CN101818638A CN 201010155703 CN201010155703A CN101818638A CN 101818638 A CN101818638 A CN 101818638A CN 201010155703 CN201010155703 CN 201010155703 CN 201010155703 A CN201010155703 A CN 201010155703A CN 101818638 A CN101818638 A CN 101818638A
Authority
CN
China
Prior art keywords
packer
anchor
pipe
throttling
pressure break
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010155703
Other languages
Chinese (zh)
Other versions
CN101818638B (en
Inventor
陈平
曹欣
高银锁
赵国兴
张军
齐加德
常树发
高光辉
郭艳萍
曹万海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN 201010155703 priority Critical patent/CN101818638B/en
Publication of CN101818638A publication Critical patent/CN101818638A/en
Application granted granted Critical
Publication of CN101818638B publication Critical patent/CN101818638B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to the technical field of petroleum and natural gas downhole operation and particularly relates to a fracturing and separate zone production combined operation device and a fracturing and separate zone production combined operation method. The device comprises a lower packer and an upper packer. The device is characterized in that: a Y221 anchor packer is used as the lower packer, a K344 packer is used as the upper packer, the upper end of the Y221 anchor packer is provided with a throttling sand blower, the Y221 anchor packer and the throttling sand blower are in threaded connection with the lower end of an adjusting pipe nipple, the lower side of the anchor packer is connected with a tail pipe which is connected with a pipe plug; and the upper end of the K344 packer is provided with a hydraulic anchor, the K344 packer and the hydraulic anchor are in threaded connection with the upper end of the adjusting pipe nipple, and a packed oil sleeve cavity is formed between the K344 packer and the Y211 anchor packer. The device and the method can reduce the construction processes of operation such as round trip, line slipping and swabbing preparation, shorten the construction period, reduce the construction cost and reduce the labor intensity of workers.

