US20020036515A1 - Apparatus for reducing power supply noise in an integrated circuit - Google Patents
Apparatus for reducing power supply noise in an integrated circuit Download PDFInfo
- Publication number
- US20020036515A1 US20020036515A1 US10/003,596 US359601A US2002036515A1 US 20020036515 A1 US20020036515 A1 US 20020036515A1 US 359601 A US359601 A US 359601A US 2002036515 A1 US2002036515 A1 US 2002036515A1
- Authority
- US
- United States
- Prior art keywords
- dut
- capacitor
- input terminal
- power supply
- current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/28—Testing of electronic circuits, e.g. by signal tracer
- G01R31/317—Testing of digital circuits
- G01R31/31721—Power aspects, e.g. power supplies for test circuits, power saving during test
Definitions
- the present invention relates in general to systems for testing integrated circuits and in particular to an apparatus for reducing power supply noise in an integrated circuit under test resulting from state transitions of the logic it implements.
- FIG. 1 is a block diagram illustrating a typical IC tester 10 connected through a probe card 12 to a set of similar IC devices under test (DUTs) 14 .
- Tester 10 uses pogo pins 15 or other means to connect various input and output terminals to a set of contacts 16 on probe card 12 .
- Probe card 12 includes a set of probes 18 for contacting input/output (I/O) pads 19 on the surface of each DUT 14 and provides conductive paths 20 linking contacts 16 to probes 18 .
- the paths through probe card 12 allow tester 10 to transmit test signals to DUT 14 and to monitor output signals produced by the DUT.
- probe card 12 also provides a path 22 through which tester 10 may supply a CLOCK signal to each DUT 14 .
- the test system also includes a power supply 24 for supplying power to DUTs 14 as they are being tested.
- Probe card 12 connects power supply 24 to a power input pad 26 of each DUT 14 through probes 18 .
- Each switching transistor within a DUT 14 has an inherent input capacitance, and in order to turn on or off the transistor, the transistor's driver must either charge or discharge the transistor's input capacitance.
- a driver charges a transistor's input capacitance it draws charging current from power supply 24 .
- its driver need only supply a relatively small amount of leakage current needed to keep the transistor's input capacitance charged so that the transistor remains turned on or off.
- most transistor switching occurs immediately after an edge of each CLOCK signal pulse.
- the signal paths 28 through which probe card 12 connects power supply 24 to each DUT 14 have an inherent impedance represented in FIG. 1 by a resistance R 1 . Since there is a voltage drop between the output of power supply 24 and the power input 26 of DUT 14 , the supply voltage input VB to DUT 14 is somewhat less than the output voltage VA of power supply 24 , and although VA may be well-regulated, VB varies with the magnitude of current I 1 . After the start of each CLOCK signal cycle, the temporary increase in I 1 needed to charge switching transistor input capacitance increases the voltage drop across R 1 , thereby temporarily reducing VB.
- FIG. 2 illustrates the behavior of supply voltage VB and current I 1 at the power input 26 of IC 14 in response to a pulse of the CLOCK signal input to IC 14 when capacitor C 1 is insufficiently large. Note that the temporary rise in I 1 above its quiescent level IQ following an edge of the CLOCK signal at time T1 produces a temporary increase in voltage drop across R 1 that in turn produces a temporary dip in supply voltage VC below its quiescent level VQ.
- FIG. 3 illustrates the behavior of VB and I 1 when capacitor C 1 is sufficiently large.
- capacitor C 1 charges to the quiescent level VQ of VB.
- a DUT 14 temporarily demands more current
- capacitor C 1 supplies some its stored charge to DUT 14 thereby reducing the amount of additional current power supply 24 must provide to meet the increased demand.
- the presence of C 1 reduces the magnitude of the temporary voltage drop across R 1 and therefore reduces the magnitude of the dip in the supply voltage VB input to the DUT 14 .
- FIG. 4 is a simplified plan view of a typical probe card 12 .
- IC tester 10 resides above the probe card and the wafer containing DUTs 14 is held below the probe card. Since the I/O terminals of IC tester 10 of FIG.
- probe card 12 provides a relatively large upper surface 25 for holding the contacts 16 the tester accesses.
- the probes 18 (not shown) on the underside of probe card 12 that contact DUTs 14 on the wafer are concentrated under a relatively small central area 27 of probe card 12 .
- the path impedance between contacts 16 on the upper surface 25 of card 12 and the probes 18 under area 27 is a function of the distance between each contact 16 and its corresponding probe.
- the capacitors should be mounted on probe card 12 near (or above) the small central area 27 .
- DUT integrated circuit device under test
- the DUT experiences a temporarily increase in its demand for power supply current after each pulse of a clock signal input to the DUT because each clock signal pulse initiates state transitions of clocked logic devices within the DUT.
- the DUT needs the extra current to charge input capacitance of transistors forming those logic devices. It is an object of the invention to provide a means for limiting variation in power supply voltage at the power input terminal of a DUT arising from the transient increase in power supply current following each clock signal pulse, thus reducing the power supply noise at the DUT.
- a charging current is supplied to the DUT's power input terminal from an auxiliary power supply source after each clock signal pulse to supplement a current continuously supplied by a main power supply during the test.
- the additional charging current reduces the need for the main power supply to increase its output current to meet the DUT's increased demand.
- the amount of additional charging current a DUT requires after each clock signal pulse varies depending on the state transition its internal logic devices undergoes in response to the clock signal pulse.
- the additional charging current supplied is adjusted to match a predicted value of transient charging current required by the DUT following each clock signal pulse.
- the auxiliary power source includes a capacitor, a transistor switch and a voltage source.
- the voltage source charges the capacitor before each clock signal pulse and the switch temporarily connects the capacitor to the DUT's power input terminal at the start of each clock cycle so that the capacitor can deliver its charge to the DUT to provide the DUT's required transient charging current.
- the voltage to which the capacitor is charged is adjusted prior to the start of each clock signal cycle so that the capacitor delivers the amount of charge the DUT is predicted to require during the next state change.
- the system can regulate the DUT's supply voltage even when there is significant path impedance between the capacitor and the DUT.
- the capacitor may be mounted on a probe card relatively distant from DUT.
- a DUT and a reference IC similar to the DUT are tested at the same time.
- the reference IC is tested slightly in advance of the DUT so that variations in the input power supply voltage of the reference IC due to changes in its current demand predict subsequent similar variations in the input current demand of the DUT.
- An amplifier amplifies variations in the voltage at the power input terminal of the reference IC to produce the time-varying charging current needed by the DUT. The lag between the tests performed on the reference DUT and the second DUT is adjusted to match a signal path delay through the amplifier and interconnect path.
- FIG. 1 is a block diagram illustrating a typical prior art test system including an integrated circuit tester connected through a probe card to a set of integrated circuit under test (DUTs),
- DUTs integrated circuit under test
- FIGS. 2 and 3 are timing diagrams illustrating behavior of signals within the prior art test system of FIG. 1,
- FIG. 4 is a simplified plan view of the prior art probe card of FIG. 1,
- FIG. 5 is a block diagram illustrating a test system implementing a system for reducing noise in the power supply inputs of a set of DUTs in accordance with a first embodiment of the present invention
- FIG. 6 is a timing diagram illustrating behavior of signals within the test system of FIG. 5,
- FIG. 7 is a block diagram illustrating operation of the test system of FIG. 5 during a calibration procedure
- FIG. 8 is a simplified plan view of the probe card of FIG. 6;
- FIGS. 9 and 10 are block diagrams illustrating test systems implementing second and third embodiments of the present invention.
- FIG. 11 is a timing diagram illustrating behavior of signals within the test system of FIG. 10;
- FIGS. 12 is a block diagram illustrating a test system implementing a fourth embodiment of the present invention.
- FIG. 13 is a timing diagram illustrating behavior of signals within the test system of FIG. 12;
- FIG. 14 is a block diagram illustrating a fifth embodiment of the present invention.
- FIG. 15 is a block diagram illustrating a sixth embodiment of the present invention.
- FIG. 16 is a block diagram illustrating a seventh embodiment of the present invention.
- FIG. 17 is a timing diagram illustrating behavior of signals within the circuit of FIG. 16.
- FIG. 5 illustrates in block diagram form an integrated circuit (IC) tester 30 linked through a probe card 32 to a set of similar IC devices under test (DUTs) 34 in the form of die on a semiconductor wafer.
- Probe card 32 includes a set of probes 37 for accessing input/output terminal pads 39 on the surfaces of DUTs 34 and also includes signal paths 46 linking tester 30 to probes 37 to allow IC tester 30 to send a clock signal (CLOCK) and other test signals to DUTs 14 and to convey DUT output signals back to tester 30 so that the tester can monitor the behavior of the DUTs.
- CLOCK clock signal
- Probe card 34 also links a main power supply to a power input terminal 41 of each DUT 34 via probes 37 .
- Power supply 36 produces a well-regulated output voltage VA and continuously supplies a current I 2 to DUT 34 .
- FIG. 5 represents the inherent impedances of the paths 43 through probe card 32 between main power supply 36 and each DUT 34 as resistors R 1 . Due to a voltage drop across resistor R 1 , the input supply voltage VB to each DUT 34 is always somewhat less than VA.
- a first transistor switch SW 1 mounted on probe card 32 links an auxiliary power supply 38 to a set of capacitors C 2 mounted in probe card 32 .
- a set of second transistor switches SW 2 also mounted on probe card 32 link each capacitor C 2 to the power input terminal of a corresponding DUT 34 .
- a resistor R 2 shown in FIG. 5 represents the inherent signal path impedance within probe card 32 between each capacitor C 1 and the power input terminal 41 of a DUT 34 when switch SW 2 is closed.
- IC tester 30 provides an output control signal CNT 1 for SW 1 , a control signal CNT 2 for controlling switches SW 2 and control data CNT 3 for controlling the magnitude of the output voltage VC of auxiliary power supply 38 .
- auxiliary power supply 38 , switches SW 1 and SW 2 and capacitors C 2 act as an auxiliary current source to inject current I 3 into the power input terminal 41 of each DUT under control of IC tester 30 .
- DUTs 34 implement synchronous logic in which switching transistors forming logic gates turn on and off in response to pulses of the periodic master CLOCK signal provided by tester 30 .
- Each switching transistor has an inherent input capacitance, and in order to turn on or off the transistor, its driver must either charge or discharge the transistor's input capacitance.
- drivers within DUTs 34 charge a transistor's input capacitance they increase the amount of current I 1 that must be supplied to each DUT's power input terminal 41 . Once the transistor's input capacitance is fully charged, its driver need only supply the relatively small amount of leakage current needed to keep the transistor's input capacitance charged so that the transistor remains turned on or off.
- each DUT 34 there is a temporary increase in the power supply current I 1 input to each DUT 34 to provide the charging current necessary to change the switching states of various transistors. Later in a CLOCK signal cycle, after those transistors have changed state, the demand for power supply current falls to a “quiescent” steady state level and remains there until the beginning of the next CLOCK signal cycle.
