US6345259B1
(en)
|
1993-09-28 |
2002-02-05 |
The Dow Chemical Company |
System and method for integrating business and manufacturing environments
|
US6141647A
(en)
*
|
1995-10-20 |
2000-10-31 |
The Dow Chemical Company |
System and method for integrating a business environment, a process control environment, and a laboratory environment
|
US5596502A
(en)
*
|
1994-11-14 |
1997-01-21 |
Sunoptech, Ltd. |
Computer system including means for decision support scheduling
|
US5612886A
(en)
*
|
1995-05-12 |
1997-03-18 |
Taiwan Semiconductor Manufacturing Company Ltd. |
Method and system for dynamic dispatching in semiconductor manufacturing plants
|
US5716856A
(en)
*
|
1995-08-22 |
1998-02-10 |
Advanced Micro Devices, Inc. |
Arrangement and method for detecting sequential processing effects in manufacturing using predetermined sequences within runs
|
KR100384213B1
(ko)
*
|
1995-10-06 |
2003-08-19 |
어드밴스트 마이크로 디바이시즈 인코퍼레이티드 |
순차리스트내의선택된타입의제1또는제2대상을인식하는처리시스템,선택회로및방법
|
GB2309800B
(en)
*
|
1996-02-03 |
1999-07-28 |
Kodak Ltd |
A method of controlling the effect of raw materials on manufacturability
|
US5975740A
(en)
|
1996-05-28 |
1999-11-02 |
Applied Materials, Inc. |
Apparatus, method and medium for enhancing the throughput of a wafer processing facility using a multi-slot cool down chamber and a priority transfer scheme
|
US5801945A
(en)
*
|
1996-06-28 |
1998-09-01 |
Lam Research Corporation |
Scheduling method for robotic manufacturing processes
|
US6104874A
(en)
*
|
1996-10-15 |
2000-08-15 |
International Business Machines Corporation |
Object oriented framework mechanism for order processing including pre-defined extensible classes for defining an order processing environment
|
US5818716A
(en)
*
|
1996-10-18 |
1998-10-06 |
Taiwan Semiconductor Manufacturing Company Ltd. |
Dynamic lot dispatching required turn rate factory control system and method of operation thereof
|
US5914879A
(en)
*
|
1997-03-04 |
1999-06-22 |
Advanced Micro Devices |
System and method for calculating cluster tool performance metrics using a weighted configuration matrix
|
JP3419241B2
(ja)
*
|
1997-03-17 |
2003-06-23 |
信越半導体株式会社 |
半導体シリコン単結晶ウエーハの工程管理方法および工程管理システム
|
US5841677A
(en)
*
|
1997-05-21 |
1998-11-24 |
Taiwan Semiconductor Manufacturing Co., Ltd. |
Method and apparatus for dispatching lots in a factory
|
JPH10326729A
(ja)
*
|
1997-05-26 |
1998-12-08 |
Toshiba Corp |
製造システム
|
US6201999B1
(en)
|
1997-06-09 |
2001-03-13 |
Applied Materials, Inc. |
Method and apparatus for automatically generating schedules for wafer processing within a multichamber semiconductor wafer processing tool
|
DE19747574A1
(de)
*
|
1997-10-28 |
1999-05-06 |
Siemens Ag |
Verfahren zur Ermittlung realisierbarer Konfigurationen von Bearbeitungsanlagen
|
US6470227B1
(en)
*
|
1997-12-02 |
2002-10-22 |
Murali D. Rangachari |
Method and apparatus for automating a microelectric manufacturing process
|
US6256550B1
(en)
|
1998-08-07 |
2001-07-03 |
Taiwan Semiconductor Manufacturing Company |
Overall equipment effectiveness on-line categories system and method
|
US6678572B1
(en)
*
|
1998-12-31 |
2004-01-13 |
Asml Holdings, N.V. |
Recipe cascading in a wafer processing system
|
US6865437B1
(en)
*
|
1998-12-31 |
2005-03-08 |
Asml Holdings N.V. |
Robot pre-positioning in a wafer processing system
|
EP1141801B1
(de)
*
|
1998-12-31 |
2005-08-17 |
Silicon Valley Group, Inc. |
Verfahren zum synchronisieren eines substratbehandlungssystems
|
US6768930B2