Description

A kind of pressure break separate zone production combined operation device and method
Technical field
The invention belongs to operation technique field, petroleum gas down-hole, particularly a kind of pressure break separate zone production combined operation device and method.
Background technology
In operation technique field, petroleum gas down-hole, exploration well, evaluation well, usually, do not beat when trying lamination beyond the Great Wall and splitting formation testing, the general employing " two envelopes choosings are pressed " (block wait to press layer with two K344 packers) technology, long celebrating Oilfield using K344 inflatable packer, utilize throttling in the pilot sandblaster to chew the inside and outside difference set packer of the formed pipe string of throttling during pressing crack construction, after finishing construction, the release pressure packer is a deblocking, if target zone is asked product, must trip out fracture drill changes branch and asks drilling tool to finish, need remove twice drilling tool like this, long construction period, labor strength is big.
Summary of the invention
The purpose of this invention is to provide a kind of the minimizing and make a trip, fall job execution operations such as rope, pumping preparation, shorten construction period, reduce construction cost, alleviate labor strength, can creep into capable pressure break for one time, press after the row of closing, branch ask a kind of pressure break separate zone production combined operation device and the method for target zone.
The object of the present invention is achieved like this, design a kind of pressure break separate zone production combined operation device, comprise: lower packet, upper packer, it is characterized in that: the Y221 anchor packer is done lower packet, do upper packer with the K344 packer, Y221 anchor packer upper end has throttling sandblaster, Y221 anchor packer and throttling sandblaster to be threaded in adjustment pipe nipple lower end, connect tail pipe under the Y221 anchor packer, tail pipe connects plug; There is hydraulic anchor the upper end of K344 packer, and K344 packer and hydraulic anchor are threaded in the upper end of adjusting pipe nipple, is packing oil jacket annular space between K344 packer and Y221 anchor packer.
Described throttling sandblaster comprises two public straight mouthpieces and bypass pipe, is used for throttling and drain, and during pressure break, the straight mouthpiece of two public affairs mainly plays throttling action, and the pressure reduction that throttling produced makes the K344 packer setting; Bypass pipe plays guide functions, makes fracturing liquid enter the stratum by oil pipe through guiding gutter.
Based on a kind of method of pressure break separate zone production combined operation device, its method is:
1) before the pressure break, set the Y221 anchor packer, Y221 anchor packer slips anchor is on sleeve pipe, and the weight by drilling tool self presses off Y221 anchor packer rubber and set then, come packing to try oil jacket annular space between interval and the fractured interval with this, with plug shutoff pipe string; Y221 anchor packer and plug acting in conjunction will try interval and fractured interval is separated;
2) during pressure break, the differential pressure action of chewing throttling by the throttling of throttling sandblaster struts K344 packer 5 rubber of upper end and set, play packing on it the oil jacket annular space and sleeve pipe played a protective role;
3) after the pressure break, continue to realize that with Y221 anchor packer and plug packing oil jacket annular space and pipe string last examination target zone is carried out pumping asks product, plays the sand setting effect in the tail pipe pumping process.
Described Y221 packer belongs to compression packer, adopt rotation to set, before boring down, the Y221 packer falls groove to following brill state, under be drilled into design attitude after, on carry 1 meter, dextrorotation 2/3 circle, alignment pin in lower contact this moment skids off from the J type groove of traction body, the release central tube is descending, to at first close and seal bypass valve, continue to transfer tubing string, it is descending to promote packing element and cone, because the rubbing action of the wiper block on the traction body, in transferring process, slips on the traction body and cone produce and relatively move, cone will strut slips, slips on the Y221 anchor packer firmly is anchored on the outer wall of oil pipe, continue to apply seating sealing load, the packing element of Y221 anchor packer swells by compression, when load increases to 60-80KN, the Y221 anchor packer enters low pressure and sets state, continuation increases to 120KN with load and enters high pressure and set state, after this directly the upper lifting pipe post will at first be opened downforce on the bypass valve balance of Y221 anchor packer, and carrying the Y221 anchor packer in the continuation will deblocking, and the Y221 anchor packer is in brill state down automatically behind the upper lifting pipe post, continue this moment to pull out of hole or directly transfer under the tubing string continuation and bore, repeat to set action when need set and get final product.
Effect of the present invention is:
1, can shorten construction period, pumping discharge opeing has in time reduced the secondary injury of fracturing fluid to the stratum, shortens construction period at least one day, for the formation testing speed-raising is performed meritorious deeds never to be obliterated;
2, this technology is compared with conventional formation testing, removes less twice to bore, and has alleviated labor strength;
3, make the lower seal device of fracture drill of the compression anchor packer, after the pressure break or intact examination back if on carry drilling tool and get final product deblocking, do not have the K344 packer because pressure reduction and the risk of deblocking bit freezing not, thereby safer, reduced accident risk;
