US20030009274A1 - Method of determining maximum service brake reduction - Google Patents

Method of determining maximum service brake reduction Download PDF

Info

Publication number
US20030009274A1
US20030009274A1 US09/877,020 US87702001A US2003009274A1 US 20030009274 A1 US20030009274 A1 US 20030009274A1 US 87702001 A US87702001 A US 87702001A US 2003009274 A1 US2003009274 A1 US 2003009274A1
Authority
US
United States
Prior art keywords
brake pipe
brake
reduction
pipe reduction
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/877,020
Other versions
US6487488B1 (en
Inventor
Edmund Peterson
Michael Hawthorne
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New York Air Brake LLC
Original Assignee
New York Air Brake LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New York Air Brake LLC filed Critical New York Air Brake LLC
Priority to US09/877,020 priority Critical patent/US6487488B1/en
Assigned to NEW YORK AIR BRAKE CORPORATION reassignment NEW YORK AIR BRAKE CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: PETERSON, EDMUND R., JR., HAWTHORNE, MICHAEL J.
Application granted granted Critical
Publication of US6487488B1 publication Critical patent/US6487488B1/en
Publication of US20030009274A1 publication Critical patent/US20030009274A1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T17/00Component parts, details, or accessories of power brake systems not covered by groups B60T8/00, B60T13/00 or B60T15/00, or presenting other characteristic features
    • B60T17/18Safety devices; Monitoring
    • B60T17/22Devices for monitoring or checking brake systems; Signal devices
    • B60T17/228Devices for monitoring or checking brake systems; Signal devices for railway vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T13/00Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems
    • B60T13/10Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems with fluid assistance, drive, or release
    • B60T13/66Electrical control in fluid-pressure brake systems
    • B60T13/665Electrical control in fluid-pressure brake systems the systems being specially adapted for transferring two or more command signals, e.g. railway systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T15/00Construction arrangement, or operation of valves incorporated in power brake systems and not covered by groups B60T11/00 or B60T13/00
    • B60T15/02Application and release valves
    • B60T15/18Triple or other relay valves which allow step-wise application or release and which are actuated by brake-pipe pressure variation to connect brake cylinders or equivalent to compressed air or vacuum source or atmosphere
    • B60T15/20Triple or other relay valves which allow step-wise application or release and which are actuated by brake-pipe pressure variation to connect brake cylinders or equivalent to compressed air or vacuum source or atmosphere controlled by two fluid pressures
    • B60T15/22Triple or other relay valves which allow step-wise application or release and which are actuated by brake-pipe pressure variation to connect brake cylinders or equivalent to compressed air or vacuum source or atmosphere controlled by two fluid pressures with one or more auxiliary valves, for braking, releasing, filling reservoirs

