CN104658119A - Method, device and system for switching rate of electric device - Google Patents

Method, device and system for switching rate of electric device Download PDF

Info

Publication number
CN104658119A
CN104658119A CN201310582575.4A CN201310582575A CN104658119A CN 104658119 A CN104658119 A CN 104658119A CN 201310582575 A CN201310582575 A CN 201310582575A CN 104658119 A CN104658119 A CN 104658119A
Authority
CN
China
Prior art keywords
electricity price
ladder
consumer
price ladder
issues
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310582575.4A
Other languages
Chinese (zh)
Other versions
CN104658119B (en
Inventor
邢宏伟
田鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310582575.4A priority Critical patent/CN104658119B/en
Publication of CN104658119A publication Critical patent/CN104658119A/en
Application granted granted Critical
Publication of CN104658119B publication Critical patent/CN104658119B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses method, device and system for switching rate of an electric device .The method comprises the steps of remotely acquiring operation status words in the electric device; determining a first stepped price of electricity of the electrical device, wherein the first stepped price of the electricity is the current stepped price of the electricity of the electric device; respectively distributing a first preset electricity price and a second preset electricity price to the first stepped price of the electricity and the second stepped price of the electricity, wherein the second stepped price of the electricity is the stepped price of the electricity without being used at present by the electric device; controlling to calculate the rate of the electric device according to the second stepped price after the preset time. With the adoption of the method, the problems of high cost and low efficiency of lots of switches on rate of electricity meters in the prior art can be solved; the effect of massively switching the stepped price of the electric device can be achieved.

