EP2616306A1 - Verfahren zur visualisierung der gleisbelegung - Google Patents

Verfahren zur visualisierung der gleisbelegung

Info

Publication number
EP2616306A1
EP2616306A1 EP11757230.5A EP11757230A EP2616306A1 EP 2616306 A1 EP2616306 A1 EP 2616306A1 EP 11757230 A EP11757230 A EP 11757230A EP 2616306 A1 EP2616306 A1 EP 2616306A1
Authority
EP
European Patent Office
Prior art keywords
train
time
diagram
visualizing
coordinate system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP11757230.5A
Other languages
English (en)
French (fr)
Other versions
EP2616306B1 (de
Inventor
Joern Thiemann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Publication of EP2616306A1 publication Critical patent/EP2616306A1/de
Application granted granted Critical
Publication of EP2616306B1 publication Critical patent/EP2616306B1/de
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
    • B61L25/02Indicating or recording positions or identities of vehicles or vehicle trains
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/06Vehicle-on-line indication; Monitoring locking and release of the route
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
    • B61L25/02Indicating or recording positions or identities of vehicles or vehicle trains
    • B61L25/025Absolute localisation, e.g. providing geodetic coordinates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
    • B61L25/06Indicating or recording the setting of track apparatus, e.g. of points, of signals
    • B61L25/08Diagrammatic displays
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • B61L27/14Following schedules

Definitions

  • the invention relates to a method for visualizing the track occupancy in a train running succession and / or Werner- planning system of the railway safety technology for at least one train on the basis of a time-way-line diagram (ZWL diagram), as Computer graphics is created.
  • ZWL diagram time-way-line diagram
  • a means to detect track occupancy conflict immediately is the visual representation by means of a time-distance line Dia ⁇ program, which is commonly referred to as ZWL diagram.
  • a time-distance line is entered for each train. This makes it clear for each train run, at what time the train should be scheduled at what place.
  • a line indicates the current situa ⁇ tion at time t.
  • Train tracking systems in the form of ZWL diagrams with target and actual data for each train at time t enable the detection of delays and the risk of collision.
  • the clarity of the graphical visualization, ie the user interface is rather suboptimal.
  • the invention is based on the object of providing a method for visualizing the track occupancy in a train track Railway and / or train scheduling system of the railway safety technology for at least one train on the basis of a ZWL diagram that is created as a computer graphic, admit ⁇ , which allows a better visibility of a track occupancy ⁇ conflict in connection with a delay situation.
  • the object is achieved in that the path is graphically displayed in a three-dimensional coordinate system as a function of time and another, a Versharidian ⁇ tungszeit characterizing coordinate.
  • Figure 1 is a diagram according to the prior art and Figure 2 is a diagram of the invention.
  • FIG. 1 shows a ZWL diagram (time-distance-line diagram) of a form of representation which is widely used and explained above.
  • FIG. 2 shows the use according to the invention of a delay time as the third dimension.
  • be ZWL diagram according to FIG. 1
  • the 3D display Positioning is possible for both train scheduling and train running in real time. The higher the bar, the longer the delay. In the 3D diagram it can be seen immediately that in the future, delays can suddenly arise, which are slowly reduced in the course of time.
  • suitable software components the parameters can be continuously recalculated during real operation.
  • a scheduling component of a traffic ⁇ medium operator calculates the delay of rail vehicles ⁇ based on an actual-target comparison with respect to the Fahr ⁇ plan. This allows you to anticipate how delays affect the entire system. Appropriate measures to minimize delays can be initiated and optimized at an early stage.

Abstract

Die Erfindung betrifft ein Verfahren zur Visualisierung der Gleisbelegung bei einem Zuglaufverfolgungs- und/oder Zuglaufplanungssystem der Eisenbahnsicherungstechnik für mindestens einen Zug auf der Basis eines Zeit-Weg-Linien-Diagramms (ZWL-Diagramms), das als Computergrafik erstellt wird. Um mögliche Zuglaufkollisionen infolge von Verspätungen erkennbar zu machen, ist vorgesehen, dass der Weg in Abhängigkeit von der Zeit und einer weiteren, eine Verspätungszeit charakterisierenden Koordinate in einem dreidimensionalen Koordinatensystem grafisch dargestellt wird.