- the amount of additional current I 1 a DUT 34 needs at the start of each CLOCK signal cycle depends on the number and nature of transistors that turn on or off during that particular CLOCK signal cycle.
- FIG. 2 represents the behavior of VB and I 1 when SW 2 is always open. Since the dip in supply voltage VB occurring after each CLOCK signal pulse edge is a form of noise that can adversely affect the performance of DUTs 34 , it is desirable to limit the magnitude of that voltage dip.
- IC tester 30 controls auxiliary power supply 38 and the states of switches SW 1 and SW 2 so that capacitor C 2 supplies additional charging current I 3 to DUT 34 at the start of each test cycle.
- the charging current I 3 which only flows during an initial portion of each CLOCK signal cycle, combines with the current I 2 output of the main power supply to provide the current input I 1 to DUT 34 .
- charging current I 3 provides approximately the same amount of charge the capacitance of switching transistors within DUT 34 acquire following a CLOCK signal pulse, there is relatively little change in the current I 2 produced by main power supply 36 following the CLOCK signal pulse and therefore very little variation in supply voltage VB.
- tester 30 supplies data CNT 3 to auxiliary power supply 38 indicating a desired magnitude of VC and then closes switch SW 1 .
- Power supply 38 then charges all capacitors C 2 .
- the amount of charge capacitors C 2 store is proportional to the magnitude of VC.
- tester 30 opens switch SW 1 .
- tester 30 closes all switches SW 2 so that charge stored in capacitors C 2 can flow as currents I 3 into DUTs 34 .
- tester 30 opens switches SW 2 so that only main power supply 36 supplies current to DUTs 34 during the remaining portion of the CLOCK signal cycle. This process repeats during every cycle of the CLOCK signal.
- FIG. 6 illustrates the behavior of supply voltage VB, and currents I 1 , I 2 and I 3 during an initial portion of a CLOCK signal cycle.
- Current I 1 exhibits a large temporarily increase above its quiescent level IQ 1 after an edge of the CLOCK pulse at time T1 to charge capacitance within the DUT 34 .
- Current I 3 rises quickly to provide substantially all the additional charging current.
- the output current I 2 of main power supply 38 exhibits only a relatively small perturbation from its quiescent value IQ 2 resulting from small mismatches between I 3 and the transient component of I 2 . Since the variation in I 2 is small, the variation in VB is small. Thus the present invention substantially limits the power supply noise due to switching transients in DUTs 34 .
- the amount of additional charging current each DUT 34 draws at the start of a CLOCK signal cycle depends on the number of transistors that turn on or off during the CLOCK signal cycle and charging current varies from cycle-to-cycle.
- tester 30 has to predict how much charge DUT 34 is going to store following the each CLOCK signal pulse because it has to adjust the magnitude of auxiliary power supply output VC so that capacitors C 2 store the proper amount of charge prior to each CLOCK signal cycle.
- FIG. 7 depicts a test system set up that allows tester 30 to experimentally determine the level to which it should set VC for each test cycle.
- a reference DUT 40 that is known to operate properly and which is similar to the ICs to be tested, is connected to tester 30 via probe 32 in generally the same way DUTs 34 are to be connected so that tester 30 can perform the same test on reference IC 40 .
- probe card 32 also links the power supply terminal of reference IC 40 to an input terminal of tester 30 so that tester 30 can monitor the power supply voltage VB. Tester 30 then executes only the first CLOCK cycle of the test while observing VB using the minimum value for VC.
- tester 38 repeats the first CLOCK signal cycle of the test using a higher value of VC. This process is repeated iteratively until an appropriate value of VC for the first CLOCK signal cycle is established. The tester then iteratively executes the first two CLOCK signal cycles of the test while monitoring VB during the second CLOCK signal cycle and adjusting VC accordingly. The same procedure is used to establish an appropriate value of VC for each successive CLOCK signal cycle of the test. Those values for VC may then be used when testing DUTs 34 .
- circuit simulators typically use circuit simulators to simulate ICs before they are fabricated.
- the circuit simulator can be employed in an analogous manner to determine the sequence of VC values to be used during a test of the real IC.
- FIG. 4 illustrates a typical prior art probe card 12 that connects voltage regulating capacitors C 1 to the power input terminals of DUTs to limit power supply noise.
- Such probe cards must minimize the distance between voltage regulating capacitors and the DUTs so as to minimize the impedance between the capacitors and the DUTs.
- the capacitors preferably are mounted on the probe card in or near a small area 27 above the probes that access the DUTs. Since there is little space on the probe card near the probes, the size and number of regulating capacitors C 1 that can be deployed on probe card 12 is limited. This limitation on capacitor mounting space can limit the number of DUTs that can be concurrently tested.
- FIG. 8 is a simplified plan view of the probe card 32 of FIG. 5 in accordance with the invention.
- Contact points 45 accessed by IC tester 30 of FIG. 7 are distributed over a relatively large area of the upper surface 43 of probe card 32 while the probes 37 (not shown) that contact DUTs 34 are concentrated under a relatively small central area 47 of the probe card. Since the voltage VC to which capacitors C 2 are charged can be adjusted to accommodate significant path impedance R 2 (FIG. 5) between any switch SW 2 and terminal 41 of DUT 34 , capacitors C 2 can be mounted on probe card 32 at a significantly greater distance from central area 47 above the DUT probes than capacitors C 1 of FIG. 4.
- capacitors C 2 are charged to a higher voltage than capacitors C 1 , they can be smaller than capacitors C 1 . Since capacitors C 2 of probe card 32 of FIG. 8 can be smaller and further from the center of the probe card than capacitors C 1 of the prior art probe card 12 of FIG. 4, a larger number of capacitors C 2 can be mounted on probe card 32 . Thus a test system employing probe card 32 in accordance with the invention can concurrently test more DUTs than a test system employing a prior art probe card 12 of FIG. 4.
- FIG. 9 illustrates an alternative embodiment of the invention including a probe card 50 generally similar to probe card 32 of FIG. 7 except that it has mounted thereon a “power control IC” 52 .
- Power control IC 52 includes a pattern generator 54 that carries out the pattern generation function of IC tester 30 of FIG. 7 with respect to producing the control signals and data CNT 1 , CNT 2 and CNT 3 for controlling switches SW 1 and SW 2 and auxiliary power supply 38 .
- Power control IC 52 includes a conventional pattern generator 54 programmed before the start of a test by externally generated programming data provided via a conventional computer bus 56 .
- Pattern generator 54 begins generating its output data pattern in response to a START signal from an IC tester 58 marking the start of a test and produces its output CNT 1 , CNT 2 , CNT 3 data pattern in response to the same system clock (SYSCLK) that clocks operations of tester 58 .
- SYSCLK system clock
- switches SW 1 and SW 2 and capacitors C 2 may be implemented within power control IC 52 as shown in FIG. 9.
- IC 52 should be mounted on the probe card as near as possible to the DUT probes. Merging switches SW 1 and SW 2 and capacitors C 2 and the pattern generation function of tester 30 into a single IC 52 reduces the cost and complexity of probe card 32 and reduces the required number of tester 30 output channels. However when necessary capacitors C 2 can be implemented by discrete components external to power control IC 52 .
- FIG. 10 illustrates an embodiment of the invention that is generally similar to the embodiment of FIG. 5.
- switch SW 1 is omitted from probe card 60 so that the VC output of auxiliary power supply 38 is directly connected to capacitors C 2 .
- the output voltage VC is fixed and not adjusted by IC tester 30 so that C 2 charges to the same value prior to each CLOCK signal pulse.
- IC tester 30 controls the amount of charge capacitors C 2 deliver to DUTs 34 at the start of each CLOCK pulse by pulse width modulating switches SW 2 via control signal CNT 2 .
- the amount of time tester 30 closes switches SW 2 following the leading edge of a CLOCK signal pulse determines the amount of charge capacitors C 2 deliver to DUTs 34 .
- the shape of the I 3 current flow illustrated in FIG. 6 can be more closely approximated when tester 30 rapidly increases and then decreases the duty cycle of the CNT 2 signal as illustrated in FIG. 11.
- FIG. 12 illustrates an embodiment of the invention that is generally similar to the embodiment of FIG. 10. However in FIG. 12 the transistor switches SW 2 are replaced with transistors Q 2 operated in their active regions when DUTs 34 are undergoing state changes and require additional current I 3 .
- the CNT 2 output of IC tester 30 is a data sequence applied as input to an analog-to-digital (A/D) converter 63 mounted on probe card 61 .
- the data sequence CNT 2 represents a predicted demand for charging current I 3 during each CLOCK signal cycle.
- A/D converter 63 responds to the CNT 2 data sequence by producing an analog signal CNT 4 input to the bases of transistors Q 2 that varies during each CLOCK signal cycle as illustrated in FIG. 13.
- Analog signal CNT 4 controls the amount of current I 3 each transistor Q 2 allows to flow out of a capacitor C 2 so that it substantially matches the predicted transient component of the current I 1 demanded by DUT 34 .
- A/D converter 63 may be implemented within IC tester 30 instead of being mounted on probe card 61 .
- FIG. 14 illustrate an embodiment of the invention wherein a reference DUT 60 similar to DUTs 34 is tested in a similar way except that tester 30 tests the reference DUT 60 slightly in advance of the other DUTs by advancing the CLOCK and other input signals it supplies to reference DUT 60 .
- a main power supply 62 powers all DUTs 34 while an auxiliary power supply 64 powers reference DUT 60 .
- a capacitor C 4 mounted on probe card 66 near reference DUT 60 regulates the voltage VREF at its power input terminal 68 in a conventional manner so that it stays within its allowed operating range.
- a capacitor C 5 links VREF to a set of amplifier's A 1
- a capacitor C 6 links the output of each amplifier A 1 to the power input terminal 70 of each DUT 34 .
- the supply voltage VREF at the input terminal 68 of reference DUT 60 falls below its quiescent level by a small amount following the start of each CLOCK signal cycle due to the reference DUT's transient charging current demand.
- the amount of voltage decline in VREF is proportional to the amount of transient charging current drawn by reference DUT 60 . Since reference DUT 60 is similar to DUTs 34 and is tested slightly in advance of DUTs 34 , a decline in VREF predicts the amount of transient charging current each DUT 34 a short time later.
- Amplifiers A 1 acting through capacitors C 5 and C 6 , amplify the AC component of VREF to produce output currents I 3 that augment the current outputs I 2 of main power supply 62 to provide the current input I 1 to each DUT 34 .
- the amount of time by which tester 30 advances the test of reference DUT 60 is set to equal the delay between variations in reference voltage VREF and corresponding variations in currents I 3 .
- currents I 3 With the (negative) gain of each amplifier A 1 appropriately adjusted by an externally generated signal (GAIN), currents I 3 will substantially match the transient charging currents required by DUTs 34 .
- embodiments of the present invention can also be employed to reduce power supply noise in application in which an integrated circuit passes though a succession of states that can be predicted.
- FIG. 15 illustrates an example embodiment of the invention in which an integrated circuit 80 passes through a predictable succession of states in response to edges of an externally generated CLOCK signal supplied as input thereto.
