CN101823123A - Manufacturing method of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting - Google Patents

Manufacturing method of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting Download PDF

Info

Publication number
CN101823123A
CN101823123A CN200910188304A CN200910188304A CN101823123A CN 101823123 A CN101823123 A CN 101823123A CN 200910188304 A CN200910188304 A CN 200910188304A CN 200910188304 A CN200910188304 A CN 200910188304A CN 101823123 A CN101823123 A CN 101823123A
Authority
CN
China
Prior art keywords
shangdian
layer
slip
shell
guide vane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910188304A
Other languages
Chinese (zh)
Other versions
CN101823123B (en
Inventor
丛健
杨胜群
张世东
邹建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Liming Aero Engine Group Co Ltd
Original Assignee
Shenyang Liming Aero Engine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Liming Aero Engine Group Co Ltd filed Critical Shenyang Liming Aero Engine Group Co Ltd
Priority to CN2009101883044A priority Critical patent/CN101823123B/en
Publication of CN101823123A publication Critical patent/CN101823123A/en
Application granted granted Critical
Publication of CN101823123B publication Critical patent/CN101823123B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a manufacturing method of a shangdian soil type shell used for heavy gas turbine plant guide vane investment casting, which belongs to the technical field of aircraft engines. Firstly, paint is coated for 11 layers, the powder is made of cobalt aluminate powder, electriccorundum powder, bauxite powder and shangdian soil powder, stucco material is made of electriccorundum sand and shangdian soil sand, adhesive is made of ethyl silicate hydrolysis liquid and silica solution, and dewaxing and roasting are carried out after coating. The manufacturing method of a shangdian soil type shell used for heavy gas turbine plant guide vane investment casting can obtain an investment casting shell with enough high temperature strength, small high-temperature dead-weight deformation and good cooling deformability, makes up the lack of the conventional technological shell, the manufactured shangdian soil type shell solves the problems of cracking, shell expansion, exudation and deformation of the conventional shell, and isometric crystal guide vane castings of the heavy gas turbine plant with qualified size are produced.