Definitions

  • the present invention relates generally to locomotive display and more specifically to a method of determining maximum service brake reduction and its use with, for example, a Locomotive Engineers Assist Display and Event Recorder (LEADER) system.
  • LEADER Locomotive Engineers Assist Display and Event Recorder
  • the LEADER System as described in U.S. Pat. No. 6,144,901, is a real-time, enhanced version of the Train Dynamics Analyzer (TDA), a long standing Locomotive Engineer training tool offered by the Train Dynamics Services Group of New York Air Brake.
  • TDA Train Dynamics Analyzer
  • the LEADER system has the ability to display a real-time or “live” representation of a train on the current track, the trackage ahead, the dynamic interaction of the cars and locomotives (both head end and remote), and the current state of the pneumatic brake system.
  • the LEADER system will allow insight into the effect of throttle changes and brake applications throughout the train providing feedback and information to the Locomotive Engineer not currently available.
  • the information the LEADER system offers provides an opportunity for both safer and more efficient train handling leading to enormous potential economic benefits.
  • the LEADER System has all the necessary information to predict the future state of the train given a range of future command changes (what if scenarios). With this ability, LEADER can assist the railroads in identifying and implementing a desired operating goal; minimize time to destination, maximize fuel efficiency, minimize in train forces, (etc.) or a weighted combination thereof. LEADER will perform calculations based on the operational goal and the current state of the train to make recommendations to the Locomotive Crew on what operating changes will best achieve these goals.
  • the TDA functionality was enhanced to assist in training Locomotive Engineer how to better handle their trains. Designs of simulators with math models are shown in U.S. Pat. Nos. 4,041,283; 4,827,438 and 4,853,883. Further capability was added to investigate accidents by playing the event recorder data through the TDA, monitoring critical physical parameters. Through the years data was collected from instrumented trains and laboratory experiments, allowing the models used by the TDA to be refined. On board data collection for off-loading is shown in U.S. Pat. Nos. 4,561,057 and 4,794,548.
  • brake pipe pressure reduction below the equalization pressure are known as an “over-reduction.” This has the effect of wasting compressed air in the brake pipe increasing the time required to recharge the train brake system and release the brakes by the recharging.
  • the brake pipe pressure that exists at each car may vary significantly with time and car location. It may take a very few minutes to charge the first car in a train to regulation level. It may take up to an hour or longer to charge the last car.
  • the present invention provides a method of determining the maximum brake pipe reduction including the steps of determining the status of the brake system throughout the train. The next step is determining, using the status of the brake system, maximum brake pipe reduction above which further reduction will not result in further brake application in the train.
  • the determined maximum brake pipe reduction may be displayed or used to control the brake pipe.
  • the status of the brake system throughout the train is determined by determining equalization pressure of the brake system in each car. This may be by a mathematical models or actual measurements.
  • the equalization pressures are a function of pressures and volumes of the reservoir and brake cylinder of the individual cars.
  • the process can also include determining the minimum determined car equalization pressure throughout the train and determining the maximum brake reduction using the minimum determined car equalization pressure. If the minimum car equalization pressure for the train is greater than a first pressure value, the minimum equalization pressure is used to determine the maximum brake pipe reduction. If the minimum car equalization pressure is less than the first pressure value, the first pressure value is used in determining the maximum brake pipe reduction.
  • the first pressure value is generally set to a minimum pressure required for an emergency operation of the brake system. Preferably the method is repeated after each brake pipe pressure increase. Recalculation is necessary because it changes the original dynamics and calculation of equalization pressure for each car.
  • FIG. 1 is a block diagram of the system components of a locomotive assist display and event recorder system according to the principles of the present invention.
  • FIGS. 2A and 2B are a LEADER display incorporating the principles of the present invention.
  • FIG. 3 is a flow chart of a first embodiment of a method for determining maximum service brake reduction according to the principles of the present invention.
  • FIG. 4 is a flow chart of a second embodiment of a method for determining maximum service brake reduction with enforcement according to the principles of the present invention.
  • Math models of the LEADER System monitors parameters and performs calculations based on the current energy state of the train to create a real-time display of train dynamics.
  • the power of LEADER resides in its ability to provide information allowing the crew to better control the train, minimizing loss of energy. Loss of energy via over-braking represents fuel unnecessarily consumed. Energy imparted to the cargo of the train represents potential damage to lading, equipment and rail. Both phenomena are undesirable and addressable with LEADER.
  • the LEADER system is comprised of a number of subsystems each with specific duties.
  • FIG. 1 shows a generic LEADER architecture.
  • the user interface of the LEADER System is the real-time display which shows a graphical and numerical representation of the current state of the train as shown in FIGS. 2A and 2B.
  • Radio communication is established between the lead locomotive, the trailing locomotives in the lead consist, and locomotives in the remote consist to report the necessary parameters from each of these locomotives necessary to perform LEADER Calculations.
  • Consist information is entered via the key pad on the real-time display, a wired communication source (laptop PC or removable storage device) or via wayside radio communication.
  • Position is determined from wheel movement sensors and a Global Positioning System (GPS).
  • GPS Global Positioning System
  • the Input/Output (I/O) Concentrator gathers all of the various locomotive parameters necessary for LEADER algorithm calculations and reports the information to the LEADER Computer.
  • the LEADER Processor a high throughput capacity computer platform using a Real Time Operating System (RTOS), then performs the calculations required by the LEADER algorithms and the real-time display is updated. All of these sub-systems combine to form the LEADER System.
  • RTOS Real Time Operating System
  • Each locomotive in a LEADER train will require at a minimum, the I/O Concentrator with communication capability to the head end.
  • a LEADER Processor and Display are only required for the lead locomotive.
  • the decision to equip all locomotives with a full LEADER installation should be based on the Railroads ability to permanently designate a locomotive as lead or trail in its duties.
  • FIGS. 2A and 2B show a “static” LEADER display.
  • Each LEADER feature is identified by a block which points to the appropriate screen location.
  • the sections following use the same paragraph number as the identification block detail the operation of each feature.
  • the LEADER Display shown in FIGS. 2A and 2B represents one particular configuration for the display of LEADER information.
  • the display format can be customized on customer request by adding information, removing information, changing the color scheme, rearranging the position of the sections of information, and/or varying the size of any particular graphic.
  • the top portion of the LEADER Display shows the track profile in three views.
  • the train consist is represented with different colored blocks for the locomotive units and for the cars.
  • the length of the displayed train is proportional to the length of the actual train.
  • Milepost marks are represented by lines running vertically through the track profile portion of the display.
  • the horizontal view of the track profile shows the grade on which the train is currently positioned and the grade of the track profile for a number of miles ahead.
  • the horizontal view of the track profile will show the position of the entire train on the track, both current location and geographic shape (uphill or downhill) as a vertical slice of the track profile in real-time.
  • the top graphic of the track profile section is made up of blocks that represent track curvature.
  • a block above the dividing line represents a curve to the right, a block below the dividing line represents a curve to the left. The longer the block the longer the curve. The higher the block the more severe the curve.
  • the overhead view incorporates symbols to represent track structures such as crossings, signals, overpasses, underpasses, and sidings.
  • the draft/buff force graphic represents draft forces as a function above the 0 kilo-pound line and buff forces as a function below the 0 kilo-pound line.
  • Draft and buff forces can be divided into two categories, steady state and transient. Steady state forces are shown, in general, by a smooth, relatively slow changing function. Transient draft and buff forces (run-in/run-out or slack induced forces) are shown by “spikes” of force that travel through the train.
  • the LEADER system accurately calculates and displays both. Slack induced forces represent momentum transfers between the cars resulting in potential lading and car damage.
  • the lower right and lower center sections of the screen have real time trajectory and status information displayed in digital format.
  • Location is a digital representation of mile marker location of the head end locomotive.
  • Grade is the grade of the track at the location of the head end locomotive.
  • Curve is the degree of curvature of the track at the location of the head end locomotive.
  • Acceleration is shown as a digital read out representing the acceleration of the head end locomotive at each instant in time.
  • Fuel is the amount of fuel consumed since the counter was last reset.
  • 2.7.6 Time is the digital read out of the current time.
  • Pneumatic Brake Reduction is shown as an analog bar graph representing the brake pipe pressure reduction at the head end locomotive at each instant in time.
  • the LEADER display is equipped with eight function keys at the bottom of the display.
  • the definition of each function key is shown in the representation of the key on the LCD panel directly above it.
  • the function keys allow user input to the system, accessing various setup and configuration menus and querying information from the LEADER system.
  • the LEADER system is capable of three operating modes, each building on the previous mode.
  • the three modes advance the LEADER system from a real time display passively providing information to the locomotive engineer (information only mode) to a LEADER system that will make suggestions to the locomotive engineer on how to better handle the train (driver assist mode) and finally to a control system that is capable of issuing commands to optimally control the locomotive (cruse control mode).
  • the locomotive engineer makes all of the decisions and solely activates the various control systems in a manual mode.
  • the LEADER system provides information to the engineer that is not currently available to him/her to use to manage various locomotive control systems.
  • driver assist mode the LEADER system determines and displays the optimum locomotive power dynamic brake throttle setting and the locomotive and car brake control settings. These settings are determined for the head end locomotives and the remotely controlled locomotives. These recommendations are desired settings displayed to the locomotive engineer who can then elect to manually move the various controls to achieve these settings.
  • LEADER derived settings are used to automatically control the locomotive power and braking systems, the train brake system of each car and ancillary systems which effect train movement.
  • the locomotive engineer serves as an operational supervisor with the ability to manually override the cruise control. Cruise control can also be produced by communication links between the LEADER and the railroad central traffic control center.
  • the LEADER system provides a maximum brake reduction using, for example, the flow charts of FIG. 3 or 4 .
  • the state of the brake system throughout the train is determined from the LEADER algorithms at 10 .
  • LEADER inputs are collected. For example, it measures the locomotive brake control settings or determined brake requirement, the brake pipe pressures and the time.
  • the brake pipe pressures may be measured at each locomotive and the end-of-train device or any other sensor or smart node throughout the train. Any additional measurement is used to increase the accuracy of the math model for the pressure in the train brake system.
  • the data base of the train make up including car weights and lengths, brake equipment definition and coupler types etc. is also used.
  • the status of the brake pipe system throughout the train is determined on a vehicle by vehicle basis using brake simulation models by themselves or in combination with multiple measurements throughout the train. Depending upon the intelligence levels of the individual cars, more information can be collected to increase the accuracy of the simulation models.
  • the equalization pressure is the pressure at which the brake cylinder and the reservoir pressure, which applies air to the brake cylinder, for example, auxiliary reservoir pressure, have equalized.
  • the maximum brake pipe reduction Rmax is determined at 14 or 16 .
  • a locomotive engineer controls the extent of brake application by reducing the brake (brake pipe reduction) pipe pressure that causes the auxiliary pressure at each freight car to correspondingly reduce to the same approximate level.
  • the auxiliary pressure is reduced through a flow of air to the brake cylinder.
  • the locomotive engineer controls the pressure level that a train is charged to.
  • the brake pipe regulation pressure typically ranges from 70 psi to 110 psi.
  • the difference between the regulation pressure that the train is charged to and the brake pipe pressure that the brake pipe is reduced to, during a brake application, is the amount of brake pipe reduction.
  • the amount of reduction is calculated as follows:
  • Brake pipe pressure reductions R lower than equalization pressure Peq is an “over reduction”, and has the effect of wasting compressed air and increasing the time required to release and recharge the train brake system.
  • the maximum reduction that should be made can be computed as follows:
  • Freight trains have an emergency application, braking mode which guarantees that the train can be stopped as quickly as possible. This emergency feature will not reliably operate at brake pipe pressures below 35 to 45 psi.
  • the maximum brake reduction should thus be computed as:
  • the brake pipe pressure that exists at each car may vary significantly with time and car location. It may take a very few minutes to charge the first car in a train to regulation level but may take up to an hour or longer to charge the last car.
  • FIG. 4 illustrates a flow chart for enforcement of the maximum brake pipe reduction. It can also be used for cruise or automatic control.
  • the LEADER system monitors locomotive brake commands at 20 . If there is a brake command at 22 , then the LEADER system calculates brake system status, vehicle by vehicle as illustrated in 24 . If there is no brake command, it cycles back to monitoring locomotive commands at 20 . Next there is analysis of each vehicles equalization pressure Peq and a determination of the minimum equalization pressure through the train Peq(min).
  • the maximum brake pipe reduction Rmax is equal to the difference of the brake pipe regulation pressure Pr and the minimum equalization pressure Peq(min) at 32 . If the minimum equalization pressure Peq(min) is equal to or less than the Pbmin at 28 , then the maximum reduction pressure Rmax is the regulation pressure Pr less the lowest brake pipe pressure for emergency to operate Pbmin.
  • the requested brake command is less than the maximum reduction Rmax at 34 . If it is, the requested brake command is executed and the LEADER display is updated at 36 . If the requested brake command is not less than the maximum brake pipe reduction Rmax at 34 , the operator is alerted to the requested over reduction at 38 . This may be an audio or visual indication. After the alert, it is determined at 42 whether the operator took appropriate action based on the railroad rules and over reduction at 40 . If the appropriate action is taken, the appropriate brake reduction is executed and the LEADER display is updated at 36 . If not, the system automatically adjusts the brake pipe command to prevent over reduction at 44 and this adjusted brake command is executed and the displays updated at 36 .
  • the present method has been carried out wherein the minimum equalization pressure throughout the brake system or the car having the minimum equalization pressure is used since this provides additional breaking even though it may be one car.
  • the railroad may set other rules for determining the minimum equalization pressure throughout the train in determining the maximum reduction.