- IC 80 receives power from a main power supply 82 .
- An auxiliary power supply 84 charges a capacitor C 2 via a switch SW 1 when switch SW 1 is closed.
- Capacitor C 2 supplies its charge as additional current input to IC 80 when a switch SW 2 is closed.
- a “charge predictor” circuit 86 responds to the CLOCK signal by asserting a signal CNT 1 to close switch SW 1 and deasserting a control signal CNT 2 to open switch SW 2 during a portion of each CLOCK signal cycle in which IC 80 is not changing state.
- auxiliary power supply 84 to charge capacitor C 2 between state changes.
- Charge predictor circuit 86 asserts control signal CNT 2 to close switch SW 2 and deasserts control signal CNT 1 to open switch SW 1 during a portion of each CLOCK signal cycle in which IC 80 is changing state, thereby allowing capacitor C 2 to deliver current to the power input of IC 80 to provide its transient current needs.
- Charge predictor 86 also provides control data CNT 2 to auxiliary power supply 84 to adjust its output voltage VC so that it charges capacitor C 2 to a level determined in accordance with an amount of current IC 80 is expected to draw during a next state change.
- Charge predictor 86 is suitably implemented by a conventional pattern generator or any other device capable of producing output data sequences CNT 1 , CNT 2 and CNT 3 that are appropriate for transient current requirements of IC 80 for its expected sequence of states.
- Switches SW 1 and SW 2 and/or capacitor C 2 may be implemented either external to IC 80 as illustrated in FIG. 15 or may be implemented internal to IC 80 .
- FIG. 16 illustrates a simple version of the invention suitable for use in applications wherein the amount of charging current an IC 80 is expected to draw at the start of each CLOCK signal cycle lies within a relatively limited, predictable range.
- an inverter 90 inverts the CLOCK signal to provide the CNT 1 control signal input to a switch SW 1 coupling a main power supply to a capacitor C 2 .
- the CLOCK signal directly provides a CNT 2 control signal input to a switch SW 2 connecting capacitor C 2 to a power input of IC 80 normally driven by a main power supply 82 .
- the CLOCK signal drives the CNT 2 signal high to close switch SW 2 during a first half of each CLOCK signal cycle and drives CNT 1 high to close switch SW 1 during a second half of each CLOCK signal cycle.
- the output voltage VC of auxiliary power supply 84 is set to a constant value so that it charges capacitor C 2 to the same level prior to the start of each CLOCK signal cycle.
- the level of VC is set to appropriately position the range over which power supply input voltage VB swings when IC 80 is drawing additional charging current at the start of each CLOCK signal cycle. For example when we want the quiescent value of VB to lie at the middle of its range, we can adjust VC so that capacitor C 2 supplies an amount of charging current that is in the middle of the range of charging currents IC 80 is expected to draw. On the other hand, if we want to prevent VB from falling much below its quiescent value but are willing to allow VB to rise above its quiescent value, we can adjust VC so that capacitor C 2 supplies the maximum amount of charging current IC 80 is expected to draw.
- capacitor C 2 may supply too little charging current during some CLOCK signal cycles and too much charging current during other CLOCK signal cycles, in many applications the system illustrated in FIG. 16 nonetheless can keep the swings in VB within acceptable limits when VC is suitably adjusted. Note that the systems of FIGS. 5, 9, 14 and 15 can be programmed to operate in a similar manner by setting control data CNT 3 to the same value for every CLOCK signal cycle.
Abstract
Description
- 1. Field of the Invention
- The present invention relates in general to systems for testing integrated circuits and in particular to an apparatus for reducing power supply noise in an integrated circuit under test resulting from state transitions of the logic it implements.
- 2. Description of Related Art
- An integrated circuit (IC) tester can concurrently test a set of ICs in the form of die on a silicon wafer. FIG. 1 is a block diagram illustrating a
typical IC tester 10 connected through aprobe card 12 to a set of similar IC devices under test (DUTs) 14.Tester 10 usespogo pins 15 or other means to connect various input and output terminals to a set ofcontacts 16 onprobe card 12.Probe card 12 includes a set ofprobes 18 for contacting input/output (I/O)pads 19 on the surface of eachDUT 14 and providesconductive paths 20 linkingcontacts 16 toprobes 18. The paths throughprobe card 12 allowtester 10 to transmit test signals toDUT 14 and to monitor output signals produced by the DUT. Digital integrated circuits often include synchronous logic gates clocked in response to pulses of a periodic master clock signal (CLOCK). Thereforeprobe card 12 also provides apath 22 through whichtester 10 may supply a CLOCK signal to eachDUT 14. The test system also includes apower supply 24 for supplying power toDUTs 14 as they are being tested.Probe card 12 connectspower supply 24 to apower input pad 26 of eachDUT 14 throughprobes 18. - Each switching transistor within a
DUT 14 has an inherent input capacitance, and in order to turn on or off the transistor, the transistor's driver must either charge or discharge the transistor's input capacitance. When a driver charges a transistor's input capacitance it draws charging current frompower supply 24. Once the transistor's input capacitance is fully charged, its driver need only supply a relatively small amount of leakage current needed to keep the transistor's input capacitance charged so that the transistor remains turned on or off. In DUTs implementing synchronous logic, most transistor switching occurs immediately after an edge of each CLOCK signal pulse. Thus immediately after each pulse of the CLOCK signal, there is a temporary increase in the power supply current I1 input to eachDUT 14 to provide the charging current necessary to change the switching states of various transistors within the DUT. Later in the CLOCK signal cycle, after those transistors have changed state, the demand for power supply current I1 falls to a “quiescent” steady state level and remains there until the beginning of the next CLOCK signal cycle. - The
signal paths 28 through whichprobe card 12 connectspower supply 24 to eachDUT 14 have an inherent impedance represented in FIG. 1 by a resistance R1. Since there is a voltage drop between the output ofpower supply 24 and thepower input 26 ofDUT 14, the supply voltage input VB toDUT 14 is somewhat less than the output voltage VA ofpower supply 24, and although VA may be well-regulated, VB varies with the magnitude of current I1. After the start of each CLOCK signal cycle, the temporary increase in I1 needed to charge switching transistor input capacitance increases the voltage drop across R1, thereby temporarily reducing VB. Since the dip in supply voltage VB occurring after each CLOCK signal pulse edge is a form of noise that can adversely affect the performance ofDUTs 14, it is desirable to limit its magnitude and duration. We can limit that noise by reducing the reactance of thepaths 28 betweenpower supply 24 andDUTs 14, for example by increasing conductor size or by minimizing the length ofpath 28. However there are practical limits to the amount by which we can reduce that reactance. - We can also reduce power supply noise by placing a capacitor C1 on
probe card 12 near thepower supply input 26 of eachDUT 14. FIG. 2 illustrates the behavior of supply voltage VB and current I1 at thepower input 26 ofIC 14 in response to a pulse of the CLOCK signal input toIC 14 when capacitor C1 is insufficiently large. Note that the temporary rise in I1 above its quiescent level IQ following an edge of the CLOCK signal at time T1 produces a temporary increase in voltage drop across R1 that in turn produces a temporary dip in supply voltage VC below its quiescent level VQ. - FIG. 3 illustrates the behavior of VB and I1 when capacitor C1 is sufficiently large. Between CLOCK signal pulses, when
DUT 14 is quiescent, capacitor C1 charges to the quiescent level VQ of VB. Following a rising (or falling) edge of the CLOCK signal at time T1, when aDUT 14 temporarily demands more current, capacitor C1 supplies some its stored charge toDUT 14 thereby reducing the amount of additionalcurrent power supply 24 must provide to meet the increased demand. As may be seen in FIG. 3, the presence of C1 reduces the magnitude of the temporary voltage drop across R1 and therefore reduces the magnitude of the dip in the supply voltage VB input to theDUT 14. - For capacitor C1 to adequately limit variation in VB, the capacitor must be large enough to supply the needed charge to
DUT 14 and must be positioned close toDUT 14 so that the path impedance between C1 andDUT 14 is very low. Unfortunately it is not always convenient or possible to mount a large capacitor on aprobe card 12 near the powersupply input terminal 26 of eachDUT 14. FIG. 4 is a simplified plan view of atypical probe card 12.IC tester 10 resides above the probe card and thewafer containing DUTs 14 is held below the probe card. Since the I/O terminals ofIC tester 10 of FIG. 1 are distributed over a relatively large area compared to the surface area of the wafer being tested,probe card 12 provides a relatively largeupper surface 25 for holding thecontacts 16 the tester accesses. On the other hand, the probes 18 (not shown) on the underside ofprobe card 12 that contactDUTs 14 on the wafer are concentrated under a relatively smallcentral area 27 ofprobe card 12. - The path impedance between
contacts 16 on theupper surface 25 ofcard 12 and theprobes 18 underarea 27 is a function of the distance between eachcontact 16 and its corresponding probe. To minimize the distance between capacitors C1 and the DUTs, the capacitors should be mounted onprobe card 12 near (or above) the smallcentral area 27. However when a wafer includes a large number of ICs to be tested or an IC having a large number of densely packed terminals, there is not enough space to mount the required number of capacitors C1 of sufficient size sufficiently close tocentral area 27. - What is needed is a system for limiting the switching noise in power supply voltage at the power input terminals of the DUTs that does not require mounting large capacitors on the probe card close to the probes accessing the power input terminals.
- During a test of an integrated circuit device under test (DUT) employing synchronous logic, the DUT experiences a temporarily increase in its demand for power supply current after each pulse of a clock signal input to the DUT because each clock signal pulse initiates state transitions of clocked logic devices within the DUT. The DUT needs the extra current to charge input capacitance of transistors forming those logic devices. It is an object of the invention to provide a means for limiting variation in power supply voltage at the power input terminal of a DUT arising from the transient increase in power supply current following each clock signal pulse, thus reducing the power supply noise at the DUT.
- In accordance with one aspect of the invention, a charging current is supplied to the DUT's power input terminal from an auxiliary power supply source after each clock signal pulse to supplement a current continuously supplied by a main power supply during the test. The additional charging current reduces the need for the main power supply to increase its output current to meet the DUT's increased demand. With the output current of the main power supply being held substantially constant despite the DUT's increased demand for current, any voltage drop across path impedance between the main power supply and the DUT remains substantially constant. Thus the supply voltage at the DUT's power input terminal remains substantially constant.
- The amount of additional charging current a DUT requires after each clock signal pulse varies depending on the state transition its internal logic devices undergoes in response to the clock signal pulse. In accordance with another aspect of the invention the additional charging current supplied is adjusted to match a predicted value of transient charging current required by the DUT following each clock signal pulse.
- In accordance with a further aspect of the invention, in a preferred embodiment thereof, the auxiliary power source includes a capacitor, a transistor switch and a voltage source. The voltage source charges the capacitor before each clock signal pulse and the switch temporarily connects the capacitor to the DUT's power input terminal at the start of each clock cycle so that the capacitor can deliver its charge to the DUT to provide the DUT's required transient charging current. The voltage to which the capacitor is charged is adjusted prior to the start of each clock signal cycle so that the capacitor delivers the amount of charge the DUT is predicted to require during the next state change. The system can regulate the DUT's supply voltage even when there is significant path impedance between the capacitor and the DUT. Thus the capacitor may be mounted on a probe card relatively distant from DUT.