4, this technology can be brought high economic benefit to enterprise, reduce construction period one day, reduce by 2000 yuan of cost of labor expenses, use 1 K344 packer less, fall 1231 yuan of costs, remove less to divide twice and ask drilling tool, reduce cost 9517 yuan, few pumping is (3 classes are in pumping) once, 10177 yuan of minimizing expenses, more than every, save 22925 yuan of costs altogether;
5, use this technology and finish 36 mouthfuls of well 45 laminations altogether and split formation testing work, success rate reaches 100%.
Description of drawings
Below in conjunction with the embodiment accompanying drawing this is described further with bright:
Fig. 1 is the example structure schematic diagram.
Among the figure: 1, plug; 2, tail pipe; 3, Y221 anchor packer; 4, throttling sandblaster; 5, K344 packer; 6, hydraulic anchor; 7, packing element; 8, oil pipe; 9, oil jacket annular space; 10, fractured interval; 11, tried interval; 12, adjust pipe nipple.
The specific embodiment
As shown in Figure 1, a kind of pressure break separate zone production combined operation device, comprise: lower packet, upper packer, Y221 anchor packer 3 is done lower packet, do upper packer with K344 packer 5, there is throttling sandblaster 4 Y221 anchor packer 3 upper ends, Y221 anchor packer 3 is threaded in throttling sandblaster 4 and adjusts pipe nipple 12 lower ends, connect tail pipe 2 under the Y221 anchor packer 3, tail pipe 2 connects plug 1, there is hydraulic anchor 6 upper end of K344 packer 5, and K344 packer 5 and hydraulic anchor 6 are threaded in the upper end of adjusting pipe nipple 12, is packing oil jacket annular space 9 between K344 packer 5 and Y221 anchor packer 3.Before the method for pressure break separate zone production combined operation device comprises pressure break, during pressure break and after the pressure break, step is: 1) before the pressure break, set Y221 anchor packer 3, Y221 anchor packer 3 slips anchors are on sleeve pipe, weight by drilling tool self presses off Y221 anchor packer 3 rubber and set then, come packing to try oil jacket annular space 9 between interval 11 and the fractured interval 10 with this, with plug 1 shutoff pipe string; Y221 anchor packer 3 and plug 1 acting in conjunction will try interval 11 and fractured interval 10 is separated; 2) during pressure break, the differential pressure action of chewing throttling by 4 throttlings of throttling sandblaster struts K344 packer 5 rubber of upper end and set, play packing on it oil jacket annular space 9 and sleeve pipe played a protective role; 3) after the pressure break, continue to realize that with Y221 anchor packer 3 and plug 1 packing oil jacket annular space 9 and pipe string last examination target zone is carried out pumping asks product, plays the sand setting effect in the tail pipe 2 pumping processes.
Should press technological operation during the pressure break separate zone production combined operation:
1. anchor packer 3 before the pressure break, sets compression Y221 anchor packer 3 as the lower packet of two envelope choosing pressures; During pressure break, with its packing oil jacket annular space 9; With plug 1 shutoff pipe string, thereby reach packing target zone and the purpose of trying layer.
2.Y221 anchor packer 3 and K344 go up packing 5 when pressure break, packing oil jacket annular space 9, with target zone with tried layer and separated, compression Y221 anchor packer 3 slips anchors are on sleeve pipe, by the weight of drilling tool self packer rubber is pressed off then and play the packing effect, it promptly set before pressure break, and K344 upper packer 5 presses off rubber by the differential pressure action that throttling is chewed in throttling when pressure break.
3. throttling sandblaster 4 critical pieces comprise two public straight mouthpieces and bypass pipe, and it mainly acts on is throttling and drain.During pressure break, the straight mouthpiece of two public affairs mainly plays throttling action, and the pressure reduction that throttling produced makes K344 go up packing 5 and sets; Bypass pipe plays guide functions, makes fracturing liquid enter the stratum by oil pipe 8 through guiding gutter.
4. after pressing, continue to reach last examination target zone is carried out the purpose that product is asked in pumping with compression Y221 anchor packer 3 and plug 1 packing oil jacket annular space and pipe string.Play the sand setting effect in the tail pipe 2 pumping processes.
The Y221 packer belongs to compression packer, adopts rotation to set.Before boring down, must fall groove to it to following brill state, under be drilled into design attitude after, on carry 1 meter, dextrorotation 2/3 circle, the alignment pin in lower contact this moment skids off from the J type groove of traction body, the release central tube is descending, to at first close and seal bypass valve, and continue to transfer tubing string, it is descending to promote packing element and cone, because the rubbing action of the wiper block on the traction body, in transferring process, slips on the traction body and cone produce and relatively move, and cone will strut slips, make the slips on the packer firmly be anchored on the casing wall, continue to apply seating sealing load, packing element 7 swells by compression, when load increases to 60-80KN, packer will reliably set, can reach the purpose that branch is asked packing this moment fully, but will realize packing under the fracturing process mesohigh condition, load must be increased to more than the 120KN.After finishing construction, directly the upper lifting pipe post will at first be opened downforce on the bypass valve balance of packer, and continuing upper lifting pipe post packer will deblocking.Packer is in brill state down automatically behind the upper lifting pipe post, can continue this moment to pull out of hole, and also can directly transfer tubing string and continue to bore down, repeats to set action when need set and gets final product.This packer can need set repeatedly according to design.

Claims (4)

1. pressure break separate zone production combined operation device, comprise: lower packet, upper packer, it is characterized in that: Y221 anchor packer (3) is done lower packet, do upper packer with K344 packer (5), there is throttling sandblaster (4) Y221 anchor packer (3) upper end, Y221 anchor packer (3) is threaded in throttling sandblaster (4) and adjusts pipe nipple (12) lower end, connects tail pipe (2) under the Y221 anchor packer 3, and tail pipe (2) connects plug (1); There is hydraulic anchor (6) upper end of K344 packer (5), and K344 packer (5) and hydraulic anchor (6) are threaded in the upper end of adjusting pipe nipple (12), is packing oil jacket annular space (9) between K344 packer (5) and Y221 anchor packer (3).
2. a kind of pressure break separate zone production combined operation device according to claim 1, it is characterized in that: described throttling sandblaster (4) comprises two public straight mouthpieces and bypass pipe, be used for throttling and drain, during pressure break, the straight mouthpiece of two public affairs mainly plays throttling action, and the pressure reduction that throttling produced makes K344 go up packing (5) and sets; Bypass pipe plays guide functions, makes fracturing liquid enter the stratum by oil pipe through guiding gutter.
3. based on a kind of method of pressure break separate zone production combined operation device, its method step is:
1) before the pressure break, set Y221 anchor packer (3), Y221 anchor packer (3) slips anchor is on sleeve pipe, weight by drilling tool self presses off Y221 anchor packer (3) rubber and set then, come packing to try oil jacket annular space (9) between interval (11) and the fractured interval (10) with this, with plug (1) shutoff pipe string; Y221 anchor packer (3) and plug (1) acting in conjunction will try interval (11) and fractured interval (10) is separated;
2) during pressure break, the differential pressure action of chewing throttling by throttling sandblaster (4) throttling struts K344 packer (5) rubber of upper end and set, play packing on it oil jacket annular space (9) and sleeve pipe played a protective role;
3) after the pressure break, continue to realize that with Y221 anchor packer (3) and plug (1) packing oil jacket annular space (9) and pipe string last examination target zone is carried out pumping asks product, plays the sand setting effect in tail pipe (2) the pumping process.
4. a kind of pressure break separate zone production combined operation device according to claim 2, it is characterized in that: described Y221 packer (5) belongs to compression packer, adopt rotation to set, before boring down, Y221 packer (5) falls groove to following brill state, under be drilled into design attitude after, on carry 1 meter, dextrorotation 2/3 circle, alignment pin in lower contact this moment skids off from the J type groove of traction body, the release central tube is descending, to at first close and seal bypass valve, continue to transfer tubing string, it is descending to promote packing element and cone, because the rubbing action of the wiper block on the traction body, in transferring process, slips on the traction body and cone produce and relatively move, cone will strut slips, slips on the Y221 anchor packer (3) firmly is anchored on the outer wall of oil pipe (8), continue to apply seating sealing load, the packing element of Y221 anchor packer (3) swells by compression, when load increases to 60-80KN, Y221 anchor packer (3) enters low pressure and sets state, continuation increases to 120KN with load and enters high pressure and set state, after this directly the upper lifting pipe post will at first be opened downforce on the bypass valve balance of Y221 anchor packer (3), carrying Y221 anchor packer (3) in the continuation will deblocking, Y221 anchor packer (3) is in brill state down automatically behind the upper lifting pipe post, and continuation this moment pulls out of hole or directly transfers tubing string and continue to bore down, repeats to set action when need set and gets final product.
CN 201010155703 2010-04-26 2010-04-26 Fracturing and separate zone production combined operation device and method Expired - Fee Related CN101818638B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010155703 CN101818638B (en) 2010-04-26 2010-04-26 Fracturing and separate zone production combined operation device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010155703 CN101818638B (en) 2010-04-26 2010-04-26 Fracturing and separate zone production combined operation device and method

Publications (2)

Publication Number Publication Date
CN101818638A true CN101818638A (en) 2010-09-01
CN101818638B CN101818638B (en) 2013-05-29

Family

ID=42653891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010155703 Expired - Fee Related CN101818638B (en) 2010-04-26 2010-04-26 Fracturing and separate zone production combined operation device and method

Country Status (1)

Country Link
CN (1) CN101818638B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285610A (en) * 2015-05-11 2017-01-04 中国石油化工股份有限公司 Fracturing string

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4685519A (en) * 1985-05-02 1987-08-11 Mobil Oil Corporation Hydraulic fracturing and gravel packing method employing special sand control technique
US6446727B1 (en) * 1998-11-12 2002-09-10 Sclumberger Technology Corporation Process for hydraulically fracturing oil and gas wells
CN201144682Y (en) * 2008-01-16 2008-11-05 中国石油化工股份有限公司西南油气分公司工程技术研究院 Multiple fracturing pipe column for petroleum and gas well
CN201412134Y (en) * 2009-06-02 2010-02-24 中国石油天然气股份有限公司 Small-casing pipe string for multilayer fracturing
CN201412133Y (en) * 2009-06-02 2010-02-24 中国石油天然气股份有限公司 Pipe string for multi-stage drag fracturing of horizontal well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4685519A (en) * 1985-05-02 1987-08-11 Mobil Oil Corporation Hydraulic fracturing and gravel packing method employing special sand control technique
US6446727B1 (en) * 1998-11-12 2002-09-10 Sclumberger Technology Corporation Process for hydraulically fracturing oil and gas wells
CN201144682Y (en) * 2008-01-16 2008-11-05 中国石油化工股份有限公司西南油气分公司工程技术研究院 Multiple fracturing pipe column for petroleum and gas well
CN201412134Y (en) * 2009-06-02 2010-02-24 中国石油天然气股份有限公司 Small-casing pipe string for multilayer fracturing
CN201412133Y (en) * 2009-06-02 2010-02-24 中国石油天然气股份有限公司 Pipe string for multi-stage drag fracturing of horizontal well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285610A (en) * 2015-05-11 2017-01-04 中国石油化工股份有限公司 Fracturing string
CN106285610B (en) * 2015-05-11 2018-08-17 中国石油化工股份有限公司 Fracturing string

Also Published As

Publication number Publication date
CN101818638B (en) 2013-05-29

Similar Documents

Publication Publication Date Title
CN103015955B (en) Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN109630060B (en) Repeatable non-killing well completion production string and construction method
CN104153753B (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN102777156A (en) Fracturing method for multi-interval oil and gas wells
CN106014346A (en) Drainage and gas production method and device through velocity string in cooperation with plunger airlift
CN103835678B (en) Horizontal well inner-pipe-free drilling-plug-free grading cementing well completion method
CN103835677B (en) A kind of horizontal well two-stage sealing bruising salvagable completion system
CN108868734A (en) Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method
CN202170788U (en) Interlayer staged fracturing technical pipe column for thick reservoir layer
CN2856407Y (en) Perforating and fracturing string of horizontal well
CN207122297U (en) It is a kind of that there is the big orifice for setting function of giving up to exempt to bore bridging plug
US2189702A (en) Well cementing mechanism
CN200992982Y (en) One-trip string hydraulic setting squeezing bridge plug
CN106761538A (en) A kind of oil field is every using long packing element packer
CN105443101A (en) Compression type double-sealing and single-clamping subsection fracturing process pipe column and fracturing method thereof
CN101818638B (en) Fracturing and separate zone production combined operation device and method
CN200975248Y (en) Fracturing of separate layers technique pipe column
CN205349316U (en) Two single deck tape -recorder staged fracturing technology tubular columns that seal of compression
CN105672938B (en) A kind of bidirectionally anchoring mechanical packer
CN204082115U (en) Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure
CN110617057A (en) Full-pipe type underground testing pipe column and testing method thereof
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
CN112081535A (en) Ultra-deep high-sulfur-content gas well completion pipe string and construction method thereof
CN112324384B (en) Non-well killing operation process method applying pressure control switch valve
CN210858683U (en) Process assembly pipe column for realizing partial pressure and separate measurement operation by one drill

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130529

Termination date: 20210426