Abstract

A method of and a system for determining a maximum brake pipe service reduction in the brake system of a train having a pneumatic brake on each car connected to a brake pipe which is controlled by a brake pipe controller. The method includes determining the status of the brake system throughout the train and determining a maximum brake pipe reduction for the brake pipe controller, using the status of the brake system, above which further reduction will not result in further brake application in the train. The determined maximum brake pipe reduction is displayed by itself or in combination with the brake pipe reduction produced by the brake pipe controller and/or used for automatic control

Description

    BACKGROUND AND SUMMARY OF THE INVENTION
  • The present invention relates generally to locomotive display and more specifically to a method of determining maximum service brake reduction and its use with, for example, a Locomotive Engineers Assist Display and Event Recorder (LEADER) system. [0001]
  • The LEADER System, as described in U.S. Pat. No. 6,144,901, is a real-time, enhanced version of the Train Dynamics Analyzer (TDA), a long standing Locomotive Engineer training tool offered by the Train Dynamics Services Group of New York Air Brake. The LEADER system has the ability to display a real-time or “live” representation of a train on the current track, the trackage ahead, the dynamic interaction of the cars and locomotives (both head end and remote), and the current state of the pneumatic brake system. As a tool for the Locomotive Engineer, the LEADER system will allow insight into the effect of throttle changes and brake applications throughout the train providing feedback and information to the Locomotive Engineer not currently available. The information the LEADER system offers provides an opportunity for both safer and more efficient train handling leading to enormous potential economic benefits. [0002]
  • The LEADER System has all the necessary information to predict the future state of the train given a range of future command changes (what if scenarios). With this ability, LEADER can assist the railroads in identifying and implementing a desired operating goal; minimize time to destination, maximize fuel efficiency, minimize in train forces, (etc.) or a weighted combination thereof. LEADER will perform calculations based on the operational goal and the current state of the train to make recommendations to the Locomotive Crew on what operating changes will best achieve these goals. [0003]
  • The TDA functionality was enhanced to assist in training Locomotive Engineer how to better handle their trains. Designs of simulators with math models are shown in U.S. Pat. Nos. 4,041,283; 4,827,438 and 4,853,883. Further capability was added to investigate accidents by playing the event recorder data through the TDA, monitoring critical physical parameters. Through the years data was collected from instrumented trains and laboratory experiments, allowing the models used by the TDA to be refined. On board data collection for off-loading is shown in U.S. Pat. Nos. 4,561,057 and 4,794,548. [0004]
  • As more Locomotive Engineers became familiar with the TDA display through training sessions, it became apparent that a real time version of the TDA in the cab of a locomotive would offer substantial benefits in improved train handling. Improved train handling would in turn foster safety and economic benefits. Technological limitations prevented the realization of LEADER for a number of years, but modern levels of computer processing power, decreased size of electronics, increase communication capability and increase size and readability of flat panel color displays has made the LEADER system a reality. Earlier designs for on board computer controllers is shown in U.S. Pat. No. 4,042,810 with a description of math models. The LEADER system provides safe and effective control of a train through display or control of the dynamically changing parameters. [0005]
  • The conventional air brakes and air brake systems in conventional freight trains, pneumatic storage reservoir on each freight car, called an auxiliary reservoir is charged by the brake pipe extending throughout the train. The compressor on the locomotive charges the brake pipe through a pressure regulating system. A brake application is achieved, following the charging action, by reducing the pressure in the brake pipe below the level of charge. When the brake pipe pressure is sufficiently reduced, the control valve on each car supplies air from the auxiliary reservoir to the car's brake cylinder. The amount of air supplied is a function of the brake pipe reduction. During an application, if the reduced pressure in the reservoir becomes equal to the increased pressure in the brake cylinder, no further air flow will occur. The pressure is thus equalized and is referred to as equalization pressure. If brake pipe pressure is reduced below the equalization pressure for that individual car, no further brake cylinder pressure is achieved. Brake pipe pressure reduction below the equalization pressure are known as an “over-reduction.” This has the effect of wasting compressed air in the brake pipe increasing the time required to recharge the train brake system and release the brakes by the recharging. In actual freight operations, the brake pipe pressure that exists at each car may vary significantly with time and car location. It may take a very few minutes to charge the first car in a train to regulation level. It may take up to an hour or longer to charge the last car. [0006]
  • It is impossible for a locomotive engineer to calculate and keep track of the maximum reduction that can be made during brake applications. Thus the engineer can easily produce an over reduction wasting compressed air and increased time required to release and recharge the train brake system. This can result in a dangerous situation as often times a quick release and then recovery of the brake application is required to properly control the train. Thus there is a need for a system to inform the engineer when all cars have come to their equalization pressure and will achieve no additional braking for a further reduction of the brake pipe. [0007]
  • The present invention provides a method of determining the maximum brake pipe reduction including the steps of determining the status of the brake system throughout the train. The next step is determining, using the status of the brake system, maximum brake pipe reduction above which further reduction will not result in further brake application in the train. The determined maximum brake pipe reduction may be displayed or used to control the brake pipe. The status of the brake system throughout the train is determined by determining equalization pressure of the brake system in each car. This may be by a mathematical models or actual measurements. The equalization pressures are a function of pressures and volumes of the reservoir and brake cylinder of the individual cars. [0008]
  • The process can also include determining the minimum determined car equalization pressure throughout the train and determining the maximum brake reduction using the minimum determined car equalization pressure. If the minimum car equalization pressure for the train is greater than a first pressure value, the minimum equalization pressure is used to determine the maximum brake pipe reduction. If the minimum car equalization pressure is less than the first pressure value, the first pressure value is used in determining the maximum brake pipe reduction. The first pressure value is generally set to a minimum pressure required for an emergency operation of the brake system. Preferably the method is repeated after each brake pipe pressure increase. Recalculation is necessary because it changes the original dynamics and calculation of equalization pressure for each car. [0009]
  • Other objects, advantages and novel features of the present invention will become apparent from the following detailed description of the invention when considered in conjunction with the accompanying drawings.[0010]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a block diagram of the system components of a locomotive assist display and event recorder system according to the principles of the present invention. [0011]
  • FIGS. 2A and 2B are a LEADER display incorporating the principles of the present invention. [0012]
  • FIG. 3 is a flow chart of a first embodiment of a method for determining maximum service brake reduction according to the principles of the present invention. [0013]
  • FIG. 4 is a flow chart of a second embodiment of a method for determining maximum service brake reduction with enforcement according to the principles of the present invention.[0014]
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • Math models of the LEADER System, monitors parameters and performs calculations based on the current energy state of the train to create a real-time display of train dynamics. The power of LEADER resides in its ability to provide information allowing the crew to better control the train, minimizing loss of energy. Loss of energy via over-braking represents fuel unnecessarily consumed. Energy imparted to the cargo of the train represents potential damage to lading, equipment and rail. Both phenomena are undesirable and addressable with LEADER. [0015]
  • The LEADER system is comprised of a number of subsystems each with specific duties. FIG. 1 shows a generic LEADER architecture. The user interface of the LEADER System is the real-time display which shows a graphical and numerical representation of the current state of the train as shown in FIGS. 2A and 2B. Radio communication is established between the lead locomotive, the trailing locomotives in the lead consist, and locomotives in the remote consist to report the necessary parameters from each of these locomotives necessary to perform LEADER Calculations. Consist information is entered via the key pad on the real-time display, a wired communication source (laptop PC or removable storage device) or via wayside radio communication. Position is determined from wheel movement sensors and a Global Positioning System (GPS). The Input/Output (I/O) Concentrator gathers all of the various locomotive parameters necessary for LEADER algorithm calculations and reports the information to the LEADER Computer. The LEADER Processor, a high throughput capacity computer platform using a Real Time Operating System (RTOS), then performs the calculations required by the LEADER algorithms and the real-time display is updated. All of these sub-systems combine to form the LEADER System. [0016]
  • Each locomotive in a LEADER train will require at a minimum, the I/O Concentrator with communication capability to the head end. A LEADER Processor and Display are only required for the lead locomotive. The decision to equip all locomotives with a full LEADER installation (Processor, Display in addition to the I/O Concentrator) should be based on the Railroads ability to permanently designate a locomotive as lead or trail in its duties. [0017]
  • The development of LEADER began over 20 years ago with early efforts to create the Train Dynamics Analyzer (TDA), a computer math model used to predict in-train forces. The train dynamic modeling techniques and algorithms embodied in the TDA are described in U.S. Pat. No. 4,041,283. A more detailed description of the LEADER system is found in U.S. Pat. No. 6,144,901. [0018]
  • FIGS. 2A and 2B show a “static” LEADER display. Each LEADER feature is identified by a block which points to the appropriate screen location. The sections following use the same paragraph number as the identification block detail the operation of each feature. [0019]
  • The LEADER Display shown in FIGS. 2A and 2B represents one particular configuration for the display of LEADER information. The display format can be customized on customer request by adding information, removing information, changing the color scheme, rearranging the position of the sections of information, and/or varying the size of any particular graphic. [0020]
  • In the following descriptions of features on the LEADER Display the term function will be used to describe the plot of the magnitude of a particular parameter across the length of the train varying with time. Sections are numbered to match the identification blocks of FIG. 2. [0021]
  • 2.1 Track Profile [0022]
  • The top portion of the LEADER Display shows the track profile in three views. The train consist is represented with different colored blocks for the locomotive units and for the cars. The length of the displayed train is proportional to the length of the actual train. Milepost marks are represented by lines running vertically through the track profile portion of the display. [0023]
  • 2.2 Horizontal View of Track [0024]
  • The horizontal view of the track profile shows the grade on which the train is currently positioned and the grade of the track profile for a number of miles ahead. The horizontal view of the track profile will show the position of the entire train on the track, both current location and geographic shape (uphill or downhill) as a vertical slice of the track profile in real-time. [0025]
  • 2.3 Track Curvature Representation [0026]
  • The top graphic of the track profile section is made up of blocks that represent track curvature. A block above the dividing line represents a curve to the right, a block below the dividing line represents a curve to the left. The longer the block the longer the curve. The higher the block the more severe the curve. [0027]
  • 2.4 Overhead View/Supplemental Information [0028]
  • Just above the horizontal view is the overhead view. This view incorporates symbols to represent track structures such as crossings, signals, overpasses, underpasses, and sidings. [0029]
  • 2.5 In-Train Forces [0030]
  • Directly below the train represented on the LEADER display is the portion of the screen dedicated to showing in-train forces. All in-train forces are displayed as a graphic that maps to each car in the train. Follow any point on any of the force functions straight up the display and it will intersect with a point on the train where that particular level of force is currently present. The graphics can be identified as the draft/buff magnitude force functions. [0031]
  • The draft/buff force graphic represents draft forces as a function above the 0 kilo-pound line and buff forces as a function below the 0 kilo-pound line. Draft and buff forces can be divided into two categories, steady state and transient. Steady state forces are shown, in general, by a smooth, relatively slow changing function. Transient draft and buff forces (run-in/run-out or slack induced forces) are shown by “spikes” of force that travel through the train. The LEADER system accurately calculates and displays both. Slack induced forces represent momentum transfers between the cars resulting in potential lading and car damage. [0032]
  • 2.6 Brake Cylinder Pressure [0033]
  • Directly below the force graphics is a function that represent brake cylinder pressure throughout the train. Again, these functions map to a location in the train representation directly above. Because the functions are real-time representations of the brake system, it is possible to monitor a brake application or release as it travels through the entire train. [0034]
  • 2.7 Trajectory/Telemetry Information [0035]
  • The lower right and lower center sections of the screen have real time trajectory and status information displayed in digital format. [0036]
  • 2.7.1 Head End Information [0037]
  • Location is a digital representation of mile marker location of the head end locomotive. Grade is the grade of the track at the location of the head end locomotive. Curve is the degree of curvature of the track at the location of the head end locomotive. [0038]
  • 2.7.2 Speed is shown as a digital read out of the speed of the head end locomotive at each instant in time. [0039]
  • 2.7.3 Acceleration is shown as a digital read out representing the acceleration of the head end locomotive at each instant in time. [0040]
  • 2.7.4 Current Speed Limit is shown as a digital read out of the speed limit for the current position of the head end locomotive. [0041]
  • 2.7.5 Fuel is the amount of fuel consumed since the counter was last reset. [0042]
  • 2.7.6 Time is the digital read out of the current time. [0043]
  • 2.7.7 Brake Pipe Reduction (or EP Brake Command) This graphic takes on two roles; one for conventional pneumatic brake equipped trains and one for EP Brake equipped trains. In Conventional, the graphic is a digital read out followed by an analog bar graph 2.8.1 representing the brake pipe pressure reduction at the head end locomotive at each instant in time. The LEADER system has the capability to support trains equipped with EP Brake Systems rather than conventional displacement valves. In an EP equipped train the graphic is a digital read out followed by an analog bar graph representing the percent of brake commanded to the EP System. [0044]
  • 2.7.8 Draw Bar Forces is a digital read out followed by an analog bar graph representing the instantaneous locomotive draw bar force of the last locomotive of the lead consist. [0045]
  • 2.8.1 Pneumatic Brake Reduction is shown as an analog bar graph representing the brake pipe pressure reduction at the head end locomotive at each instant in time. [0046]
  • 2.8.2 Minimum Safe Pneumatic Brake Reduction is of interest for safe train operation. As brake applications are applied and released the charge state of the pneumatic brake system can become such that an undesired release of brakes will occur if the next brake application requested is not deep enough. The LEADER system will calculate the safe brake application level and visually display a minimum target on the Brake Reduction bar graph. If the brake application requested is not deep enough, a visual warning will be posted by the LEADER display. This is described in detail in U.S. patent application Ser. No. 09/152,244 filed Sep. 11, 1998. [0047]
  • 2.8.3 Maximum Pneumatic Brake Reduction is of interest for safe train operation. As the auxiliary reservoir reaches the equalization pressure for its brake cylinder, further reduction of the brake pipe will not produce any additional braking on that car. Once all the car's auxiliary reservoirs have reached their equalization pressure, further reduction of the brake pipe will produce no additional braking on the train. Further reduction will only waste brake pipe pressure. The LEADER system will calculate a maximum safe brake pipe reduction and visually displays if on the brake pipe reduction bar graph. If the brake pipe request is greater than the maximum target, visual warning will be posted by the LEADER display. [0048]
  • The LEADER display is equipped with eight function keys at the bottom of the display. The definition of each function key is shown in the representation of the key on the LCD panel directly above it. The function keys allow user input to the system, accessing various setup and configuration menus and querying information from the LEADER system. [0049]
