The content of the invention
For the low problem of a large amount of switching ammeter rate high costs, efficiency in correlation technique, not yet propose at present effective
Solution, therefore, it is a primary object of the present invention to provide a kind of method, apparatus and system for switching electrical equipment rate,
To solve the above problems.
To achieve these goals, according to an aspect of the invention, there is provided a kind of side for switching electrical equipment rate
Method, the method includes:The long-range running status word obtained in electrical equipment;Determine the first of electrical equipment according to running status word
Electricity price ladder, wherein, the first electricity price ladder is the currently used electricity price ladder of electrical equipment;First default electricity price and second is pre-
If electricity price is issued to the first electricity price ladder and the second electricity price ladder respectively, wherein, the second electricity price ladder is electrical equipment current
Untapped electricity price ladder;Control electrical equipment calculates rate using the second electricity price ladder after the preset lime.
Further, the first default electricity price and the second default electricity price are issued to the first electricity price ladder and the second electricity price respectively
The step of ladder, includes:First default electricity price is issued to the first electricity price ladder;Verify the first electricity price ladder electricity price whether under
Send out successfully;In the case of the electricity price of the first electricity price ladder is issued successfully, the second default electricity price is issued to the second electricity price ladder;
The first electricity price ladder electricity price issue it is unsuccessful in the case of, re-issue the electricity price of the first default electricity price until the first electricity price
The electricity price of ladder is issued successfully.
Further, whether the electricity price of the first electricity price ladder of checking issues successful step includes:Read the first electricity price rank
The rate parameter of ladder;Detect whether the rate parameter of the first electricity price ladder is consistent with the first default electricity price;In the first electricity price ladder
Rate parameter it is consistent with the first default electricity price in the case of, confirm that the electricity price of the first electricity price ladder is issued successfully;In the first electricity
In the case that the rate parameter of valency ladder is inconsistent with the first default electricity price, confirm that the electricity price of the first electricity price ladder can not issued
Work(.
Further, the step of the second default electricity price being issued into the second electricity price ladder includes:Verify the second electricity price ladder
Electricity price whether issue successfully;In the case of the electricity price of the second electricity price ladder is issued successfully, control electrical equipment is when default
Between after using the second electricity price ladder calculate rate;The second electricity price ladder electricity price issue it is unsuccessful in the case of, again under
The default electricity price of hair second is until the electricity price of the second electricity price ladder is issued successfully.
Further, the step of control electrical equipment calculates rate using the second electricity price ladder after the preset lime is wrapped
Include:Preset Time is sent to electrical equipment;Electrical equipment is controlled to switch rate computation schema after Preset Time is reached
It is the pattern of the second electricity price ladder;Electrical equipment calculates rate using the second electricity price ladder.
To achieve these goals, according to an aspect of the invention, there is provided a kind of dress for switching electrical equipment rate
Put, the device includes:Acquisition module, for the long-range running status word obtained in electrical equipment;First determining module, for root
The first electricity price ladder of electrical equipment is determined according to running status word, wherein, the first electricity price ladder is that electrical equipment is currently used
Electricity price ladder;Module is issued, for the first default electricity price and the second default electricity price to be issued into the first electricity price ladder and the respectively
Two electricity price ladders, wherein, the second electricity price ladder is electrical equipment in not currently used electricity price ladder;Control module, for controlling
Electrical equipment processed calculates rate using the second electricity price ladder after the preset lime.
Further, issuing module includes:First issues submodule, for the first default electricity price to be issued into the first electricity price
Ladder;Whether the first authentication module, the electricity price for verifying the first electricity price ladder issues successfully;Second issues submodule, is used for
In the case of the electricity price of the first electricity price ladder is issued successfully, the second default electricity price is issued to the second electricity price ladder;Under 3rd
Hair submodule, for the electricity price of the first electricity price ladder issue it is unsuccessful in the case of, re-issue the electricity of the first default electricity price
Valency is until the electricity price of the first electricity price ladder is issued successfully.
