data-receiving device.
  • a data movement may be mentioned an electronic means of real-time data movement such as a network (such as the Internet (i.e., the World Wide Web (WWW), an intranet, etc.), most preferably, the Internet.
  • the sources of the machine-readable data that is received and subjected to machine-based monitoring may be mentioned any metering device, measuring device, etc. that measures energy use (including actual use and scheduled upcoming use) of an energy user.
  • the electronic-acting upon 120 a detected adverse energy event may be any response or adjustment that reduces energy cost and/or energy usage, most preferably an energy cost reduction and energy usage reduction approach with minimal impact on occupant comfort and normal operations.
  • An exemplary electronic response 120 to a detected adverse energy event may be seen with respect to FIG. 2 , in which the energy management system provides electronic receipt of data from a plurality of energy users ( 200 ). The received data is electronically processed ( 210 ) vis-á-vis whether an adverse energy event (such as approach of a new peak) may exist, and when an adverse energy event is detected, the system electronically requests energy curtailment possibilities ( 220 ) from some or all of the plurality of energy users. Energy curtailment possibilities from energy users are electronically received ( 230 ), and received energy curtailment possibilities are automatically processed ( 240 ).
  • the electronic request for energy curtailment possibilities ( 220 ) it is not required that all energy users be queried for energy curtailment possibilities. For example, certain energy users that are deemed essential may be excluded from being part of an automatic query for energy curtailment possibilities.
  • the requests for energy curtailment possibilities are directed to such energy users that have the ability to consider their energy curtailment possibilities and to formulate an energy curtailment response (such as an offer of kilowatt hours to forego).
  • the energy users to be queried are supplied with such artificial intelligence, neural network technology, or other computer- or machine-based technology and programming such that they can compute, in real-time, what energy curtailment they can offer based on certain preset rules applicable to the respective energy user, such as rules relating to current weather conditions, comfort, etc.
  • respective energy users will have programming suitable for the context in which the energy user operates.
  • an air conditioning energy user and a multi-elevator energy user will be programmed to consider different factors for evaluating whether each can use less energy.
  • An air conditioning energy user may be programmed to consider outside temperature and time of day and other factors, while a multi-elevator energy user may consider time of day and not be programmed to consider outside temperature.
  • the multi-elevator energy user may place much different emphasis on time-of-day than the air conditioning energy user. For example, because shutting down elevators at certain high-traffic times of day may achieve an energy savings but be unacceptable from a building management viewpoint, the elevator energy user's formulation of an energy curtailment possibility response may heavily depend on the time of day.
  • Each to-be-queried energy user thus is provided with a means to intelligently respond in real-time with an appropriate response that is minimally-invasive or bothersome to the building occupants and those being served by the queried energy user.
  • the energy curtailment possibilities from the energy users are electronically received ( 230 ) and automatically processed ( 240 ). That is, reliance on a human operator advantageously is not needed.
  • the invention provides for the energy management system of FIG. 3 , in which the system provides real-time machine-based evaluation of data for energy curtailment possibilities ( 340 ), from which an automatic round-robin energy curtailment rotation is established ( 350 ). Each affected energy user is automatically advised of the energy curtailment that the affected energy user is to implement ( 360 ) as its part in the round-robin energy curtailment rotation. It will be appreciated that a human operator or operators (especially in a multi-building system) cannot formulate an optimal round-robin energy curtailment rotation in the short time that a machine-based system can.
  • trigger agent(s) 1 such as user-set goals or peak load
  • trigger agent 1 when the trigger agent 1 comprises user-set goals for higher level agents to accomplish may be mentioned: impact on occupants expressed in computer-based terms; price sensitivity expressed in computer-based terms, etc.
  • Energy-using devices 2 , 2 A, 2 B are shown, but more sets of devices may be incorporated into the system. In the case of the three sets of devices 2 , 2 A, 2 B, three are shown for manageability of illustration, and not to indicate any limitation of the invention in that regard. The same comment applies to other features shown herein, such as buildings 10 , 10 A, 10 B.
  • Device 2 is provided with a forecasting agent 3 , a modeling agent 4 and a control agent 5 .
  • device 2 A is provided with a forecasting agent 3 A
  • device 2 B is provided with a forecasting agent 3 B, a modeling agent 4 B and a control agent 5 B.
  • each device energy user
  • the neural network may learn that if the temperature setting of an air conditioning unit is bumped by 2 degrees, that a certain drop in kW consumption results.
  • the neural network may learn that if kW consumption is dropped by 3 kW, a certain temperature effect is observed.
  • the neural network may learn that if a certain event or device setting adjustment occurs, the time elapsed before an OSHA level is reached is a certain amount.
  • a modeling agent 4 may be used any system configurable as a neural network that may be disposed with respect to an energy user (device) to learn (preferably, to continuously learn). Examples of what may be learned about an associated device by a modeling agent include, e.g., energy consumption (kW), temperature, degradation time, fan speed, vane position, etc.
  • a modeling agent preferably continually learns the operating characteristics of the device with which it is associated, thus understanding, for example, the connections between energy consumption (kW) and room temperature for an air conditioner.
  • a forecasting agent predicts energy consumption of the device associated therewith under various conditions, allowing simulation and curtailment decision making.
  • a device control agent takes control of the device.
  • a forecasting agent 3 may be used any system that, upon receiving a question, returns to the modeling agent 4 and runs the question.
  • the forecasting agent 3 neither over- nor under-generalizes.
  • the modeling agent 4 it is preferred for the modeling agent 4 to have been in continual learning for as long a time period as possible, with relatively longer times of continual learning being more preferable.
  • a modeling agent that has been in continual learning for a one-day period has only a certain limited number of data points and if a query is posed to the forecasting agent and the forecasting agent cannot find an exact match of data points in the modeling agent, the forecasting agent will need to generalize (i.e., extrapolate) and is relatively likely to over- or under-generalize. If the modeling agent has been in continual learning for a five-year period, if the same query is posed to the forecasting agent, the forecasting agent is relatively more likely to find a match, or at least a closer match, of data points in the modeling agent, and thus the forecasting agent is relatively less likely to over- or under-generalize.
  • Higher-level control agents run on the portfolio or building level, controlling many devices (via their control agents). Based on user-set goals and environmental input (such as price of energy, temperature, occupancy, etc.), the higher level agents devise a strategy to achieve the user-set goals and accomplish the user-set goals by controlling the device agents. Higher-level agents reason via artificial intelligence to find a suitable balance between two or more goals, such as between savings and comfort.
  • a higher level control agent (for load rotation) 6 is provided in FIGS. 4A and 4B .
  • a second higher level control agent (for load rotation) 6 ′ also is provided, showing a situation where load rotation may have two different portfolios.
  • An example of a context represented by FIG. 4B may be where different strategies are in place. Examples of a strategy include, e.g., a permanent 24 ⁇ 7 load rotation; a curtailment load rotation.
  • a strategy or strategies is or are embodied by one or more artificial intelligent agents.
  • An artificial intelligent agent may be concerned with a strategy such as price sensitivity; air supply; temperature, etc.
  • Intelligent agents can be used to reduce energy cost better than automated building management systems and/or human experts.
  • examples are given showing how intelligent agents using continuous learning and reasoning can manage energy better than conventional building management systems. Both, the cost of energy for large buildings and the comfort for tenants are taken into account.
  • the scenarios of the Examples herein highlight major differences between knowledge based energy management and conventional, schedule-driven energy management.
  • Control agents 6 , 6 ′ (in FIG. 4B ) and 7 are intelligent agents.
  • BMS building management system
  • a building equipped with a building management system provides the easiest connection to the system comprising the intelligent agents (i.e., the higher-level control agents), as well as to individual energy-consuming devices 2 , 2 A, 2 B.
  • BMS building management system
  • any communications protocol that allows quick and seamless communication with the BMS and the devices it monitors.
  • BMS platforms with open communications protocols such as BacNet via UDP, which allow quick and seamless communication between the system comprising the intelligent agents with the BMS and the devices it monitors.
  • BMS is not open (i.e., does not adhere to an open communications standard, such as BacNet or OPC)
  • appropriate drivers may be obtained and used to communicate.
  • the BMS manufacturer may be contacted to buy or otherwise obtain the driver or at least the specifications for the driver to talk through the Internet to the BMS through them.
  • BMS drivers include, e.g., control drivers by Johnson, Invensys, Honeywell, etc.
  • software useable in the invention may be any software that allows communication with a BMS such that remote control can be achieved.
  • the present invention is installable in conjunction with certain existing equipment and software.
  • hardware devices may be installed that can translate between protocols and conduct simple data buffer or transfer tasks.
  • Existing monitoring systems (such as those provided by Engage Networks and Silicon Energy) may be leveraged, for connecting portfolios of buildings.
  • Such existing monitoring systems which allow end-users to manually control a BMS are lacking in any artificial intelligence capability, and that artificial intelligence capability is thus supplied by the present invention.
  • the present invention by operating in connection with an existing monitoring system, can connect to an installed, in-place customer base quickly, with minimal local installation.
  • FIG. 5 an exemplary Internet-based energy management system of three buildings 10 , 10 A, 10 B, according to the invention, may be seen. It will be appreciated that the invention may be used with more or less than three buildings. Each respective building 10 , 10 A, 10 B has located on-site respective energy-using devices 11 , 11 A, 11 B. A preferred embodiment is discussed in which a building such as building 10 has multiple energy-using devices 11 .
  • Each respective building 10 , 10 A, 10 B has associated therewith respective meters 12 , 12 A, 12 B.
  • a preferred embodiment is discussed in which a building such as building 10 has multiple meters 12 , but it is possible for a building to have only one meter.
  • a meter may mentioned any metering device that measures energy-relevant information, such as air temperature, air quality, humidity, etc.
  • Meters 12 , 12 A, 12 B and devices 11 , 11 A, 11 B are connected through a building management system or energy management system (such as an existing building management system) and a network 15 (such as the Internet) to at least one intelligent agent, most preferably to a system including intelligent agents.
  • Each respective building 10 , 10 A, 10 B has associated therewith a respective building management system or energy management system 13 , 13 A, 13 B (such as a conventional building management system, a conventional energy management system, etc.).
  • a respective building management system or energy management system 13 , 13 A, 13 B such as a conventional building management system, a conventional energy management system, etc.
  • FIG. 5 a three layered architecture (user interface, business logic, and data layer) is shown.
  • Each respective building 10 , 10 A, 10 B has associated therewith a respective protocol driver 14 , 14 A, 14 B.
  • Each respective protocol driver 14 , 14 A, 14 B is in communication with a network 15 (such as the Internet).
  • the network 15 in addition to receiving data from protocol drivers 14 , 14 A, 14 B, also receives other energy-relevant data 16 (such as a price feed (in $/MWh) and/or a NOAA weather feed, etc.).
  • the network 15 (such as the Internet) further is in communication with a communication layer (such as a communication layer comprising AEM/DCOM (or other Engage Data Server driven by Active Server Page Technology through the firewall generating HTML pages) 17 , FTP (File Transfer Protocol) 18 , BacNet/UDP 19 , and expandable protocol slots 20 ).
  • BacNet/UDP is an open standard, an example of an open building intercommunications protocol, put forward by the BacNet consortium. BacNet via UDP takes that protocol and transports it in datagrams (UDP) over the Internet. The UDP is the envelope; the BacNet message is the content.
  • a communication layer other than a communication layer comprising AEM/DCOM 17 , FTP 18 , BacNet/(UDP 19 , and expandable protocol slots 20 may be used in the invention. It will be appreciated that AEM/DCOM, FTP, BacNET/UDP and expandable protocol slots are shown as examples and their use is not required, with communications tools being useable in the invention.
  • AEM/DCOM 17 , FTP 18 , BacNet/UDP 19 , and expandable protocol slots 20 are included in data processing system or computer system 25 .
  • Data processing or computer system 25 thus is able provide a real-time database 26 .
  • the real-time database 26 advantageously includes real-time energy-relevant information specific to the buildings 10 , 10 A, 10 B as well as real-time energy-relevant information “from the world,” i.e., the energy-relevant information 16 (such as price feed in $/MWH and NOAA weather feed).
  • Data processing or computer system 25 further includes intelligent agents 21 , optional but particularly preferred financial engine 22 , optional but particularly preferred notification workflow system 23 and optional but particularly preferred energy monitoring system 24 , which receive, process and/or act on information communicated via the network 15 (such as the Internet).
  • the intelligent agents 21 are the heart of the intelligent use of energy system of FIG. 5 .
  • the intelligent agents 21 preferably function in neural networks, which monitor each piece of equipment, forming a non-parametric model of its behavior, allowing accurate predictions of the impact that specific energy control actions will have on the building environment. Also, energy savings predictions can be accomplished based on environmental changes (temperature, air-quality, etc.).
  • devices are used by higher-level agents to pursue a number of strategies, such as “minimum disturbance load rotation” or “supply air reset”. These intelligent agents function like highly specialized, 24 ⁇ 7 staff members, and can be switched on or off, or given different goals to accomplish.
  • the intelligent agents 21 monitor and control the devices to maximize energy savings, while minimizing impact on environmental quality.
  • the data processing or computer system 25 thus monitors and processes the real-time database 26 , based on rules and/or parameters, and formulates real-time queries (such as queries for energy curtailment possibilities from energy-using devices 11 within building 10 ) and/or commands (such as an energy curtailment round-robin rotation to be imposed on devices 11 , 11 A, 11 B).
  • the real-time queries and/or commands formulated by the data processing or computer system 25 are communicated in real-time via the network 15 (such as the Internet) to the respective protocol drivers 14 , 14 A, 14 B which leads to devices 11 , 11 A, 11 B being controlled in an overall energy use reducing manner but with minimized discomfort or inconvenience to occupants or users of buildings 10 , 10 A, 10 B.
  • Discomfort or inconvenience to occupants or users of buildings 10 , 10 A, 10 B is considered and included in the data processing or computer system 25 so that a particular energy-using device in the plurality of devices 11 , 11 A, 11 B will not be curtailed in its energy use in a manner that would cause discomfort or negative impact.
  • certain energy-using devices such as computer equipment, hospital equipment, etc.
  • building 10 and building 10 A are in different time zones but otherwise have a similar set of respective devices 11 , 11 A, they may be controlled appropriately and in a maximally energy-intelligent manner.
  • the data processing or computer system 25 depends on rules and/or expressions and/or logic which are expressed in terms of variables and/or input which are manipulable and evaluable. For example, there may be used rules, expressions, variables and/or input suitable for aggregating energy use for the entire system of buildings 10 , 10 A, 10 B and monitoring whether movement towards a new energy peak is occurring.
  • the computer or data processing system 25 with the real-time database 26 , the network 15 (such as the Internet) and the buildings 10 , 10 A, 10 B essentially run themselves without necessity of a human operator.
  • the computer or data processing system 25 can be far more effective at computational operations than can a human operator, and also can process the available data and real-time information, using the rules, far more quickly and accurately than a human operator could in the same amount of time.
  • the invention advantageously provides machine-based operations in areas where reliance on human operators conventionally meant responses that now can be seen as relatively slow, inadequate or non-optimal.
  • a controller for an energy using device such as protocol driver 14 , for example, may have a basis for responding to a query for energy curtailment possibilities.
  • a set of rules is put into place for the protocol driver 14 and any energy-using devices 11 associated therewith.
  • the set of rules is any set of rules appropriate to the energy-using device, the building in which the energy-using device is situated, and the building occupants or those served by the building.
  • the set of rules may take into account outside temperature, inside temperature, etc. and based on the differential therebetween may characterize the comfort level, with certain differential ranges being assigned to certain comfort level characterizations.
  • the set of rules While the set of rules is fixed in operation, the set of rules may be subjected to overhaul and change, such as if it is decided that a colder or warmer temperature range is now to be considered acceptable than in the past. While in a preferred embodiment the variables and rules operate so as to minimize any need or desire for human operator intervention, optionally, a manual human operator override may be provided, in which a human operator would be permitted to override computer-based control of one or more energy-using devices.
  • the invention as discussed above advantageously permits systems of buildings 10 , 10 A, 10 B to “run themselves” without the necessity of intervention of a human operator (on-site of buildings 10 , 10 A, 10 B or elsewhere such as at a monitoring facility).
  • a human operator is not needed for making energy curtailment and energy use decisions and optimizing energy use in real-time.
  • buildings 10 , 10 A, 10 B and users are connected over a network 15 (such as the Internet).
  • the intelligent use of energy system may include modules dedicated to meeting respective needs of users with different responsibilities and concerns, such as a financial engine module, a notification workflow module, an energy monitoring module, etc.
  • building managers, financial managers and/or energy managers may observe how the computer-based system is performing, via browser-based user interface 27 .
  • users access the intelligent use of energy system through a web-browner that connects to an ASP hosting site of intelligent use of energy software, which in turn, connects through the Internet, either directly or indirectly, to the buildings 10 , 10 A, 10 B managed by the system.
  • a communications module preferably one that is an expandable communications bus architecture that can easily accommodate new communication protocols as plug-ins; also, preferably the communications module is one that can communicate with existing bidding management systems, “monitoring” systems and associated protocols currently available in the marketplace as well as able to communicate with new systems being developed and developed in the future.
  • a particularly preferred communications module to use is IUE-Comm, developed by the present applicant
  • Building managers, financial managers, energy managers, and/or others via browser-based user interface 27 may view information that would be of interest to them.
  • a building manager may use the system of FIG. 5 to monitor the current state of devices 11 , 11 A, 11 B in the buildings 10 , 10 A, 10 B.
  • Building managers can see the temperature setting of air-conditioners, the consumption of chillers, the speed of fans, etc.
  • the building managers can also optionally simulate one or more “what if” scenarios, using the intelligent agents, to predict the effect of control actions on the energy bill and the comfort in the building.
  • Building managers optionally may manipulate the parameters of the intelligent agents, such as by constraining the temperature band used by a “supply air rest” agent.
  • the building manager no longer needs to control individual devices (as he would conventionally do) because the intelligent use of energy system of FIG. 5 is “goal based”.
  • the manager gives the system a goal (such as to save 40 KW in the next two hours) and the intelligent use of energy system of FIG. 5 determines how to best achieve the goal.
  • a building manager can rely on and use the intelligent agents like highly specialized, 24 ⁇ 7 staff members, switching them on or off, or giving them different goals to accomplish.
  • the energy manager refers to a human responsible for the optimal use of energy across facilities, such as across buildings 10 , 10 A, 10 B. Issuing curtailment requests, for instance, is one of the major tasks of an energy manager. Using the system of FIG. 5 , issuance of a curtailment request optionally can be accomplished manually, or automatically by pre-instructing the intelligent agents.
  • the financial manager is a human.
  • the financial manager generally is interested in showing the savings that have been produced by using an intelligent use of energy system such as that according to FIG. 5 .
  • Finance modules in the system draw on a data warehouse that is created based on the system's real-time data base, and support the financial manager in analyzing energy consumption, identifying peak demands, pin-pointing inefficient equipment or operations, and demonstrating the overall effect of the agents saving energy costs. While such mentioned finance-related activities may not be necessary, they are particularly preferred for using the invention in a commercial context.
  • the real-time database 26 will be understood as a database continuously changing to reflect current data.
  • the data in the real-time database 26 preferably is saved in a data warehouse (not depicted on FIG. 5 ), and from the data warehouse is usable such as for energy analysis and financial reporting.
  • a particularly preferred example of an energy curtailment regiment that may be automatically devised and implemented according to the invention is a round robin load rotation.
  • the flow chart of FIG. 6 shows a preferred round robin algorithm for load rotation. For simplicity, not all checks (e.g., equipment status, manual override, etc.) that may preferably be performed are shown on FIG. 6 .
  • the round robin algorithm begins with a curtailment call 600 for a specific amount “X” KW (such as 30 KW).
  • the rotation counter is set 602 to group curtailment duration, from which the system increments group selection counter 603 .
  • the system shuts group equipment down 604 .
  • group equipment shut down 604 the system turns on previous equipment group 606 .
  • the system then asks 608 whether the curtailment requirement has been met, and if not, shuts the next (group+1) equipment down 609 , and loops to re-ask 608 whether the curtailment requirement has been met.
  • the loop continues until the question 608 of whether the curtailment requirement has been met is answered affirmatively, and then the system asks 610 if the rotation duration is complete; if not complete, the loop to the question 608 of whether the curtailment requirement has been met continues.
  • the question whether the rotation duration is complete 610 can be answered affirmatively, the system then asks 612 whether all groups have been rotated through. If all groups have not been rotated through, return is provided to incrementing group selection counter 603 .
  • the system next resets group selection counter 614 , and asks 616 whether the curtailment call is complete. If the curtailment call is not complete, i.e., if not enough energy curtailment can be achieved, the algorithm ends (END) on FIG. 6 .
  • the invention has many practical and industrial uses.
  • the invention advantageously combines the power of artificial intelligence with the Internet to enable energy-using customers (such as building systems) to dramatically cut building energy costs in real time. Customers are able to do so by reducing the energy they consume each month, lowering their “peak load” demand charges, and by aggregating multiple electric meters into one “virtual meter.”
  • the neural network and artificial intelligence used in the invention permit many factors that influence consumption (such as current weather conditions, occupancy levels and market price of energy) to be taken into account, as the system constantly monitors and adjusts energy use.
  • the invention also provides for quantification of economic and energy savings, and for revenue generation.
  • the “curtailable” capacity and energy that may be generated from using the invention may be sold to regional control authorities and/or energy service providers.
  • the invention takes energy management to a new level, by applying the power of artificial intelligence, and by drastically reducing or removing the human element altogether (except when building managers choose to over-ride the system).
  • Neural network and intelligence agent technology is used to monitor, analyze and adjust energy consumption in real-time. A number of factors, including energy prices, current and forecasted weather conditions, current and scheduled occupancy levels, space air temperature and space air quality, etc., may be taken into consideration. These factors are applied to the selection of strategies for reducing energy consumption at any given moment.
  • the inventive energy management system is much more “intelligent” on a real-time basis than a human operator, who could not possibly analyze all of the constantly-changing factors affecting energy consumption and make adjustments quickly. Furthermore, the system provides a wealth of new data to building owners and managers, who can then make informed decisions for further energy reductions and future equipment purchase decisions.
  • the invention thus may be used to provide one or more of the following advantages: permanent load reduction; peak load avoidance; aggregation of multiple meters under a single “virtual meter”; automated curtailment response to Independent System Operator (ISO)/supplier requests; extensive baseline analysis, reporting and financial control; real-time reading of meters and devices; meter equipment trending; alarming; reporting; intelligent use of energy financing.
  • ISO Independent System Operator
  • the invention permits customers (such as industrial, commercial, university, hospital and other customers) to reduce their energy consumption on an ongoing basis by making thousands of minor adjustments hour-by-hour, twenty-four hours a day, to every piece of equipment attached to the system.
  • customers such as industrial, commercial, university, hospital and other customers
  • minor adjustments to each one can have a significant impact on overall energy consumption.
  • the system can meet energy reduction goals by raising the temperature in unoccupied rooms from 70 degrees to 75 degrees.
  • the system might decide that starting the air conditioning before employees arrive for work would not be necessary or economic. Over the course of a month or a year, these minor adjustments add up to significant reductions in energy consumption and costs, without any discernable impact on operations or people.
  • Peak load avoidance is also advantageously provided by the invention.
  • the energy bills for commercial customers consist of two parts—the cost of total energy consumption for the month, and a charge for the “peak” energy consumed during that month. This “peak load” charge can account for as much as 50% of the electric bill.
  • the invention provides for intelligent use of energy, by applying artificial intelligence to achieve on-going peak load reduction guidelines, pre-set by the customer. In a typical situation, the customer would want to insure that peak loads will not exceed a previously set maximum or, more aggressively, might decide to reduce peak loads each month (such as by 10%).
  • the intelligent agents in the invention can choose from a wide variety of available strategies to prevent crossing the line, such as raising (or lowering) thermostats throughout a building(s); dimming lights; etc.
  • raising (or lowering) thermostats throughout a building(s); dimming lights; etc. e.g., raising (or lowering) thermostats throughout a building(s); dimming lights; etc.
  • the intelligent agents of the invention will either employ another strategy for reducing peak load demand, or notify the customer that the goal cannot be achieved. All of this analysis, action and/or notification occurs within minutes, and permits customers (including commercial customers in multi-building systems) to truly control their peak load charges.
  • the ability to produce a virtual meter or virtual meters is another advantage of the invention.
  • Many commercial energy consumers receive a bill for every meter in their building or portfolio of buildings. It is not unusual for a single building to have multiple electric meters, and major office complexes or building portfolios in a given area may have many meters. Beyond the inefficiency inherent in receiving and paying numerous electric bills each month, electricity consumers are also charged for multiple, separate peak loads. The total of these peak load charges can be significantly greater than the actual peak that a single consumer reached at a particular point in a given month.
  • Intelligent use of energy according to the present invention can resolve this problem by aggregating all of a customer's meters into one “virtual meter.”
  • This virtual meter can encompass hundreds of meters in dozens of buildings within a single Electricity (Energy) Pool. (The United States is divided into ten Pools which have very different tariff structures and regulations. As a result, a virtual meter cannot aggregate meters in different pools, under the present framework in the United States.) Customers could receive one bill, not hundreds, and the peak load charge would be calculated against the combined meters, not against each individual meter. This can lead to significant savings.
  • Another advantage of the invention is the provision of automated curtailment. Solving the long-term energy problem in the United States (and elsewhere) will require a multi-dimensional approach. New construction of energy plants and transmission facilities alone will not solve the problem, particularly in the short term where California and other areas face the potential for a California-size crisis.
  • the present invention can play a significant role in mitigating energy shortages, and over the long term, substantially reduce the need for and cost of additional energy infrastructure. Under the terms of many commercial contracts, energy suppliers can ask customers to reduce consumption an agreed-upon number of times each year. During the electricity crisis in California in the spring of 2001, these provisions were invoked a number of times.
  • the intelligent agents of the invention may be able to achieve the curtailment by slight adjustments in equipment, or by selectively shutting down non-essential devices first. Or, the system in the invention may be set to shut down only non-essential buildings.
  • the invention provides the ability to take into account many factors before taking action, and to do so within mere minutes of a request to curtail consumption, something otherwise beyond the capability of any human operator or business manager or conventional energy management.
  • the invention also provides advantageous analyses, reporting and financial control.
  • a customer initially determines to proceed with start-up of an inventive computer-based energy management system according to the invention
  • the customer's data may be entered in the computer-based system and provide the baseline for future analysis of the customer's energy consumption.
  • the impact of the computer-based system on the customer's energy consumption may be seen.
  • a customer is able to monitor and analyze its energy consumption in real-time.
  • a customer may customize an energy management system so that that it provides information in a manner and format suited to the customer needs.
  • a customer can monitor and analyze the customer's energy consumption at a given moment or over any specified period of time.
  • Another use and advantage of the invention is regarding real-time reading of meters and devices.
  • the energy consumption of every meter and device connected to the system may be monitored and evaluated, if desired.
  • Equipment that is not performing at peak efficiency can be repaired or replaced, further lowering the overall energy costs.
  • the invention thus provides a data stream relating to individual efficiency of energy-using equipment.
  • the invention also is useful in meter equipment trending, including permitting energy-using customers to undertake trend analysis on a meter-by-meter basis in real time. Building managers can access screens at any time that show the current usage trend on a given meter, and provide a forecast for future consumption if the trend does not change.
  • the invention further provides for alarming, including appropriate notification when any situation occurs outside specified parameters. For example, if a peak load threshold is about to be exceeded, the system provides notification immediately so that remedial action can be taken. However, the system also provides notification for less critical problems, such as malfunction of a particular piece of equipment, or sudden changes in energy consumption patterns.
  • reporting may be provided.
  • a full suite of reports may be provided, which can be accessed at any time or on a regular basis. These reports may include billing rates and differential billing, load shaping and profiling, and virtually any other report that a client may specify.
  • advantages related to finance also may be provided.
  • the bill that an average commercial customer receives from its energy provider is enormous complex and frequently incorrect.
  • the customer may compare actual real time data collected against detailed baseline data and against rate and tariff structures that apply to the customer's energy consumption. Such a comparison will show a customer the level of savings and revenue achieved and help the customer to ascertain whether or not the bill provided by the energy provider is correct.
  • the present invention provides the mentioned advantages, with a rapidity of evaluation and of execution, accuracy, and precision well beyond that possible by a human operator or team of human operators. Also, advantageously, the energy management systems of the present invention are intelligent and “learn,” i.e., the systems learn from prior experience to improve results over time.
  • Initial deployment of energy load reduction according to the invention is accomplished by a fixed rotation schedule of equipment that is stepped through in a serial fashion.
  • System attributes such as allowable curtailment duration and electrical demand, is determined through functional testing and pre-programmed in a fixed matrix.
  • a rotation script is then deployed to systematically cycle each piece (or group) of equipment off and on at a fixed duration.
  • This ‘round robin’ rotation approach offers a less-than-fully-optinized rotation cycle but the system responses obtained from this method is used for training of the programmable intelligent agent (PIA) for optimal load rotation.
  • PDA programmable intelligent agent
  • a programmable intelligent agent optimizes the load rotation of curtailable loads, using a combination of intelligent agents which operate the device level, portfolio level, and pool level as follows:
  • the equipment targeted for load rotation includes: electrical space heat, air conditioning compressors, fan motors, package unitary HVAC equipment, and process motors.
  • the Intelligent Agent interface requirements include:
  • process limit(s) (required for resource leveling IAs). Where group on/off control is used, an average process measurement is to be provided, for example, the average space temperature or common return air temperature. If process limit monitoring is not deployed, then an acceptable period of the rotation schedule is determined through functional testing of process drift.
  • FIG. 7 A Rotation Schedule/Matrix example is shown in FIG. 7 , of a round robin approach to load rotation.
  • the rotation matrix in FIG. 6 provides an example grouping for a 30 KW curtailment rotation schedule. Curtailable demand is determined by continuous measurement using the Internet enabled kW meter.
  • Rotation Group Numerical group assignment for the purpose of prioritization and counting.
  • the rotation groups are fixed during the initial deployment.
  • the Load Rotation IAs optimize groups into equal load/equal duration.
  • Equipment ID Alphameric equipment descriptor.
  • Controlled Device ID Alphameric description of energy device.
  • Manual/Auto Indicator Address The address of the Manual/Auto Status. (The term “address” is used to refer to the location assigned by the enabling platform (e.g., Silicon Energy “PtID”, Engagenet, etc.) to be written to or read from.) Reading this point gives a “digital state” (0 or 1) indication the equipment has been placed in local override and is therefore not accessible for curtailment. If equipment status is unavailable, then the application “remembers” the outcome from the remote control event. For example, if equipment did not change kW during prior remote control event, then digital state is set to off. (“0”).
  • Equipment Status Address (Optional) A read only point that indicates the operational status (state output) of a piece of equipment. Operational status includes: normal, alarm, alarm code.
  • Curtailable Demand Setpoint The curtailable electrical demand (kW).
  • the setpoint for resettable devices is derived by means of direct measurement and approved by customer.
  • the curtailable demand setpoint is equal to zero.
  • Curtailable Demand initially is fixed, derived by means of direct measurement and review of normal kW process range. Once the Load Rotation IAs are enabled, the curtailable electrical demand is calculated as:
  • the calculated curtailable Demand is used within the Load Rotation IAs to optimize groups into equal load/equal intervals.
  • On/Off Control Address The primary control address to which curtailment on/off commands are written. The command is as detailed in the on/off Control Command entry.
  • On/Off Control Command The command signal to be written to the primary control address to place the equipment into curtailment mode. In most cases, this is a digital state command (0 or 1). The complement of the state command is used to disable curtailment. In those cases that require two cases, this typically is the “Internet control override” signal.
  • Reset Control Address The (optional) secondary address to which curtailment commands are written.
  • Reset Control Command The (optional) secondary command required to place a piece of equipment into curtailment mode. In most cases this is an analog reset variable (%, mA, V), for example, a reduced speed input into a variable speed drive. This input need not be reset to disable the curtailment mode, and is ignored when Control Command 1 indicates disablement.
  • Minimum Equipment Off Time The minimum duration in which a piece of equipment may be sent into curtailment mode. Required to prevent short-cycling of equipment.
  • Maximum Curtailment Duration The maximum duration a piece of equipment may be sent into curtailment mode. This period is initially determined through testing and is typically the worse case time interval before a process limit (space temperature, CO 2 , etc.) served by the equipment falls out of range. Once the Device Level IAs are trained, the maximum duration will be fed into the Load Rotation IA for sorting into load groups.
  • Settling Duration The time delay in which two equipment groups are required to overlap in curtailment mode (both groups in curtailment mode) before the prior group is brought out of curtailment mode. This is used to accommodate an overshoot electrical demand as the prior group's equipment is brought back to non-curtailment mode. Initially the settling duration will be fixed. Once the FANN IAs are trained, the settling duration will be fed into the Load Rotation IA for determining the group overlap.
  • Process Variable 1 Address The address of the first process variable to be used to constrain the magnitude and duration of the curtailment.
  • an AHU load rotation may be constrained by space temperature. This is typically be a zone temperature for AHU type curtailment. This information may not be required for the simplest form of the Round Robin approach. Up to three process variables are available for use; while not required, at least preferably one is be used (example for no process variables: fountain pumps).
  • Process Variable 1 Min Range This is the lower allowable limit for the primary process variable. Note that a curtailment range is typically more extreme than for normal allowable operating conditions.
  • Process Variable 1 Max Range This is the maximum allowable limit for the primary process variable. Note that a curtailment range is typically more extreme than for normal allowable operating conditions.
  • Process Variable 2 Address The address of the second process variable to be used to constrain the magnitude and duration of the curtailment. This information may not be required for the simplest form of the Round Robin approach. Two process variables are available for use; while not required, at least one preferably is used (example for no process variables: fountain pumps).
  • Process Variable 2 Min Range This is the lower allowable limit for the secondary process variable. Note that a curtailment range is typically more extreme than for normal allowable operating conditions.
  • Process Variable 2 Max Range This is the maximum allowable limit for the secondary process variable. Note that a curtailment range is typically more extreme than for normal allowable operating conditions.
  • Curtailment duration and impact are determined through functional testing; the equipment is disabled and the spaces served by the units is monitored to determine the maximum duration of curtailment before space conditions fall out of acceptable range.
  • Equipment is grouped under the following rules:
  • the flow chart of FIG. 6 is applicable to the above rotation schedule example, for a 30 kW curtailment call. Additional equipment status checks, manual override checks, etc. are performed that are not shown on FIG. 6 .
  • FIG. 8 An example of Peak Load: Virtual Meter according to the invention versus Real Meters is shown in FIG. 8 .
  • the combined total energy usage recorded by four meters A, B, C and D was 95 kW.
  • Meter A reached its peak at 4:00 p.m. on the third day of the month
  • Meter B's peak occurred at 10:00 a.m. on the 12 th
  • Meter C recorded its highest usage at noon on the 16 th
  • Meter D recorded its peak at 6:00 p.m. on the 29 th .
  • none of these peaks occurred at the same time, or even on the same day, the customer was charged for the combined total of the four.
  • Permanent Load Reduction software intelligent agents that continually make and implement complex multi-input, device-setting decisions, and permanently reduce the amount of energy consumed by a customer.
  • Peak Load Avoidance The use of a neural network to forecast, identify and minimize peak load events, reducing the portion of a customer's energy bill related to its peak energy usage each month. These peak load events can account for up to 50% of annual energy costs and thus their reduction is highly advantageous.
  • Virtual Meter Data Aggregation The integration of multiple buildings and electrical meters into one virtual meter, which can eliminate multiple billings, consolidate billable peak loads and give the customer greater flexibility in managing its energy consumption. This, in turn, can create a new, reduced peak load for the aggregated portfolio that will allow for negotiations of better rates from the customer's energy supplier, thus notably reducing demand charges.
  • Capacity Savings and Emergency Curtailment The system has the ability to rapidly reduce a customer's immediate energy usage at its request in response to short-term curtailments in energy supply. Energy consumption may be rapidly curtailed in response to requests by authorities or the energy supplier. This capability also makes it possible for a customer to sell into available markets the kilowatts of capacity it can curtail and the kilowatt-hours of energy it is able to provide back to the market during an emergency.
  • the IUE system Upon request by the local ISO, power authority or utility supplier, the IUE system will place buildings in peak curtailment operation. Non-essential loads will be de-energized and HVAC equipment will be rotated in and out of service to maintain a consistent load reduction through the curtailment period.
  • An automated building management system or energy management system is an automated building management system or energy management system
  • a building management system operated by an expert human engineer operated by an expert human engineer.
  • Intelligent agents are provided according to the invention.
  • the Intelligent agents continually learn.
  • a “modeling neural net” is connected to each device controlled. This net has one job: learn all there is to know about this device. All parameters of this device are followed by the neural net. Minute changes in operating characteristics, due to wear and tear, aging, weather, new parameter constellations etc. are immediately picked up and become part of the “model” that the agents have of this device.
  • the neural network knows how much power it consumes at a certain temperature setting at a certain outside temperature with a certain occupancy of the building. The net also knows this connection from other perspectives, it knows at which temperature setting, for a given occupancy and outside temperature what the power consumption would be.
  • the relationships between these parameters is neither linear nor easily expressable in an algebraic formula or differential equation (which are the standard ways in engineering to model systems).
  • the neural networks work like the human mind, creating connections between concepts, which are either reinforced or weakened, depending on observation—herein called “learning”, as in how children learn language or a ball game.
  • the intelligent agents can run the devices in the optimal fashion for the way the equipment operates right that moment. This characteristic is contrasted this to the way a conventional, automated building management system (BMS) works.
  • BMS automated building management system
  • the BMS may give fixed instructions to the device, regardless of the current efficiency or price of energy or interaction between temperature and occupancy.
  • the BMS has put the device on a schedule, e.g go to 71 F by 7 am, and that what it will do until it is given a new schedule.
  • the BMS has resets that are based on more than one variable, e.g., outside air temperature or space air temperature.
  • BMSs are typically set for worst case ranges, to avoid trouble calls—clearly not the smartest or most energy efficient way to run a building. It is easy to see how energy is wasted by such a rigid operation as the Comparative Example 1, that does not take changes and idiosyncrasies at the equipment level into effect. Also the case (Comparative Example 2) where a human expert controls is building management system is not much better. It is impossible for a human to monitor hundreds of devices with tens of points on every device.
  • Comparative Examples 1 and 2 are not used to forecast energy use. At best, these systems can look up yesterday's energy use and report that to a human user. They cannot factor this information into their own control actions. At best, Comparative Examples 1 and 2 need a human to do this. The human building managers will base their actions usually on “experience”, meaning that they will look at the weather forecast and err on the save side, either overcooling a building in the summer, or overheating it in the summer. Building managers are mostly striving to please patrons, not financial managers. Even a cost-conscious building manager is lacking the inputs and the modeling power to create an accurate forecast for their buildings, device by device, floor by floor, building by building, campus by campus.
  • the intelligent agents of Inventive Example 4 leverage the learning that has occurred over time in the neural network and use it to predict energy usage exactly in that fashion. Predictions are made short term or long range device by device, building by building, portfolio by portfolio. This allows the agents to pre-cool just to the right amount. During a curtailment it allows agents to predict degradation of room temperature and gently rotate the equipment that is either being shut off or reduced. Thus the impact on building comfort is maintained, while energy cost is kept at its lowest.
  • curtailment stages e.g Normal Stage, Yellow Alert Stage, Red Alert Stage.
  • curtailment stages e.g Normal Stage, Yellow Alert Stage, Red Alert Stage.
  • Each such curtailment stage specifies exactly how energy must be conserved.
  • Detailed plans exist that require certain air conditioners to be set to higher temperatures or to be switched off completely. Instructions for switching off certain banks of lights or pumps or other such measures may be part of curtailment plans.
  • One can easily see that these plans as in Comparative Examples 1 and 2 are very rigid. Clearly energy shortages do not come in three or four flavors. Yet the responses are patterned that way.
  • the agents can monitor energy price and scarcity of energy in the grid. This can happen on a extremely fine grained scale, not just green-yellow-red. Due to the agents ability to reason, they can react most appropriately even in early stages of an energy crunch. As the crunch gets more severe, agents can adopt their curtailment measures too. These curtailment measures are not the coarse measures taken be switching blocks of equipment off but try to minimize the impact on comfort and quality in the building. The agents can do this by using their knowledge about the operating characteristics of the devices and by forecasting energy need and consumption. Then the agents can take gentle control actions. While each control action may only save a minute amount of energy, compared to the sledge-hammer method of completely switching of full banks of equipment, the sum of these many minute savings equals the coarse action savings taken today by less sophisticated control systems and overworked building managers.
  • BMS Building management systems
  • the feedback/control variable in these loops is mostly a single, internal parameter to the system.
  • the controller does not take a sufficiently wide range of variables into consideration.
  • There are additional internal variables from the BMS itself such as carbon dioxide or other air quality measures). Connected to this are occupancy date, influencing variables such as air flow or fan speed or heating in winter. Humans rarely monitor global variables from outside the building that influence major decisions which can impact cost dramatically. Building managers usually do not have a display of the current price of energy.
  • Intelligent agents as in Inventive Example 4 take many global variables into consideration.
  • the agents thus have the ability to aggressively conserve energy when it becomes extremely expensive.
  • the agents sacrifice a little building comfort when it pays heavy dividends, yet keep the building comfortable when it is cheap to do so. Knowing about events in the world of energy, and not just the local building, thus pays a return to the building owner.
  • the agents of Inventive Example 4 on the other hand, knowing the energy price, will start reasoning to find a compromise between cost and comfort. First the agents will most likely set the temperature to 71 F, then they will rotate among various zones in the building to distribute “discomfort” equally, and only when that is exhausted go to an even higher temperature to keep costs under control.
  • the Inventive Example 4 has the artificial intelligence tools to balance opposed objectives, such as energy saving and building comfort.
  • the Comparative Example building management system is created on the metaphor of its predecessor—electromechanical systems. End-users are presented with “blocks” which may represent relays and other such physical entities. On a higher level control blocks represent blocks of panels or devices. While this metaphor is initially helpful for a building manager to make the transition from the physical world to systems controlled by microprocessors, it does eventually limits what the system can do.
  • Inventive Example 4 is not subject to such eventual limitations.
  • Inventive Example 1 true learning (observation and the creation of a knowledge base) occurs, such as by neural networks and rule-based expert systems. Due to such true learning, the system in Inventive Example 1 therefore come up with the right answer faster, more accurately and in a wider range of learning situations than the Comparative Examples.
  • Comparative Example 1 using intelligent agents surpasses both, automated building management systems (Comparative Example 1) and human experts (Comparative Example 2) in delivering better building comfort at less cost.
  • Comparative Example 2 The table below summarizes these findings.
  • Intelligent Agents Human Expert driving Concept driving a BMS a BMS Automatic BMS Learning operational Constant observation of Common sense of At best a fixed parametric specifics of devices every single device updates operational characteristics; description of a device; no [how to run air the neural network for that macro level only, can not learning or updating. coniditioners, pumps etc. device continually; up-to- follow all points on all Usually no modeling of most efficiently] date representation of the devices in detail for 24 device parameters. device hours per day.
  • the basis of comparison is both, the cost of energy consumed in the scenario and the comfort level achieved for the tenants.
  • Intelligent agents operate equipment more efficiently and effectively by automatically learning the operating characteristics of devices via a neural network approach is. This is faster, more accurate, and more representative of the current state of the device than preprogramming a building management system with static, manufacturer supplied parameters or specs for the device, which may not represent the current condition of the actual device.
  • Intelligent agents can achieve higher comfort levels for tenants during curtailment events since they do not rely on predetermined “shut down” groups or sequences, which are the only way building management systems or humans can handle these complex requests for curbing energy use.
  • Agents can run the equipment more effectively and efficiently on a day to day basis. The agents can do this, since they have the ability to reason about causes and trade-offs react flexibly to events in the building itself (temperature, CO 2 , occupancy, etc.) and to global changes (weather data, price of energy). Building management systems are usually on a schedule, where they take control actions, regardless of occupancy or the price of energy. This makes building management systems less efficient.
  • Intelligent learning is more cost effective than trial-and-error: While some conventional BMSs and even some domestic thermostats claim they can “learn”, what most of these devices actually are doing is a stochastic approximation approach—in other words: they are guessing. Guessing a value can be very wasteful, taking many “stabs” until a somewhat satisfactory value is found. Guessing also allows no transfer from one learning event to the next. True learning on the other hand requires observation and the creation of a knowledge base. Neural networks and rule-based expert systems can do this and therefore come up with the right answer faster, more accurately and in a wider range of learning situations.
  • Agents control more than one building While traditional BMSs merely schedule and monitor the actions in a single building, our agents control devices, such as HVAC or lighting across a whole portfolio of buildings. This prevents the agents from merely finding local maxima but allow them to globally optimize. It also equips the agents with increased degrees of freedom in balancing energy savings requirements with tenant comfort across buildings.

Abstract

Automatic energy management is provided, in even the most complex multi-building system. The necessity of a human operator for managing energy in a complex, multi-building system is reduced and even eliminated. Computer-based monitoring and computer-based recognition of adverse energy events (such as the approach of a new energy peak) is highly advantageous in energy management. Immediate automatic querying of energy users within a system of buildings for energy curtailment possibilities is provided. Such immediate, automatic querying may be answered by the energy users through artificial intelligence and/or neural network technology provided to or programmed into the energy users, and the queried energy users may respond in real-time. Those real-time computerized responses with energy curtailment possibilities may be received automatically by a data processing facility, and processed in real-time. Advantageously, the responses from queried energy users with energy curtailment possibilities may be automatically processed into a round-robin curtailment rotation which may be implemented by a computer-based control system. Thus, impact on occupants is minimized, and energy use and energy cost may be beneficially reduced in an intelligent, real-time manner. The invention also provides for early-recognition of impending adverse energy events, optimal response to a particular energy situation, real-time analysis of energy-related data, etc.

Description

    BACKGROUND OF THE INVENTION
  • This invention relates generally to systems and methods for managing use of energy, and especially to systems and methods for managing energy use in a complex multi-building context.
  • A number of factors have combined in recent years to create an electrical energy crisis in many regions of the United States. These include: a shortage of generating capacity; lack of capital investment in new transmission capacity; fuel volatility; and increased demand. The result is a power shortage and difficulties in the energy infrastructure.
  • Multiple-building systems, such as commonly owned systems of 30, 60 or more buildings, exist throughout the world today. Examples of such building systems include, e.g., university systems. Multiple building systems may be geographically dispersed. Controlling energy consumption, and costs of energy consumption, in such wide-spread building systems presents challenges. See, e.g., U.S. Pat. No. 6,178,362 issued in 2001 to Woolard et al. (assigned to Silicon Energy Corp.), discussing some of the problems of energy management and energy cost management for commercial users who operate large physical plants.
  • Conventionally, if it was desired to reduce energy consumption by a particular amount (such as a 40 KW reduction in the next two hours) in a multi-building system, which typically use procedure-based systems (such as conventional building management systems, current-generation energy management software, or SCADA-type systems), the building manager was required to conduct all the steps and tasks necessary to accomplish the goal manually. Thus, the question of how to accomplish a specified energy consumption reduction has been heavily human-dependent.
  • Another question is how to know what specific energy consumption reduction to even want to accomplish. That question, too, has been heavily human-dependent. For example, conventionally, as in U.S. Pat. No. 6,178,362, various meters and data-taking devices have been included in multi-building systems, but the obtained energy data still must be reviewed by a human operator. The necessary inclusion of a human operator in conventional systems has posed certain substantial disadvantages. A human operator may fail to recognize one or more energy-relevant events (such as the threat of a new maximum peak). The diligence, accuracy, speed, and foresight of a human operator necessarily may be limited, contributing to likely missed recognition of such energy relevant events. Human operators may have other duties, so that they not be reviewing relevant energy data at what would be a critical time. Human operators may review data yet fail to appreciate its significance. Human operators may review data, appreciate its significance, and decide on a course of action that may be less than optimal in terms of cost or convenience or comfort.
  • In any energy management system, reaching a new maximum of peak usage will be expensive and is acknowledged as something to be recognized—and avoided. In a human-based energy management system, the human operator may, or may not, be looking at energy data output at a time when the data is surging towards a new peak. Human operators come in a variety of diligence, attentiveness, and ability levels. Human operators tasked with recognizing surges towards new peaks tend to have other tasks, such that they cannot provide a sufficient level of attention and monitoring to recognize every surge towards a new peak.
  • Recognition of an energy-relevant event such as a surge towards a new peak is only one aspect of energy management. After recognition that an undesirable energy-relevant event is in progress, there remains the question of what response to take. There is only so much information and so many permutations that a human operator possibly can take into account in a fixed amount of time. The human operator is called upon to decide and act quickly, to avoid the new peak toward which the system is surging. When a human operator recognizes that a new energy peak is being approached, he or she will want to act quickly to avoid reaching the peak and will make a decision to reduce power to one or more power consumers in the system. The human operator is essentially incapable in a limited amount of time of consulting or studying the many different energy users (such as energy-using devices or apparatuses such as air-conditioners, etc.) to ascertain the status of each. A human operator practically speaking can do no more than, at best, execute one or more energy-reducing commands—for at least the reason that the luxury of time is not present.
  • Software systems that reduce energy consumption in building have been available for many years. These systems work by connecting various pieces of energy-consuming equipment to a computer, which allows the building manager to monitor consumption, and, if necessary, manually reduce it. More sophisticated systems allow third party “service bureaus” to provide these functions for building owners, but they still rely on intensive human intervention to be effective. Heretofore, the analysis and management of energy consumption has been a manual process. Computers and software systems have been able to collect data on energy consumption in particular facilities or on individual pieces of equipment for years. But human beings have had to analyze that information, and decide what action to take to reduce energy consumption. And because many factors affect energy consumption at any given moment—the weather outside, the number of people inside, etc.—it has never been possible to accurately and precisely adjust energy consumption in real time. For example, the Woolard et al. system seeks to use three dimensional facilities navigation tools, energy consumption analysis processes, TCP/IP communication and a World Wide Web (WWW)-based interface, but it is based on sub-systems each of which “performs operations which permit an employee of the entity to control and manage its facilities including its energy consumption.” Id., column 2, lines 26-29 (emphasis added).
  • The electricity crisis in California in 2001 provides a vivid illustration. Although many buildings and factories in the state have energy management systems, the only option available to power suppliers and commercial consumers trying to prevent wholesale network collapse was literally to turn out the lights in “brownouts” and rolling blackouts. The energy management systems in place and the people who monitor them on a daily basis were simply not capable of analyzing all of the potential alternative for reducing energy consumption and doing so quickly. The only choice was to shut down whole systems and businesses. Power outages, even planned power outages, have highly disruptive effects, such as disrupting telephone and computer network equipment, data inaccessibility, etc.
  • The various government and quasi-government entities charged with ensuring energy availability will continue to push users to curtail their electric power usage in order to avoid the devastating impact of blackouts, either actual or threatened. Avoidance of power outages by large users of power is sought, as having many benefits. Businesses need to have reliable sources of energy. Governments face social and political consequences of chronic energy shortages. Power suppliers cannot meet the demand for electricity in their areas, without building large power-generating reserves, which is not an optimal solution. Thus, it will be appreciated that there are many challenges in the areas of energy consumption, energy shortages, and energy management that remain to be addressed.
  • SUMMARY OF THE INVENTION
  • In the present invention, a system comprising artificial intelligence is connected to energy-using devices (such as pieces of equipment). Energy consumption advantageously may be monitored and/or manipulated in real time. Artificial intelligence (such as intelligent agents) may be used to evaluate, forecast and/or control energy consumption patterns. From the system comprising artificial intelligence, control signals may be sent to deploy agreed-upon energy-saving strategies at the building and/or device (energy user) level. Advantageously, energy management can be autonomous, artificial-intelligence based, real-time, over the Internet.
  • A significant advantage of the invention is to provide maximum energy curtailment with minimal impact to occupants of buildings in the building system. Maximum energy curtailment may be achieved with no greater than a certain defined level of impact to occupants of buildings in the building system.
  • The invention in a first preferred embodiment provides an energy management system comprising: computer-based monitoring for an adverse energy event in a building system; computer-based recognition of an adverse energy event in the building system; immediate automatic querying of energy users within the building system for energy curtailment possibilities; automatic receipt of responses from queried energy users with energy curtailment possibilities; automatic processing of energy curtailment possibilities into a round-robin curtailment rotation. Preferably, responses from queried energy users with energy curtailment possibilities are automatically processed by a computer with a set of instructions for evaluating how to enact each respective curtailment possibility of each respective energy user offering a curtailment possibility.
  • In another preferred embodiment, the invention provides a method for minimizing and/or eliminating need for human operator attention in energy management of a building system, comprising: non-human, computerized processing of obtained energy data, wherein the obtained energy data is for at least one energy user in the building system, said processing including (A) automatic determination of whether at least one energy-relevant event is present or (B) continual optimization of a setting of the at least one energy user. Optionally, when a energy-relevant event is automatically determined to be present, the invention provides immediately activating an automatic response to the energy-relevant event. Another preferred but optional example is mentioned, wherein at least one intelligent agent, from the obtained energy data, actually forecasts the peak; wherein the energy-relevant event is a threat of a new maximum peak, and the immediately activated automatic response includes energy reduction interventions to avoid the new maximum peak.
  • In a further preferred embodiment, the invention provides a computer-based energy management system, comprising: non-human, computerized processing of obtained energy data, wherein the obtained energy data is for at least one energy user in a building system, said processing including automatic determination of whether at least one energy-relevant event is present; and upon recognition of an automatic determination that at least one energy-relevant event, a non-human, computerized response thereto based upon artificial intelligence reasoning.
  • Additionally, in another preferred embodiment the invention provides a computer-based round-robin rotation system for energy users, wherein the energy users are under computer-based control and are present in a building system, the round-robin rotation system comprising: a series of computer-based energy curtailment commands to each of a plurality of energy users in the building system, wherein (1) each computer-based energy curtailment command in the series of energy curtailment commands; (a) is specific to the energy user to which the curtailment command is directed; (b) has been derived from an energy curtailment offer provided by the energy user; and/or (c) is based on continually learned and observed characteristics of the energy user; and/or (2) an energy user in the plurality of energy users is grouped with other energy users based on similarity with regard to a certain parameter or parameters.
  • The invention, in another preferred embodiment, provides a computer based method of avoiding a new energy peak, comprising: priming a computer-based system with data as to energy peak(s) already reached in a building system; for current energy usage in the building system, obtaining, in real-time, computer-readable data from which to automatically forecast if a new energy peak is approaching; and real-time automatic processing the obtained computer-readable data to forecast whether or not a new energy peak is approaching. Preferably, if the real-time automatic processing of the obtained computer-readable data provides a forecast that a new energy peak is approaching, an immediate, real-time, automatic response is initiated.
  • In a further preferred embodiment, the invention provides an energy curtailment system comprising an automatically managed round-robin rotation of a plurality of energy curtailment interventions. Each respective energy curtailment intervention within the plurality of energy curtailment interventions may derived from an energy curtailment offer from a to-be-curtailed energy user. A plurality of to-be-curtailed energy users may be included in a single building or in a multi-building system.
  • Additionally, the invention in yet another embodiment provides a compilation of energy-relevant data, comprising: a stream of energy-related data for at least one individual energy user within a plurality of energy users (such as where the at least one individual energy user is within a multi-building system and separate streams of data are provided for other individual energy users within the multi-building system.) The invention also provides a data analysis method, comprising leveraging a stream of energy-related data for at least one individual energy user within a plurality of energy users, wherein the leveraging includes a comparison against historic data for the device. The leveraging may include computer-based searching for rapid deviation from a historic pattern.
  • Another embodiment of the invention provides a method of determining whether to repair or replace an individual energy user, comprising: reviewing a stream of energy-related data for the individual energy user, wherein the individual energy user is contained within a plurality of energy users.
  • The invention in an additional embodiment provides an energy management system for automatically achieving energy curtailment in a multi-building system, comprising: immediate automatic querying of energy users within the building system for energy curtailment possibilities; automatic receipt of responses from queried energy users with energy curtailment possibilities; automatic processing of energy curtailment possibilities into a round-robin curtailment rotation.
  • Some perfecting details of the inventive systems, methods, etc. are mentioned as follows, without the invention being limited thereto.
  • Preferably, each energy user has associated therewith a dedicated neural network, such as a dedicated neural network that continuously learns operating characteristics of said energy user associated with the dedicated neural network, wherein forward and backward reasoning and forecastability are provided.
  • Where an adverse energy event or energy-relevant event is mentioned, examples may be a new peak demand or threat thereof; a human-given directive to curtail a certain amount of energy consumption; and/or an excess increase of energy price in a deregulated market. The adverse or energy-relevant energy event may be a surge or a steady increase towards a new peak demand; at least one recognizable pattern of data that has been learned via artificial intelligence by a computer system doing the monitoring; etc. Preferably, the computer doing the recognition of an adverse energy event, for each recognized pattern of data that is an adverse energy event, reacts with an automatic response based upon reasoning (such as a a querying response to be executed).
  • Where monitoring is mentioned, the monitoring may occur in a context selected from a business-as-usual context; 24×7 permanent load reduction context; and an emergency context. Energy use may be constantly monitored and/or adjusted, said constant monitoring and/or adjustment being non-human, wherein business-as-usual constant adjustment, 24×7 load reduction is provided. The non-human constant monitoring and/or adjustment preferably is by artificial intelligence; and, preferably is to monitor and/or adjust at least one factor that influences energy consumption (such as current weather conditions at and/or approaching an energy-user; occupancy levels of a facility served by an energy-user; market price of energy; weather forecasts; market price forecasts; air quality; air quality forecasts; lighting quality; lighting quality forecasts; plug load patterns; plug load pattern forecasts; etc.).
  • The invention may include and/or provide one or more of the following:
      • at least one modeling agent and/or at least one forecasting agent;
      • 24×7 permanent load reduction;
      • minimization of energy consumption in ongoing business-as-usual energy consumption;
      • load balancing between buildings;
      • automatic documentation of energy savings attributable to any automatic intervention(s) by the energy management system;
      • machine-based learning from the obtained data and/or machined-based constructing a model from the obtained data;
      • automatic documentation of energy savings attributable to any said automatic intervention(s);
      • machine-based reasoning to select between at least two conflicting goals (such as machine-based reasoning is to select between a market price goal and a comfort-maintenance goal);
      • a computerized display of energy data and/or device;
      • on human demand, computerized forecasting, computerized simulation of an effect or effects of a proposed control action, and/or computerized reporting on simulation at various levels of aggregation;
      • artificial intelligence reasoning based on one or more of: (A) knowledge about a building or buildings in the building system, (B) knowledge about an energy using device, (C) knowledge about the building system, and (D) data outside the building system;
      • automatic querying of energy users;
      • receiving responses from queried energy users and automatically processing the received responses;
      • automatic formulation of an optimal energy-saving command decision and/or strategy;
      • executing the optimal energy-saving command decision or strategy;
      • generation of a log of historical activity by one or more artificial intelligent agents performing the artificial intelligence reasoning;
      • machine-based detection of presence of a chemical or biological warfare agent, to which is determined a machine-based response (such as release of an anti-agent and/or adjustment of one or more energy users); at least one machine-based determination of at least one parameter of interest to a building manager, said parameter being measurable and controllable;
      • automatic monitoring of the computerized response;
      • communication over the Internet;
      • learning by artificial intelligence that a desired target parameter (such as room temperature) in each area served by the system can be maintained by a round-robin rotation;
      • compiling a complete array of historical data in computer-readable form, determining one or more patterns thereform, and comparing therewith current real-time data to forecast if a new peak is going to be reached;
      • neural network based prediction;
      • one revenue-grade virtual meter which is an aggregation of revenue-grade meters;
      • monitoring and adjusting based on all of current weather conditions at and/or approaching an energy-user; occupancy levels of a facility served by an energy-user; market price of energy; weather forecasts; market price forecasts; air quality; air quality forecasts; lighting quality; lighting quality forecasts; plug load patterns; and plug load pattern forecasts;
      • preliminary functional testing for obtaining data and formulating applicable rules, and a continuous process of learning embedded in a neural net of a modeling agent associated with an energy-using device.
  • Where a building system is mentioned, the building system may be a single building or at least two buildings. The building or buildings may be, for example, at least one university building; at least one hotel building; at least one hospital building; at least one car dealership building; at least one shopping mall; at lease one government building; at least one chemical processing plant; at least one manufacturing facility; and any combination thereof of buildings.
  • When at least two buildings are provided, the at least two buildings under management may be geographically dispersed (such as a state's difference apart); and/or commonly owned or not commonly owned. Ownership may be, for example, by a commercial entity, a university, a government, etc.
  • Where a peak is mentioned, examples of a peak include a kW demand peak, a lighting peak, a carbon dioxide peak, a pollutant peak, etc.
  • Where an automatic response is mentioned, preferably the automatic response is non-determinative.
  • There has been mentioned automatic determination of whether at least one energy-relevant event is present, and preferably such automatic determination comprises application of artificial intelligence.
  • When artificial intelligence is mentioned, preferably the artificial intelligence is that of neural networks; rule-based expert systems; and/or goal-based planning systems. The artificial intelligence reasoning may comprise at least one artificial intelligent agent and, optionally, at any given time, what the artificial intelligence agent is doing may be monitored (such as monitoring by a human viewing what the artificial intelligence agent is doing.).
  • One or more of the following may be provided and/or included: more obtained energy data is processed in a given time period than could be processed by a human being; a non-human, computerized response may be formulated after processing of more information than could be accomplished by a human in whatever processing time has been expended; monthly energy consumption may be reduced for the building system and/or peak load demand charges for the building system are lowered. Where computerized reporting has been mentioned, the aggregation level for the computerized reporting may be at an individual device, at everything in a building, at a set of buildings, or everything commonly owned. The optimal energy-saving command decision may comprise a rotation of energy curtailment that minimizes impact over energy users in the system.
  • Where a computerized response has been mentioned, the computerized response may include at least one determination based on one or more of: (A) air quality, humidity, pollutants, air flow speed, temperature, and other descriptors of physical properties of air; (B) light direction, light color, ambient temperature, foot candle, kw consumption of light producing equipment, smell of light, and other descriptors of physical properties of light; (C) plug load; motion sensed by motion sensors; carbon dioxide levels; brightness; sound levels; automated device for sensing human presence; motion detectors; light-sensing apparatus; habitation-sensor; (D) chemical or biological warfare agent sensing device (such as a mustard gas sensor, an anthrax sensor, a carbon monoxide sensor, a carbon dioxide sensor, a chlorine gas sensor, a nerve gas sensor, etc.).
  • Where a round-robin rotation system has been mentioned, examples may be a round-robin system formulated in response to a human request for energy curtailment; a round-robin system implemented under business-as-usual circumstances, etc. By way of example, a computer may automatically process the responses from queried users, total the respective curtailment possibilities from the queried energy users amounts, determine whether the total of respective curtailment possibilities is sufficiently large, and, (A) if so, proceed to schedule a round-robin energy curtailment rotation pursuant to criteria; and, (B) if not, notify a human user. The round-robin curtailment rotation may be executed and achieve energy consumption reduction. The energy consumption reduction may occur during an energy emergency (such as, e.g., an energy emergency declared by a local independent system operator, a power authority, a utility supplier, or a governmental authority, etc.). A round-robin curtailment rotation may be called in order that energy may be sold back into the grid.
  • Where computer-readable data has been mentioned, the computer-readable data may comprise data from the energy users in the building system; from a source selected from sensing devices, electric meters used for billing, and information from individual devices; etc.
  • Demand for each individual device may be forecast based on temperature forecasts; patterns historically observed and learned via artificial intelligence and under continual update; and occupancy where the individual device is provided.
  • Where immediate automatic querying has been mentioned, such querying may be directly or indirectly activated such as querying based on, for example, a request by a local independent system operator, a power authority or a utility supplier.
  • The invention provides optional documentation, such automatic documentation automatically generated of avoidance of a new energy peak, with said automatic documentation being (a) stored in an accessible computer file and/or (b) printed and/or stored in a human operator-friendly format.
  • The invention advantageously makes possible that, if desired, a human operator is not needed. If desired, a human operator may have an optional override right. Also optionally, a human operator may enter a query (such as a query as to current state of one or more devices in a specified building, a query requesting a prediction of effect of proposed control action(s) on an energy bill and/or on comfort, etc.). The invention includes an embodiment wherein no human operator intervention is involved in either the automatic processing to forecast whether or not a new energy peak is approaching nor the immediate, real-time, automatic response to the forecast that a new energy peak is approaching. By applying the invention, new energy peaks may be avoided without human operator intervention. Advantageous results (such as energy consumption reduction) mentioned herein may be achieved even when no human is controlling.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a flow chart of an exemplary inventive energy management system which is machine-based and may operate human-free.
  • FIG. 2 is a flow chart of exemplary machine-based energy data receipt and processing, including automatically identifying and responding to an adverse energy event, according to the invention.
  • FIG. 3 is a flow chart of an exemplary machine-based energy curtailment response to an adverse energy event, according to the invention.
  • FIGS. 4A and 4B are examples of schematic diagrams of the relationship of user-set goals to be effectuated by higher level agents and the higher level agents, according to the invention.
  • FIG. 5 is a diagram of an exemplary Internet-based energy management system of three buildings, according to the invention.
  • FIG. 6 is flow chart for an exemplary round robin algorithm for load rotation, according to the invention.
  • FIG. 7 is a chart of an exemplary rotation schedule/matrix example according to the invention, with a load rotation “round robin” approach being shown.
  • FIG. 8 is a graph of Peak Load: exemplary Virtual Meter according to the invention versus Real Meters.
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
  • As may be seen with reference to FIG. 1, in one preferred embodiment, the invention is a machine-based energy management system, which may be human-free in operation. Although a human operator is not needed, a human operator is not necessarily precluded from acting in the energy management system. In the energy management system of FIG. 1, for data received electronically from a plurality of energy users, an adverse energy event is monitored-for electronically (100). If the electronic monitoring 100 detects no adverse energy event, the electronic monitoring for an adverse energy event continues (100A) as more to-be-monitored data is electronically received. If the electronic monitoring 100 electronically detects an adverse energy event 110, the adverse energy event that has been electronically detected 110 is electronically acted-upon 120 by adjustment of at least some of the plurality of energy users. (Herein, reference is made, variously, to electronically-done steps, machine-based activity, computer functioning, electronic activity, automatic activity, and the like, in each case, to make clear that the step is performed in a non-human manner rather than to limit reference to a particular machine or device.) The monitored-for adverse energy event may be any energy-usage and/or energy-cost related event, for which the received to-be-monitored data may be electronically monitored. As a preferred example of an adverse energy event for which the received energy data may be monitored is mentioned the surge towards a new energy peak. It will be recognized and appreciated that a machine, such as computer, may more rapidly calculate and compare numerical information than could a human operator. Presented with the same electronic energy data, a machine-based system can more rapidly and accurately arrive at a faster conclusion as to the direction being taken by the energy use in the entire system. The greater the number of energy users, the greater the number of buildings in the system, and the greater the dispersion of energy users over different buildings, the more difficult it is for a human operator or for several human operators to make decisions that minimize energy usage and cost of energy usage without adversely affecting operations and occupants.
  • The invention may be used in any system including a plurality of energy users, most preferably a system in which the plurality of energy users are dispersed in multiple commercial buildings. The invention provides particular advantage in a multi-commercial building system, because of the difficulties otherwise posed by energy management and energy cost control in such multi-commercial building systems. As examples of commercial buildings may be mentioned, e.g., university buildings, factories, hospitals, office buildings, etc. It will be appreciated that not necessarily all energy users in a building are required to participate in the energy management system of the invention.
  • As examples of an “energy user” in the present invention may be mentioned any device that requires energy to operate, including but not limited to, e.g., air conditioners, chillers, heating and ventilation, fans, fountain pumps, elevators, other equipment, lighting, etc.
  • As examples of the to-be-monitored energy data received electronically from the energy users are any data that are receivable from an energy user in real-time (i.e., embedded) communication with a data-receiving device. As examples of such data movement may be mentioned an electronic means of real-time data movement such as a network (such as the Internet (i.e., the World Wide Web (WWW), an intranet, etc.), most preferably, the Internet. As examples of the sources of the machine-readable data that is received and subjected to machine-based monitoring may be mentioned any metering device, measuring device, etc. that measures energy use (including actual use and scheduled upcoming use) of an energy user.
  • With reference to FIG. 1, the electronic-acting upon 120 a detected adverse energy event may be any response or adjustment that reduces energy cost and/or energy usage, most preferably an energy cost reduction and energy usage reduction approach with minimal impact on occupant comfort and normal operations. An exemplary electronic response 120 to a detected adverse energy event may be seen with respect to FIG. 2, in which the energy management system provides electronic receipt of data from a plurality of energy users (200). The received data is electronically processed (210) vis-á-vis whether an adverse energy event (such as approach of a new peak) may exist, and when an adverse energy event is detected, the system electronically requests energy curtailment possibilities (220) from some or all of the plurality of energy users. Energy curtailment possibilities from energy users are electronically received (230), and received energy curtailment possibilities are automatically processed (240).
  • In the electronic request for energy curtailment possibilities (220), it is not required that all energy users be queried for energy curtailment possibilities. For example, certain energy users that are deemed essential may be excluded from being part of an automatic query for energy curtailment possibilities. The requests for energy curtailment possibilities are directed to such energy users that have the ability to consider their energy curtailment possibilities and to formulate an energy curtailment response (such as an offer of kilowatt hours to forego). Thus, the energy users to be queried are supplied with such artificial intelligence, neural network technology, or other computer- or machine-based technology and programming such that they can compute, in real-time, what energy curtailment they can offer based on certain preset rules applicable to the respective energy user, such as rules relating to current weather conditions, comfort, etc. Thus, it will be appreciated that respective energy users will have programming suitable for the context in which the energy user operates. For example, an air conditioning energy user and a multi-elevator energy user will be programmed to consider different factors for evaluating whether each can use less energy. An air conditioning energy user may be programmed to consider outside temperature and time of day and other factors, while a multi-elevator energy user may consider time of day and not be programmed to consider outside temperature. The multi-elevator energy user may place much different emphasis on time-of-day than the air conditioning energy user. For example, because shutting down elevators at certain high-traffic times of day may achieve an energy savings but be unacceptable from a building management viewpoint, the elevator energy user's formulation of an energy curtailment possibility response may heavily depend on the time of day.
  • Each to-be-queried energy user thus is provided with a means to intelligently respond in real-time with an appropriate response that is minimally-invasive or bothersome to the building occupants and those being served by the queried energy user.
  • With reference to FIG. 2, it is particularly mentioned that the energy curtailment possibilities from the energy users are electronically received (230) and automatically processed (240). That is, reliance on a human operator advantageously is not needed.
  • It will be appreciated that, in a preferred embodiment, the invention provides for the energy management system of FIG. 3, in which the system provides real-time machine-based evaluation of data for energy curtailment possibilities (340), from which an automatic round-robin energy curtailment rotation is established (350). Each affected energy user is automatically advised of the energy curtailment that the affected energy user is to implement (360) as its part in the round-robin energy curtailment rotation. It will be appreciated that a human operator or operators (especially in a multi-building system) cannot formulate an optimal round-robin energy curtailment rotation in the short time that a machine-based system can. Moreover, even once a machine-based energy curtailment round-robin rotation is established, it will be appreciated that it is much preferred for a machine-based system to electronically implement the established rotation, compared to human involvement in controlling the to-be-curtailed energy users. While human involvement in the inventive energy management system is not prohibited (such as the ability of a human operator to override or command that a certain feature of the established rotation not be implemented), preferably human operator involvement is limited or none.
  • With reference to FIGS. 4A and 4B, the relationship of trigger agent(s) 1 (such as user-set goals or peak load) for higher level agents to accomplish, higher level agents that are to accomplish those user-set goals, and devices 2, 2A, 2B may be seen in two exemplary uses of the invention. As examples of trigger agent 1 when the trigger agent 1 comprises user-set goals for higher level agents to accomplish may be mentioned: impact on occupants expressed in computer-based terms; price sensitivity expressed in computer-based terms, etc.
  • Energy-using devices 2, 2A, 2B are shown, but more sets of devices may be incorporated into the system. In the case of the three sets of devices 2, 2A, 2B, three are shown for manageability of illustration, and not to indicate any limitation of the invention in that regard. The same comment applies to other features shown herein, such as buildings 10, 10A, 10B.
  • Device 2 is provided with a forecasting agent 3, a modeling agent 4 and a control agent 5. Respectively, device 2A is provided with a forecasting agent 3A, a modeling agent 4A and a control agent 5A and device 2B is provided with a forecasting agent 3B, a modeling agent 4B and a control agent 5B. Preferably, each device (energy user) has a dedicated neural network that continuously learns the operating characteristics of that energy user, and allows forward and backward reasoning, thereby making forecasts. For example, the neural network may learn that if the temperature setting of an air conditioning unit is bumped by 2 degrees, that a certain drop in kW consumption results. The neural network may learn that if kW consumption is dropped by 3 kW, a certain temperature effect is observed. The neural network may learn that if a certain event or device setting adjustment occurs, the time elapsed before an OSHA level is reached is a certain amount. These are only a few examples of reasoning by the neural network.
  • As a modeling agent 4 may be used any system configurable as a neural network that may be disposed with respect to an energy user (device) to learn (preferably, to continuously learn). Examples of what may be learned about an associated device by a modeling agent include, e.g., energy consumption (kW), temperature, degradation time, fan speed, vane position, etc. A modeling agent preferably continually learns the operating characteristics of the device with which it is associated, thus understanding, for example, the connections between energy consumption (kW) and room temperature for an air conditioner. A forecasting agent predicts energy consumption of the device associated therewith under various conditions, allowing simulation and curtailment decision making. A device control agent takes control of the device.
  • As a forecasting agent 3 may be used any system that, upon receiving a question, returns to the modeling agent 4 and runs the question. Preferably, the forecasting agent 3 neither over- nor under-generalizes. For reducing over- and under-generalization by the forecasting agent 4, it is preferred for the modeling agent 4 to have been in continual learning for as long a time period as possible, with relatively longer times of continual learning being more preferable. For example, a modeling agent that has been in continual learning for a one-day period has only a certain limited number of data points and if a query is posed to the forecasting agent and the forecasting agent cannot find an exact match of data points in the modeling agent, the forecasting agent will need to generalize (i.e., extrapolate) and is relatively likely to over- or under-generalize. If the modeling agent has been in continual learning for a five-year period, if the same query is posed to the forecasting agent, the forecasting agent is relatively more likely to find a match, or at least a closer match, of data points in the modeling agent, and thus the forecasting agent is relatively less likely to over- or under-generalize.
  • Higher-level control agents run on the portfolio or building level, controlling many devices (via their control agents). Based on user-set goals and environmental input (such as price of energy, temperature, occupancy, etc.), the higher level agents devise a strategy to achieve the user-set goals and accomplish the user-set goals by controlling the device agents. Higher-level agents reason via artificial intelligence to find a suitable balance between two or more goals, such as between savings and comfort.
  • A higher level control agent (for load rotation) 6 is provided in FIGS. 4A and 4B. In FIG. 4B, a second higher level control agent (for load rotation) 6′ also is provided, showing a situation where load rotation may have two different portfolios. An example of a context represented by FIG. 4B may be where different strategies are in place. Examples of a strategy include, e.g., a permanent 24×7 load rotation; a curtailment load rotation. A strategy or strategies is or are embodied by one or more artificial intelligent agents.
  • An artificial intelligent agent may be concerned with a strategy such as price sensitivity; air supply; temperature, etc. Intelligent agents can be used to reduce energy cost better than automated building management systems and/or human experts. Herein, examples are given showing how intelligent agents using continuous learning and reasoning can manage energy better than conventional building management systems. Both, the cost of energy for large buildings and the comfort for tenants are taken into account. The scenarios of the Examples herein highlight major differences between knowledge based energy management and conventional, schedule-driven energy management. From the Examples and Comparative Examples herein, it can be seen that continuous learning is more accurate than one-time settings; accurate forecasting enables smart planning; flexible responses to curtailment requests are provided; a wider range of information inputs means better building intelligence; rigid scheduling cannot accomplish the results of knowledge-based reasoning; feedback loops are too simplistic for today's sophisticated energy management concepts; trial and error methods are too costly
  • Referring to FIGS. 4A and 4B, a higher level control agent 7 that is price sensitive is provided. Control agents 6, 6′ (in FIG. 4B) and 7 are intelligent agents.
  • For connecting to buildings in which the devices 2, 2A, 2B are located, suitable hardware and software (such as platform hardware and software provided by Engage Networks and Silicon Energy) are used. A building equipped with a building management system (BMS) provides the easiest connection to the system comprising the intelligent agents (i.e., the higher-level control agents), as well as to individual energy-consuming devices 2, 2A, 2B. When BMS is used, as a platform may be mentioned any communications protocol that allows quick and seamless communication with the BMS and the devices it monitors. As a most preferred example may be mentioned BMS platforms with open communications protocols such as BacNet via UDP, which allow quick and seamless communication between the system comprising the intelligent agents with the BMS and the devices it monitors. If the BMS is not open (i.e., does not adhere to an open communications standard, such as BacNet or OPC), appropriate drivers may be obtained and used to communicate. For example, the BMS manufacturer may be contacted to buy or otherwise obtain the driver or at least the specifications for the driver to talk through the Internet to the BMS through them. Examples of such BMS drivers include, e.g., control drivers by Johnson, Invensys, Honeywell, etc. As software useable in the invention may be any software that allows communication with a BMS such that remote control can be achieved.
  • Advantageously, the present invention is installable in conjunction with certain existing equipment and software. For example, hardware devices may be installed that can translate between protocols and conduct simple data buffer or transfer tasks. Existing monitoring systems (such as those provided by Engage Networks and Silicon Energy) may be leveraged, for connecting portfolios of buildings. Such existing monitoring systems which allow end-users to manually control a BMS are lacking in any artificial intelligence capability, and that artificial intelligence capability is thus supplied by the present invention. The present invention, by operating in connection with an existing monitoring system, can connect to an installed, in-place customer base quickly, with minimal local installation.
  • Referring to FIG. 5, an exemplary Internet-based energy management system of three buildings 10, 10A, 10B, according to the invention, may be seen. It will be appreciated that the invention may be used with more or less than three buildings. Each respective building 10, 10A, 10B has located on-site respective energy-using devices 11, 11A, 11B. A preferred embodiment is discussed in which a building such as building 10 has multiple energy-using devices 11.
  • Each respective building 10, 10A, 10B has associated therewith respective meters 12, 12A, 12B. A preferred embodiment is discussed in which a building such as building 10 has multiple meters 12, but it is possible for a building to have only one meter. As a meter may mentioned any metering device that measures energy-relevant information, such as air temperature, air quality, humidity, etc. Meters 12, 12A, 12B and devices 11, 11A, 11B are connected through a building management system or energy management system (such as an existing building management system) and a network 15 (such as the Internet) to at least one intelligent agent, most preferably to a system including intelligent agents. Each respective building 10, 10A, 10B has associated therewith a respective building management system or energy management system 13, 13A, 13B (such as a conventional building management system, a conventional energy management system, etc.). In FIG. 5, a three layered architecture (user interface, business logic, and data layer) is shown.
  • Each respective building 10, 10A, 10B has associated therewith a respective protocol driver 14, 14A, 14B. Each respective protocol driver 14, 14A, 14B is in communication with a network 15 (such as the Internet). The network 15, in addition to receiving data from protocol drivers 14, 14A, 14B, also receives other energy-relevant data 16 (such as a price feed (in $/MWh) and/or a NOAA weather feed, etc.).
  • In this example, the network 15 (such as the Internet) further is in communication with a communication layer (such as a communication layer comprising AEM/DCOM (or other Engage Data Server driven by Active Server Page Technology through the firewall generating HTML pages) 17, FTP (File Transfer Protocol) 18, BacNet/UDP 19, and expandable protocol slots 20). BacNet/UDP is an open standard, an example of an open building intercommunications protocol, put forward by the BacNet consortium. BacNet via UDP takes that protocol and transports it in datagrams (UDP) over the Internet. The UDP is the envelope; the BacNet message is the content. A communication layer other than a communication layer comprising AEM/DCOM 17, FTP 18, BacNet/(UDP 19, and expandable protocol slots 20 may be used in the invention. It will be appreciated that AEM/DCOM, FTP, BacNET/UDP and expandable protocol slots are shown as examples and their use is not required, with communications tools being useable in the invention.
  • AEM/DCOM 17, FTP 18, BacNet/UDP 19, and expandable protocol slots 20 are included in data processing system or computer system 25. Data processing or computer system 25 thus is able provide a real-time database 26. The real-time database 26 advantageously includes real-time energy-relevant information specific to the buildings 10, 10A, 10B as well as real-time energy-relevant information “from the world,” i.e., the energy-relevant information 16 (such as price feed in $/MWH and NOAA weather feed).
  • Data processing or computer system 25 further includes intelligent agents 21, optional but particularly preferred financial engine 22, optional but particularly preferred notification workflow system 23 and optional but particularly preferred energy monitoring system 24, which receive, process and/or act on information communicated via the network 15 (such as the Internet). Advantageously, real-time receipt is made possible, as well as real-time processing and/or acting on received information. The intelligent agents 21 are the heart of the intelligent use of energy system of FIG. 5. The intelligent agents 21 preferably function in neural networks, which monitor each piece of equipment, forming a non-parametric model of its behavior, allowing accurate predictions of the impact that specific energy control actions will have on the building environment. Also, energy savings predictions can be accomplished based on environmental changes (temperature, air-quality, etc.). These “device agents” are used by higher-level agents to pursue a number of strategies, such as “minimum disturbance load rotation” or “supply air reset”. These intelligent agents function like highly specialized, 24×7 staff members, and can be switched on or off, or given different goals to accomplish. The intelligent agents 21 monitor and control the devices to maximize energy savings, while minimizing impact on environmental quality.
  • The data processing or computer system 25 thus monitors and processes the real-time database 26, based on rules and/or parameters, and formulates real-time queries (such as queries for energy curtailment possibilities from energy-using devices 11 within building 10) and/or commands (such as an energy curtailment round-robin rotation to be imposed on devices 11, 11A, 11B). The real-time queries and/or commands formulated by the data processing or computer system 25 are communicated in real-time via the network 15 (such as the Internet) to the respective protocol drivers 14, 14A, 14B which leads to devices 11, 11A, 11B being controlled in an overall energy use reducing manner but with minimized discomfort or inconvenience to occupants or users of buildings 10, 10A, 10B. Discomfort or inconvenience to occupants or users of buildings 10, 10A, 10B is considered and included in the data processing or computer system 25 so that a particular energy-using device in the plurality of devices 11, 11A, 11B will not be curtailed in its energy use in a manner that would cause discomfort or negative impact. Thus, certain energy-using devices (such as computer equipment, hospital equipment, etc.) are treated differentially and intelligently so as not to be subjected to energy curtailment in the same manner as other energy-using devices, while other energy-using devices that are otherwise identical but in different buildings may be subjected to different energy curtailment based on time of day and occupancy or the like in the respective buildings. Thus, if building 10 and building 10A are in different time zones but otherwise have a similar set of respective devices 11, 11A, they may be controlled appropriately and in a maximally energy-intelligent manner.
  • It will be appreciated that the data processing or computer system 25 depends on rules and/or expressions and/or logic which are expressed in terms of variables and/or input which are manipulable and evaluable. For example, there may be used rules, expressions, variables and/or input suitable for aggregating energy use for the entire system of buildings 10, 10A, 10B and monitoring whether movement towards a new energy peak is occurring.
  • Thus, it will be appreciated that, in operation, the computer or data processing system 25 with the real-time database 26, the network 15 (such as the Internet) and the buildings 10, 10A, 10B essentially run themselves without necessity of a human operator. It will be appreciated that the computer or data processing system 25 can be far more effective at computational operations than can a human operator, and also can process the available data and real-time information, using the rules, far more quickly and accurately than a human operator could in the same amount of time. Thus, the invention advantageously provides machine-based operations in areas where reliance on human operators conventionally meant responses that now can be seen as relatively slow, inadequate or non-optimal.
  • Artificial intelligence and neural network technology are used so that a controller for an energy using device such as protocol driver 14, for example, may have a basis for responding to a query for energy curtailment possibilities. A set of rules is put into place for the protocol driver 14 and any energy-using devices 11 associated therewith. The set of rules is any set of rules appropriate to the energy-using device, the building in which the energy-using device is situated, and the building occupants or those served by the building. For example, the set of rules may take into account outside temperature, inside temperature, etc. and based on the differential therebetween may characterize the comfort level, with certain differential ranges being assigned to certain comfort level characterizations. While the set of rules is fixed in operation, the set of rules may be subjected to overhaul and change, such as if it is decided that a colder or warmer temperature range is now to be considered acceptable than in the past. While in a preferred embodiment the variables and rules operate so as to minimize any need or desire for human operator intervention, optionally, a manual human operator override may be provided, in which a human operator would be permitted to override computer-based control of one or more energy-using devices.
  • Referring to FIG. 5, it will be appreciated that the invention as discussed above advantageously permits systems of buildings 10, 10A, 10B to “run themselves” without the necessity of intervention of a human operator (on-site of buildings 10, 10A, 10B or elsewhere such as at a monitoring facility). A human operator is not needed for making energy curtailment and energy use decisions and optimizing energy use in real-time.
  • For the intelligent use of energy system of FIG. 5, buildings 10, 10A, 10B and users (such as building managers, energy managers, financial managers, etc.) are connected over a network 15 (such as the Internet). The intelligent use of energy system may include modules dedicated to meeting respective needs of users with different responsibilities and concerns, such as a financial engine module, a notification workflow module, an energy monitoring module, etc.
  • Moreover, valuable information is provided that building managers, financial managers and/or energy managers may observe how the computer-based system is performing, via browser-based user interface 27. For example, in a preferred embodiment, users access the intelligent use of energy system through a web-browner that connects to an ASP hosting site of intelligent use of energy software, which in turn, connects through the Internet, either directly or indirectly, to the buildings 10, 10A, 10B managed by the system. To accommodate the diversity of building management systems and associated protocols that are commercially in use, there may be used a communications module, preferably one that is an expandable communications bus architecture that can easily accommodate new communication protocols as plug-ins; also, preferably the communications module is one that can communicate with existing bidding management systems, “monitoring” systems and associated protocols currently available in the marketplace as well as able to communicate with new systems being developed and developed in the future. A particularly preferred communications module to use is IUE-Comm, developed by the present applicant
  • Building managers, financial managers, energy managers, and/or others via browser-based user interface 27 may view information that would be of interest to them. For example, a building manager may use the system of FIG. 5 to monitor the current state of devices 11, 11A, 11B in the buildings 10, 10A, 10B. Building managers can see the temperature setting of air-conditioners, the consumption of chillers, the speed of fans, etc. The building managers can also optionally simulate one or more “what if” scenarios, using the intelligent agents, to predict the effect of control actions on the energy bill and the comfort in the building. Building managers optionally may manipulate the parameters of the intelligent agents, such as by constraining the temperature band used by a “supply air rest” agent. The building manager no longer needs to control individual devices (as he would conventionally do) because the intelligent use of energy system of FIG. 5 is “goal based”. The manager gives the system a goal (such as to save 40 KW in the next two hours) and the intelligent use of energy system of FIG. 5 determines how to best achieve the goal. A building manager can rely on and use the intelligent agents like highly specialized, 24×7 staff members, switching them on or off, or giving them different goals to accomplish.
  • The energy manager refers to a human responsible for the optimal use of energy across facilities, such as across buildings 10, 10A, 10B. Issuing curtailment requests, for instance, is one of the major tasks of an energy manager. Using the system of FIG. 5, issuance of a curtailment request optionally can be accomplished manually, or automatically by pre-instructing the intelligent agents.
  • The financial manager is a human. In a preferred embodiment of the invention, the financial manager generally is interested in showing the savings that have been produced by using an intelligent use of energy system such as that according to FIG. 5. Finance modules in the system draw on a data warehouse that is created based on the system's real-time data base, and support the financial manager in analyzing energy consumption, identifying peak demands, pin-pointing inefficient equipment or operations, and demonstrating the overall effect of the agents saving energy costs. While such mentioned finance-related activities may not be necessary, they are particularly preferred for using the invention in a commercial context.
  • The real-time database 26 will be understood as a database continuously changing to reflect current data. The data in the real-time database 26 preferably is saved in a data warehouse (not depicted on FIG. 5), and from the data warehouse is usable such as for energy analysis and financial reporting.
  • A particularly preferred example of an energy curtailment regiment that may be automatically devised and implemented according to the invention is a round robin load rotation. The flow chart of FIG. 6 shows a preferred round robin algorithm for load rotation. For simplicity, not all checks (e.g., equipment status, manual override, etc.) that may preferably be performed are shown on FIG. 6. In FIG. 6, the round robin algorithm begins with a curtailment call 600 for a specific amount “X” KW (such as 30 KW). In response to the curtailment call 600, the rotation counter is set 602 to group curtailment duration, from which the system increments group selection counter 603. Also, based on the rotation counter being set 602, the system shuts group equipment down 604. After group equipment shut down 604, the system turns on previous equipment group 606. The system then asks 608 whether the curtailment requirement has been met, and if not, shuts the next (group+1) equipment down 609, and loops to re-ask 608 whether the curtailment requirement has been met. The loop continues until the question 608 of whether the curtailment requirement has been met is answered affirmatively, and then the system asks 610 if the rotation duration is complete; if not complete, the loop to the question 608 of whether the curtailment requirement has been met continues. When the question whether the rotation duration is complete 610 can be answered affirmatively, the system then asks 612 whether all groups have been rotated through. If all groups have not been rotated through, return is provided to incrementing group selection counter 603.
  • When the question 612 whether all groups have been rotated through is answered affirmatively, the system next resets group selection counter 614, and asks 616 whether the curtailment call is complete. If the curtailment call is not complete, i.e., if not enough energy curtailment can be achieved, the algorithm ends (END) on FIG. 6.
  • The invention has many practical and industrial uses. For example, the invention advantageously combines the power of artificial intelligence with the Internet to enable energy-using customers (such as building systems) to dramatically cut building energy costs in real time. Customers are able to do so by reducing the energy they consume each month, lowering their “peak load” demand charges, and by aggregating multiple electric meters into one “virtual meter.” Also, the neural network and artificial intelligence used in the invention permit many factors that influence consumption (such as current weather conditions, occupancy levels and market price of energy) to be taken into account, as the system constantly monitors and adjusts energy use.
  • It is calculated that certain installations using the invention are expected to be able to reduce energy costs by more than 15% when all major energy-consuming devices are connected and full control over device settings is given to a software system according to the invention.
  • In another embodiment, the invention also provides for quantification of economic and energy savings, and for revenue generation. Particularly, the “curtailable” capacity and energy that may be generated from using the invention may be sold to regional control authorities and/or energy service providers.
  • The invention takes energy management to a new level, by applying the power of artificial intelligence, and by drastically reducing or removing the human element altogether (except when building managers choose to over-ride the system). Neural network and intelligence agent technology is used to monitor, analyze and adjust energy consumption in real-time. A number of factors, including energy prices, current and forecasted weather conditions, current and scheduled occupancy levels, space air temperature and space air quality, etc., may be taken into consideration. These factors are applied to the selection of strategies for reducing energy consumption at any given moment. The inventive energy management system is much more “intelligent” on a real-time basis than a human operator, who could not possibly analyze all of the constantly-changing factors affecting energy consumption and make adjustments quickly. Furthermore, the system provides a wealth of new data to building owners and managers, who can then make informed decisions for further energy reductions and future equipment purchase decisions.
  • The invention thus may be used to provide one or more of the following advantages: permanent load reduction; peak load avoidance; aggregation of multiple meters under a single “virtual meter”; automated curtailment response to Independent System Operator (ISO)/supplier requests; extensive baseline analysis, reporting and financial control; real-time reading of meters and devices; meter equipment trending; alarming; reporting; intelligent use of energy financing. These advantages and uses of the invention are discussed as follows.
  • As for permanent load reduction, it will be appreciated that the invention permits customers (such as industrial, commercial, university, hospital and other customers) to reduce their energy consumption on an ongoing basis by making thousands of minor adjustments hour-by-hour, twenty-four hours a day, to every piece of equipment attached to the system. When hundreds of energy-consuming devices such as air handlers, chillers and lighting systems are covered by the system, minor adjustments to each one can have a significant impact on overall energy consumption. For example, the system can meet energy reduction goals by raising the temperature in unoccupied rooms from 70 degrees to 75 degrees. Or, in response to an unusually cool summer day, the system might decide that starting the air conditioning before employees arrive for work would not be necessary or economic. Over the course of a month or a year, these minor adjustments add up to significant reductions in energy consumption and costs, without any discernable impact on operations or people.
  • Peak load avoidance is also advantageously provided by the invention. The energy bills for commercial customers consist of two parts—the cost of total energy consumption for the month, and a charge for the “peak” energy consumed during that month. This “peak load” charge can account for as much as 50% of the electric bill. The invention provides for intelligent use of energy, by applying artificial intelligence to achieve on-going peak load reduction guidelines, pre-set by the customer. In a typical situation, the customer would want to insure that peak loads will not exceed a previously set maximum or, more aggressively, might decide to reduce peak loads each month (such as by 10%). At any point in the month when peak loads approach the preset threshold, the intelligent agents in the invention can choose from a wide variety of available strategies to prevent crossing the line, such as raising (or lowering) thermostats throughout a building(s); dimming lights; etc. However, if executing a certain strategy would violate another parameter or other parameters set by the customer (e.g., that temperature must never go beyond a certain threshold or that lights cannot be dimmed below defined lumens, etc.), then the intelligent agents of the invention will either employ another strategy for reducing peak load demand, or notify the customer that the goal cannot be achieved. All of this analysis, action and/or notification occurs within minutes, and permits customers (including commercial customers in multi-building systems) to truly control their peak load charges.
  • The ability to produce a virtual meter or virtual meters is another advantage of the invention. Many commercial energy consumers receive a bill for every meter in their building or portfolio of buildings. It is not unusual for a single building to have multiple electric meters, and major office complexes or building portfolios in a given area may have many meters. Beyond the inefficiency inherent in receiving and paying numerous electric bills each month, electricity consumers are also charged for multiple, separate peak loads. The total of these peak load charges can be significantly greater than the actual peak that a single consumer reached at a particular point in a given month. Intelligent use of energy according to the present invention can resolve this problem by aggregating all of a customer's meters into one “virtual meter.” This virtual meter can encompass hundreds of meters in dozens of buildings within a single Electricity (Energy) Pool. (The United States is divided into ten Pools which have very different tariff structures and regulations. As a result, a virtual meter cannot aggregate meters in different pools, under the present framework in the United States.) Customers could receive one bill, not hundreds, and the peak load charge would be calculated against the combined meters, not against each individual meter. This can lead to significant savings.
  • Another advantage of the invention is the provision of automated curtailment. Solving the long-term energy problem in the United States (and elsewhere) will require a multi-dimensional approach. New construction of energy plants and transmission facilities alone will not solve the problem, particularly in the short term where California and other areas face the potential for a California-size crisis. The present invention can play a significant role in mitigating energy shortages, and over the long term, substantially reduce the need for and cost of additional energy infrastructure. Under the terms of many commercial contracts, energy suppliers can ask customers to reduce consumption an agreed-upon number of times each year. During the electricity crisis in California in the spring of 2001, these provisions were invoked a number of times. To encourage commercial consumers to reduce consumption, and thereby avoid a crisis like that in California, many energy suppliers offered incentives to users to voluntarily curtail power during peak load events, such as unusually hot summer days. These incentives can include significant reservation charges for agreeing to be curtailed, discounts on tariffs, or even payments to companies that “sell back” unused power or capacity when requested to do so. In many instances, building managers used conventional energy management systems to manually or non-analytically turn off equipment in response to requests to cut consumption. In many cases, this led to the shutdown of businesses for hours or days, as happened in California. The invention can prevent this undesirable business shutdown situation, by automatically curtailing equipment in response to a request by the energy supplier, and can do so in a manner that minimizes disruptions. The intelligent agents of the invention, for example, may be able to achieve the curtailment by slight adjustments in equipment, or by selectively shutting down non-essential devices first. Or, the system in the invention may be set to shut down only non-essential buildings. The invention provides the ability to take into account many factors before taking action, and to do so within mere minutes of a request to curtail consumption, something otherwise beyond the capability of any human operator or business manager or conventional energy management.
  • The invention also provides advantageous analyses, reporting and financial control. When a customer initially determines to proceed with start-up of an inventive computer-based energy management system according to the invention, the customer's data may be entered in the computer-based system and provide the baseline for future analysis of the customer's energy consumption. Thus the impact of the computer-based system on the customer's energy consumption may be seen. Once a computer-based energy management system according to the invention is fully operational, a customer is able to monitor and analyze its energy consumption in real-time. Optionally a customer may customize an energy management system so that that it provides information in a manner and format suited to the customer needs. A customer can monitor and analyze the customer's energy consumption at a given moment or over any specified period of time.
  • Another use and advantage of the invention is regarding real-time reading of meters and devices. The energy consumption of every meter and device connected to the system may be monitored and evaluated, if desired. Equipment that is not performing at peak efficiency can be repaired or replaced, further lowering the overall energy costs. The invention thus provides a data stream relating to individual efficiency of energy-using equipment.
  • The invention also is useful in meter equipment trending, including permitting energy-using customers to undertake trend analysis on a meter-by-meter basis in real time. Building managers can access screens at any time that show the current usage trend on a given meter, and provide a forecast for future consumption if the trend does not change.
  • The invention further provides for alarming, including appropriate notification when any situation occurs outside specified parameters. For example, if a peak load threshold is about to be exceeded, the system provides notification immediately so that remedial action can be taken. However, the system also provides notification for less critical problems, such as malfunction of a particular piece of equipment, or sudden changes in energy consumption patterns.
  • In the invention, reporting may be provided. A full suite of reports may be provided, which can be accessed at any time or on a regular basis. These reports may include billing rates and differential billing, load shaping and profiling, and virtually any other report that a client may specify.
  • In the present invention, advantages related to finance also may be provided. Conventionally, the bill that an average commercial customer receives from its energy provider is immensely complex and frequently incorrect. By using the invention, the customer may compare actual real time data collected against detailed baseline data and against rate and tariff structures that apply to the customer's energy consumption. Such a comparison will show a customer the level of savings and revenue achieved and help the customer to ascertain whether or not the bill provided by the energy provider is correct.
  • Thus, the present invention provides the mentioned advantages, with a rapidity of evaluation and of execution, accuracy, and precision well beyond that possible by a human operator or team of human operators. Also, advantageously, the energy management systems of the present invention are intelligent and “learn,” i.e., the systems learn from prior experience to improve results over time.
  • EXAMPLE 1
  • Initial deployment of energy load reduction according to the invention is accomplished by a fixed rotation schedule of equipment that is stepped through in a serial fashion. System attributes, such as allowable curtailment duration and electrical demand, is determined through functional testing and pre-programmed in a fixed matrix. A rotation script is then deployed to systematically cycle each piece (or group) of equipment off and on at a fixed duration. This ‘round robin’ rotation approach offers a less-than-fully-optinized rotation cycle but the system responses obtained from this method is used for training of the programmable intelligent agent (PIA) for optimal load rotation.
  • Ultimately, a programmable intelligent agent optimizes the load rotation of curtailable loads, using a combination of intelligent agents which operate the device level, portfolio level, and pool level as follows:
      • 1) Device Level Programmable Intelligent Agent—utilizes a forward artificial neural network (FANN) to predict the load rotation period for equipment (device level IA).
      • 2) Portfolio Level Programmable Intelligent Agent—optimizes resource leveling based on the predicted load rotation periods derived in the device level PIA. Initially the portfolio is defined as the building revenue meter.
      • 3) Pool Level Intelligent Agent—optimizes the load rotation using pre-conditioning strategies based on the timing of the market order. Once the PIA algorithms are trained, the ‘round robin’ algorithm is withdrawn and the Intelligent Agent takes over schedule load rotation.
  • The system to which this example is applied is as follows. The equipment targeted for load rotation includes: electrical space heat, air conditioning compressors, fan motors, package unitary HVAC equipment, and process motors.
  • The Intelligent Agent interface requirements include:
  • 1) Internet enabled on/off control. Curtailable loads are grouped into “banks” of equivalent electrical demand. Multiple matrices with alternative demand sizes may be deployed.
  • 2) Optional Internet enabled monitoring of process limit(s) (required for resource leveling IAs). Where group on/off control is used, an average process measurement is to be provided, for example, the average space temperature or common return air temperature. If process limit monitoring is not deployed, then an acceptable period of the rotation schedule is determined through functional testing of process drift.
  • 3) Optional Internet enabled control of process setpoint (required for preconditioning strategies IAs). If process setpoint is not deployed, then preconditioning strategies cannot be implemented.
  • 4) Internet enabled monitoring of energy consumption through any of the following methods:
      • a) Kw meter located either at the equipment level or in the electrical service to the electric heaters.
      • b) Virtual Kw meter based on field verified rated kW and equipment on/off status. Calculation of virtual Kw can reside either within the customer's Building Control System or at an Application Server.
  • A Rotation Schedule/Matrix example is shown in FIG. 7, of a round robin approach to load rotation. The rotation matrix in FIG. 6 provides an example grouping for a 30 KW curtailment rotation schedule. Curtailable demand is determined by continuous measurement using the Internet enabled kW meter.
  • A brief description of each data entry is as follows. Data fields in bold italic are temporary values which are updated once the PIAs for Load Duration and Resource Leveling Optimization are deployed.
  • Rotation Group—Numerical group assignment for the purpose of prioritization and counting. The rotation groups are fixed during the initial deployment. The Load Rotation IAs optimize groups into equal load/equal duration.
  • Equipment ID—Alphanumeric equipment descriptor.
  • Controlled Device ID—Alphanumeric description of energy device.
  • Manual/Auto Indicator Address—The address of the Manual/Auto Status. (The term “address” is used to refer to the location assigned by the enabling platform (e.g., Silicon Energy “PtID”, Engagenet, etc.) to be written to or read from.) Reading this point gives a “digital state” (0 or 1) indication the equipment has been placed in local override and is therefore not accessible for curtailment. If equipment status is unavailable, then the application “remembers” the outcome from the remote control event. For example, if equipment did not change kW during prior remote control event, then digital state is set to off. (“0”).
  • Equipment Status Address—(Optional) A read only point that indicates the operational status (state output) of a piece of equipment. Operational status includes: normal, alarm, alarm code.
  • Curtailable Demand Setpoint—The curtailable electrical demand (kW). The setpoint for resettable devices is derived by means of direct measurement and approved by customer. For on/off devices, the curtailable demand setpoint is equal to zero.
  • Curtailable Demand—Curtailable demand initially is fixed, derived by means of direct measurement and review of normal kW process range. Once the Load Rotation IAs are enabled, the curtailable electrical demand is calculated as:
  • Electrical Meter (prior time interval)—Curtailable Demand Setpoint.
  • The calculated curtailable Demand is used within the Load Rotation IAs to optimize groups into equal load/equal intervals.
  • On/Off Control Address—The primary control address to which curtailment on/off commands are written. The command is as detailed in the on/off Control Command entry.
  • On/Off Control Command—The command signal to be written to the primary control address to place the equipment into curtailment mode. In most cases, this is a digital state command (0 or 1). The complement of the state command is used to disable curtailment. In those cases that require two cases, this typically is the “Internet control override” signal.
  • Reset Control Address—The (optional) secondary address to which curtailment commands are written.
  • Reset Control Command—The (optional) secondary command required to place a piece of equipment into curtailment mode. In most cases this is an analog reset variable (%, mA, V), for example, a reduced speed input into a variable speed drive. This input need not be reset to disable the curtailment mode, and is ignored when Control Command 1 indicates disablement.
  • Minimum Equipment Off Time—The minimum duration in which a piece of equipment may be sent into curtailment mode. Required to prevent short-cycling of equipment.
  • Maximum Curtailment Duration—The maximum duration a piece of equipment may be sent into curtailment mode. This period is initially determined through testing and is typically the worse case time interval before a process limit (space temperature, CO2, etc.) served by the equipment falls out of range. Once the Device Level IAs are trained, the maximum duration will be fed into the Load Rotation IA for sorting into load groups.
  • Settling Duration—The time delay in which two equipment groups are required to overlap in curtailment mode (both groups in curtailment mode) before the prior group is brought out of curtailment mode. This is used to accommodate an overshoot electrical demand as the prior group's equipment is brought back to non-curtailment mode. Initially the settling duration will be fixed. Once the FANN IAs are trained, the settling duration will be fed into the Load Rotation IA for determining the group overlap.
  • Revenue Meter Address—The address of the utility meter serving the equipment to be placed in curtailment mode. The net desired kW curtailment must be seen at the meters or additional groups must be rotated into curtailment mode. Reasons for shortfalls in curtailment may include equipment off or in local override mode, or other equipment brought online during the previous group rotation. A range is established for the need for additional curtailment.
  • Process Variable 1 Address—The address of the first process variable to be used to constrain the magnitude and duration of the curtailment. For example, an AHU load rotation may be constrained by space temperature. This is typically be a zone temperature for AHU type curtailment. This information may not be required for the simplest form of the Round Robin approach. Up to three process variables are available for use; while not required, at least preferably one is be used (example for no process variables: fountain pumps).
  • Process Variable 1 Min Range—This is the lower allowable limit for the primary process variable. Note that a curtailment range is typically more extreme than for normal allowable operating conditions.
  • Process Variable 1 Max Range—This is the maximum allowable limit for the primary process variable. Note that a curtailment range is typically more extreme than for normal allowable operating conditions.
  • Process Variable 2 Address—The address of the second process variable to be used to constrain the magnitude and duration of the curtailment. This information may not be required for the simplest form of the Round Robin approach. Two process variables are available for use; while not required, at least one preferably is used (example for no process variables: fountain pumps).
  • Process Variable 2 Min Range—This is the lower allowable limit for the secondary process variable. Note that a curtailment range is typically more extreme than for normal allowable operating conditions.
  • Process Variable 2 Max Range—This is the maximum allowable limit for the secondary process variable. Note that a curtailment range is typically more extreme than for normal allowable operating conditions.
  • AND Inclusions—This entry lists equipment that must be placed into curtailment mode simultaneously with the listed equipment entry. Circumstances for this include matched Supply Air/Return Air fan sets.
  • OR Exclusions—This entry lists equipment that cannot be placed into curtailment mode simultaneously with the equipment entry. Circumstances for this include shutting down all elevators simultaneously.
  • In this example, data sources and grouping rules are as follows. Curtailment duration and impact are determined through functional testing; the equipment is disabled and the spaces served by the units is monitored to determine the maximum duration of curtailment before space conditions fall out of acceptable range. Equipment is grouped under the following rules:
      • Equipment must be controllable and curtailable.
      • Equipment with fixed and coinciding operational schedules (during possible periods of curtailment) are required.
      • Curtailment durations are determined by monitoring space conditions during functional testing. Space temperature is monitored at minimum; other conditions such as IAQ (CO2 levels) or relative humidity levels may also be observed to determine curtailment durations.
      • Equipment is grouped such that the curtailable demand for each group is approximately equal.
      • The functional curtailment duration for each group is the smallest duration for any individual piece of equipment within that group.
      • Minimal occupant impact is the basis for group priority. Example: fountains first, alternating elevators next, AHUs after.
      • Simultaneous, multiple group curtailments are spread across the building portfolio; concentrations of curtailment groups within one building are not permitted.
      • Groups may require exclusivity. Example: all elevators may not be in the same group.
      • Groups may require inclusivity. Example: return and supply fan operation for the same space may be interlinked.
  • The flow chart of FIG. 6 is applicable to the above rotation schedule example, for a 30 kW curtailment call. Additional equipment status checks, manual override checks, etc. are performed that are not shown on FIG. 6.
  • EXAMPLE 2
  • An example of Peak Load: Virtual Meter according to the invention versus Real Meters is shown in FIG. 8. In this hypothetical example, the combined total energy usage recorded by four meters A, B, C and D was 95 kW. However, Meter A reached its peak at 4:00 p.m. on the third day of the month, Meter B's peak occurred at 10:00 a.m. on the 12th, Meter C recorded its highest usage at noon on the 16th and Meter D recorded its peak at 6:00 p.m. on the 29th. Despite the fact that none of these peaks occurred at the same time, or even on the same day, the customer was charged for the combined total of the four.
  • With a virtual meter, however, there is only one recorded peak—the single point in time during the month when the customer's total aggregate usage was highest. In this example, that peak was only 80 kW, and could have occurred at any time during the billing cycle. This functionality can provide the customer the ability to negotiate with its energy supplier for a different rate or tariff and hence significantly lower the “peak load” bill. (It is noted that relations between commercial consumers and energy suppliers vary greatly, depending on whether a given market is still regulated or deregulated. The ability of a customer to win lower rates through negotiations will be highly dependent on the nature of the market and the players involved.)
  • EXAMPLE 3
  • In this Example, there is provided an energy management system according to the invention in which are used five integrated products or features:
  • 1) Permanent Load Reduction—software intelligent agents that continually make and implement complex multi-input, device-setting decisions, and permanently reduce the amount of energy consumed by a customer.
  • 2) Peak Load Avoidance—The use of a neural network to forecast, identify and minimize peak load events, reducing the portion of a customer's energy bill related to its peak energy usage each month. These peak load events can account for up to 50% of annual energy costs and thus their reduction is highly advantageous.
  • 3) Virtual Meter Data Aggregation—The integration of multiple buildings and electrical meters into one virtual meter, which can eliminate multiple billings, consolidate billable peak loads and give the customer greater flexibility in managing its energy consumption. This, in turn, can create a new, reduced peak load for the aggregated portfolio that will allow for negotiations of better rates from the customer's energy supplier, thus notably reducing demand charges.
  • 4) Capacity Savings and Emergency Curtailment—The system has the ability to rapidly reduce a customer's immediate energy usage at its request in response to short-term curtailments in energy supply. Energy consumption may be rapidly curtailed in response to requests by authorities or the energy supplier. This capability also makes it possible for a customer to sell into available markets the kilowatts of capacity it can curtail and the kilowatt-hours of energy it is able to provide back to the market during an emergency. Upon request by the local ISO, power authority or utility supplier, the IUE system will place buildings in peak curtailment operation. Non-essential loads will be de-energized and HVAC equipment will be rotated in and out of service to maintain a consistent load reduction through the curtailment period.
  • 5) Finance—Tools for comparing actual energy usage with energy bills, which frequently overstate the amount of energy consumed by commercial customers.
  • In the following Examples and Comparative Examples, a number of scenarios illustrate the major issues in which ways to manage energy conventionally and according to the invention differ, and show the advantage of using intelligent agents to manage energy.
  • COMPARATIVE EXAMPLE C1
  • An automated building management system or energy management system
  • COMPARATIVE EXAMPLE C2
  • A building management system operated by an expert human engineer.
  • INVENTIVE EXAMPLE 4
  • Intelligent agents are provided according to the invention. The Intelligent agents continually learn. A “modeling neural net” is connected to each device controlled. This net has one job: learn all there is to know about this device. All parameters of this device are followed by the neural net. Minute changes in operating characteristics, due to wear and tear, aging, weather, new parameter constellations etc. are immediately picked up and become part of the “model” that the agents have of this device.
  • For an air conditioner, for example, the neural network knows how much power it consumes at a certain temperature setting at a certain outside temperature with a certain occupancy of the building. The net also knows this connection from other perspectives, it knows at which temperature setting, for a given occupancy and outside temperature what the power consumption would be.
  • The relationships between these parameters is neither linear nor easily expressable in an algebraic formula or differential equation (which are the standard ways in engineering to model systems). The neural networks work like the human mind, creating connections between concepts, which are either reinforced or weakened, depending on observation—herein called “learning”, as in how children learn language or a ball game.
  • Continuous Learning
  • By knowing about every detail of operational characteristics, the intelligent agents can run the devices in the optimal fashion for the way the equipment operates right that moment. This characteristic is contrasted this to the way a conventional, automated building management system (BMS) works. Usually, the BMS does not even have a model of the device. The BMS may give fixed instructions to the device, regardless of the current efficiency or price of energy or interaction between temperature and occupancy. The BMS has put the device on a schedule, e.g go to 71 F by 7 am, and that what it will do until it is given a new schedule. At best, the BMS has resets that are based on more than one variable, e.g., outside air temperature or space air temperature. Yet the BMS still does not make predictions about future energy use, which would inform its energy management decisions. BMSs are typically set for worst case ranges, to avoid trouble calls—clearly not the smartest or most energy efficient way to run a building. It is easy to see how energy is wasted by such a rigid operation as the Comparative Example 1, that does not take changes and idiosyncrasies at the equipment level into effect. Also the case (Comparative Example 2) where a human expert controls is building management system is not much better. It is impossible for a human to monitor hundreds of devices with tens of points on every device. Imagine a building engineer in front of a monitoring console who has to track 230 air conditioners, the energy consumption of those devices, their temperature setting, the time it takes each device to change by 1 degree Fahrenheit, do that at different exterior temperatures, factor in different occupancy loads, and do that 24 hours a day. Clearly the human operator is overloaded with information.
  • Accuracy of Forecasting
  • Building management system such as Comparative Examples 1 and 2 are not used to forecast energy use. At best, these systems can look up yesterday's energy use and report that to a human user. They cannot factor this information into their own control actions. At best, Comparative Examples 1 and 2 need a human to do this. The human building managers will base their actions usually on “experience”, meaning that they will look at the weather forecast and err on the save side, either overcooling a building in the summer, or overheating it in the summer. Building managers are mostly striving to please patrons, not financial managers. Even a cost-conscious building manager is lacking the inputs and the modeling power to create an accurate forecast for their buildings, device by device, floor by floor, building by building, campus by campus.
  • The intelligent agents of Inventive Example 4, on the other hand, leverage the learning that has occurred over time in the neural network and use it to predict energy usage exactly in that fashion. Predictions are made short term or long range device by device, building by building, portfolio by portfolio. This allows the agents to pre-cool just to the right amount. During a curtailment it allows agents to predict degradation of room temperature and gently rotate the equipment that is either being shut off or reduced. Thus the impact on building comfort is maintained, while energy cost is kept at its lowest.
  • Flexibility of Responses to Curtailment Requests
  • The conventional way as in Conventional Examples 1 and 2 to implement a curtailment response is to devise a number of curtailment stages (e.g Normal Stage, Yellow Alert Stage, Red Alert Stage). As energy becomes more scarce the possibility of a rolling black-out occurs, and higher curtailment stages are called into action. Each such curtailment stage specifies exactly how energy must be conserved. Detailed plans exist that require certain air conditioners to be set to higher temperatures or to be switched off completely. Instructions for switching off certain banks of lights or pumps or other such measures may be part of curtailment plans. One can easily see that these plans as in Comparative Examples 1 and 2 are very rigid. Clearly energy shortages do not come in three or four flavors. Yet the responses are patterned that way. The reason for this is obvious: in order to deal with the vast complexity of energy consuming devices, certain simplifications must be made to react quickly. Coarse tools, such as block-based building management systems and human operators who can only execute a limited number of operations until the curtailment level is to be met, inherently provide such limitations.
  • Greater flexibility is provided by the intelligent agents as used in Inventive Example 4. The agents can monitor energy price and scarcity of energy in the grid. This can happen on a extremely fine grained scale, not just green-yellow-red. Due to the agents ability to reason, they can react most appropriately even in early stages of an energy crunch. As the crunch gets more severe, agents can adopt their curtailment measures too. These curtailment measures are not the coarse measures taken be switching blocks of equipment off but try to minimize the impact on comfort and quality in the building. The agents can do this by using their knowledge about the operating characteristics of the devices and by forecasting energy need and consumption. Then the agents can take gentle control actions. While each control action may only save a minute amount of energy, compared to the sledge-hammer method of completely switching of full banks of equipment, the sum of these many minute savings equals the coarse action savings taken today by less sophisticated control systems and overworked building managers.
  • Wider Range of Information Inputs
  • Building management systems (BMS) as in the Comparative Example use simple feedback loops to control temperature or other such variables. The feedback/control variable in these loops is mostly a single, internal parameter to the system. Such an approach is too myopic to manage a system intelligently. The controller does not take a sufficiently wide range of variables into consideration. There are additional internal variables from the BMS itself (such as carbon dioxide or other air quality measures). Connected to this are occupancy date, influencing variables such as air flow or fan speed or heating in winter. Humans rarely monitor global variables from outside the building that influence major decisions which can impact cost immensely. Building managers usually do not have a display of the current price of energy. On those extreme days where the price of energy in unregulated markets shoots over the $200/kWh mark, neither the BMS on a schedule, nor the human building manager will react to this fact. While the price of energy in a deregulated market is mostly of concern to the ESCO and not the end-consumer, not preparing for flexible pricing falls short of being prudent energy management for every participant.
  • Intelligent agents as in Inventive Example 4 on the other hand take many global variables into consideration. The agents thus have the ability to aggressively conserve energy when it becomes extremely expensive. Thus the agents sacrifice a little building comfort when it pays heavy dividends, yet keep the building comfortable when it is cheap to do so. Knowing about events in the world of energy, and not just the local building, thus pays a return to the building owner.
  • Rigid Scheduling Versus Knowledge-Based Reasoning
  • Previously, the dynamic reasoning and decisions based on knowledge as in Inventive Example 4 have been said to be superior to fixed schedules or simple loops according to Comparative Examples 1 and 2. Yet all conventional building management systems employ exactly these basic concepts. The schedule is the preferred way to control a device in a conventional system. Even though this schedule may be very sophisticated (such as being able to distinguish weekdays from weekends, to recognize holidays, to set repeats, very much like the calendar function in Mircosoft Outlook, for example), still the conventional schedule does not ascertain whether the currently scheduled course of action makes sense under the current environmental conditions. The conventional BMS will do what is instructed to do, even if it has long gone off-course. In the scenario of energy costs skyrocketing on a particularly hot summer's day in California, the BMS will do what it is scheduled to do. It will cool the space to 68 F, even if that runs up an energy bill that is in the hundreds of thousands of dollars just for that one day.
  • The agents of Inventive Example 4, on the other hand, knowing the energy price, will start reasoning to find a compromise between cost and comfort. First the agents will most likely set the temperature to 71 F, then they will rotate among various zones in the building to distribute “discomfort” equally, and only when that is exhausted go to an even higher temperature to keep costs under control.
  • Feedback Loops
  • From a cybernetic point of view, current BMSs such as the Comparative Example use either simple feedback loops (keep temperature a set level) or they use triggers from simple sensors to control an action (light sensor switches on parking lot lights). Such cybernetic constructs cannot deal with diametrically opposed objectives, such as how to save as much energy as possible while keeping building comfort as high as possible.
  • The Inventive Example 4 has the artificial intelligence tools to balance opposed objectives, such as energy saving and building comfort.
  • Blocks
  • The Comparative Example building management system is created on the metaphor of its predecessor—electromechanical systems. End-users are presented with “blocks” which may represent relays and other such physical entities. On a higher level control blocks represent blocks of panels or devices. While this metaphor is initially helpful for a building manager to make the transition from the physical world to systems controlled by microprocessors, it does eventually limits what the system can do.
  • Inventive Example 4 is not subject to such eventual limitations.
  • Trial and Error
  • Some BMSs and even some domestic thermostats claim they can “learn”. What most of these devices are actually doing is a stochastic approximation approach—in other words: they are guessing. Guessing a value can be very wasteful, taking many “stabs” until a somewhat satisfactory value is found. Guessing also allows no transfer from one learning event to the next. The Comparative Example suffers from the costs of trial and error.
  • In Inventive Example 1, true learning (observation and the creation of a knowledge base) occurs, such as by neural networks and rule-based expert systems. Due to such true learning, the system in Inventive Example 1 therefore come up with the right answer faster, more accurately and in a wider range of learning situations than the Comparative Examples.
  • The differences between the Comparative Examples 1 and 2 and Inventive Example 4 are summarized as follows. Inventive Example 1 using intelligent agents surpasses both, automated building management systems (Comparative Example 1) and human experts (Comparative Example 2) in delivering better building comfort at less cost. The table below summarizes these findings.
    Intelligent Agents Human Expert driving
    Concept driving a BMS a BMS Automatic BMS
    Learning operational Constant observation of Common sense of At best a fixed parametric
    specifics of devices every single device updates operational characteristics; description of a device; no
    [how to run air the neural network for that macro level only, can not learning or updating.
    coniditioners, pumps etc. device continually; up-to- follow all points on all Usually no modeling of
    most efficiently] date representation of the devices in detail for 24 device parameters.
    device hours per day.
    Forecasting energy usage Neural nets can make Human can make educated At best lookup in a
    [saving money by doing accurate predictions based guess based on experience; database, very inaccurate;
    necessary cooling/heating on historic observations. usually can not take all usually no forecasting.
    actions when energy is datapoints into account due
    cheap] to information overload
    and non-linear nature of
    forecasting formulas.
    Dealing with curtailments Infinitely small levels of Brute force; using None; needs human
    [keeping good building automatic response to predefined groups of operator.
    comfort while responding tightening energy supply; devices to switch off in
    to curtailments] increasing stages of
    severity
    Day to day operation of Constant observation of Operates BMS on macro According to a fixed
    devices every single device updates level; can not dedicate full schedule (e.g. set A/C to
    [Running the building in the neural network for that 8 hours to drive system; 70° F. at 6 am) or a single
    the most energy efficient device continually; up-to- unable to deal with flow of event (e.g. parking lots
    manner] date representation of the information (up to light go on when it is
    device 150 Mb/minute) dark); no tactical
    optimization.
    Context for decision Use all local feeds from Not all global information Use local sensor readings
    making building (e.g temperature, feeds accessible to building only for simple feedback
    [being pound-wise, not humidity, CO2, etc.); use manager; decisions made loop
    penny foolish] weather forecasts from with incomplete data on a
    NOAA; use price feeds guesswork basis
    from ISOs;
    Decision making methods Forward and backward Intelligent decision making Simple feedback loops
    reasoning using neural using reasoning and with single control
    networks, rule-based “common sense” parameter
    systems, and plan-based
    systems;
    Granularity of Control Every device has an agent Limited by the control Controlling via “blocks”
    attached which in turn can level provided by the BMS and other electro-
    be leveraged by higher mechanical metaphors that
    level strategy agents; this do not utilize the full
    allows to implement many flexibility of computerized
    different strategies, systems
    independent of physical
    “control blocks”
    Automatic determination Neural networks Based on experience and Trial and error to deduce
    of parameters continually use monitoring observations; prone to pre-cooling or pre-heating
    as input to learning; system misjudgements and effects times wastes energy and
    never guesses but uses of exponential effects does not adapt to changes
    reasoning based on historic (humans can only estimate in the building or the
    facts. linear systems well), environment (weather)
    Control over multiple Agents can leverage Restricted to a single Restricted to a single
    buildings multiple devices and building via the current building. If umbrella
    therefore have more BMS. system exist than only for
    degrees of freedom in monitoring.
    finding the best
    compromise between
    savings and comfort
  • The basis of comparison is both, the cost of energy consumed in the scenario and the comfort level achieved for the tenants.
  • The scenarios show that agents can run a building more effectively and efficiently due to the following reasons:
  • Continuous learning: Intelligent agents operate equipment more efficiently and effectively by automatically learning the operating characteristics of devices via a neural network approach is. This is faster, more accurate, and more representative of the current state of the device than preprogramming a building management system with static, manufacturer supplied parameters or specs for the device, which may not represent the current condition of the actual device.
  • Accurate forecasting: Intelligent agents save money by using their device knowledge to make knowledgeable energy forecasts which result in savings rather than operating on a fixed schedule regardless of temperature forecasts or changing energy prices.
  • Flexible response to curtailment requests: Intelligent agents can achieve higher comfort levels for tenants during curtailment events since they do not rely on predetermined “shut down” groups or sequences, which are the only way building management systems or humans can handle these complex requests for curbing energy use.
  • Wider information context: Since agents have access to a wider context to base their decisions on, they can save more money than a building management system. The building management system is constrained to data that comes from the building itself, while the agents can leverage subscriptions to the NOAA (national oceanographic and atmospheric administration) or to various price feeds from ISOs.
  • Reasoning wins over scheduling: Agents can run the equipment more effectively and efficiently on a day to day basis. The agents can do this, since they have the ability to reason about causes and trade-offs react flexibly to events in the building itself (temperature, CO2, occupancy, etc.) and to global changes (weather data, price of energy). Building management systems are usually on a schedule, where they take control actions, regardless of occupancy or the price of energy. This makes building management systems less efficient.
  • Reasoning is more powerful than feedback loops: From a cybernetic point of view, current BMSs use either simple feedback loops (keep temperature a set level) or they use triggers from simple sensors to control an action (light sensor switches on parking lot lights). Such cybernetic constructs can not deal with diametrically opposed objectives, namely to save as much energy as possible while keeping building comfort as high as possible. It takes domain knowledge, learning, and decision making intelligence in a system to accomplish this.
  • Conventional block control is cumbersome: Most building management systems have been created on the metaphor of their predecessors—electromechanical systems. End-users are presented with “blocks” which may represent relays and other such physical entities. On a higher level control blocks represent blocks of panels or devices. While this metaphor is initially helpful for a building manager to make the transition from the physical world to systems controlled by microprocessors, it does eventually limits what the system can do.
  • Intelligent learning is more cost effective than trial-and-error: While some conventional BMSs and even some domestic thermostats claim they can “learn”, what most of these devices actually are doing is a stochastic approximation approach—in other words: they are guessing. Guessing a value can be very wasteful, taking many “stabs” until a somewhat satisfactory value is found. Guessing also allows no transfer from one learning event to the next. True learning on the other hand requires observation and the creation of a knowledge base. Neural networks and rule-based expert systems can do this and therefore come up with the right answer faster, more accurately and in a wider range of learning situations.
  • Agents control more than one building: While traditional BMSs merely schedule and monitor the actions in a single building, our agents control devices, such as HVAC or lighting across a whole portfolio of buildings. This prevents the agents from merely finding local maxima but allow them to globally optimize. It also equips the agents with increased degrees of freedom in balancing energy savings requirements with tenant comfort across buildings.
  • While various embodiments of the present invention have been shown and described, it should be understood that other modifications, substitutions and alternatives may be made by one of ordinary skill in the art without departing from the spirit and scope of the invention, which should be determined from the appended claims.