Description

Beschreibung
Verfahren zur Visualisierung der Gleisbelegung Die Erfindung betrifft ein Verfahren zur Visualisierung der Gleisbelegung bei einem Zuglauf erfolgungs- und/oder Zuglauf- planungssystem der Eisenbahnsicherungstechnik für mindestens einen Zug auf der Basis eines Zeit-Weg-Linien-Diagramms (ZWL- Diagramms), das als Computergrafik erstellt wird.
Die aktuelle wie auch die vorgeplante Gleisbelegung muss ga¬ rantieren, dass ein Mindestabstand zwischen den Zügen eingehalten wird und Kollisionen quasi ausgeschlossen sind. Ein Mittel, um Gleisbelegungskonflikte sofort zu erkennen, ist die visuelle Darstellung mittels eines Zeit-Weg-Linien-Dia¬ gramms, das üblicherweise als ZWL-Diagramm bezeichnet wird. Hierzu wird ein X-Y-Koordinatensystem verwendet, wie in Figur 1 veranschaulicht. Die X-Achse oder die Y-Achse dient zur An¬ zeige der Zeitkoordinate, beispielsweise der Stunden und Mi- nuten eines Tages, während die andere Achse Ortsangaben, bei¬ spielsweise Kilometermarken oder Bahnhofsbezeichnungen, enthält. In das Koordinatensystem wird für jeden Zug eine Zeit- Weg-Linie eingetragen. Dadurch ist für jeden Zuglauf erkennbar, zu welcher Zeit sich der Zug an welchem Ort planmäßig aufhalten soll. Eine Linie kennzeichnet die aktuelle Situa¬ tion zum Zeitpunkt t. Zuglaufverfolgungssysteme in Form von ZWL-Diagrammen mit Soll- und Ist-Daten für jeden Zug zum Zeitpunkt t ermöglichen die Erkennung von Verspätungen und Kollisionsgefahr. Die Übersichtlichkeit der grafischen Visua- lisierung, d. h. der Benutzeroberfläche, ist dabei jedoch eher suboptimal.
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zur Visualisierung der Gleisbelegung bei einem Zuglaufverfol- gungs- und/oder Zuglaufplanungssystem der Eisenbahnsicherungstechnik für mindestens einen Zug auf der Basis eines ZWL-Diagramms , das als Computergrafik erstellt wird, an¬ zugeben, das eine bessere Erkennbarkeit eines Gleisbelegungs¬ konfliktes im Zusammenhang mit einer Verspätungssituation ermöglicht .
Erfindungsgemäß wird die Aufgabe dadurch gelöst, dass der Weg in Abhängigkeit von der Zeit und einer weiteren, eine Verspä¬ tungszeit charakterisierenden Koordinate in einem dreidimensionalen Koordinatensystem grafisch dargestellt wird.
Die Verwendung dreidimensionaler Zeit-Weg-„Gebirge" mit der Verspätungszeit als dritter Dimension gestattet eine über¬ sichtlichere Darstellung der Gleisbelegungen sowohl in der Planungsphase als auch im laufenden Betrieb. Es wird erkenn¬ bar, welche Zugläufe bei simulierter oder tatsächlicher Verspätung einer bestimmten Größenordnung mindestens eines Zuges in Konflikt zueinander geraten und somit ebenfalls zu Verspä¬ tungen führen werden. Aus dieser Kenntnis heraus lassen sich optimale Gegenmaßnahmen ableiten. Neben einer energetisch vernünftigen temporären Geschwindigkeitserhöhung aller verspäteten Züge kann dabei auch eine Nachführung des Fahrplanes im Sinne einer Entzerrung von Konfliktknoten resultieren. Bei ähnlichen Verspätungs-Gebirgen kann auch auf die Erfahrungen aus der Vergangenheit zurückgegriffen werden.
Durch die Einbeziehung der Verspätungszeiten aller Züge in die Computergrafik gemäß Anspruch 2 ist auf den ersten Blick erkennbar, welche Züge, z. B. wegen Kollisionsgefahr oder wegen ihrer Anschlusszugeigenschaft bis zum Eintreffen des ur¬ sprünglich verspäteten Zuges warten müssen und wie groß ihre Verspätungszeit momentan ist und in der Zukunft sein wird. Mittels Simulation verschiedener Einflussgrößen, beispiels- weise der Geschwindigkeit mindestens eines verspäteten Zuges, lässt sich quasi spielerisch ein optimales Vorgehen zum sukzessiven Abbau der Verspätung jedes einzelnen Zuges ableiten. Dabei kann neben der Pünktlichkeit auch der Energieverbrauch oder der Vorrang eines bestimmten Zugtyps berücksichtigt werden .
Durch die vorteilhafte Weiterbildung gemäß Anspruch 3, d. h. durch Drehung des Koordinatensystems um eine Raumachse, lässt sich der visuelle Eindruck, inwieweit sich Verspätungen gegenseitig aufschaukeln, noch weiter verstärken. Dadurch ist auch bei sehr komplexen Bahnanlagen, beispielsweise im Bahnhofsbereich, eine hohe Sicherheit bei der Planung der Gleis¬ belegung wie auch bei der ZuglaufVerfolgung zur Kontrolle des tatsächlichen Gleisbelegungszustandes in Abhängigkeit von Zugverspätungen oder umgekehrt gegeben.
Nachfolgend wird die Erfindung anhand figürlicher Darstellungen näher erläutert. Es zeigen:
Figur 1 ein Diagramm gemäß dem Stand der Technik und Figur 2 eine erfindungsgemäße Diagrammdarstellung.
Figur 1 zeigt ein ZWL-Diagramm (Zeit-Weg-Linien-Diagramm) einer Darstellungsform, die vielfach gebräuchlich und oben erläutert ist.
In Figur 2 ist die erfindungsgemäße Verwendung einer Verspä- tungszeit als dritter Dimension dargestellt. Durch diese Kom¬ bination wird erkennbar, zu welchem Zeitpunkt welches Schie¬ nenfahrzeug welche Verspätung hab en wird. Eine derartige quantitative Aussage bezüglich der Verspätung ist mit dem be¬ kannten ZWL-Diagramm gemäß Figur 1 nicht möglich. Die 3D-Dar- Stellung ist sowohl für die Zuglaufplanung als auch für die Zuglauf erfolgung in Echtzeit möglich. Je höher der Balken ist, desto größer ist die Verspätungszeit. Im 3D-Diagramm lässt sich sofort erkennen, dass in der Zukunft plötzlich Verspätungen auftauchen können, die erst im weiteren Verlauf langsam abgebaut werden. Durch geeignete Softwarekomponenten können die Parameter während des realen Betriebes laufend neu berechnet werden. Eine Dispositionskomponente eines Verkehrs¬ mittelbetreibers berechnet die Verspätung der Schienenfahr¬ zeuge anhand eines Ist-Soll-Vergleiches bezüglich des Fahr¬ planes. Dadurch lässt sich vorausschauend erkennen, wie sich Verspätungen im gesamten System auswirken. Geeignete Maßnahmen, um die Verspätungen zu minimieren, können frühzeitig eingeleitet und optimiert werden.

Claims

Patentansprüche
1. Verfahren zur Visualisierung der Gleisbelegung bei einem Zuglauf erfolgungs- und/oder Zuglaufplanungssystem der Eisen- bahnsicherungstechnik für mindestens einen Zug auf der Basis eines Zeit-Weg-Linien-Diagramms ( ZWL-Diagramms ) , das als Com¬ putergrafik erstellt wird,
d a d u r c h g e k e n n z e i c h n e t , dass
der Weg in Abhängigkeit von der Zeit und einer weiteren, eine Verspätungszeit charakterisierenden Koordinate in einem drei¬ dimensionalen Koordinatensystem grafisch dargestellt wird.
2. Verfahren nach Anspruch 1,
d a d u r c h g e k e n n z e i c h n e t , dass
eine vorausschauende Entwicklung der Verspätungszeiten aller Züge des Zuglaufverfolgungs- und/oder Zuglaufplanungssystems in dem dreidimensionalen Koordinatensystem grafisch dargestellt wird.
3. Verfahren nach einem der vorangehenden Ansprüche,
d a d u r c h g e k e n n z e i c h n e t , dass
das Koordinatensystem um mindestens eine Raumachse gedreht werden kann.
EP11757230.5A 2010-09-14 2011-09-05 Verfahren zur visualisierung der gleisbelegung Not-in-force EP2616306B1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102010045461A DE102010045461A1 (de) 2010-09-14 2010-09-14 Verfahren zur Visualisierung der Gleisbelegung
PCT/EP2011/065250 WO2012034878A1 (de) 2010-09-14 2011-09-05 Verfahren zur visualisierung der gleisbelegung

Publications (2)