Description

Switch method, the Apparatus and system of consumer rate
Technical field
The present invention relates to consumer control field, in particular to a kind of method, the Apparatus and system that switch consumer rate.
Background technology
Along with the large-scale installation application of Beijing area intelligent electric energy meter, for further adapting to country about the enforcement performing resident's step price, what at present need batch at the intelligent electric energy meter of fortune switches to step price pattern, therefore need to test the function of the long-range switching step price of intelligent electric energy meter, guarantee the normal operation at fortune intelligent electric energy meter.
At present, Beijing area is changed and has been installed more than 200 ten thousand family intelligent electric energy meters, and intelligent electric energy meter all possesses the n-back test of step price, and before in July, 2012, the intelligent electric energy meter of most resident adopts the mode operation of single rate, and namely often spending electricity is 0.4883 yuan.Electric energy meter rate after the transformation of the way and stair step fashion are divided into three kinds: single rate pattern, multi tariff pattern, stair step fashion.Can only run with the one in upper type within a time, the optimum configurations by Local or Remote realizes the conversion between three kinds of modes.In Beijing area, intelligence electric power users is wider, step price can not carried out in electric energy meter, and namely user uses still often degree electricity to be 0.4883 yuan, when use exceedes a certain charge value, backstage main website calculates automatically, need this user in next power purchase time pay arrears.But for the intelligent electric energy meter transported, can only be arranged by remote parameter and switch, but also not have the method for testing that remote batch switches, single switching needs the manpower and materials cost of at substantial high and easily makes mistakes.
Switch high, the inefficient problem of ammeter rate cost for a large amount of in prior art, not yet propose effective solution at present.
Summary of the invention
High, the inefficient problem of ammeter rate cost is switched for a large amount of in correlation technique, at present effective solution is not yet proposed, for this reason, fundamental purpose of the present invention is to provide a kind of method, the Apparatus and system that switch consumer rate, to solve the problem.
To achieve these goals, according to an aspect of the present invention, provide a kind of method switching consumer rate, the method comprises: the running status word in Remote Acquisitioning consumer; According to the first electricity price ladder of running status word determination consumer, wherein, the first electricity price ladder is the electricity price ladder of the current use of consumer; First default electricity price and second are preset electricity price and is issued to the first electricity price ladder and the second electricity price ladder respectively, wherein, the second electricity price ladder is that consumer is at current untapped electricity price ladder; Controlling consumer uses the second electricity price ladder to calculate rate after the preset lime.
Further, the step that the first default electricity price and the second default electricity price are issued to the first electricity price ladder and the second electricity price ladder is respectively comprised: preset electricity price by first and be issued to the first electricity price ladder; Verify whether the electricity price of the first electricity price ladder issues successfully; Under the electricity price of the first electricity price ladder issues successful situation, preset electricity price by second and be issued to the second electricity price ladder; Under the electricity price of the first electricity price ladder issues unsuccessful situation, re-issue first and preset the electricity price of electricity price until the electricity price of the first electricity price ladder issues successfully.
Further, verify whether the electricity price of the first electricity price ladder issues successful step and comprise: the rate parameter reading the first electricity price ladder; Whether the rate parameter detecting the first electricity price ladder is consistent with the first default electricity price; When the first electricity price ladder rate parameter and first preset electricity price consistent, confirm that the electricity price of the first electricity price ladder issues successfully; When the first electricity price ladder rate parameter and first preset electricity price inconsistent, confirm that the electricity price of the first electricity price ladder issues unsuccessful.
Further, the step that the second default electricity price is issued to the second electricity price ladder is comprised: verify whether the electricity price of the second electricity price ladder issues successfully; Under the electricity price of the second electricity price ladder issues successful situation, control consumer and use the second electricity price ladder to calculate rate after the preset lime; Under the electricity price of the second electricity price ladder issues unsuccessful situation, re-issue second and preset electricity price until the electricity price of the second electricity price ladder issues successfully.
Further, controlling consumer uses the step of the second electricity price ladder calculating rate to comprise after the preset lime: Preset Time is sent to consumer; The pattern that rate computation schema is switched to the second electricity price ladder by consumer is controlled after reaching Preset Time; Consumer uses the second electricity price ladder to calculate rate.
To achieve these goals, according to an aspect of the present invention, provide a kind of device switching consumer rate, this device comprises: acquisition module, for the running status word in Remote Acquisitioning consumer; First determination module, for the first electricity price ladder according to running status word determination consumer, wherein, the first electricity price ladder is the electricity price ladder of the current use of consumer; Issue module, be issued to the first electricity price ladder and the second electricity price ladder respectively for the first default electricity price and second are preset electricity price, wherein, the second electricity price ladder is that consumer is at current untapped electricity price ladder; Control module, uses the second electricity price ladder to calculate rate for controlling consumer after the preset lime.
Further, issuing module and comprise: first issues submodule, being issued to the first electricity price ladder for presetting electricity price by first; First authentication module, for verifying whether the electricity price of the first electricity price ladder issues successfully; Second issues submodule, under issuing successful situation in the electricity price of the first electricity price ladder, presets electricity price be issued to the second electricity price ladder by second; 3rd issues submodule, under issuing unsuccessful situation in the electricity price of the first electricity price ladder, re-issues first and presets the electricity price of electricity price until the electricity price of the first electricity price ladder issues successfully.
Further, authentication module comprises: read module, for reading the rate parameter of the first electricity price ladder; Detection module, whether consistent with the first default electricity price for the rate parameter detecting the first electricity price ladder; Second determination module, for when the first electricity price ladder rate parameter and first preset electricity price consistent, confirm that the electricity price of the first electricity price ladder issues successfully; 3rd determination module, for when the first electricity price ladder rate parameter and first preset electricity price inconsistent, confirm that the electricity price of the first electricity price ladder issues unsuccessful.
Further, second issues submodule comprises: the second authentication module, for verifying whether the electricity price of the second electricity price ladder issues successfully; First controls submodule, under issuing successful situation in the electricity price of the second electricity price ladder, controls consumer and uses the second electricity price ladder to calculate rate after the preset lime; 4th issues submodule, under issuing unsuccessful situation in the electricity price of the second electricity price ladder, re-issues second and presets electricity price until the electricity price of the second electricity price ladder issues successfully.
Further, control module comprises: sending module, for Preset Time is sent to consumer; Handover module, to switch to the pattern of the second electricity price ladder by rate computation schema for controlling consumer after reaching Preset Time; Accounting module, uses the second electricity price ladder to calculate rate for consumer.