(en)
|
1998-12-31 |
2004-07-27 |
Asml Holding N.V. |
Method and apparatus for resolving conflicts in a substrate processing system
|
US6418356B1
(en)
|
1998-12-31 |
2002-07-09 |
Silicon Valley Group, Inc. |
Method and apparatus for resolving conflicts in a substrate processing system
|
US6408220B1
(en)
|
1999-06-01 |
2002-06-18 |
Applied Materials, Inc. |
Semiconductor processing techniques
|
US6456894B1
(en)
*
|
1999-06-01 |
2002-09-24 |
Applied Materials, Inc. |
Semiconductor processing techniques
|
US6459946B1
(en)
|
1999-11-12 |
2002-10-01 |
Agere Systems Guardian Corp. |
Method and system for determining operator staffing
|
JP4524720B2
(ja)
*
|
1999-12-28 |
2010-08-18 |
ルネサスエレクトロニクス株式会社 |
プロセス制御装置
|
US6714830B2
(en)
*
|
2000-02-28 |
2004-03-30 |
Canon Kabushiki Kaisha |
Push-type scheduling for semiconductor fabrication
|
US6546302B1
(en)
*
|
2000-04-05 |
2003-04-08 |
Ford Motor Company |
Method for scheduling and sequencing vehicles for manufacture
|
US6952656B1
(en)
|
2000-04-28 |
2005-10-04 |
Applied Materials, Inc. |
Wafer fabrication data acquisition and management systems
|
JP2001345241A
(ja)
*
|
2000-05-31 |
2001-12-14 |
Tokyo Electron Ltd |
基板処理システム及び基板処理方法
|
JP2002023823A
(ja)
*
|
2000-07-12 |
2002-01-25 |
Mitsubishi Electric Corp |
生産管理システム
|
JP2002073143A
(ja)
*
|
2000-08-25 |
2002-03-12 |
Matsushita Electric Ind Co Ltd |
製造装置監視方法
|
JP3613516B2
(ja)
*
|
2000-08-28 |
2005-01-26 |
本田技研工業株式会社 |
製品の樹脂部品のリサイクル回数を管理する解体管理システム及び解体管理方法
|
US7325190B1
(en)
|
2000-10-02 |
2008-01-29 |
Boehmer Tiffany D |
Interface system and method of building rules and constraints for a resource scheduling system
|
EP1410292A1
(de)
*
|
2001-01-04 |
2004-04-21 |
Roger Murphy |
System zum abliefern von waren
|
TW526530B
(en)
*
|
2001-01-26 |
2003-04-01 |
Applied Materials Inc |
Method and apparatus for automatically generating schedules for wafer processing within a multichamber semiconductor wafer processing tool
|
US20020147960A1
(en)
*
|
2001-01-26 |
2002-10-10 |
Applied Materials, Inc. |
Method and apparatus for determining scheduling for wafer processing in cluster tools with integrated metrology and defect control
|
US7082345B2
(en)
|
2001-06-19 |
2006-07-25 |
Applied Materials, Inc. |
Method, system and medium for process control for the matching of tools, chambers and/or other semiconductor-related entities
|
US7047099B2
(en)
*
|
2001-06-19 |
2006-05-16 |
Applied Materials Inc. |
Integrating tool, module, and fab level control
|
ITMI20011340A1
(it)
*
|
2001-06-26 |
2002-12-26 |
Ausimont Spa |
Pfpe aventi almeno un terminale alchiletereo e relativo processo dipreparazione
|
WO2003006215A2
(en)
*
|
2001-07-13 |
2003-01-23 |
Fsi International |
Robotic system control
|
US6978187B1
(en)
*
|
2001-12-12 |
2005-12-20 |
Advanced Micro Devices, Inc. |
Method and apparatus for scheduling production lots based on lot and tool health metrics
|
US6907305B2
(en)
*
|
2002-04-30 |
2005-06-14 |
Advanced Micro Devices, Inc. |
Agent reactive scheduling in an automated manufacturing environment
|
US20030225474A1
(en)
*
|
2002-05-31 |
2003-12-04 |
Gustavo Mata |
Specialization of active software agents in an automated manufacturing environment
|
US7512454B1
(en)
*
|
2002-05-31 |
2009-03-31 |
Advanced Micro Devices, Inc. |
Display unit with processor and communication controller
|
US6983189B2
(en)
*
|
2002-06-14 |
2006-01-03 |
The Boeing Company |