Further, authentication module includes:Read module, the rate parameter for reading the first electricity price ladder;Detection mould
Whether block, the rate parameter for detecting the first electricity price ladder is consistent with the first default electricity price;Second determining module, for
In the case that the rate parameter of one electricity price ladder is consistent with the first default electricity price, confirm that the electricity price of the first electricity price ladder is issued into
Work(;3rd determining module, in the case where the rate parameter of the first electricity price ladder is inconsistent with the first default electricity price, confirming
The electricity price of the first electricity price ladder issues unsuccessful.
Further, second issue submodule and include:Second authentication module, for verify the second electricity price ladder electricity price be
It is no to issue successfully;First control submodule, in the case of being issued successfully in the electricity price of the second electricity price ladder, control electricity consumption sets
It is standby to calculate rate using the second electricity price ladder after the preset lime;4th issues submodule, in the second electricity price ladder
Electricity price issue it is unsuccessful in the case of, re-issue the second default electricity price until the electricity price of the second electricity price ladder is issued successfully.
Further, control module includes:Sending module, for Preset Time to be sent to electrical equipment;Handover module,
For controlling electrical equipment that rate computation schema is switched to the pattern of the second electricity price ladder after Preset Time is reached;Charging
Module, rate is calculated for electrical equipment using the second electricity price ladder.
To achieve these goals, according to an aspect of the invention, there is provided a kind of electrical equipment rate of switching is
System, the system includes:Main station system, is connected with electrical equipment, for the long-range running status word obtained in electrical equipment, and root
The first electricity price ladder of electrical equipment is determined according to running status word, is issued respectively by the first default electricity price and the second default electricity price
To the first electricity price ladder and the second electricity price ladder, control electrical equipment uses the second electricity price ladder meter after the preset lime
Rate is calculated, wherein, the first electricity price ladder is the currently used electricity price ladder of electrical equipment, and the second electricity price ladder exists for electrical equipment
Not currently used electricity price ladder.
Further, system also includes:Power information collecting device, is connected between main station system and electrical equipment, uses
In the data gathered and between transmission main station system and electrical equipment;Communicator, including:Telecommunication channel and local communication
Channel;Telecommunication channel is connected between main station system and power information collecting device, for setting up main station system and electricity consumption
Communication between information collecting device;Local communi-cation channel is connected between electrical equipment and power information collecting device, is used for
The communication set up between electrical equipment and power information collecting device.
Using the present invention, it is possible to use the running status word of main station system remote collection electrical equipment, and it is determined that electricity consumption
Equipment it is currently used when protheca ladder(That is the first electricity price ladder)Afterwards, the first default electricity price and the second default electricity price are issued
To when protheca ladder(That is the first electricity price ladder)Ladder is covered with non-present(That is the second electricity price ladder)Afterwards, control electrical equipment exists
Rate is calculated using the second electricity price ladder after Preset Time, to ensure that all of user performs the second default electricity in the same time
Valency.Rate computation schema that can be rapidly to electrical equipment by main station system is controlled, and recycles above-mentioned side
Method carries out the control of rate calculating to each electrical equipment, realizes switching in bulk the electricity price ladder of electrical equipment, and can be with
Ensure that step price is correctly performed in intelligent meter, it is existing rather than using being manually controlled to electricity price one to one, solving
There is the low problem of a large amount of switching ammeter rate high costs, efficiency in technology.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase
Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Fig. 1 is the system schematic of switching electrical equipment rate according to embodiments of the present invention.As shown in figure 1, the system
Can include:Main station system 1, is connected with electrical equipment 5, for the long-range running status word obtained in electrical equipment, and according to
Running status word determines the first electricity price ladder of electrical equipment, is issued to respectively by the first default electricity price and the second default electricity price
After first electricity price ladder and the second electricity price ladder, control electrical equipment is calculated using the second electricity price ladder after the preset lime
Rate, wherein, the first electricity price ladder is the currently used electricity price ladder of electrical equipment, and the second electricity price ladder is that electrical equipment is being worked as
Preceding untapped electricity price ladder.Wherein, electrical equipment can be intelligent electric energy meter.