To achieve these goals, according to an aspect of the present invention, provide a kind of system switching consumer rate, this system comprises: main station system, be connected with consumer, for the running status word in Remote Acquisitioning consumer, and according to the first electricity price ladder of running status word determination consumer, after the first default electricity price and second being preset electricity price and being issued to the first electricity price ladder and the second electricity price ladder respectively, controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, wherein, first electricity price ladder is the electricity price ladder of the current use of consumer, second electricity price ladder is that consumer is at current untapped electricity price ladder.
Further, system also comprises: power information collecting device, is connected between main station system and consumer, for gathering and transmitting the data between main station system and consumer; Communicator, comprising: telecommunication channel and local communi-cation channel; Telecommunication channel is connected between main station system and power information collecting device, for setting up the communication between main station system and power information collecting device; Local communi-cation channel is connected between consumer and power information collecting device, for setting up the communication between consumer and power information collecting device.
Adopt the present invention, the running status word of main station system remote collection consumer can be used, and determine the current use of consumer after protheca ladder (i.e. the first electricity price ladder), first default electricity price and second are preset electricity price to be issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide a further understanding of the present invention, and form a application's part, schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the system schematic of the switching consumer rate according to the embodiment of the present invention;
Fig. 2 is a kind of method flow diagram switching consumer rate according to the embodiment of the present invention;
Fig. 3 is the schematic diagram of the running status word according to the embodiment of the present invention; And
Fig. 4 is a kind of device schematic diagram switching consumer rate according to the embodiment of the present invention.
Embodiment
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
Fig. 1 is the system schematic of the switching consumer rate according to the embodiment of the present invention.As shown in Figure 1, this system can comprise: main station system 1, be connected with consumer 5, for the running status word in Remote Acquisitioning consumer, and according to the first electricity price ladder of running status word determination consumer, after the first default electricity price and second being preset electricity price and being issued to the first electricity price ladder and the second electricity price ladder respectively, controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, wherein, first electricity price ladder is the electricity price ladder of the current use of consumer, second electricity price ladder is that consumer is at current untapped electricity price ladder.Wherein, consumer can be intelligent electric energy meter.
Adopt the solution of the present invention, the running status word of main station system remote collection consumer can be used, and determine the current use of consumer after protheca ladder (i.e. the first electricity price ladder), first default electricity price and second are preset electricity price to be issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
According to the abovementioned embodiments of the present invention, this system can also comprise: power information collecting device 6, is connected between main station system and consumer, for gathering and transmitting the data between main station system and consumer; Communicator, comprising: telecommunication channel and local communi-cation channel; Telecommunication channel is connected between main station system and power information collecting device, for setting up the communication between main station system and power information collecting device; Local communi-cation channel is connected between consumer and power information collecting device, for setting up the communication between consumer and power information collecting device.
As shown in Figure 1, main station system is within the system communicated by communicator consumer 5.Wherein, this communicator can be communication network.Wherein, main station system can be unified to store to power information, centralized management, computer system to task requests unified management and scheduling, main station system can be that acquisition system is run, scheduling, monitoring, the core that stores and show.And main station system formulates the acquisition tasks of power information collecting device, gather and store the power information of consumer that power information collecting device gathers, and statistical study is carried out to power information, perform power purchase job order to issue, perform consumer optimum configurations, perform the work such as provisional traffic operation.Consumer shown in figure can be multiple intelligent electric energy meter.
Communication network (communicator namely in above-described embodiment) comprises telecommunication channel 2 and local communi-cation channel 4, is the communication port of connection main website and power information collecting device.Wherein, telecommunication channel refers to the communication port of power information collecting device and main station system, and GPRS mode can be adopted to set up communication; Local communi-cation channel is the communication port of power information collecting device and consumer, can adopt micropower wireless mode.
Power information collecting device in above-described embodiment can comprise concentrator and micropower wireless communication module, is mainly used for the equipment to on-site data gathering and transmission.
Fig. 2 is a kind of method flow diagram switching consumer rate according to the embodiment of the present invention, and as shown in Figure 2, the method can comprise the steps:
Step S102, the running status word in Remote Acquisitioning consumer.
Step S104, according to the first electricity price ladder of running status word determination consumer, wherein, the first electricity price ladder is the electricity price ladder of the current use of consumer.
Step S106, presets electricity price by first and the second default electricity price is issued to the first electricity price ladder and the second electricity price ladder respectively, and wherein, the second electricity price ladder is that consumer is at current untapped electricity price ladder.
Step S108, controls consumer and uses the second electricity price ladder to calculate rate after the preset lime.
Adopt the present invention, the running status word of main station system remote collection consumer can be used, and determine the current use of consumer after protheca ladder (i.e. the first electricity price ladder), first default electricity price and second are preset electricity price to be issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
Existing electric energy meter is the pattern of single rate, and often spending electricity is 0.4883 yuan, and main station system can the running status word of reading power meters, to determine that protheca ladder worked as by electric energy meter, will work as protheca ladder and be defined as the first electricity price ladder.
Particularly, when electric energy meter is in single rate state, do not show any symbol that electricity price ladder is relevant, therefore clearly cannot learn in intelligent meter from the display device of electric energy meter and be in first set electricity price step condition or the second cover electricity price step condition, known when protheca step condition by the running status word of reading power meters.
More specifically, running status word is the one group of data being stored in electric energy meter inside, for characterizing the running status machine relevant information of electric energy meter, running status word 3 can carry out digital independent by the local communication interface of electric energy meter or by power information collecting device, as shown in Figure 3, for electric energy meter, introduce the present invention in detail: the Bit11 position of running status word 3 in this figure, when being read as 0, determine that electric energy meter is current and be in first set ladder, when being read as 1, determining that electric energy meter is current and being in the second cover ladder.
In this embodiment, electricity price can be preset by first and be set to excessively use electricity price, preset electricity price by first and be issued to when protheca ladder (i.e. the first electricity price ladder), if the first default electricity price is often spend electricity 0.4883 yuan.Wherein, particularly, issue and be when needing some parameter changing electric energy meter, can GPRS mode be adopted to be issued to concentrator by main station system change parameter (be first in this embodiment and preset electricity price and the second default electricity price) order, concentrator is issued to intelligent electric energy meter in the mode wireless by micropower, thus realizes the parameters remote change of electric energy meter.