Description

A kind of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method
Technical field
The invention belongs to the aero engine technology field, be specifically related to heavy combustion engine guide vane investment casting technology.
Background technology
At present, the shell refractory material that domestic traditional turbine guide vane investment casting generally uses is aluminium vanadine, emergy and bastard coal stone sand etc., the bonding agent that uses is ethyl silicate hydrolyzate and Ludox, the process for making shell that adopts is total silicon acid second grease coating material, total silicon sol paint or ethyl silicate-Ludox alternative method, table 1 is that total silicon sol paint process for making shell is given an example, and table 2 is that ethyl silicate-Ludox alternative method coating process for making shell is given an example.(annotate: press domestic standard HB5351.1-2004 investment compound method for testing performance part 1: the mensuration regulation of viscosity, the slip viscosity measurement is for adopting the flow cup of standard specification, it's the required time of tap hole of normal diameter is past the pulp flow of measuring certain volume, and unit is second)
The traditional total silicon sol paint of table 1 process for making shell for example
The traditional ethyl silicate of table 2-Ludox alternative method coating process for making shell for example
? ? ??3.2~3.4 ? ? ? ? ? ?
??2 Silicate hydrolyzate liquid ??1.85~2.0 Emergy 60 # Schmigel ??>6 ? ??23±2 ??50~70
??3 Ludox ??15~20 ??2.5~2.8 Gangue 46 # Aluminium vanadine powder ??>12 ? ??23±2 ??40~60
??4 Silicate hydrolyzate liquid ??1.85~2.4 Gangue 46 # Aluminium vanadine powder ??>6 ??>3 ??23±2 ??40~60
??5 Ludox ??15~20 ??2.0~2.6 Gangue 46 # Aluminium vanadine powder ??>12 ??>6 ??23±2 ??40~60
??6 Silicate hydrolyzate liquid ??1.85~2.4 Gangue 46 # Aluminium vanadine powder ? ??>3 ??23±2 ??40~60
??7 Ludox ??15~20 ??2.0~2.6 Gangue 46 # Aluminium vanadine powder ? ??>6 ??23±2 ??40~60
??8 Silicate hydrolyzate liquid ??1.85~2.4 Gangue 46 # Aluminium vanadine powder ? ??>3 ??23±2 ??40~60
Hanging Silicate hydrolyzate liquid ??2.0~2.4 Not stucco Aluminium vanadine powder ? ??>24 ??23±2 ??40~60
Show by test and practical application, the elevated temperature strength of total silicon acid second grease coating material process for making shell is minimum, cause the shell crackle the easiliest in the pouring molten steel process and after the cast, expand shell and runout phenomenon, can not satisfy the production needs of the equiax crystal guide vane of restriking at all.Compare with total silicon acid second grease coating material process for making shell, the elevated temperature strength of ethyl silicate-Ludox alternative method coating process for making shell and total silicon sol paint process for making shell improves successively, but high temperature deadweight deflection is very big, still can not solve the guide vane of restriking because the multiple amount of molten steel amount is big, cooling is slow, do not solidify the shell crackle that is brought, expand shell and runout problem for a long time, still can not satisfy the development of the equiax crystal guide vane of restriking and produce needs.In aluminium vanadine, electro-corundum sand and bastard coal stone sand system shell refractory material, though electro-corundum sand possesses the good characteristics of dimensional stability, heat endurance and stability at elevated temperature, but owing to it costs an arm and a leg, shortage of resources, bring the too high shortcoming of production cost, in the shell pouring experiment, use full emergy can not solve the bloated shell problem of blade foundry goods fully simultaneously.
Summary of the invention
Weak point at above prior art existence, the invention provides a kind of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method, restriking with solution, guide vane is big because of the multiple amount of molten steel amount, cooling is slow, do not solidify the shell crackle that is brought, bloated shell and runout problem for a long time.
The present invention by to traditional equiax crystal blade with shell manufacturing process significant improvement in addition, employing possesses the Shangdian clay refractory material of excellent high performance, optimize technological parameter, improved shell intensity at high temperature, reduced the deadweight deflection of shell, improve the cooling deformability of shell, worked out a kind of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method.
The inventive method processing step is as follows.
(1) coating, totally 11 layers
The 1st layer: press mass ratio, in the slip bucket in Ludox and aluminic acid cobalt powder 1: the ratio of (2.5~2.8) preparation slip, and add the moistened surface agent account for Ludox weight (0.1~0.3) % respectively and the defoamer of (0.05~0.1) % stirs, slip viscosity is controlled at (30~33) s, blade wax-pattern module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 80#-100# electro-corundum sand refractory material on the fluidised form bed, from dried (12~15) h, envionmental humidity (50~70) %, temperature (23 ± 2) ℃ is finished the 1st layer of system shell.
The 2nd layer: press mass ratio, in the slip bucket in ethyl silicate hydrolyzate and electro-corundum powder or aluminium vanadine powder 1: the ratio of (2.4~2.8) preparation slip, stir, pulp density is controlled at (2.0~2.4) g/cm 3, module is put into slip evenly is coated with the taking-up of extension one deck slurry, after spreading 80#-100# electro-corundum sand refractory material on the fluidised form bed, earlier from doing (10~15) min, back ammonia drying (15~20) min, envionmental humidity (50~70) %, temperature (23 ± 2) ℃ is finished the 2nd layer of system shell.
The 3rd layer: the preparation of slip and being coated with is hung with the 2nd layer, after spreading 46#-60# electro-corundum sand refractory material on the fluidised form bed, and air-dry (0.5~1) h, envionmental humidity (50~70) %, temperature (23 ± 2) ℃ is finished the 3rd layer of system shell.
The 4th layer: press mass ratio, in the slip bucket in Ludox and Shangdian clay powder 1: the ratio of (2.2~2.5) preparation slip, stir, slip viscosity is controlled at (18~21) s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 36# Shangdian clay sand refractory material on the fluidised form bed, air-dry 6~8h, envionmental humidity (40~60) %, temperature (23 ± 2) ℃ is finished the 4th layer of system shell.
The 5th layer: press mass ratio, in the slip bucket in Ludox and Shangdian clay powder 1: the ratio of (2.5~2.8) preparation slip, stir, slip viscosity is controlled at (15~17) s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 24# Shangdian clay sand refractory material on the fluidised form bed, air-dry 6~8h, envionmental humidity (40~60) %, temperature (23 ± 2) ℃.The 6th~11 layer is repeated the 5th layer operation.