Claims (78)

1. An energy management system comprising:
computer-based monitoring for an adverse energy event in a building system;
computer-based recognition of an adverse energy event in the building system;
immediate automatic querying of energy users within the building system for energy curtailment possibilities;
automatic receipt of responses from queried energy users with energy curtailment possibilities;
automatic processing of energy curtailment possibilities into a round-robin curtailment rotation.
2. The system of claim 1, wherein the adverse energy event is selected from the group consisting of a new peak demand; a human-given directive to curtail a certain amount of energy consumption; and an excess increase of energy price in a deregulated market.
3. The system of claim 1, wherein the monitoring occurs in a context selected from a business-as-usual context; 24×7 permanent load reduction context; and an emergency context.
4. The system of claim 1, including 24×7 permanent load reduction.
5. The system of claim 1, including minimization of energy consumption in ongoing business-as-usual energy consumption.
6. The system of claim 1, wherein the building system is selected from the group consisting of a single building and at least two buildings.
7. A system of claim 1, wherein the adverse energy event is a surge or a steady increase towards a new peak demand.
8. A system of claim 1, wherein the system comprises at least two buildings.
9. A system of claim 1, wherein the system comprises load balancing between buildings.
10. The system of claim 1, wherein served by the system is a building or are buildings selected from the group consisting of at least one university building; at least one hotel building; at least one hospital building; at least one car dealership building; at least one shopping mall; at lease one government building; at least one chemical processing plant; at least one manufacturing facility; and any combination thereof of buildings.
11. The system of claim 1, wherein at least two buildings are under management and are geographically dispersed.
12. The system of claim 1, wherein a human operator is not needed.
13. The system of claim 12, wherein a human operator has an optional override right.
14. The system of claim 1, including at least two buildings, said buildings being commonly owned or not commonly owned.
15. The system of claim 1, including automatic documentation of energy savings attributable to any automatic intervention(s) by the energy management system.
16-37. (cancelled).
38. A computer-based energy management system, comprising:
(A) non-human, computerized processing of obtained energy data, wherein the obtained energy data is for at least one energy user in a building system, said processing including automatic determination of whether at least one energy-relevant event is present; and
(B) upon recognition of an automatic determination that at least one energy-relevant event, a non-human, computerized response thereto based upon artificial intelligence reasoning.
39. The system of claim 38, wherein the non-human, computerized response is formulated after processing of more information than could be accomplished by a human in whatever processing time has been expended.
40. The system of claim 38, including artificial intelligence reasoning based on one or more of: (A) knowledge about a building or buildings in the building system; (B) knowledge about an energy using device; (C) knowledge about the building system; and (D) data outside the building system.
41. The system of claim 38, including automatic querying of energy users.
42. The system of claim 41, including receiving responses from queried energy users and automatically processing the received responses.
43. The system of claim 42, including automatic formulation of an optimal energy-saving command decision and/or strategy.
44. The system of claim 43, including executing the optimal energy-saving command decision or strategy.
45. The system of claim 44, wherein the optimal energy-saving command decision comprises a rotation of energy curtailment that minimizes impact over energy users in the system.
46. The system of claim 38, wherein the computerized response includes at least one determination based on one or more of: (A) air quality, humidity, pollutants, air flow speed, temperature, and other descriptors of physical properties of air; (B) light direction, light color, ambient temperature, foot candle, kw consumption of light producing equipment, smell of light, and other descriptors of physical properties of light; (C) plug load; motion sensed by motion sensors; carbon dioxide levels; brightness; sound levels; automated device for sensing human presence; motion detectors; light-sensing apparatus; habitation-sensor; (D) chemical or biological warfare agent sensing device.
47. The system of claim 46, wherein the chemical or biological warfare agent sensing device is selected from the group consisting of a mustard gas sensor, an anthrax sensor, a carbon monoxide sensor, a carbon dioxide sensor, a chlorine gas sensor and a nerve gas sensor.
48. The system of claim 38, wherein the artificial intelligence reasoning comprises at least one artificial intelligent agent and at any given time, what the artificial intelligence agent is doing may be monitored.
49. The system of claim 47, including monitoring is by a human viewing what the artificial intelligence agent is doing.
50. The system of claim 47, including generation of a log of historical activity by one or more artificial intelligent agents performing the artificial intelligence reasoning.
51. The system of claim 38, including machine-based detection of presence of a chemical or biological warfare agent, to which a machine-based response is determined.
52. The system of claim 48, wherein the machine-based response includes release of an anti-agent and/or adjustment of one or more energy users.
53. The system of claim 38, including at least one machine-based determination of at least one parameter of interest to a building manager, said parameter being measurable and controllable.
54. The system of claim 38, including automatic monitoring of the computerized response.
55. The system of claim 38, including communication over the Internet.
56. The system of claim 38, wherein a human operator may enter a query.
57. The system of claim 56, wherein the human operator query is a query as to current state of one or more devices in a specified building.
58. The system of claim 56, wherein the human operator query is a query requesting a prediction of effect of proposed control action(s) on an energy bill and/or on comfort.
59. A computer-based round-robin rotation system for energy users, wherein the energy users are under computer-based control and are present in a building system, the round-robin rotation system comprising
a series of computer-based energy curtailment commands to each of a plurality of energy users in the building system, wherein
(1) each computer-based energy curtailment command in the series of energy curtailment commands
(a) is specific to the energy user to which the curtailment command is directed;
(b) has been derived from an energy curtailment offer provided by the energy user; and/or
(c) is based on continually learned and observed characteristics of the energy user; and/or
(2) an energy user in the plurality of energy users is grouped with other energy users based on similarity with regard to a certain parameter or parameters.
60. The round-robin rotation system of claim 59, wherein the building system includes at least two buildings.
61. The round-robin rotation system of claim 59, wherein the round-robin system is formulated in response to a human request for energy curtailment.
62. The round-robin rotation system of claim 59, wherein the round-robin system is implemented under business-as-usual circumstances.
63. The round-robin rotation system of claim 62, wherein the system has learned by artificial intelligence that a desired target parameter in each area served by the system can be maintained by a round-robin rotation.
64. The round-robin rotation system of claim 63, wherein the target parameter is room temperature.
65-73. (cancelled).
74. An energy curtailment system comprising
an automatically managed round-robin rotation of a plurality of energy curtailment interventions.
75. The energy curtailment system of claim 74, wherein each respective energy curtailment intervention within the plurality of energy curtailment interventions is derived from an energy curtailment offer from a to-be-curtailed energy user.
76. The energy curtailment system of claim 75, including a plurality of to-be-curtailed energy users in a multi-building system.
77. The energy curtailment system of claim 76, wherein the multi-building system includes buildings geographically dispersed at least a state's distance apart.
78. The energy curtailment system of claim 75, wherein new energy peaks are avoided without human operator intervention.
79. The energy curtailment system of claim 75, wherein automatic documentation is automatically generated of avoidance of a new energy peak, with said automatic documentation being (a) stored in an accessible computer file and/or (b) printed and/or stored in a human operator-friendly format.
80. The energy management system of claim 1, wherein monthly energy consumption is reduced for the building system and/or peak load demand charges for the building system are lowered.
81. The energy management system of claim 1, including one revenue-grade virtual meter which is an aggregation of revenue-grade meters.
82. The energy management system of claim 1, wherein energy use is constantly monitored and/or adjusted, said constant monitoring and/or adjustment being non-human, wherein business-as-usual constant adjustment, 24×7 load reduction is provided.
83. The energy management system of claim 82, wherein the non-human constant monitoring and/or adjustment is by artificial intelligence.
84. The energy management system of claim 82, wherein the non-human constant monitoring and/or adjustment is to monitor and/or adjust at least one factor that influences energy consumption.
85. The energy management system of claim 84, wherein the at least one factor that influences energy consumption is selected from the group consisting of current weather conditions at and/or approaching an energy-user; occupancy levels of a facility served by an energy-user; market price of energy; weather forecasts; market price forecasts; air quality; air quality forecasts; lighting quality; lighting quality forecasts; plug load patterns; and plug load pattern forecasts.
86. The energy management system of claim 85, including monitoring and adjusting based on all of current weather conditions at and/or approaching an energy-user; occupancy levels of a facility served by an energy-user; market price of energy; weather forecasts; market price forecasts; air quality; air quality forecasts; lighting quality; lighting quality forecasts; plug load patterns; and plug load pattern forecasts.
87. The energy management system of claim 1, wherein the adverse energy event being monitored-for is at least one recognizable pattern of data that has been learned via artificial intelligence by a computer system doing the monitoring.
88. The energy management system of claim 87, wherein the computer doing the recognition of an adverse energy event, for each recognized pattern of data that is an adverse energy event, reacts with an automatic response based upon reasoning.
89. The system of claim 88, wherein the reasoning-based response is a querying response to be executed.
90. The energy management system of claim 1, wherein responses from queried energy users with energy curtailment possibilities are automatically processed by a computer with a set of instructions for evaluating how to enact each respective curtailment possibility of each respective energy user offering a curtailment possibility.
91. The energy management system of claim 90, wherein the computer automatically processing the responses from queried users totals the respective curtailment possibilities from the queried energy users amounts, determines whether the total of respective curtailment possibilities is sufficiently large, and, if so, proceeds to schedule a round-robin energy curtailment rotation pursuant to criteria.
92. The energy management system of claim 90, wherein the computer automatically processing the responses from queried users totals the respective curtailment possibilities from the queried energy users amounts, determines whether the total of respective curtailment possibilities is sufficiently large, and, if not, notifies a human user.
93. The energy management system of claim 1, including a preliminary step of functional testing for obtaining data and formulating applicable rules, and a continuous process of learning embedded in a neural net of a modeling agent associated with an energy-using device.
94-99. (cancelled).
100. An energy management system for automatically achieving energy curtailment in a multi-building system, comprising:
immediate automatic querying of energy users within the building system for energy curtailment possibilities;
automatic receipt of responses from queried energy users with energy curtailment possibilities;
automatic processing of energy curtailment possibilities into a round-robin curtailment rotation.
101. The energy management system of claim 100, wherein the immediate automatic querying is directly or indirectly activated based on a request by a local independent system operator, a power authority or a utility supplier.
102. The energy management system of claim 100, wherein the round-robin curtailment rotation is executed and achieves energy consumption reduction.
103. The energy management system of claim 102, wherein the energy consumption reduction occurs during an energy emergency.
104. The energy management system of claim 103, wherein the energy emergency is declared by a local independent system operator, a power authority, a utility supplier, or a governmental authority.
105. The energy management system of claim 100, wherein no human is controlling.
106. The energy management system of claim 100, wherein the round-robin curtailment rotation has been called in order that energy may be sold back into the grid.
107. The energy management system of claim 100, wherein maximum energy curtailment is achieved with minimal impact to occupants of buildings in the building system.
108. The energy management system of claim 100, wherein maximum energy curtailment is achieved with no greater than a certain defined level of impact to occupants of buildings in the building system.
109. The energy management system of claim 100, wherein the multi-building system is owned by an owner selected from the group consisting of a commercial entity, a university and a government.
110. The system of claim 1, wherein each energy user has associated therewith a dedicated neural network that continuously learns operating characteristics of said energy user associated with the dedicated neural network, wherein forward and backward reasoning and forecastability are provided.
111. The system of claim 1, including at least one modeling agent and/or at least one forecasting agent.
112. The system of claim 1, wherein the system is autonomous, artificial-intelligence based, real-time, over the Internet.
US10/942,773 2002-03-08 2004-09-17 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems Abandoned US20050038571A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US10/942,773 US20050038571A1 (en) 2002-03-08 2004-09-17 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
US11/783,883 US20070255461A1 (en) 2002-03-08 2007-04-12 Automatic energy management and energy consumption reduction, especially in commercial and multi-building system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/092,507 US20030171851A1 (en) 2002-03-08 2002-03-08 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
US10/942,773 US20050038571A1 (en) 2002-03-08 2004-09-17 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US10/092,507 Division US20030171851A1 (en) 2002-03-08 2002-03-08 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/783,883 Continuation US20070255461A1 (en) 2002-03-08 2007-04-12 Automatic energy management and energy consumption reduction, especially in commercial and multi-building system

Publications (1)

Publication Number Publication Date
US20050038571A1 true US20050038571A1 (en) 2005-02-17

Family

ID=29248142

Family Applications (5)

Application Number Title Priority Date Filing Date
US10/092,507 Abandoned US20030171851A1 (en) 2002-03-08 2002-03-08 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
US10/942,780 Abandoned US20050043862A1 (en) 2002-03-08 2004-09-17 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
US10/942,773 Abandoned US20050038571A1 (en) 2002-03-08 2004-09-17 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
US11/783,883 Abandoned US20070255461A1 (en) 2002-03-08 2007-04-12 Automatic energy management and energy consumption reduction, especially in commercial and multi-building system
US11/889,513 Expired - Fee Related US8078330B2 (en) 2002-03-08 2007-08-14 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems

Family Applications Before (2)

Application Number Title Priority Date Filing Date
US10/092,507 Abandoned US20030171851A1 (en) 2002-03-08 2002-03-08 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
US10/942,780 Abandoned US20050043862A1 (en) 2002-03-08 2004-09-17 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems

Family Applications After (2)

Application Number Title Priority Date Filing Date
US11/783,883 Abandoned US20070255461A1 (en) 2002-03-08 2007-04-12 Automatic energy management and energy consumption reduction, especially in commercial and multi-building system
US11/889,513 Expired - Fee Related US8078330B2 (en) 2002-03-08 2007-08-14 Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems

Country Status (6)

Country Link
US (5) US20030171851A1 (en)
CN (1) CN1692317A (en)
AU (1) AU2003253581A1 (en)
CA (1) CA2478667C (en)
MX (1) MXPA04008754A (en)
WO (1) WO2003090038A2 (en)

Cited By (69)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050165565A1 (en) * 2003-09-05 2005-07-28 Carrier Corporation Compressor performance approximation using Bin Analysis data
US20070024708A1 (en) * 2005-04-05 2007-02-01 Activeye, Inc. Intelligent video for building management and automation
US20070168050A1 (en) * 2006-01-09 2007-07-19 Chambers Gregory L Asset Performance Optimization
US20070191992A1 (en) * 2006-02-10 2007-08-16 Taliaferro James B Power distribution expert system
US20080275802A1 (en) * 2007-05-03 2008-11-06 Verfuerth Neal R System and method for a utility financial model
WO2009046132A1 (en) * 2007-10-01 2009-04-09 Gridpoint, Inc. Modular electrical grid interface device
US20090119077A1 (en) * 2007-11-06 2009-05-07 David Everton Norman Use of simulation to generate predictions pertaining to a manufacturing facility
US20090118842A1 (en) * 2007-11-06 2009-05-07 David Everton Norman Manufacturing prediction server
US20090132091A1 (en) * 2007-11-19 2009-05-21 Prenova Parameter Standardization
US20090248217A1 (en) * 2008-03-27 2009-10-01 Orion Energy Systems, Inc. System and method for reducing peak and off-peak electricity demand by monitoring, controlling and metering high intensity fluorescent lighting in a facility
US20090243517A1 (en) * 2008-03-27 2009-10-01 Orion Energy Systems, Inc. System and method for controlling lighting
US20090315485A1 (en) * 2007-06-29 2009-12-24 Orion Energy Systems, Inc. Lighting fixture control systems and methods
US20100031324A1 (en) * 2008-03-07 2010-02-04 Strich Ronald F Apparatus and method for dynamic licensing access to wireless network information
US20100061088A1 (en) * 2007-06-29 2010-03-11 Orion Energy Systems, Inc. Lighting device
US20100070102A1 (en) * 2008-09-08 2010-03-18 Tendril Networks, Inc. Collaborative energy benchmarking systems and methods
US20100070101A1 (en) * 2008-09-08 2010-03-18 Tendril Networks, Inc. Consumer directed energy management systems and methods
US20100106543A1 (en) * 2008-10-28 2010-04-29 Honeywell International Inc. Building management configuration system
US20100131653A1 (en) * 2008-11-21 2010-05-27 Honeywell International, Inc. Building control system user interface with pinned display feature
US20100131877A1 (en) * 2008-11-21 2010-05-27 Honeywell International, Inc. Building control system user interface with docking feature
US20100274366A1 (en) * 2009-04-15 2010-10-28 DiMi, Inc. Monitoring and control systems and methods
US20100305998A1 (en) * 2009-04-27 2010-12-02 Empowered Solutions, Inc Evaluating Energy Saving Improvements
US20110010654A1 (en) * 2009-05-11 2011-01-13 Honeywell International Inc. High volume alarm managment system
US20110022242A1 (en) * 2009-06-08 2011-01-27 GroundedPower, Inc. Methods and systems for managing energy usage in buildings
US20110060701A1 (en) * 2009-09-04 2011-03-10 Orion Energy Systems, Inc. Outdoor fluorescent lighting fixtures and related systems and methods
US20110083077A1 (en) * 2008-10-28 2011-04-07 Honeywell International Inc. Site controller discovery and import system
US20110093493A1 (en) * 2008-10-28 2011-04-21 Honeywell International Inc. Building management system site categories
US20110140901A1 (en) * 2009-12-16 2011-06-16 Schneider Electric USA, Inc. Point-of-use status indicator
US20110196539A1 (en) * 2010-02-10 2011-08-11 Honeywell International Inc. Multi-site controller batch update system
US20110208337A1 (en) * 2010-02-19 2011-08-25 David Everton Norman Prediction and scheduling server
US20110225580A1 (en) * 2010-03-11 2011-09-15 Honeywell International Inc. Offline configuration and download approach
US20110231320A1 (en) * 2009-12-22 2011-09-22 Irving Gary W Energy management systems and methods
US20120004783A1 (en) * 2010-06-30 2012-01-05 Siemens Corporation Integrated Demand Response For Energy Utilization
CN102354976A (en) * 2011-10-20 2012-02-15 湖南省电力公司科学研究院 Rapid network topology analysis method
US20120089269A1 (en) * 2007-10-02 2012-04-12 Weaver Jason C Managing energy usage
US8219258B1 (en) 2011-02-25 2012-07-10 eCurv, Inc. Queuing access to a shared power supply
US8224763B2 (en) 2009-05-11 2012-07-17 Honeywell International Inc. Signal management system for building systems
WO2012137097A1 (en) * 2011-04-04 2012-10-11 Koninklijke Philips Electronics N.V. Controlling device and method for controlling power consumption in a system of power consuming devices
US20120310431A1 (en) * 2011-05-31 2012-12-06 General Electric Company System and method for selecting consumers for demand response
US20120323393A1 (en) * 2011-06-17 2012-12-20 Raphael Imhof Automated demand response system
US8352047B2 (en) 2009-12-21 2013-01-08 Honeywell International Inc. Approaches for shifting a schedule
US8370283B2 (en) 2010-12-15 2013-02-05 Scienergy, Inc. Predicting energy consumption
US8445826B2 (en) 2007-06-29 2013-05-21 Orion Energy Systems, Inc. Outdoor lighting systems and methods for wireless network communications
US8476565B2 (en) 2007-06-29 2013-07-02 Orion Energy Systems, Inc. Outdoor lighting fixtures control systems and methods
WO2013106576A1 (en) * 2012-01-13 2013-07-18 Shoppertrak Rct Corporation System and method for managing energy
US8586902B2 (en) 2007-06-29 2013-11-19 Orion Energy Systems, Inc. Outdoor lighting fixture and camera systems
US8648706B2 (en) 2010-06-24 2014-02-11 Honeywell International Inc. Alarm management system having an escalation strategy
US8729446B2 (en) 2007-06-29 2014-05-20 Orion Energy Systems, Inc. Outdoor lighting fixtures for controlling traffic lights
US8819562B2 (en) 2010-09-30 2014-08-26 Honeywell International Inc. Quick connect and disconnect, base line configuration, and style configurator
US20140277763A1 (en) * 2013-03-14 2014-09-18 Sundeep Ramachandran System for Controlling Building Services Based on Occupant
US8850347B2 (en) 2010-09-30 2014-09-30 Honeywell International Inc. User interface list control system
US8884203B2 (en) 2007-05-03 2014-11-11 Orion Energy Systems, Inc. Lighting systems and methods for displacing energy consumption using natural lighting fixtures
US8890675B2 (en) 2010-06-02 2014-11-18 Honeywell International Inc. Site and alarm prioritization system
US9213539B2 (en) 2010-12-23 2015-12-15 Honeywell International Inc. System having a building control device with on-demand outside server functionality
US9223839B2 (en) 2012-02-22 2015-12-29 Honeywell International Inc. Supervisor history view wizard
US9310815B2 (en) 2013-02-12 2016-04-12 Tendril Networks, Inc. Setpoint adjustment-based duty cycling
US9423779B2 (en) 2013-02-06 2016-08-23 Tendril Networks, Inc. Dynamically adaptive personalized smart energy profiles
US9529349B2 (en) 2012-10-22 2016-12-27 Honeywell International Inc. Supervisor user management system
WO2016210091A1 (en) * 2015-06-24 2016-12-29 Emerson Electric Co. Hvac performance and energy usage monitoring and reporting system
US9576472B2 (en) 2013-02-06 2017-02-21 Tendril Networks, Inc. Real-time monitoring and dissemination of energy consumption and production data
US9933762B2 (en) 2014-07-09 2018-04-03 Honeywell International Inc. Multisite version and upgrade management system
US9971977B2 (en) 2013-10-21 2018-05-15 Honeywell International Inc. Opus enterprise report system
US20180163991A1 (en) * 2016-12-13 2018-06-14 Haier Us Appliance Solutions, Inc. Water Heater Appliance
US10209689B2 (en) 2015-09-23 2019-02-19 Honeywell International Inc. Supervisor history service import manager
US10362104B2 (en) 2015-09-23 2019-07-23 Honeywell International Inc. Data manager
US10678279B2 (en) 2012-08-01 2020-06-09 Tendril Oe, Llc Optimization of energy use through model-based simulations
US10782032B2 (en) 2013-03-15 2020-09-22 Pacecontrols, Llc Controller for automatic control of duty cycled HVACR equipment, and systems and methods using same
US10866568B2 (en) 2016-04-01 2020-12-15 Tendril Oe, Llc Orchestrated energy
US11149975B2 (en) 2019-07-24 2021-10-19 Uplight, Inc. Adaptive thermal comfort learning for optimized HVAC control
US11889239B2 (en) 2014-06-03 2024-01-30 Applied Minds, Llc Color night vision cameras, systems, and methods thereof

Families Citing this family (401)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6965319B1 (en) * 1999-06-25 2005-11-15 Henry Crichlow Method and system for energy management using intelligent agents over the internet
US20030041016A1 (en) * 2001-05-10 2003-02-27 Spool Peter R. Business management system and method for a deregulated electric power market using cooperatively produced estimates
US7013204B1 (en) 2002-09-17 2006-03-14 Ricoh Company Ltd. Approach for managing power consumption of network devices
US7209805B2 (en) * 2002-09-17 2007-04-24 Ricoh Company Ltd. Approach for managing power consumption of network devices
US6748299B1 (en) 2002-09-17 2004-06-08 Ricoh Company, Ltd. Approach for managing power consumption in buildings
US8463441B2 (en) 2002-12-09 2013-06-11 Hudson Technologies, Inc. Method and apparatus for optimizing refrigeration systems
US6968295B1 (en) * 2002-12-31 2005-11-22 Ingersoll-Rand Company, Ir Retail Solutions Division Method of and system for auditing the energy-usage of a facility
JP2004280618A (en) * 2003-03-18 2004-10-07 Hitachi Ltd Energy management system
DE10324045B3 (en) * 2003-05-27 2004-10-14 Siemens Ag System characteristics modelling method for dynamic system using similarity analysis for modification of known system characteristics supplied to neural network structure for causality analysis
US20040254686A1 (en) * 2003-05-28 2004-12-16 Masaru Matsui Energy consumption prediction apparatus and energy consumption prediction method
US20060259199A1 (en) * 2003-06-05 2006-11-16 Gjerde Jan O Method and a system for automatic management of demand for non-durables
JP4124035B2 (en) * 2003-06-26 2008-07-23 ヤマハ株式会社 Energy saving evaluation system
US8560476B2 (en) 2003-08-26 2013-10-15 The Trustees Of Columbia University In The City Of New York Martingale control of production for optimal profitability of oil and gas fields
WO2005040992A2 (en) * 2003-10-24 2005-05-06 Square D Company Intelligent power management control system
US7489988B2 (en) * 2003-11-19 2009-02-10 Panasonic Corporation Generator control system, generating apparatus control method, program and record medium
US20050234600A1 (en) * 2004-04-16 2005-10-20 Energyconnect, Inc. Enterprise energy automation
US7412842B2 (en) 2004-04-27 2008-08-19 Emerson Climate Technologies, Inc. Compressor diagnostic and protection system
US7275377B2 (en) * 2004-08-11 2007-10-02 Lawrence Kates Method and apparatus for monitoring refrigerant-cycle systems
US7424343B2 (en) 2004-08-11 2008-09-09 Lawrence Kates Method and apparatus for load reduction in an electric power system
EP1781996A2 (en) * 2004-08-11 2007-05-09 Lawrence Kates Method and apparatus for monitoring refrigerant-cycle systems
US7249269B1 (en) 2004-09-10 2007-07-24 Ricoh Company, Ltd. Method of pre-activating network devices based upon previous usage data
JP2006190145A (en) * 2005-01-07 2006-07-20 Omron Corp Store management system, store controller, store control method, management server, management method and program
US7623042B2 (en) * 2005-03-14 2009-11-24 Regents Of The University Of California Wireless network control for building lighting system
JP4736913B2 (en) * 2005-09-27 2011-07-27 株式会社デンソー Eco drive system
US20070136217A1 (en) * 2005-12-13 2007-06-14 Peter Johnson Method and apparatus for remotely monitoring electricity rates
US7519485B2 (en) * 2005-12-21 2009-04-14 Sterling Planet, Inc. Method and apparatus for determining energy savings by using a baseline energy use model that incorporates a neural network algorithm
US7881889B2 (en) 2005-12-21 2011-02-01 Barclay Kenneth B Method and apparatus for determining energy savings by using a baseline energy use model that incorporates an artificial intelligence algorithm
US8543343B2 (en) 2005-12-21 2013-09-24 Sterling Planet, Inc. Method and apparatus for determining energy savings by using a baseline energy use model that incorporates an artificial intelligence algorithm
US20070239317A1 (en) * 2006-04-07 2007-10-11 Bogolea Bradley D Artificial-Intelligence-Based Energy Auditing, Monitoring and Control
JP5114026B2 (en) * 2006-06-28 2013-01-09 三洋電機株式会社 Demand control device
US8590325B2 (en) 2006-07-19 2013-11-26 Emerson Climate Technologies, Inc. Protection and diagnostic module for a refrigeration system
FR2904486B1 (en) 2006-07-31 2010-02-19 Jean Marc Oury METHOD AND SYSTEM FOR REAL TIME MANAGEMENT AND MODULATION OF ELECTRICAL CONSUMPTION.
US20080216494A1 (en) 2006-09-07 2008-09-11 Pham Hung M Compressor data module
US7873441B2 (en) * 2006-09-25 2011-01-18 Andreas Joanni Synesiou System for execution of a load operating plan for load control
US20080082183A1 (en) * 2006-09-29 2008-04-03 Johnson Controls Technology Company Building automation system with automated component selection for minimum energy consumption
US7698233B1 (en) * 2007-01-23 2010-04-13 Southern Company Services, Inc. System and method for determining expected unserved energy to quantify generation reliability risks
US20080183337A1 (en) * 2007-01-31 2008-07-31 Fifth Light Technology Ltd. Methods and systems for controlling addressable lighting units
KR100877987B1 (en) * 2007-02-08 2009-01-12 엘지전자 주식회사 Building management system
US7784704B2 (en) 2007-02-09 2010-08-31 Harter Robert J Self-programmable thermostat
US20080229226A1 (en) * 2007-03-09 2008-09-18 Lutron Electronics Co., Inc. System and method for graphically displaying energy consumption and savings
GB2448896B (en) * 2007-05-02 2009-05-20 Univ Montfort Energy management system
KR100894506B1 (en) * 2007-06-28 2009-04-22 한양대학교 산학협력단 Monitoring system for communication network having a plurality of layers
US20090055300A1 (en) * 2007-07-17 2009-02-26 Mcdowell Grant Method and system for remote generation of renewable energy
US20090030758A1 (en) * 2007-07-26 2009-01-29 Gennaro Castelli Methods for assessing potentially compromising situations of a utility company
US20090037142A1 (en) 2007-07-30 2009-02-05 Lawrence Kates Portable method and apparatus for monitoring refrigerant-cycle systems
US8855279B2 (en) 2007-08-28 2014-10-07 Consert Inc. Apparatus and method for controlling communications to and from utility service points
US8145361B2 (en) 2007-08-28 2012-03-27 Consert, Inc. System and method for manipulating controlled energy using devices to manage customer bills
US9130402B2 (en) 2007-08-28 2015-09-08 Causam Energy, Inc. System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management
US8700187B2 (en) 2007-08-28 2014-04-15 Consert Inc. Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities
US8805552B2 (en) 2007-08-28 2014-08-12 Causam Energy, Inc. Method and apparatus for actively managing consumption of electric power over an electric power grid
US8890505B2 (en) 2007-08-28 2014-11-18 Causam Energy, Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US10295969B2 (en) 2007-08-28 2019-05-21 Causam Energy, Inc. System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management
US9177323B2 (en) 2007-08-28 2015-11-03 Causam Energy, Inc. Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US8996183B2 (en) * 2007-08-28 2015-03-31 Consert Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US8396606B2 (en) 2007-08-28 2013-03-12 Consert Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US7715951B2 (en) 2007-08-28 2010-05-11 Consert, Inc. System and method for managing consumption of power supplied by an electric utility
US8806239B2 (en) 2007-08-28 2014-08-12 Causam Energy, Inc. System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators
US8527107B2 (en) 2007-08-28 2013-09-03 Consert Inc. Method and apparatus for effecting controlled restart of electrical servcie with a utility service area
WO2009039500A1 (en) * 2007-09-20 2009-03-26 Sterling Planet, Inc. Method and apparatus for determining energy savings by using a baseline energy use model that incorporates an artificial intelligence algorithm
US8013861B2 (en) 2007-10-31 2011-09-06 International Business Machines Corporation Reducing a display quality of an area in a virtual universe to conserve computing resources
US8214750B2 (en) 2007-10-31 2012-07-03 International Business Machines Corporation Collapsing areas of a region in a virtual universe to conserve computing resources
US8127297B2 (en) 2007-10-31 2012-02-28 International Business Machines Corporation Smart virtual objects of a virtual universe independently select display quality adjustment settings to conserve energy consumption of resources supporting the virtual universe
US9140728B2 (en) 2007-11-02 2015-09-22 Emerson Climate Technologies, Inc. Compressor sensor module
US8127235B2 (en) 2007-11-30 2012-02-28 International Business Machines Corporation Automatic increasing of capacity of a virtual space in a virtual world
US20090143915A1 (en) * 2007-12-04 2009-06-04 Dougan David S Environmental control system
US20140114867A1 (en) * 2008-02-12 2014-04-24 Accenture Global Services Gmbh System for providing actions to reduce a carbon footprint
WO2009117742A1 (en) * 2008-03-21 2009-09-24 The Trustees Of Columbia University In The City Of New York Methods and systems of determining the effectiveness of capital improvement projects
WO2009117741A1 (en) * 2008-03-21 2009-09-24 The Trustees Of Columbia University In The City Of New York Decision support control centers
US20090248704A1 (en) * 2008-03-31 2009-10-01 Continental Electrical Construction Company, Llc Alternative work space assignment portal
US7996164B2 (en) * 2008-05-06 2011-08-09 International Business Machines Corporation Managing energy usage by devices associated with a virtual universe resource conservation region
US8199145B2 (en) * 2008-05-06 2012-06-12 International Business Machines Corporation Managing use limitations in a virtual universe resource conservation region
US20090281885A1 (en) * 2008-05-08 2009-11-12 International Business Machines Corporation Using virtual environment incentives to reduce real world energy usage
US7873485B2 (en) * 2008-05-08 2011-01-18 International Business Machines Corporation Indicating physical site energy usage through a virtual environment
EP2082851A1 (en) * 2008-05-16 2009-07-29 ABB Research Ltd. An industrial robot capable of supervising its environmental impact and a method thereof
US8364325B2 (en) * 2008-06-02 2013-01-29 Adura Technologies, Inc. Intelligence in distributed lighting control devices
US8275471B2 (en) 2009-11-06 2012-09-25 Adura Technologies, Inc. Sensor interface for wireless control
US7839017B2 (en) * 2009-03-02 2010-11-23 Adura Technologies, Inc. Systems and methods for remotely controlling an electrical load
US20100114340A1 (en) * 2008-06-02 2010-05-06 Charles Huizenga Automatic provisioning of wireless control systems
US20090302996A1 (en) * 2008-06-10 2009-12-10 Millennial Net, Inc. System and method for a management server
JP5102875B2 (en) * 2008-06-10 2012-12-19 パナソニック株式会社 Energy management system and computer program
US20090302994A1 (en) * 2008-06-10 2009-12-10 Mellennial Net, Inc. System and method for energy management
US8260468B2 (en) * 2008-06-25 2012-09-04 Versify Solutions, Inc. Aggregator, monitor, and manager of distributed demand response
SI2310751T1 (en) 2008-07-03 2017-09-29 Jeffrey A. Weston Thermal gradient fluid header for multiple heating and cooling systems
US20100025483A1 (en) * 2008-07-31 2010-02-04 Michael Hoeynck Sensor-Based Occupancy and Behavior Prediction Method for Intelligently Controlling Energy Consumption Within a Building
US8396678B2 (en) * 2008-08-11 2013-03-12 Edward L. Davis Peakpower energy management and control system method and apparatus
US9268385B2 (en) 2008-08-20 2016-02-23 International Business Machines Corporation Introducing selective energy efficiency in a virtual environment
US8260471B2 (en) * 2008-08-27 2012-09-04 Herman Miller, Inc. Energy distribution management system
US10296987B2 (en) * 2008-09-11 2019-05-21 International Business Machines Corporation Policy-based energy management
US8843242B2 (en) 2008-09-15 2014-09-23 General Electric Company System and method for minimizing consumer impact during demand responses
US8803040B2 (en) 2008-09-15 2014-08-12 General Electric Company Load shedding for surface heating units on electromechanically controlled cooking appliances
US9303878B2 (en) 2008-09-15 2016-04-05 General Electric Company Hybrid range and method of use thereof
US8541719B2 (en) 2008-09-15 2013-09-24 General Electric Company System for reduced peak power consumption by a cooking appliance
US8433452B2 (en) * 2008-09-15 2013-04-30 Aclara Power-Line Systems, Inc. Method for load control using temporal measurements of energy for individual pieces of equipment
US8548638B2 (en) * 2008-09-15 2013-10-01 General Electric Company Energy management system and method
US8704639B2 (en) 2008-09-15 2014-04-22 General Electric Company Management control of household appliances using RFID communication
US8412654B2 (en) * 2008-10-08 2013-04-02 Rey Montalvo Method and system for fully automated energy curtailment
US9002761B2 (en) 2008-10-08 2015-04-07 Rey Montalvo Method and system for automatically adapting end user power usage
KR101022574B1 (en) * 2008-10-28 2011-03-16 한국전력공사 Day-Ahead Load Reduction System Based on Customer Baseline Load
US9542658B2 (en) 2008-11-06 2017-01-10 Silver Spring Networks, Inc. System and method for identifying power usage issues
ES2549126T3 (en) * 2008-11-18 2015-10-23 Otis Elevator Company Load disconnection on demand in an elevator
US9325573B2 (en) 2008-12-09 2016-04-26 Schneider Electric Buildings Ab Building control system
EP2204712A1 (en) * 2008-12-17 2010-07-07 Bayer MaterialScience AG Method and system for monitoring and analysing energy consumption in operated chemical plants
JP5255462B2 (en) * 2009-01-13 2013-08-07 株式会社日立製作所 Power supply and demand operation management server and power supply and demand operation management system
US8364609B2 (en) * 2009-01-14 2013-01-29 Integral Analytics, Inc. Optimization of microgrid energy use and distribution
US8706650B2 (en) * 2009-01-14 2014-04-22 Integral Analytics, Inc. Optimization of microgrid energy use and distribution
US8103388B2 (en) * 2009-01-29 2012-01-24 International Business Machines Corporation System for prediction and communication of environmentally induced power useage limitation
WO2010096783A1 (en) 2009-02-20 2010-08-26 The Trustees Of Columbia University In The City Of New York Dynamic contingency avoidance and mitigation system
US10776726B2 (en) * 2009-02-23 2020-09-15 McHenry Wallace Computer application for the gathering and interpretation of data from interval smart meters
WO2010118332A1 (en) * 2009-04-09 2010-10-14 E3 Greentech Enterprises, Inc. System and method for energy consumption management
US9129231B2 (en) * 2009-04-24 2015-09-08 Rockwell Automation Technologies, Inc. Real time energy consumption analysis and reporting
US20100275147A1 (en) * 2009-04-24 2010-10-28 Rockwell Automation Technologies, Inc. Industrial energy demand management and services
US10013666B2 (en) * 2009-04-24 2018-07-03 Rockwell Automation Technologies, Inc. Product lifecycle sustainability score tracking and indicia
US8321187B2 (en) 2009-04-24 2012-11-27 Rockwell Automation Technologies, Inc. Process simulation utilizing component-specific consumption data
US20100274612A1 (en) * 2009-04-24 2010-10-28 Rockwell Automation Technologies, Inc. Utilizing sustainability factors for product optimization
US20100274603A1 (en) * 2009-04-24 2010-10-28 Rockwell Automation Technologies, Inc. Dynamic sustainability factor management
US10223167B2 (en) * 2009-04-24 2019-03-05 Rockwell Automation Technologies, Inc. Discrete resource management
US8892540B2 (en) * 2009-04-24 2014-11-18 Rockwell Automation Technologies, Inc. Dynamic sustainability search engine
US9406036B2 (en) * 2009-04-24 2016-08-02 Rockwell Automation Technologies, Inc. Discrete energy assignments for manufacturing specifications
US7912807B2 (en) 2009-04-30 2011-03-22 Integrated Environmental Solutions, Ltd. Method and system for modeling energy efficient buildings using a plurality of synchronized workflows
EP3101602B1 (en) * 2009-05-08 2018-09-12 Accenture Global Services Limited Building energy consumption analysis system
US8725625B2 (en) 2009-05-28 2014-05-13 The Trustees Of Columbia University In The City Of New York Capital asset planning system
US8121958B2 (en) 2009-06-08 2012-02-21 Ricoh Company, Ltd. Approach for determining alternative printing device arrangements
FR2948780B1 (en) 2009-07-30 2014-06-27 Commissariat Energie Atomique ENERGY MANAGEMENT IN A BUILDING
WO2011012134A1 (en) * 2009-07-31 2011-02-03 Gridmanager A/S Method and apparatus for managing transmission of power in a power transmission network
JP4806059B2 (en) * 2009-09-09 2011-11-02 株式会社東芝 Energy management system and energy management method
US9471045B2 (en) 2009-09-11 2016-10-18 NetESCO LLC Controlling building systems
US8843416B2 (en) 2009-09-11 2014-09-23 NetESCO LLC Determining energy consumption in a structure
US8869569B2 (en) 2009-09-15 2014-10-28 General Electric Company Clothes washer demand response with at least one additional spin cycle
US8522579B2 (en) 2009-09-15 2013-09-03 General Electric Company Clothes washer demand response with dual wattage or auxiliary heater
US8943845B2 (en) 2009-09-15 2015-02-03 General Electric Company Window air conditioner demand supply management response
US8943857B2 (en) 2009-09-15 2015-02-03 General Electric Company Clothes washer demand response by duty cycling the heater and/or the mechanical action
EP2302470A3 (en) 2009-09-29 2014-06-11 Honeywell International Inc. Systems and methods for configuring a building management system
US8565902B2 (en) * 2009-09-29 2013-10-22 Honeywell International Inc. Systems and methods for controlling a building management system
US8584030B2 (en) * 2009-09-29 2013-11-12 Honeywell International Inc. Systems and methods for displaying HVAC information
JP5425582B2 (en) * 2009-09-30 2014-02-26 三洋電機株式会社 Electrical equipment management system
US9159042B2 (en) 2009-10-23 2015-10-13 Viridity Energy, Inc. Facilitating revenue generation from data shifting by data centers
US9367825B2 (en) 2009-10-23 2016-06-14 Viridity Energy, Inc. Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model
US8892264B2 (en) 2009-10-23 2014-11-18 Viridity Energy, Inc. Methods, apparatus and systems for managing energy assets
US8457802B1 (en) 2009-10-23 2013-06-04 Viridity Energy, Inc. System and method for energy management
US9159108B2 (en) 2009-10-23 2015-10-13 Viridity Energy, Inc. Facilitating revenue generation from wholesale electricity markets
US20110264276A1 (en) * 2009-10-30 2011-10-27 Rudin Management Co. Inc. Interconnected electrical network and building management system and method of operation
EP2499611A4 (en) 2009-11-09 2014-11-19 Hdr Architecture Inc Method and system for integration of clinical and facilities management systems
US9075408B2 (en) * 2009-11-16 2015-07-07 Applied Materials, Inc. Energy savings and global gas emissions monitoring and display
CA2780801C (en) * 2009-11-18 2021-09-07 Pacecontrols, Llc Controller for automatic control and optimization of duty cycled hvac&r equipment, and systems and methods using same
US8624430B2 (en) * 2009-11-19 2014-01-07 General Electric Company Standby power reduction
EP2336834A1 (en) * 2009-11-20 2011-06-22 Zerogroup Holding OÜ A method and system for controlling environmental conditions of entity
EP2328049A1 (en) * 2009-11-20 2011-06-01 Zerogroup Holding OÜ A system for controlling environmental conditions of a building
US9274518B2 (en) 2010-01-08 2016-03-01 Rockwell Automation Technologies, Inc. Industrial control energy object
US8738190B2 (en) 2010-01-08 2014-05-27 Rockwell Automation Technologies, Inc. Industrial control energy object
EP2348596B1 (en) * 2010-01-25 2021-09-08 Accenture Global Services Limited Analytics for consumer power consumption
US8577505B2 (en) * 2010-01-27 2013-11-05 Honeywell International Inc. Energy-related information presentation system
JP5645244B2 (en) * 2010-02-05 2014-12-24 パナソニックIpマネジメント株式会社 Energy supply and demand control system
US8457803B2 (en) * 2010-02-10 2013-06-04 Enernoc, Inc. Apparatus and method for demand coordination network
WO2011106511A1 (en) 2010-02-24 2011-09-01 The Trustees Of Columbia University In The City Of New York Metric monitoring and financial validation system for tracking performance of improvement to an infrastructure
EP2544140A4 (en) * 2010-03-01 2014-03-05 Panasonic Corp Energy management apparatus, method, and system
US20110218777A1 (en) * 2010-03-03 2011-09-08 Honeywell International Inc. System and method for generating a building information model
CN102193528B (en) * 2010-03-05 2013-08-14 朗德华信(北京)自控技术有限公司 Cloud computing based energy management control system and method
WO2011109759A1 (en) * 2010-03-05 2011-09-09 Efficient Energy America Incorporated System and method for providing reduced consumption of energy using automated human thermal comfort controls
JP5062273B2 (en) * 2010-03-12 2012-10-31 ダイキン工業株式会社 Energy management system
JPWO2011118607A1 (en) * 2010-03-24 2013-07-04 三洋電機株式会社 Power supply device, power storage device, and power control device
US9056212B2 (en) * 2010-03-25 2015-06-16 David H. C. Chen Systems and methods of property security
WO2011127313A1 (en) * 2010-04-08 2011-10-13 Energyresource Management Corp Energy-saving measurement, adjustment and monetization system and method
JP5518553B2 (en) * 2010-04-13 2014-06-11 文平 馬郡 Energy saving unit and system for buildings by mutual learning
US8583405B2 (en) 2010-05-11 2013-11-12 Maggie Chow Contingency analysis information for utility service network
US8682635B2 (en) 2010-05-28 2014-03-25 Rockwell Automation Technologies, Inc. Optimal self-maintained energy management system and use
US8706310B2 (en) 2010-06-15 2014-04-22 Redwood Systems, Inc. Goal-based control of lighting
US9417616B2 (en) * 2010-06-22 2016-08-16 Lg Electronics Inc. Electric product for effectively managing energy sources
WO2011162552A2 (en) * 2010-06-22 2011-12-29 엘지전자 주식회사 Network system
US9979201B2 (en) * 2010-06-26 2018-05-22 Lg Electronics Inc. Component for a network system including a power saving function
US20130197703A1 (en) * 2010-06-26 2013-08-01 Junho AHN Component for network system
US9558250B2 (en) * 2010-07-02 2017-01-31 Alstom Technology Ltd. System tools for evaluating operational and financial performance from dispatchers using after the fact analysis
US8538593B2 (en) 2010-07-02 2013-09-17 Alstom Grid Inc. Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast
US20110029142A1 (en) * 2010-07-02 2011-02-03 David Sun System tools that provides dispatchers in power grid control centers with a capability to make changes
US20110071690A1 (en) * 2010-07-02 2011-03-24 David Sun Methods that provide dispatchers in power grid control centers with a capability to manage changes
US9093840B2 (en) 2010-07-02 2015-07-28 Alstom Technology Ltd. System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast
US8972070B2 (en) 2010-07-02 2015-03-03 Alstom Grid Inc. Multi-interval dispatch system tools for enabling dispatchers in power grid control centers to manage changes
US9727828B2 (en) 2010-07-02 2017-08-08 Alstom Technology Ltd. Method for evaluating operational and financial performance for dispatchers using after the fact analysis
WO2012009724A1 (en) 2010-07-16 2012-01-19 The Trustees Of Columbia University In The City Of New York Machine learning for power grids
EP2599182A1 (en) * 2010-07-29 2013-06-05 Spirae Inc. Dynamic distributed power grid control system
US8386087B2 (en) * 2010-08-02 2013-02-26 General Electric Company Load shed system for demand response without AMI/AMR system
US20110119113A1 (en) * 2010-08-20 2011-05-19 Hara Software, Inc. Best Practices for Emission and Energy Management
JP5693898B2 (en) 2010-09-14 2015-04-01 株式会社東芝 Power control apparatus, power control system and method
US20120072140A1 (en) * 2010-09-21 2012-03-22 Schneider Electric USA, Inc. Systems, methods, and devices for analyzing utility usage with load duration curves
US8801862B2 (en) 2010-09-27 2014-08-12 General Electric Company Dishwasher auto hot start and DSM
US8484231B2 (en) 2010-10-28 2013-07-09 Honeywell International Inc. System and method for data mapping and information sharing
DE102010050726A1 (en) * 2010-11-08 2012-05-10 Alphaeos Gmbh & Co. Kg Building automation system
US8532836B2 (en) * 2010-11-08 2013-09-10 General Electric Company Demand response load reduction estimation
US8583531B2 (en) * 2010-11-24 2013-11-12 Joseph P. Hirl Decision support system for the management of energy use, contracting and capital investments for facilities
CN102096992A (en) * 2010-12-14 2011-06-15 广东雅达电子股份有限公司 OPC communication-based energy consumption monitoring system and building method thereof
US20120150509A1 (en) * 2010-12-14 2012-06-14 Patrick Andrew Shiel Continuous optimization energy reduction process in commercial buildings
CN102074954B (en) * 2010-12-20 2014-02-19 重庆电力科学试验研究院 Comprehensive energy-conservation evaluation and decision-making method for urban and rural distribution network
KR20120072106A (en) * 2010-12-23 2012-07-03 한국전자통신연구원 Apparatus and method for managing defect and maintain of building facility
US9417637B2 (en) * 2010-12-31 2016-08-16 Google Inc. Background schedule simulations in an intelligent, network-connected thermostat
KR20120080406A (en) * 2011-01-07 2012-07-17 한국전자통신연구원 Apparatus and method and for deducting manage plan of building
US8172147B2 (en) * 2011-02-10 2012-05-08 Christian Smith Method and system for the estimating the energy consumption of commercially available electrical devices
WO2012161804A1 (en) * 2011-02-24 2012-11-29 Clean Urban Energy, Inc. Integration of commercial building operations with electric system operations and markets
US20120323637A1 (en) * 2011-02-24 2012-12-20 Cushing Vincent J Optimization of attributes in a portfolio of commercial and industrial facilities
CN105910247B (en) 2011-02-28 2018-12-14 艾默生电气公司 The monitoring and diagnosis of the HVAC of house solution
US8560126B2 (en) * 2011-03-11 2013-10-15 Honeywell International Inc. Setpoint optimization for air handling units
US8874242B2 (en) 2011-03-18 2014-10-28 Rockwell Automation Technologies, Inc. Graphical language for optimization and use
GB2479060B (en) 2011-03-24 2012-05-02 Reactive Technologies Ltd Energy consumption management
US9306396B2 (en) 2011-03-25 2016-04-05 Green Charge Networks Llc Utility distribution control system
WO2012129675A1 (en) * 2011-03-31 2012-10-04 Energent Incorporated A computer implemented electrical energy hub management system and method
WO2012140529A1 (en) * 2011-04-11 2012-10-18 Koninklijke Philips Electronics N.V. Load adjustment sharing system and method
GB2494368B (en) * 2011-04-27 2014-04-02 Ea Tech Ltd Electric power demand management
US8862280B1 (en) * 2011-06-13 2014-10-14 Gridpoint, Inc. Dynamic load curtailment system and method
US20120323382A1 (en) * 2011-06-15 2012-12-20 Expanergy, Llc Systems and methods to assess and optimize energy usage for a facility
US9115908B2 (en) 2011-07-27 2015-08-25 Honeywell International Inc. Systems and methods for managing a programmable thermostat