Publication Number Publication Date
EP2616306A1 true EP2616306A1 (de) 2013-07-24
EP2616306B1 EP2616306B1 (de) 2017-06-28

Family

ID=44651714

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11757230.5A Not-in-force EP2616306B1 (de) 2010-09-14 2011-09-05 Verfahren zur visualisierung der gleisbelegung

Country Status (7)

Country Link
US (1) US8662454B2 (de)
EP (1) EP2616306B1 (de)
CN (1) CN103097227B (de)
DE (1) DE102010045461A1 (de)
DK (1) DK2616306T3 (de)
ES (1) ES2641297T3 (de)
WO (1) WO2012034878A1 (de)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017056169A1 (ja) * 2015-09-29 2017-04-06 株式会社日立製作所 運行状況表示システム
US10279823B2 (en) * 2016-08-08 2019-05-07 General Electric Company System for controlling or monitoring a vehicle system along a route
CN107330012B (zh) * 2017-06-15 2019-08-30 中国电子科技集团公司第二十八研究所 一种海量空间目标处理方法
EP3530547A1 (de) * 2018-02-21 2019-08-28 ALSTOM Transport Technologies Verfahren und system zur durchführung eines planungsprozesses eines zugverkehrsdienstes
CN110104025A (zh) * 2019-04-24 2019-08-09 南京南瑞继保电气有限公司 一种轨道交通系统中列车实时位置可视化展示方法及系统
US11193683B2 (en) * 2019-12-31 2021-12-07 Lennox Industries Inc. Error correction for predictive schedules for a thermostat
CN112644559B (zh) * 2021-01-04 2022-12-02 北京全路通信信号研究设计院集团有限公司 轨道区段显示状态的确定方法、装置、设备和介质
CN112793631B (zh) * 2021-01-07 2021-07-06 北京交通大学 一种列车退出正线运营条件下的地铁行车调整方法及系统

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE795267A (fr) * 1972-02-10 1973-05-29 Secretary Environment Brit Systemes de transport
US3953714A (en) * 1972-09-22 1976-04-27 Agence Nationale De Valorisation De La Recherche (Anvar) Method of and means for controlling the movement of self-propelled bodies traveling in a fixed order along a track
US5177684A (en) * 1990-12-18 1993-01-05 The Trustees Of The University Of Pennsylvania Method for analyzing and generating optimal transportation schedules for vehicles such as trains and controlling the movement of vehicles in response thereto
US7539624B2 (en) * 1994-09-01 2009-05-26 Harris Corporation Automatic train control system and method
US5623413A (en) * 1994-09-01 1997-04-22 Harris Corporation Scheduling system and method
US7092894B1 (en) * 1994-09-01 2006-08-15 Harris Corporation Cost reactive scheduler and method
JP3653954B2 (ja) * 1997-10-23 2005-06-02 トヨタ自動車株式会社 移動体交通制御システムの移動体装置、移動体交通制御システムの管制局、移動体交通制御システム
US6848657B2 (en) * 2002-01-17 2005-02-01 The Creative Train Company, Llc Dynamic self-teaching train track layout learning and control system
US7725249B2 (en) * 2003-02-27 2010-05-25 General Electric Company Method and apparatus for congestion management
DE102006002607B4 (de) 2006-01-16 2007-12-27 Siemens Ag Verfahren und Vorrichtung zur Zugfolgesicherung
WO2007102405A1 (ja) * 2006-03-01 2007-09-13 Toyota Jidosha Kabushiki Kaisha 自車進路決定方法および自車進路決定装置
US8082071B2 (en) * 2006-09-11 2011-12-20 General Electric Company System and method of multi-generation positive train control system
US8433461B2 (en) * 2006-11-02 2013-04-30 General Electric Company Method of planning the movement of trains using pre-allocation of resources

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2012034878A1 *

Also Published As

Publication number Publication date
WO2012034878A1 (de) 2012-03-22
ES2641297T3 (es) 2017-11-08
US20130168504A1 (en) 2013-07-04
EP2616306B1 (de) 2017-06-28
DE102010045461A1 (de) 2012-03-15
CN103097227A (zh) 2013-05-08
DK2616306T3 (en) 2017-09-18
CN103097227B (zh) 2016-03-23
US8662454B2 (en) 2014-03-04