  • The LEADER system is capable of three operating modes, each building on the previous mode. The three modes advance the LEADER system from a real time display passively providing information to the locomotive engineer (information only mode) to a LEADER system that will make suggestions to the locomotive engineer on how to better handle the train (driver assist mode) and finally to a control system that is capable of issuing commands to optimally control the locomotive (cruse control mode). [0050]
  • In the information only mode, the locomotive engineer makes all of the decisions and solely activates the various control systems in a manual mode. The LEADER system provides information to the engineer that is not currently available to him/her to use to manage various locomotive control systems. In driver assist mode, the LEADER system determines and displays the optimum locomotive power dynamic brake throttle setting and the locomotive and car brake control settings. These settings are determined for the head end locomotives and the remotely controlled locomotives. These recommendations are desired settings displayed to the locomotive engineer who can then elect to manually move the various controls to achieve these settings. In the cruise control mode, LEADER derived settings are used to automatically control the locomotive power and braking systems, the train brake system of each car and ancillary systems which effect train movement. The locomotive engineer serves as an operational supervisor with the ability to manually override the cruise control. Cruise control can also be produced by communication links between the LEADER and the railroad central traffic control center. [0051]
  • The LEADER system provides a maximum brake reduction using, for example, the flow charts of FIG. 3 or [0052] 4. As illustrated in the flow chart of FIG. 3, the state of the brake system throughout the train is determined from the LEADER algorithms at 10. LEADER inputs are collected. For example, it measures the locomotive brake control settings or determined brake requirement, the brake pipe pressures and the time. The brake pipe pressures may be measured at each locomotive and the end-of-train device or any other sensor or smart node throughout the train. Any additional measurement is used to increase the accuracy of the math model for the pressure in the train brake system. The data base of the train make up including car weights and lengths, brake equipment definition and coupler types etc. is also used.
  • The status of the brake pipe system throughout the train is determined on a vehicle by vehicle basis using brake simulation models by themselves or in combination with multiple measurements throughout the train. Depending upon the intelligence levels of the individual cars, more information can be collected to increase the accuracy of the simulation models. [0053]
  • An analysis of each car's equalization pressure and the minimum equalization pressure for the train is determined. The equalization pressure is the pressure at which the brake cylinder and the reservoir pressure, which applies air to the brake cylinder, for example, auxiliary reservoir pressure, have equalized. The equalization pressure can be determined by the following formula: (Boyle's Law): [0054]
    Peq = (Pa*Va+Pc*Vc) / (Va+Vc)
    Where:
    Peq=Equalization pressure
    Pa=Auxiliary pressure
    Pc=Brake cylinder pressure
    Va=Auxiliary Reservoir volume
    Vc=Brake Cylinder volume
    For example:
    IF:
    Pa = 70 psi
    Pc = 0 psi
    Va = 2500 Cu. in.
    Vc = 1000 cu. in.
    THEN:
    Peq=50 psi
  • Next the maximum brake pipe reduction Rmax is determined at [0055] 14 or 16. A locomotive engineer controls the extent of brake application by reducing the brake (brake pipe reduction) pipe pressure that causes the auxiliary pressure at each freight car to correspondingly reduce to the same approximate level. The auxiliary pressure is reduced through a flow of air to the brake cylinder. The locomotive engineer controls the pressure level that a train is charged to. The brake pipe regulation pressure typically ranges from 70 psi to 110 psi. The difference between the regulation pressure that the train is charged to and the brake pipe pressure that the brake pipe is reduced to, during a brake application, is the amount of brake pipe reduction. The amount of reduction is calculated as follows:
  • R=Pr−Pb
  • Where: [0056]
  • R=Brake pipe reduction [0057]
  • Pr=Brake pipe regulation pressure [0058]
  • Pb=Current brake pipe level [0059]
  • If the brake pipe pressure is reduced below the equalization pressures Peq no further brake cylinder pressure is achieved. Brake pipe pressure reductions R lower than equalization pressure Peq is an “over reduction”, and has the effect of wasting compressed air and increasing the time required to release and recharge the train brake system. The maximum reduction that should be made can be computed as follows: [0060]
  • Rmax=Pr−Peq
  • Freight trains have an emergency application, braking mode which guarantees that the train can be stopped as quickly as possible. This emergency feature will not reliably operate at brake pipe pressures below 35 to 45 psi. The maximum brake reduction should thus be computed as: [0061]
  • Rmax=Pr−Peq(min) (if Peq>Pbmin)
  • Rmax=Pr−Pbmin (if Peq<Pbmin)
  • Where: [0062]
  • Rmax=recommended maximum reduction [0063]
  • Pbmin=lowest brake pipe pressure for emergency to operate [0064]
  • Peq(min)=minimum equalization pressure in the brake system [0065]
  • In actual freight operations, the brake pipe pressure that exists at each car may vary significantly with time and car location. It may take a very few minutes to charge the first car in a train to regulation level but may take up to an hour or longer to charge the last car. [0066]
  • It is impossible for a locomotive engineer to calculate and keep track of the maximum reduction that he should make during brake applications. The LEADER computer keeps track of the state of brake pipe and reservoir charge pressures from car to car on a continuous basis. The resultant Rmax is then reported at [0067] 18 continuously to the engineer in a graphical fashion on the LEADER display as shown in FIG. 2B.
  • FIG. 4 illustrates a flow chart for enforcement of the maximum brake pipe reduction. It can also be used for cruise or automatic control. The LEADER system monitors locomotive brake commands at [0068] 20. If there is a brake command at 22, then the LEADER system calculates brake system status, vehicle by vehicle as illustrated in 24. If there is no brake command, it cycles back to monitoring locomotive commands at 20. Next there is analysis of each vehicles equalization pressure Peq and a determination of the minimum equalization pressure through the train Peq(min). If the minimum brake equalization pressure Peq(min) is greater than the lowest brake type pressure for emergency to operate Pbmin as determined at 28, then the maximum brake pipe reduction Rmax is equal to the difference of the brake pipe regulation pressure Pr and the minimum equalization pressure Peq(min) at 32. If the minimum equalization pressure Peq(min) is equal to or less than the Pbmin at 28, then the maximum reduction pressure Rmax is the regulation pressure Pr less the lowest brake pipe pressure for emergency to operate Pbmin.
  • In addition to displaying the maximum reduction Rmax as 2.8.3 in FIG. 2B, it is determined whether the requested brake command is less than the maximum reduction Rmax at [0069] 34. If it is, the requested brake command is executed and the LEADER display is updated at 36. If the requested brake command is not less than the maximum brake pipe reduction Rmax at 34, the operator is alerted to the requested over reduction at 38. This may be an audio or visual indication. After the alert, it is determined at 42 whether the operator took appropriate action based on the railroad rules and over reduction at 40. If the appropriate action is taken, the appropriate brake reduction is executed and the LEADER display is updated at 36. If not, the system automatically adjusts the brake pipe command to prevent over reduction at 44 and this adjusted brake command is executed and the displays updated at 36.
  • The present method has been carried out wherein the minimum equalization pressure throughout the brake system or the car having the minimum equalization pressure is used since this provides additional breaking even though it may be one car. The railroad may set other rules for determining the minimum equalization pressure throughout the train in determining the maximum reduction. [0070]
  • Since the process of FIGS. 3 and 4 are continuously performed, the equalization pressure of each car and the brake pipe values are continuously updated. This will account for any release of brakes, subsequent to any braking action. With the release of brakes, the brake cylinder pressure is reduced to atmosphere and the auxiliary pressure is recharged. This will change the equalization pressure for each of the cars. Also with the rate of charging the brake pipe, at any point in time each car may have a different value and consequently its equalization pressure. It should also be noted that the LEADER model takes into effect variations in brake pipe pressure throughout the train due to reduction for braking or charging for release. [0071]
  • Although the present invention has been described and illustrated in detail, it is to be clearly understood that the same is by way of illustration and example only, and is not to be taken by way of limitation. The spirit and scope of the present invention are to be limited only by the terms of the appended claims. [0072]