US10453005B2 (en) 2011-08-09 2019-10-22 Autodesk, Inc. Method and system for generating occupant schedules
US10515322B2 (en) * 2011-08-09 2019-12-24 Autodesk, Inc. Method and system for generating occupant schedules
US9049078B2 (en) 2011-08-31 2015-06-02 Eneroc, Inc. NOC-oriented control of a demand coordination network
US9082294B2 (en) 2011-09-14 2015-07-14 Enernoc, Inc. Apparatus and method for receiving and transporting real time energy data
US8843238B2 (en) 2011-09-30 2014-09-23 Johnson Controls Technology Company Systems and methods for controlling energy use in a building management system using energy budgets
JP5639562B2 (en) * 2011-09-30 2014-12-10 株式会社東芝 Service execution device, service execution method, and service execution program
JP5899770B2 (en) * 2011-10-03 2016-04-06 富士ゼロックス株式会社 Energy usage management device and program
JP5874311B2 (en) * 2011-10-24 2016-03-02 ソニー株式会社 Electric power demand prediction apparatus, electric power demand prediction method, and electric power demand prediction system
AT512133A1 (en) * 2011-11-14 2013-05-15 Kuhn Andreas Dr METHOD FOR REGULATING ENERGY TRANSMISSIONS
LU91904B1 (en) * 2011-11-22 2013-05-22 Gael Richard Real-time energy consumption regulation process for an industrial infrastructure
US9192019B2 (en) 2011-12-07 2015-11-17 Abl Ip Holding Llc System for and method of commissioning lighting devices
US10554077B2 (en) * 2011-12-13 2020-02-04 Schneider Electric USA, Inc. Automated monitoring for changes in energy consumption patterns
ES2644528T3 (en) * 2011-12-21 2017-11-29 Siemens Aktiengesellschaft Method for the computer-aided determination of the use of electric power produced by a power generation plant, particularly a renewable power generation plant
US20130173322A1 (en) * 2011-12-30 2013-07-04 Schneider Electric USA, Inc. Energy Management with Correspondence Based Data Auditing Signoff
US8964338B2 (en) 2012-01-11 2015-02-24 Emerson Climate Technologies, Inc. System and method for compressor motor protection
US10069300B2 (en) * 2012-01-20 2018-09-04 Sunpower Corporation Methods and apparatus for dispatching electrical energy from distributed energy resources
US9007027B2 (en) 2012-01-31 2015-04-14 Green Charge Networks Llc Charge management for energy storage temperature control
US9048671B2 (en) 2012-02-24 2015-06-02 Green Charge Networks Llc Delayed reactive electrical consumption mitigation
US9892472B2 (en) * 2012-02-27 2018-02-13 Siemens Corporation Cost optimization for buildings with hybrid ventilation systems
US10095207B2 (en) * 2012-03-05 2018-10-09 Siemens Corporation System and method of energy management control
US9329650B2 (en) 2012-03-14 2016-05-03 Accenture Global Services Limited Customer-centric demand side management for utilities
US9338861B2 (en) 2012-03-28 2016-05-10 Koninklijke Philips N.V. Methods and apparatus for operating a lighting network according to energy demand and energy supply
US10013725B2 (en) 2012-04-02 2018-07-03 Carrier Corporation Architecture for energy management of multi customer multi time zone distributed facilities
US9798298B2 (en) 2012-04-02 2017-10-24 Accenture Global Services Limited Community energy management system
KR20130120657A (en) * 2012-04-26 2013-11-05 한국전자통신연구원 Smart grid interlocking apparatus
US8761953B2 (en) * 2012-04-30 2014-06-24 Innovari, Inc. Grid optimization resource dispatch scheduling
US9727071B2 (en) * 2012-05-04 2017-08-08 Viridity Energy Solutions, Inc. Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model
US8761949B2 (en) * 2012-05-31 2014-06-24 Sharp Laboratories Of America, Inc. Method and system for mitigating impact of malfunction in actual load determination on peak load management
US9207698B2 (en) 2012-06-20 2015-12-08 Causam Energy, Inc. Method and apparatus for actively managing electric power over an electric power grid
US9465398B2 (en) * 2012-06-20 2016-10-11 Causam Energy, Inc. System and methods for actively managing electric power over an electric power grid
US9461471B2 (en) 2012-06-20 2016-10-04 Causam Energy, Inc System and methods for actively managing electric power over an electric power grid and providing revenue grade date usable for settlement
US9002532B2 (en) * 2012-06-26 2015-04-07 Johnson Controls Technology Company Systems and methods for controlling a chiller plant for a building
US9563215B2 (en) 2012-07-14 2017-02-07 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US10311416B2 (en) 2014-10-22 2019-06-04 Causam Energy, Inc. Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same
US9513648B2 (en) 2012-07-31 2016-12-06 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US8983669B2 (en) 2012-07-31 2015-03-17 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US10475138B2 (en) 2015-09-23 2019-11-12 Causam Energy, Inc. Systems and methods for advanced energy network
US8849715B2 (en) 2012-10-24 2014-09-30 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US10861112B2 (en) 2012-07-31 2020-12-08 Causam Energy, Inc. Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform
US9411327B2 (en) 2012-08-27 2016-08-09 Johnson Controls Technology Company Systems and methods for classifying data in building automation systems
US9519874B2 (en) 2012-08-30 2016-12-13 Honeywell International Inc. HVAC controller with regression model to help reduce energy consumption
US10140670B2 (en) 2012-08-31 2018-11-27 Engie Storage Services Na Llc Energy management methods and systems based on financial impact
CN103679306A (en) * 2012-08-31 2014-03-26 国际商业机器公司 Method and system for saving building energy consumption
CN103797844B (en) * 2012-09-13 2018-11-06 埃森哲环球服务有限公司 The mthods, systems and devices and visible computer readable medium of power grid peak load shifting
US8947437B2 (en) 2012-09-15 2015-02-03 Honeywell International Inc. Interactive navigation environment for building performance visualization
US9310439B2 (en) 2012-09-25 2016-04-12 Emerson Climate Technologies, Inc. Compressor having a control and diagnostic module
CN102938092A (en) * 2012-10-08 2013-02-20 珠海派诺科技股份有限公司 Prediction method of building energy consumption in festivals and holidays based on neural network
US10366403B2 (en) * 2012-10-15 2019-07-30 International Business Machines Corporation Distributed forecasting and pricing system
US9524529B2 (en) 2012-11-07 2016-12-20 Cenergistic Llc Interval analysis tool for energy consumption
CA2837414C (en) 2012-12-14 2022-12-13 Battelle Memorial Institute Transactive control and coordination framework and associated toolkit functions
US20140229026A1 (en) * 2013-02-13 2014-08-14 Al Cabrini Prediction of future energy and demand usage using historical energy and demand usage
US20140278485A1 (en) * 2013-03-12 2014-09-18 Strathspey Crown LLC Systems and methods for market participant-based automated decisioning
US9423848B2 (en) 2013-03-15 2016-08-23 Rockwell Automation Technologies, Inc. Extensible energy management architecture
US9911163B2 (en) 2013-03-15 2018-03-06 Rockwell Automation Technologies, Inc. Systems and methods for determining energy information using an organizational model of an industrial automation system
CA2846722C (en) * 2013-03-15 2023-09-05 Sasan Mokhtari Systems and methods of determining optimal scheduling and dispatch of power resources
US9501804B2 (en) 2013-03-15 2016-11-22 Rockwell Automation Technologies, Inc. Multi-core processor for performing energy-related operations in an industrial automation system using energy information determined with an organizational model of the industrial automation system
US9842372B2 (en) 2013-03-15 2017-12-12 Rockwell Automation Technologies, Inc. Systems and methods for controlling assets using energy information determined with an organizational model of an industrial automation system
US20140278617A1 (en) * 2013-03-15 2014-09-18 Rockwell Automation Technologies, Inc. Systems and methods for updating confidence values for energy information associated with an industrial automation system
US20140277754A1 (en) * 2013-03-15 2014-09-18 Tmg Energy Systems, Inc. Integrated Sustainable Energy System
US9803902B2 (en) 2013-03-15 2017-10-31 Emerson Climate Technologies, Inc. System for refrigerant charge verification using two condenser coil temperatures
US9551504B2 (en) 2013-03-15 2017-01-24 Emerson Electric Co. HVAC system remote monitoring and diagnosis
WO2014144446A1 (en) 2013-03-15 2014-09-18 Emerson Electric Co. Hvac system remote monitoring and diagnosis
CN106030221B (en) 2013-04-05 2018-12-07 艾默生环境优化技术有限公司 Heat pump system with refrigerant charging diagnostic function
CN106339825A (en) * 2013-04-08 2017-01-18 江苏理工学院 Energy saving evaluation method for power supply and distribution networks of industrial enterprises
US9171276B2 (en) * 2013-05-06 2015-10-27 Viridity Energy, Inc. Facilitating revenue generation from wholesale electricity markets using an engineering-based model
US9098876B2 (en) 2013-05-06 2015-08-04 Viridity Energy, Inc. Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model
CN103382786B (en) * 2013-06-27 2016-08-10 武汉数阵信息集成技术有限公司 The multifunctional intellectual building of energy-conserving and environment-protective and control system thereof
US9292888B2 (en) 2013-06-28 2016-03-22 Globalfoundries Inc. Constructing and calibrating enthalpy based predictive model for building energy consumption
WO2015029194A1 (en) * 2013-08-29 2015-03-05 株式会社日立システムズ Wide area management system, wide area management device, building management device and wide area management method
US20150088442A1 (en) * 2013-09-20 2015-03-26 Panduit Corp. Systems and methods for utility usage monitoring and management
CN103532133B (en) * 2013-09-29 2015-11-04 天津理工大学 Load transfer plan system and method during 35kV distribution network failure based on MAS
WO2015047411A1 (en) * 2013-09-30 2015-04-02 Schneider Electric Usa Inc. Systems and methods of data acquisition
US20150112617A1 (en) * 2013-10-17 2015-04-23 Chai energy Real-time monitoring and analysis of energy use
US20150108230A1 (en) * 2013-10-23 2015-04-23 Burnham Holdings, Inc. Multiple zone control system and method of operation
US10152683B2 (en) * 2014-01-22 2018-12-11 Fujistu Limited Demand response event assessment
US9568519B2 (en) 2014-05-15 2017-02-14 International Business Machines Corporation Building energy consumption forecasting procedure using ambient temperature, enthalpy, bias corrected weather forecast and outlier corrected sensor data
US9454141B2 (en) 2014-06-06 2016-09-27 Innovari, Inc. Real time capacity monitoring for measurement and verification of demand side management
US20150379542A1 (en) * 2014-06-30 2015-12-31 Battelle Memorial Institute Transactive control framework for heterogeneous devices
US9948101B2 (en) 2014-07-03 2018-04-17 Green Charge Networks Llc Passive peak reduction systems and methods
US10078315B2 (en) * 2014-07-11 2018-09-18 Nec Corporation Collaborative balancing of renewable energy overproduction with electricity-heat coupling and electric and thermal storage for prosumer communities
US9651929B2 (en) * 2014-09-29 2017-05-16 International Business Machines Corporation HVAC system control integrated with demand response, on-site energy storage system and on-site energy generation system
KR101641258B1 (en) * 2014-10-10 2016-07-20 엘지전자 주식회사 Central control apparatus for controlling facilities, facility control system comprising the same, and method for controlling facilities
US9785126B2 (en) 2014-11-25 2017-10-10 Rockwell Automation Technologies, Inc. Inferred energy usage and multiple levels of energy usage
US9798306B2 (en) 2014-11-25 2017-10-24 Rockwell Automation Technologies, Inc. Energy usage auto-baseline for diagnostics and prognostics
US9798343B2 (en) 2014-11-25 2017-10-24 Rockwell Automation Technologies, Inc. Quantifying operating strategy energy usage
WO2016142733A1 (en) * 2015-03-09 2016-09-15 Chohol System and method for use in connection on with pollutant emissions
US20160291622A1 (en) * 2015-03-31 2016-10-06 Enernoc, Inc. System for weather induced facility energy consumption characterization
US9977447B2 (en) * 2015-03-31 2018-05-22 Enernoc, Inc. Demand response dispatch system employing weather induced facility energy consumption characterizations
US9904269B2 (en) 2015-03-31 2018-02-27 Enernoc, Inc. Apparatus and method for demand coordination network control
US20160294185A1 (en) 2015-03-31 2016-10-06 Enernoc, Inc. Energy brown out prediction system
US10025338B2 (en) 2015-03-31 2018-07-17 Enernoc, Inc. Demand response dispatch prediction system
US10152074B2 (en) * 2015-06-09 2018-12-11 Honeywell International Inc. Energy management using a wearable device
JP6625022B2 (en) * 2015-09-24 2019-12-25 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカPanasonic Intellectual Property Corporation of America Absence prediction method and presence / absence prediction device
US10534326B2 (en) 2015-10-21 2020-01-14 Johnson Controls Technology Company Building automation system with integrated building information model
CN105446139A (en) * 2015-12-18 2016-03-30 华南理工大学 Construction energy consumption analysis method and construction energy consumption analysis system based on BP neural network
US11947785B2 (en) 2016-01-22 2024-04-02 Johnson Controls Technology Company Building system with a building graph
US11268732B2 (en) 2016-01-22 2022-03-08 Johnson Controls Technology Company Building energy management system with energy analytics
US10181165B2 (en) * 2016-02-12 2019-01-15 Fujitsu Limited Critical peak pricing demand response participant assessment
CN109154802A (en) 2016-03-31 2019-01-04 江森自控科技公司 HVAC device registration in distributed building management system
US20170323207A1 (en) * 2016-05-03 2017-11-09 Enernoc, Inc. Apparatus and method for occupancy determination
US10505756B2 (en) 2017-02-10 2019-12-10 Johnson Controls Technology Company Building management system with space graphs
US11774920B2 (en) 2016-05-04 2023-10-03 Johnson Controls Technology Company Building system with user presentation composition based on building context
US10901373B2 (en) 2017-06-15 2021-01-26 Johnson Controls Technology Company Building management system with artificial intelligence for unified agent based control of building subsystems
US10417451B2 (en) 2017-09-27 2019-09-17 Johnson Controls Technology Company Building system with smart entity personal identifying information (PII) masking
US10317865B2 (en) 2016-05-25 2019-06-11 Carrier Corporation Method and system for determining potential energy saving for a multisite enterprise
CN105843196A (en) * 2016-05-25 2016-08-10 重庆市工程管理有限公司 Integrated energy consumption management system for large building
WO2018030968A1 (en) 2016-08-11 2018-02-15 Positive Surdurulebilir Enerji Yazilim Musavirlik Yatirim Ve Bagimsiz Denetim Hizmetleri A. S. Architecturally controlled environment parameter building energy management and automation system
CA2982199A1 (en) * 2016-10-24 2018-04-24 Centre For Development Of Telematics (C-Dot) System and method for facilitating optimization and analytics of a managed network
US20180189431A1 (en) * 2017-12-18 2018-07-05 Hosni I. Adra Dynamic simulation models constantly adapting to the changes of complex systems
US10684033B2 (en) 2017-01-06 2020-06-16 Johnson Controls Technology Company HVAC system with automated device pairing
US10409305B2 (en) 2017-01-29 2019-09-10 Trane International Inc. HVAC system configuration and zone management
US11900287B2 (en) 2017-05-25 2024-02-13 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with budgetary constraints
US10854194B2 (en) 2017-02-10 2020-12-01 Johnson Controls Technology Company Building system with digital twin based data ingestion and processing
US20190361412A1 (en) 2017-02-10 2019-11-28 Johnson Controls Technology Company Building smart entity system with agent based data ingestion and entity creation using time series data
US10515098B2 (en) 2017-02-10 2019-12-24 Johnson Controls Technology Company Building management smart entity creation and maintenance using time series data
US11360447B2 (en) * 2017-02-10 2022-06-14 Johnson Controls Technology Company Building smart entity system with agent based communication and control
US10417245B2 (en) 2017-02-10 2019-09-17 Johnson Controls Technology Company Building management system with eventseries processing
US20190095518A1 (en) 2017-09-27 2019-03-28 Johnson Controls Technology Company Web services for smart entity creation and maintenance using time series data
US11764991B2 (en) 2017-02-10 2023-09-19 Johnson Controls Technology Company Building management system with identity management
US11042144B2 (en) 2017-03-24 2021-06-22 Johnson Controls Technology Company Building management system with dynamic channel communication
US10788229B2 (en) 2017-05-10 2020-09-29 Johnson Controls Technology Company Building management system with a distributed blockchain database
US10999652B2 (en) 2017-05-24 2021-05-04 Engie Storage Services Na Llc Energy-based curtailment systems and methods
US11022947B2 (en) 2017-06-07 2021-06-01 Johnson Controls Technology Company Building energy optimization system with economic load demand response (ELDR) optimization and ELDR user interfaces
US10658841B2 (en) 2017-07-14 2020-05-19 Engie Storage Services Na Llc Clustered power generator architecture
US11159044B2 (en) 2017-07-14 2021-10-26 Battelle Memorial Institute Hierarchal framework for integrating distributed energy resources into distribution systems
WO2019018304A1 (en) * 2017-07-17 2019-01-24 Johnson Controls Technology Company Systems and methods for agent based building simulation for optimal control
US11733663B2 (en) 2017-07-21 2023-08-22 Johnson Controls Tyco IP Holdings LLP Building management system with dynamic work order generation with adaptive diagnostic task details
US10619882B2 (en) 2017-07-27 2020-04-14 Johnson Controls Technology Company Building management system with scorecard for building energy and equipment performance
US11605036B2 (en) * 2017-08-09 2023-03-14 Verdigris Technologies, Inc. System and methods for power system forecasting using deep neural networks
US10559180B2 (en) 2017-09-27 2020-02-11 Johnson Controls Technology Company Building risk analysis system with dynamic modification of asset-threat weights
US11314788B2 (en) 2017-09-27 2022-04-26 Johnson Controls Tyco IP Holdings LLP Smart entity management for building management systems
US10962945B2 (en) 2017-09-27 2021-03-30 Johnson Controls Technology Company Building management system with integration of data into smart entities
FR3072514B1 (en) 2017-10-12 2021-09-24 Evolution Energie CONTROL AND MANAGEMENT SYSTEM OF DISTRIBUTED ENERGY EQUIPMENT.
US11281169B2 (en) 2017-11-15 2022-03-22 Johnson Controls Tyco IP Holdings LLP Building management system with point virtualization for online meters
US20190146425A1 (en) * 2017-11-15 2019-05-16 Electronics And Telecommunications Research Institute Method and apparatus for controlling demand management based on energy source selection by real-time price information
US10809682B2 (en) 2017-11-15 2020-10-20 Johnson Controls Technology Company Building management system with optimized processing of building system data
US11127235B2 (en) 2017-11-22 2021-09-21 Johnson Controls Tyco IP Holdings LLP Building campus with integrated smart environment
US10838440B2 (en) 2017-11-28 2020-11-17 Johnson Controls Technology Company Multistage HVAC system with discrete device selection prioritization
US10838441B2 (en) 2017-11-28 2020-11-17 Johnson Controls Technology Company Multistage HVAC system with modulating device demand control
US11669914B2 (en) 2018-05-06 2023-06-06 Strong Force TX Portfolio 2018, LLC Adaptive intelligence and shared infrastructure lending transaction enablement platform responsive to crowd sourced information
US11550299B2 (en) 2020-02-03 2023-01-10 Strong Force TX Portfolio 2018, LLC Automated robotic process selection and configuration
US11544782B2 (en) 2018-05-06 2023-01-03 Strong Force TX Portfolio 2018, LLC System and method of a smart contract and distributed ledger platform with blockchain custody service
WO2019217323A1 (en) * 2018-05-06 2019-11-14 Strong Force TX Portfolio 2018, LLC Methods and systems for improving machines and systems that automate execution of distributed ledger and other transactions in spot and forward markets for energy, compute, storage and other resources
US11735028B2 (en) 2018-06-12 2023-08-22 Intergraph Corporation Artificial intelligence applications for computer-aided dispatch systems
US20200004212A1 (en) * 2018-07-02 2020-01-02 Demand Energy Networks, Inc. Systems and methods to aggregate distributed energy resources
CN109190799B (en) * 2018-08-07 2021-01-26 广东电网有限责任公司 Collaborative optimization control method and device for industrial and commercial temperature control load
US11163271B2 (en) * 2018-08-28 2021-11-02 Johnson Controls Technology Company Cloud based building energy optimization system with a dynamically trained load prediction model
CA3054216C (en) 2018-09-05 2023-08-01 Honeywell International Inc. Methods and systems for improving infection control in a facility
US11031787B2 (en) 2018-09-14 2021-06-08 Lancium Llc System of critical datacenters and behind-the-meter flexible datacenters
US11016648B2 (en) 2018-10-30 2021-05-25 Johnson Controls Technology Company Systems and methods for entity visualization and management with an entity node editor
US11927925B2 (en) 2018-11-19 2024-03-12 Johnson Controls Tyco IP Holdings LLP Building system with a time correlated reliability data stream
WO2020117973A1 (en) * 2018-12-04 2020-06-11 Sidewalk Labs LLC Methods, systems, and media for energy management
US10978199B2 (en) 2019-01-11 2021-04-13 Honeywell International Inc. Methods and systems for improving infection control in a building
US20200234220A1 (en) 2019-01-18 2020-07-23 Johnson Controls Technology Company Smart building automation system with employee productivity features
US10788798B2 (en) 2019-01-28 2020-09-29 Johnson Controls Technology Company Building management system with hybrid edge-cloud processing
US11295255B2 (en) 2019-03-29 2022-04-05 Datakwip Holdings, LLC Facility analytics
EP3726307A1 (en) * 2019-04-17 2020-10-21 Carrier Corporation Method for controlling building power consumption
AU2020276342A1 (en) 2019-05-15 2021-12-16 Upstream Data Inc. Portable blockchain mining system and methods of use
US11371737B2 (en) * 2019-07-08 2022-06-28 Target Brands, Inc. Optimization engine for energy sustainability
US11868106B2 (en) 2019-08-01 2024-01-09 Lancium Llc Granular power ramping
US11764580B2 (en) 2019-12-06 2023-09-19 Enel X S.R.L. Systems and apparatuses to aggregate distributed energy resources
US11894944B2 (en) 2019-12-31 2024-02-06 Johnson Controls Tyco IP Holdings LLP Building data platform with an enrichment loop
US20210200807A1 (en) 2019-12-31 2021-07-01 Johnson Controls Technology Company Building data platform with a graph change feed
US11244466B2 (en) * 2020-02-27 2022-02-08 Dell Products L.P. Automated capacity management using artificial intelligence techniques
US11537386B2 (en) 2020-04-06 2022-12-27 Johnson Controls Tyco IP Holdings LLP Building system with dynamic configuration of network resources for 5G networks
US11874809B2 (en) 2020-06-08 2024-01-16 Johnson Controls Tyco IP Holdings LLP Building system with naming schema encoding entity type and entity relationships
US11620594B2 (en) 2020-06-12 2023-04-04 Honeywell International Inc. Space utilization patterns for building optimization
US11783658B2 (en) 2020-06-15 2023-10-10 Honeywell International Inc. Methods and systems for maintaining a healthy building
US11914336B2 (en) 2020-06-15 2024-02-27 Honeywell International Inc. Platform agnostic systems and methods for building management systems
US11783652B2 (en) 2020-06-15 2023-10-10 Honeywell International Inc. Occupant health monitoring for buildings
US11184739B1 (en) 2020-06-19 2021-11-23 Honeywel International Inc. Using smart occupancy detection and control in buildings to reduce disease transmission
US11823295B2 (en) 2020-06-19 2023-11-21 Honeywell International, Inc. Systems and methods for reducing risk of pathogen exposure within a space
US11592886B2 (en) 2020-07-06 2023-02-28 Navier, Inc. Assessment of energy consumption of computer networks and use thereof
US11619414B2 (en) * 2020-07-07 2023-04-04 Honeywell International Inc. System to profile, measure, enable and monitor building air quality
US11402113B2 (en) 2020-08-04 2022-08-02 Honeywell International Inc. Methods and systems for evaluating energy conservation and guest satisfaction in hotels
US11894145B2 (en) 2020-09-30 2024-02-06 Honeywell International Inc. Dashboard for tracking healthy building performance
US11397773B2 (en) 2020-09-30 2022-07-26 Johnson Controls Tyco IP Holdings LLP Building management system with semantic model integration
US20220137575A1 (en) 2020-10-30 2022-05-05 Johnson Controls Technology Company Building management system with dynamic building model enhanced by digital twins
US11372383B1 (en) 2021-02-26 2022-06-28 Honeywell International Inc. Healthy building dashboard facilitated by hierarchical model of building control assets
US11662115B2 (en) 2021-02-26 2023-05-30 Honeywell International Inc. Hierarchy model builder for building a hierarchical model of control assets
US11617093B1 (en) 2021-03-05 2023-03-28 T-Mobile Usa, Inc. Prioritizing an issue reported by a user of a wireless telecommunication network
JP2024511974A (en) 2021-03-17 2024-03-18 ジョンソン・コントロールズ・タイコ・アイピー・ホールディングス・エルエルピー System and method for determining equipment energy waste
US11474489B1 (en) 2021-03-29 2022-10-18 Honeywell International Inc. Methods and systems for improving building performance
US11769066B2 (en) 2021-11-17 2023-09-26 Johnson Controls Tyco IP Holdings LLP Building data platform with digital twin triggers and actions
US11899723B2 (en) 2021-06-22 2024-02-13 Johnson Controls Tyco IP Holdings LLP Building data platform with context based twin function processing
CN113610085B (en) * 2021-10-10 2021-12-07 成都千嘉科技有限公司 Character wheel image identification method based on attention mechanism
US11868098B2 (en) * 2021-11-12 2024-01-09 Phaidra, Inc. Chiller and pump control using customizable artificial intelligence system
US11796974B2 (en) 2021-11-16 2023-10-24 Johnson Controls Tyco IP Holdings LLP Building data platform with schema extensibility for properties and tags of a digital twin
US11934966B2 (en) 2021-11-17 2024-03-19 Johnson Controls Tyco IP Holdings LLP Building data platform with digital twin inferences
US11704311B2 (en) 2021-11-24 2023-07-18 Johnson Controls Tyco IP Holdings LLP Building data platform with a distributed digital twin
US11714930B2 (en) 2021-11-29 2023-08-01 Johnson Controls Tyco IP Holdings LLP Building data platform with digital twin based inferences and predictions for a graphical building model
US11846435B2 (en) 2022-03-21 2023-12-19 Sridharan Raghavachari System and method for online assessment and manifestation (OLAAM) for building energy optimization
CN117193624B (en) * 2023-11-06 2024-02-27 深圳市海星信力德智能系统工程有限公司 Energy data acquisition method and system for intelligent building

