CN103089009B - Middle-buried type rubber waterstop fixing split bolt and use method thereof - Google Patents
Middle-buried type rubber waterstop fixing split bolt and use method thereof Download PDFInfo
- Publication number
- CN103089009B CN103089009B CN201310044968.XA CN201310044968A CN103089009B CN 103089009 B CN103089009 B CN 103089009B CN 201310044968 A CN201310044968 A CN 201310044968A CN 103089009 B CN103089009 B CN 103089009B
- Authority
- CN
- China
- Prior art keywords
- screw rod
- fastening band
- rubber fastening
- buried rubber
- strap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses a middle-buried type rubber waterstop fixing split bolt which comprises a screw rod, a fixing clamp plate, a moving clamp plate, a clamp plate fixing nut, a 3-shaped clamp, a template fixing nut and a limiting pillar. The moving clamp plate is fixed on the screw rod through the clamp plate fixing nut and rectangular. The upper part and the lower part of the moving clamp plate are bent to the same direction in 45 degrees and [-shaped. A rod penetrating hole is drilled in the middle of the moving clamp plate. The fixing clamp plate is fixed on the screw rod and ]-shaped. The fixing clamp is identical with the moving clamp in shape and directions of the fixing clamp and the moving clamp are opposite. The circumference of the rod penetrating hole of the fixing clamp plate is welded and fixed with the screw rod. The limiting pillar is arranged between the fixing clamp plate and the 3-shaped clamp and vertically connected with the screw rod. The middle-buried type rubber waterstop fixing split bolt has the advantages of being easy to operate, reliable in quality and low in cost.
Description
Technical field
The invention belongs to waterproof concrete construction reinforcement bolt and using method thereof, especially relate to buried rubber fastening band in one and fix split bolt and using method thereof.
Background technology
In existing, the fixing general additional bar that adopts of buried rubber fastening band is fixed, or socket fixing by galvanized wire and template, the former amount of reinforcement is large, pad many and when concreting in the telescopic hole of buried rubber fastening band easily depart from concrete extension joint and water after entering in body of wall, in when concrete shrinkage, buried rubber fastening band easily breaks and leaks, the latter is the easy distortion in installing zone edge of buried rubber fastening band in when point type is fixed on concreting, in causing, local, buried rubber fastening band installing zone edge is exposed and leaks, loss zone difficulty and expense are all very large.
Summary of the invention
The object of the invention is to solve prior art problem, provide buried rubber fastening band in one to fix split bolt and using method thereof.
In one of the present invention, buried rubber fastening band fixes split bolt, in described, buried rubber fastening band is fixed split bolt and is comprised screw rod, strap, ambulatory splint, clamping plate clamp nut, " 3 " type card, dies plate tap nut and position limiting pile, described ambulatory splint is fixed on screw rod by clamping plate clamp nut, ambulatory splint is rectangle, top and the bottom all to same direction 45-degree-buckling in " [" shape, its centre is drilled with pole perforating hole, described strap is fixed on screw rod, strap is in "] " shape, consistent with ambulatory splint shape and direction is relative, the pole perforating hole periphery of described strap and screw rod are welded and fixed, described position limiting pile is located between strap and " 3 " type card, and be connected with screw rod is vertical.
Described screw rod is full silk galvanized steel screw rod, and described position limiting pile is two steel bar ends, is connected by spot welding with screw rod, and described ambulatory splint is steel plate.Described " 3 " type card is two, lays respectively at screw rod two ends.
In buried rubber fastening band fix the using method of split bolt, comprise the following steps:
A, in buried rubber water-proof belt edge drill rod aperture, screw rod is passed down through pole perforating hole, makes its lower end be inserted in ambulatory splint and clamping plate clamp nut;
B, by after clamping plate clamp nut fastening screw to centre position, strap and ambulatory splint and in respectively place a reinforcing bar between buried rubber fastening band, continue binding clip clamp nut, again by strap ambulatory splint by reinforcing bar and in the edge installing zone on the buried rubber fastening band left side tightly clamp, in making, buried rubber fastening band left part is fixed in concrete wall;
C, on the right side of buried rubber fastening band up and down symmetry the lumps of wood, wooden form, lumps of wood back cord, steel pipe (14) are installed successively, by two 3 " type card and dies plate tap nut; the reserved part exposed on the right of buried rubber fastening band during both up and down wood is tightly clamped; and telescopic hole is controlled in the lumps of wood, formboard fastening clamp nut makes position limiting pile be close to wooden form inner surface;
D, by the fixing lumps of wood of vertical steel pipe clamping, the steel pipe on vertical steel pipe and upper and lower both sides is fixed by steel pipe strap.
Beneficial effect of the present invention is: (1) is simple to operate, and expense is low.(2) can avoid leaking when using, effective.
Accompanying drawing explanation
Fig. 1 is that in the present invention, buried rubber fastening band fixes split bolt front view;
Fig. 2 is that in Fig. 1, ambulatory splint 3 makes front view;
Fig. 3 is that in Fig. 1, ambulatory splint 3 makes left view;
Fig. 4 is that in the present invention, buried rubber fastening band fixes split bolt use schematic diagram.
In Fig. 1 ~ Fig. 4:
Screw rod 1, strap 2, ambulatory splint 3, clamping plate clamp nut 4, " 3 " type card 5, dies plate tap nut 6, position limiting pile 7, pole perforating hole 8, reinforcing bar 9, in buried rubber fastening band 10, the lumps of wood 11, wooden form 12, lumps of wood back cord 13, steel pipe 14, steel pipe strap 15, concrete wall 16, telescopic hole 17.
Detailed description of the invention
Now the present invention is further illustrated by reference to the accompanying drawings.
In of the present invention, buried rubber fastening band fixes split bolt, in described, buried rubber fastening band is fixed split bolt and is comprised screw rod 1, strap 2, ambulatory splint 3, clamping plate clamp nut 4, " 3 " type card 5, dies plate tap nut 6 and position limiting pile 7, described ambulatory splint 3 is fixed on screw rod 1 by clamping plate clamp nut 4, ambulatory splint 3 is rectangle, top and the bottom all to same direction 45-degree-buckling in " [" shape, its centre is drilled with pole perforating hole 8, described strap 2 is fixed on screw rod 1, strap 2 is in "] " shape, consistent with ambulatory splint 3 shape and direction is relative, pole perforating hole 8 periphery and the screw rod 1 of described strap 2 are welded and fixed, described position limiting pile 7 is located between strap 2 and " 3 " type card 5, and be connected with screw rod 1 is vertical.
Described screw rod 1 is full silk galvanized steel screw rod, and described position limiting pile 7 is two steel bar ends, is connected by spot welding with screw rod 1, and described ambulatory splint 3 is steel plates.Described " 3 " type card 5 is two, lays respectively at screw rod 1 two ends.
In buried rubber fastening band fix the using method of split bolt, comprise the following steps:
A, in buried rubber fastening band 10 edge drill rod aperture 8, screw rod 1 is passed down through pole perforating hole 8, makes its lower end be inserted in ambulatory splint 3 and clamping plate clamp nut 4;
B, by after clamping plate clamp nut 4 fastening screw 1 to centre position, strap 2 and ambulatory splint 3 and in respectively place a reinforcing bar 9 between buried rubber fastening band 10, continue binding clip clamp nut 4, again by strap 2 ambulatory splint 3 by reinforcing bar 9 and in the edge installing zone on buried rubber fastening band 10 left side tightly clamp, in making, buried rubber fastening band 10 left part is fixed in concrete wall 16;
C, on the right side of buried rubber fastening band 10 up and down symmetry the lumps of wood 11, wooden form 12, lumps of wood back cord 13, steel pipe 14 are installed successively, by two 3 " type card 5 and dies plate tap nut 6; the reserved part exposed on the right of buried rubber fastening band 10 during both up and down wood 11 is tightly clamped; and telescopic hole 17 is controlled in the lumps of wood 11, formboard fastening clamp nut 6 makes position limiting pile 7 be close to wooden form 12 inner surface;
D, clamp the fixing lumps of wood 11 by vertical steel pipe 14, the steel pipe 14 on vertical steel pipe 14 and upper and lower both sides is fixed by steel pipe strap 15.
Claims (6)
1. in, buried rubber fastening band fixes a using method for split bolt, it is characterized in that, described using method comprises the following steps:
A, in buried rubber fastening band (10) edge drill rod aperture (8), screw rod (1) is passed down through pole perforating hole (8), makes its lower end be inserted in ambulatory splint (3) and clamping plate clamp nut (4);
B, by after clamping plate clamp nut (4) fastening screw (1) to centre position, strap (2) and ambulatory splint (3) and in respectively place a reinforcing bar (9) between buried rubber fastening band (10), continue binding clip clamp nut (4), again by strap (2) ambulatory splint (3) by reinforcing bar (9) and in the edge installing zone on buried rubber fastening band (10) left side tightly clamp, in making, buried rubber fastening band (10) left part is fixed in concrete wall (16);
C, in buried rubber fastening band (10) right side up and down symmetry the lumps of wood (11), wooden form (12), lumps of wood back cord (13), steel pipe (14) are installed successively, by two 3 " type card (5) and dies plate tap nut (6); the reserved part exposed in buried rubber fastening band (10) the right during both up and down wood (11) is tightly clamped; and telescopic hole (17) is controlled in the lumps of wood (11), formboard fastening clamp nut (6) makes position limiting pile (7) be close to wooden form (12) inner surface;
D, by the fixing lumps of wood (11) of vertical steel pipe (14) clamping, the steel pipe (14) on vertical steel pipe (14) and upper and lower both sides is fixing by steel pipe strap (15).
2. according to claim 1, buried rubber fastening band fixes the using method of split bolt, it is characterized in that, described ambulatory splint (3) is fixed on screw rod (1) by clamping plate clamp nut (4), ambulatory splint (3) is rectangle, top and the bottom all to same direction 45-degree-buckling in " [" shape, its centre is drilled with pole perforating hole (8), described strap (2) is fixed on screw rod (1), strap (2) is in "] " shape, consistent with ambulatory splint (3) shape and direction is relative, pole perforating hole (8) periphery and the screw rod (1) of described strap (2) are welded and fixed, described position limiting pile (7) is located between strap (2) and " 3 " type card (5), and be connected with screw rod (1) is vertical.
3. according to claim 1 and 2, buried rubber fastening band fixes the using method of split bolt, and it is characterized in that, described screw rod (1) is full silk galvanized steel screw rod.
4. according to claim 1 and 2, buried rubber fastening band fixes the using method of split bolt, and it is characterized in that, described position limiting pile (7) is two steel bar ends, is connected by spot welding with screw rod (1).
5. according to claim 1 and 2, buried rubber fastening band fixes the using method of split bolt, and it is characterized in that, described ambulatory splint (3) is steel plate.
6. according to claim 1 and 2, buried rubber fastening band fixes the using method of split bolt, and it is characterized in that, described " 3 " type card (5) are two, lay respectively at screw rod (1) two ends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310044968.XA CN103089009B (en) | 2013-02-05 | 2013-02-05 | Middle-buried type rubber waterstop fixing split bolt and use method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310044968.XA CN103089009B (en) | 2013-02-05 | 2013-02-05 | Middle-buried type rubber waterstop fixing split bolt and use method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103089009A CN103089009A (en) | 2013-05-08 |
CN103089009B true CN103089009B (en) | 2015-05-20 |
Family
ID=48202095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310044968.XA Active CN103089009B (en) | 2013-02-05 | 2013-02-05 | Middle-buried type rubber waterstop fixing split bolt and use method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103089009B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107152092B (en) * | 2017-06-15 | 2019-03-29 | 中铁十五局集团有限公司 | The installation method of buried water stop and its fixed frame used at a kind of construction joint |
CN109594662B (en) * | 2019-01-16 | 2024-01-30 | 中建八局第一建设有限公司 | Method for fixing embedded water stop and clamp device thereof |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2014080A (en) * | 1934-03-16 | 1935-09-10 | Samuel S Colt | Concrete form retaining means |
CN200955262Y (en) * | 2007-04-04 | 2007-10-03 | 中天建设集团有限公司第六建设公司 | Double-square-bracket type counter-pull screw reinforcing clamp |
CN201443204U (en) * | 2009-08-18 | 2010-04-28 | 李述宏 | Combined through-wall screw rod |
CN201649459U (en) * | 2010-04-23 | 2010-11-24 | 王世杰 | Slope roof cast-in-place concrete structure |
CN202000660U (en) * | 2011-03-04 | 2011-10-05 | 中建七局第二建筑有限公司 | Surface layer template connecting structure for cast-in-place concrete sloping roof |
CN202148687U (en) * | 2011-06-10 | 2012-02-22 | 黄学贵 | Building template forming structure and fastening piece |
CN202266029U (en) * | 2011-08-29 | 2012-06-06 | 上海宝冶集团有限公司 | Detachable leakproof pull screw device |
CN202370251U (en) * | 2011-12-28 | 2012-08-08 | 王洪伟 | Through-wall combined water stopping screw rod |
CN202530762U (en) * | 2012-04-12 | 2012-11-14 | 中建八局第二建设有限公司 | Opposite-pull screw for template |
CN202689555U (en) * | 2012-05-25 | 2013-01-23 | 中国十七冶集团有限公司 | Anti-leakage device of cast-in-place concrete wall template |
-
2013
- 2013-02-05 CN CN201310044968.XA patent/CN103089009B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2014080A (en) * | 1934-03-16 | 1935-09-10 | Samuel S Colt | Concrete form retaining means |
CN200955262Y (en) * | 2007-04-04 | 2007-10-03 | 中天建设集团有限公司第六建设公司 | Double-square-bracket type counter-pull screw reinforcing clamp |
CN201443204U (en) * | 2009-08-18 | 2010-04-28 | 李述宏 | Combined through-wall screw rod |
CN201649459U (en) * | 2010-04-23 | 2010-11-24 | 王世杰 | Slope roof cast-in-place concrete structure |
CN202000660U (en) * | 2011-03-04 | 2011-10-05 | 中建七局第二建筑有限公司 | Surface layer template connecting structure for cast-in-place concrete sloping roof |
CN202148687U (en) * | 2011-06-10 | 2012-02-22 | 黄学贵 | Building template forming structure and fastening piece |
CN202266029U (en) * | 2011-08-29 | 2012-06-06 | 上海宝冶集团有限公司 | Detachable leakproof pull screw device |
CN202370251U (en) * | 2011-12-28 | 2012-08-08 | 王洪伟 | Through-wall combined water stopping screw rod |
CN202530762U (en) * | 2012-04-12 | 2012-11-14 | 中建八局第二建设有限公司 | Opposite-pull screw for template |
CN202689555U (en) * | 2012-05-25 | 2013-01-23 | 中国十七冶集团有限公司 | Anti-leakage device of cast-in-place concrete wall template |
Also Published As
Publication number | Publication date |
---|---|
CN103089009A (en) | 2013-05-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204282174U (en) | Concrete square road surface steel form splicing seams position fixing apparatus | |
CN204402005U (en) | A kind of novel overhanging unloading platform anchor ring | |
CN103089009B (en) | Middle-buried type rubber waterstop fixing split bolt and use method thereof | |
CN103670452A (en) | Installation structure and method for accurately positioning tunnel arch wall lining buried type water-stop belt | |
CN204960953U (en) | Vertical waterstop of formula of burying device of flare -outing in tunnel | |
CN207080239U (en) | A kind of fixing device of longitudinal waterstop | |
CN212563272U (en) | Induced seam department steel limit rubber waterstop mounting structure of tunnel | |
CN106758663B (en) | Buried rubber fastening band installs positioning construction method in one kind | |
CN205171502U (en) | Device is flowed in lap guard of underground continuous wall flexible rubber hose formula | |
CN211849631U (en) | Bury formula steel limit rubber waterstop fixing device in underground structure | |
CN203756198U (en) | Tunnel buried type rubber waterstop linear control device | |
CN208763063U (en) | Fixture for pipe gallery rubber watertight strip connection operation | |
CN214787447U (en) | Buried water stop mounting and fixing part in horizontal construction joint of short side wall of tunnel | |
CN205577133U (en) | A U type bolt fastening presss from both sides and fixation clamp structure for fixing outer wall rubber waterstop | |
CN204253063U (en) | A kind of tunnel waterstop positioning fixture | |
CN204983180U (en) | Vertical construction joint waterstop clamping device | |
CN205024733U (en) | Fixing device of leading waterstop | |
CN213204952U (en) | Structure is set up to roof movement joint department template | |
CN203878756U (en) | Embedded connecting device | |
CN201713933U (en) | Trench cover plate | |
CN203585549U (en) | Pipe fitting clamping device for motor vehicle | |
CN202578719U (en) | Steel-edged water-stop fixing device | |
CN104863359A (en) | Template reinforcement device of reinforced concrete wall pillar part and usage method of same | |
CN205936664U (en) | Tunnel waterstop installation fixing device | |
CN210599026U (en) | Clamp for longitudinal steel-edge water stop belt of tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |