Summary of the invention
High, the inefficient problem of ammeter rate cost is switched for a large amount of in correlation technique, at present effective solution is not yet proposed, for this reason, fundamental purpose of the present invention is to provide a kind of method, the Apparatus and system that switch consumer rate, to solve the problem.
To achieve these goals, according to an aspect of the present invention, provide a kind of method switching consumer rate, the method comprises: the running status word in Remote Acquisitioning consumer; According to the first electricity price ladder of running status word determination consumer, wherein, the first electricity price ladder is the electricity price ladder of the current use of consumer; First default electricity price and second are preset electricity price and is issued to the first electricity price ladder and the second electricity price ladder respectively, wherein, the second electricity price ladder is that consumer is at current untapped electricity price ladder; Controlling consumer uses the second electricity price ladder to calculate rate after the preset lime.
Further, the step that the first default electricity price and the second default electricity price are issued to the first electricity price ladder and the second electricity price ladder is respectively comprised: preset electricity price by first and be issued to the first electricity price ladder; Verify whether the electricity price of the first electricity price ladder issues successfully; Under the electricity price of the first electricity price ladder issues successful situation, preset electricity price by second and be issued to the second electricity price ladder; Under the electricity price of the first electricity price ladder issues unsuccessful situation, re-issue first and preset the electricity price of electricity price until the electricity price of the first electricity price ladder issues successfully.
Further, verify whether the electricity price of the first electricity price ladder issues successful step and comprise: the rate parameter reading the first electricity price ladder; Whether the rate parameter detecting the first electricity price ladder is consistent with the first default electricity price; When the first electricity price ladder rate parameter and first preset electricity price consistent, confirm that the electricity price of the first electricity price ladder issues successfully; When the first electricity price ladder rate parameter and first preset electricity price inconsistent, confirm that the electricity price of the first electricity price ladder issues unsuccessful.
Further, the step that the second default electricity price is issued to the second electricity price ladder is comprised: verify whether the electricity price of the second electricity price ladder issues successfully; Under the electricity price of the second electricity price ladder issues successful situation, control consumer and use the second electricity price ladder to calculate rate after the preset lime; Under the electricity price of the second electricity price ladder issues unsuccessful situation, re-issue second and preset electricity price until the electricity price of the second electricity price ladder issues successfully.
Further, controlling consumer uses the step of the second electricity price ladder calculating rate to comprise after the preset lime: Preset Time is sent to consumer; The pattern that rate computation schema is switched to the second electricity price ladder by consumer is controlled after reaching Preset Time; Consumer uses the second electricity price ladder to calculate rate.
To achieve these goals, according to an aspect of the present invention, provide a kind of device switching consumer rate, this device comprises: acquisition module, for the running status word in Remote Acquisitioning consumer; First determination module, for the first electricity price ladder according to running status word determination consumer, wherein, the first electricity price ladder is the electricity price ladder of the current use of consumer; Issue module, be issued to the first electricity price ladder and the second electricity price ladder respectively for the first default electricity price and second are preset electricity price, wherein, the second electricity price ladder is that consumer is at current untapped electricity price ladder; Control module, uses the second electricity price ladder to calculate rate for controlling consumer after the preset lime.
Further, issuing module and comprise: first issues submodule, being issued to the first electricity price ladder for presetting electricity price by first; First authentication module, for verifying whether the electricity price of the first electricity price ladder issues successfully; Second issues submodule, under issuing successful situation in the electricity price of the first electricity price ladder, presets electricity price be issued to the second electricity price ladder by second; 3rd issues submodule, under issuing unsuccessful situation in the electricity price of the first electricity price ladder, re-issues first and presets the electricity price of electricity price until the electricity price of the first electricity price ladder issues successfully.
Further, authentication module comprises: read module, for reading the rate parameter of the first electricity price ladder; Detection module, whether consistent with the first default electricity price for the rate parameter detecting the first electricity price ladder; Second determination module, for when the first electricity price ladder rate parameter and first preset electricity price consistent, confirm that the electricity price of the first electricity price ladder issues successfully; 3rd determination module, for when the first electricity price ladder rate parameter and first preset electricity price inconsistent, confirm that the electricity price of the first electricity price ladder issues unsuccessful.
Further, second issues submodule comprises: the second authentication module, for verifying whether the electricity price of the second electricity price ladder issues successfully; First controls submodule, under issuing successful situation in the electricity price of the second electricity price ladder, controls consumer and uses the second electricity price ladder to calculate rate after the preset lime; 4th issues submodule, under issuing unsuccessful situation in the electricity price of the second electricity price ladder, re-issues second and presets electricity price until the electricity price of the second electricity price ladder issues successfully.
Further, control module comprises: sending module, for Preset Time is sent to consumer; Handover module, to switch to the pattern of the second electricity price ladder by rate computation schema for controlling consumer after reaching Preset Time; Accounting module, uses the second electricity price ladder to calculate rate for consumer.
To achieve these goals, according to an aspect of the present invention, provide a kind of system switching consumer rate, this system comprises: main station system, be connected with consumer, for the running status word in Remote Acquisitioning consumer, and according to the first electricity price ladder of running status word determination consumer, after the first default electricity price and second being preset electricity price and being issued to the first electricity price ladder and the second electricity price ladder respectively, controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, wherein, first electricity price ladder is the electricity price ladder of the current use of consumer, second electricity price ladder is that consumer is at current untapped electricity price ladder.
Further, system also comprises: power information collecting device, is connected between main station system and consumer, for gathering and transmitting the data between main station system and consumer; Communicator, comprising: telecommunication channel and local communi-cation channel; Telecommunication channel is connected between main station system and power information collecting device, for setting up the communication between main station system and power information collecting device; Local communi-cation channel is connected between consumer and power information collecting device, for setting up the communication between consumer and power information collecting device.
Adopt the present invention, the running status word of main station system remote collection consumer can be used, and determine the current use of consumer after protheca ladder (i.e. the first electricity price ladder), first default electricity price and second are preset electricity price to be issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
Embodiment
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
Fig. 1 is the system schematic of the switching consumer rate according to the embodiment of the present invention.As shown in Figure 1, this system can comprise: main station system 1, be connected with consumer 5, for the running status word in Remote Acquisitioning consumer, and according to the first electricity price ladder of running status word determination consumer, after the first default electricity price and second being preset electricity price and being issued to the first electricity price ladder and the second electricity price ladder respectively, controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, wherein, first electricity price ladder is the electricity price ladder of the current use of consumer, second electricity price ladder is that consumer is at current untapped electricity price ladder.Wherein, consumer can be intelligent electric energy meter.
Adopt the solution of the present invention, the running status word of main station system remote collection consumer can be used, and determine the current use of consumer after protheca ladder (i.e. the first electricity price ladder), first default electricity price and second are preset electricity price to be issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
According to the abovementioned embodiments of the present invention, this system can also comprise: power information collecting device 6, is connected between main station system and consumer, for gathering and transmitting the data between main station system and consumer; Communicator, comprising: telecommunication channel and local communi-cation channel; Telecommunication channel is connected between main station system and power information collecting device, for setting up the communication between main station system and power information collecting device; Local communi-cation channel is connected between consumer and power information collecting device, for setting up the communication between consumer and power information collecting device.
As shown in Figure 1, main station system is within the system communicated by communicator consumer 5.Wherein, this communicator can be communication network.Wherein, main station system can be unified to store to power information, centralized management, computer system to task requests unified management and scheduling, main station system can be that acquisition system is run, scheduling, monitoring, the core that stores and show.And main station system formulates the acquisition tasks of power information collecting device, gather and store the power information of consumer that power information collecting device gathers, and statistical study is carried out to power information, perform power purchase job order to issue, perform consumer optimum configurations, perform the work such as provisional traffic operation.Consumer shown in figure can be multiple intelligent electric energy meter.
Communication network (communicator namely in above-described embodiment) comprises telecommunication channel 2 and local communi-cation channel 4, is the communication port of connection main website and power information collecting device.Wherein, telecommunication channel refers to the communication port of power information collecting device and main station system, and GPRS mode can be adopted to set up communication; Local communi-cation channel is the communication port of power information collecting device and consumer, can adopt micropower wireless mode.
Power information collecting device in above-described embodiment can comprise concentrator and micropower wireless communication module, is mainly used for the equipment to on-site data gathering and transmission.
Fig. 2 is a kind of method flow diagram switching consumer rate according to the embodiment of the present invention, and as shown in Figure 2, the method can comprise the steps:
Step S102, the running status word in Remote Acquisitioning consumer.
Step S104, according to the first electricity price ladder of running status word determination consumer, wherein, the first electricity price ladder is the electricity price ladder of the current use of consumer.
Step S106, presets electricity price by first and the second default electricity price is issued to the first electricity price ladder and the second electricity price ladder respectively, and wherein, the second electricity price ladder is that consumer is at current untapped electricity price ladder.
Step S108, controls consumer and uses the second electricity price ladder to calculate rate after the preset lime.
Adopt the present invention, the running status word of main station system remote collection consumer can be used, and determine the current use of consumer after protheca ladder (i.e. the first electricity price ladder), first default electricity price and second are preset electricity price to be issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
Existing electric energy meter is the pattern of single rate, and often spending electricity is 0.4883 yuan, and main station system can the running status word of reading power meters, to determine that protheca ladder worked as by electric energy meter, will work as protheca ladder and be defined as the first electricity price ladder.
Particularly, when electric energy meter is in single rate state, do not show any symbol that electricity price ladder is relevant, therefore clearly cannot learn in intelligent meter from the display device of electric energy meter and be in first set electricity price step condition or the second cover electricity price step condition, known when protheca step condition by the running status word of reading power meters.
More specifically, running status word is the one group of data being stored in electric energy meter inside, for characterizing the running status machine relevant information of electric energy meter, running status word 3 can carry out digital independent by the local communication interface of electric energy meter or by power information collecting device, as shown in Figure 3, for electric energy meter, introduce the present invention in detail: the Bit11 position of running status word 3 in this figure, when being read as 0, determine that electric energy meter is current and be in first set ladder, when being read as 1, determining that electric energy meter is current and being in the second cover ladder.
In this embodiment, electricity price can be preset by first and be set to excessively use electricity price, preset electricity price by first and be issued to when protheca ladder (i.e. the first electricity price ladder), if the first default electricity price is often spend electricity 0.4883 yuan.Wherein, particularly, issue and be when needing some parameter changing electric energy meter, can GPRS mode be adopted to be issued to concentrator by main station system change parameter (be first in this embodiment and preset electricity price and the second default electricity price) order, concentrator is issued to intelligent electric energy meter in the mode wireless by micropower, thus realizes the parameters remote change of electric energy meter.
Preset electricity price be issued to the first electricity price ladder as shown 1(first) and table 2(second preset electricity price and be issued to the second electricity price ladder) shown in, the step price after issuing following (five electricity prices can be set in intelligent electric energy meter):
Table 1:
Step price 1 |
0.4883 yuan |
Step price 2 |
0.4883 yuan |
Step price 3 |
0.4883 yuan |
Step price 4 |
0.4883 yuan |
Step price 5 |
0.4883 yuan |
Table 2:
Step price 1 |
0.4883 yuan |
Step price 2 |
0.5383 yuan |
Step price 3 |
0.7883 yuan |
Step price 4 |
Default value |
Step price 5 |
Default value |
In the above embodiment of the present invention, the step that the first default electricity price and the second default electricity price are issued to the first electricity price ladder and the second electricity price ladder respectively can be comprised: preset electricity price by first and be issued to the first electricity price ladder; Verify whether the electricity price of the first electricity price ladder issues successfully; Under the electricity price of the first electricity price ladder issues successful situation, preset electricity price by second and be issued to the second electricity price ladder; Under the electricity price of the first electricity price ladder issues unsuccessful situation, re-issue first and preset the electricity price of electricity price until the electricity price of the first electricity price ladder issues successfully.
Particularly, verify whether the electricity price of the first electricity price ladder issues successful step and can comprise: the rate parameter reading the first electricity price ladder; Whether the rate parameter detecting the first electricity price ladder is consistent with the first default electricity price; When the first electricity price ladder rate parameter and first preset electricity price consistent, confirm that the electricity price of the first electricity price ladder issues successfully; When the first electricity price ladder rate parameter and first preset electricity price inconsistent, confirm that the electricity price of the first electricity price ladder issues unsuccessful.
In the above embodiment of the present invention, the step that the second default electricity price is issued to the second electricity price ladder can be comprised: verify whether the electricity price of the second electricity price ladder issues successfully; Under the electricity price of the second electricity price ladder issues successful situation, control consumer and use the second electricity price ladder to calculate rate after the preset lime; Under the electricity price of the second electricity price ladder issues unsuccessful situation, re-issue second and preset electricity price until the electricity price of the second electricity price ladder issues successfully.
In the above embodiment of the present invention, verify whether the electricity price of the first electricity price ladder issues and successfully pass the realization of following method: read the rate parameter when protheca ladder (i.e. the first electricity price ladder), verify whether successful excessive electricity consumption valency (namely first presetting electricity price) issues.And can verify whether the electricity price of the second electricity price ladder issues successfully: read the rate parameter that non-present overlaps ladder (i.e. the second electricity price ladder), and whether successful the actual step price (namely second presetting electricity price) that performs of checking issues.
Particularly, lower heat gradient charge value and ladder number, as shown in table 3.
Table 3:
Gradient charge value (KWh) |
When protheca step price |
Non-present cover step price |
0-240 |
0.4883 yuan |
0.4883 yuan |
240-400 |
0.4883 yuan |
0.5383 yuan |
More than 400 |
0.4883 yuan |
0.7883 yuan |
|
0.4883 yuan |
Default value |
|
0.4883 yuan |
Default value |
In the above embodiment of the present invention, determining that the first default electricity price and second is preset electricity price and issued successfully, control electric energy meter is switched to the electricity price when protheca ladder, namely controls electric energy meter and uses the first electricity price ladder to calculate rate.
Particularly, when electric energy meter is in single rate, often spending electricity is 0.4883 yuan, be switched to the electricity price when protheca ladder (i.e. the first electricity price ladder), also be all 0.4883 yuan, any impact is not had on actual user, just variant in electric energy meter display, thus the consistance calculating user power utilization rate can be ensured.
In the above-described embodiments, electricity price is preset in checking first and whether the second default electricity price issues successfully, owing to needing through what relaying or data transmission from main station system to consumer, mistake or failure may be there is in the process of transmission, therefore, again read the rate parameter when protheca ladder, whether successful for determining the operation of the first default electricity price and the second default electricity price, next step operation is just carried out after success, with the problem of the consistance and system works that ensure whole system electricity price, make Consumer's Experience good.
According to the abovementioned embodiments of the present invention, controlling consumer uses the step of the second electricity price ladder calculating rate to comprise after the preset lime: Preset Time is sent to consumer; The pattern that rate computation schema is switched to the second electricity price ladder by consumer is controlled after reaching Preset Time; Consumer uses the second electricity price ladder to calculate rate.
Particularly, issue when protheca step price (first presets electricity price) is to the switching time (i.e. the Preset Time of above-described embodiment) of non-present cover step price (namely second presetting electricity price), after waiting until switching time, check whether electric energy meter is switched to non-present cover step price (namely the actual step price performed also second presets electricity price).
More specifically, intelligent electric energy meter is under single rate, by under the arranging and can be switched to stair step fashion immediately of processor, but switching mutually under stair step fashion, namely under the first electricity price ladder switches to the second electricity price ladder, needing by arranging switching time, as being set to point in 1 day 0 September, after the time goes to September 10, the pattern calculating rate can be switched, can ensure like this to start to perform step price in all users same time.
When carrying out batch to consumer and switching, background loop program loop can be carried out at main station system and perform the method mentioned in any one above-mentioned embodiment of the present invention, namely can realize batch testing, quick and precisely realize low cost batch and switch.
It should be noted that, can perform in the computer system of such as one group of computer executable instructions in the step shown in the process flow diagram of accompanying drawing, and, although show logical order in flow charts, but in some cases, can be different from the step shown or described by order execution herein.
Fig. 4 is a kind of device schematic diagram switching consumer rate according to the embodiment of the present invention, and as shown in Figure 4, this device can comprise: acquisition module 10, for the running status word in Remote Acquisitioning consumer; First determination module 30, for the first electricity price ladder according to running status word determination consumer, wherein, the first electricity price ladder is the electricity price ladder of the current use of consumer; Issue module 50, be issued to the first electricity price ladder and the second electricity price ladder respectively for the first default electricity price and second are preset electricity price, wherein, the second electricity price ladder is that consumer is at current untapped electricity price ladder; Control module 70, uses the second electricity price ladder to calculate rate for controlling consumer after the preset lime.
Adopt the present invention, the running status word of the acquisition module remote collection consumer of main station system can be used, and in the current use of the first determination module determination consumer after protheca ladder (i.e. the first electricity price ladder), by issuing module, the first default electricity price and the second default electricity price are issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), using control module to control consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
Existing electric energy meter is the pattern of single rate, and often spending electricity is 0.4883 yuan, and main station system can the running status word of reading power meters, to determine that protheca ladder worked as by electric energy meter, will work as protheca ladder and be defined as the first electricity price ladder.
Particularly, when electric energy meter is in single rate state, do not show any symbol that electricity price ladder is relevant, therefore clearly cannot learn in intelligent meter from the display device of electric energy meter and be in first set electricity price step condition or the second cover electricity price step condition, known when protheca step condition by the running status word of reading power meters.
More specifically, running status word is the one group of data being stored in electric energy meter inside, for characterizing the running status machine relevant information of electric energy meter, running status word 3 can carry out digital independent by the local communication interface of electric energy meter or by power information collecting device, as shown in Figure 3, for electric energy meter, introduce the present invention in detail: the Bit11 position of running status word 3 in this figure, when being read as 0, determine that electric energy meter is current and be in first set ladder, when being read as 1, determining that electric energy meter is current and being in the second cover ladder.
In this embodiment, electricity price can be preset by first and be set to excessively use electricity price, preset electricity price by first and be issued to when protheca ladder (i.e. the first electricity price ladder), if the first default electricity price is often spend electricity 0.4883 yuan.Wherein, particularly, issue and be when needing some parameter changing electric energy meter, can GPRS mode be adopted to be issued to concentrator by main station system change parameter (be first in this embodiment and preset electricity price and the second default electricity price) order, concentrator is issued to intelligent electric energy meter in the mode wireless by micropower, thus realizes the parameters remote change of electric energy meter.
According to the abovementioned embodiments of the present invention, issuing module can comprise: first issues submodule, is issued to the first electricity price ladder for presetting electricity price by first; First authentication module, for verifying whether the electricity price of the first electricity price ladder issues successfully; Second issues submodule, under issuing successful situation in the electricity price of the first electricity price ladder, presets electricity price be issued to the second electricity price ladder by second; 3rd issues submodule, under issuing unsuccessful situation in the electricity price of the first electricity price ladder, re-issues first and presets the electricity price of electricity price until the electricity price of the first electricity price ladder issues successfully.
Particularly, authentication module can comprise: read module, for reading the rate parameter of the first electricity price ladder; Detection module, whether consistent with the first default electricity price for the rate parameter detecting the first electricity price ladder; Second determination module, for when the first electricity price ladder rate parameter and first preset electricity price consistent, confirm that the electricity price of the first electricity price ladder issues successfully; 3rd determination module, for when the first electricity price ladder rate parameter and first preset electricity price inconsistent, confirm that the electricity price of the first electricity price ladder issues unsuccessful.
In the above embodiment of the present invention, second issues submodule can comprise: the second authentication module, for verifying whether the electricity price of the second electricity price ladder issues successfully; First controls submodule, under issuing successful situation in the electricity price of the second electricity price ladder, controls consumer and uses the second electricity price ladder to calculate rate after the preset lime; 4th issues submodule, under issuing unsuccessful situation in the electricity price of the second electricity price ladder, re-issues second and presets electricity price until the electricity price of the second electricity price ladder issues successfully.
In the above embodiment of the present invention, verify whether the electricity price of the first electricity price ladder issues and successfully pass the realization of following method: read the rate parameter when protheca ladder (i.e. the first electricity price ladder), verify whether successful excessive electricity consumption valency (namely first presetting electricity price) issues.And can verify whether the electricity price of the second electricity price ladder issues successfully: read the rate parameter that non-present overlaps ladder (i.e. the second electricity price ladder), and whether successful the actual step price (namely second presetting electricity price) that performs of checking issues.
In the above embodiment of the present invention, determining that the first default electricity price and second is preset electricity price and issued successfully, control electric energy meter is switched to the electricity price when protheca ladder, namely controls electric energy meter and uses the first electricity price ladder to calculate rate.
Particularly, when electric energy meter is in single rate, often spending electricity is 0.4883 yuan, be switched to the electricity price when protheca ladder (i.e. the first electricity price ladder), also be all 0.4883 yuan, any impact is not had on actual user, just variant in electric energy meter display, thus the consistance calculating user power utilization rate can be ensured.
In the above-described embodiments, electricity price is preset in checking first and whether the second default electricity price issues successfully, owing to needing through what relaying or data transmission from main station system to consumer, mistake or failure may be there is in the process of transmission, therefore, again read the rate parameter when protheca ladder, whether successful for determining the operation of the first default electricity price and the second default electricity price, next step operation is just carried out after success, with the problem of the consistance and system works that ensure whole system electricity price, make Consumer's Experience good.
In the above embodiment of the present invention, control module 70 comprises: sending module, for Preset Time is sent to consumer; Handover module, to switch to the pattern of the second electricity price ladder by rate computation schema for controlling consumer after reaching Preset Time; Accounting module, uses the second electricity price ladder to calculate rate for consumer.
Particularly, issue when protheca step price (first presets electricity price) is to the switching time (i.e. the Preset Time of above-described embodiment) of non-present cover step price (namely second presetting electricity price), after waiting until switching time, check whether electric energy meter is switched to non-present cover step price (namely the actual step price performed also second presets electricity price).
More specifically, intelligent electric energy meter is under single rate, by under the arranging and can be switched to stair step fashion immediately of processor, but switching mutually under stair step fashion, namely under the first electricity price ladder switches to the second electricity price ladder, needing by arranging switching time, as being set to point in 1 day 0 September, after the time goes to September 10, the pattern calculating rate can be switched, can ensure like this to start to perform step price in all users same time.
When carrying out batch to consumer and switching, background loop program loop can be carried out at main station system and perform the method mentioned in any one above-mentioned embodiment of the present invention, namely can realize batch testing, quick and precisely realize low cost batch and switch.
From above description, can find out, present invention achieves following technique effect: adopt the solution of the present invention, the running status word of main station system remote collection consumer can be used, and determine the current use of consumer after protheca ladder (i.e. the first electricity price ladder), first default electricity price and second are preset electricity price to be issued to after protheca ladder (i.e. the first electricity price ladder) and non-present cover ladder (i.e. the second electricity price ladder), controlling consumer uses the second electricity price ladder to calculate rate after the preset lime, to ensure that all users perform second at one time and preset electricity price.Can be controlled the rate computation schema of consumer rapidly by main station system, and recycle said method carries out rate calculating control to each consumer, realize the electricity price ladder switching consumer in bulk, and can ensure that step price correctly performs in intelligent meter, instead of use manually controls electricity price one to one, solve high, the inefficient problem of a large amount of switching ammeter rate cost in prior art.
Obviously, those skilled in the art should be understood that, above-mentioned of the present invention each module or each step can realize with general calculation element, they can concentrate on single calculation element, or be distributed on network that multiple calculation element forms, alternatively, they can realize with the executable program code of calculation element, thus, they can be stored and be performed by calculation element in the storage device, or they are made into each integrated circuit modules respectively, or the multiple module in them or step are made into single integrated circuit module to realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.