Using the solution of the present invention, it is possible to use the running status word of main station system remote collection electrical equipment, and true
Determine electrical equipment it is currently used when protheca ladder(That is the first electricity price ladder)Afterwards, by the first default electricity price and the second default electricity
Valency is issued to when protheca ladder(That is the first electricity price ladder)Ladder is covered with non-present(That is the second electricity price ladder)Afterwards, electricity consumption is controlled
Equipment calculates rate using the second electricity price ladder after the preset lime, to ensure that all of user performs second in the same time
Default electricity price.Rate computation schema that can be rapidly to electrical equipment by main station system is controlled, and recycles
The above method carries out the control of rate calculating to each electrical equipment, realizes switching in bulk the electricity price ladder of electrical equipment, and
And can ensure that step price is correctly performed in intelligent meter, rather than using being manually controlled to electricity price one to one, solve
Determine and largely switched the low problem of ammeter rate high costs, efficiency in the prior art.
According to the abovementioned embodiments of the present invention, the system can also include:Power information collecting device 6, is connected to main website
Between system and electrical equipment, for gathering and transmitting the data between main station system and electrical equipment;Communicator, including:
Telecommunication channel and local communi-cation channel;Telecommunication channel is connected between main station system and power information collecting device,
For setting up the communication between main station system and power information collecting device;Local communi-cation channel is connected to electrical equipment and electricity consumption
Between information collecting device, for setting up the communication between electrical equipment and power information collecting device.
As shown in figure 1, main station system within the system is communicated by communicator electrical equipment 5.Wherein, this leads to
T unit can be communication network.Wherein, main station system can power information unify storing, managed concentratedly, to task
Request unified management and the computer system of scheduling, main station system can be acquisition system operation, scheduling, monitoring, storage and open up
The core for showing.And main station system formulates the acquisition tasks of power information collecting device, collects and stores power information and adopt
The power information of the electrical equipment of collection equipment collection, and statistical analysis is carried out to power information, perform power purchase job order and issue, hold
Row electrical equipment parameter setting, performs the work such as provisional traffic operation.The electrical equipment shown in figure can be multiple intelligence
Electric energy meter.
Communication network(Communicator i.e. in above-described embodiment)It is to include telecommunication channel 2 and local communi-cation channel 4,
It is the communication port for being coupled main website and power information collecting device.Wherein, telecommunication channel refers to power information collecting device
With the communication port of main station system, communication can be set up using GPRS modes;Local communi-cation channel is power information collecting device
With the communication port of electrical equipment, micropower wireless mode can be used.
Power information collecting device in above-described embodiment can include concentrator and micropower wireless communication module, mainly
It is for the equipment to on-site data gathering and transmission.
Fig. 2 is a kind of method flow diagram of switching electrical equipment rate according to embodiments of the present invention, as shown in Fig. 2 should
Method may include steps of:
Step S102, the long-range running status word obtained in electrical equipment.
Step S104, the first electricity price ladder of electrical equipment is determined according to running status word, wherein, the first electricity price ladder is
The currently used electricity price ladder of electrical equipment.
Step S106, the first electricity price ladder and the second electricity price are issued to by the first default electricity price and the second default electricity price respectively
Ladder, wherein, the second electricity price ladder is electrical equipment in not currently used electricity price ladder.
Step S108, control electrical equipment calculates rate using the second electricity price ladder after the preset lime.
Using the present invention, it is possible to use the running status word of main station system remote collection electrical equipment, and it is determined that electricity consumption
Equipment it is currently used when protheca ladder(That is the first electricity price ladder)Afterwards, the first default electricity price and the second default electricity price are issued
To when protheca ladder(That is the first electricity price ladder)Ladder is covered with non-present(That is the second electricity price ladder)Afterwards, control electrical equipment exists
Rate is calculated using the second electricity price ladder after Preset Time, to ensure that all of user performs the second default electricity in the same time
Valency.Rate computation schema that can be rapidly to electrical equipment by main station system is controlled, and recycles above-mentioned side
Method carries out the control of rate calculating to each electrical equipment, realizes switching in bulk the electricity price ladder of electrical equipment, and can be with
Ensure that step price is correctly performed in intelligent meter, it is existing rather than using being manually controlled to electricity price one to one, solving
There is the low problem of a large amount of switching ammeter rate high costs, efficiency in technology.
Existing electric energy meter is the pattern of single rate, and it is 0.4883 yuan often to spend electricity, and main station system can be with reading power meters
Running status word, to determine that electric energy meter when protheca ladder, will work as protheca ladder and be defined as the first electricity price ladder.
Specifically, when electric energy meter is in single rate state, the relevant any symbol of electricity price ladder is not shown, therefore cannot
Clearly learn stepped in first set electricity price step condition or second set of electricity price in intelligent meter from the display device of electric energy meter
State, understands to work as protheca step condition by the running status word of reading power meters.
More specifically, running status word is stored in one group of data inside electric energy meter, the operation for characterizing electric energy meter
State machine related information, running status word 3 can be set by the local communication interface of electric energy meter or by power information collection
It is standby to carry out digital independent, as shown in figure 3, by taking electric energy meter as an example, the present invention is discussed in detail:The Bit11 of running status word 3 in the figure
Position, when being read as 0, determines that electric energy meter is currently at first set ladder, when being read as 1, determines that electric energy meter is currently at the
Two sets of ladders.
In this embodiment it is possible to the first default electricity price is set to, excessively with electricity price, the first default electricity price to be issued to
When protheca ladder(That is the first electricity price ladder), the such as first default electricity price is every 0.4883 yuan of degree electricity.Wherein, specifically, issue i.e.
It is that, when needing to change some parameters of electric energy meter, can will change parameter(Be in this embodiment the first default electricity price and
Second default electricity price)Order is issued to concentrator by main station system using GPRS modes, and concentrator is wireless by micropower
Mode be issued to intelligent electric energy meter, so as to realize electric energy meter parameters remote change.
Such as table 1(First default electricity price is issued to the first electricity price ladder)With table 2(Second default electricity price is issued to the second electricity price
Ladder)Shown, the step price after issuing is as follows(Five electricity prices can be set in intelligent electric energy meter):
Table 1:
Step price 1 |
0.4883 yuan |
Step price 2 |
0.4883 yuan |
Step price 3 |
0.4883 yuan |
Step price 4 |
0.4883 yuan |
Step price 5 |
0.4883 yuan |
Table 2:
Step price 1 |
0.4883 yuan |
Step price 2 |
0.5383 yuan |
Step price 3 |
0.7883 yuan |
Step price 4 |
Default value |
Step price 5 |
Default value |
In the above embodiment of the present invention, the first default electricity price and the second default electricity price are issued to the first electricity price respectively
The step of ladder and the second electricity price ladder, can include:First default electricity price is issued to the first electricity price ladder;The electricity of checking first
Whether the electricity price of valency ladder issues successfully;In the case of the electricity price of the first electricity price ladder is issued successfully, by the second default electricity price
It is issued to the second electricity price ladder;The first electricity price ladder electricity price issue it is unsuccessful in the case of, re-issue the first default electricity
The electricity price of valency is until the electricity price of the first electricity price ladder is issued successfully.
Specifically, whether the electricity price of the first electricity price ladder of checking issues successful step can include:Read the first electricity price
The rate parameter of ladder;Detect whether the rate parameter of the first electricity price ladder is consistent with the first default electricity price;In the first electricity price rank
In the case that the rate parameter of ladder is consistent with the first default electricity price, confirm that the electricity price of the first electricity price ladder is issued successfully;First
In the case that the rate parameter of electricity price ladder is inconsistent with the first default electricity price, confirm that the electricity price of the first electricity price ladder can not issued
Work(.
In the above embodiment of the present invention, second is preset the step of electricity price is issued to the second electricity price ladder can wrap
Include:Verify whether the electricity price of the second electricity price ladder issues successfully;In the case of the electricity price of the second electricity price ladder is issued successfully, control
Electrical equipment processed calculates rate using the second electricity price ladder after the preset lime;Can not issued in the electricity price of the second electricity price ladder
In the case of work(, the second default electricity price is re-issued until the electricity price of the second electricity price ladder is issued successfully.
In the above embodiment of the present invention, verify whether the electricity price of the first electricity price ladder issues and successfully pass following method
Realize:Read and work as protheca ladder(That is the first electricity price ladder)Rate parameter, verify excessive electricity consumption valency(I.e. first default electricity price)
Issue and whether succeed.And can verify whether the electricity price of the second electricity price ladder issues successfully:Read non-present set ladder(I.e.
Two electricity price ladders)Rate parameter, and verify actual execution step price(I.e. second default electricity price)Issue and whether succeed.
Specifically, lower heat gradient charge value and ladder number, as shown in table 3.
Table 3:
Gradient charge value(KWh) |
When protheca step price |
Non-present covers step price |
0-240 |
0.4883 yuan |
0.4883 yuan |
240-400 |
0.4883 yuan |
0.5383 yuan |
More than 400 |
0.4883 yuan |
0.7883 yuan |
|
0.4883 yuan |
Default value |
|
0.4883 yuan |
Default value |
In the above embodiment of the present invention, after it is determined that the first default electricity price and the second default electricity price are issued successfully, control
Electric energy meter processed is switched to when the electricity price of protheca ladder, that is, control electric energy meter to calculate rate using the first electricity price ladder.
Specifically, in the case where electric energy meter is in single rate, it is 0.4883 yuan often to spend electricity, is switched to when protheca ladder
(That is the first electricity price ladder)Electricity price, be also all 0.4883 yuan, do not have any influence on actual user, it is simply aobvious in electric energy meter
Show variant, thereby may be ensured that the uniformity for calculating user power utilization rate.
In the above-described embodiments, whether the default electricity price of checking first and the second default electricity price issue successfully, are due to from master
What relaying or data transfer system of standing is needed by electrical equipment, may exist during transmission mistake or
Failure, therefore, the rate parameter when protheca ladder is again read off, the behaviour for determining the first default electricity price and the second default electricity price
Whether succeed, next step operation is just carried out after success, with asking that the uniformity and system that ensure whole system electricity price work
Topic property so that Consumer's Experience is good.
According to the abovementioned embodiments of the present invention, control electrical equipment is calculated using the second electricity price ladder after the preset lime
The step of rate, can include:Preset Time is sent to electrical equipment;Control electrical equipment will after Preset Time is reached
Rate computation schema switches to the pattern of the second electricity price ladder;Electrical equipment calculates rate using the second electricity price ladder.
Specifically, issue when protheca step price(First default electricity price)Step price is covered to non-present(I.e. second presets
Electricity price)Switching time(That is the Preset Time of above-described embodiment), after waiting until switching time, check whether electric energy meter is switched to
Non-present covers step price(The actual step price for performing, namely the second default electricity price).
More specifically, intelligent electric energy meter is under single rate, stair step fashion can be immediately switched to by the setting of processor
Under, but switch mutually under stair step fashion, that is, in the case where the first electricity price ladder switches to the second electricity price ladder, it is necessary to pass through
Switching time is set, is such as set to 0 point of September 1 day, after the time 1 day 0 point of September is gone to, the mould for calculating rate can be switched
Formula, can so ensure to start to perform step price in all users same time.
When batch switching is carried out to electrical equipment, the circulation of background loop program can be carried out in main station system and perform this hair
The method referred in bright any one above-mentioned embodiment, you can to realize batch testing, quick and precisely realizes low cost batch
Switching.
It should be noted that can be in such as one group computer executable instructions the step of the flow of accompanying drawing is illustrated
Performed in computer system, and, although logical order is shown in flow charts, but in some cases, can be with not
The order being same as herein performs shown or described step.
Fig. 4 is a kind of schematic device of switching electrical equipment rate according to embodiments of the present invention, as shown in figure 4, should
Device can include:Acquisition module 10, for the long-range running status word obtained in electrical equipment;First determining module 30, uses
In the first electricity price ladder that electrical equipment is determined according to running status word, wherein, the first electricity price ladder currently makes for electrical equipment
Electricity price ladder;Module 50 is issued, for the first default electricity price and the second default electricity price to be issued into the first electricity price rank respectively
Ladder and the second electricity price ladder, wherein, the second electricity price ladder is electrical equipment in not currently used electricity price ladder;Control module
70, for controlling electrical equipment to calculate rate using the second electricity price ladder after the preset lime.
Using the present invention, it is possible to use the running status word of the acquisition module remote collection electrical equipment of main station system, and
The first determining module determine electrical equipment it is currently used when protheca ladder(That is the first electricity price ladder)Afterwards, by issuing mould
Be issued to when protheca ladder for first default electricity price and the second default electricity price by block(That is the first electricity price ladder)Ladder is covered with non-present
(That is the second electricity price ladder)Afterwards, electrical equipment is controlled to use the second electricity price ladder meter after the preset lime using control module
Rate is calculated, to ensure that all of user performs the second default electricity price in the same time.By main station system can rapidly to
The rate computation schema of electric equipment is controlled, and recycles the above method and carry out rate calculating to each electrical equipment
Control, realizes switching in bulk the electricity price ladder of electrical equipment, and can ensure that step price is correctly performed in intelligent meter,
Rather than using being manually controlled to electricity price one to one, solve in the prior art a large amount of switching ammeter rate high costs,
The low problem of efficiency.
Existing electric energy meter is the pattern of single rate, and it is 0.4883 yuan often to spend electricity, and main station system can be with reading power meters
Running status word, to determine that electric energy meter when protheca ladder, will work as protheca ladder and be defined as the first electricity price ladder.
Specifically, when electric energy meter is in single rate state, the relevant any symbol of electricity price ladder is not shown, therefore cannot
Clearly learn stepped in first set electricity price step condition or second set of electricity price in intelligent meter from the display device of electric energy meter
State, understands to work as protheca step condition by the running status word of reading power meters.
More specifically, running status word is stored in one group of data inside electric energy meter, the operation for characterizing electric energy meter
State machine related information, running status word 3 can be set by the local communication interface of electric energy meter or by power information collection
It is standby to carry out digital independent, as shown in figure 3, by taking electric energy meter as an example, the present invention is discussed in detail:The Bit11 of running status word 3 in the figure
Position, when being read as 0, determines that electric energy meter is currently at first set ladder, when being read as 1, determines that electric energy meter is currently at the
Two sets of ladders.
In this embodiment it is possible to the first default electricity price is set to, excessively with electricity price, the first default electricity price to be issued to
When protheca ladder(That is the first electricity price ladder), the such as first default electricity price is every 0.4883 yuan of degree electricity.Wherein, specifically, issue i.e.
It is that, when needing to change some parameters of electric energy meter, can will change parameter(Be in this embodiment the first default electricity price and
Second default electricity price)Order is issued to concentrator by main station system using GPRS modes, and concentrator is wireless by micropower
Mode be issued to intelligent electric energy meter, so as to realize electric energy meter parameters remote change.
According to the abovementioned embodiments of the present invention, issuing module can include:First issues submodule, for first to be preset
Electricity price is issued to the first electricity price ladder;Whether the first authentication module, the electricity price for verifying the first electricity price ladder issues successfully;The
Two issue submodule, in the case of being issued successfully in the electricity price of the first electricity price ladder, the second default electricity price are issued into the
Two electricity price ladders;3rd issues submodule, for the electricity price of the first electricity price ladder issue it is unsuccessful in the case of, re-issue
The electricity price of the first default electricity price is until the electricity price of the first electricity price ladder is issued successfully.
Specifically, authentication module can include:Read module, the rate parameter for reading the first electricity price ladder;Detection
Whether module, the rate parameter for detecting the first electricity price ladder is consistent with the first default electricity price;Second determining module, for
In the case that the rate parameter of the first electricity price ladder is consistent with the first default electricity price, confirm that the electricity price of the first electricity price ladder is issued into
Work(;3rd determining module, in the case where the rate parameter of the first electricity price ladder is inconsistent with the first default electricity price, confirming
The electricity price of the first electricity price ladder issues unsuccessful.
In the above embodiment of the present invention, second issues submodule can include:Second authentication module, for verifying the
Whether the electricity price of two electricity price ladders issues successfully;First control submodule, for being issued successfully in the electricity price of the second electricity price ladder
In the case of, control electrical equipment calculates rate using the second electricity price ladder after the preset lime;4th issues submodule, uses
In the electricity price of the second electricity price ladder issue it is unsuccessful in the case of, re-issue the second default electricity price until the second electricity price ladder
Electricity price issue successfully.
In the above embodiment of the present invention, verify whether the electricity price of the first electricity price ladder issues and successfully pass following method
Realize:Read and work as protheca ladder(That is the first electricity price ladder)Rate parameter, verify excessive electricity consumption valency(I.e. first default electricity price)
Issue and whether succeed.And can verify whether the electricity price of the second electricity price ladder issues successfully:Read non-present set ladder(I.e.
Two electricity price ladders)Rate parameter, and verify actual execution step price(I.e. second default electricity price)Issue and whether succeed.
In the above embodiment of the present invention, after it is determined that the first default electricity price and the second default electricity price are issued successfully, control
Electric energy meter processed is switched to when the electricity price of protheca ladder, that is, control electric energy meter to calculate rate using the first electricity price ladder.
Specifically, in the case where electric energy meter is in single rate, it is 0.4883 yuan often to spend electricity, is switched to when protheca ladder
(That is the first electricity price ladder)Electricity price, be also all 0.4883 yuan, do not have any influence on actual user, it is simply aobvious in electric energy meter
Show variant, thereby may be ensured that the uniformity for calculating user power utilization rate.
In the above-described embodiments, whether the default electricity price of checking first and the second default electricity price issue successfully, are due to from master
What relaying or data transfer system of standing is needed by electrical equipment, may exist during transmission mistake or
Failure, therefore, the rate parameter when protheca ladder is again read off, the behaviour for determining the first default electricity price and the second default electricity price
Whether succeed, next step operation is just carried out after success, with asking that the uniformity and system that ensure whole system electricity price work
Topic property so that Consumer's Experience is good.
In the above embodiment of the present invention, control module 70 includes:Sending module, for Preset Time to be sent to use
Electric equipment;Handover module, for controlling electrical equipment that rate computation schema is switched into the second electricity after Preset Time is reached
The pattern of valency ladder;Accounting module, rate is calculated for electrical equipment using the second electricity price ladder.
Specifically, issue when protheca step price(First default electricity price)Step price is covered to non-present(I.e. second presets
Electricity price)Switching time(That is the Preset Time of above-described embodiment), after waiting until switching time, check whether electric energy meter is switched to
Non-present covers step price(The actual step price for performing, namely the second default electricity price).
More specifically, intelligent electric energy meter is under single rate, stair step fashion can be immediately switched to by the setting of processor
Under, but switch mutually under stair step fashion, that is, in the case where the first electricity price ladder switches to the second electricity price ladder, it is necessary to pass through
Switching time is set, is such as set to 0 point of September 1 day, after the time 1 day 0 point of September is gone to, the mould for calculating rate can be switched
Formula, can so ensure to start to perform step price in all users same time.
When batch switching is carried out to electrical equipment, the circulation of background loop program can be carried out in main station system and perform this hair
The method referred in bright any one above-mentioned embodiment, you can to realize batch testing, quick and precisely realizes low cost batch
Switching.
As can be seen from the above description, the present invention realizes following technique effect:Using the solution of the present invention, can
With using main station system remote collection electrical equipment running status word, and it is determined that electrical equipment it is currently used when protheca rank
Ladder(That is the first electricity price ladder)Afterwards, the first default electricity price and the second default electricity price are issued to when protheca ladder(I.e. first electricity
Valency ladder)Ladder is covered with non-present(That is the second electricity price ladder)Afterwards, control electrical equipment uses second after the preset lime
Electricity price ladder calculates rate, to ensure that all of user performs the second default electricity price in the same time.Can be with by main station system
Rapidly the rate computation schema to electrical equipment is controlled, and recycles the above method each electrical equipment is carried out
The control that rate is calculated, realizes switching in bulk the electricity price ladder of electrical equipment, and step price can be ensured in intelligent meter
Interior correct execution, ammeters are largely switched rather than using being manually controlled to electricity price one to one, solving in the prior art
The low problem of rate high cost, efficiency.
Obviously, those skilled in the art should be understood that above-mentioned of the invention each module or each step can be with general
Computing device realize that they can be concentrated on single computing device, or be distributed in multiple computing devices and constituted
Network on, alternatively, the program code that they can be can perform with computing device be realized, it is thus possible to they are stored
Performed by computing device in the storage device, or they be fabricated to each integrated circuit modules respectively, or by they
In multiple modules or step single integrated circuit module is fabricated to realize.So, the present invention is not restricted to any specific
Hardware and software is combined.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair
Change, equivalent, improvement etc., should be included within the scope of the present invention.