Citations (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US25209A (en) * 1859-08-23 Iiippolytb monier
US4583090A (en) * 1981-10-16 1986-04-15 American Diversified Capital Corporation Data communication system
US4661914A (en) * 1984-06-07 1987-04-28 Magnavox Government And Industrial Electronics Company Energy management control apparatus
US4695738A (en) * 1985-09-30 1987-09-22 Daniel Wilmot Energy management system
US4855922A (en) * 1987-03-20 1989-08-08 Scientific-Atlanta, Inc. Apparatus and method for monitoring an energy management system
US4916328A (en) * 1988-12-08 1990-04-10 Honeywell Inc. Add/shed load control using anticipatory processes
US5327760A (en) * 1992-01-17 1994-07-12 Sms Schloemann-Siemag Aktiengesellschaft Roller leveller
US5462225A (en) * 1994-02-04 1995-10-31 Scientific-Atlanta, Inc. Apparatus and method for controlling distribution of electrical energy to a space conditioning load
US5544036A (en) * 1992-03-25 1996-08-06 Brown, Jr.; Robert J. Energy management and home automation system
US5543667A (en) * 1992-12-29 1996-08-06 Honeywell Inc. Load control for partially increasing/decreasing power usage
US5565855A (en) * 1991-05-06 1996-10-15 U.S. Philips Corporation Building management system
US5572438A (en) * 1995-01-05 1996-11-05 Teco Energy Management Services Engery management and building automation system
US5576700A (en) * 1992-08-26 1996-11-19 Scientific-Atlanta Apparatus and method for controlling an electrical load and monitoring control operations and the electrical load
US5579993A (en) * 1995-01-06 1996-12-03 Landis & Gyr Powers, Inc. HVAC distribution system identification
US5640153A (en) * 1994-12-02 1997-06-17 Excel Energy Technologies, Ltd. Energy utilization controller and control system and method
US5682590A (en) * 1995-02-08 1997-10-28 Sandvik Ab Coated titanium-based carbonitride
US5924486A (en) * 1997-10-29 1999-07-20 Tecom, Inc. Environmental condition control and energy management system and method
US5927598A (en) * 1997-04-23 1999-07-27 Wexl Energy management method and apparatus
US5930773A (en) * 1997-12-17 1999-07-27 Avista Advantage, Inc. Computerized resource accounting methods and systems, computerized utility management methods and systems, multi-user utility management methods and systems, and energy-consumption-based tracking methods and systems
US5962989A (en) * 1995-01-17 1999-10-05 Negawatt Technologies Inc. Energy management control system
US5971597A (en) * 1995-03-29 1999-10-26 Hubbell Corporation Multifunction sensor and network sensor system
US6047274A (en) * 1997-02-24 2000-04-04 Geophonic Networks, Inc. Bidding for energy supply
US6095426A (en) * 1997-11-07 2000-08-01 Siemens Building Technologies Room temperature control apparatus having feedforward and feedback control and method
US6098893A (en) * 1998-10-22 2000-08-08 Honeywell Inc. Comfort control system incorporating weather forecast data and a method for operating such a system
US6145751A (en) * 1999-01-12 2000-11-14 Siemens Building Technologies, Inc. Method and apparatus for determining a thermal setpoint in a HVAC system
US6167389A (en) * 1996-12-23 2000-12-26 Comverge Technologies, Inc. Method and apparatus using distributed intelligence for applying real time pricing and time of use rates in wide area network including a headend and subscriber
US6178362B1 (en) * 1998-09-24 2001-01-23 Silicon Energy Corp. Energy management system and method
US6185483B1 (en) * 1998-01-27 2001-02-06 Johnson Controls, Inc. Real-time pricing controller of an energy storage medium
US6263260B1 (en) * 1996-05-21 2001-07-17 Hts High Technology Systems Ag Home and building automation system
US6301527B1 (en) * 1996-04-03 2001-10-09 General Electric Company Utilities communications architecture compliant power management control system
US6311105B1 (en) * 1998-05-29 2001-10-30 Powerweb, Inc. Multi-utility energy control system
US6327541B1 (en) * 1998-06-30 2001-12-04 Ameren Corporation Electronic energy management system
US6366889B1 (en) * 1998-05-18 2002-04-02 Joseph A. Zaloom Optimizing operational efficiency and reducing costs of major energy system at large facilities
US6388564B1 (en) * 1997-12-04 2002-05-14 Digital Security Controls Ltd. Power distribution grid communication system
US6510369B1 (en) * 1999-08-24 2003-01-21 Plug Power Inc. Residential load shedding
US6785592B1 (en) * 1999-07-16 2004-08-31 Perot Systems Corporation System and method for energy management