Preset electricity price be issued to the first electricity price ladder as shown 1(first) and table 2(second preset electricity price and be issued to the second electricity price ladder) shown in, the step price after issuing following (five electricity prices can be set in intelligent electric energy meter):
Table 1:
Step price 1 0.4883 yuan
Step price 2 0.4883 yuan
Step price 3 0.4883 yuan
Step price 4 0.4883 yuan
Step price 5 0.4883 yuan
Table 2:
Step price 1 0.4883 yuan
Step price 2 0.5383 yuan
Step price 3 0.7883 yuan
Step price 4 Default value
Step price 5 Default value
In the above embodiment of the present invention, the step that the first default electricity price and the second default electricity price are issued to the first electricity price ladder and the second electricity price ladder respectively can be comprised: preset electricity price by first and be issued to the first electricity price ladder; Verify whether the electricity price of the first electricity price ladder issues successfully; Under the electricity price of the first electricity price ladder issues successful situation, preset electricity price by second and be issued to the second electricity price ladder; Under the electricity price of the first electricity price ladder issues unsuccessful situation, re-issue first and preset the electricity price of electricity price until the electricity price of the first electricity price ladder issues successfully.
Particularly, verify whether the electricity price of the first electricity price ladder issues successful step and can comprise: the rate parameter reading the first electricity price ladder; Whether the rate parameter detecting the first electricity price ladder is consistent with the first default electricity price; When the first electricity price ladder rate parameter and first preset electricity price consistent, confirm that the electricity price of the first electricity price ladder issues successfully; When the first electricity price ladder rate parameter and first preset electricity price inconsistent, confirm that the electricity price of the first electricity price ladder issues unsuccessful.
In the above embodiment of the present invention, the step that the second default electricity price is issued to the second electricity price ladder can be comprised: verify whether the electricity price of the second electricity price ladder issues successfully; Under the electricity price of the second electricity price ladder issues successful situation, control consumer and use the second electricity price ladder to calculate rate after the preset lime; Under the electricity price of the second electricity price ladder issues unsuccessful situation, re-issue second and preset electricity price until the electricity price of the second electricity price ladder issues successfully.
In the above embodiment of the present invention, verify whether the electricity price of the first electricity price ladder issues and successfully pass the realization of following method: read the rate parameter when protheca ladder (i.e. the first electricity price ladder), verify whether successful excessive electricity consumption valency (namely first presetting electricity price) issues.And can verify whether the electricity price of the second electricity price ladder issues successfully: read the rate parameter that non-present overlaps ladder (i.e. the second electricity price ladder), and whether successful the actual step price (namely second presetting electricity price) that performs of checking issues.
Particularly, lower heat gradient charge value and ladder number, as shown in table 3.
Table 3:
Gradient charge value (KWh) When protheca step price Non-present cover step price
0-240 0.4883 yuan 0.4883 yuan
240-400 0.4883 yuan 0.5383 yuan
More than 400 0.4883 yuan 0.7883 yuan
0.4883 yuan Default value
0.4883 yuan Default value
In the above embodiment of the present invention, determining that the first default electricity price and second is preset electricity price and issued successfully, control electric energy meter is switched to the electricity price when protheca ladder, namely controls electric energy meter and uses the first electricity price ladder to calculate rate.
Particularly, when electric energy meter is in single rate, often spending electricity is 0.4883 yuan, be switched to the electricity price when protheca ladder (i.e. the first electricity price ladder), also be all 0.4883 yuan, any impact is not had on actual user, just variant in electric energy meter display, thus the consistance calculating user power utilization rate can be ensured.
In the above-described embodiments, electricity price is preset in checking first and whether the second default electricity price issues successfully, owing to needing through what relaying or data transmission from main station system to consumer, mistake or failure may be there is in the process of transmission, therefore, again read the rate parameter when protheca ladder, whether successful for determining the operation of the first default electricity price and the second default electricity price, next step operation is just carried out after success, with the problem of the consistance and system works that ensure whole system electricity price, make Consumer's Experience good.
According to the abovementioned embodiments of the present invention, controlling consumer uses the step of the second electricity price ladder calculating rate to comprise after the preset lime: Preset Time is sent to consumer; The pattern that rate computation schema is switched to the second electricity price ladder by consumer is controlled after reaching Preset Time; Consumer uses the second electricity price ladder to calculate rate.
Particularly, issue when protheca step price (first presets electricity price) is to the switching time (i.e. the Preset Time of above-described embodiment) of non-present cover step price (namely second presetting electricity price), after waiting until switching time, check whether electric energy meter is switched to non-present cover step price (namely the actual step price performed also second presets electricity price).
More specifically, intelligent electric energy meter is under single rate, by under the arranging and can be switched to stair step fashion immediately of processor, but switching mutually under stair step fashion, namely under the first electricity price ladder switches to the second electricity price ladder, needing by arranging switching time, as being set to point in 1 day 0 September, after the time goes to September 10, the pattern calculating rate can be switched, can ensure like this to start to perform step price in all users same time.
When carrying out batch to consumer and switching, background loop program loop can be carried out at main station system and perform the method mentioned in any one above-mentioned embodiment of the present invention, namely can realize batch testing, quick and precisely realize low cost batch and switch.
It should be noted that, can perform in the computer system of such as one group of computer executable instructions in the step shown in the process flow diagram of accompanying drawing, and, although show logical order in flow charts, but in some cases, can be different from the step shown or described by order execution herein.
Fig. 4 is a kind of device schematic diagram switching consumer rate according to the embodiment of the present invention, and as shown in Figure 4, this device can comprise: acquisition module 10, for the running status word in Remote Acquisitioning consumer; First determination module 30, for the first electricity price ladder according to running status word determination consumer, wherein, the first electricity price ladder is the electricity price ladder of the current use of consumer; Issue module 50, be issued to the first electricity price ladder and the second electricity price ladder respectively for the first default electricity price and second are preset electricity price, wherein, the second electricity price ladder is that consumer is at current untapped electricity price ladder; Control module 70, uses the second electricity price ladder to calculate rate for controlling consumer after the preset lime.
Adopt the present invention, the running status word of the acquisition module remote collection consumer of main station system can be used, and in the current use of the first determination module determination consumer after protheca ladder (i.e. the first electricity price ladder), by issuing module, the first default electricity price and the second default electricity price are issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), using control module to control consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
Existing electric energy meter is the pattern of single rate, and often spending electricity is 0.4883 yuan, and main station system can the running status word of reading power meters, to determine that protheca ladder worked as by electric energy meter, will work as protheca ladder and be defined as the first electricity price ladder.
Particularly, when electric energy meter is in single rate state, do not show any symbol that electricity price ladder is relevant, therefore clearly cannot learn in intelligent meter from the display device of electric energy meter and be in first set electricity price step condition or the second cover electricity price step condition, known when protheca step condition by the running status word of reading power meters.
More specifically, running status word is the one group of data being stored in electric energy meter inside, for characterizing the running status machine relevant information of electric energy meter, running status word 3 can carry out digital independent by the local communication interface of electric energy meter or by power information collecting device, as shown in Figure 3, for electric energy meter, introduce the present invention in detail: the Bit11 position of running status word 3 in this figure, when being read as 0, determine that electric energy meter is current and be in first set ladder, when being read as 1, determining that electric energy meter is current and being in the second cover ladder.
In this embodiment, electricity price can be preset by first and be set to excessively use electricity price, preset electricity price by first and be issued to when protheca ladder (i.e. the first electricity price ladder), if the first default electricity price is often spend electricity 0.4883 yuan.Wherein, particularly, issue and be when needing some parameter changing electric energy meter, can GPRS mode be adopted to be issued to concentrator by main station system change parameter (be first in this embodiment and preset electricity price and the second default electricity price) order, concentrator is issued to intelligent electric energy meter in the mode wireless by micropower, thus realizes the parameters remote change of electric energy meter.
According to the abovementioned embodiments of the present invention, issuing module can comprise: first issues submodule, is issued to the first electricity price ladder for presetting electricity price by first; First authentication module, for verifying whether the electricity price of the first electricity price ladder issues successfully; Second issues submodule, under issuing successful situation in the electricity price of the first electricity price ladder, presets electricity price be issued to the second electricity price ladder by second; 3rd issues submodule, under issuing unsuccessful situation in the electricity price of the first electricity price ladder, re-issues first and presets the electricity price of electricity price until the electricity price of the first electricity price ladder issues successfully.
Particularly, authentication module can comprise: read module, for reading the rate parameter of the first electricity price ladder; Detection module, whether consistent with the first default electricity price for the rate parameter detecting the first electricity price ladder; Second determination module, for when the first electricity price ladder rate parameter and first preset electricity price consistent, confirm that the electricity price of the first electricity price ladder issues successfully; 3rd determination module, for when the first electricity price ladder rate parameter and first preset electricity price inconsistent, confirm that the electricity price of the first electricity price ladder issues unsuccessful.
In the above embodiment of the present invention, second issues submodule can comprise: the second authentication module, for verifying whether the electricity price of the second electricity price ladder issues successfully; First controls submodule, under issuing successful situation in the electricity price of the second electricity price ladder, controls consumer and uses the second electricity price ladder to calculate rate after the preset lime; 4th issues submodule, under issuing unsuccessful situation in the electricity price of the second electricity price ladder, re-issues second and presets electricity price until the electricity price of the second electricity price ladder issues successfully.
In the above embodiment of the present invention, verify whether the electricity price of the first electricity price ladder issues and successfully pass the realization of following method: read the rate parameter when protheca ladder (i.e. the first electricity price ladder), verify whether successful excessive electricity consumption valency (namely first presetting electricity price) issues.And can verify whether the electricity price of the second electricity price ladder issues successfully: read the rate parameter that non-present overlaps ladder (i.e. the second electricity price ladder), and whether successful the actual step price (namely second presetting electricity price) that performs of checking issues.
In the above embodiment of the present invention, determining that the first default electricity price and second is preset electricity price and issued successfully, control electric energy meter is switched to the electricity price when protheca ladder, namely controls electric energy meter and uses the first electricity price ladder to calculate rate.
Particularly, when electric energy meter is in single rate, often spending electricity is 0.4883 yuan, be switched to the electricity price when protheca ladder (i.e. the first electricity price ladder), also be all 0.4883 yuan, any impact is not had on actual user, just variant in electric energy meter display, thus the consistance calculating user power utilization rate can be ensured.
In the above-described embodiments, electricity price is preset in checking first and whether the second default electricity price issues successfully, owing to needing through what relaying or data transmission from main station system to consumer, mistake or failure may be there is in the process of transmission, therefore, again read the rate parameter when protheca ladder, whether successful for determining the operation of the first default electricity price and the second default electricity price, next step operation is just carried out after success, with the problem of the consistance and system works that ensure whole system electricity price, make Consumer's Experience good.
In the above embodiment of the present invention, control module 70 comprises: sending module, for Preset Time is sent to consumer; Handover module, to switch to the pattern of the second electricity price ladder by rate computation schema for controlling consumer after reaching Preset Time; Accounting module, uses the second electricity price ladder to calculate rate for consumer.
Particularly, issue when protheca step price (first presets electricity price) is to the switching time (i.e. the Preset Time of above-described embodiment) of non-present cover step price (namely second presetting electricity price), after waiting until switching time, check whether electric energy meter is switched to non-present cover step price (namely the actual step price performed also second presets electricity price).
More specifically, intelligent electric energy meter is under single rate, by under the arranging and can be switched to stair step fashion immediately of processor, but switching mutually under stair step fashion, namely under the first electricity price ladder switches to the second electricity price ladder, needing by arranging switching time, as being set to point in 1 day 0 September, after the time goes to September 10, the pattern calculating rate can be switched, can ensure like this to start to perform step price in all users same time.
When carrying out batch to consumer and switching, background loop program loop can be carried out at main station system and perform the method mentioned in any one above-mentioned embodiment of the present invention, namely can realize batch testing, quick and precisely realize low cost batch and switch.
From above description, can find out, present invention achieves following technique effect: adopt the solution of the present invention, the running status word of main station system remote collection consumer can be used, and determine the current use of consumer after protheca ladder (i.e. the first electricity price ladder), first default electricity price and second are preset electricity price to be issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
Obviously, those skilled in the art should be understood that, above-mentioned of the present invention each module or each step can realize with general calculation element, they can concentrate on single calculation element, or be distributed on network that multiple calculation element forms, alternatively, they can realize with the executable program code of calculation element, thus, they can be stored and be performed by calculation element in the storage device, or they are made into each integrated circuit modules respectively, or the multiple module in them or step are made into single integrated circuit module to realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (12)