Systems and methods for manufacturing a product in a pull and push manufacturing system and associated methods and computer program products for modeling the same
|
DE10235816A1
(de)
*
|
2002-08-05 |
2004-02-26 |
Infineon Technologies Ag |
Verfahren zum Vorgeben einer Bearbeitungsreihenfolge und zugehörige Einheiten
|
US7426419B2
(en)
*
|
2002-08-13 |
2008-09-16 |
Texas Instruments Incorporated |
Scheduling system and method
|
US6968245B2
(en)
*
|
2002-08-13 |
2005-11-22 |
Taiwan Semiconductor Manufacturing Co., Ltd. |
Flexible recipe modeling and recipe cluster management system
|
US7813993B1
(en)
|
2002-08-30 |
2010-10-12 |
Advanced Micro Devices, Inc. |
Method and apparatus for scheduling a resource
|
US7069097B1
(en)
|
2002-08-30 |
2006-06-27 |
Advanced Micro Devices, Inc. |
Method and apparatus for reducing scheduling conflicts for a resource
|
US7127310B1
(en)
|
2002-08-30 |
2006-10-24 |
Advanced Micro Devices, Inc. |
Method and apparatus for determining cost functions using parameterized components
|
US6782302B1
(en)
|
2002-08-30 |
2004-08-24 |
Advanced Micro Devices, Inc. |
Method and apparatus for scheduling workpieces with compatible processing requirements
|
US6904329B1
(en)
|
2002-08-30 |
2005-06-07 |
Advanced Micro Devices, Inc. |
Method and apparatus for generating a multi-dimensional cost function
|
US6801819B1
(en)
|
2002-08-30 |
2004-10-05 |
Advanced Micro Devices, Inc. |
Method and apparatus for evaluating bids for scheduling a resource
|
US8315898B2
(en)
*
|
2002-10-30 |
2012-11-20 |
Palo Alto Research Center, Incorporated |
Planning and scheduling reconfigurable systems around off-line resources
|
US7027885B1
(en)
|
2002-12-30 |
2006-04-11 |
Advanced Micro Devices, Inc. |
Determining batch start versus delay
|
US6687563B1
(en)
|
2003-01-31 |
2004-02-03 |
Taiwan Semiconductor Manufacturing Company |
Integration method of dispatch and schedule tools for 300 mm full automation Fab
|
CA2462711C
(en)
*
|
2003-03-31 |
2008-09-02 |
Honda Motor Co., Ltd. |
Assembly line quality control
|
DE10316102A1
(de)
*
|
2003-04-09 |
2004-10-21 |
Daimlerchrysler Ag |
Verfahren zur Steuerung und Planung der Fertigungsreihenfolge
|
AU2003271658A1
(en)
*
|
2003-09-30 |
2005-05-11 |
Telecom Italia S.P.A. |
Method and system for tuning a taskscheduling process
|
US7257454B2
(en)
*
|
2003-11-21 |
2007-08-14 |
Taiwan Semiconductor Manufacturing Company, Ltd. |
Dynamically adjusting the distribution for dispatching lot between current and downstream tool by using expertise weighting mechanism
|
US7904192B2
(en)
*
|
2004-01-14 |
2011-03-08 |
Agency For Science, Technology And Research |
Finite capacity scheduling using job prioritization and machine selection
|
JP4367167B2
(ja)
*
|
2004-02-18 |
2009-11-18 |
日本電気株式会社 |
リアルタイムシステム、QoS適応制御装置及びそれらに用いるQoS適応制御方法並びにそのプログラム
|
JP2005294473A
(ja)
*
|
2004-03-31 |
2005-10-20 |
Canon Inc |
露光装置、デバイス製造方法及びデバイス
|
US7184852B2
(en)
*
|
2004-04-07 |
2007-02-27 |
Taiwan Semiconductor Manufacturing Company, Ltd. |
System and method for integrating a dispatching system with multiple process lines in a semiconductor manufacturing environment
|
US7337032B1
(en)
|
2004-10-04 |
2008-02-26 |
Advanced Micro Devices, Inc. |
Scheduling ahead for various processes
|
US7680970B2
(en)
*
|
2004-10-22 |
2010-03-16 |
Fisher-Rosemount Systems, Inc. |
Method and system for batch process arbitration in a process control system
|
US7463939B1
(en)
|
2004-11-18 |
2008-12-09 |
Advanced Micro Devices, Inc. |
Scheduling tools with queue time constraints
