CN103095504A - Management system of wired network basic resources - Google Patents

Management system of wired network basic resources Download PDF

Info

Publication number
CN103095504A
CN103095504A CN2013100282785A CN201310028278A CN103095504A CN 103095504 A CN103095504 A CN 103095504A CN 2013100282785 A CN2013100282785 A CN 2013100282785A CN 201310028278 A CN201310028278 A CN 201310028278A CN 103095504 A CN103095504 A CN 103095504A
Authority
CN
China
Prior art keywords
resource
management
network
data
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100282785A
Other languages
Chinese (zh)
Other versions
CN103095504B (en
Inventor
谢立国
王作明
闫爱文
李靖
宋立源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Broadcast & Television Network Co Ltdjinan Branch
Original Assignee
Shandong Broadcast & Television Network Co Ltdjinan Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Broadcast & Television Network Co Ltdjinan Branch filed Critical Shandong Broadcast & Television Network Co Ltdjinan Branch
Priority to CN201310028278.5A priority Critical patent/CN103095504B/en
Publication of CN103095504A publication Critical patent/CN103095504A/en
Application granted granted Critical
Publication of CN103095504B publication Critical patent/CN103095504B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a management system of wired network basic resources and is characterized by comprising a structured resource data management subsystem, a basic resource function management subsystem and an external system docking and collaboration subsystem, wherein the structured resource data management subsystem classifies various kinds of element attributes of network resources, formulates a naming method and completes the naming and description of the resources, the description of the data is correlated and can support data call of various functions of resource management, the basic resource function management subsystem provides various practical functions which are adaptive to network planning, design and establishment and needed in actual operation and maintenance management work on the basis of resource object data, and the external system docking and collaboration subsystem achieves the collaboration work of a basic resource management platform and business and an operation support system (BOSS), a client management system, an equipment network management system and a warehouse management system through information exchange with other business management information systems based on data description of key resource objects.