Claims (40)

In the claims:
1. A method of determining maximum brake pipe reduction in a brake system of a train having a pneumatic brake on each car connected to a train brake pipe which is controlled by a brake pipe controller, the method comprising:
determining status of the brake system through out the train; and
determining, using the status of the brake system, a maximum brake pipe reduction for the brake pipe controller above which further reduction will not result in further brake application in the train.
2. A method according to claim 1, including displaying the determined maximum brake pipe reduction.
3. A method according to claim 1, wherein determining the status includes determining equalization pressure of the brake system at each car.
4. A method according to claim 3, wherein determining the equalization pressure for each car is determined as a function of the pressures and volumes of a reservoir and a brake cylinder of each car.
5. A method according to claim 3, wherein determining the maximum brake pipe reduction includes determining the minimum determined car equalization pressure in the brake system, and determining the maximum brake pipe reduction for the brake pipe controller using the minimum determined car equalization pressure.
6. A method according to claim 1, wherein determining the status includes determining equalization pressure of the brake system at each car; and determining the maximum brake pipe reduction includes determining the minimum determined car equalization pressure in the brake system and using the minimum determined car equalization pressure and brake pipe regulation pressure.
7. A method according to claim 1, wherein determining the status includes determining a minimum equalization pressure of the brake system; and the maximum brake pipe reduction is determined using the minimum car equalization pressure.
8. A method according to claim 7, wherein the maximum brake pipe reduction is determined using the minimum car equalization pressure if the minimum car equalization pressure is greater than a first pressure value and using the first pressure if the minimum car equalization pressure is less than the first pressure value.
9. A method according to claim 8, wherein the first pressure value is set to a minimum pressure value required for emergency operation of the braking system.
10. A method according to claim 1, including determining a requested brake pipe reduction; and indicating if the requested brake pipe reduction is more than the determined maximum brake pipe reduction.
11. A method according to claim 1, including determining a requested brake pipe reduction; and displaying the determined maximum brake pipe reduction if the requested brake pipe reduction is greater than the determined maximum brake pipe reduction and displaying the requested brake pipe reduction if the requested brake pipe reduction is less than the determined maximum brake pipe reduction.
12. A method according to claim 10, including controlling the brake pipe controller to the displayed brake pipe reduction.
13. A method according to claim 1, including determining a requested brake pipe reduction; and controlling the brake pipe controller to the determined maximum brake pipe reduction if the requested brake pipe reduction is greater than the determined maximum brake pipe reduction and controlling the brake pipe controller to the requested brake pipe reduction if the requested brake pipe reduction is less than the determined maximum brake pipe reduction.
14. A method according to claim 1, wherein the brake pipe controller is in a locomotive of the train and the method is performed on a computer in the locomotive.
15. A method according to claim 1, wherein the status of the brake system is determined using train brake system modeling.
16. A method according to claim 1, wherein determining the status of the brake system includes each car reporting the status of the brake system of the car.
17. A method according to claim 1, wherein determining the status of the brake system includes determining brake cylinder pressure and at least one of reservoir or brake pipe pressure for each car.
18. A method according to claim 1, wherein the method is repeated at least after each brake pipe pressure increase.
19. A method of determining maximum brake pipe reduction in a brake system of a train having a pneumatic brake on each car connected to a train brake pipe which is controlled by a brake pipe controller, the method comprising:
determining equalization pressure of the brake system at each car;
determining the minimum determined car equalization pressure in the brake system; and
determining, using the minimum determined car equalization pressure, a maximum brake pipe reduction for the brake pipe controller above which further reduction will not result in further brake application in the train.
20. A method according to claim 19, wherein determining the equalization pressure for each car is determined as a function of the pressures and volumes of a reservoir and a brake cylinder of each car.
21. A method according to claim 19, wherein the maximum brake pipe reduction is determined using the minimum car equalization pressure if the minimum car equalization pressure is greater than a first pressure value and using the first pressure if the minimum car equalization pressure is less than the first pressure value.
22. A method according to claim 19, including displaying the determined maximum brake pipe reduction.
23. A method according to claim 19, including determining a requested brake pipe reduction; and indicating if the requested brake pipe reduction is more than the determined maximum brake pipe reduction.
24. A method according to claim 19, including determining a requested brake pipe reduction; and displaying the determined maximum brake pipe reduction if the requested brake pipe reduction is greater than the determined maximum brake pipe reduction and displaying the requested brake pipe reduction if the requested brake pipe reduction is less than the determined maximum brake pipe reduction.
25. A method according to claim 19, including determining a requested brake pipe reduction; and controlling the brake pipe controller to the determined maximum brake pipe reduction if the requested brake pipe reduction is greater than the determined maximum brake pipe reduction and controlling the brake pipe controller to the requested brake pipe reduction if the requested brake pipe reduction is less than the determined maximum brake pipe reduction.
26. A method of determining maximum brake pipe reduction in a brake system of a train having a pneumatic brake on each car connected to a train brake pipe which is controlled by a brake pipe controller, the method comprising:
determining a minimum car equalization pressure of the brake system;
determining a maximum brake pipe reduction using the minimum car equalization pressure if the minimum car equalization pressure is greater than a first pressure value and using the first pressure if the minimum car equalization pressure is less than the first pressure value.
27. A method according to claim 26, including displaying the determined maximum brake pipe reduction.
28. A method of determining maximum brake pipe reduction in a brake system of a train having a pneumatic brake on each car connected to a train brake pipe which is controlled by a brake pipe controller, the method comprising:
determining a minimum car equalization pressure of the brake system;
determining, using the minimum determined car equalization pressure, a maximum brake pipe reduction for the brake pipe controller;
determining a requested brake pipe reduction; and
indicating if the requested brake pipe reduction is more than the determined maximum brake pipe reduction.
29. A method of displaying maximum brake pipe reduction in a brake system of a train having a pneumatic brake on each car connected to a train brake pipe which is controlled by a brake pipe controller, the method comprising:
determining a minimum car equalization pressure of the brake system;
determining, using the minimum determined car equalization pressure, a maximum brake pipe reduction for the brake pipe controller;
determining a requested brake pipe reduction; and
displaying the determined maximum brake pipe reduction if the requested brake pipe reduction is greater than the determined maximum brake pipe reduction and displaying the requested brake pipe reduction if the requested brake pipe reduction is less than the determined maximum brake pipe reduction.
30. A method of controlling maximum brake pipe reduction in a brake system of a train having a pneumatic brake on each car connected to a train brake pipe which is controlled by a brake pipe controller, the method comprising:
determining a minimum car equalization pressure of the brake system;
determining, using the minimum determined car equalization pressure, a maximum brake pipe reduction for the brake pipe controller;
determining a requested brake pipe reduction; and
controlling the brake pipe controller to the determined maximum brake pipe reduction if the requested brake pipe reduction is greater than the determined maximum brake pipe reduction and controlling the brake pipe controller to the requested brake pipe reduction if the requested brake pipe reduction is less than the determined maximum brake pipe reduction.
31. A locomotive display system for a train including a brake system having a pneumatic brake on each car connected to a train brake pipe which is controlled by a brake pipe controller, the display system comprising:
a display of brake pipe reduction at the locomotive; and
a display of a maximum brake pipe reduction above which further reduction will not result in further brake application in the train.
32. A system according to claim 31, wherein the brake pipe reduction is an analog display and the maximum brake pipe reduction is an indication on the analog display.
33. A system according to claim 32, wherein the brake pipe reduction is also digitally displayed.
34. A system according to claim 31, including means for determining the maximum brake pipe reduction using the brake system status throughout the train.
35. A system according to claim 31, including means for determining a minimum equalization pressure in the brake system and determining the maximum brake pipe reduction using the determined minimum equalization pressure.
36. A system according to claim 35, wherein the means determines the maximum brake pipe reduction using the minimum car equalization pressure if the minimum car equalization pressure is greater than a first pressure value and using the first pressure if the minimum car equalization pressure is less than the first pressure value.
37. A system according to claim 31, including means for determining the equalization pressure of each car in the train, determining a minimum determined equalization pressure in the brake system, and determining the maximum brake pipe reduction using the determined minimum determined equalization pressure.
38. A system according to claim 31, including means for determining a requested brake pipe reduction and controlling the brake pipe controller to the determined maximum brake pipe reduction if the requested brake pipe reduction is greater than the determined maximum brake pipe reduction and controlling the brake pipe controller to the requested brake pipe reduction if the requested brake pipe reduction is less than the determined maximum brake pipe reduction.
39. A locomotive control system for a train including a brake system having a pneumatic brake on each car connected to a train brake pipe which is controlled by a brake pipe controller, the system comprising:
means for determining a minimum car equalization pressure of the brake system;
means for determining, using the minimum determined car equalization pressure, a maximum brake pipe reduction for the brake pipe controller;
means for determining a requested brake pipe reduction; and
means for controlling the brake pipe controller to the determined maximum brake pipe reduction if the requested brake pipe reduction is greater than the determined maximum brake pipe reduction and controlling the brake pipe controller to the requested brake pipe reduction if the requested brake pipe reduction is less than the determined maximum brake pipe reduction.
40. A system according to claim 39, wherein the means for determining a maximum brake pipe reduction uses the minimum car equalization pressure if the minimum car equalization pressure is greater than a first pressure value and uses the first pressure if the minimum car equalization pressure is less than the first pressure value.
US09/877,020 2001-06-11 2001-06-11 Method of determining maximum service brake reduction Expired - Lifetime US6487488B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US09/877,020 US6487488B1 (en) 2001-06-11 2001-06-11 Method of determining maximum service brake reduction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US09/877,020 US6487488B1 (en) 2001-06-11 2001-06-11 Method of determining maximum service brake reduction