|
US20080275582A1
(en)
*
|
2004-11-19 |
2008-11-06 |
Nettles Steven C |
Scheduling AMHS pickup and delivery ahead of schedule
|
TW200622777A
(en)
*
|
2004-12-31 |
2006-07-01 |
Inventec Corp |
Manufacturing-order giving system and method thereof
|
EP1691328A1
(de)
*
|
2005-02-11 |
2006-08-16 |
Sap Ag |
Erkennen von kritischen Aktivitäten in einem Produktionsprozess
|
US7142937B1
(en)
*
|
2005-05-12 |
2006-11-28 |
Systems On Silicon Manufacturing Company Pte. Ltd. |
Capacity management in a wafer fabrication plant
|
US20070005170A1
(en)
*
|
2005-06-29 |
2007-01-04 |
Thorsten Schedel |
Method for the preferred processing of workpieces of highest priority
|
DE102006009248B4
(de)
*
|
2006-02-28 |
2017-10-12 |
Globalfoundries Inc. |
Verfahren und System zur Modellierung eines Produktstromes in einer Fertigungsumgebung durch Prozess- und Anlagenkategorisierung
|
US7487003B1
(en)
|
2006-03-09 |
2009-02-03 |
Rockwell Automation Technologies, Inc. |
Automatic tracking of a lot of items through virtual sublots
|
US7369914B2
(en)
*
|
2006-07-14 |
2008-05-06 |
Hitachi Global Storage Technologies Netherlands B.V. |
Method for projecting build progression for a product in a manufacturing environment
|
US9008836B2
(en)
*
|
2007-01-09 |
2015-04-14 |
Abb Inc. |
Method and system for robotic assembly parameter optimization
|
JP4193996B2
(ja)
*
|
2007-01-25 |
2008-12-10 |
エルピーダメモリ株式会社 |
生産管理方法及び生産管理システム
|
EP2009532A1
(de)
|
2007-06-29 |
2008-12-31 |
Siemens Aktiengesellschaft |
Verfahren zur Echtzeit-Fertigungsplanung von Prozessen an verteilten Herstellungsorten
|
US7983778B2
(en)
*
|
2007-12-26 |
2011-07-19 |
Advanced Micro Devices, Inc. |
Method and apparatus for reducing setups during test, mark and pack operations
|
EP2161637B1
(de)
|
2008-09-04 |
2015-05-20 |
Siemens Aktiengesellschaft |
Verfahren zur Aktualisierung der Fertigungsplanungsdaten für einen Fertigungsprozess
|
EP2224384A1
(de)
*
|
2009-02-25 |
2010-09-01 |
Siemens Aktiengesellschaft |
Verfahren und System zur Planung eines Herstellungsverfahrens
|
US8155770B2
(en)
*
|
2009-03-31 |
2012-04-10 |
Globalfoundries Inc. |
Method and apparatus for dispatching workpieces to tools based on processing and performance history
|
US8452437B2
(en)
*
|
2009-11-10 |
2013-05-28 |
International Business Machines Corporation |
Product release control into time-sensitive processing environments
|
JP5099188B2
(ja)
*
|
2010-08-18 |
2012-12-12 |
コニカミノルタビジネステクノロジーズ株式会社 |
処理順決定装置、処理順決定方法および処理順決定プログラム
|
KR101930981B1
(ko)
*
|
2011-11-25 |
2018-12-19 |
도쿄엘렉트론가부시키가이샤 |
처리 장치군 컨트롤러, 생산 처리 시스템, 처리 장치군 제어 방법, 생산 효율화 시스템, 생산 효율화 장치 및 생산 효율화 방법
|
US9618929B2
(en)
*
|
2014-11-26 |
2017-04-11 |
Wafertech, Llc |
Method and priority system for inventory management in semiconductor manufacturing
|
US9400687B2
(en)
*
|
2014-12-11 |
2016-07-26 |
International Business Machines Corporation |
Method and system for dynamic pool reallocation
|
KR102363113B1
(ko)
*
|
2018-03-01 |
2022-02-15 |
가부시키가이샤 에바라 세이사꾸쇼 |
스케줄러, 기판 처리 장치, 및 기판 반송 방법
|
CN111354654B
(zh)
*
|
2018-12-20 |
2022-10-21 |
北京北方华创微电子装备有限公司 |
死锁判断方法及半导体设备
|
CN111382959B
(zh)
*
|
2020-05-29 |
2020-09-01 |
双胞胎(集团)股份有限公司 |
基于数据队列的进度控制方法及猪饲料生产方法
|
DE102021204043B3
(de)
|
2021-04-22 |
2022-02-03 |
Robert Bosch Gesellschaft mit beschränkter Haftung |
Scheduler und, insbesondere computerimplementiertes, Verfahren zur Maschinenzeitplanung zum Durchführen einer Gruppe von Jobs einer Aufgabe mit einem Maschinensatz
|