- In accordance with a further aspect of the invention, in an alternative embodiment thereof, a DUT and a reference IC similar to the DUT are tested at the same time. However the reference IC is tested slightly in advance of the DUT so that variations in the input power supply voltage of the reference IC due to changes in its current demand predict subsequent similar variations in the input current demand of the DUT. An amplifier amplifies variations in the voltage at the power input terminal of the reference IC to produce the time-varying charging current needed by the DUT. The lag between the tests performed on the reference DUT and the second DUT is adjusted to match a signal path delay through the amplifier and interconnect path.
- The concluding portion of this specification particularly points out and distinctly claims the subject matter of the present invention. However those skilled in the art will best understand both the organization and method of operation of the invention, together with further advantages and objects thereof, by reading the remaining portions of the specification in view of the accompanying drawing(s) wherein like reference characters refer to like elements.
- FIG. 1 is a block diagram illustrating a typical prior art test system including an integrated circuit tester connected through a probe card to a set of integrated circuit under test (DUTs),
- FIGS. 2 and 3 are timing diagrams illustrating behavior of signals within the prior art test system of FIG. 1,
- FIG. 4 is a simplified plan view of the prior art probe card of FIG. 1,
- FIG. 5 is a block diagram illustrating a test system implementing a system for reducing noise in the power supply inputs of a set of DUTs in accordance with a first embodiment of the present invention;
- FIG. 6 is a timing diagram illustrating behavior of signals within the test system of FIG. 5,
- FIG. 7 is a block diagram illustrating operation of the test system of FIG. 5 during a calibration procedure;
- FIG. 8 is a simplified plan view of the probe card of FIG. 6;
- FIGS. 9 and 10 are block diagrams illustrating test systems implementing second and third embodiments of the present invention;
- FIG. 11 is a timing diagram illustrating behavior of signals within the test system of FIG. 10;
- FIGS.12 is a block diagram illustrating a test system implementing a fourth embodiment of the present invention;
- FIG. 13 is a timing diagram illustrating behavior of signals within the test system of FIG. 12;
- FIG. 14 is a block diagram illustrating a fifth embodiment of the present invention;
- FIG. 15 is a block diagram illustrating a sixth embodiment of the present invention;
- FIG. 16 is a block diagram illustrating a seventh embodiment of the present invention; and
- FIG. 17 is a timing diagram illustrating behavior of signals within the circuit of FIG. 16.
- System Architecture
- FIG. 5 illustrates in block diagram form an integrated circuit (IC)
tester 30 linked through aprobe card 32 to a set of similar IC devices under test (DUTs) 34 in the form of die on a semiconductor wafer.Probe card 32 includes a set ofprobes 37 for accessing input/output terminal pads 39 on the surfaces ofDUTs 34 and also includessignal paths 46 linkingtester 30 toprobes 37 to allowIC tester 30 to send a clock signal (CLOCK) and other test signals toDUTs 14 and to convey DUT output signals back totester 30 so that the tester can monitor the behavior of the DUTs. -
Probe card 34 also links a main power supply to apower input terminal 41 of eachDUT 34 via probes 37.Power supply 36 produces a well-regulated output voltage VA and continuously supplies a current I2 toDUT 34. For illustrative purposes, FIG. 5 represents the inherent impedances of thepaths 43 throughprobe card 32 betweenmain power supply 36 and eachDUT 34 as resistors R1. Due to a voltage drop across resistor R1, the input supply voltage VB to eachDUT 34 is always somewhat less than VA. - In accordance with the invention, a first transistor switch SW1 mounted on
probe card 32 links anauxiliary power supply 38 to a set of capacitors C2 mounted inprobe card 32. A set of second transistor switches SW2 also mounted onprobe card 32 link each capacitor C2 to the power input terminal of acorresponding DUT 34. A resistor R2 shown in FIG. 5 represents the inherent signal path impedance withinprobe card 32 between each capacitor C1 and thepower input terminal 41 of aDUT 34 when switch SW2 is closed.IC tester 30 provides an output control signal CNT1 for SW1, a control signal CNT2 for controlling switches SW2 and control data CNT3 for controlling the magnitude of the output voltage VC ofauxiliary power supply 38. As discussed in detail below,auxiliary power supply 38, switches SW1 and SW2 and capacitors C2 act as an auxiliary current source to inject current I3 into thepower input terminal 41 of each DUT under control ofIC tester 30. - Power Supply Noise
-
DUTs 34 implement synchronous logic in which switching transistors forming logic gates turn on and off in response to pulses of the periodic master CLOCK signal provided bytester 30. Each switching transistor has an inherent input capacitance, and in order to turn on or off the transistor, its driver must either charge or discharge the transistor's input capacitance. When drivers withinDUTs 34 charge a transistor's input capacitance they increase the amount of current I1 that must be supplied to each DUT'spower input terminal 41. Once the transistor's input capacitance is fully charged, its driver need only supply the relatively small amount of leakage current needed to keep the transistor's input capacitance charged so that the transistor remains turned on or off. Thus immediately after each pulse of the CLOCK signal, there is a temporary increase in the power supply current I1 input to eachDUT 34 to provide the charging current necessary to change the switching states of various transistors. Later in a CLOCK signal cycle, after those transistors have changed state, the demand for power supply current falls to a “quiescent” steady state level and remains there until the beginning of the next CLOCK signal cycle. The amount of additional current I1 aDUT 34 needs at the start of each CLOCK signal cycle depends on the number and nature of transistors that turn on or off during that particular CLOCK signal cycle. - If
tester 30 always kept switches SW1 and SW2 open,main power supply 36 would always provide all of the current input I1 to eachDUT 34. In such case the temporary increase in supply current I1 due to the increased switching activity within eachDUT 34 after each CLOCK signal pulse would cause a temporary increase in the voltage drop across the inherent impedance R1 of thesignal path 43 betweenmain power supply 36 andDUT 34. This in turn would cause a temporary decline in the voltage VB at the DUT'spower input terminal 41. FIG. 2 represents the behavior of VB and I1 when SW2 is always open. Since the dip in supply voltage VB occurring after each CLOCK signal pulse edge is a form of noise that can adversely affect the performance ofDUTs 34, it is desirable to limit the magnitude of that voltage dip. - Predictive Charge Compensation
- In accordance with the invention,
IC tester 30 controlsauxiliary power supply 38 and the states of switches SW1 and SW2 so that capacitor C2 supplies additional charging current I3 toDUT 34 at the start of each test cycle. The charging current I3, which only flows during an initial portion of each CLOCK signal cycle, combines with the current I2 output of the main power supply to provide the current input I1 toDUT 34. When charging current I3 provides approximately the same amount of charge the capacitance of switching transistors withinDUT 34 acquire following a CLOCK signal pulse, there is relatively little change in the current I2 produced bymain power supply 36 following the CLOCK signal pulse and therefore very little variation in supply voltage VB. - Thus prior to each CLOCK signal pulse,
tester 30 supplies data CNT3 toauxiliary power supply 38 indicating a desired magnitude of VC and then closes switchSW1. Power supply 38 then charges all capacitors C2. The amount of charge capacitors C2 store is proportional to the magnitude of VC. When capacitors C2 have had time to fully charge,tester 30 opens switch SW1. Thereafter, at the start of the next CLOCK signal cycle,tester 30 closes all switches SW2 so that charge stored in capacitors C2 can flow as currents I3 intoDUTs 34. Thereafter, when the need for transient charging current has passed,tester 30 opens switches SW2 so that onlymain power supply 36 supplies current toDUTs 34 during the remaining portion of the CLOCK signal cycle. This process repeats during every cycle of the CLOCK signal. - FIG. 6 illustrates the behavior of supply voltage VB, and currents I1, I2 and I3 during an initial portion of a CLOCK signal cycle. Current I1 exhibits a large temporarily increase above its quiescent level IQ1 after an edge of the CLOCK pulse at time T1 to charge capacitance within the
DUT 34. Current I3 rises quickly to provide substantially all the additional charging current. The output current I2 ofmain power supply 38 exhibits only a relatively small perturbation from its quiescent value IQ2 resulting from small mismatches between I3 and the transient component of I2. Since the variation in I2 is small, the variation in VB is small. Thus the present invention substantially limits the power supply noise due to switching transients inDUTs 34. - Tester Programming
- As mentioned above, the amount of additional charging current each
DUT 34 draws at the start of a CLOCK signal cycle depends on the number of transistors that turn on or off during the CLOCK signal cycle and charging current varies from cycle-to-cycle. In order to provide proper voltage regulation atDUT terminal 41,tester 30 has to predict howmuch charge DUT 34 is going to store following the each CLOCK signal pulse because it has to adjust the magnitude of auxiliary power supply output VC so that capacitors C2 store the proper amount of charge prior to each CLOCK signal cycle. - FIG. 7 depicts a test system set up that allows
tester 30 to experimentally determine the level to which it should set VC for each test cycle. Areference DUT 40 that is known to operate properly and which is similar to the ICs to be tested, is connected totester 30 viaprobe 32 in generally thesame way DUTs 34 are to be connected so thattester 30 can perform the same test onreference IC 40. However probecard 32 also links the power supply terminal ofreference IC 40 to an input terminal oftester 30 so thattester 30 can monitor the power supply voltage VB.Tester 30 then executes only the first CLOCK cycle of the test while observing VB using the minimum value for VC. If VB falls below a desired lower limit during the CLOCK signal cycle,tester 38 repeats the first CLOCK signal cycle of the test using a higher value of VC. This process is repeated iteratively until an appropriate value of VC for the first CLOCK signal cycle is established. The tester then iteratively executes the first two CLOCK signal cycles of the test while monitoring VB during the second CLOCK signal cycle and adjusting VC accordingly. The same procedure is used to establish an appropriate value of VC for each successive CLOCK signal cycle of the test. Those values for VC may then be used when testingDUTs 34. - Designers typically use circuit simulators to simulate ICs before they are fabricated. When a circuit simulator performs the same test on simulated ICs that an IC tester would perform on its real counterpart, the circuit simulator can be employed in an analogous manner to determine the sequence of VC values to be used during a test of the real IC.