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US557670A (en) * 1896-04-07 Pencil sharpening
US4023043A (en) * 1974-08-16 1977-05-10 Megatherm Corporation Computerized peak-shaving system for alleviating electric utility peak loads
US5414640A (en) * 1991-07-05 1995-05-09 Johnson Service Company Method and apparatus for adaptive demand limiting electric consumption through load shedding
CA2069273A1 (en) * 1992-05-22 1993-11-23 Edward L. Ratcliffe Energy management systems
US5627760A (en) * 1995-04-17 1997-05-06 Slutsker; Ilya Method and apparatus for real time recursive parameter energy management system
US5962983A (en) * 1998-01-30 1999-10-05 Electro Plasma, Inc. Method of operation of display panel
JP3591300B2 (en) * 1998-04-24 2004-11-17 株式会社日立製作所 Power supply control device
AU6213900A (en) 1999-07-16 2001-02-05 Patrick T. Golden System and method for energy management

Patent Citations (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US25209A (en) * 1859-08-23 Iiippolytb monier
US4583090A (en) * 1981-10-16 1986-04-15 American Diversified Capital Corporation Data communication system
US4661914A (en) * 1984-06-07 1987-04-28 Magnavox Government And Industrial Electronics Company Energy management control apparatus
US4695738A (en) * 1985-09-30 1987-09-22 Daniel Wilmot Energy management system
US4855922A (en) * 1987-03-20 1989-08-08 Scientific-Atlanta, Inc. Apparatus and method for monitoring an energy management system
US4916328A (en) * 1988-12-08 1990-04-10 Honeywell Inc. Add/shed load control using anticipatory processes
US5565855A (en) * 1991-05-06 1996-10-15 U.S. Philips Corporation Building management system
US5327760A (en) * 1992-01-17 1994-07-12 Sms Schloemann-Siemag Aktiengesellschaft Roller leveller
US5544036A (en) * 1992-03-25 1996-08-06 Brown, Jr.; Robert J. Energy management and home automation system
US5576700A (en) * 1992-08-26 1996-11-19 Scientific-Atlanta Apparatus and method for controlling an electrical load and monitoring control operations and the electrical load
US5543667A (en) * 1992-12-29 1996-08-06 Honeywell Inc. Load control for partially increasing/decreasing power usage
US5462225A (en) * 1994-02-04 1995-10-31 Scientific-Atlanta, Inc. Apparatus and method for controlling distribution of electrical energy to a space conditioning load
US5640153A (en) * 1994-12-02 1997-06-17 Excel Energy Technologies, Ltd. Energy utilization controller and control system and method
US5572438A (en) * 1995-01-05 1996-11-05 Teco Energy Management Services Engery management and building automation system
US5579993A (en) * 1995-01-06 1996-12-03 Landis & Gyr Powers, Inc. HVAC distribution system identification
US5962989A (en) * 1995-01-17 1999-10-05 Negawatt Technologies Inc. Energy management control system
US5682590A (en) * 1995-02-08 1997-10-28 Sandvik Ab Coated titanium-based carbonitride
US5971597A (en) * 1995-03-29 1999-10-26 Hubbell Corporation Multifunction sensor and network sensor system
US6301527B1 (en) * 1996-04-03 2001-10-09 General Electric Company Utilities communications architecture compliant power management control system
US6263260B1 (en) * 1996-05-21 2001-07-17 Hts High Technology Systems Ag Home and building automation system
US6167389A (en) * 1996-12-23 2000-12-26 Comverge Technologies, Inc. Method and apparatus using distributed intelligence for applying real time pricing and time of use rates in wide area network including a headend and subscriber
US6047274A (en) * 1997-02-24 2000-04-04 Geophonic Networks, Inc. Bidding for energy supply
US5927598A (en) * 1997-04-23 1999-07-27 Wexl Energy management method and apparatus
US6216956B1 (en) * 1997-10-29 2001-04-17 Tocom, Inc. Environmental condition control and energy management system and method
US5924486A (en) * 1997-10-29 1999-07-20 Tecom, Inc. Environmental condition control and energy management system and method
US6095426A (en) * 1997-11-07 2000-08-01 Siemens Building Technologies Room temperature control apparatus having feedforward and feedback control and method
US6388564B1 (en) * 1997-12-04 2002-05-14 Digital Security Controls Ltd. Power distribution grid communication system
US5930773A (en) * 1997-12-17 1999-07-27 Avista Advantage, Inc. Computerized resource accounting methods and systems, computerized utility management methods and systems, multi-user utility management methods and systems, and energy-consumption-based tracking methods and systems
US6185483B1 (en) * 1998-01-27 2001-02-06 Johnson Controls, Inc. Real-time pricing controller of an energy storage medium
US6366889B1 (en) * 1998-05-18 2002-04-02 Joseph A. Zaloom Optimizing operational efficiency and reducing costs of major energy system at large facilities
US6311105B1 (en) * 1998-05-29 2001-10-30 Powerweb, Inc. Multi-utility energy control system
US6327541B1 (en) * 1998-06-30 2001-12-04 Ameren Corporation Electronic energy management system
US6178362B1 (en) * 1998-09-24 2001-01-23 Silicon Energy Corp. Energy management system and method
US6098893A (en) * 1998-10-22 2000-08-08 Honeywell Inc. Comfort control system incorporating weather forecast data and a method for operating such a system
US6145751A (en) * 1999-01-12 2000-11-14 Siemens Building Technologies, Inc. Method and apparatus for determining a thermal setpoint in a HVAC system
US6785592B1 (en) * 1999-07-16 2004-08-31 Perot Systems Corporation System and method for energy management
US6510369B1 (en) * 1999-08-24 2003-01-21 Plug Power Inc. Residential load shedding

Cited By (158)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050165565A1 (en) * 2003-09-05 2005-07-28 Carrier Corporation Compressor performance approximation using Bin Analysis data
US20070024708A1 (en) * 2005-04-05 2007-02-01 Activeye, Inc. Intelligent video for building management and automation
US7529646B2 (en) * 2005-04-05 2009-05-05 Honeywell International Inc. Intelligent video for building management and automation
US20070168050A1 (en) * 2006-01-09 2007-07-19 Chambers Gregory L Asset Performance Optimization
US20100138008A1 (en) * 2006-01-09 2010-06-03 Prenova, Inc. Asset Performance Optimization
US7659813B2 (en) 2006-01-09 2010-02-09 Prenova, Inc. Asset performance optimization
US7928839B2 (en) 2006-01-09 2011-04-19 Prenova, Inc. Power conservation via asset management of multiple remote assets
US20070191992A1 (en) * 2006-02-10 2007-08-16 Taliaferro James B Power distribution expert system
US7369921B2 (en) 2006-02-10 2008-05-06 Northrop Grumman Corporation Power distribution expert system
US9521726B2 (en) 2007-05-03 2016-12-13 Orion Energy Systems, Inc. Lighting systems and methods for displacing energy consumption using natural lighting fixtures
US8884203B2 (en) 2007-05-03 2014-11-11 Orion Energy Systems, Inc. Lighting systems and methods for displacing energy consumption using natural lighting fixtures
US8626643B2 (en) 2007-05-03 2014-01-07 Orion Energy Systems, Inc. System and method for a utility financial model
US20080275802A1 (en) * 2007-05-03 2008-11-06 Verfuerth Neal R System and method for a utility financial model
US11202355B2 (en) 2007-06-29 2021-12-14 Orion Energy Systems, Inc. Outdoor lighting fixture and camera systems
US8476565B2 (en) 2007-06-29 2013-07-02 Orion Energy Systems, Inc. Outdoor lighting fixtures control systems and methods
US20090315485A1 (en) * 2007-06-29 2009-12-24 Orion Energy Systems, Inc. Lighting fixture control systems and methods
US8779340B2 (en) 2007-06-29 2014-07-15 Orion Energy Systems, Inc. Lighting fixture control systems and methods
US8729446B2 (en) 2007-06-29 2014-05-20 Orion Energy Systems, Inc. Outdoor lighting fixtures for controlling traffic lights
US20100061088A1 (en) * 2007-06-29 2010-03-11 Orion Energy Systems, Inc. Lighting device
US11026302B2 (en) 2007-06-29 2021-06-01 Orion Energy Systems, Inc. Outdoor lighting fixtures control systems and methods
US10098213B2 (en) 2007-06-29 2018-10-09 Orion Energy Systems, Inc. Lighting fixture control systems and methods
US8586902B2 (en) 2007-06-29 2013-11-19 Orion Energy Systems, Inc. Outdoor lighting fixture and camera systems
US11432390B2 (en) 2007-06-29 2022-08-30 Orion Energy Systems, Inc. Outdoor lighting fixtures control systems and methods
US8450670B2 (en) 2007-06-29 2013-05-28 Orion Energy Systems, Inc. Lighting fixture control systems and methods
US8445826B2 (en) 2007-06-29 2013-05-21 Orion Energy Systems, Inc. Outdoor lighting systems and methods for wireless network communications
US8376600B2 (en) 2007-06-29 2013-02-19 Orion Energy Systems, Inc. Lighting device
US10187557B2 (en) 2007-06-29 2019-01-22 Orion Energy Systems, Inc. Outdoor lighting fixture and camera systems
US9146012B2 (en) 2007-06-29 2015-09-29 Orion Energy Systems, Inc. Lighting device
US10206265B2 (en) 2007-06-29 2019-02-12 Orion Energy Systems, Inc. Outdoor lighting fixtures control systems and methods
US10694605B2 (en) 2007-06-29 2020-06-23 Orion Energy Systems, Inc. Outdoor lighting fixtures control systems and methods
US8921751B2 (en) 2007-06-29 2014-12-30 Orion Energy Systems, Inc. Outdoor lighting fixtures control systems and methods
US10694594B2 (en) 2007-06-29 2020-06-23 Orion Energy Systems, Inc. Lighting fixture control systems and methods
WO2009046132A1 (en) * 2007-10-01 2009-04-09 Gridpoint, Inc. Modular electrical grid interface device
US20150058064A1 (en) * 2007-10-02 2015-02-26 Google Inc. Systems, methods and apparatus for overall load balancing by scheduled and prioritized reductions
US9523993B2 (en) 2007-10-02 2016-12-20 Google Inc. Systems, methods and apparatus for monitoring and managing device-level energy consumption in a smart-home environment
US20140371939A1 (en) * 2007-10-02 2014-12-18 Google Inc. Direct-to-consumer challenges for encouraging energy conscious behavior
US9600011B2 (en) 2007-10-02 2017-03-21 Google Inc. Intelligent temperature management based on energy usage profiles and outside weather conditions
US9500385B2 (en) * 2007-10-02 2016-11-22 Google Inc. Managing energy usage
US10698434B2 (en) 2007-10-02 2020-06-30 Google Llc Intelligent temperature management based on energy usage profiles and outside weather conditions
US9322565B2 (en) 2007-10-02 2016-04-26 Google Inc. Systems, methods and apparatus for weather-based preconditioning
US10048712B2 (en) * 2007-10-02 2018-08-14 Google Llc Systems, methods and apparatus for overall load balancing by scheduled and prioritized reductions
US20120089269A1 (en) * 2007-10-02 2012-04-12 Weaver Jason C Managing energy usage
US20090118842A1 (en) * 2007-11-06 2009-05-07 David Everton Norman Manufacturing prediction server
US20090119077A1 (en) * 2007-11-06 2009-05-07 David Everton Norman Use of simulation to generate predictions pertaining to a manufacturing facility
US20090132091A1 (en) * 2007-11-19 2009-05-21 Prenova Parameter Standardization
US20090132069A1 (en) * 2007-11-19 2009-05-21 Prenova Asset Commissioning
US8099194B2 (en) 2007-11-19 2012-01-17 Prenova, Inc. Demand control
US10423900B2 (en) 2007-11-19 2019-09-24 Engie Insight Services Inc. Parameter standardization
US8090675B2 (en) 2007-11-19 2012-01-03 Prenova, Inc. HVAC system that controls an asset via a wide area network in accordance with a business strategy using predictor and responder data points
US20090132092A1 (en) * 2007-11-19 2009-05-21 Prenova Demand Control
US20100031324A1 (en) * 2008-03-07 2010-02-04 Strich Ronald F Apparatus and method for dynamic licensing access to wireless network information
US9215780B2 (en) 2008-03-27 2015-12-15 Orion Energy Systems, Inc. System and method for reducing peak and off-peak electricity demand by monitoring, controlling and metering lighting in a facility
US10334704B2 (en) 2008-03-27 2019-06-25 Orion Energy Systems, Inc. System and method for reducing peak and off-peak electricity demand by monitoring, controlling and metering lighting in a facility
US8406937B2 (en) 2008-03-27 2013-03-26 Orion Energy Systems, Inc. System and method for reducing peak and off-peak electricity demand by monitoring, controlling and metering high intensity fluorescent lighting in a facility
US20090248217A1 (en) * 2008-03-27 2009-10-01 Orion Energy Systems, Inc. System and method for reducing peak and off-peak electricity demand by monitoring, controlling and metering high intensity fluorescent lighting in a facility
US9504133B2 (en) 2008-03-27 2016-11-22 Orion Energy Systems, Inc. System and method for controlling lighting
US9351381B2 (en) 2008-03-27 2016-05-24 Orion Energy Systems, Inc. System and method for controlling lighting
US20090243517A1 (en) * 2008-03-27 2009-10-01 Orion Energy Systems, Inc. System and method for controlling lighting
US8666559B2 (en) 2008-03-27 2014-03-04 Orion Energy Systems, Inc. System and method for reducing peak and off-peak electricity demand by monitoring, controlling and metering high intensity fluorescent lighting in a facility
US8344665B2 (en) 2008-03-27 2013-01-01 Orion Energy Systems, Inc. System and method for controlling lighting
US9329212B2 (en) 2008-09-08 2016-05-03 Tendril Networks, Inc. Collaborative energy benchmarking systems and methods
US20100070101A1 (en) * 2008-09-08 2010-03-18 Tendril Networks, Inc. Consumer directed energy management systems and methods
US20100070102A1 (en) * 2008-09-08 2010-03-18 Tendril Networks, Inc. Collaborative energy benchmarking systems and methods
US10911256B2 (en) 2008-09-08 2021-02-02 Tendril Ea, Llc Consumer directed energy management systems and methods
US8977404B2 (en) 2008-09-08 2015-03-10 Tendril Networks, Inc. Collaborative energy benchmarking systems and methods
US9722813B2 (en) 2008-09-08 2017-08-01 Tendril Networks, Inc. Consumer directed energy management systems and methods
US11409315B2 (en) 2008-09-30 2022-08-09 Google Llc Systems, methods and apparatus for encouraging energy conscious behavior based on aggregated third party energy consumption
US9507363B2 (en) 2008-09-30 2016-11-29 Google Inc. Systems, methods and apparatus for encouraging energy conscious behavior based on aggregated third party energy consumption
US9507362B2 (en) 2008-09-30 2016-11-29 Google Inc. Systems, methods and apparatus for encouraging energy conscious behavior based on aggregated third party energy consumption
US10108217B2 (en) 2008-09-30 2018-10-23 Google Llc Systems, methods and apparatus for encouraging energy conscious behavior based on aggregated third party energy consumption
US10565532B2 (en) 2008-10-28 2020-02-18 Honeywell International Inc. Building management system site categories
US20110083077A1 (en) * 2008-10-28 2011-04-07 Honeywell International Inc. Site controller discovery and import system
US8719385B2 (en) 2008-10-28 2014-05-06 Honeywell International Inc. Site controller discovery and import system
US9852387B2 (en) 2008-10-28 2017-12-26 Honeywell International Inc. Building management system site categories
US20100106543A1 (en) * 2008-10-28 2010-04-29 Honeywell International Inc. Building management configuration system
US20110093493A1 (en) * 2008-10-28 2011-04-21 Honeywell International Inc. Building management system site categories
US20100131653A1 (en) * 2008-11-21 2010-05-27 Honeywell International, Inc. Building control system user interface with pinned display feature
US8572502B2 (en) 2008-11-21 2013-10-29 Honeywell International Inc. Building control system user interface with docking feature
US9471202B2 (en) 2008-11-21 2016-10-18 Honeywell International Inc. Building control system user interface with pinned display feature
US20100131877A1 (en) * 2008-11-21 2010-05-27 Honeywell International, Inc. Building control system user interface with docking feature
US20100274366A1 (en) * 2009-04-15 2010-10-28 DiMi, Inc. Monitoring and control systems and methods
US8781633B2 (en) 2009-04-15 2014-07-15 Roberto Fata Monitoring and control systems and methods
US20100305998A1 (en) * 2009-04-27 2010-12-02 Empowered Solutions, Inc Evaluating Energy Saving Improvements
US20110010654A1 (en) * 2009-05-11 2011-01-13 Honeywell International Inc. High volume alarm managment system
US8224763B2 (en) 2009-05-11 2012-07-17 Honeywell International Inc. Signal management system for building systems
US8554714B2 (en) 2009-05-11 2013-10-08 Honeywell International Inc. High volume alarm management system
US20110022242A1 (en) * 2009-06-08 2011-01-27 GroundedPower, Inc. Methods and systems for managing energy usage in buildings
US9026261B2 (en) * 2009-06-08 2015-05-05 Tendril Networks, Inc. Methods and systems for managing energy usage in buildings
US20160004290A1 (en) * 2009-06-08 2016-01-07 Tendril Networks, Inc. Methods and systems for managing energy usage in buildings
US20110060701A1 (en) * 2009-09-04 2011-03-10 Orion Energy Systems, Inc. Outdoor fluorescent lighting fixtures and related systems and methods
US8866582B2 (en) 2009-09-04 2014-10-21 Orion Energy Systems, Inc. Outdoor fluorescent lighting fixtures and related systems and methods
US9951933B2 (en) 2009-09-04 2018-04-24 Orion Energy Systems, Inc. Outdoor lighting fixtures and related systems and methods
US8063787B2 (en) 2009-12-16 2011-11-22 Parker Kevin L Point-of-use status indicator
US20110140901A1 (en) * 2009-12-16 2011-06-16 Schneider Electric USA, Inc. Point-of-use status indicator
US8352047B2 (en) 2009-12-21 2013-01-08 Honeywell International Inc. Approaches for shifting a schedule
US20110231320A1 (en) * 2009-12-22 2011-09-22 Irving Gary W Energy management systems and methods
US20110196539A1 (en) * 2010-02-10 2011-08-11 Honeywell International Inc. Multi-site controller batch update system
US20110208337A1 (en) * 2010-02-19 2011-08-25 David Everton Norman Prediction and scheduling server
US8623672B2 (en) 2010-02-19 2014-01-07 Applied Materials, Inc. Prediction and scheduling server
US8640098B2 (en) 2010-03-11 2014-01-28 Honeywell International Inc. Offline configuration and download approach
US20110225580A1 (en) * 2010-03-11 2011-09-15 Honeywell International Inc. Offline configuration and download approach
US8890675B2 (en) 2010-06-02 2014-11-18 Honeywell International Inc. Site and alarm prioritization system
US8648706B2 (en) 2010-06-24 2014-02-11 Honeywell International Inc. Alarm management system having an escalation strategy
US8676394B2 (en) * 2010-06-30 2014-03-18 Siemens Aktiengesellschaft Integrated demand response for energy utilization
US20120004783A1 (en) * 2010-06-30 2012-01-05 Siemens Corporation Integrated Demand Response For Energy Utilization
US8819562B2 (en) 2010-09-30 2014-08-26 Honeywell International Inc. Quick connect and disconnect, base line configuration, and style configurator
US8850347B2 (en) 2010-09-30 2014-09-30 Honeywell International Inc. User interface list control system
US8370283B2 (en) 2010-12-15 2013-02-05 Scienergy, Inc. Predicting energy consumption
US9213539B2 (en) 2010-12-23 2015-12-15 Honeywell International Inc. System having a building control device with on-demand outside server functionality
US10613491B2 (en) 2010-12-23 2020-04-07 Honeywell International Inc. System having a building control device with on-demand outside server functionality
US10474114B2 (en) * 2011-02-25 2019-11-12 eCurv, Inc. Queuing access to a shared power supply
US8798802B2 (en) 2011-02-25 2014-08-05 eCurv, Inc. Queuing access to a shared power supply
US8219258B1 (en) 2011-02-25 2012-07-10 eCurv, Inc. Queuing access to a shared power supply
US20140350744A1 (en) * 2011-02-25 2014-11-27 eCurv, Inc. Queuing access to a shared power supply
US9594363B2 (en) * 2011-02-25 2017-03-14 eCurv, Inc. Queuing access to a shared power supply
US9996060B2 (en) 2011-04-04 2018-06-12 Philips Lighting Holding B.V. Controlling device and method for controlling power consumption in a system of power consuming devices
WO2012137097A1 (en) * 2011-04-04 2012-10-11 Koninklijke Philips Electronics N.V. Controlling device and method for controlling power consumption in a system of power consuming devices
US20120310431A1 (en) * 2011-05-31 2012-12-06 General Electric Company System and method for selecting consumers for demand response
US10110002B2 (en) 2011-06-17 2018-10-23 Siemens Industry, Inc. Automated demand response system
US20120323393A1 (en) * 2011-06-17 2012-12-20 Raphael Imhof Automated demand response system
US9310786B2 (en) * 2011-06-17 2016-04-12 Siemens Industry, Inc. Automated demand response scheduling to reduce electrical loads
CN102354976A (en) * 2011-10-20 2012-02-15 湖南省电力公司科学研究院 Rapid network topology analysis method
US10915131B2 (en) 2012-01-13 2021-02-09 Shoppertrak Rct Corporation System and method for managing energy
US10268223B2 (en) 2012-01-13 2019-04-23 Shoppertrak Rct Corporation System and method for managing energy
US9217994B2 (en) 2012-01-13 2015-12-22 Shoppertrak Rct Corporation System and method for managing energy
WO2013106576A1 (en) * 2012-01-13 2013-07-18 Shoppertrak Rct Corporation System and method for managing energy
US9223839B2 (en) 2012-02-22 2015-12-29 Honeywell International Inc. Supervisor history view wizard
US11385664B2 (en) 2012-08-01 2022-07-12 Tendril Oe, Llc Methods and apparatus for achieving energy consumption goals through model-based simulations
US11782465B2 (en) 2012-08-01 2023-10-10 Tendril Oe, Llc Optimization of energy use through model-based simulations
US10678279B2 (en) 2012-08-01 2020-06-09 Tendril Oe, Llc Optimization of energy use through model-based simulations
US10289086B2 (en) 2012-10-22 2019-05-14 Honeywell International Inc. Supervisor user management system
US9529349B2 (en) 2012-10-22 2016-12-27 Honeywell International Inc. Supervisor user management system
US11720075B2 (en) 2013-02-06 2023-08-08 Tendril Ea, Llc Dynamically adaptive personalized smart energy profiles
US9423779B2 (en) 2013-02-06 2016-08-23 Tendril Networks, Inc. Dynamically adaptive personalized smart energy profiles
US11327457B2 (en) 2013-02-06 2022-05-10 Tendril Ea, Llc Dynamically adaptive personalized smart energy profiles
US9576472B2 (en) 2013-02-06 2017-02-21 Tendril Networks, Inc. Real-time monitoring and dissemination of energy consumption and production data
US10782666B2 (en) 2013-02-06 2020-09-22 Tendril Ea, Llc Dynamically adaptive personalized smart energy profiles
US10379508B2 (en) 2013-02-12 2019-08-13 Tendril Networks, Inc. Setpoint adjustment-based duty cycling
US11042141B2 (en) 2013-02-12 2021-06-22 Uplight, Inc. Setpoint adjustment-based duty cycling
US9310815B2 (en) 2013-02-12 2016-04-12 Tendril Networks, Inc. Setpoint adjustment-based duty cycling
US11892182B2 (en) 2013-02-12 2024-02-06 Uplight, Inc. Setpoint adjustment-based duty cycling
US20140277763A1 (en) * 2013-03-14 2014-09-18 Sundeep Ramachandran System for Controlling Building Services Based on Occupant
US10782032B2 (en) 2013-03-15 2020-09-22 Pacecontrols, Llc Controller for automatic control of duty cycled HVACR equipment, and systems and methods using same
US9971977B2 (en) 2013-10-21 2018-05-15 Honeywell International Inc. Opus enterprise report system
US11889239B2 (en) 2014-06-03 2024-01-30 Applied Minds, Llc Color night vision cameras, systems, and methods thereof
US9933762B2 (en) 2014-07-09 2018-04-03 Honeywell International Inc. Multisite version and upgrade management system
US10338550B2 (en) 2014-07-09 2019-07-02 Honeywell International Inc. Multisite version and upgrade management system
US10739027B2 (en) 2015-06-24 2020-08-11 Emerson Electric Co. HVAC performance and energy usage monitoring and reporting system
WO2016210091A1 (en) * 2015-06-24 2016-12-29 Emerson Electric Co. Hvac performance and energy usage monitoring and reporting system
CN107924542A (en) * 2015-06-24 2018-04-17 艾默生电气公司 HVAC performances and energy use monitoring and reporting system
US10362104B2 (en) 2015-09-23 2019-07-23 Honeywell International Inc. Data manager
US10209689B2 (en) 2015-09-23 2019-02-19 Honeywell International Inc. Supervisor history service import manager
US10951696B2 (en) 2015-09-23 2021-03-16 Honeywell International Inc. Data manager
US11709465B2 (en) 2016-04-01 2023-07-25 Tendril Oe, Llc Orchestrated energy
US10866568B2 (en) 2016-04-01 2020-12-15 Tendril Oe, Llc Orchestrated energy
US20180163991A1 (en) * 2016-12-13 2018-06-14 Haier Us Appliance Solutions, Inc. Water Heater Appliance
US11802707B2 (en) 2019-07-24 2023-10-31 Uplight, Inc. Adaptive thermal comfort learning for optimized HVAC control
US11149975B2 (en) 2019-07-24 2021-10-19 Uplight, Inc. Adaptive thermal comfort learning for optimized HVAC control

Also Published As

Publication number Publication date
US20050043862A1 (en) 2005-02-24
US8078330B2 (en) 2011-12-13
WO2003090038A2 (en) 2003-10-30
US20030171851A1 (en) 2003-09-11
CN1692317A (en) 2005-11-02
AU2003253581A8 (en) 2003-11-03
CA2478667C (en) 2013-08-27
WO2003090038A3 (en) 2005-07-14
WO2003090038A9 (en) 2004-02-12
CA2478667A1 (en) 2003-10-30
US20070255461A1 (en) 2007-11-01
US20080177423A1 (en) 2008-07-24
MXPA04008754A (en) 2005-09-20
AU2003253581A1 (en) 2003-11-03

Similar Documents

Publication Publication Date Title
US8078330B2 (en) Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
US11900287B2 (en) Model predictive maintenance system with budgetary constraints
US11163271B2 (en) Cloud based building energy optimization system with a dynamically trained load prediction model
US20200356087A1 (en) Model predictive maintenance system with event or condition based performance
US20200293031A1 (en) Central plant control system with plug and play empc
US20200076196A1 (en) Building energy optimization system with a dynamically trained load prediction model
US20190219293A1 (en) Control system for central energy facility with distributed energy storage
Firestone et al. Energy manager design for microgrids
JP4363244B2 (en) Energy management equipment
US11445024B2 (en) Building control system with smart edge devices having embedded model predictive control
US20060065750A1 (en) Measurement, scheduling and reporting system for energy consuming equipment
WO2018136672A1 (en) Method of optimizing market supply and demand dynamics for energy distribution and consumption
US20220365495A1 (en) Building control system with features for operating under intermittent connectivity to a cloud computation system
US11663541B2 (en) Building energy system with load-following-block resource allocation
US20210173366A1 (en) Systems and methods for maintaining occupant comfort for various environmental conditions
WO2003023675A2 (en) Method and system to calculate a demand for energy
Potter et al. Demand response advanced controls framework and assessment of enabling technology costs
US20200193345A1 (en) Cost optimization of a central energy facility with load-following-block rate structure
US11144020B2 (en) Central plant control system with geometric modeling of operational sequences
Vedullapalli et al. Effect of forecaster performance on peak shaving in a university building by battery scheduling
Julin Demand response in commercial buildings
EP3671609A1 (en) Cost optimization of a central energy facility with block-and-index and load-following-block rate structure
Erten et al. Forecasting Electricity Consumption for Accurate Energy Management in Commercial Buildings With Deep Learning Models to Facilitate Demand Response Programs
Potter et al. Demand Response Advanced Controls Framework and Assessment of Enabling Technology
Abdulaal Optimizing Industrial Consumer Demand Response Through DIsaggregation, Hour-Ahead Pricing, and Momentary Autonomous Control

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

AS Assignment

Owner name: INTERCAP CAPITAL PARTNERS, LLC, FLORIDA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WEBGEN SYSTEMS, INC.;REEL/FRAME:022275/0857

Effective date: 20090213