1. switch a method for consumer rate, it is characterized in that, comprising:
Running status word in Remote Acquisitioning consumer;
Determine the first electricity price ladder of described consumer according to described running status word, wherein, described first electricity price ladder is the electricity price ladder of the current use of described consumer;
First default electricity price and second are preset electricity price and is issued to described first electricity price ladder and the second electricity price ladder respectively, wherein, described second electricity price ladder is that described consumer is at current untapped electricity price ladder;
Controlling described consumer uses described second electricity price ladder to calculate rate after the preset lime.
2. method according to claim 1, is characterized in that, the step that the first default electricity price and the second default electricity price are issued to described first electricity price ladder and described second electricity price ladder is respectively comprised:
Preset electricity price by described first and be issued to described first electricity price ladder;
Verify whether the electricity price of described first electricity price ladder issues successfully;
Under the electricity price of described first electricity price ladder issues successful situation, preset electricity price by described second and be issued to described second electricity price ladder;
Under the electricity price of described first electricity price ladder issues unsuccessful situation, re-issue described first and preset the electricity price of electricity price until the electricity price of described first electricity price ladder issues successfully.
3. method according to claim 2, is characterized in that, verifies whether the electricity price of described first electricity price ladder issues successful step and comprise:
Read the rate parameter of described first electricity price ladder;
Whether the rate parameter detecting described first electricity price ladder is consistent with the described first default electricity price;
When described first electricity price ladder rate parameter and described first preset electricity price consistent, confirm that the electricity price of described first electricity price ladder issues successfully;
When described first electricity price ladder rate parameter and described first preset electricity price inconsistent, confirm that the electricity price of described first electricity price ladder issues unsuccessful.
4. method according to claim 2, is characterized in that, the step that the described second default electricity price is issued to described second electricity price ladder is comprised:
Verify whether the electricity price of described second electricity price ladder issues successfully;
Under the electricity price of described second electricity price ladder issues successful situation, control described consumer and use described second electricity price ladder to calculate rate after the preset lime;
Under the electricity price of described second electricity price ladder issues unsuccessful situation, re-issue described second and preset electricity price until the electricity price of described second electricity price ladder issues successfully.
5. method as claimed in any of claims 1 to 4, is characterized in that, controls described consumer and uses the step of described second electricity price ladder calculating rate to comprise after the preset lime:
Described Preset Time is sent to described consumer;
The pattern that rate computation schema is switched to described second electricity price ladder by described consumer is controlled after reaching described Preset Time;
Described consumer uses described second electricity price ladder to calculate rate.
6. switch a device for consumer rate, it is characterized in that, comprising:
Acquisition module, for the running status word in Remote Acquisitioning consumer;
First determination module, for determining the first electricity price ladder of described consumer according to described running status word, wherein, described first electricity price ladder is the electricity price ladder of the current use of described consumer;
Issue module, be issued to described first electricity price ladder and the second electricity price ladder respectively for the first default electricity price and second are preset electricity price, wherein, described second electricity price ladder is that described consumer is at current untapped electricity price ladder;
Control module, uses described second electricity price ladder to calculate rate for controlling described consumer after the preset lime.
7. device according to claim 6, is characterized in that, described in issue module and comprise:
First issues submodule, is issued to described first electricity price ladder for presetting electricity price by described first;
First authentication module, for verifying whether the electricity price of described first electricity price ladder issues successfully;
Second issues submodule, under issuing successful situation in the electricity price of described first electricity price ladder, presets electricity price be issued to described second electricity price ladder by described second;
3rd issues submodule, under issuing unsuccessful situation in the electricity price of described first electricity price ladder, re-issues described first and presets the electricity price of electricity price until the electricity price of described first electricity price ladder issues successfully.
8. device according to claim 7, is characterized in that, described authentication module comprises:
Read module, for reading the rate parameter of described first electricity price ladder;
Detection module, whether consistent with the described first default electricity price for the rate parameter detecting described first electricity price ladder;
Second determination module, for when described first electricity price ladder rate parameter and described first preset electricity price consistent, confirm that the electricity price of described first electricity price ladder issues successfully;
3rd determination module, for when described first electricity price ladder rate parameter and described first preset electricity price inconsistent, confirm that the electricity price of described first electricity price ladder issues unsuccessful.
9. device according to claim 7, is characterized in that, described second issues submodule comprises:
Second authentication module, for verifying whether the electricity price of described second electricity price ladder issues successfully;
First controls submodule, under issuing successful situation in the electricity price of described second electricity price ladder, controls described consumer and uses described second electricity price ladder to calculate rate after the preset lime;
4th issues submodule, under issuing unsuccessful situation in the electricity price of described second electricity price ladder, re-issues described second and presets electricity price until the electricity price of described second electricity price ladder issues successfully.
10. according to the device in claim 6 to 9 described in any one, it is characterized in that, described control module comprises:
Sending module, for being sent to described consumer by described Preset Time;
Handover module, to switch to the pattern of described second electricity price ladder by rate computation schema for controlling described consumer after reaching described Preset Time;
Accounting module, uses described second electricity price ladder to calculate rate for described consumer.
11. 1 kinds of systems switching consumer rate, is characterized in that, comprising:
Main station system, be connected with consumer, for the running status word in Remote Acquisitioning consumer, and the first electricity price ladder of described consumer is determined according to described running status word, after the first default electricity price and second being preset electricity price and being issued to described first electricity price ladder and the second electricity price ladder respectively, controlling described consumer uses described second electricity price ladder to calculate rate after the preset lime
Wherein, described first electricity price ladder is the electricity price ladder of the current use of described consumer, and described second electricity price ladder is that described consumer is at current untapped electricity price ladder.
12. systems according to claim 11, is characterized in that, described system also comprises:
Power information collecting device, is connected between described main station system and described consumer, for gathering and transmitting the data between described main station system and described consumer;
Communicator, comprising: telecommunication channel and local communi-cation channel;
Described telecommunication channel is connected between described main station system and described power information collecting device, for setting up the communication between described main station system and described power information collecting device;
Described local communi-cation channel is connected between described consumer and described power information collecting device, for setting up the communication between described consumer and described power information collecting device.
CN201310582575.4A 2013-11-19 2013-11-19 Switch method, the apparatus and system of electrical equipment rate Active CN104658119B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310582575.4A CN104658119B (en) 2013-11-19 2013-11-19 Switch method, the apparatus and system of electrical equipment rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310582575.4A CN104658119B (en) 2013-11-19 2013-11-19 Switch method, the apparatus and system of electrical equipment rate