- Probe Card
- FIG. 4 illustrates a typical prior
art probe card 12 that connects voltage regulating capacitors C1 to the power input terminals of DUTs to limit power supply noise. Such probe cards must minimize the distance between voltage regulating capacitors and the DUTs so as to minimize the impedance between the capacitors and the DUTs. Thus the capacitors preferably are mounted on the probe card in or near asmall area 27 above the probes that access the DUTs. Since there is little space on the probe card near the probes, the size and number of regulating capacitors C1 that can be deployed onprobe card 12 is limited. This limitation on capacitor mounting space can limit the number of DUTs that can be concurrently tested. - FIG. 8 is a simplified plan view of the
probe card 32 of FIG. 5 in accordance with the invention. Contact points 45 accessed byIC tester 30 of FIG. 7 are distributed over a relatively large area of theupper surface 43 ofprobe card 32 while the probes 37 (not shown) thatcontact DUTs 34 are concentrated under a relatively smallcentral area 47 of the probe card. Since the voltage VC to which capacitors C2 are charged can be adjusted to accommodate significant path impedance R2 (FIG. 5) between any switch SW2 andterminal 41 ofDUT 34, capacitors C2 can be mounted onprobe card 32 at a significantly greater distance fromcentral area 47 above the DUT probes than capacitors C1 of FIG. 4. Also since capacitors C2 are charged to a higher voltage than capacitors C1, they can be smaller than capacitors C1. Since capacitors C2 ofprobe card 32 of FIG. 8 can be smaller and further from the center of the probe card than capacitors C1 of the priorart probe card 12 of FIG. 4, a larger number of capacitors C2 can be mounted onprobe card 32. Thus a test system employingprobe card 32 in accordance with the invention can concurrently test more DUTs than a test system employing a priorart probe card 12 of FIG. 4. - Probe Card with On-board Pattern Generator
- FIG. 9 illustrates an alternative embodiment of the invention including a
probe card 50 generally similar to probecard 32 of FIG. 7 except that it has mounted thereon a “power control IC” 52.Power control IC 52 includes apattern generator 54 that carries out the pattern generation function ofIC tester 30 of FIG. 7 with respect to producing the control signals and data CNT1, CNT2 and CNT3 for controlling switches SW1 and SW2 andauxiliary power supply 38.Power control IC 52 includes aconventional pattern generator 54 programmed before the start of a test by externally generated programming data provided via aconventional computer bus 56.Pattern generator 54 begins generating its output data pattern in response to a START signal from anIC tester 58 marking the start of a test and produces its output CNT1, CNT2, CNT3 data pattern in response to the same system clock (SYSCLK) that clocks operations oftester 58. - When the required capacitance C2 is sufficiently small, switches SW1 and SW2 and capacitors C2 may be implemented within
power control IC 52 as shown in FIG. 9.IC 52 should be mounted on the probe card as near as possible to the DUT probes. Merging switches SW1 and SW2 and capacitors C2 and the pattern generation function oftester 30 into asingle IC 52 reduces the cost and complexity ofprobe card 32 and reduces the required number oftester 30 output channels. However when necessary capacitors C2 can be implemented by discrete components external topower control IC 52. - Pulse Width Modulated Charge Flow
- FIG. 10 illustrates an embodiment of the invention that is generally similar to the embodiment of FIG. 5. However in FIG. 10 switch SW1 is omitted from
probe card 60 so that the VC output ofauxiliary power supply 38 is directly connected to capacitors C2. Also the output voltage VC is fixed and not adjusted byIC tester 30 so that C2 charges to the same value prior to each CLOCK signal pulse. In thisconfiguration IC tester 30 controls the amount of charge capacitors C2 deliver toDUTs 34 at the start of each CLOCK pulse by pulse width modulating switches SW2 via control signal CNT2. The amount oftime tester 30 closes switches SW2 following the leading edge of a CLOCK signal pulse determines the amount of charge capacitors C2 deliver toDUTs 34. Alternatively, the shape of the I3 current flow illustrated in FIG. 6 can be more closely approximated whentester 30 rapidly increases and then decreases the duty cycle of the CNT2 signal as illustrated in FIG. 11. - Analog Modulated Charge Flow
- FIG. 12 illustrates an embodiment of the invention that is generally similar to the embodiment of FIG. 10. However in FIG. 12 the transistor switches SW2 are replaced with transistors Q2 operated in their active regions when
DUTs 34 are undergoing state changes and require additional current I3. In this configuration, the CNT2 output ofIC tester 30 is a data sequence applied as input to an analog-to-digital (A/D)converter 63 mounted onprobe card 61. The data sequence CNT2 represents a predicted demand for charging current I3 during each CLOCK signal cycle. A/D converter 63 responds to the CNT2 data sequence by producing an analog signal CNT4 input to the bases of transistors Q2 that varies during each CLOCK signal cycle as illustrated in FIG. 13. Analog signal CNT4 controls the amount of current I3 each transistor Q2 allows to flow out of a capacitor C2 so that it substantially matches the predicted transient component of the current I1 demanded byDUT 34. A/D converter 63 may be implemented withinIC tester 30 instead of being mounted onprobe card 61. - Charge Prediction using Reference DUT
- FIG. 14 illustrate an embodiment of the invention wherein a
reference DUT 60 similar toDUTs 34 is tested in a similar way except thattester 30 tests thereference DUT 60 slightly in advance of the other DUTs by advancing the CLOCK and other input signals it supplies to referenceDUT 60. Amain power supply 62 powers allDUTs 34 while anauxiliary power supply 64 powers referenceDUT 60. A capacitor C4 mounted onprobe card 66 nearreference DUT 60 regulates the voltage VREF at itspower input terminal 68 in a conventional manner so that it stays within its allowed operating range. A capacitor C5 links VREF to a set of amplifier's A1, and a capacitor C6 links the output of each amplifier A1 to thepower input terminal 70 of eachDUT 34. - Though well-regulated, the supply voltage VREF at the
input terminal 68 ofreference DUT 60 falls below its quiescent level by a small amount following the start of each CLOCK signal cycle due to the reference DUT's transient charging current demand. The amount of voltage decline in VREF is proportional to the amount of transient charging current drawn byreference DUT 60. Sincereference DUT 60 is similar toDUTs 34 and is tested slightly in advance ofDUTs 34, a decline in VREF predicts the amount of transient charging current each DUT 34 a short time later. - Amplifiers A1, acting through capacitors C5 and C6, amplify the AC component of VREF to produce output currents I3 that augment the current outputs I2 of
main power supply 62 to provide the current input I1 to eachDUT 34. The amount of time by whichtester 30 advances the test ofreference DUT 60 is set to equal the delay between variations in reference voltage VREF and corresponding variations in currents I3. With the (negative) gain of each amplifier A1 appropriately adjusted by an externally generated signal (GAIN), currents I3 will substantially match the transient charging currents required byDUTs 34. - Charge Prediction In Non-testing Environments
- In addition to being useful for reducing power supply noise when testing integrated circuits, embodiments of the present invention can also be employed to reduce power supply noise in application in which an integrated circuit passes though a succession of states that can be predicted.
- FIG. 15 illustrates an example embodiment of the invention in which an
integrated circuit 80 passes through a predictable succession of states in response to edges of an externally generated CLOCK signal supplied as input thereto.IC 80 receives power from amain power supply 82. Anauxiliary power supply 84 charges a capacitor C2 via a switch SW1 when switch SW1 is closed. Capacitor C2 supplies its charge as additional current input toIC 80 when a switch SW2 is closed. A “charge predictor”circuit 86 responds to the CLOCK signal by asserting a signal CNT1 to close switch SW1 and deasserting a control signal CNT2 to open switch SW2 during a portion of each CLOCK signal cycle in whichIC 80 is not changing state. This allowsauxiliary power supply 84 to charge capacitor C2 between state changes.Charge predictor circuit 86 asserts control signal CNT2 to close switch SW2 and deasserts control signal CNT1 to open switch SW1 during a portion of each CLOCK signal cycle in whichIC 80 is changing state, thereby allowing capacitor C2 to deliver current to the power input ofIC 80 to provide its transient current needs. Chargepredictor 86 also provides control data CNT2 toauxiliary power supply 84 to adjust its output voltage VC so that it charges capacitor C2 to a level determined in accordance with an amount ofcurrent IC 80 is expected to draw during a next state change. Chargepredictor 86 is suitably implemented by a conventional pattern generator or any other device capable of producing output data sequences CNT1, CNT2 and CNT3 that are appropriate for transient current requirements ofIC 80 for its expected sequence of states. Switches SW1 and SW2 and/or capacitor C2 may be implemented either external toIC 80 as illustrated in FIG. 15 or may be implemented internal toIC 80. - Charge Averaging
- FIG. 16 illustrates a simple version of the invention suitable for use in applications wherein the amount of charging current an
IC 80 is expected to draw at the start of each CLOCK signal cycle lies within a relatively limited, predictable range. As shown in FIG. 16, aninverter 90 inverts the CLOCK signal to provide the CNT1 control signal input to a switch SW1 coupling a main power supply to a capacitor C2. The CLOCK signal directly provides a CNT2 control signal input to a switch SW2 connecting capacitor C2 to a power input ofIC 80 normally driven by amain power supply 82. As illustrated in FIG. 17, the CLOCK signal drives the CNT2 signal high to close switch SW2 during a first half of each CLOCK signal cycle and drives CNT1 high to close switch SW1 during a second half of each CLOCK signal cycle. - The output voltage VC of
auxiliary power supply 84 is set to a constant value so that it charges capacitor C2 to the same level prior to the start of each CLOCK signal cycle. The level of VC is set to appropriately position the range over which power supply input voltage VB swings whenIC 80 is drawing additional charging current at the start of each CLOCK signal cycle. For example when we want the quiescent value of VB to lie at the middle of its range, we can adjust VC so that capacitor C2 supplies an amount of charging current that is in the middle of the range of chargingcurrents IC 80 is expected to draw. On the other hand, if we want to prevent VB from falling much below its quiescent value but are willing to allow VB to rise above its quiescent value, we can adjust VC so that capacitor C2 supplies the maximum amount of chargingcurrent IC 80 is expected to draw. - While capacitor C2 may supply too little charging current during some CLOCK signal cycles and too much charging current during other CLOCK signal cycles, in many applications the system illustrated in FIG. 16 nonetheless can keep the swings in VB within acceptable limits when VC is suitably adjusted. Note that the systems of FIGS. 5, 9, 14 and 15 can be programmed to operate in a similar manner by setting control data CNT3 to the same value for every CLOCK signal cycle.
- Thus has been shown and described a system for limiting power supply noise of an integrated circuit device when it is being tested. While the forgoing specification has described preferred embodiment(s) of the present invention, one skilled in the art may make many modifications to the preferred embodiment without departing from the invention in its broader aspects. While the invention is illustrated herein as reducing noise in a system employing only a single main power supply, it will be appreciated that the invention can be employed in environments in which more than one main power supply provide power to DUTs. Also while the apparatus is illustrated as operating in connection with DUTs having a single power input, it will be appreciated that the apparatus can be adapted to operate in connection with DUTs having multiple power inputs. For example referring to FIG. 7, if each
DUT 34 had more than one powersupply input terminal 41, an additionalauxiliary power supply 38, an additional capacitor C2 and additional switches SW1 and SW2 would be provided for each additional DUT power input terminal. Also, it should be noted that while the apparatus is described as providing additional charging current following a leading edge of a CLOCK signal pulse, it may be easily adapted to provide additional charging current following a trailing edge of the CLOCK signal pulse for use with DUTs that switch on trailing CLOCK signal edges. The appended claims therefore are intended to cover all such modifications as fall within the true scope and spirit of the invention.