Description

A kind of cable network basic resource management system
Technical field
The present invention relates to a kind of management system, specifically, relate to a kind of cable network basic resource management system.
Background technology
A large amount of Internet resources and interconnecting relation thereof are the bases of cable network Existence and development, how effectively the supervising the network basic resource is that Broadcast Television network operators is paid close attention to and puzzled problem, CHINA RFTCOM Co Ltd company completes the digitlization of cable TV high definition bidirectional, is carrying out " integration of three networks " pilot and two-way multiple services while of development, to network resource management, utilization and supporting business operation propose can be more urgent demand.From the resource management means that occurred, many places have been changed into from manual drawing and have been utilized GIS-Geographic Information System (GIS), what have has also further developed the resource management system with more expanded functions on this basis, but the demand from effective management and full-service support, also there are many limitations in present system, and the one, reasonable not to tissue and the describing method of network resource data; The 2nd, lack runing making rational planning for of business supporting role, even as just drawing data storage and query facility; The 3rd, lack effective resource change security mechanism, cause resource data and real network to disconnect, thereby total effect is undesirable.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of cable network basic resource management system, can complete, accurate, dynamic, in time manage the cable network basic resource, realizes supporting more by force the broadcasting and TV service operation.
The present invention adopts following technological means to realize goal of the invention:
A kind of cable network basic resource management system is characterized in that, comprising:
Structuring resource data ADMINISTRATION SUBSYSTEM: comprise all kinds of key element attributes of Internet resources are classified, formulate naming method, complete name and description to resource, the description of these data will possess relevance, data call that can the support resource management various functions;
Basic resource function management subsystem: based on the resource object data, provide to adapt to needed various utility functions in Network Programe Design, construction and actual motion maintenance management work;
External system is docked and is worked in coordination with subsystem: be described as the basis with the keystone resources object data, by with other service management information system information exchanges, realize the collaborative work of basic resource management platform and BOSS system, client management system, facility network guard system, warehouse management system.
As the further restriction to the technical program, described structuring resource data ADMINISTRATION SUBSYSTEM comprises:
Fixing point resource name module: adopt geographical coordinate hand over word, type and sequence number three parts to describe the fixing point resource, but form the unique identification code of the fixing point resource of structuring computing;
Linear resource data identification module: describe linear resource data based on defined fixing point resource object.
As the further restriction to the technical program, described basic resource function management subsystem comprises:
Resource Modeling and data maintenance module: dynamically, configure base resource data model flexibly, extended resources attribute, the variation of flexible adaptation resource model structure and the needs of business development;
Auxiliary programming design module: complete conventional network resources, New-deployed Network Resource Design guide function and building distribution network stencil design function;
Projects development process administration module: the networking task is run through from the links that is initiated to termination, realized the BPR of related work and the pressure renewal of resource data;
The resource Reports module: to resource data carry out at many levels, the statistical forms of various dimensions;
Management of power use module: power taking dot information and pay charge way are carried out Classification Management; The electricity consumption agreement of management power taking point, and carry out early warning to being about to overdue agreement; The management of paying the fees, the automatic-prompting fee payment early warning; The electricity consumption situation is inquired about and statistical analysis.
As the further restriction to the technical program, described external system is docked and is worked in coordination with subsystem and comprises:
BOSS systematic collaboration module: with the BOSS systematic collaboration, with building as with the information crossing of BOSS system, with the key message of building identification code as both associations;
The customer service system cooperative module: collaborative with client, when the disparate networks fault occurring, send affected building identification code to the BOSS system, automatically extract user list from the BOSS system and be forwarded to client;
The network management system cooperative module: work in coordination with network management system, the problem of network management system reflection is directly targeted to actual network facilities object by native system, gives the physical location and the further coverage that go wrong;
The warehouse management system cooperative module: collaborative with warehouse management system, the needs of problems of solution network appliance.
compared with prior art, advantage of the present invention with good effect is: the present invention compares with the working method in past, the efficient of completing job family obviously improves, based on native system work, task is clear, responsibility is clear and definite, the basic resource data search is convenient, and consistent with actual state, engineering design is more reasonable, realized concentrating effective electricity bill control, the multisystem collaborative work that native system provides, cross-system obtains data easily, for real work provides great convenience, reporting for repairment the user particularly, can be distinguished by the service request of concentrating the fault point to cause, obviously reduced the work odd number amount of making house calls, promote maintenance cost to descend.
Description of drawings
Fig. 1 is functional-block diagram of the present invention.
Fig. 2 is that routing relation is described schematic diagram.
Fig. 3 is that optical cable segment is described schematic diagram.
Fig. 4 is that link is described schematic diagram.
Fig. 5 is the general design flow diagram of auxiliary programming design module of the present invention.
Fig. 6 is that conventional network resources of the present invention is utilized design diagram.
Fig. 7 is the basic flow process graph of a relation of engineering construction of the present invention.
Fig. 8 is process management flow chart of the present invention.
Fig. 9 is resource data Status Change flow chart of the present invention.
Figure 10 is management of power use graph of a relation of the present invention.
Figure 11 is the present invention and BOSS system, customer service system cooperation interaction schematic diagram
Embodiment
Below in conjunction with accompanying drawing and preferred embodiment, the present invention is done further to describe in detail.
A kind of cable network basic resource management system comprises:
Structuring resource data ADMINISTRATION SUBSYSTEM: comprise all kinds of key element attributes of Internet resources are classified, formulate naming method, complete name and description to resource, the description of these data will possess relevance, data call that can the support resource management various functions;
Basic resource function management subsystem: based on the resource object data, provide to adapt to needed various utility functions in Network Programe Design, construction and actual motion maintenance management work;
External system is docked and is worked in coordination with subsystem: be described as the basis with the keystone resources object data, by with other service management information system information exchanges, realize the collaborative work of basic resource management platform and BOSS system, client management system, facility network guard system, warehouse management system.
Described structuring resource data ADMINISTRATION SUBSYSTEM comprises:
Fixing point resource name module: adopt geographical coordinate hand over word, type and sequence number three parts to describe the fixing point resource, but form the unique identification code of the fixing point resource of structuring computing;
Linear resource data identification module: describe linear resource data based on defined fixing point resource object.
Described basic resource function management subsystem comprises:
Resource Modeling and data maintenance module: dynamically, configure base resource data model flexibly, extended resources attribute, the variation of flexible adaptation resource model structure and the needs of business development;
Auxiliary programming design module: complete conventional network resources, New-deployed Network Resource Design guide function and building distribution network stencil design function;
Projects development process administration module: the networking task is run through from the links that is initiated to termination, realized the BPR of related work and the pressure renewal of resource data;
The resource Reports module: to resource data carry out at many levels, the statistical forms of various dimensions;
Management of power use module: power taking dot information and pay charge way are carried out Classification Management; The electricity consumption agreement of management power taking point, and carry out early warning to being about to overdue agreement; The management of paying the fees, the automatic-prompting fee payment early warning; The electricity consumption situation is inquired about and statistical analysis.
Described external system is docked and is worked in coordination with subsystem and comprises:
BOSS systematic collaboration module: with the BOSS systematic collaboration, with building as with the information crossing of BOSS system, with the key message of building identification code as both associations;
The customer service system cooperative module: collaborative with client, when the disparate networks fault occurring, send affected building identification code to the BOSS system, automatically extract user list from the BOSS system and be forwarded to client;
The network management system cooperative module: work in coordination with network management system, the problem of network management system reflection is directly targeted to actual network facilities object by native system, gives the physical location and the further coverage that go wrong;
The warehouse management system cooperative module: collaborative with warehouse management system, the needs of problems of solution network appliance.
The below is described in detail the technological means that above-mentioned each functional module adopts.
1, Internet resources object data structure
1.1. the step analysis of Internet resources
Element of resource is marked at has only realized visually on the electronic chart of generalized information system, this moment, all kinds of resource datas and describe or isolated, lacked incidence relation, do not possess the condition that resource is further analyzed, managed and effectively utilizes.
We mainly adopted administrative naming method to the description of Internet resources object in the past.This describing mode has apparent inconvenience and deficiency as the basic data of system.The one, administrative title is not that broadcasting and TV are initiatively named, and often occurs changing; The 2nd, the data intractability is large; The 3rd, inconvenient precise positioning in real work.
Also often adopt in the industry another kind of describing mode: be exactly from machine room, move towards to number in order name along optical cable.This class mode has very large defective equally: the one, and title does not comprise geographical coordinate information, and the 2nd, after inserting new facility in the variation of upper level numbering or order, whole numbering relation will be upset; The 3rd, the real network cross reference is complicated, and very difficult formation is Cahn-Ingold-Prelog sequence rule clearly.
In conjunction with operation management experience for many years, in this patent, the concept to keystone resources object hierarchy management in network has been proposed.Concrete mode is analyzed as table 1.
Table 1: keystone resources object hierarchy mode
The physical resource that distributes on network can be divided into fixing point resource and linear resource.Fixing point resource such as building,
Light commuting case, bare electrode bag, pipe well etc. can the direct correlation geography information.Linear resource such as route, pipeline, pore, optical cable, optical fiber etc., its geography information inconvenience Direct function description.Yet how identifying linear resource, is that the different levels resource realizes related key, is also to be difficult to the effectively difficulties of solution in existed system.
We find, the equal initial sum of linear resource ends at the crucial fixing point resource object of optical cross box, route bifurcation point, building etc.From level, linear relying is in the fixing point resource.If can solve preferably the sign of fixing point resource, linear resource can represent with terminal.Therefore, the cutting point of dealing with problems, the one, the fixing point resource is described; The 2nd, according to the character of linear resource, its initial and terminating point of reasonable definition.
1.2 the naming method of fixing point resource
1.1.1. name requirement
The fixing point resource is divided into general resource object and keystone resources object.General resource object plays guiding and connection function on electronic chart as supporting material, as the pipe well on route, vertical rod, cable connection bag etc.The keystone resources object is much important, and they have such Some features: cause network route fork, the Optical Fiber Physical interconnection occurs, as transfer point or the terminal of network and signal transmission.According to these characteristics, we need to give unique identification code to the fixing point resource.Identification code should satisfy following requirement:
⒈ stability.Only relevant with nature and position, can not affect because of the change of other relation factors the validity of identification code.
⒉ uniqueness and definition.The directly identification of the identified code of its position and type energy, the description that does not need to rely on other defines, and relatively succinct and standard.
The information of related other kind of ⒊ energy and level is convenient to computing and statistics.
Crucial fixing point resource mainly comprises:
The ⒈ building.Building are objects the most stable in network, are mutually isolated final allocation units, are also the key objects of network and user-association.
⒉ route bifurcation, optical fiber commuting case and fused fiber splice bag.These points have represented the terminal of the linear change in resources such as route, optical cable, optical fiber, have also adhered to simultaneously complicated annexation.
The equipment such as switch, EOC local side in ⒊ package case and optical receiver, a building amplifier, ONU, building.As the keystone resources object of network layer, often represent the end of link.
1.1.2. fixing point resource identification code design
We have designed the unique identification code plan for the fixing point resource object, are made of three parts: Coordinate Conversion code, type, sequence number, see table 2 for details.
Table 2: fixing point resource object unique identification code consists of
Consist of The Coordinate Conversion code Type Sequence number
Technical finesse Independent field Independent field Independent field
Adopt figure place 8 2 of letters 1 of numeral
⒈ Coordinate Conversion code label method
For satisfying the requirement to the unique identification code, need fixing point resource identification code to possess coordinate information, and be convenient to the data processing, we have proposed Coordinate Conversion code label method.
If the coordinate information of fixing point directly identifies with the combination of its longitude and latitude, its precision adopts 1/10th seconds (namely getting 3 position effective digitals of second value) proper.Represented the approximately distance of 2.5 to 3 meters in every 1/10th seconds, be easy to distinguish on electronic chart.Prove through practice examining, adopt the sign of 1/10th seconds precision, even if use general GPS terminal (as smart mobile phone) also to be easy to locate at the scene, but complete longitude and latitude identifier combination will reach 16 bit digital this moment, and obvious figure place is long, poor practicability.
Now take Jinan City as example, cover fully the administrative scope rectangle of Jinan City to angular coordinate, as shown in Figure 2:
Northeast corner: 36 ° of 45'56.25 of north latitude " 117 ° of 14'56.51 of east longitude "
Southwest corner: 36 ° of 24'2.28 of north latitude " east longitude: 116 ° of 44'38.56 "
Degree value in northeast corner and southwest corner longitude and latitude is converted into score value, and compares, both latitudes differed 21 minutes, and longitude differed 30 minutes, all once was no more than.In fact, each latitude changes approximately 111 kilometers of coverage distances, and each longitude of China the greater part changes coverage distance and is no less than 85 kilometers, head and shoulders above the Urban Area Coverage territory.
We choose near certain point coordinates southwest corner: 36 ° of 23'0.0 of north latitude " 116 ° of 43'0.0 of east longitude " are as the reference coordinate point.Being converted into score value is: north latitude 2183', east longitude 7003'.
Longitude and latitude degree value and the score value of all fixing points all are converted into score value, get itself and the difference of the reference coordinate relative score value coordinate as this point, keep simultaneously the second value in the actual longitude and latitude of this point, just form relative coordinate.In relative coordinate, degree value position is cancelled, and score value position two digits generally is not more than 50, can be by a letter representation, and as shown in table 3.
Table 3: relative latitude and longitude coordinates code definition
01 02 26 27 28 52
A B Z a b z
Through processing like this, in fact only just the zone, citywide is divided into the grid that a series of length and width are no more than 2 kilometers with two letters.Add longitude second value and latitude value second 3 position effective digitals respectively, totally 8 characters get final product the coordinate information of Precise Representation fixing point.Such as: " P362R108 " just represented the center of Jinan TV station launching tower.
The benefit of expression is that this information is placed in a specific field, is convenient to computing like this; System can carry out reverse conversion by identification code, and is automatically related with electronic chart; Identify very accurate stable, the variation with other factors does not change; In actual the use, the staff also is easy to even physical location of identification relative position relation.Original administrative descriptor can be retained in the attribute of this fixing point as supplementary.
Because concrete and concentrated resource management demand like this is all the network that comes from prefecture-level following administrative region, the coverage of data is enough, thereby this programme has larger application value.If realize wider management (as provincial network), can set up transfer gateway between the prefectures and cities system.
The ⒉ type codes is used for the classification (as building, equipment etc.) of expression fixing point resource, and corresponding relation is as shown in table 4.
Table 4: fixing point resource type and code corresponding relation
Type Code Type Code Type Code
Building LY Support point CD ONU ON
Machine room JF Casing XT EOC EO
Optical cross box GJ Dish stays PL Amplifier FD
Pipe well RJ Connector box JT The building switch JH
Electric pole DG Ray machine RX Charger GD
Draw YS Splitter FL Splitter FZ
The ⒊ serial number represents which the similar resource object on same geographical position, as comprising a plurality of light bags in same pipe well, distinguishes them with sequence number.
Through above name, on complete description network, the identification code of a fixing point resource is comprised of 11 characters.Be exemplified below:
P319R349GJ1: expression is moistened No. 2 building optical cross box of century city in Jingshi Road, Lixia District 1089
Different describing methods are relatively as table 5.
Table 5: the longitude and latitude coding compares with longitude and latitude hand over word Coding and description method
Type Sign
The relative position coding No. 2 building optical cross box of profit century city in Jingshi Road, Lixia District 1089
The longitude and latitude coding 363931911701349GJ1
Longitude and latitude hand over word coding P319R349GJ1
1.2. the sign of linear resource data
Network neutral line resource description is based on defined fixing point resource object.
The ⒈ route.When describing certain route, intersect change point as terminal take route, segmentation is described.According to terminal title coordinate, system can identify annexation automatically, as shown in Figure 2.Title is described the effect play external description, when we point to certain concrete route, and can related its built-in attribute.Its attribute mainly comprise general fixed support point, pipeline hole count, related optical cable and the administrative description thereof of process.
The ⒉ cable segment.We notice, the annexation of attempting complete description optical cable and equipment is invalid.In real work, optical cable is that segmentation lays, thereby the sign of optical cable also needs to adopt the method for terminal.The terminal of optical cable mainly contains light bag, optical cross box or terminal.Article one, when physical segmentation and the exchange of light core did not appear in optical cable, its title was constant, as shown in Figure 3.Optical cable is nested among route, but the terminal of its terminal and route may not be identical.When pointing to a concrete optical cable, its related attribute is extremely important, and what comprise core number and numbering thereof, light core is using state, and this optical cable is in the fused fiber splice relation of terminal.
The ⒊ link.Be light path for the optical-fiber network link, the light mouth of the two ends connection device of light path can identify it with two ends light device port., the formation of light path can be crossed over different optical cable segment and route segment.If comprise light-dividing device (as PON network or cable TV optical transport network) in fibre circuit, may comprise many light paths in the optical fiber before light splitting, light path is because the front-end equipment terminal mouth is consistent but these are associated, thereby its as easy as rolling off a log identification of sign and statistics, as shown in Figure 4.Article one, the formation of light path depends on light core numbering in relevant optical cable segment and the welding relation table at optical cable segment terminal place.To cable system, link is the cable through of equipment room.When pointing to a link, its related attribute is mainly: the signal data of terminal device port, port, the class of service of carrying, the optical cable segment list of process.
The ⒋ mechanical floor.Mechanical floor belongs to the fixing point resource.The port of mechanical floor must connect a link, and the different links of same equipment connection generally belong to the business of similar or tight association.Whether the network attribute of equipment will comprise: affiliated machine room (or equipment box), the class of service of carrying, affiliated power taking point, port number or downward direct-connected active equipment quantity, by network management control etc.To access network equipment (ray machine, ONU, a building amplifier etc.), its title and attribute also with the building direct correlation of serving.
By the Internet resources level being divided, named, sets up attribution rule, the incidence relation between them is more clear, and related data is easy to be processed by system-computed.No matter be from material object, title, classification, or from map, can point to arbitrarily the object of being concerned about, and the resource information of level up and down that it is associated showed intactly and comes out.Like this, both realized the management to resource, also reality is built and the function of management work needs provides the foundation for further exploitation is satisfied.
2, described basic resource function management subsystem comprises:
2.1 Resource Modeling and data maintenance module: system provides visual Resource Modeling instrument, can be dynamically, resource allocation data model flexibly, and extended resources attribute, the variation of flexible adaptation resource model structure and the needs of business development.In the situation that new equipment is arranged, can define this resource type and association attributes by system, in the situation that Resource Properties changes, also can be configured by system, adjust, and the incidence relation between can define system.Resource data is safeguarded in the situation that data change, does not need the update routine code based on defined data model, can complete the basic maintenance work such as newly-increased, modification, importing, derivation.Also the data in system can be exported in the EXCEL file, after unified the modification, in import system, realize the batch Modify rapidly of data in batches.
2.2 the general design cycle of auxiliary programming design module is as shown in Figure 5:
(1) determine the key Design point
After starting design work, at first need to analyze designing requirement, determine a series of connection key points, and propose the resource requirement to key point.Such as in order to cover the newly-built building of a slice, need to according to the building structure, tentatively judge the mode of building access and the fixed position of the interior active equipment of building; Judge the network Rendezvous Point that whole regional domestic demand arranges; Utilize the docking point of this platform examination choosing and legacy network; In the time of these key points of initial option, its specification requirement is described, as the power of device requirement, light or electricity and index, number of fibers, closure etc.
(2) task resolution scope and kind of design
After determining key point and specification requirement thereof, take key point as the boundary, some scopes are resolved in whole design work, satisfy the design of key point specification requirement in different range.These scopes of design have different kind of designs, mainly contain three classes: the one, to the reasonable utilization of existing Internet resources; The 2nd, the New-deployed Network design; The 3rd, the interior distribution network of design building body.This platform all provides the Computer Aided Design function to three kinds of kind of designs.
(3) design verification
Through after Preliminary design, will carry out pooled analysis and Calculation Verification around the different schemes of key Design point, determine its feasibility.If can not meet the demands, need to begin to readjust design from selecting key point; If can meet the demands, can enter the step that generates design document.
(4) generate design document
Up to the present, the design that is verified is mainly also the selection to position, equipment and parameter.System can according to selected parameter, generate the design documents such as construction drawing, optical fiber connection relation (welding table), the bill of materials and construction requirement automatically.
System provides guide function to above step, and in conjunction with needing, starts concrete Computer Aided Design function by guide.
2.3 utilize the Computer Aided Design of legacy network resource
After confirming newly-built key point (optical node, Optical Switch Node etc.) and clear and definite its designing requirement, search and satisfy the demands and operable existing Internet resources interface (abbreviation source point), and form operational version to existing Internet resources.System provides signal source to search, optical fiber is searched, route querying, automatically generate the Computer Aided Design functions such as welding table.
The l source point is searched
Centered by building, search within the specific limits satisfactory Optical Switch Node, and represent result.These results offer the designer and try design.The range size of searching can set up on their own.
The l light path is searched and is designed
To certain concrete source point, need to attempt setting up light path.After this source point is proposed the light path demand, miscellaneous function will automatically be set up satisfactory some light paths and select for the designer.When the light path Automated Design, the available fiber that comprises idle optical fiber is sought along available all optical cable segment of route automatic inspection by system.
After light path was selected, relevant stand-by resource was locked.If after the examination design, the checking link can repeat the Automated Design process not by maybe needing adjustment, and last time, the slack resources of locking was automatically released.
L generates the welding table automatically
After light path is selected, light path process switching node and treat also to be determined with the light core, system can determine the fused fiber splice relation between optical cable segment automatically at this moment.According to the rule of correspondence of optical fiber numbering with chromatogram, automatically generate the welding table, form end-to-end light path, as shown in Figure 6.The welding table can be directly as construction drawing.This function also can be used in the scenes such as newly-built fiber optic network.
2.4 the Computer Aided Design of newly-built resource
Newly-built Resource Design comprises newly-built to route, optical cable, Optical Switch Node.For this reason, auxiliary programming design provides and has utilized key point to generate route, optical cable automatic laying, automatically generate the function such as welding table.
L gathers key point and generates route
To there not being the place of available network resource, need the designer for predefined linking objective, carry out the inspection of the scene of a crime.Site inspection is mainly the route strong point that selection can be passed through, and the manual latitude and longitude coordinates that gathers the strong point.After strong point coordinate was imported platform, platform generated route automatically.
When selecting the strong point, can synchronously input key parameter, Ru Renjing, hand well, straight-through, threeway, four-way etc., system generates the pipe well design automatically according to attribute;
After design is completed to route and pipe well, set pore for route segment and count demand and relevant parameter thereof, system can generate the duct section design automatically, thereby finally forms the design of newly-built pipeline.
L fiber cable laying Automated Design
On platform, can be for the pipeline that has designed or pole line, default fiber cable laying start-stop end points.System generates the bearing relation of route and optical cable automatically according to laying requirement.According to the length of design, can be from warehouse management system the optical cable of choice for use suitable length.
● automatically generate the welding table
After optic cable design was completed, if the actual optical cable curtailment of selecting, when needing segmentation to lay, system also can generate the welding table that continues automatically according to the rule of correspondence of optical fiber numbering with chromatogram, forms end-to-end light path.
2.5 building distribution network stencil design function
At building distribution network design aspect, different floor structures has different basic design principle, and therefore, the specific design function of this module is:
According to floor structure input major parameter, as unit number, floor, every layer of amount, system generates floor figure automatically, and This floor figure can directly offer the BOSS system, is convenient to associated user.
For floor structure, this module has been preset different design templates and has been selected for the designer, the stelliform connection topology configuration, the splitter that comprise ray machine and crucial splitter in template cover the parameters such as number of users, the designer can adjust ray machine, splitter for installation position, splitter covers the number of plies, the key parameters such as service wire length, generate building distribution network Preliminary design, generation comprises the design documents such as construction drawing, engineering material list, budget table automatically after the over level checking.
3, projects development process administration module
The projects development process management function is that the networking task is run through from the links that is initiated to termination, has realized the BPR of related work.Its effect is mainly reflected in the following aspects: the one, engineering project is carried out Whole Course Management, and realized the time of project is controlled; The 2nd, realize utilization and pressure change management to existing resource data, guaranteed synchronizeing of platform data and real network variation; The 3rd, realize the examination of engineering project and the management of clearing, strengthen the control to result and cost; The 4th, by the automatic management of flow process, realize the examination to post, construction team.
Another advantage of this flow management function is to allow the keeper to carry out self-defining and modification to flow process, thereby can adapt to the operating state that multiple adjustment changes.The basic flow process relation of engineering construction is seen Fig. 7,
3.1 the function aspect process management
1. system's centralized management task is initiated.From obtaining information, all include demand and contract in platform management.The time point of the task of initiation is shifted to an earlier date, changed the mode that in the past waits the user to visit the passive construction of.Can do analysis to construction object by calling platform in the stage of reconnoitring.Directly call the Computer Aided Design function and design in the project flow process, and form construction documents.Carry out the distributing of construction task in the construction stage, dispatch, supervision, progress and quality control; Dispatch the examination of uniting of each related service link in acceptance phase, and generate the examination data.
2. the management of work progress transfer point.By the key link of standard construction process, guarantee construction quality and project progress.Such as, by filling in commencement report in system, realize that the inspection of the requirements for starting construction such as equipment, manpower, instrument, instrument and meter, drawing is implemented, the shut-down of avoiding master factor in advance to cause; By builder's diary, with will on work day, to the periodic logging management of work progress, thereby the project that prevents is stagnated the time management that realizes project.
3.2 the function aspect resource data control
⒈ can control the accuracy of floor structure figure.Building unique identification code and floor structure figure are the significant datas of Internet resources, are that customer service is opened, the basis of management, charging, service, play basic supporting role in whole company operation.This function can generate building unique identification code and floor structure figure automatically at phase of exploration, and is synchronized to the BOSS system when completing engineering project.Construction stage forces to check floor structure figure, and acceptance phase is finally determined floor structure figure, and the Data storage stage is synchronized to the operation of BOSS system.Concrete link action is as shown in table 6.
Table 6: resource data control flow link
Link Action
Prospecting Collect field data
Design Generate floor structure figure
Construction, examination Check floor structure figure
Data storage BOSS formally sets up floor structure figure
Collection and the processing of ⒉ to resource attribute data.Large due to the attribute data amount of resource, disperse, therefore must have effective attribute data collection, treatment mechanism.This platform adopts the mode of Flow driving.Such as the at first storage facility collection of calling platform before including platform management in of new equipment, process the attributes such as specification, model, producer, technical parameter, in the planning and designing phase acquisition, process carrying between resource, comprise, relating attribute and the resource identification attribute such as connection; The procedure attributes such as collection in construction, processing time, construction special circumstances; Gather, process the geographical attribute of being correlated with such as path, position after checking and accepting end.; Collect, process non-geographical resource change attribute (as the replacing of fault ray machine) in the O﹠M stage.Concrete link, that resource data is collected content is as shown in table 7.
Table 7: link and content that resource attribute data is collected
Link The resource data of collecting
The equipment buying Specification, model, producer, technical parameter etc.
Planning and designing Carrying between resource, comprise, connect relating attribute; Resource identification
Construction Time, construction special circumstances etc.
Check and accept Path, position; Design result is confirmed
O﹠M Non-geographical attribute data
⒊ forces change resource data state.The change of resource status is mainly caused by engineering construction, therefore sets up the resource status change mechanism that drives based on engineering process particularly important.This platform forms resource yet to be built in the design phase, and construction, acceptance phase are formed on and build resource; Examination by after be formed on the net resource.Comparison in the Data storage stage by completion information, design data realizes papery Data storage and resource data warehouse-in, triggers simultaneously the foundation of the floor structure figure on user management basis in the Boss system.
3.3 the function aspect examination and clearing
Due to from project, the overall process to design, construction all has clear and definite flow rules to quantities and equipment, and the calculating of quantities and material data and change are followed in whole flow process.Thereby checking and accepting is more simple and accurate.According to the process data change in check and acceptance result and construction, can realize Automatic-settlement at accounts settling phase.If equipment has webmaster, can realize that also parameter checks and accepts automatically.
3.4 post and construction team's management function
This platform all has clear and definite responsibility and transformation rule to project at the links of whole flow process, and can realize implementing to the result statistics of post link to each link, apply mechanically again certain score principle, thereby realized the automatic score formula examination to each post and construction team.
3.5 resource Reports module
System can according to time, resource type etc. to resource data carry out at many levels, the statistical forms of various dimensions.For example add up all quantity in the net state resource of Jinan broadcasting and TV.
3.6 network equipment management of power use module
3.6.1 management of power use Organization of Data figure
External plant electricity consumption situation is very complicated, and Electrical Safety is to affect the key factor that network runs well.
Referring to Figure 10, a power taking point may be a plurality of active equipments power supplies on every side.Several power taking points may belong to a power supply unit and supply with.Resource management platform can all power consumption equipments of statistical management, and each power consumption equipment is attributed to a concrete power taking point, and the electricity consumption agreement under indicating, thereby have formed the basic data of equipment electricity consumption.When the network facilities changed, power information is synchronously change also.
3.6.2 management of power use functional description
According to the difference of electricity consumption protocol type, can Classification Management to the power taking point.Such as the power taking point that has is that mode is supplemented in the electricity charge in advance with money, have plenty of pay charge way after the ammeter charging, have plenty of regular quota pay charge way, the free mode used etc. mutually that has.System provides following management function:
The one, power taking dot information and pay charge way are carried out Classification Management; The 2nd, the electricity consumption agreement of management power taking point, and carry out early warning to being about to overdue agreement; The 3rd, the management of paying the fees, automatic-prompting fee payment early warning.Particularly to supplementing in advance the power taking point of paying the fees with money, can do and give warning in advance according to the cycle of paying the fees, equipment rated power, guarantee the equipment normal power supply; The 4th, the electricity consumption situation is inquired about and statistical analysis, comprise according to time period statistics expense, power taking point electricity charge ANOMALOUS VARIATIONS, user's information management etc. is freely used in the dynamic analysis of power taking point power consumption mutually.
4, the docking of external system is with collaborative
4.1 with the BOSS systematic collaboration
The BOSS system is mainly the management of user oriented and product, needn't network resource administration information, and resource platform also needn't directly be concerned about user profile.We notice, to cable network, the user of BOSS system management is all among concrete building.We are the information crossing of building as BOSS system and network foundation resource platform, with the key message of building identification code as both associations.
Resource management platform has been worked out identification code stable, unique and that be convenient to process for building.Can directly the building identification code be introduced the BOSS system, as one of its bottom data, direct correlation user's customer number.Originally the administrative description of the building attached attribute as identification code was kept one of means of communication during only as user's transacting business in the BOSS system.
The user side that initiate with any business demand BOSS System Dependent, all can pass through bottom building identification code, be directly linked to resource management platform, the support of realization to customer service.Such as, can directly show user's integrated service access conditions, ustomer premises access equipment state etc.On the other hand, any situation of real network also can go out associated user by the BOSS system queries, and is as single in detail in the user that the network rebuilding, network failure can affect.
4.2 collaborative with customer service system
The client service management system of Jinan CHINA RFTCOM Co Ltd, the service be in charge of is accepted, service process, complaint handling and multiple query statistic function, but does not set up direct incidence relation with the real network resource.This makes when the user initiates service request, and service system can't the awareness network situation, can only passive initiation maintenance requirement.Cause the user when reporting for repairment such as chance failure appears in certain section circuit, a large amount of manpower and materials are wasted in the inspection of visiting of sending someone often.
Service system, BOSS system is with after resource platform docks, when the disparate networks fault occurring, resource management platform can send affected building identification code to the BOSS system, automatically extracts user list and be forwarded to client service management system from the BOSS system.When the user reported for repairment, more effective processing just can under the support of customer service system, be done, as shown in figure 11 by the call center.For another example, when Broadcasting Broadband MAN user or digital television bidirectional user propose service request, client service management system can obtain user's building identification code and be delivered to resource platform by BOSS, resource platform can lock and long-range inspection related pathways and status of equipment at once, dwindle problem scope, improve efficiency of service.
4.3 collaborative with network management system
To service management such as the configuration of equipment, alarms, generally be responsible for by corresponding network management system.But what network management system provided is the logical construction management, has situation about disconnecting with the real network facility.The hierarchical data management of resource management platform has comprised mechanical floor information and relevant port link relation thereof.Thereby the problem of facility network guard system reflection, can be directly targeted to actual network facilities object by resource management platform, even provide actual abort situation and further coverage.
It is also less that at present the Jinan cable network has been set up the device type of webmaster management, only equipment component realized this coordinated management function.
4.4 collaborative with warehouse management system
With working in coordination with of warehouse management system, mainly solve the problems such as network appliance demand.When carrying out Computer Aided Design on resource management platform, in case determine the demand of certain section newly-built optical cable, can automatically show the optical cable segment storage that satisfies construction requirement in the warehouse, directly specify suitable stock's optical cable by the designer, thereby avoid waste or the too much situation that continues occurs.In addition, during the optical cable warehouse-in, the chromatogram relation of its light core will be recorded in warehouse management system, and when using this optical cable, resource management platform is specified the relation of light core numbering and chromatogram automatically, is convenient to generate the fused fiber splice table.System can also send Material Needs in advance in conjunction with the planning and designing requirement, for warehouse buying reference.The key foundation data of resource management platform and warehouse management system exchange are the equipment type numberings, are defined by warehouse management system.
The interface of resource management platform and other system adopts the WebService technology to develop, and resource model access interface, resource data access interface, resource operation interface are provided.Support cross-system, cross-platform calling, for the integrated application exploitation provides support.
Certainly, above-mentioned explanation is not limitation of the present invention, and the present invention also is not limited only to above-mentioned giving an example, and the variation that those skilled in the art make in essential scope of the present invention, remodeling, interpolation or replacement also belong to protection scope of the present invention.

Claims (4)

1. a cable network basic resource management system, is characterized in that, comprising:
Structuring resource data ADMINISTRATION SUBSYSTEM: comprise all kinds of key element attributes of Internet resources are classified, formulate naming method, complete name and description to resource, the description of these data will possess relevance, data call that can the support resource management various functions;
Basic resource function management subsystem: based on the resource object data, provide to adapt to needed various utility functions in Network Programe Design, construction and actual motion maintenance management work;
External system is docked and is worked in coordination with subsystem: be described as the basis with the keystone resources object data, by with other service management information system information exchanges, realize the collaborative work of basic resource management platform and BOSS system, client management system, facility network guard system, warehouse management system.
2. cable network basic resource management system according to claim 1, is characterized in that, described structuring resource data ADMINISTRATION SUBSYSTEM comprises:
Fixing point resource name module: adopt geographical coordinate hand over word, type and sequence number three parts to describe the fixing point resource, but form the unique identification code of the fixing point resource of structuring computing;
Linear resource data identification module: describe linear resource data based on defined fixing point resource object.
3. cable network basic resource management system according to claim 1, is characterized in that, described basic resource function management subsystem comprises:
Resource Modeling and data maintenance module: dynamically, configure base resource data model flexibly, extended resources attribute, the variation of flexible adaptation resource model structure and the needs of business development;
Auxiliary programming design module: complete conventional network resources, New-deployed Network Resource Design guide function and building distribution network stencil design function;
Projects development process administration module: the networking task is run through from the links that is initiated to termination, realized the BPR of related work and the pressure renewal of resource data;
The resource Reports module: to resource data carry out at many levels, the statistical forms of various dimensions;
Management of power use module: power taking dot information and pay charge way are carried out Classification Management; The electricity consumption agreement of management power taking point, and carry out early warning to being about to overdue agreement; The management of paying the fees, the automatic-prompting fee payment early warning; The electricity consumption situation is inquired about and statistical analysis.
4. cable network basic resource management system according to claim 1, is characterized in that, described external system is docked and worked in coordination with subsystem and comprises:
BOSS systematic collaboration module: with the BOSS systematic collaboration, with building as with the information crossing of BOSS system, with the key message of building identification code as both associations;
The customer service system cooperative module: collaborative with client, when the disparate networks fault occurring, send affected building identification code to the BOSS system, automatically extract user list from the BOSS system and be forwarded to client;
The network management system cooperative module: work in coordination with network management system, the problem of network management system reflection is directly targeted to actual network facilities object by native system, gives the physical location and the further coverage that go wrong;
The warehouse management system cooperative module: collaborative with warehouse management system, the needs of problems of solution network appliance.
CN201310028278.5A 2013-01-25 2013-01-25 A kind of wired network infrastructure resource management system Expired - Fee Related CN103095504B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310028278.5A CN103095504B (en) 2013-01-25 2013-01-25 A kind of wired network infrastructure resource management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310028278.5A CN103095504B (en) 2013-01-25 2013-01-25 A kind of wired network infrastructure resource management system

Publications (2)

Publication Number Publication Date
CN103095504A true CN103095504A (en) 2013-05-08
CN103095504B CN103095504B (en) 2016-03-02

Family

ID=48207664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310028278.5A Expired - Fee Related CN103095504B (en) 2013-01-25 2013-01-25 A kind of wired network infrastructure resource management system

Country Status (1)

Country Link
CN (1) CN103095504B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235867A (en) * 2013-05-16 2013-08-07 浪潮通信信息系统有限公司 Intelligent building distribution network designing method
CN104504452A (en) * 2014-11-17 2015-04-08 华信咨询设计研究院有限公司 Method for laying communication pipelines in linear scene newly constructed area
CN104507094A (en) * 2014-11-17 2015-04-08 华信咨询设计研究院有限公司 A method of communication pipe laying in a linear scene inventory area
CN104715314A (en) * 2013-12-13 2015-06-17 中国移动通信集团四川有限公司 Monitoring method and device determining use quantity of materials in construction
CN104749704A (en) * 2015-03-23 2015-07-01 北京千禧维讯科技有限公司 Method for rapidly building continuing relationship of cable fiber core
CN105373976A (en) * 2015-12-07 2016-03-02 重庆财信合同能源管理有限公司 Mobile communication network based intelligent community fee reminding and paying device and method
CN108710716A (en) * 2018-03-29 2018-10-26 中国联合网络通信集团有限公司 Light puts the design drawing generation method and device at station in a kind of optical transmission system
CN111708953A (en) * 2020-06-19 2020-09-25 航电建筑科技(深圳)有限公司 Address management method for property patrol equipment
CN112052294A (en) * 2019-06-05 2020-12-08 烽火通信科技股份有限公司 General data configuration method and system for service calling
CN112882837A (en) * 2021-03-10 2021-06-01 国网河北省电力有限公司信息通信分公司 Mobile network resource management system based on cloud computing
CN113409305A (en) * 2021-07-15 2021-09-17 中国南方电网有限责任公司 Optical cable resource digital management method
CN113486012A (en) * 2021-07-02 2021-10-08 国网湖北省电力有限公司恩施供电公司 Optical cable data model for comprehensive network maintenance management
CN113613102A (en) * 2021-08-20 2021-11-05 中通服咨询设计研究院有限公司 Transport network construction method based on micro-grid form
CN116760768A (en) * 2023-08-21 2023-09-15 山东东方智光网络通信有限公司 Method and system for realizing route inquiry bottom layer

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1150874A (en) * 1994-06-13 1997-05-28 艾利森电话股份有限公司 Network element in telecommunication network
US20030041167A1 (en) * 2001-08-15 2003-02-27 International Business Machines Corporation Method and system for managing secure geographic boundary resources within a network management framework
CN1909473A (en) * 2006-08-24 2007-02-07 上海交通大学 Method for realizing integrated composite network information managing system based on geography information
CN101815003A (en) * 2010-02-23 2010-08-25 浪潮通信信息系统有限公司 Uniform resource model of full service converged network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1150874A (en) * 1994-06-13 1997-05-28 艾利森电话股份有限公司 Network element in telecommunication network
US20030041167A1 (en) * 2001-08-15 2003-02-27 International Business Machines Corporation Method and system for managing secure geographic boundary resources within a network management framework
CN1909473A (en) * 2006-08-24 2007-02-07 上海交通大学 Method for realizing integrated composite network information managing system based on geography information
CN101815003A (en) * 2010-02-23 2010-08-25 浪潮通信信息系统有限公司 Uniform resource model of full service converged network

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235867A (en) * 2013-05-16 2013-08-07 浪潮通信信息系统有限公司 Intelligent building distribution network designing method
CN104715314A (en) * 2013-12-13 2015-06-17 中国移动通信集团四川有限公司 Monitoring method and device determining use quantity of materials in construction
CN104504452A (en) * 2014-11-17 2015-04-08 华信咨询设计研究院有限公司 Method for laying communication pipelines in linear scene newly constructed area
CN104507094A (en) * 2014-11-17 2015-04-08 华信咨询设计研究院有限公司 A method of communication pipe laying in a linear scene inventory area
CN104504452B (en) * 2014-11-17 2017-12-01 华信咨询设计研究院有限公司 The communication pipe laying method in the linear newly-built region of scene
CN104749704A (en) * 2015-03-23 2015-07-01 北京千禧维讯科技有限公司 Method for rapidly building continuing relationship of cable fiber core
CN104749704B (en) * 2015-03-23 2017-06-20 北京千禧维讯科技有限公司 A kind of method that optical cable fibre core succession relation is quickly set up
CN105373976A (en) * 2015-12-07 2016-03-02 重庆财信合同能源管理有限公司 Mobile communication network based intelligent community fee reminding and paying device and method
CN108710716A (en) * 2018-03-29 2018-10-26 中国联合网络通信集团有限公司 Light puts the design drawing generation method and device at station in a kind of optical transmission system
CN112052294A (en) * 2019-06-05 2020-12-08 烽火通信科技股份有限公司 General data configuration method and system for service calling
CN112052294B (en) * 2019-06-05 2023-01-31 烽火通信科技股份有限公司 General data configuration method and system for service call
CN111708953A (en) * 2020-06-19 2020-09-25 航电建筑科技(深圳)有限公司 Address management method for property patrol equipment
CN112882837A (en) * 2021-03-10 2021-06-01 国网河北省电力有限公司信息通信分公司 Mobile network resource management system based on cloud computing
CN113486012A (en) * 2021-07-02 2021-10-08 国网湖北省电力有限公司恩施供电公司 Optical cable data model for comprehensive network maintenance management
CN113486012B (en) * 2021-07-02 2022-11-15 国网湖北省电力有限公司恩施供电公司 Optical cable data model processing system for comprehensive network maintenance management
CN113409305A (en) * 2021-07-15 2021-09-17 中国南方电网有限责任公司 Optical cable resource digital management method
CN113409305B (en) * 2021-07-15 2022-06-17 中国南方电网有限责任公司 Optical cable resource digital management method
CN113613102A (en) * 2021-08-20 2021-11-05 中通服咨询设计研究院有限公司 Transport network construction method based on micro-grid form
CN116760768A (en) * 2023-08-21 2023-09-15 山东东方智光网络通信有限公司 Method and system for realizing route inquiry bottom layer

Also Published As

Publication number Publication date
CN103095504B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN103095504B (en) A kind of wired network infrastructure resource management system
WO2023115842A1 (en) Data-driven offline and online integrated simulation system and method for power distribution network
CN101436790B (en) On-line splicing and coalition method for electric network model containing complex T connection line
CN103955789B (en) A kind of supply path analysis method based on allotment Integrated Model
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN104767642B (en) ODN wiring based on GIS platform manages method and system
CN105005676A (en) Three-dimension design method based on cable engineering information model
CN105022769A (en) Data interaction system of urban underground pipeline, and method thereof
CN103646091B (en) A kind of generation method and device of grid graph data
CN103093392A (en) Electrical power system three-dimensional digitalization operation platform
CN103064895B (en) Based on the communication resource management system computer generating method of GIS
CN109635127A (en) A kind of power equipment portrait knowledge mapping construction method based on big data technology
CN109284346A (en) A kind of distribution network planning method and device based on cloud computing
CN109245923B (en) Communication optical cable routing resource management method and system
CN107483239A (en) A kind of electric power communication transmission network reliability determines method
CN106408207A (en) Modeling method and system for secondary virtual loop of intelligent substation
CN106708984A (en) Method, apparatus and system for acquiring basic data of cable channel
CN100566359C (en) Teleservice circuit resource intelligence inquire and affirmation system towards field of telecommunications
CN102647612B (en) Overall network management wired audio-video on demand accounting and charging system
CN109617732A (en) A kind of electric power wireless private network integration mixed networking and integrated management approach
CN105069694A (en) Underground pipeline data synchronization method and underground pipeline data synchronization device
CN107563665A (en) A kind of electric power facility distribution and power network resources quality testing method
CN106326450A (en) Interaction method for realizing SCD (system configuration description) file sign-in and sign-off based on data integration
CN106789194B (en) The energy communication service automatic fault diagnosis localization method of multi-disciplinary collaboration
CN101729417B (en) Telecommunication-orientated intelligent inquiry and verification system for end-to-end service circuit resource

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20170125