Similar Documents

Publication Publication Date Title
WO2012034878A1 (de) Verfahren zur visualisierung der gleisbelegung
EP1466803A1 (de) Verfahren zur Vorgabe einer Geschwindigkeit für ein Schienenfahzeug
EP1977950B1 (de) Verfahren zur wirkungsbezogenen Beurteilung der Lagequalität eines Gleises
EP3089895B1 (de) Verfahren und steuergerät zum betrieb eines fahrzeugs, insbesondere eines schienenfahrzeugs.
EP2870047B1 (de) Betrieb eines schienenfahrzeugs
DE102011106345B4 (de) Streckenvalidierung
EP2619067B1 (de) Verfahren zur automatischen steuerung einer mehrzahl spurgebundener fahrzeuge
WO2021032638A1 (de) Verfahren zur steuerung eines zugs innerhalb eines zugsicherungssystems, zugsicherungssystem
EP3075626B1 (de) Verfahren und system zum betrieb einer gleisanlage
WO2018036759A1 (de) Vorhersage des zuglaufs
EP3787950B1 (de) Verfahren und einrichtung zum erkennen hinterherfahrender fahrzeuge
DE102008027488B4 (de) Vorrichtung zur Simulation von Balisen
WO1998007609A1 (de) Verfahren und vorrichtung zur steuerung und überwachung einer verkehrstechnischen anlage
DE102010041038A1 (de) Verfahren und Anordnung zur Visualisierung von Systemzuständen
DE102011079419A1 (de) Verfahren sowie Steuereinrichtung zum Bestimmen der Länge zumindest eines Gleisabschnitts
DE102019212655A1 (de) Ermittlung und/oder Optimierung einer Effizienz einer Lichtsignalsteuerung
EP2945831A2 (de) Verfahren und vorrichtung zur etcs -l1 - und/oder -l2 - zugbeeinflussung
WO2018134013A2 (de) Verfahren zum übertragen von nachrichten
DE19924497C2 (de) Verfahren zur Konsistenzprüfung von Informationen über Linienführungen
EP3577005B1 (de) Anzeigen von sekundären signaleinrichtungen sowie sicherheitseinrichtung eines eisenbahnfahrzeugs
DE102020213777A1 (de) Simulationseinrichtung und Verfahren zum Simulieren einer Fahrt eines Schienenfahrzeugs
EP4071028A1 (de) Verhinderung einer kollision eines schienenfahrzeuges an einem knotenpunkt in einem cbtc system
EP3812239A1 (de) Rechnergestützte plattform zur darstellung einer bahninfrastruktur und verfahren zu deren betrieb
Longo et al. CAPACiTy vS. ReliAbiliTy iN RAilwAyS: A SToChASTiC miCRo–SimulATioN APPRoACh
EP4331943A1 (de) Verkehrsnetz und verfahren zum betreiben von schienenfahrzeugen in einem verkehrsnetz, bestehend aus einer kombination von streckenabschnitten mit und ohne zugsicherung

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130301

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20150629

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 502011012521

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: B61L0027000000

Ipc: B61L0025020000

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: B61L 25/02 20060101AFI20170118BHEP

INTG Intention to grant announced

Effective date: 20170206

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 904558

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: SIEMENS SCHWEIZ AG, CH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502011012521

Country of ref document: DE

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: SIEMENS AKTIENGESELLSCHAFT

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20170911

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCOW

Free format text: NEW ADDRESS: WERNER-VON-SIEMENS-STRASSE 1, 80333 MUENCHEN (DE)

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20170628

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170929

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2641297

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20171108

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171028

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502011012521

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

26N No opposition filed

Effective date: 20180329

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170905

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171002

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20180924

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20180911

Year of fee payment: 8

Ref country code: AT

Payment date: 20180806

Year of fee payment: 8

Ref country code: BE

Payment date: 20180919

Year of fee payment: 8

Ref country code: FI

Payment date: 20180920

Year of fee payment: 8

Ref country code: NL

Payment date: 20180911

Year of fee payment: 8

Ref country code: DK

Payment date: 20180921

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20181119

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20181217

Year of fee payment: 8

Ref country code: CH

Payment date: 20181210

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170628

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502011012521

Country of ref document: DE

REG Reference to a national code

Ref country code: FI

Ref legal event code: MAE

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20190930

Ref country code: NO

Ref legal event code: MMEP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190905

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20191001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191001

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200401

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170628

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190930

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 904558

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20190905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190905

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20210127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190906