Claims (26)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/003,596 US6456103B1 (en) | 2000-01-18 | 2001-10-30 | Apparatus for reducing power supply noise in an integrated circuit |
US10/062,999 US7342405B2 (en) | 2000-01-18 | 2002-01-30 | Apparatus for reducing power supply noise in an integrated circuit |
US10/206,276 US6657455B2 (en) | 2000-01-18 | 2002-07-25 | Predictive, adaptive power supply for an integrated circuit under test |
US10/725,824 US6949942B2 (en) | 2000-01-18 | 2003-12-01 | Predictive, adaptive power supply for an integrated circuit under test |
US11/237,092 US7245120B2 (en) | 2000-01-18 | 2005-09-27 | Predictive, adaptive power supply for an integrated circuit under test |
US11/779,188 US7714603B2 (en) | 2000-01-18 | 2007-07-17 | Predictive, adaptive power supply for an integrated circuit under test |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/484,600 US6339338B1 (en) | 2000-01-18 | 2000-01-18 | Apparatus for reducing power supply noise in an integrated circuit |
US10/003,596 US6456103B1 (en) | 2000-01-18 | 2001-10-30 | Apparatus for reducing power supply noise in an integrated circuit |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/484,600 Division US6339338B1 (en) | 2000-01-18 | 2000-01-18 | Apparatus for reducing power supply noise in an integrated circuit |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/062,999 Continuation-In-Part US7342405B2 (en) | 2000-01-18 | 2002-01-30 | Apparatus for reducing power supply noise in an integrated circuit |
Publications (2)
Publication Number | Publication Date |
---|---|
US20020036515A1 true US20020036515A1 (en) | 2002-03-28 |
US6456103B1 US6456103B1 (en) | 2002-09-24 |
Family
ID=23924816
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/484,600 Expired - Lifetime US6339338B1 (en) | 2000-01-18 | 2000-01-18 | Apparatus for reducing power supply noise in an integrated circuit |
US10/003,596 Expired - Fee Related US6456103B1 (en) | 2000-01-18 | 2001-10-30 | Apparatus for reducing power supply noise in an integrated circuit |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/484,600 Expired - Lifetime US6339338B1 (en) | 2000-01-18 | 2000-01-18 | Apparatus for reducing power supply noise in an integrated circuit |
Country Status (5)
Country | Link |
---|---|
US (2) | US6339338B1 (en) |
EP (1) | EP1219008A2 (en) |
AU (1) | AU2001232887A1 (en) |
TW (1) | TW529232B (en) |
WO (1) | WO2001073929A2 (en) |
Cited By (46)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6629048B1 (en) * | 2000-11-20 | 2003-09-30 | Tektronix, Inc. | Measurement test instrument and associated voltage management system for accessory device |
US20040004400A1 (en) * | 2000-06-14 | 2004-01-08 | Masahiro Nomura | Semiconductor device for preventing noise generation |
US20070143638A1 (en) * | 2005-12-20 | 2007-06-21 | Dobyns Kenneth P | Accessory device voltage management system controlled by a host |
US20150061720A1 (en) * | 2013-08-30 | 2015-03-05 | Keysight Technologies, Inc. | System and apparatus for measuring capacitance |
US20150153799A1 (en) * | 2013-12-04 | 2015-06-04 | Sandisk Enterprise Ip Llc | Startup Performance and Power Isolation |
US9235509B1 (en) | 2013-08-26 | 2016-01-12 | Sandisk Enterprise Ip Llc | Write amplification reduction by delaying read access to data written during garbage collection |
US9236886B1 (en) | 2013-03-15 | 2016-01-12 | Sandisk Enterprise Ip Llc | Universal and reconfigurable QC-LDPC encoder |
US9239783B2 (en) | 2007-12-27 | 2016-01-19 | Sandisk Enterprise Ip Llc | Multiprocessor storage controller |
US9244763B1 (en) | 2013-03-15 | 2016-01-26 | Sandisk Enterprise Ip Llc | System and method for updating a reading threshold voltage based on symbol transition information |
US9244785B2 (en) | 2013-11-13 | 2016-01-26 | Sandisk Enterprise Ip Llc | Simulated power failure and data hardening |
US9263156B2 (en) | 2013-11-07 | 2016-02-16 | Sandisk Enterprise Ip Llc | System and method for adjusting trip points within a storage device |
US9298608B2 (en) | 2013-10-18 | 2016-03-29 | Sandisk Enterprise Ip Llc | Biasing for wear leveling in storage systems |
US9367246B2 (en) | 2013-03-15 | 2016-06-14 | Sandisk Technologies Inc. | Performance optimization of data transfer for soft information generation |
US9384126B1 (en) | 2013-07-25 | 2016-07-05 | Sandisk Technologies Inc. | Methods and systems to avoid false negative results in bloom filters implemented in non-volatile data storage systems |
US9390814B2 (en) | 2014-03-19 | 2016-07-12 | Sandisk Technologies Llc | Fault detection and prediction for data storage elements |
US9390021B2 (en) | 2014-03-31 | 2016-07-12 | Sandisk Technologies Llc | Efficient cache utilization in a tiered data structure |
US9436831B2 (en) | 2013-10-30 | 2016-09-06 | Sandisk Technologies Llc | Secure erase in a memory device |
US9442662B2 (en) | 2013-10-18 | 2016-09-13 | Sandisk Technologies Llc | Device and method for managing die groups |
US9443601B2 (en) | 2014-09-08 | 2016-09-13 | Sandisk Technologies Llc | Holdup capacitor energy harvesting |
US9448876B2 (en) | 2014-03-19 | 2016-09-20 | Sandisk Technologies Llc | Fault detection and prediction in storage devices |
US9454448B2 (en) | 2014-03-19 | 2016-09-27 | Sandisk Technologies Llc | Fault testing in storage devices |
US9454420B1 (en) | 2012-12-31 | 2016-09-27 | Sandisk Technologies Llc | Method and system of reading threshold voltage equalization |
US9501398B2 (en) | 2012-12-26 | 2016-11-22 | Sandisk Technologies Llc | Persistent storage device with NVRAM for staging writes |
US9520162B2 (en) | 2013-11-27 | 2016-12-13 | Sandisk Technologies Llc | DIMM device controller supervisor |
US9520197B2 (en) | 2013-11-22 | 2016-12-13 | Sandisk Technologies Llc | Adaptive erase of a storage device |
US9524235B1 (en) | 2013-07-25 | 2016-12-20 | Sandisk Technologies Llc | Local hash value generation in non-volatile data storage systems |
US9582058B2 (en) | 2013-11-29 | 2017-02-28 | Sandisk Technologies Llc | Power inrush management of storage devices |
US9612948B2 (en) | 2012-12-27 | 2017-04-04 | Sandisk Technologies Llc | Reads and writes between a contiguous data block and noncontiguous sets of logical address blocks in a persistent storage device |
US9626399B2 (en) | 2014-03-31 | 2017-04-18 | Sandisk Technologies Llc | Conditional updates for reducing frequency of data modification operations |
US9626400B2 (en) | 2014-03-31 | 2017-04-18 | Sandisk Technologies Llc | Compaction of information in tiered data structure |
US9639463B1 (en) | 2013-08-26 | 2017-05-02 | Sandisk Technologies Llc | Heuristic aware garbage collection scheme in storage systems |
US9652381B2 (en) | 2014-06-19 | 2017-05-16 | Sandisk Technologies Llc | Sub-block garbage collection |
US9699263B1 (en) | 2012-08-17 | 2017-07-04 | Sandisk Technologies Llc. | Automatic read and write acceleration of data accessed by virtual machines |
US9697267B2 (en) | 2014-04-03 | 2017-07-04 | Sandisk Technologies Llc | Methods and systems for performing efficient snapshots in tiered data structures |
US9703491B2 (en) | 2014-05-30 | 2017-07-11 | Sandisk Technologies Llc | Using history of unaligned writes to cache data and avoid read-modify-writes in a non-volatile storage device |
US9703636B2 (en) | 2014-03-01 | 2017-07-11 | Sandisk Technologies Llc | Firmware reversion trigger and control |
US9703816B2 (en) | 2013-11-19 | 2017-07-11 | Sandisk Technologies Llc | Method and system for forward reference logging in a persistent datastore |
US9870830B1 (en) | 2013-03-14 | 2018-01-16 | Sandisk Technologies Llc | Optimal multilevel sensing for reading data from a storage medium |
US10114557B2 (en) | 2014-05-30 | 2018-10-30 | Sandisk Technologies Llc | Identification of hot regions to enhance performance and endurance of a non-volatile storage device |
US10146448B2 (en) | 2014-05-30 | 2018-12-04 | Sandisk Technologies Llc | Using history of I/O sequences to trigger cached read ahead in a non-volatile storage device |
US10162748B2 (en) | 2014-05-30 | 2018-12-25 | Sandisk Technologies Llc | Prioritizing garbage collection and block allocation based on I/O history for logical address regions |
CN109687690A (en) * | 2018-12-26 | 2019-04-26 | 联想(北京)有限公司 | A kind of control method, device and electronic equipment |
US10372613B2 (en) | 2014-05-30 | 2019-08-06 | Sandisk Technologies Llc | Using sub-region I/O history to cache repeatedly accessed sub-regions in a non-volatile storage device |
US10656842B2 (en) | 2014-05-30 | 2020-05-19 | Sandisk Technologies Llc | Using history of I/O sizes and I/O sequences to trigger coalesced writes in a non-volatile storage device |
US10656840B2 (en) | 2014-05-30 | 2020-05-19 | Sandisk Technologies Llc | Real-time I/O pattern recognition to enhance performance and endurance of a storage device |
US11243232B2 (en) | 2019-06-05 | 2022-02-08 | Samsung Electronics Co., Ltd. | Test apparatuses including probe card for testing semiconductor devices and operation methods thereof |
Families Citing this family (66)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6232789B1 (en) * | 1997-05-28 | 2001-05-15 | Cascade Microtech, Inc. | Probe holder for low current measurements |
US5729150A (en) * | 1995-12-01 | 1998-03-17 | Cascade Microtech, Inc. | Low-current probe card with reduced triboelectric current generating cables |
US5914613A (en) * | 1996-08-08 | 1999-06-22 | Cascade Microtech, Inc. | Membrane probing system with local contact scrub |
US6034533A (en) * | 1997-06-10 | 2000-03-07 | Tervo; Paul A. | Low-current pogo probe card |
US6256882B1 (en) * | 1998-07-14 | 2001-07-10 | Cascade Microtech, Inc. | Membrane probing system |
IT1308062B1 (en) * | 1999-05-28 | 2001-11-29 | St Microelectronics Srl | PROTECTION CIRCUIT TO REDUCE NOISE ON DENSITY REFERENCES, IN PARTICULAR IN DC-DC CONVERTERS |
US6578264B1 (en) * | 1999-06-04 | 2003-06-17 | Cascade Microtech, Inc. | Method for constructing a membrane probe using a depression |