Publications (2)

Publication Number Publication Date
US6487488B1 US6487488B1 (en) 2002-11-26
US20030009274A1 true US20030009274A1 (en) 2003-01-09

Family

ID=25369088

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/877,020 Expired - Lifetime US6487488B1 (en) 2001-06-11 2001-06-11 Method of determining maximum service brake reduction

Country Status (1)

Country Link
US (1) US6487488B1 (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060025903A1 (en) * 2004-07-23 2006-02-02 Kumar Ajith K Locomotive consist configuration control
US20090223760A1 (en) * 2008-03-05 2009-09-10 Smith Eugene A Adaptive brake scheme during a locomotive distributed power communication loss
US20090281705A1 (en) * 2008-05-12 2009-11-12 Wabtec Holding Corp. Braking System
US20100241295A1 (en) * 2009-03-17 2010-09-23 Jared Klineman Cooper System and method for communicating data in locomotive consist or other vehicle consist
US20110093144A1 (en) * 2009-03-17 2011-04-21 Todd Goodermuth System and method for communicating data in a train having one or more locomotive consists
US8380413B2 (en) 2011-07-14 2013-02-19 General Electric Company Method and system for rail vehicle control
US8798821B2 (en) 2009-03-17 2014-08-05 General Electric Company System and method for communicating data in a locomotive consist or other vehicle consist
US8935022B2 (en) 2009-03-17 2015-01-13 General Electric Company Data communication system and method
US9379775B2 (en) 2009-03-17 2016-06-28 General Electric Company Data communication system and method
US9513630B2 (en) 2010-11-17 2016-12-06 General Electric Company Methods and systems for data communications
US9581998B2 (en) 2009-10-22 2017-02-28 General Electric Company System and method for vehicle communication, vehicle control, and/or route inspection
US9637147B2 (en) 2009-03-17 2017-05-02 General Electronic Company Data communication system and method
US9650059B2 (en) 2012-05-23 2017-05-16 General Electric Company System and method for inspecting a route during movement of a vehicle system over the route
US10144440B2 (en) 2010-11-17 2018-12-04 General Electric Company Methods and systems for data communications

Families Citing this family (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9233696B2 (en) 2006-03-20 2016-01-12 General Electric Company Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear
US9733625B2 (en) 2006-03-20 2017-08-15 General Electric Company Trip optimization system and method for a train
US10569792B2 (en) 2006-03-20 2020-02-25 General Electric Company Vehicle control system and method
US10308265B2 (en) 2006-03-20 2019-06-04 Ge Global Sourcing Llc Vehicle control system and method
US8924049B2 (en) 2003-01-06 2014-12-30 General Electric Company System and method for controlling movement of vehicles
US8630757B2 (en) * 2006-03-20 2014-01-14 General Electric Company System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks
US8473127B2 (en) 2006-03-20 2013-06-25 General Electric Company System, method and computer software code for optimizing train operations considering rail car parameters
US9201409B2 (en) 2006-03-20 2015-12-01 General Electric Company Fuel management system and method
US20080183490A1 (en) * 2006-03-20 2008-07-31 Martin William P Method and computer software code for implementing a revised mission plan for a powered system
US8398405B2 (en) 2006-03-20 2013-03-19 General Electric Company System, method, and computer software code for instructing an operator to control a powered system having an autonomous controller
US8768543B2 (en) 2006-03-20 2014-07-01 General Electric Company Method, system and computer software code for trip optimization with train/track database augmentation
US8290645B2 (en) 2006-03-20 2012-10-16 General Electric Company Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable
US8998617B2 (en) 2006-03-20 2015-04-07 General Electric Company System, method, and computer software code for instructing an operator to control a powered system having an autonomous controller
US20080201019A1 (en) * 2006-03-20 2008-08-21 Ajith Kuttannair Kumar Method and computer software code for optimized fuel efficiency emission output and mission performance of a powered system
US8295993B2 (en) 2006-03-20 2012-10-23 General Electric Company System, method, and computer software code for optimizing speed regulation of a remotely controlled powered system
US9266542B2 (en) 2006-03-20 2016-02-23 General Electric Company System and method for optimized fuel efficiency and emission output of a diesel powered system
US20080208401A1 (en) * 2006-03-20 2008-08-28 Ajith Kuttannair Kumar System, method, and computer software code for insuring continuous flow of information to an operator of a powered system
US8370006B2 (en) 2006-03-20 2013-02-05 General Electric Company Method and apparatus for optimizing a train trip using signal information
US8401720B2 (en) 2006-03-20 2013-03-19 General Electric Company System, method, and computer software code for detecting a physical defect along a mission route
US8249763B2 (en) 2006-03-20 2012-08-21 General Electric Company Method and computer software code for uncoupling power control of a distributed powered system from coupled power settings
US8126601B2 (en) * 2006-03-20 2012-02-28 General Electric Company System and method for predicting a vehicle route using a route network database
US9527518B2 (en) 2006-03-20 2016-12-27 General Electric Company System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system
US8788135B2 (en) 2006-03-20 2014-07-22 General Electric Company System, method, and computer software code for providing real time optimization of a mission plan for a powered system
US7974774B2 (en) * 2006-03-20 2011-07-05 General Electric Company Trip optimization system and method for a vehicle
US9156477B2 (en) 2006-03-20 2015-10-13 General Electric Company Control system and method for remotely isolating powered units in a vehicle system
US8370007B2 (en) * 2006-03-20 2013-02-05 General Electric Company Method and computer software code for determining when to permit a speed control system to control a powered system
US9037323B2 (en) 2006-12-01 2015-05-19 General Electric Company Method and apparatus for limiting in-train forces of a railroad train
US9580090B2 (en) 2006-12-01 2017-02-28 General Electric Company System, method, and computer readable medium for improving the handling of a powered system traveling along a route
US8229607B2 (en) * 2006-12-01 2012-07-24 General Electric Company System and method for determining a mismatch between a model for a powered system and the actual behavior of the powered system
US8180544B2 (en) * 2007-04-25 2012-05-15 General Electric Company System and method for optimizing a braking schedule of a powered system traveling along a route
US9120493B2 (en) 2007-04-30 2015-09-01 General Electric Company Method and apparatus for determining track features and controlling a railroad train responsive thereto
US8190312B2 (en) * 2008-03-13 2012-05-29 General Electric Company System and method for determining a quality of a location estimation of a powered system
US8965604B2 (en) 2008-03-13 2015-02-24 General Electric Company System and method for determining a quality value of a location estimation of a powered system
US8155811B2 (en) * 2008-12-29 2012-04-10 General Electric Company System and method for optimizing a path for a marine vessel through a waterway
US9834237B2 (en) 2012-11-21 2017-12-05 General Electric Company Route examining system and method
AU2010310546A1 (en) * 2009-10-22 2012-05-17 Wabtec Holding Corp. Brake pipe charge monitor system and method
US9403517B2 (en) 2010-12-22 2016-08-02 Wabtec Holding Corp. System and method for determining air propagation data in a braking arrangement of a train
US9702715B2 (en) 2012-10-17 2017-07-11 General Electric Company Distributed energy management system and method for a vehicle system
US9669851B2 (en) 2012-11-21 2017-06-06 General Electric Company Route examination system and method
US9676403B2 (en) * 2015-04-29 2017-06-13 General Electric Company System and method for determining operational restrictions for vehicle control

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4946229A (en) * 1988-08-15 1990-08-07 Harris Corporation Adaptive air brake control system
US5172316A (en) * 1989-12-08 1992-12-15 New York Air Brake Computer controlled railway brake equipment
US5056873A (en) * 1990-09-13 1991-10-15 Harris Corporation Adaptive air braking system with correction for second order transient effects
US5833325A (en) * 1996-02-06 1998-11-10 Westinghouse Air Brake Company Freight brake control using train net braking ratio
CA2635895C (en) 1997-09-12 2009-11-17 New York Air Brake Corporation Method of optimizing train operation
US6219595B1 (en) * 1997-09-12 2001-04-17 New York Air Brake Corporation Method of minimizing undesirable brake release
US6249722B1 (en) * 1998-03-11 2001-06-19 Westinghouse Air Brake Company Method of controlling brake pipe pressure
US6227625B1 (en) * 1999-08-24 2001-05-08 Westinghouse Air Brake Company Two way field tester for EOT device

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060025903A1 (en) * 2004-07-23 2006-02-02 Kumar Ajith K Locomotive consist configuration control
US20090223760A1 (en) * 2008-03-05 2009-09-10 Smith Eugene A Adaptive brake scheme during a locomotive distributed power communication loss
US8190311B2 (en) 2008-03-05 2012-05-29 General Electric Company Adaptive brake scheme during a locomotive distributed power communication loss
US8000873B2 (en) 2008-05-12 2011-08-16 Wabtec Holding Corp. Braking system
US20090281705A1 (en) * 2008-05-12 2009-11-12 Wabtec Holding Corp. Braking System
US8532850B2 (en) 2009-03-17 2013-09-10 General Electric Company System and method for communicating data in locomotive consist or other vehicle consist
US20110093144A1 (en) * 2009-03-17 2011-04-21 Todd Goodermuth System and method for communicating data in a train having one or more locomotive consists
US20100241295A1 (en) * 2009-03-17 2010-09-23 Jared Klineman Cooper System and method for communicating data in locomotive consist or other vehicle consist
US8583299B2 (en) 2009-03-17 2013-11-12 General Electric Company System and method for communicating data in a train having one or more locomotive consists
US8798821B2 (en) 2009-03-17 2014-08-05 General Electric Company System and method for communicating data in a locomotive consist or other vehicle consist
US8935022B2 (en) 2009-03-17 2015-01-13 General Electric Company Data communication system and method
US9379775B2 (en) 2009-03-17 2016-06-28 General Electric Company Data communication system and method
US9637147B2 (en) 2009-03-17 2017-05-02 General Electronic Company Data communication system and method
US9581998B2 (en) 2009-10-22 2017-02-28 General Electric Company System and method for vehicle communication, vehicle control, and/or route inspection
US9513630B2 (en) 2010-11-17 2016-12-06 General Electric Company Methods and systems for data communications
US10144440B2 (en) 2010-11-17 2018-12-04 General Electric Company Methods and systems for data communications
US8380413B2 (en) 2011-07-14 2013-02-19 General Electric Company Method and system for rail vehicle control
US9650059B2 (en) 2012-05-23 2017-05-16 General Electric Company System and method for inspecting a route during movement of a vehicle system over the route

Also Published As

Publication number Publication date
US6487488B1 (en) 2002-11-26

Similar Documents

Publication Publication Date Title
US6487488B1 (en) Method of determining maximum service brake reduction
CA2339709C (en) Method of optimizing train operation and training
US6219595B1 (en) Method of minimizing undesirable brake release
US6587764B2 (en) Method of optimizing train operation and training
US9037323B2 (en) Method and apparatus for limiting in-train forces of a railroad train
EP2010424B1 (en) Method of forecasting train speed
US9580090B2 (en) System, method, and computer readable medium for improving the handling of a powered system traveling along a route
AU737882B2 (en) Method of minimizing undesirable brake release
CA2531842C (en) Method of optimizing train operation
AU758845B2 (en) Method of optimizing train operation and training
AU2002301645C1 (en) Method of optimizing train operation and training
MXPA00002468A (en) Method of minimizing undesirable brake release
MXPA00002535A (en) Method of optimizing train operation and training

Legal Events

Date Code Title Description
AS Assignment

Owner name: NEW YORK AIR BRAKE CORPORATION, NEW YORK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:PETERSON, EDMUND R., JR.;HAWTHORNE, MICHAEL J.;REEL/FRAME:011897/0472;SIGNING DATES FROM 20010511 TO 20010604

STCF Information on status: patent grant

Free format text: PATENTED CASE

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

FPAY Fee payment

Year of fee payment: 12