Behind the 11th layer system of the finishing shell, shell is soaked (1~2) min strengthen in the ethyl silicate hydrolyzate.
Strengthen the back and hang the slip that 5~11 coatings are used, not stucco, air-dry 6~8h finishes coating.
(2) dewaxing
The shell that coating finishes dewaxes in high steam dewaxing still.
(3) roasting
Shell after the dewaxing carries out roasting in chamber type electric resistance furnace, sintering temperature is (970~1000) ℃, and temperature retention time (3~4) h comes out of the stove, and the system shell finishes.
The technological parameter parameter sees table 3 for details.
Table 3 coating process and parameter
Figure DEST_PATH_GSB00000047865500041
Main feature of the present invention is as follows.
(1) the 1st laminar surface layer powder adopts the cobalt aluminate inovulant, can play the effect of refinement casting equi-axed crystal.
(2) the 1st, 2,3 layers with fine granularity and more fine-grained electro-corundum sand as sanding material, mainly be to utilize electro-corundum sand dimensional stability, heat endurance and the good characteristics of stability at elevated temperature, cost improves few simultaneously.
(3) the 4th~11 layers of backing layer bonding agent adopt single Ludox, powder and sanding material all adopt the Shangdian clay refractory material to replace traditional bastard coal stone sand, can make full use of the outstanding elevated temperature strength that Ludox bonding agent elevated temperature strength is good and the Shangdian clay refractory material possesses, little high temperature deadweight deflection and good cooling deformability characteristics, improve the high temperature dimensional stability and the heat endurance of backing layer (back-up coat), make whole shell obtain good serviceability.
(4) creatively ethyl silicate-Ludox alternative method and total silicon sol paint system shell side method are organically combined, promptly preceding 4 layers is that alternative method, 5~11 layers are total silicon sol paint process for making shell, can draw advantage separately, remedies deficiency separately.Preceding 4 layers of alternative method can be accelerated every layer of system shell speed, at short notice can preceding 4 layers have made, and have reduced the possibility that superficial layer is heaved as employing total silicon sol paint system shell; 5~11 layers of total silicon sol paint process for making shell can remedy the shortcoming of alternative method undercapacity, make that the manufacturing property of shell and serviceability are comprehensively improved.
(5) the most outstanding characteristics of the present invention are that backing layer (back-up coat) powder and sanding material adopt the Shangdian clay refractory material.
(6) another characteristics of the present invention are that various materials are organically united, and fully utilize the advantage of various materials, give full play to its characteristic, remedy the shortcoming of other materials simultaneously, make the excellent combination property of shell.Adopt cobalt aluminate inovulant crystal grain thinning as superficial layer, preceding 3 layers of employing electro-corundum sand are sanding material, preceding 4 layers are adopted the alternative method process for making shell, 5~11 layers is total silicon sol paint process for making shell, the 2nd layer is adopted ammonia to do the reinforcing of accelerating ground floor, backing layer (back-up coat) adopts the Shangdian clay refractory material, adopts ethyl silicate that whole shell is strengthened behind the 11th layer, carries out hanging processing etc. at last.The integrated use of various materials and methods has just createed the Shangdian clay shell that satisfies the guide vane requirement of restriking.
A kind of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of the present invention, can obtain to possess enough elevated temperature strengths, the investment casting shell of very little high temperature deadweight deflection and good cooling deformability, remedied the deficiency of traditional handicraft shell, the Shangdian clay shell that produces has solved traditional shell shake line, the problem of expand shell, runout and distortion, has produced the qualified heavy combustion engine equiax crystal guide vane foundry goods of size.
The specific embodiment
Further specify method of the present invention by the following examples.The component target of embodiment material therefor sees Table 4 and table 5, and the material particle size index sees Table 6.
Table 4 system shell bonding agent chemical composition
Figure DEST_PATH_GSB00000047865500051
Table 5 system shell refractory material chemical composition (%)
Figure DEST_PATH_GSB00000047865500052
Table 6 system shell refractory material granularity (mm)
Fire proofed wood Powder Sanding material
The material title The aluminic acid cobalt powder The electro-corundum powder The bauxite powder The Shangdian clay powder ??80 #-100 #Electro-corundum sand ??46 #-60 #Electro-corundum sand ??36 #Shangdian clay sand ??24 #Shangdian clay sand
Granularity ??0.053~0.038 ??0.040 ??0.040 ??0.074 ??0.178~0.150 ??0.350~0.250 ??0.500 ??0.710
Embodiment 1
Shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacturing approach craft step is as follows.
(1) coating, totally 11 layers
The 1st layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.6 ratio of aluminic acid cobalt powder, and add respectively and account for the moistened surface agent EA of Ludox weight 0.2% and 0.08% defoamer n-octyl alcohol stirs, slip viscosity is controlled at 32s, blade wax-pattern module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 90# electro-corundum sand refractory material (granularity 0.165mm) on the fluidised form bed, from dried 13h, envionmental humidity 60%, 23 ℃ of temperature are finished the 1st layer of system shell.
The 2nd layer: press mass ratio, in ethyl silicate hydrolyzate and electro-corundum powder or 1: 2.6 ratio of aluminium vanadine powder preparation slip, stir in the slip bucket, pulp density is controlled at 2.2g/cm 3, module is put into slip evenly be coated with and hang one deck slurry and take out, after spreading 90# electro-corundum sand refractory material (granularity 0.165mm) on the fluidised form bed, earlier from doing 12min, the back is with the dry 18min of ammonia, envionmental humidity 60%, 23 ℃ of temperature are finished the 2nd layer of system shell.
The 3rd layer: the preparation of slip and being coated with is hung with the 2nd layer, after spreading 50# electro-corundum sand refractory material (granularity 0.280mm) on the fluidised form bed, and air-dry 0.8h, envionmental humidity 60%, 23 ℃ of temperature are finished the 3rd layer of system shell.
The 4th layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.3 ratio of Shangdian clay powder, stir, slip viscosity is controlled at 20s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 36# Shangdian clay sand refractory material (granularity 0.500mm) on the fluidised form bed, air-dry 7h, envionmental humidity 50%, 23 ℃ of temperature are finished the 4th layer of system shell.
The 5th layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.6 ratio of Shangdian clay powder, stir, slip viscosity is controlled at 16s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 24# Shangdian clay sand refractory material (granularity 0.710mm) on the fluidised form bed, air-dry 7h, envionmental humidity 50%, 23 ℃ of temperature.The 6th~11 layer is repeated the 5th layer operation.
Behind the 11th layer system of the finishing shell, shell is soaked 1.5min strengthen in the ethyl silicate hydrolyzate.
Strengthen the back and hang the slip that 5~11 coatings are used, not stucco, air-dry 7h finishes coating.
(2) dewaxing
The shell that coating finishes dewaxes in high steam dewaxing still.
(3) roasting
Shell after the dewaxing carries out roasting in chamber type electric resistance furnace, sintering temperature is 985 ℃, and temperature retention time 3.5h comes out of the stove, and the system shell finishes.
Embodiment 2
Shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacturing approach craft step is as follows.
(1) coating, totally 11 layers
The 1st layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.8 ratio of aluminic acid cobalt powder, and add respectively and account for the moistened surface agent EA of Ludox weight 0.3% and 0.1% defoamer n-octyl alcohol stirs, slip viscosity is controlled at 33s, blade wax-pattern module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 100# electro-corundum sand refractory material (granularity 0.150mm) on the fluidised form bed, from dried 15h, envionmental humidity 70%, 25 ℃ of temperature are finished the 1st layer of system shell.
The 2nd layer: press mass ratio, in ethyl silicate hydrolyzate and electro-corundum powder or 1: 2.8 ratio of aluminium vanadine powder preparation slip, stir in the slip bucket, pulp density is controlled at 2.4g/cm 3, module is put into slip evenly is coated with the taking-up of extension one deck slurry, after spreading 100# electro-corundum sand refractory material (granularity 0.150mm) on the fluidised form bed, earlier from doing 15min, the back dry 20min of ammonia, envionmental humidity 70%, 25 ℃ of temperature are finished the 2nd layer of system shell.
The 3rd layer: the preparation of slip and being coated with is hung with the 2nd layer, after spreading 60# electro-corundum sand refractory material (granularity 0.250mm) on the fluidised form bed, and air-dry 1h, envionmental humidity 70%, 25 ℃ of temperature are finished the 3rd layer of system shell.
The 4th layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.5 ratio of Shangdian clay powder, stir, slip viscosity is controlled at 21s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 36# Shangdian clay sand refractory material (granularity 0.500mm) on the fluidised form bed, air-dry 8h, envionmental humidity 60%, 25 ℃ of temperature are finished the 4th layer of system shell.
The 5th layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.8 ratio of Shangdian clay powder, stir, slip viscosity is controlled at 17s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 24# Shangdian clay sand refractory material (granularity 0.710mm) on the fluidised form bed, air-dry 8h, envionmental humidity 60%, 25 ℃ of temperature.The 6th~11 layer is repeated the 5th layer operation.
Behind the 11th layer system of the finishing shell, shell is soaked 2min strengthen in the ethyl silicate hydrolyzate.
Strengthen the back and hang the slip that 5~11 coatings are used, not stucco, air-dry 8h finishes coating.
(2) dewaxing
The shell that coating finishes dewaxes in high steam dewaxing still.
(3) roasting
Shell after the dewaxing carries out roasting in chamber type electric resistance furnace, sintering temperature is 1000 ℃, and temperature retention time 3h comes out of the stove, and the system shell finishes.
Embodiment 3
Shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacturing approach craft step is as follows.
(1) coating, totally 11 layers
The 1st layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.5 ratio of aluminic acid cobalt powder, and add respectively and account for the moistened surface agent EA of Ludox weight 0.1% and 0.05% defoamer n-octyl alcohol stirs, slip viscosity is controlled at 30s, blade wax-pattern module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 80# electro-corundum sand refractory material (granularity 0.178mm) on the fluidised form bed, from dried 12h, envionmental humidity 50%, 21 ℃ of temperature are finished the 1st layer of system shell.
The 2nd layer: press mass ratio, in ethyl silicate hydrolyzate and electro-corundum powder or 1: 2.4 ratio of aluminium vanadine powder preparation slip, stir in the slip bucket, pulp density is controlled at 2.0g/cm 3, module is put into slip evenly be coated with and hang one deck slurry and take out, after spreading 80# electro-corundum sand refractory material (granularity 0.178mm) on the fluidised form bed, earlier from doing 10min, the back is with the dry 15min of ammonia, envionmental humidity 50%, 21 ℃ of temperature are finished the 2nd layer of system shell.
The 3rd layer: the preparation of slip and being coated with is hung with the 2nd layer, after spreading 46# electro-corundum sand refractory material (granularity 0.350mm) on the fluidised form bed, and air-dry 0.5h, envionmental humidity 50%, 21 ℃ of temperature are finished the 3rd layer of system shell.
The 4th layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.2 ratio of Shangdian clay powder, stir, slip viscosity is controlled at 18s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 36# Shangdian clay sand refractory material (granularity 0.500mm) on the fluidised form bed, air-dry 6h, envionmental humidity 40%, 21 ℃ of temperature are finished the 4th layer of system shell.
The 5th layer: press mass ratio, in the slip bucket, prepare slip in Ludox and 1: 2.5 ratio of Shangdian clay powder, stir, slip viscosity is controlled at 15s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading 24# Shangdian clay sand refractory material (granularity 0.710mm) on the fluidised form bed, air-dry 6h, envionmental humidity 40%, 21 ℃ of temperature.The 6th~11 layer is repeated the 5th layer operation.
Behind the 11th layer system of the finishing shell, shell is soaked 1min strengthen in the ethyl silicate hydrolyzate.
Strengthen the back and hang the slip that 5~11 coatings are used, not stucco, air-dry 6h finishes coating.
(2) dewaxing
The shell that coating finishes dewaxes in high steam dewaxing still.
(3) roasting
Shell after the dewaxing carries out roasting in chamber type electric resistance furnace, sintering temperature is 970 ℃, and temperature retention time 4h comes out of the stove, and the system shell finishes.
 

Claims (10)

1. shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method is characterized in that step is as follows:
(1) coating, totally 11 layers
The 1st layer: press mass ratio, in the slip bucket in Ludox and aluminic acid cobalt powder 1: the ratio of (2.5~2.8) preparation slip, and add respectively and account for the moistened surface agent of Ludox weight 0.1~0.3% and 0.05~0.1% defoamer stirs, slip viscosity is controlled at 30~33s, blade wax-pattern module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading electro-corundum sand refractory material on the fluidised form bed, do certainly, finish the 1st layer of system shell;
The 2nd layer: press mass ratio, in the slip bucket in ethyl silicate hydrolyzate and electro-corundum powder or aluminium vanadine powder 1: the ratio of (2.4~2.8) preparation slip, stir, pulp density is controlled at 2.0~2.4g/cm 3, module is put into slip evenly be coated with and hang one deck slurry and take out, after spreading electro-corundum sand refractory material on the fluidised form bed, from doing, the ammonia drying use in the back earlier, finishes the 2nd layer and makes shell;
The 3rd layer: the preparation of slip and being coated with is hung with the 2nd layer, and is air-dry after spreading electro-corundum sand refractory material on the fluidised form bed, finishes the 3rd layer of system shell;
The 4th layer: press mass ratio, ratio in Ludox and Shangdian clay powder 1: 2.2~2.5 in the slip bucket is prepared slip, stir, slip viscosity is controlled at 18~21s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading Shangdian clay sand refractory material on the fluidised form bed, air-dry, finish the 4th layer of system shell;
The 5th layer: press mass ratio, in the slip bucket in Ludox and Shangdian clay powder 1: the ratio of (2.5~2.8) preparation slip, stir, slip viscosity is controlled at 15~17s, module is put into slip evenly be coated with the taking-up of extension one deck slurry, after spreading Shangdian clay sand refractory material on the fluidised form bed, air-dry, the 6th~11 layer is repeated the 5th layer operation;
Behind the 11th layer system of the finishing shell, shell is soaked 1~2min strengthen in the ethyl silicate hydrolyzate;
Strengthen the back and hang the slip that 5~11 coatings are used, air-dry 6~8h finishes coating;
(2) dewaxing
The shell that coating finishes dewaxes in high steam dewaxing still;
(3) roasting
Shell after the dewaxing carries out roasting in chamber type electric resistance furnace, sintering temperature is 970~1000 ℃, and temperature retention time 3~4h comes out of the stove, and the system shell finishes.
2. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 1st coating, do 12~15h, envionmental humidity 50~70%, 23 ± 2 ℃ of temperature certainly.
3. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 2nd coating, earlier from doing 10~15min, back ammonia drying 15~20min, envionmental humidity 50~70%, 23 ± 2 ℃ of temperature.
4. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 3rd coating, air-dry 0.5~1h, envionmental humidity 50~70%, 23 ± 2 ℃ of temperature.
5. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 4th coating, air-dry 6~8h, envionmental humidity 40~60%, 23 ± 2 ℃ of temperature.
6. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 5th coating, air-dry 6~8h, envionmental humidity 40~60%, 23 ± 2 ℃ of temperature.
7. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 1st layer, the 2nd coating electro-corundum sand refractory material are 80 #-100 #Electro-corundum sand, granularity 0.178~0.150mm.
8. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 3rd layer of electro-corundum sand refractory material is 46#-60# electro-corundum sand refractory material, granularity 0.350~0.250mm.
9. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 4th layer of Shangdian clay sand refractory material is 36 #Shangdian clay sand refractory material, granularity 0.500mm.
10. according to the described shangdian soil type shell used for heavy gas turbine plant guide vane investment casting manufacture method of claim 1, it is characterized in that the 5th layer of Shangdian clay sand refractory material is 24 #Shangdian clay sand refractory material, granularity 0.710mm.
CN2009101883044A 2009-10-30 2009-10-30 Manufacturing method of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting Expired - Fee Related CN101823123B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101883044A CN101823123B (en) 2009-10-30 2009-10-30 Manufacturing method of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101883044A CN101823123B (en) 2009-10-30 2009-10-30 Manufacturing method of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting

Publications (2)

Publication Number Publication Date
CN101823123A true CN101823123A (en) 2010-09-08
CN101823123B CN101823123B (en) 2012-04-25

Family

ID=42687406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101883044A Expired - Fee Related CN101823123B (en) 2009-10-30 2009-10-30 Manufacturing method of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting

Country Status (1)

Country Link
CN (1) CN101823123B (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101992268A (en) * 2010-11-20 2011-03-30 沈阳工业大学 Preparation process of high-temperature alloy multigang hollow turbine blade
CN102069144A (en) * 2011-01-10 2011-05-25 安徽应流集团霍山铸造有限公司 Shell mold casting process for wax mold precision casting stainless steel big part
CN102366820A (en) * 2011-10-21 2012-03-07 沈阳黎明航空发动机(集团)有限责任公司 Preparation method of complex large thin-walled Ni3Al alloy cast
CN102652984A (en) * 2012-01-06 2012-09-05 山东泰山钢铁集团有限公司 Precise casting shell de-waxing process
CN102847875A (en) * 2012-07-09 2013-01-02 沈阳黎明航空发动机(集团)有限责任公司 Shell making process method for vane directional solidification and alloy sand-burning prevention
CN102985197A (en) * 2010-05-20 2013-03-20 贝克休斯公司 Methods of forming at least a portion of earth-boring tools, and articles formed by such methods
CN103100661A (en) * 2013-03-07 2013-05-15 重庆江增船舶重工有限公司 High-temperature resistant coating for refining crystal grains of casting and preparation method of high-temperature resistant coating
CN103252448A (en) * 2013-04-19 2013-08-21 江苏大学 Preparation method of thin-wall high-strength mold shell for single crystal blade manufacturing
CN103658533A (en) * 2013-12-10 2014-03-26 西北稀有金属材料研究院 Ceramic shell mould used for beryllium aluminium alloy, and preparation method thereof
CN104353786A (en) * 2014-11-10 2015-02-18 沈阳黎明航空发动机(集团)有限责任公司 Preparation method of shell with long and thin blades of investment casting aero-engine
CN104368757A (en) * 2014-11-07 2015-02-25 沈阳黎明航空发动机(集团)有限责任公司 Thin-walled circular type investment casting shell and preparation method thereof
CN104439097A (en) * 2014-11-10 2015-03-25 沈阳黎明航空发动机(集团)有限责任公司 Method for solving penetrative porosity defect of high-temperature alloy expansion regulation sheet base plate
CN105057589A (en) * 2015-07-16 2015-11-18 西安航空动力股份有限公司 Method for increasing number of directionally solidified blade column crystals
CN105215275A (en) * 2015-10-19 2016-01-06 西安航空动力股份有限公司 A kind of shell side method processed with narrow gap structure precision castings
CN105294166A (en) * 2015-11-12 2016-02-03 沈阳黎明航空发动机(集团)有限责任公司 Passivation method for corundum ceramic mould shell
CN106734886A (en) * 2017-01-23 2017-05-31 江苏永瀚特种合金技术有限公司 A kind of method for preventing the formwork cracking during shell processed
US9687963B2 (en) 2010-05-20 2017-06-27 Baker Hughes Incorporated Articles comprising metal, hard material, and an inoculant
CN105290337B (en) * 2015-11-16 2017-07-25 沈阳黎明航空发动机(集团)有限责任公司 A kind of concatermer blade casting method
CN107747129A (en) * 2017-09-30 2018-03-02 中国航发动力股份有限公司 A kind of insulated wall manufacture method in directional solidification casting adjustment temperature field
CN108941457A (en) * 2016-05-13 2018-12-07 上海万泽精密铸造有限公司 The preparation method of the shell of the guide vane casting of K438 high temperature alloy
US10167673B2 (en) 2004-04-28 2019-01-01 Baker Hughes Incorporated Earth-boring tools and methods of forming tools including hard particles in a binder
CN110227798A (en) * 2019-07-19 2019-09-13 上海云铸三维科技有限公司 A kind of preparation method based on steam-heated light-cured resin investment shell
CN110961579A (en) * 2019-12-27 2020-04-07 安徽应流航源动力科技有限公司 Shell manufacturing process for large directional blade formwork
CN111438331A (en) * 2020-05-13 2020-07-24 中国航发北京航空材料研究院 Method for controlling grain size of turbine blade
CN112338132A (en) * 2020-11-04 2021-02-09 吴应卓 Process for manufacturing shell surface layer by using compact corundum surface layer powder and surface layer sand
CN112453313A (en) * 2020-11-13 2021-03-09 中国航发沈阳黎明航空发动机有限责任公司 Preparation method of shell material of high-temperature alloy case investment casting
CN113953451A (en) * 2021-10-18 2022-01-21 马鞍山市方圆材料工程股份有限公司 Composite shell precision casting process
CN114951551A (en) * 2022-06-07 2022-08-30 中国航发航空科技股份有限公司 Alternate hardening composite ceramic shell manufacturing method for aviation investment precision casting

Cited By (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10167673B2 (en) 2004-04-28 2019-01-01 Baker Hughes Incorporated Earth-boring tools and methods of forming tools including hard particles in a binder
US9687963B2 (en) 2010-05-20 2017-06-27 Baker Hughes Incorporated Articles comprising metal, hard material, and an inoculant
US9790745B2 (en) 2010-05-20 2017-10-17 Baker Hughes Incorporated Earth-boring tools comprising eutectic or near-eutectic compositions
CN102985197A (en) * 2010-05-20 2013-03-20 贝克休斯公司 Methods of forming at least a portion of earth-boring tools, and articles formed by such methods
US10603765B2 (en) 2010-05-20 2020-03-31 Baker Hughes, a GE company, LLC. Articles comprising metal, hard material, and an inoculant, and related methods
CN101992268A (en) * 2010-11-20 2011-03-30 沈阳工业大学 Preparation process of high-temperature alloy multigang hollow turbine blade
CN101992268B (en) * 2010-11-20 2012-09-05 沈阳工业大学 Preparation process of high-temperature alloy multigang hollow turbine blade
CN102069144A (en) * 2011-01-10 2011-05-25 安徽应流集团霍山铸造有限公司 Shell mold casting process for wax mold precision casting stainless steel big part
CN102366820A (en) * 2011-10-21 2012-03-07 沈阳黎明航空发动机(集团)有限责任公司 Preparation method of complex large thin-walled Ni3Al alloy cast
CN102366820B (en) * 2011-10-21 2013-02-27 沈阳黎明航空发动机(集团)有限责任公司 Preparation method of complex large thin-walled Ni3Al alloy cast
CN102652984A (en) * 2012-01-06 2012-09-05 山东泰山钢铁集团有限公司 Precise casting shell de-waxing process
CN102652984B (en) * 2012-01-06 2014-05-07 山东泰山钢铁集团有限公司 Precise casting shell de-waxing process
CN102847875A (en) * 2012-07-09 2013-01-02 沈阳黎明航空发动机(集团)有限责任公司 Shell making process method for vane directional solidification and alloy sand-burning prevention
CN102847875B (en) * 2012-07-09 2015-12-16 沈阳黎明航空发动机(集团)有限责任公司 A kind of process for making shell method of solidifying for blades oriented, preventing alloy scab
CN103100661A (en) * 2013-03-07 2013-05-15 重庆江增船舶重工有限公司 High-temperature resistant coating for refining crystal grains of casting and preparation method of high-temperature resistant coating
CN103252448A (en) * 2013-04-19 2013-08-21 江苏大学 Preparation method of thin-wall high-strength mold shell for single crystal blade manufacturing
CN103252448B (en) * 2013-04-19 2015-09-09 江苏大学 A kind of thin-wall high-strength mold shell preparation method manufactured for single crystal blade
CN103658533A (en) * 2013-12-10 2014-03-26 西北稀有金属材料研究院 Ceramic shell mould used for beryllium aluminium alloy, and preparation method thereof
CN103658533B (en) * 2013-12-10 2017-01-04 西北稀有金属材料研究院 A kind of beryllium alumin(i)um alloy ceramic shell mould and preparation method thereof
CN104368757A (en) * 2014-11-07 2015-02-25 沈阳黎明航空发动机(集团)有限责任公司 Thin-walled circular type investment casting shell and preparation method thereof
CN104368757B (en) * 2014-11-07 2016-07-13 沈阳黎明航空发动机(集团)有限责任公司 A kind of thin-wall ring investment-casting shell and preparation method thereof
CN104439097A (en) * 2014-11-10 2015-03-25 沈阳黎明航空发动机(集团)有限责任公司 Method for solving penetrative porosity defect of high-temperature alloy expansion regulation sheet base plate
CN104353786A (en) * 2014-11-10 2015-02-18 沈阳黎明航空发动机(集团)有限责任公司 Preparation method of shell with long and thin blades of investment casting aero-engine
CN105057589B (en) * 2015-07-16 2017-05-17 西安航空动力股份有限公司 Method for increasing number of directionally solidified blade column crystals
CN105057589A (en) * 2015-07-16 2015-11-18 西安航空动力股份有限公司 Method for increasing number of directionally solidified blade column crystals
CN105215275A (en) * 2015-10-19 2016-01-06 西安航空动力股份有限公司 A kind of shell side method processed with narrow gap structure precision castings
CN105215275B (en) * 2015-10-19 2017-08-25 西安航空动力股份有限公司 A kind of shell side method processed with narrow gap structure precision castings
CN105294166A (en) * 2015-11-12 2016-02-03 沈阳黎明航空发动机(集团)有限责任公司 Passivation method for corundum ceramic mould shell
CN105290337B (en) * 2015-11-16 2017-07-25 沈阳黎明航空发动机(集团)有限责任公司 A kind of concatermer blade casting method
CN108941457B (en) * 2016-05-13 2019-12-31 上海万泽精密铸造有限公司 Preparation method of shell of guide blade casting made of K438 high-temperature alloy
CN108941457A (en) * 2016-05-13 2018-12-07 上海万泽精密铸造有限公司 The preparation method of the shell of the guide vane casting of K438 high temperature alloy
CN106734886A (en) * 2017-01-23 2017-05-31 江苏永瀚特种合金技术有限公司 A kind of method for preventing the formwork cracking during shell processed
CN107747129A (en) * 2017-09-30 2018-03-02 中国航发动力股份有限公司 A kind of insulated wall manufacture method in directional solidification casting adjustment temperature field
CN110227798A (en) * 2019-07-19 2019-09-13 上海云铸三维科技有限公司 A kind of preparation method based on steam-heated light-cured resin investment shell
CN110961579A (en) * 2019-12-27 2020-04-07 安徽应流航源动力科技有限公司 Shell manufacturing process for large directional blade formwork
CN111438331A (en) * 2020-05-13 2020-07-24 中国航发北京航空材料研究院 Method for controlling grain size of turbine blade
CN112338132A (en) * 2020-11-04 2021-02-09 吴应卓 Process for manufacturing shell surface layer by using compact corundum surface layer powder and surface layer sand
CN112453313A (en) * 2020-11-13 2021-03-09 中国航发沈阳黎明航空发动机有限责任公司 Preparation method of shell material of high-temperature alloy case investment casting
CN113953451A (en) * 2021-10-18 2022-01-21 马鞍山市方圆材料工程股份有限公司 Composite shell precision casting process
CN113953451B (en) * 2021-10-18 2023-03-10 马鞍山市方圆材料工程股份有限公司 Composite shell precision casting process
CN114951551A (en) * 2022-06-07 2022-08-30 中国航发航空科技股份有限公司 Alternate hardening composite ceramic shell manufacturing method for aviation investment precision casting

Also Published As

Publication number Publication date
CN101823123B (en) 2012-04-25

Similar Documents

Publication Publication Date Title
CN101823123B (en) Manufacturing method of shangdian soil type shell used for heavy gas turbine plant guide vane investment casting
CN105903901A (en) Near-zero shrinkage rate molding shell based on fused quartz and preparation method thereof
CN104368757B (en) A kind of thin-wall ring investment-casting shell and preparation method thereof
CN102601307B (en) Preparation method of shell mold for investment casting of TiAl based alloy
CN105290313B (en) A kind of method for improving titanium-aluminium alloy hot investment casting New Oxide Ceramic Shell Mould deformability
CN101428328A (en) Powdery paint for lost foam casting of cast iron
CN102151787A (en) 600-DEG C high-temperature titanium alloy fired mold casting type shell surface painting and preparation method thereof
CN102284678A (en) Method for preparing formwork of precisely-cast titanium alloy
CN102029353B (en) Aluminasol bonded alumina mould case and manufacturing method thereof
CN105108054B (en) A kind of precision casting transition zone coating and its preparation method and application for shell processed
CN102873262B (en) Lost foam coating and preparation method thereof
Liao et al. Study on the surface roughness of ceramic shells and castings in the ceramic shell casting process based on expandable pattern
CN109513878A (en) The water base cast paint of large-scale steel-casting quick-drying and its preparation method
CN108500209A (en) The preparation method of high collapsibility formwork
CN1049166C (en) Coating for casting thin foundry goods
CN114178486B (en) Shell for improving sand sticking on surface of high-temperature alloy after casting and preparation method thereof
CN108751998B (en) Silicon nitride and silicon carbide combined ceramic filter and preparation method thereof
CN105108053B (en) A kind of precision casting investment precoat and preparation method thereof for shell processed
CN103044013B (en) Preparation method of alumina ceramic shell for monocrystal blades
CN113070445B (en) Large-caliber nodular cast iron pipe die coating and preparation method and application thereof
Pattnaik et al. Preparation and analysis of a hybrid ceramic shell for investment casting
CN107971453A (en) Lost foam paint of heat resisting steel and preparation method thereof
CN107052227B (en) A kind of thin-wall tube lost foam paint and its preparation method and application
CN106270372A (en) A kind of cast iron lost foam paint and preparation method thereof
CN114074177A (en) Preparation method of investment precision casting shell for brittle material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120425

Termination date: 20161030