US6657455B2 (en) * | 2000-01-18 | 2003-12-02 | Formfactor, Inc. | Predictive, adaptive power supply for an integrated circuit under test |
US6838890B2 (en) * | 2000-02-25 | 2005-01-04 | Cascade Microtech, Inc. | Membrane probing system |
US6724209B1 (en) * | 2000-04-13 | 2004-04-20 | Ralph G. Whitten | Method for testing signal paths between an integrated circuit wafer and a wafer tester |
US6677744B1 (en) * | 2000-04-13 | 2004-01-13 | Formfactor, Inc. | System for measuring signal path resistance for an integrated circuit tester interconnect structure |
JP2001296335A (en) * | 2000-04-14 | 2001-10-26 | Nec Corp | Method and apparatus for inspection of semiconductor device |
WO2002025296A2 (en) * | 2000-09-22 | 2002-03-28 | Don Mccord | Method and system for wafer and device-level testing of an integrated circuit |
DE10143173A1 (en) | 2000-12-04 | 2002-06-06 | Cascade Microtech Inc | Wafer probe has contact finger array with impedance matching network suitable for wide band |
JP3696507B2 (en) * | 2000-12-28 | 2005-09-21 | 株式会社アドバンテスト | Test apparatus, test method, and production method |
WO2003052435A1 (en) * | 2001-08-21 | 2003-06-26 | Cascade Microtech, Inc. | Membrane probing system |
US6504395B1 (en) * | 2001-08-30 | 2003-01-07 | Teradyne, Inc. | Method and apparatus for calibration and validation of high performance DUT power supplies |
US6880118B2 (en) * | 2001-10-25 | 2005-04-12 | Sun Microsystems, Inc. | System and method for testing operational transmissions of an integrated circuit |
US6816031B1 (en) | 2001-12-04 | 2004-11-09 | Formfactor, Inc. | Adjustable delay transmission line |
DE10202904B4 (en) * | 2002-01-25 | 2004-11-18 | Infineon Technologies Ag | Device and method for parallel and independent testing of voltage-supplied semiconductor memory devices |
US7114084B2 (en) | 2002-03-06 | 2006-09-26 | Micron Technology, Inc. | Data controlled programmable power supply |
US6965244B2 (en) * | 2002-05-08 | 2005-11-15 | Formfactor, Inc. | High performance probe system |
US6911835B2 (en) * | 2002-05-08 | 2005-06-28 | Formfactor, Inc. | High performance probe system |
WO2003100445A2 (en) * | 2002-05-23 | 2003-12-04 | Cascade Microtech, Inc. | Probe for testing a device under test |
US6724205B1 (en) * | 2002-11-13 | 2004-04-20 | Cascade Microtech, Inc. | Probe for combined signals |
JP4173726B2 (en) * | 2002-12-17 | 2008-10-29 | 株式会社ルネサステクノロジ | Interface circuit |
US7057404B2 (en) * | 2003-05-23 | 2006-06-06 | Sharp Laboratories Of America, Inc. | Shielded probe for testing a device under test |
US7084659B2 (en) * | 2003-06-09 | 2006-08-01 | Credence Systems Corporation | Power supply arrangement for integrated circuit tester |
JP2007517231A (en) * | 2003-12-24 | 2007-06-28 | カスケード マイクロテック インコーポレイテッド | Active wafer probe |
TWI260415B (en) * | 2004-03-31 | 2006-08-21 | Nanya Technology Corp | Apparatus and method for testing semiconductor device |
TWI241071B (en) * | 2004-06-30 | 2005-10-01 | Univ Nat Cheng Kung | Test framework and test method of analog to digital converter |
DE202005021386U1 (en) * | 2004-07-07 | 2007-11-29 | Cascade Microtech, Inc., Beaverton | Probe with a sensor with membrane suspension |
WO2006031646A2 (en) * | 2004-09-13 | 2006-03-23 | Cascade Microtech, Inc. | Double sided probing structures |
DE202005021436U1 (en) * | 2004-11-02 | 2008-02-14 | Cascade Microtech, Inc., Beaverton | Optically enhanced digital imaging system |
US7257788B2 (en) * | 2004-11-08 | 2007-08-14 | International Business Machines Corporation | Method and apparatus for converting globally clock-gated circuits to locally clock-gated circuits |
US7262624B2 (en) * | 2004-12-21 | 2007-08-28 | Formfactor, Inc. | Bi-directional buffer for interfacing test system channel |
US7414418B2 (en) * | 2005-01-07 | 2008-08-19 | Formfactor, Inc. | Method and apparatus for increasing operating frequency of a system for testing electronic devices |
US7656172B2 (en) | 2005-01-31 | 2010-02-02 | Cascade Microtech, Inc. | System for testing semiconductors |
US7535247B2 (en) * | 2005-01-31 | 2009-05-19 | Cascade Microtech, Inc. | Interface for testing semiconductors |
US7005879B1 (en) * | 2005-03-01 | 2006-02-28 | International Business Machines Corporation | Device for probe card power bus noise reduction |
US7449899B2 (en) * | 2005-06-08 | 2008-11-11 | Cascade Microtech, Inc. | Probe for high frequency signals |
US7425834B2 (en) * | 2005-08-26 | 2008-09-16 | Power Integrations, Inc. | Method and apparatus to select a parameter/mode based on a time measurement |
JP4940643B2 (en) * | 2005-12-08 | 2012-05-30 | 日本電気株式会社 | Power supply noise tolerance inspection circuit and power supply noise tolerance inspection method |
US7764072B2 (en) * | 2006-06-12 | 2010-07-27 | Cascade Microtech, Inc. | Differential signal probing system |
US7723999B2 (en) * | 2006-06-12 | 2010-05-25 | Cascade Microtech, Inc. | Calibration structures for differential signal probing |
US7443186B2 (en) * | 2006-06-12 | 2008-10-28 | Cascade Microtech, Inc. | On-wafer test structures for differential signals |
US7403028B2 (en) | 2006-06-12 | 2008-07-22 | Cascade Microtech, Inc. | Test structure and probe for differential signals |
US7675310B2 (en) * | 2006-10-23 | 2010-03-09 | Planet Ate, Inc. | Device under test power supply |
US7876114B2 (en) * | 2007-08-08 | 2011-01-25 | Cascade Microtech, Inc. | Differential waveguide probe |
US20090085596A1 (en) * | 2007-09-28 | 2009-04-02 | Qimonda Ag | System and method for testing semiconductor devices |
US8531202B2 (en) * | 2007-10-11 | 2013-09-10 | Veraconnex, Llc | Probe card test apparatus and method |
US20090177866A1 (en) * | 2008-01-08 | 2009-07-09 | Choate Michael L | System and method for functionally redundant computing system having a configurable delay between logically synchronized processors |
TWI362496B (en) * | 2008-03-05 | 2012-04-21 | Nanya Technology Corp | Apparatus for testing chip and circuit of probe card |
US7999530B2 (en) * | 2008-03-21 | 2011-08-16 | Intersil Americas Inc. | Device under test power supply |
US8154315B2 (en) * | 2008-04-08 | 2012-04-10 | Formfactor, Inc. | Self-referencing voltage regulator |
US8030959B2 (en) * | 2008-06-12 | 2011-10-04 | Texas Instruments Incorporated | Device-under-test power management |
US7924035B2 (en) * | 2008-07-15 | 2011-04-12 | Formfactor, Inc. | Probe card assembly for electronic device testing with DC test resource sharing |
WO2010029597A1 (en) | 2008-09-10 | 2010-03-18 | 株式会社アドバンテスト | Tester and circuit system |
US8116106B2 (en) | 2008-09-19 | 2012-02-14 | Power Integrations, Inc. | Method and apparatus to select a parameter/mode based on a measurement during an initialization period |
US8344746B2 (en) * | 2008-09-29 | 2013-01-01 | Thermo Fisher Scientific Inc. | Probe interface for electrostatic discharge testing of an integrated circuit |
US7888957B2 (en) * | 2008-10-06 | 2011-02-15 | Cascade Microtech, Inc. | Probing apparatus with impedance optimized interface |
WO2010059247A2 (en) | 2008-11-21 | 2010-05-27 | Cascade Microtech, Inc. | Replaceable coupon for a probing apparatus |
US8242629B2 (en) * | 2009-02-03 | 2012-08-14 | Transistor Devices, Inc. | Hybrid load systems including a dynamic electronic load and passive resistive load modules |
TW201413440A (en) * | 2012-09-26 | 2014-04-01 | Wistron Corp | Method for controlling power mode switching |
KR102324800B1 (en) | 2014-11-11 | 2021-11-11 | 삼성전자주식회사 | Rechargeable power module and test system including the same |
US11543453B2 (en) * | 2019-01-25 | 2023-01-03 | Texas Instruments Incorporated | In-wafer reliability testing |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4144536A (en) * | 1977-11-21 | 1979-03-13 | Probe-Rite, Inc. | Inker network for probing machine |
DE3234004A1 (en) | 1982-09-14 | 1984-03-15 | Christoph Emmerich GmbH & Co KG, 6000 Frankfurt | Memory chip for microprocessors |
US5101149A (en) * | 1989-07-18 | 1992-03-31 | National Semiconductor Corporation | Modifiable IC board |
US5422562A (en) | 1994-01-19 | 1995-06-06 | Unitrode Corporation | Switching regulator with improved Dynamic response |
US6055661A (en) * | 1994-06-13 | 2000-04-25 | Luk; Fong | System configuration and methods for on-the-fly testing of integrated circuits |
US5502671A (en) | 1994-08-31 | 1996-03-26 | Texas Instruments Incorporated | Apparatus and method for a semiconductor memory configuration-dependent output buffer supply circuit |
US5592077A (en) * | 1995-02-13 | 1997-01-07 | Cirrus Logic, Inc. | Circuits, systems and methods for testing ASIC and RAM memory devices |
JP3233559B2 (en) * | 1995-08-14 | 2001-11-26 | シャープ株式会社 | Method and apparatus for testing semiconductor integrated circuit |
US5721495A (en) * | 1995-10-24 | 1998-02-24 | Unisys Corporation | Circuit for measuring quiescent current |
US5652524A (en) | 1995-10-24 | 1997-07-29 | Unisys Corporation | Built-in load board design for performing high resolution quiescent current measurements of a device under test |
US5822166A (en) | 1996-12-05 | 1998-10-13 | Intel Corporation | DC power bus voltage transient suppression circuit |
US5926384A (en) | 1997-06-26 | 1999-07-20 | Harris Corporation | DC-dC converter having dynamic regulator with current sourcing and sinking means |
US6087843A (en) * | 1997-07-14 | 2000-07-11 | Credence Systems Corporation | Integrated circuit tester with test head including regulating capacitor |
-
2000
- 2000-01-18 US US09/484,600 patent/US6339338B1/en not_active Expired - Lifetime
-
2001
- 2001-01-18 EP EP20010904961 patent/EP1219008A2/en not_active Withdrawn
- 2001-01-18 AU AU2001232887A patent/AU2001232887A1/en not_active Abandoned
- 2001-01-18 WO PCT/US2001/001955 patent/WO2001073929A2/en active Application Filing
- 2001-02-21 TW TW90101160A patent/TW529232B/en not_active IP Right Cessation
- 2001-10-30 US US10/003,596 patent/US6456103B1/en not_active Expired - Fee Related