Publications (2)

Publication Number Publication Date
CN104658119A true CN104658119A (en) 2015-05-27
CN104658119B CN104658119B (en) 2017-06-06

Family

ID=53249186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310582575.4A Active CN104658119B (en) 2013-11-19 2013-11-19 Switch method, the apparatus and system of electrical equipment rate

Country Status (1)

Country Link
CN (1) CN104658119B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105610982A (en) * 2016-03-01 2016-05-25 积成电子股份有限公司 Method for issuing electricity price parameter to electric energy meter by electricity consumption information acquisition system
CN108416926A (en) * 2018-03-08 2018-08-17 万帮充电设备有限公司 The charging method and device of charging pile
CN109039668A (en) * 2018-10-26 2018-12-18 成都艺馨达科技有限公司 A kind of charging rate channel automatic switching method
CN109326116A (en) * 2018-09-26 2019-02-12 国网河北省电力有限公司电力科学研究院 Ammeter parameter batch delivery method and system
CN109511092A (en) * 2018-09-30 2019-03-22 宁波三星智能电气有限公司 A method of meter Fee Schedule is updated by short message
CN117238077A (en) * 2023-11-16 2023-12-15 成都秦川物联网科技股份有限公司 Ultrasonic metering instrument stepped gas price management method and system based on Internet of things

