CN105825325B - Project quality supervision personnel supervision capability evaluation method and device - Google Patents

Project quality supervision personnel supervision capability evaluation method and device Download PDF

Info

Publication number
CN105825325B
CN105825325B CN201610136680.9A CN201610136680A CN105825325B CN 105825325 B CN105825325 B CN 105825325B CN 201610136680 A CN201610136680 A CN 201610136680A CN 105825325 B CN105825325 B CN 105825325B
Authority
CN
China
Prior art keywords
action
bim model
supervisor
storage element
stored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610136680.9A
Other languages
Chinese (zh)
Other versions
CN105825325A (en
Inventor
田成
金少军
梁新华
罗震
刘向东
宋伟
叶嵩
缪德彬
戴芳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Construction Engineering Quality Supervision Station
JIANGSU JIANKE ENGINEERING CONSULTING Co.,Ltd.
Nanjing Construction Engineering Quality and safety supervision station
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
JIANGSU JIANKE PROJECT MANAGEMENT Co Ltd
NANJING BUILDING INSTALLATION ENGINEERING QUALITY SUPERVISION STATION
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JIANKE PROJECT MANAGEMENT Co Ltd, NANJING BUILDING INSTALLATION ENGINEERING QUALITY SUPERVISION STATION, Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical JIANGSU JIANKE PROJECT MANAGEMENT Co Ltd
Priority to CN201610136680.9A priority Critical patent/CN105825325B/en
Publication of CN105825325A publication Critical patent/CN105825325A/en
Application granted granted Critical
Publication of CN105825325B publication Critical patent/CN105825325B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a project quality supervision personnel supervision capability evaluation method and device. The method is characterized by comprising the following steps that S1. first type of BIM models at least containing a project quality problem are established and stored in a storage unit; S2. At least one first type of BIM model is called from the storage unit and displayed in an output unit in an image mode; S3. an action acquisition unit performs onsite acquisition and processing on the actions of supervision personnel and acquires first data information which can be identified by a processor; and S4. the processor calls criteria stored in the storage unit and compares the first data information with the criteria so that two results of conforming or non-conforming are obtained, and a first signal and a second signal which can be artificially identified are respectively transmitted. The limitation of the conventional project quality supervision personnel supervision capability evaluation and promotion method in the aspects of time and space can be broken through, the possible safety accidents in the training process can be effectively avoided, and a realistic scene can be created so that students are enabled to generate immersive feel and learning interest of the students can be stimulated.

Description

A kind of engineering quality supervision personnel's ability to supervise evaluation method and device
Technical field
The present invention relates to a kind of engineering quality supervision personnel's ability to supervise based on BIM is evaluated and method for improving and device, Belong to engineering quality supervision technical field.
Background technology
Since engineering quality supervision mechanism sets up, the method master of the ability to supervise of training and raising engineering quality supervision personnel Depend on quality surveillance personnel to learn by oneself, participate in pre-job training, various specifications explain and publicise the study of class, quality surveillance knowwhy The modes such as examination, special examination comparation and assessment are carrying out.BIM (Building Information Modeling) is " architecture information mould The abbreviation of type ", is based on the relevant information data of construction-engineering project, sets up three-dimensional building data model, by numeral The real information of information emulator simulant building thing, by the visual simulating feature of BIM technology, with the data letter in BIM model Cease for relying on true simulation real scene environment, cooperation easy virtual reality (virtual reality, abbreviation vr) equipment makes User produces the same interactive learning examination environment in reality, for substituting traditional evaluation and method for improving, realizes quality Quality surveillance personnel in monitoring ability training and lifting, supervision evaluation content " double covering ".
Traditional evaluation method, knowledge evaluation system is not comprehensive, lacks comprehensive, systemic, is easily subject to time and sky Between on restriction, some evaluation methods and activity, such as:Set up work-place study environment need to disposably consume more manpower, the time, Space and excessive expense.And, in building trade using conventional on-site ability evaluation also by setting up physical model complete Become, cost is big, it is many to limit.
Content of the invention
In order to overcome the defect of above-mentioned ability to supervise evaluation method, problem to be solved by this invention is that offer is a kind of new Ability to supervise evaluation method, it can break traditional ability to supervise evaluation method in time, restriction spatially.
Corresponding to this, it is to provide a kind of new ability to supervise evaluating apparatus that another technology to be solved of the present invention is asked, its Traditional ability to supervise evaluation method can be broken in time, restriction spatially.
For new ability to supervise evaluation method, the invention provides a kind of engineering quality supervision personnel's ability to supervise is commented Valency method is it is characterised in that comprise the following steps:
S1, the first kind BIM model at least containing qualitative problems of construction for the foundation, and be stored in storage element;
S2, transfer at least one described first kind BIM model from described storage element, and single in output with image mode Show in unit;
S3, action collecting unit carry out collection in worksite and process to the action of supervisor, and acquisition can be identified by processor The first data message;
S4, described processor scheduling are stored in the criterion in described storage element, and by described first data message Contrasted with described criterion, obtain and meet or do not meet both results, and send respectively and can be identified manually First signal and secondary signal.
As a further improvement on the present invention, also store in described storage element and first kind BIM model each described One by one relative to and massless problem Equations of The Second Kind BIM model, when the contrast knot of described first data message and described criterion When fruit is not meet, execute the following step:
S5, transfer described Equations of The Second Kind BIM model from described storage element, in this Equations of The Second Kind BIM model and step S2 Described first kind BIM model is corresponding, and is shown in output unit with image mode.
As a further improvement on the present invention, the described first kind BIM model in described step S1 and described Equations of The Second Kind BIM Model is stored in described storage element in the way of the second data message, and described step S2 can be by described second data message It is converted into the image information that can show in described output end.
As a further improvement on the present invention, in described step S1, described first kind BIM model can be modified or delete Remove, and be again stored in described storage element.
As a further improvement on the present invention, described action collecting unit includes one of following devices or multiple:
- position sensor, at least can interpolate that whether the live action of described supervisor puts in place;
- photoelectric sensor, at least can obtain orientation and/or amplitude and/or the body of the live action of described supervisor The concrete distance that position is stretched out;
- very first time relay, be able to record that between the action being captured by least two relative to time interval,
- the second time relay, controls other described action collecting unit work on the time period setting;
- voltage sensitive sensor, can gather the power of the contact action of described supervisor.