Cited By (53)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040004400A1 (en) * | 2000-06-14 | 2004-01-08 | Masahiro Nomura | Semiconductor device for preventing noise generation |
US7199490B2 (en) * | 2000-06-14 | 2007-04-03 | Nec Corporation | Semiconductor device for preventing noise generation |
US6629048B1 (en) * | 2000-11-20 | 2003-09-30 | Tektronix, Inc. | Measurement test instrument and associated voltage management system for accessory device |
US20070143638A1 (en) * | 2005-12-20 | 2007-06-21 | Dobyns Kenneth P | Accessory device voltage management system controlled by a host |
US7532492B2 (en) | 2005-12-20 | 2009-05-12 | Tektronix, Inc. | Host controlled voltage input system for an accessory device |
US9448743B2 (en) | 2007-12-27 | 2016-09-20 | Sandisk Technologies Llc | Mass storage controller volatile memory containing metadata related to flash memory storage |
US9483210B2 (en) | 2007-12-27 | 2016-11-01 | Sandisk Technologies Llc | Flash storage controller execute loop |
US9239783B2 (en) | 2007-12-27 | 2016-01-19 | Sandisk Enterprise Ip Llc | Multiprocessor storage controller |
US9699263B1 (en) | 2012-08-17 | 2017-07-04 | Sandisk Technologies Llc. | Automatic read and write acceleration of data accessed by virtual machines |
US9501398B2 (en) | 2012-12-26 | 2016-11-22 | Sandisk Technologies Llc | Persistent storage device with NVRAM for staging writes |
US9612948B2 (en) | 2012-12-27 | 2017-04-04 | Sandisk Technologies Llc | Reads and writes between a contiguous data block and noncontiguous sets of logical address blocks in a persistent storage device |
US9454420B1 (en) | 2012-12-31 | 2016-09-27 | Sandisk Technologies Llc | Method and system of reading threshold voltage equalization |
US9870830B1 (en) | 2013-03-14 | 2018-01-16 | Sandisk Technologies Llc | Optimal multilevel sensing for reading data from a storage medium |
US9367246B2 (en) | 2013-03-15 | 2016-06-14 | Sandisk Technologies Inc. | Performance optimization of data transfer for soft information generation |
US9244763B1 (en) | 2013-03-15 | 2016-01-26 | Sandisk Enterprise Ip Llc | System and method for updating a reading threshold voltage based on symbol transition information |
US9236886B1 (en) | 2013-03-15 | 2016-01-12 | Sandisk Enterprise Ip Llc | Universal and reconfigurable QC-LDPC encoder |
US9524235B1 (en) | 2013-07-25 | 2016-12-20 | Sandisk Technologies Llc | Local hash value generation in non-volatile data storage systems |
US9384126B1 (en) | 2013-07-25 | 2016-07-05 | Sandisk Technologies Inc. | Methods and systems to avoid false negative results in bloom filters implemented in non-volatile data storage systems |
US9639463B1 (en) | 2013-08-26 | 2017-05-02 | Sandisk Technologies Llc | Heuristic aware garbage collection scheme in storage systems |
US9361221B1 (en) | 2013-08-26 | 2016-06-07 | Sandisk Technologies Inc. | Write amplification reduction through reliable writes during garbage collection |
US9235509B1 (en) | 2013-08-26 | 2016-01-12 | Sandisk Enterprise Ip Llc | Write amplification reduction by delaying read access to data written during garbage collection |
US9651596B2 (en) * | 2013-08-30 | 2017-05-16 | Keysight Technologies, Inc. | System and apparatus for measuring capacitance |
US20150061720A1 (en) * | 2013-08-30 | 2015-03-05 | Keysight Technologies, Inc. | System and apparatus for measuring capacitance |
US9298608B2 (en) | 2013-10-18 | 2016-03-29 | Sandisk Enterprise Ip Llc | Biasing for wear leveling in storage systems |
US9442662B2 (en) | 2013-10-18 | 2016-09-13 | Sandisk Technologies Llc | Device and method for managing die groups |
US9436831B2 (en) | 2013-10-30 | 2016-09-06 | Sandisk Technologies Llc | Secure erase in a memory device |
US9263156B2 (en) | 2013-11-07 | 2016-02-16 | Sandisk Enterprise Ip Llc | System and method for adjusting trip points within a storage device |
US9244785B2 (en) | 2013-11-13 | 2016-01-26 | Sandisk Enterprise Ip Llc | Simulated power failure and data hardening |
US9703816B2 (en) | 2013-11-19 | 2017-07-11 | Sandisk Technologies Llc | Method and system for forward reference logging in a persistent datastore |
US9520197B2 (en) | 2013-11-22 | 2016-12-13 | Sandisk Technologies Llc | Adaptive erase of a storage device |
US9520162B2 (en) | 2013-11-27 | 2016-12-13 | Sandisk Technologies Llc | DIMM device controller supervisor |
US9582058B2 (en) | 2013-11-29 | 2017-02-28 | Sandisk Technologies Llc | Power inrush management of storage devices |
US9235245B2 (en) * | 2013-12-04 | 2016-01-12 | Sandisk Enterprise Ip Llc | Startup performance and power isolation |
US20150153799A1 (en) * | 2013-12-04 | 2015-06-04 | Sandisk Enterprise Ip Llc | Startup Performance and Power Isolation |
US9703636B2 (en) | 2014-03-01 | 2017-07-11 | Sandisk Technologies Llc | Firmware reversion trigger and control |
US9454448B2 (en) | 2014-03-19 | 2016-09-27 | Sandisk Technologies Llc | Fault testing in storage devices |
US9448876B2 (en) | 2014-03-19 | 2016-09-20 | Sandisk Technologies Llc | Fault detection and prediction in storage devices |
US9390814B2 (en) | 2014-03-19 | 2016-07-12 | Sandisk Technologies Llc | Fault detection and prediction for data storage elements |
US9390021B2 (en) | 2014-03-31 | 2016-07-12 | Sandisk Technologies Llc | Efficient cache utilization in a tiered data structure |
US9626399B2 (en) | 2014-03-31 | 2017-04-18 | Sandisk Technologies Llc | Conditional updates for reducing frequency of data modification operations |
US9626400B2 (en) | 2014-03-31 | 2017-04-18 | Sandisk Technologies Llc | Compaction of information in tiered data structure |
US9697267B2 (en) | 2014-04-03 | 2017-07-04 | Sandisk Technologies Llc | Methods and systems for performing efficient snapshots in tiered data structures |
US9703491B2 (en) | 2014-05-30 | 2017-07-11 | Sandisk Technologies Llc | Using history of unaligned writes to cache data and avoid read-modify-writes in a non-volatile storage device |
US10114557B2 (en) | 2014-05-30 | 2018-10-30 | Sandisk Technologies Llc | Identification of hot regions to enhance performance and endurance of a non-volatile storage device |
US10146448B2 (en) | 2014-05-30 | 2018-12-04 | Sandisk Technologies Llc | Using history of I/O sequences to trigger cached read ahead in a non-volatile storage device |
US10162748B2 (en) | 2014-05-30 | 2018-12-25 | Sandisk Technologies Llc | Prioritizing garbage collection and block allocation based on I/O history for logical address regions |
US10372613B2 (en) | 2014-05-30 | 2019-08-06 | Sandisk Technologies Llc | Using sub-region I/O history to cache repeatedly accessed sub-regions in a non-volatile storage device |
US10656842B2 (en) | 2014-05-30 | 2020-05-19 | Sandisk Technologies Llc | Using history of I/O sizes and I/O sequences to trigger coalesced writes in a non-volatile storage device |
US10656840B2 (en) | 2014-05-30 | 2020-05-19 | Sandisk Technologies Llc | Real-time I/O pattern recognition to enhance performance and endurance of a storage device |
US9652381B2 (en) | 2014-06-19 | 2017-05-16 | Sandisk Technologies Llc | Sub-block garbage collection |
US9443601B2 (en) | 2014-09-08 | 2016-09-13 | Sandisk Technologies Llc | Holdup capacitor energy harvesting |
CN109687690A (en) * | 2018-12-26 | 2019-04-26 | 联想(北京)有限公司 | A kind of control method, device and electronic equipment |
US11243232B2 (en) | 2019-06-05 | 2022-02-08 | Samsung Electronics Co., Ltd. | Test apparatuses including probe card for testing semiconductor devices and operation methods thereof |
Also Published As
Publication number | Publication date |
---|---|
US6456103B1 (en) | 2002-09-24 |
TW529232B (en) | 2003-04-21 |
EP1219008A2 (en) | 2002-07-03 |
US6339338B1 (en) | 2002-01-15 |
WO2001073929A2 (en) | 2001-10-04 |
AU2001232887A1 (en) | 2001-10-08 |
WO2001073929A3 (en) | 2002-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6339338B1 (en) | Apparatus for reducing power supply noise in an integrated circuit | |
US7342405B2 (en) | Apparatus for reducing power supply noise in an integrated circuit | |
US6657455B2 (en) | Predictive, adaptive power supply for an integrated circuit under test | |
US5951705A (en) | Integrated circuit tester having pattern generator controlled data bus | |
JP2006250941A (en) | Pin electronics used within automatic test device for testing integrated circuit | |
US6202186B1 (en) | Integrated circuit tester having pattern generator controlled data bus | |
EP1825280A2 (en) | Using parametric measurement units as a source of power for a device under test | |
US20050174137A1 (en) | Distributed, load sharing power supply system for IC tester | |
US6927590B2 (en) | Method and circuit for testing a regulated power supply in an integrated circuit | |
US6801050B2 (en) | Driver circuit integrated with load current output circuit, pin electronics and IC tester having thereof | |
EP1025476A4 (en) | Multiple output programmable reference voltage source | |
TWI298922B (en) | Predictive, adaptive power supply for an integrated circuit under test | |
KR100334398B1 (en) | Current measuring method and current measuring apparatus | |
US6393593B1 (en) | Tester and method for testing LSI designed for scan method | |
JPH0980118A (en) | Ic tester | |
JPH0981250A (en) | Power supply device for testing integrated circuit | |
JPH08129051A (en) | Element characteristic measuring device and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
FPAY | Fee payment |
Year of fee payment: 8 |
|
REMI | Maintenance fee reminder mailed | ||
LAPS | Lapse for failure to pay maintenance fees | ||
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20140924 |
|
AS | Assignment |
Owner name: HSBC BANK USA, NATIONAL ASSOCIATION, CALIFORNIA Free format text: SECURITY INTEREST IN UNITED STATES PATENTS AND TRADEMARKS;ASSIGNORS:FORMFACTOR, INC.;ASTRIA SEMICONDUCTOR HOLDINGS, INC.;CASCADE MICROTECH, INC.;AND OTHERS;REEL/FRAME:039184/0280 Effective date: 20160624 |