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5572438A (en) * 1995-01-05 1996-11-05 Teco Energy Management Services Engery management and building automation system
CN101212528A (en) * 2006-12-31 2008-07-02 北京纳思电器有限公司 Network metering service management system and emergency treatment station
CN201278000Y (en) * 2008-06-12 2009-07-22 河南新天科技有限公司 Multi-charge rate double loop electric meter with resistive load monitoring
CN102696198A (en) * 2010-02-09 2012-09-26 Lg电子株式会社 Apparatus for controlling a power using a smart device and method thereof
CN202512665U (en) * 2012-03-08 2012-10-31 银川华能电力仪表有限公司 Mixed charging type prepayment electric energy meter for electronic type tiered pricing for electricity, and time-sharing electricity price

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5572438A (en) * 1995-01-05 1996-11-05 Teco Energy Management Services Engery management and building automation system
CN101212528A (en) * 2006-12-31 2008-07-02 北京纳思电器有限公司 Network metering service management system and emergency treatment station
CN201278000Y (en) * 2008-06-12 2009-07-22 河南新天科技有限公司 Multi-charge rate double loop electric meter with resistive load monitoring
CN102696198A (en) * 2010-02-09 2012-09-26 Lg电子株式会社 Apparatus for controlling a power using a smart device and method thereof
CN202512665U (en) * 2012-03-08 2012-10-31 银川华能电力仪表有限公司 Mixed charging type prepayment electric energy meter for electronic type tiered pricing for electricity, and time-sharing electricity price

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105610982A (en) * 2016-03-01 2016-05-25 积成电子股份有限公司 Method for issuing electricity price parameter to electric energy meter by electricity consumption information acquisition system
CN105610982B (en) * 2016-03-01 2019-02-15 积成电子股份有限公司 A kind of method that power information acquisition system electric energy meter electric price parameter issues
CN108416926A (en) * 2018-03-08 2018-08-17 万帮充电设备有限公司 The charging method and device of charging pile
CN109326116A (en) * 2018-09-26 2019-02-12 国网河北省电力有限公司电力科学研究院 Ammeter parameter batch delivery method and system
CN109511092A (en) * 2018-09-30 2019-03-22 宁波三星智能电气有限公司 A method of meter Fee Schedule is updated by short message
CN109511092B (en) * 2018-09-30 2021-11-19 宁波三星智能电气有限公司 Method for updating charge rate table through short message
CN109039668A (en) * 2018-10-26 2018-12-18 成都艺馨达科技有限公司 A kind of charging rate channel automatic switching method
CN117238077A (en) * 2023-11-16 2023-12-15 成都秦川物联网科技股份有限公司 Ultrasonic metering instrument stepped gas price management method and system based on Internet of things
CN117238077B (en) * 2023-11-16 2024-01-23 成都秦川物联网科技股份有限公司 Ultrasonic metering instrument stepped gas price management method and system based on Internet of things

Also Published As

Publication number Publication date
CN104658119B (en) 2017-06-06

Similar Documents

Publication Publication Date Title
CN104658119A (en) Method, device and system for switching rate of electric device
CN102447255A (en) Power management apparatus, power management system and method for controlling power management system
CN201408476Y (en) Wireless remote meter reading control system based on ZigBee technique
CN201918030U (en) Parking management system for parking lot
CN106651161A (en) Acquisition operation and maintenance and dynamic tasking method
CN103078327B (en) A kind of electric power load control method and system
CN102831756A (en) Mobile terminal positioning electric utility meter reading method and meter reading system
CN103839189A (en) Distribution automation scheme optimization method and system based on reliability benefit evaluation
CN205407327U (en) Charging station distribution management system based on zigbee network
CN102855525A (en) System and method for forecasting and analyzing load of resident user
CN203870789U (en) Bluetooth remote-transmission metering and meter reading system
CN107249211A (en) A kind of intelligent gateway and operational process based on LoRa and NB IoT
CN106532928A (en) Electrical load intelligent control system and activation management method thereof
CN103136914A (en) TD-LTE wireless network-based automatic meter reading system
CN206421561U (en) Power information real-time data acquisition device
CN104660293A (en) Terminal, intelligent electricity consuming system and method for acquiring electricity consumption information
CN102316171B (en) Large-consumer remote centralized meter reading interface device of power meter
CN102254414B (en) Embedded automatic meter reading system based on GPRS (Global System for Mobile Communications)
CN206097452U (en) GPRS signal conversion equipment
CN104616476A (en) Electric energy acquisition terminal based on Beidou short message communication
CN101620774A (en) Data short message collection system for gas meter
CN105844731A (en) Patrol task issuing device
CN105045155A (en) Charging pile electric energy collection device
CN204706959U (en) Line loss monitoring navigation system
CN203455946U (en) Automatic collection system of power consumption

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xing Hongwei

Inventor after: Liu Heng

Inventor after: Zhou Wenbin

Inventor after: Peng Fang

Inventor after: Sun Jian

Inventor after: Zhang Yanyan

Inventor after: Tian Peng

Inventor after: Li Guochang

Inventor after: Li Haitao

Inventor after: Li Ji

Inventor after: Zhao Cheng

Inventor after: Song Weiqiong

Inventor after: Xian Huizhu

Inventor after: Li Rui

Inventor before: Xing Hongwei

Inventor before: Tian Peng