As a further improvement on the present invention, when the contrast of the first data message and described criterion in described step S4 After result is when meeting or step S5 is finished, execute the following step:
S6, stored count is carried out to sending the first signal in step S4 by counter, when this counting is less than setting value, Return execution step S2.
As a further improvement on the present invention, also execute the following step between described step S1 and S2:
S1.5, obtain the biological information of single described supervisor by biological identification device, and dispatch be stored in described In storage element to the database that should have identity information and biological information, obtain and currently to be identified by described biological identification device The identity information of described supervisor;
In described step S6, when the value of described counter stored count is more than setting value, execution step S1.5.
As a further improvement on the present invention, described biological identification device is fingerprint identification device or face recognition dress Put.
For new ability to supervise evaluating apparatus, the invention provides a kind of engineering quality supervision personnel's ability to supervise is commented Valency device is it is characterised in that include:
- storage element, inside stores the first database, described first database is at least by some containing qualitative problems of construction First kind BIM model constitute;
- output unit, can receive discernible data message and be shown in the way of image;
- transmitting element, can call the first database in described storage element, and chooses at least one Described first kind BIM model, be converted into can by described output unit identify data message after send to described output Unit;
- action collecting unit, the action that scene can be occurred is acquired and processes, and obtains action message;
- processor, is capable of identify that described action message, and calls the criterion being stored in described storage element, will Described action message is contrasted with described criterion, obtains and meets or do not meet two kinds of results, and is tied according to both Fruit sends the first signal that can be identified manually and secondary signal by transmitter, respectively when the judged result of described processor is When not meeting, transmitting element can be controlled to call the Equations of The Second Kind BIM being stored in described first database in described storage element Model, and be converted into can by described output unit identify data message, retransmit to described output unit, with image Mode shown, described Equations of The Second Kind BIM model is relative one by one with first kind BIM model each described and massless problem 's.
As a further improvement on the present invention, described action collecting unit includes one of following devices or multiple:
- position sensor, at least can interpolate that whether the live action of described supervisor puts in place;
- photoelectric sensor, at least can obtain orientation and/or amplitude and/or the body of the live action of described supervisor The concrete distance that position is stretched out;
- very first time relay, be able to record that between the action being captured by least two relative to time interval,
- the second time relay, controls other described action collecting unit work on the time period setting;
- voltage sensitive sensor, can gather the power of the contact action of described supervisor.
As a further improvement on the present invention, also include counter and biology sets device, wherein:
Described biology sets the biological information that device can obtain single described supervisor, and dispatches and be stored in described storage Form in memory cell, by some identity informations and biological information and both are the second database of one-to-one relationship, obtain and work as The identity information of the front described supervisor being identified by described biological identification device, and send and can control to described transmitting element The working signal of its work;
When the judged result that described processor obtains after judging is as meeting, sends to described transmitting element and can control it The working signal of work;
Described counter can count to the first signal that described transmitter sends and/or secondary signal, when When described first signal reaches setting value, then described processor is controlled to stop sending to described transmitting element and can control its work Working signal.
The beneficial effects of the present invention is, the present invention can be applied to merit rating and the lifting of engineering quality supervision personnel Work, it has been broken Traditional project quality surveillance personnel's ability to supervise and has evaluated with hoisting way method in time, limit spatially System, green low-carbon environment-friendly, greatly reduce artificial input, effectively avoid the safe thing being likely to occur in training process Therefore, and due to improper activity and the scene accidental damage that causes in training process, by figure shows, build scene true to nature, Enable student to produce sensation on the spot in person, excite the learning interest of student, change passive learning is Active searching, improves energy The effect that power is evaluated and lifted, has a good application prospect.
Brief description
Fig. 1 is the structural representation of first embodiment of the invention;
Fig. 2 is the structural representation of second embodiment of the invention;
Fig. 3 is the structural representation of third embodiment of the invention;
Wherein:2- storage element;4- output unit;6- transmitting element;8- action collecting unit;10- processor;11- sends out Emitter;12- counter;14- biology sets device.
Specific embodiment
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is described in further detail.
Embodiment 1:
As shown in figure 1, taking a beam column quality supervision and control merit rating process as a example, it comprises the following steps that:
S1. the problem being likely to occur is made first kind BIM model according to common quality defect storehouse, and constituted the with data mode During one database purchase is in the storage element 2 of computer it is possible to by means of computer complete BIM model real time modifying and Adjustment, in addition also stores in the memory cell of computer, first kind BIM model is relative one by one and massless are asked with each described The Equations of The Second Kind BIM model of topic.
S2. transfer a first kind by transmitting element 6 first database from the memory cell of computer of computer BIM model, and carry out data conversion, this first kind BIM model is converted to by data message can be by the output list of computer The image information of unit 4 identification:
S3. the supervisor participating in facility evaluation test makes according to the image of output unit 4 display of computer Feedback action, and these feedback actions being acquired by the action collecting unit 8 with compunication, and be converted into can be by Second data message of processor 10 identification of computer;
S4. processor 10 scheduling of computer is stored in the criterion in storage element 2, and described first data is believed Breath is contrasted with this criterion, obtains and meets or do not meet both results, and sends energy quilt respectively by transmitter 11 First signal of manual identified and secondary signal, represent this action criteria when sending the first signal, believe when sending the second work Number when represent that this action is nonstandard.
In addition it is noted that action collecting unit 8 in step S3, can be diversified, such as following several Kind, but it is several to be also not restricted to this:
- position sensor, at least can interpolate that whether the live action of described supervisor puts in place;
- photoelectric sensor, at least can obtain orientation and/or amplitude and/or the body of the live action of described supervisor The concrete distance that position is stretched out;
- very first time relay, be able to record that between the action being captured by least two relative to time interval,
- the second time relay, controls other described action collecting units 8 to work on the time period setting;
- voltage sensitive sensor, can gather the power of the contact action of described supervisor.
Embodiment 2:
As shown in Fig. 2 taking a Bars In Poured Concrete Slab quality supervision and control merit rating process as a example, it comprises the following steps that:
S1. the problem being likely to occur is made first kind BIM model according to common quality defect storehouse, and constituted the with data mode During one database purchase is in the storage element 2 of computer it is possible to by means of computer complete BIM model real time modifying and Adjustment, in addition also stores in the memory cell of computer, first kind BIM model is relative one by one and massless are asked with each described The Equations of The Second Kind BIM model of topic.
S2. transfer a first kind by transmitting element 6 first database from the memory cell of computer of computer BIM model, and carry out data conversion, this first kind BIM model is converted to by data message can be by the output list of computer The image information of unit 4 identification:
S3. the supervisor participating in facility evaluation test makes according to the image of output unit 4 display of computer Feedback action, and these feedback actions being acquired by the action collecting unit 8 with compunication, and be converted into can be by Second data message of processor 10 identification of computer;
S4. processor 10 scheduling of computer is stored in the criterion in storage element 2, and described first data is believed Breath is contrasted with this criterion, obtains and meets or do not meet both results, and sends energy quilt respectively by transmitter 11 First signal of manual identified and secondary signal, represent this action criteria when sending the first signal, believe when sending the second work Number when represent that this action is nonstandard, processor 10 send for the first signal when, stop continuing executing with, when processor 10 sends For secondary signal when, execution step S5;
S5. the transmitting element 6 of computer transfers an Equations of The Second Kind BIM model from the storage element 2 of computer, and this second Class BIM model is corresponding with the first kind BIM model in step S2, and is sending it to output unit 4, in the way of image Output unit 4 shows, so that the supervisor that scene takes one's test is obtained in that correct way, plays the work of rectification With.
In addition it is noted that action collecting unit 8 in step S3, can be diversified, such as following several Kind, but it is several to be also not restricted to this:
- position sensor, at least can interpolate that whether the live action of described supervisor puts in place;
- photoelectric sensor, at least can obtain orientation and/or amplitude and/or the body of the live action of described supervisor The concrete distance that position is stretched out;
- very first time relay, be able to record that between the action being captured by least two relative to time interval,
- the second time relay, controls other described action collecting units 8 to work on the time period setting;
- voltage sensitive sensor, can gather the power of the contact action of described supervisor.
Embodiment 3:
As shown in figure 3, taking a hydropower installation quality supervision and control merit rating process as a example, it comprises the following steps that:
S1. the problem being likely to occur is made first kind BIM model according to common quality defect storehouse, and constituted the with data mode During one database purchase is in the storage element 2 of computer it is possible to by means of computer complete BIM model real time modifying and Adjustment, in addition also stores in the memory cell of computer, first kind BIM model is relative one by one and massless are asked with each described The Equations of The Second Kind BIM model of topic;
S1.5, obtain the biological information of single described supervisor by biological identification device 14, and dispatch and be stored in meter Form in calculation machine storage element 2, by some identity informations and biological information and both be the second database of one-to-one relationship, Obtain the identity information of the described supervisor currently being identified by described biological identification device 14, and send to described transmitting element The working signal of its work can be controlled;
S2. transfer a first kind by transmitting element 6 first database from the memory cell of computer of computer BIM model, and carry out data conversion, this first kind BIM model is converted to by data message can be by the output list of computer The image information of unit 4 identification:
S3. the supervisor participating in facility evaluation test makes according to the image of output unit 4 display of computer Feedback action, and these feedback actions being acquired by the action collecting unit 8 with compunication, and be converted into can be by Second data message of processor 10 identification of computer;
S4. processor 10 scheduling of computer is stored in the criterion in storage element 2, and described first data is believed Breath is contrasted with this criterion, obtains and meets or do not meet both results, and sends energy quilt respectively by transmitter 11 First signal of manual identified and secondary signal, represent this action criteria when sending the first signal, believe when sending the second work Number when represent that this action is nonstandard, processor 10 send for the first signal when, stop continuing executing with, when processor 10 sends For secondary signal when, execution step S5;
S5. the transmitting element 6 of computer transfers an Equations of The Second Kind BIM model from the storage element 2 of computer, and this second Class BIM model is corresponding with the first kind BIM model in step S2, and is sending it to output unit 4, in the way of image Output unit 4 shows, so that the supervisor that scene takes one's test is obtained in that correct way, plays the work of rectification With.
S6. stored count is carried out to sending the first signal in step S4 by counter 12, when this counting is less than setting value When, return execution step S2, when the value of described counter 12 stored count is more than setting value, execution step S1.5.
The present embodiment is that with the difference of above-described embodiment, and the present embodiment can be remembered by biometric apparatus equipment Supervisor in the second database for the record, and record the result of each supervisor test.Setting processing device 10 sends solid After determining the first signal of number of times, that is, how much just out of service after qualified number of times it reach or reselect other supervisors and enter Row test evaluation.
Simultaneously it is noted that action collecting unit 8 in step S3, can be diversified, such as following several Kind, but it is several to be also not restricted to this:
- position sensor, at least can interpolate that whether the live action of described supervisor puts in place;
- photoelectric sensor, at least can obtain orientation and/or amplitude and/or the body of the live action of described supervisor The concrete distance that position is stretched out;
- very first time relay, be able to record that between the action being captured by least two relative to time interval,
- the second time relay, controls other described action collecting units 8 to work on the time period setting;
- voltage sensitive sensor, can gather the power of the contact action of described supervisor.
Above example is only the present invention three kinds of embodiments therein, and its description is more concrete and detailed, but can not Therefore it is interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, Without departing from the inventive concept of the premise, some deformation can also be made and improve, these broadly fall into the protection model of the present invention Enclose.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (8)

1. a kind of engineering quality supervision personnel's ability to supervise evaluation method is it is characterised in that comprise the following steps:
S1, the first kind BIM model at least containing qualitative problems of construction for the foundation, and be stored in storage element;
S2, transfer at least one described first kind BIM model from described storage element, and with image mode in output unit Display;
S3, action collecting unit carry out collection in worksite and process to the action of supervisor, obtain the being identified by processor One data message;
S4, described processor scheduling are stored in the criterion in described storage element, and by described first data message and institute State criterion to be contrasted, obtain and meet or do not meet both results, and send first being identified manually respectively Signal and secondary signal;
Also store in described storage element with first kind BIM model each described one by one relative to and massless problem Equations of The Second Kind BIM model, when the comparing result of described first data message and described criterion is not meet, executes the following step:
S5, transfer described Equations of The Second Kind BIM model from described storage element, described in this Equations of The Second Kind BIM model and step S2 First kind BIM model is corresponding, and is shown in output unit with image mode.
2. a kind of engineering quality supervision personnel's ability to supervise evaluation method according to claim 1 is it is characterised in that described Described first kind BIM model in step S1 and described Equations of The Second Kind BIM model are stored in described in the way of the second data message In storage element, the image that described second data message can be converted into show in described output end by described step S2 is believed Breath.
3. a kind of engineering quality supervision personnel's ability to supervise evaluation method according to claim 2 is it is characterised in that described In step S1, described first kind BIM model can be modified or delete, and is again stored in described storage element.
4. a kind of engineering quality supervision personnel's ability to supervise evaluation method according to claim 3 is it is characterised in that described Action collecting unit includes one of following devices or multiple:
- position sensor, at least can interpolate that whether the live action of described supervisor puts in place;
- photoelectric sensor, at least can obtain orientation and/or amplitude and/or the body part of the live action of described supervisor The concrete distance stretched out;
- very first time relay, be able to record that between the action being captured by least two relative to time interval,
- the second time relay, controls other described action collecting unit work on the time period setting;
- voltage sensitive sensor, can gather the power of the contact action of described supervisor.
5. a kind of engineering quality supervision personnel's ability to supervise evaluation method according to claim 3 is it is characterised in that work as institute The comparing result stating the first data message and described criterion in step S4 is when meeting or after step S5 is finished, and holds Row the following step:
S6, stored count is carried out to sending the first signal in step S4 by counter, when this counting is less than setting value, return Execution step S2.
6. a kind of engineering quality supervision personnel's ability to supervise evaluation method according to claim 5 is it is characterised in that described The following step is also executed between step S1 and S2:
S1.5, obtain the biological information of single described supervisor by biological identification device, and dispatch and be stored in described storage In unit to the database that should have identity information and biological information, obtain described in currently being identified by described biological identification device The identity information of supervisor;
In described step S6, when the value of described counter stored count is more than setting value, execution step S1.5.
7. a kind of engineering quality supervision personnel's ability to supervise evaluation method according to claim 6 is it is characterised in that described Biological identification device is fingerprint identification device or face recognition device.
8. a kind of engineering quality supervision personnel's ability to supervise evaluating apparatus are it is characterised in that include:
- storage element(2), inside store the first database, described first database is at least by some containing qualitative problems of construction First kind BIM model constitute;
- output unit(4), discernible data message can be received and shown in the way of image;
- transmitting element(6), can call positioned at described storage element(2)In the first database, and choose at least one Individual described first kind BIM model, being converted into can be by described output unit(4)Send to described defeated after the data message of identification Go out unit(4);
- action collecting unit(8), the action that scene can be occurred is acquired and processes, and obtains action message;
- processor(10), it is capable of identify that described action message, and call and be stored in described storage element(2)In criterion, Described action message is contrasted with described criterion, obtains and meet or do not meet two kinds of results, and according to both Result is by transmitter(11)Send the first signal that can be identified manually and secondary signal respectively, when described processor(10)'s When judged result is not meet, transmitting element can be controlled(6)Call and be stored in described storage element(2)In described first data Equations of The Second Kind BIM model in storehouse, and be converted into can be by described output unit(4)Identification data message, retransmit to Described output unit(4), shown in the way of image, described Equations of The Second Kind BIM model and each described first kind BIM model One by one relative to and massless problems;
Described action collecting unit(8)Including one of following devices or multiple:
- position sensor, at least can interpolate that whether the live action of described supervisor puts in place;
- photoelectric sensor, at least can obtain orientation and/or amplitude and/or the body part of the live action of described supervisor The concrete distance stretched out;
- very first time relay, be able to record that between the action being captured by least two relative to time interval,
- the second time relay, controls other described action collecting unit work on the time period setting;
- voltage sensitive sensor, can gather the power of the contact action of described supervisor;
Also include counter(12)And biology sets device(14), wherein:
Described biology sets device(14)The biological information of single described supervisor can be obtained, and dispatch and be stored in described storage Memory cell(2)In, be made up of some identity informations and biological information and both are the second database of one-to-one relationship, obtain The identity information of the described supervisor currently being identified by described biological identification device, and to described transmitting element(6)Send energy Enough control the working signal of its work;
Described processor(10)When the judged result obtaining after judging is as meeting, to described transmitting element(6)Send and can control Make the working signal of its work;
Described counter(12)Can be to described transmitter(11)The first signal sending and/or secondary signal are counted, when When described first signal reaches setting value, then control described processor(10)Stop to described transmitting element(6)Send and can control Make the working signal of its work.
CN201610136680.9A 2016-03-10 2016-03-10 Project quality supervision personnel supervision capability evaluation method and device Active CN105825325B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610136680.9A CN105825325B (en) 2016-03-10 2016-03-10 Project quality supervision personnel supervision capability evaluation method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610136680.9A CN105825325B (en) 2016-03-10 2016-03-10 Project quality supervision personnel supervision capability evaluation method and device

Publications (2)

Publication Number Publication Date
CN105825325A CN105825325A (en) 2016-08-03
CN105825325B true CN105825325B (en) 2017-02-08

Family

ID=56987565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610136680.9A Active CN105825325B (en) 2016-03-10 2016-03-10 Project quality supervision personnel supervision capability evaluation method and device

Country Status (1)

Country Link
CN (1) CN105825325B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108200010B (en) * 2017-12-11 2021-04-16 机械工业第六设计研究院有限公司 Data interaction method, device, terminal and system for virtual scene and real scene
CN111105106A (en) * 2018-10-25 2020-05-05 玳能本股份有限公司 Operation evaluation device, operation evaluation method, and operation evaluation system
CN109871453A (en) * 2019-01-29 2019-06-11 中铁四局集团第三建设有限公司 A kind of information processing system and method for the common quality defect data based on BIM model
CN109919505A (en) * 2019-03-14 2019-06-21 上海达慧智能科技有限公司 A kind of mode of operation judgment method, device, system, equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5493658A (en) * 1992-03-26 1996-02-20 International Business Machines Corporation Interactive online tutorial system with monitoring function for software products
WO2013188277A1 (en) * 2012-06-12 2013-12-19 Connotate, Inc. Monitoring and replaying user behaviors on the web
CN105308536A (en) * 2013-01-15 2016-02-03 厉动公司 Dynamic user interactions for display control and customized gesture interpretation

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101996311A (en) * 2009-08-10 2011-03-30 深圳泰山在线科技有限公司 Yoga stance recognition method and system
CN104133813B (en) * 2014-08-11 2017-02-15 南通大学 Navy semaphore training method based on Kinect
CN104616028B (en) * 2014-10-14 2017-12-12 北京中科盘古科技发展有限公司 Human body limb gesture actions recognition methods based on space segmentation study

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5493658A (en) * 1992-03-26 1996-02-20 International Business Machines Corporation Interactive online tutorial system with monitoring function for software products
WO2013188277A1 (en) * 2012-06-12 2013-12-19 Connotate, Inc. Monitoring and replaying user behaviors on the web
CN105308536A (en) * 2013-01-15 2016-02-03 厉动公司 Dynamic user interactions for display control and customized gesture interpretation

Also Published As

Publication number Publication date
CN105825325A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN105825325B (en) Project quality supervision personnel supervision capability evaluation method and device
CN106057001A (en) Simulation teaching system of vocational education
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN106779380A (en) A kind of intelligent construction safety checks evaluation system and method
CN107944118A (en) A kind of effective building safety monitoring method
CN110415521A (en) Prediction technique, device and the computer readable storage medium of traffic data
CN107993170A (en) A kind of psychological health education system based on virtual reality technology
CN104182906A (en) Substation simulation method and system for realizing multi-role cooperative operation
CN102609423A (en) Cooperative question bank system and implementing method thereof
CN106445777A (en) Machine room smart 3D inspection system
CN108629717A (en) A kind of enterprise technology training system and method based on computer networking technology
CN110767007B (en) Intelligent classroom artificial intelligence teaching management system and method based on Baidu intelligence
CN109377802A (en) A kind of automatic and interactive intellectual education system and method
CN108806374A (en) A kind of tutoring system
CN113270007A (en) Multi-mode dispatcher training simulation system in cloud environment
CN205582357U (en) Real standard system is synthesized to innovative 0 practical technical ability of vocational education industry 4.
CN107272050A (en) Nuclear power plant's seismic monitoring method, apparatus and system
CN103841595A (en) Base station information supervising system
WO2023097684A1 (en) Virtual laboratory teaching implementation method and system based on 3d simulation, and medium and device
CN109087006A (en) Power equipment supervises the processing method and processing device for making information
CN111818064B (en) Automatic method for enterprise security education process
CN112598556A (en) Virtual-real combined remote DDC experimental platform and application thereof
CN113610688A (en) Food safety supervision method based on big data analysis and storage medium
CN114078347A (en) Novel juvenile STEAM education system and method
Tengfei et al. Application analysis of 3d digital technology in power grid training

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161026

Address after: Yudaojie Qinhuai District of Nanjing City, Jiangsu Province, No. 210000 33-30

Applicant after: Nanjing Building Installation Engineering Quality Supervision Station

Applicant after: Jiangsu Jianke Project Management Co., Ltd.

Address before: Yudaojie Qinhuai District of Nanjing City, Jiangsu Province, No. 210000 33-30

Applicant before: Nanjing Building Installation Engineering Quality Supervision Station

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161227

Address after: Yudaojie Qinhuai District of Nanjing City, Jiangsu Province, No. 210000 33-30

Applicant after: Nanjing Building Installation Engineering Quality Supervision Station

Applicant after: Jiangsu Jianke Project Management Co., Ltd.

Applicant after: The Third Construction Co., Ltd. of China Construction Eighth Engineering Bureau

Address before: Yudaojie Qinhuai District of Nanjing City, Jiangsu Province, No. 210000 33-30

Applicant before: Nanjing Building Installation Engineering Quality Supervision Station

Applicant before: Jiangsu Jianke Project Management Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Jin Shaojun

Inventor after: Tian Cheng

Inventor after: Liang Xinhua

Inventor after: Luo Zhen

Inventor after: Liu Xiangdong

Inventor after: Song Wei

Inventor after: Ye Song

Inventor after: Jiu Debin

Inventor after: Dai Fanghua

Inventor before: Tian Cheng

Inventor before: Jin Shaojun

Inventor before: Liang Xinhua

Inventor before: Luo Zhen

Inventor before: Liu Xiangdong

Inventor before: Song Wei

Inventor before: Ye Song

Inventor before: Jiu Debin

Inventor before: Dai Fanghua

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20180426

Address after: 210000 27, Jiangsu Development Building, 88 meadow street, Nanjing, Jiangsu.

Co-patentee after: Nanjing Building Installation Engineering Quality Supervision Station

Patentee after: Jiangsu Construction Engineering Quality Supervision Center

Co-patentee after: The Third Construction Co., Ltd. of China Construction Eighth Bureau

Co-patentee after: Jiangsu Jianke Project Management Co., Ltd.

Address before: No. 33-30, Qinhuai District, Qinhuai District, Nanjing, Jiangsu

Co-patentee before: Jiangsu Jianke Project Management Co., Ltd.

Patentee before: Nanjing Building Installation Engineering Quality Supervision Station

Co-patentee before: The Third Construction Co., Ltd. of China Construction Eighth Bureau

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 210000 27, Jiangsu Development Building, 88 meadow street, Nanjing, Jiangsu.

Patentee after: Jiangsu Construction Engineering Quality Supervision Station

Patentee after: Nanjing Construction Engineering Quality and safety supervision station

Patentee after: THE THIRD CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION

Patentee after: JIANGSU JIANKE ENGINEERING CONSULTING Co.,Ltd.

Address before: 210000 27, Jiangsu Development Building, 88 meadow street, Nanjing, Jiangsu.

Patentee before: Jiangsu Construction Engineering Quality Supervision Station

Patentee before: Nanjing Building Installation Engineering Quality Supervision Station

Patentee before: THE THIRD CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION

Patentee before: JIANGSU JIANKE PROJECT MANAGEMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder