CA2342942A1 - Computer-implemented product development planning method - Google Patents
Computer-implemented product development planning method Download PDFInfo
- Publication number
- CA2342942A1 CA2342942A1 CA002342942A CA2342942A CA2342942A1 CA 2342942 A1 CA2342942 A1 CA 2342942A1 CA 002342942 A CA002342942 A CA 002342942A CA 2342942 A CA2342942 A CA 2342942A CA 2342942 A1 CA2342942 A1 CA 2342942A1
- Authority
- CA
- Canada
- Prior art keywords
- product
- model
- task
- component
- resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
A computer-implemented system (10) for product development planning. The system (10) models a business enterprise in terms of its proposed products a nd the tasks and resources used to develop them. An optimizing engine comprised of a genetic algorithm (13) and a constraint engine (14) operates on the mod el to construct candidate product portfolios and schedules. Each schedule is evaluated and used to generate an "improved" candidate porfolio in accordanc e with genetic processing. This process continues to improve the product prioritization and pipeline schedule as measured in terms of an objective criterion such as profit maximization.
Description
COMPUTER-IMPLEMENTED PRODUCT DEVELOPMENT PLANNING METHOD
~~~~TCAT_ FTELD OF THE INVENTION
This invention relates to computer implemented management for business enterprises, and more particularly to a system and method for planning a portfolio of products to be developed.
BACKGROLmTD OF THE INVENTION
Computer implemented planning and scheduling systems are increasingly being used in factories and other enterprises. Such systems model the enterprise environment and provide schedules for producing items to fulfill consumer demand within the constraints of the environment.
Typically, planning and scheduling problems can be represented as a constrained optimization problem. For example, consider the problem of sequencing a set of tasks on a single resource in a manufacturing environment. Assume each task has a deadline and that the objective is to schedule each task so that it is completed by its deadline. One way to view this problem is as a search in a space of start times. Under this view, the problem is a constrained optimization problem in which the variables are the start times, the constraint is that no tasks can overlap, and the objective is not missing deadlines.
One enterprise activity whose scheduling and planning problems have not been adequately addressed by computer-implemented methods is new product development.
Companies rely on new product development to achieve strategic positioning or increase revenue growth. This places an emphasis on optimizing the enterprise's product WO 00/16228 PC'T/US99/20983 portfolio, that is, the selection of what products to make and the associated resource scheduling.
Many existing techniques and tools that have been developed for other types of enterprise management can be applied to portfolio planning. For example, a supply chain management system is available from i2 Technologies, Inc. of Irving, Texas. Many of the modeling structures and processes used for supply chain management can be applied to product development management. However, unique problems that arise in portfolio planning give rise to a need for a model especially formulated for product development.
,gLIMMARy OF THE INVENTION
One aspect of the invention is a system for providing data representing an "optimal" product portfolio, for use in enterprise product development management. The system has an optimizing engine that uses both a genetic algorithm and a constraint engine.
The optimizing engine operates on an enterprise model having the following components:
product models representing products proposed to be manufactured by said enterprise, component models representing components from which products are made, task models representing tasks to be performed in the development of a component, and resource models representing resources available for use in performing tasks. The genetic algorithm is used to provide sequences of products as candidates for the portfolio.
The constraint engine builds a schedules for each sequence, subject to constraints of the model. The genetic algorithm and constraint engine cooperate in an iterative process to evaluate each sequence in terms of constraint violations of constraints associated with the WO 00/16228 PCTlUS99/20983 model, and to provide better sequences. The result of this process is a "best" portfolio, that is, one that best satisfies constraints, as well as data representing a pipeline for developing the portfolio. Constraint violations can be translated to an objective criteria, such as profit such that the optimization is in terms of profit maximization.
An advantage of the invention is that optimizes a product portfolio subject to the constraint of the product pipeline. The system rapidly converges to a good solution but is also able to quickly propagate incremental changes to the schedule.
BRTEF DESCRIPTION OF THE DRAWINGS
FIGURE 1 illustrates a product development management system in accordance with the invention.
FIGURE 2 illustrates the product development model of FIGURE 1.
FIGURE 3 illustrates the process performed by the genetic algorithm and constraint engine of FIGURE 1.
FIGURES 4 - 10 illustrate various views provided by the presentation layer of FIGURE 1.
nETATT,ED DESCRTPTION OF THE INVENTION
FIGURE 1 is a block diagram of the software architecture of a computer implemented product portfolio management system 10 in accordance with the invention.
System 10 can be implemented on a computer having typical computer components, such as a processor, memory, storage devices, and input and output devices. In operation, system 10 is used to present product scenarios and to provide product portfolios that optimize a certain goal, such as profit maximization.
~~~~TCAT_ FTELD OF THE INVENTION
This invention relates to computer implemented management for business enterprises, and more particularly to a system and method for planning a portfolio of products to be developed.
BACKGROLmTD OF THE INVENTION
Computer implemented planning and scheduling systems are increasingly being used in factories and other enterprises. Such systems model the enterprise environment and provide schedules for producing items to fulfill consumer demand within the constraints of the environment.
Typically, planning and scheduling problems can be represented as a constrained optimization problem. For example, consider the problem of sequencing a set of tasks on a single resource in a manufacturing environment. Assume each task has a deadline and that the objective is to schedule each task so that it is completed by its deadline. One way to view this problem is as a search in a space of start times. Under this view, the problem is a constrained optimization problem in which the variables are the start times, the constraint is that no tasks can overlap, and the objective is not missing deadlines.
One enterprise activity whose scheduling and planning problems have not been adequately addressed by computer-implemented methods is new product development.
Companies rely on new product development to achieve strategic positioning or increase revenue growth. This places an emphasis on optimizing the enterprise's product WO 00/16228 PC'T/US99/20983 portfolio, that is, the selection of what products to make and the associated resource scheduling.
Many existing techniques and tools that have been developed for other types of enterprise management can be applied to portfolio planning. For example, a supply chain management system is available from i2 Technologies, Inc. of Irving, Texas. Many of the modeling structures and processes used for supply chain management can be applied to product development management. However, unique problems that arise in portfolio planning give rise to a need for a model especially formulated for product development.
,gLIMMARy OF THE INVENTION
One aspect of the invention is a system for providing data representing an "optimal" product portfolio, for use in enterprise product development management. The system has an optimizing engine that uses both a genetic algorithm and a constraint engine.
The optimizing engine operates on an enterprise model having the following components:
product models representing products proposed to be manufactured by said enterprise, component models representing components from which products are made, task models representing tasks to be performed in the development of a component, and resource models representing resources available for use in performing tasks. The genetic algorithm is used to provide sequences of products as candidates for the portfolio.
The constraint engine builds a schedules for each sequence, subject to constraints of the model. The genetic algorithm and constraint engine cooperate in an iterative process to evaluate each sequence in terms of constraint violations of constraints associated with the WO 00/16228 PCTlUS99/20983 model, and to provide better sequences. The result of this process is a "best" portfolio, that is, one that best satisfies constraints, as well as data representing a pipeline for developing the portfolio. Constraint violations can be translated to an objective criteria, such as profit such that the optimization is in terms of profit maximization.
An advantage of the invention is that optimizes a product portfolio subject to the constraint of the product pipeline. The system rapidly converges to a good solution but is also able to quickly propagate incremental changes to the schedule.
BRTEF DESCRIPTION OF THE DRAWINGS
FIGURE 1 illustrates a product development management system in accordance with the invention.
FIGURE 2 illustrates the product development model of FIGURE 1.
FIGURE 3 illustrates the process performed by the genetic algorithm and constraint engine of FIGURE 1.
FIGURES 4 - 10 illustrate various views provided by the presentation layer of FIGURE 1.
nETATT,ED DESCRTPTION OF THE INVENTION
FIGURE 1 is a block diagram of the software architecture of a computer implemented product portfolio management system 10 in accordance with the invention.
System 10 can be implemented on a computer having typical computer components, such as a processor, memory, storage devices, and input and output devices. In operation, system 10 is used to present product scenarios and to provide product portfolios that optimize a certain goal, such as profit maximization.
The typical user of system 10 is a manufacturing enterprise with some degree of product turnover. Some such enterprises may have tens or hundreds of products in consideration for development at any time. Often, product launch time is critical because of finite sales windows. Examples of such industries are the high-tech, consumer electronics, automotive, and pharmaceutical industries. The enterprise uses system 10 to manage product development activities. That is, system 10 l0 assists in the determination of what products to develop and where and when to develop them.
One component of system 10 is a model 12 of the product development process. As explained below, model 12 models the business enterprise in terms of proposed and active products. Products have components, which require tasks, which use resources. The model 12 represents a product portfolio, as well as its pipeline, that is, the set of all tasks and resources for the portfolio.
Genetic algorithm 13 uses model 12 to generate various product priority sequences, which are then scheduled and evaluated. Constraint engine 14 uses model 12 to builds these schedules, that is, the tasks required to develop products and to assign resources to the tasks. In the example of this description, constraint engine 13 and genetic algorithm 14 are separate processes. However, system 10 could be also used with an engine 13 that integrates the functions of both.
For long term storage, model 12, genetic algorithm 13, and constraint engine 14 are stored in long term storage memory 16. However, during operation of the invention for solving portfolio management problems, these components of system 10 are maintained in active computer memory for speed and efficiency.
A presentation interface 18 provides an interactive visualization for the user. Various views are appropriate for different aspects of the planning process and for different personnel.
One component of system 10 is a model 12 of the product development process. As explained below, model 12 models the business enterprise in terms of proposed and active products. Products have components, which require tasks, which use resources. The model 12 represents a product portfolio, as well as its pipeline, that is, the set of all tasks and resources for the portfolio.
Genetic algorithm 13 uses model 12 to generate various product priority sequences, which are then scheduled and evaluated. Constraint engine 14 uses model 12 to builds these schedules, that is, the tasks required to develop products and to assign resources to the tasks. In the example of this description, constraint engine 13 and genetic algorithm 14 are separate processes. However, system 10 could be also used with an engine 13 that integrates the functions of both.
For long term storage, model 12, genetic algorithm 13, and constraint engine 14 are stored in long term storage memory 16. However, during operation of the invention for solving portfolio management problems, these components of system 10 are maintained in active computer memory for speed and efficiency.
A presentation interface 18 provides an interactive visualization for the user. Various views are appropriate for different aspects of the planning process and for different personnel.
5 System 10 may be implemented using object-oriented techniques. As explained below, object orientation concepts provide a highly interactive user interface as well as an internal representation that fairly represents a complex enterprise.
Typically, system 10 is implemented on a network of computers, such as a client-server system. In fact, the typical application of system 10 will be as a distributed system, where various personnel at different workstations may be provided with information relevant to the decisions encompassed by their job function. For example, as explained below, system 10 provides different views for personnel such as portfolio manager, master planner, line manager, and project manager.
The Product Development Model As illustrated in FIGURE 2, model 12 is comprised of a number of model types, each with associated attributes.
Each model type is used to define model instances. For each model type, the various models derived for them comprise the overall product development model 12.
For example, product model type 21 is used to define various product models, each of which represents a product proposal, that is, a product that the enterprise might produce. Products are described in terms of their breakdown in components. A product may be "active" or "inactive". In general, a product that is included in the product portfolio 26 thereby become an active product; otherwise, it is a product proposal. Examples of other attributes of the product model type 21 are:
Typically, system 10 is implemented on a network of computers, such as a client-server system. In fact, the typical application of system 10 will be as a distributed system, where various personnel at different workstations may be provided with information relevant to the decisions encompassed by their job function. For example, as explained below, system 10 provides different views for personnel such as portfolio manager, master planner, line manager, and project manager.
The Product Development Model As illustrated in FIGURE 2, model 12 is comprised of a number of model types, each with associated attributes.
Each model type is used to define model instances. For each model type, the various models derived for them comprise the overall product development model 12.
For example, product model type 21 is used to define various product models, each of which represents a product proposal, that is, a product that the enterprise might produce. Products are described in terms of their breakdown in components. A product may be "active" or "inactive". In general, a product that is included in the product portfolio 26 thereby become an active product; otherwise, it is a product proposal. Examples of other attributes of the product model type 21 are:
stages, strategic value, and various financial measures.
The latter include projected total life-cycle sales as a function of the product's completion date, as well as a projected production cost that varies over time.
The component model type 22 defines component models, which represent the components of each product.
Examples of other attributes of the component model type 22 are: a task network, sales multipliers, precedence relations to other components, production (not development) costs, and production capacities. The task network for a component is one or more tasks representing the work needed to build the component, and the task durations and dependencies. Components may have profit boosts, such that incorporating an optional component will boost the projected profit for the product. An example of a profit boost, is that including a CD-ROM in a computer will boost profit by 10%. Components can be recursive, in that one component can be part of another component.
Both products 21 and components 22 have priorities.
Priorities are used to determine the order in which tasks are scheduled. Thus, tasks for high priority products and components will have a better chance at obtaining resources.
A task model type 23 defines task models, each of which represents a task required to develop a given component. A task model type 23 has the following attributes: duration, variance, and resource alternatives. Resource alternates result in varying productivity (because of different durations and duration variances) and different costs fox the task.
A resource model type 24 has the following attributes: capacities, calendars, a parent - the aggregation grouping of this resource, and cost structure. Capacity is finite but varies over time. For example, a design group that has six people until March when it will have seven. Resources are modeled hierarchically, enabling a planning funnel that specifies future aggregate plans as well as current specific plans.
Model 12 also provides "views", which are derived from the data of the model. These views, the portfolio 25 and pipeline 25, are constructed by the genetic algorithm 13 and constraint engine 14 and contain subsets of the model data.
A product portfolio view 25 defines a set of active products. The portfolio 25 is the result of a the product development planning process performed by the genetic algorithm 13 and constraint engine 14. Thus, it specifies a resolution of all the options and alternatives among each product's components. The portfolio 25 also specifies a schedule for selected components, that is, assignments of resources and start dates to tasks of those components.
A portfolio 25 has various financial measure attributes. Projected sales and projected costs are derived from bringing products to market according to the portfolio's schedule. A life-cycle cost has two components: development costs and production costs.
Development costs are the sum total of costs for all tasks. Production costs are independently input and can be based on whatever factors the user desires. Projected profit is the projected life-cycle sales less projected costs.
As an example of obtaining costs, assume a selected product has Component Y. This component has certain associated tasks. A particular task might be performed on alternative resources, for example, a market research tasks might be performed an in-house resource or an outsource resource. Likewise, tasks might have timing choices. Because each resource has an associated cost structure, the selection of which tasks to do and when to do them results in a given cost.
A product pipeline view 26 is the set of resources and all the tasks scheduled on (assigned on) the resources for active products. Typically, all resource models will be used in the pipeline. Those tasks associated with selected components of active products will also be part of the pipeline. Like a portfolio 25, a pipeline 26 is the result of the product development planning process.
Optimization of the portfolio 26 means finding a portfolio with as high a profit (or other objective criterion) as possible. The problem is presented to genetic algorithm 13 and constraint engine 14 as a combinatorial search problem, and reduces to finding which component selections, resource selections, and timing selections produce the best portfolio.
The desired goal, such as projected prof it, is optimized subject to various constraints. Examples of constraints are: development capacity, product/feature strategy (priority), time dependent sales, task precedence, frozen development commitments to resources, resource options, and costs. A example of a precedence constraint is that Task B must follow Task A. An example of a resource option constraint is that Task A can be done on Resource 1, 2, or 3, but not on Resource 4 or 5.
Time is represented to the day. The expected usage is that the planning horizon is one year to five years, with daily, weekly and monthly revision of various portions of the model instance data.
In a typical application, the product model type 21, the component model type 22, the task model type 23; and the resource model type 24, provide the initial enterprise model. Values for the model instances and their attributes are provided by the particular user.
Values for the portfolio view 25 and pipeline view 26 are built dynamically during operation of system 10 by the genetic algorithm 13 and constraint engine 14.
An example of dynamically calculated model attributes is product development costs. Development costs are a function of a particular schedule (what resources are used and their timing) and are assigned values during the schedule building process of constraint engine 14. Development costs can be contrasted to projected production costs, which are input to model 12.
However, as explained below, both are factors in finding an optimal product portfolio, for example, one that maximizes profit.
c-'onstra,'_nt Encrine and Genetic Alegori thm A feature of the invention is the use of both genetic algorithm 13 and constraint engine 14. The problem of providing an optimized portfolio is partitioned into two parts: prioritizing a set of products and scheduling tasks required to build a set of products.
In general, as explained in further detail below, genetic algorithm 13 is used to provide prioritized lists (sequences) of products. Constraint engine 14 is used to build a schedule of tasks required to design a given sequence of products, which involves resolving component, resource, and timing choices. In other words, the schedules built by constraint engine 14 resolve the resource choices and timing choices presented by the various task network attributes of components. Although these two components of system 10 are functionally distinct, they can be collectively referred to as an "optimizing engine".
Like conventional genetic algorithms, genetic algorithm 13 derives its behavior from a metaphor of the 5 process of evolution. The processes in nature seem to boil down to objects competing for resources in the environment. Some objects are better equipped for survival and are more likely to survive and propagate their genetic material. In general, a genetic algorithm 10 functions by applying operators (crossover and mutation) to a population of possible solutions referred to as "chromosomes". Crossover is analogous to the (simplified) genetic phenomenon when genetic material crosses over from one chromosome to another. The general process followed by genetic algorithm 14 is to evaluate the fitness of a set (population) of possible solutions (chromosomes). Then create a new population by performing operations such as crossover, reproduction, and mutation. Discard the old population and iterate using the new population.
An example of a genetic algorithm used for computer-implemented scheduling is described in U.S. Patent No.
5,319,781, to G. Syswerda, entitled "Generation of Schedules Using a Genetic Procedure". Such an algorithm could be adapted for use with model 12 of the present invention. Other variations of genetic algorithms could also be used.
A commercially available product that provides both genetic algorithm 13 and constraint engine 14 is the RHYTHM OPTIMAL SCHEDULER tool, part of the RHYTHM family of products, from i2 Technologies, Inc. These tools could be adapted for use with model 12 to solve the problems to which the present invention is directed.
The latter include projected total life-cycle sales as a function of the product's completion date, as well as a projected production cost that varies over time.
The component model type 22 defines component models, which represent the components of each product.
Examples of other attributes of the component model type 22 are: a task network, sales multipliers, precedence relations to other components, production (not development) costs, and production capacities. The task network for a component is one or more tasks representing the work needed to build the component, and the task durations and dependencies. Components may have profit boosts, such that incorporating an optional component will boost the projected profit for the product. An example of a profit boost, is that including a CD-ROM in a computer will boost profit by 10%. Components can be recursive, in that one component can be part of another component.
Both products 21 and components 22 have priorities.
Priorities are used to determine the order in which tasks are scheduled. Thus, tasks for high priority products and components will have a better chance at obtaining resources.
A task model type 23 defines task models, each of which represents a task required to develop a given component. A task model type 23 has the following attributes: duration, variance, and resource alternatives. Resource alternates result in varying productivity (because of different durations and duration variances) and different costs fox the task.
A resource model type 24 has the following attributes: capacities, calendars, a parent - the aggregation grouping of this resource, and cost structure. Capacity is finite but varies over time. For example, a design group that has six people until March when it will have seven. Resources are modeled hierarchically, enabling a planning funnel that specifies future aggregate plans as well as current specific plans.
Model 12 also provides "views", which are derived from the data of the model. These views, the portfolio 25 and pipeline 25, are constructed by the genetic algorithm 13 and constraint engine 14 and contain subsets of the model data.
A product portfolio view 25 defines a set of active products. The portfolio 25 is the result of a the product development planning process performed by the genetic algorithm 13 and constraint engine 14. Thus, it specifies a resolution of all the options and alternatives among each product's components. The portfolio 25 also specifies a schedule for selected components, that is, assignments of resources and start dates to tasks of those components.
A portfolio 25 has various financial measure attributes. Projected sales and projected costs are derived from bringing products to market according to the portfolio's schedule. A life-cycle cost has two components: development costs and production costs.
Development costs are the sum total of costs for all tasks. Production costs are independently input and can be based on whatever factors the user desires. Projected profit is the projected life-cycle sales less projected costs.
As an example of obtaining costs, assume a selected product has Component Y. This component has certain associated tasks. A particular task might be performed on alternative resources, for example, a market research tasks might be performed an in-house resource or an outsource resource. Likewise, tasks might have timing choices. Because each resource has an associated cost structure, the selection of which tasks to do and when to do them results in a given cost.
A product pipeline view 26 is the set of resources and all the tasks scheduled on (assigned on) the resources for active products. Typically, all resource models will be used in the pipeline. Those tasks associated with selected components of active products will also be part of the pipeline. Like a portfolio 25, a pipeline 26 is the result of the product development planning process.
Optimization of the portfolio 26 means finding a portfolio with as high a profit (or other objective criterion) as possible. The problem is presented to genetic algorithm 13 and constraint engine 14 as a combinatorial search problem, and reduces to finding which component selections, resource selections, and timing selections produce the best portfolio.
The desired goal, such as projected prof it, is optimized subject to various constraints. Examples of constraints are: development capacity, product/feature strategy (priority), time dependent sales, task precedence, frozen development commitments to resources, resource options, and costs. A example of a precedence constraint is that Task B must follow Task A. An example of a resource option constraint is that Task A can be done on Resource 1, 2, or 3, but not on Resource 4 or 5.
Time is represented to the day. The expected usage is that the planning horizon is one year to five years, with daily, weekly and monthly revision of various portions of the model instance data.
In a typical application, the product model type 21, the component model type 22, the task model type 23; and the resource model type 24, provide the initial enterprise model. Values for the model instances and their attributes are provided by the particular user.
Values for the portfolio view 25 and pipeline view 26 are built dynamically during operation of system 10 by the genetic algorithm 13 and constraint engine 14.
An example of dynamically calculated model attributes is product development costs. Development costs are a function of a particular schedule (what resources are used and their timing) and are assigned values during the schedule building process of constraint engine 14. Development costs can be contrasted to projected production costs, which are input to model 12.
However, as explained below, both are factors in finding an optimal product portfolio, for example, one that maximizes profit.
c-'onstra,'_nt Encrine and Genetic Alegori thm A feature of the invention is the use of both genetic algorithm 13 and constraint engine 14. The problem of providing an optimized portfolio is partitioned into two parts: prioritizing a set of products and scheduling tasks required to build a set of products.
In general, as explained in further detail below, genetic algorithm 13 is used to provide prioritized lists (sequences) of products. Constraint engine 14 is used to build a schedule of tasks required to design a given sequence of products, which involves resolving component, resource, and timing choices. In other words, the schedules built by constraint engine 14 resolve the resource choices and timing choices presented by the various task network attributes of components. Although these two components of system 10 are functionally distinct, they can be collectively referred to as an "optimizing engine".
Like conventional genetic algorithms, genetic algorithm 13 derives its behavior from a metaphor of the 5 process of evolution. The processes in nature seem to boil down to objects competing for resources in the environment. Some objects are better equipped for survival and are more likely to survive and propagate their genetic material. In general, a genetic algorithm 10 functions by applying operators (crossover and mutation) to a population of possible solutions referred to as "chromosomes". Crossover is analogous to the (simplified) genetic phenomenon when genetic material crosses over from one chromosome to another. The general process followed by genetic algorithm 14 is to evaluate the fitness of a set (population) of possible solutions (chromosomes). Then create a new population by performing operations such as crossover, reproduction, and mutation. Discard the old population and iterate using the new population.
An example of a genetic algorithm used for computer-implemented scheduling is described in U.S. Patent No.
5,319,781, to G. Syswerda, entitled "Generation of Schedules Using a Genetic Procedure". Such an algorithm could be adapted for use with model 12 of the present invention. Other variations of genetic algorithms could also be used.
A commercially available product that provides both genetic algorithm 13 and constraint engine 14 is the RHYTHM OPTIMAL SCHEDULER tool, part of the RHYTHM family of products, from i2 Technologies, Inc. These tools could be adapted for use with model 12 to solve the problems to which the present invention is directed.
For purposes of the present invention, optimization can be posed as the following search problem: find a prioritization of products that optimizes projected profit when building a schedule against finite resources.
The search space is a combination of choices of product priority, product configuration, execution strategy (e. g.
make or buy), and execution time. As an example, an optimization problem might involve 200 product proposals, each with 10 options for different component configurations, each configuration generating a high-level factory order (routing) with 1.5 alternate resources at each operation and perhaps a year's time horizon.
Each chromosome of the genetic algorithm 13 represents a set of products having a particular prioritization, i.e., a product sequence.
"Prioritization" as used herein means the ability of a product to obtain its preferred resources at its preferred times. A particular sequence of products represented by a chromosome corresponds to a prioritization of those products.
Priority can be a combination of user-input values and values assigned by genetic algorithm 13. For example, a set of 200 product proposals might be input to model 12 (by assigned values to product models 21) with 5 different priority categories, i.e., Priority Categories 1 - 5. In this case, genetic algorithm 13 can be used to resolve priorities within each category.
For a given set of products, say 50 products of Priority Category X, there will be 50! possible prioritizations (sequences). For a given sequence, constraint engine 14 is used to build an optimal schedule, to evaluate the schedule, and to assign a score to the schedule. This score is derived from a sum of penalty violations, if any, for each constraint. The score is then attached to the chromosome associated with the sequence. Genetic algorithm 13 then uses the chromosome and its score to regenerate new chromosomes.
FIGURE 3 illustrates the process of the optimizing engine (genetic algorithm 13 and constraint engine 14).
In Step 31, the genetic algorithm 13 generates a trial sequence of products. This trial sequence can be deemed a "proposed portfolio". In Step 32, the constraint engine 14 generates a schedule for this sequence, and in Step 33, it evaluates the schedule with a score. Step 34 is determining whether the sequence and schedule are the best so far, where "best" is determined by an objective criterion such as profit maximization. If not, the sequence and the score are returned to the genetic algorithm 13, which generates a new (and potentially better) sequence.
A feature of system 10 is its ability to provide either incremental or global optimization, as well as to respond to what-if hypotheses. For example, an incremental optimization might be requested if a certain component has failed. System 10 can be used to provide an alternative solution. A global optimization provides a proposed portfolio that optimizes a specified goal, such as profit. A model editing view for inputting "what-if" type queries is described below in connection with FIGURE 9.
prPCPntat~on Interface The presentation interface 18 supports a number of views, defined as displays that provide graphic representations of the model 12. Model 12 can be viewed differently for different purposes, such as when different personnel use model 12 for decision-making and monitoring relevant to their particular role in product development. As indicated below, views fall into three main categories: financial, program management, and resource allocation. All types of views can be used for both reporting and querying.
As illustrated, the screen displays are in a windows-type format, with graphical interface features commonly associated with this type of format. The user interacts with presentation layer 18 by using standard interface tools, such as a keyboard input and cursor movement with a pointing device (mouse). Various tool bars, menu bars, and file identifiers, above and below the displays, which are generic to windows-type displays, are not shown.
FIGURE 4 is an example of a product definition view 40 of system 10. View 40 defines potential products and components, and has several windows 40a - 40c. In the example of view 40, the product is an automobile -- one of its components, a die, is shown with its various tasks. In window 40a, the product is viewed graphically in a "tree" structure. The tasks associated with a particular component can be viewed, such as those listed under Die CX322. Task window 40b lists these tasks with their start dates, end dates, and durations. Task window 40b also illustrates a task network, with dependency links between tasks. Completing a task network completes the design of the component. A resource window 40c illustrates the tasks required to design a specified component.
FIGURE 5 illustrates view 40 with task window 40b replaced by resource schedule window 4od. As stated above, for a given task network associated with a component, once component, resource, and timing choices have been made, either manually or by constraint engine 14, a schedule can be displayed in window 40c. The combination of schedules for a complete portfolio comprises the pipeline view 25.
FIGURE 6 illustrates a portfolio view 60 of model 12. View 60 lists each of the product models 21 selected for the portfolio, together with timing and financial data. The financial attributes associated with the portfolio, as described above, are used to provide portfolio summary financial detail.
FIGURE 7 illustrates a task progress view 70 of model 12. This view 60 illustrates, for a selected product, task progress, and variations from predicted timing.
FIGURE 8 is a sales projection view 80 of a product model 12. As stated above, each product has a projected sales attribute, which is used to provide view 80.
FIGURE 9 is an "add project" view 90, illustrating the "what-if" capabilities of constraint engine 14. View 90 permits the user to add a product model 21 to portfolio 25. Engine 14 modifies the pipeline model 25, and calculates and displays the financial results.
FIGURE 10 illustrates a scenario editor view 100.
View 100 permits a manager or other personnel to create an investment scenario consisting of investments (or divestments) in various resource models 24. Constraint engine 14 then calculates financial results based on the current portfolio 25 and pipeline 26 and displays these results (not shown).
Other Embodiments Although the present invention has been described in detail, it should be understood that various changes, substitutions, and alterations can be made hereto without departing from the spirit and scope of the invention as defined by the appended claims.
The search space is a combination of choices of product priority, product configuration, execution strategy (e. g.
make or buy), and execution time. As an example, an optimization problem might involve 200 product proposals, each with 10 options for different component configurations, each configuration generating a high-level factory order (routing) with 1.5 alternate resources at each operation and perhaps a year's time horizon.
Each chromosome of the genetic algorithm 13 represents a set of products having a particular prioritization, i.e., a product sequence.
"Prioritization" as used herein means the ability of a product to obtain its preferred resources at its preferred times. A particular sequence of products represented by a chromosome corresponds to a prioritization of those products.
Priority can be a combination of user-input values and values assigned by genetic algorithm 13. For example, a set of 200 product proposals might be input to model 12 (by assigned values to product models 21) with 5 different priority categories, i.e., Priority Categories 1 - 5. In this case, genetic algorithm 13 can be used to resolve priorities within each category.
For a given set of products, say 50 products of Priority Category X, there will be 50! possible prioritizations (sequences). For a given sequence, constraint engine 14 is used to build an optimal schedule, to evaluate the schedule, and to assign a score to the schedule. This score is derived from a sum of penalty violations, if any, for each constraint. The score is then attached to the chromosome associated with the sequence. Genetic algorithm 13 then uses the chromosome and its score to regenerate new chromosomes.
FIGURE 3 illustrates the process of the optimizing engine (genetic algorithm 13 and constraint engine 14).
In Step 31, the genetic algorithm 13 generates a trial sequence of products. This trial sequence can be deemed a "proposed portfolio". In Step 32, the constraint engine 14 generates a schedule for this sequence, and in Step 33, it evaluates the schedule with a score. Step 34 is determining whether the sequence and schedule are the best so far, where "best" is determined by an objective criterion such as profit maximization. If not, the sequence and the score are returned to the genetic algorithm 13, which generates a new (and potentially better) sequence.
A feature of system 10 is its ability to provide either incremental or global optimization, as well as to respond to what-if hypotheses. For example, an incremental optimization might be requested if a certain component has failed. System 10 can be used to provide an alternative solution. A global optimization provides a proposed portfolio that optimizes a specified goal, such as profit. A model editing view for inputting "what-if" type queries is described below in connection with FIGURE 9.
prPCPntat~on Interface The presentation interface 18 supports a number of views, defined as displays that provide graphic representations of the model 12. Model 12 can be viewed differently for different purposes, such as when different personnel use model 12 for decision-making and monitoring relevant to their particular role in product development. As indicated below, views fall into three main categories: financial, program management, and resource allocation. All types of views can be used for both reporting and querying.
As illustrated, the screen displays are in a windows-type format, with graphical interface features commonly associated with this type of format. The user interacts with presentation layer 18 by using standard interface tools, such as a keyboard input and cursor movement with a pointing device (mouse). Various tool bars, menu bars, and file identifiers, above and below the displays, which are generic to windows-type displays, are not shown.
FIGURE 4 is an example of a product definition view 40 of system 10. View 40 defines potential products and components, and has several windows 40a - 40c. In the example of view 40, the product is an automobile -- one of its components, a die, is shown with its various tasks. In window 40a, the product is viewed graphically in a "tree" structure. The tasks associated with a particular component can be viewed, such as those listed under Die CX322. Task window 40b lists these tasks with their start dates, end dates, and durations. Task window 40b also illustrates a task network, with dependency links between tasks. Completing a task network completes the design of the component. A resource window 40c illustrates the tasks required to design a specified component.
FIGURE 5 illustrates view 40 with task window 40b replaced by resource schedule window 4od. As stated above, for a given task network associated with a component, once component, resource, and timing choices have been made, either manually or by constraint engine 14, a schedule can be displayed in window 40c. The combination of schedules for a complete portfolio comprises the pipeline view 25.
FIGURE 6 illustrates a portfolio view 60 of model 12. View 60 lists each of the product models 21 selected for the portfolio, together with timing and financial data. The financial attributes associated with the portfolio, as described above, are used to provide portfolio summary financial detail.
FIGURE 7 illustrates a task progress view 70 of model 12. This view 60 illustrates, for a selected product, task progress, and variations from predicted timing.
FIGURE 8 is a sales projection view 80 of a product model 12. As stated above, each product has a projected sales attribute, which is used to provide view 80.
FIGURE 9 is an "add project" view 90, illustrating the "what-if" capabilities of constraint engine 14. View 90 permits the user to add a product model 21 to portfolio 25. Engine 14 modifies the pipeline model 25, and calculates and displays the financial results.
FIGURE 10 illustrates a scenario editor view 100.
View 100 permits a manager or other personnel to create an investment scenario consisting of investments (or divestments) in various resource models 24. Constraint engine 14 then calculates financial results based on the current portfolio 25 and pipeline 26 and displays these results (not shown).
Other Embodiments Although the present invention has been described in detail, it should be understood that various changes, substitutions, and alterations can be made hereto without departing from the spirit and scope of the invention as defined by the appended claims.
Claims (20)
1. A computer system for modeling product development for use in enterprise product management on the computer system and maintained and manipulated by an optimizing engine, comprising:
a plurality of product models defined from a product model type and stored by the computer system, each product model representing a product proposed to be manufactured by said enterprise;
a plurality of component models defined from a component model type and stored by the computer system, each component model representing a component from which a product is made;
a plurality of task models defined from a task model type and stored by the computer system, each task model representing a task to be performed in the development of a component;
a plurality of resource models defined from a resource model type and stored by the computer system, each resource model representing a resource available for use in performing a task;
at least one pipeline view that represents a set of tasks and assigned resources for producing a set of products as determined by said optimizing engine; and at least one product portfolio view that represents a set of said products, as determined by said optimizing engine.
a plurality of product models defined from a product model type and stored by the computer system, each product model representing a product proposed to be manufactured by said enterprise;
a plurality of component models defined from a component model type and stored by the computer system, each component model representing a component from which a product is made;
a plurality of task models defined from a task model type and stored by the computer system, each task model representing a task to be performed in the development of a component;
a plurality of resource models defined from a resource model type and stored by the computer system, each resource model representing a resource available for use in performing a task;
at least one pipeline view that represents a set of tasks and assigned resources for producing a set of products as determined by said optimizing engine; and at least one product portfolio view that represents a set of said products, as determined by said optimizing engine.
2. The system of Claim 1, wherein said optimizing engine has a genetic algorithm for providing candidate portfolios for said portfolio view.
3. The system of Claim 1, wherein chromosomes of said genetic algorithm represent potential product sequences.
4. The system of Claim 1, wherein said optimizing engine has a constraint engine for building candidate schedules for said pipeline view, wherein said constraint engine builds said schedules subject to constraints associated with said model.
5. The system of Claim 4, wherein said constraint engine evaluates each schedule with a score based on whether said constraints are violated.
6. The system of Claim 1, wherein said portfolio view provides financial measures associated with said portfolio.
7. The system of Claim 1, wherein said task model type has a resource alternative attribute representing alternative resources for performing a task.
8. The system of Claim 1, wherein said component model type has a task network attribute representing the tasks for providing a component.
9. The system of Claim 1, wherein said resource model type has a capacity attribute representing rules for allocating resources to tasks.
10. A system for providing data representing a product portfolio for use in enterprise product development management on the computer system, comprising:
an optimizing engine having a genetic algorithm and a constraint engine;
an enterprise model having the following components:
a plurality of product models defined from a product model type and stored by the computer system, each product model representing a product proposed to be manufactured by said enterprise; a plurality of component models defined from a component model type and stored by the computer system, each component model representing a component from which a product is made; a plurality of task models defined from a task model type and stored by the computer system, each task model representing a task to be performed in the development of a component; a plurality of resource models defined from a resource model type and stored by the computer system, each resource model representing a resource available for use in performing a task; at least one pipeline model view representing a set of tasks and assigned resources for producing a set of products; and at least one product portfolio view representing a set of said products;
wherein said genetic algorithm is operable to provide sequences of products as candidates for said portfolio view;
wherein said constraint engine is operable to provide schedules for said sequences subject to constraints of said model; and wherein said genetic algorithm and said constraint engine cooperate to evaluate said sequences in terms of constraint violations and to improve said sequences, thereby providing said portfolio view and said pipeline view.
an optimizing engine having a genetic algorithm and a constraint engine;
an enterprise model having the following components:
a plurality of product models defined from a product model type and stored by the computer system, each product model representing a product proposed to be manufactured by said enterprise; a plurality of component models defined from a component model type and stored by the computer system, each component model representing a component from which a product is made; a plurality of task models defined from a task model type and stored by the computer system, each task model representing a task to be performed in the development of a component; a plurality of resource models defined from a resource model type and stored by the computer system, each resource model representing a resource available for use in performing a task; at least one pipeline model view representing a set of tasks and assigned resources for producing a set of products; and at least one product portfolio view representing a set of said products;
wherein said genetic algorithm is operable to provide sequences of products as candidates for said portfolio view;
wherein said constraint engine is operable to provide schedules for said sequences subject to constraints of said model; and wherein said genetic algorithm and said constraint engine cooperate to evaluate said sequences in terms of constraint violations and to improve said sequences, thereby providing said portfolio view and said pipeline view.
11. The system of Claim 10, wherein said optimizing engine is operable to respond to variations in said model input by a user, by modifying said portfolio view as incrementally affected by said variation.
12. The system of Claim 10, wherein chromosomes of said genetic algorithm represent potential product priorities.
13. The system of Claim 10, wherein said constraint engine evaluates each schedule with a score based on whether said constraints are violated.
14. The system of Claim 10, wherein said portfolio view provides financial measures associated with said portfolio.
15. The system of Claim 10, wherein said task model further represents resource alternatives for performing tasks.
16. The system of Claim 10, wherein said component model type has a task network attribute representing the tasks for providing a component.
17. The system of Claim 10, wherein said sequences are evaluated such that profit from said sequence is maximized.
18. The system of Claim l0, further comprising a presentation layer for providing displays of said views and said model.
19. The system of Claim 10, wherein said resource model type has a capacity attribute representing rules for allocating resources to tasks.
20. A method of providing data representing a product portfolio for use in enterprise product development management on the computer system, comprising the steps of:
modeling said enterprise with an enterprise model having at least the following components: a plurality of product models defined from a product model type and stored by the computer system, each product model representing a product proposed to be manufactured by said enterprise; a plurality of component models defined from a component model type and stored by the computer system, each component model representing a component from which a product is made; a plurality of task models defined from a task model type and stored by the computer system, each task model representing a task to be performed in the development of a component; a plurality of resource models defined from a resource model type and stored by the computer system, each resource model representing a resource available for use in performing a task and rules for allocating the resource to the task;
selecting a sequence of said products as a candidate portfolio;
building a schedule for said sequence, said building step being performed with a constraint engine that builds said schedule subject to constraints of said model;
evaluating said sequence in terms of violations of said constraints;
generating a new sequence based on the results of said evaluating step, said generating step being performed by a genetic algorithm; and repeating said building, evaluating, and generating steps for a number of iterations.
modeling said enterprise with an enterprise model having at least the following components: a plurality of product models defined from a product model type and stored by the computer system, each product model representing a product proposed to be manufactured by said enterprise; a plurality of component models defined from a component model type and stored by the computer system, each component model representing a component from which a product is made; a plurality of task models defined from a task model type and stored by the computer system, each task model representing a task to be performed in the development of a component; a plurality of resource models defined from a resource model type and stored by the computer system, each resource model representing a resource available for use in performing a task and rules for allocating the resource to the task;
selecting a sequence of said products as a candidate portfolio;
building a schedule for said sequence, said building step being performed with a constraint engine that builds said schedule subject to constraints of said model;
evaluating said sequence in terms of violations of said constraints;
generating a new sequence based on the results of said evaluating step, said generating step being performed by a genetic algorithm; and repeating said building, evaluating, and generating steps for a number of iterations.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/154,373 | 1998-09-16 | ||
US09/154,373 US6233493B1 (en) | 1998-09-16 | 1998-09-16 | Computer-implemented product development planning method |
PCT/US1999/020983 WO2000016228A1 (en) | 1998-09-16 | 1999-09-10 | Computer-implemented product development planning method |
Publications (1)
Publication Number | Publication Date |
---|---|
CA2342942A1 true CA2342942A1 (en) | 2000-03-23 |
Family
ID=22551107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002342942A Abandoned CA2342942A1 (en) | 1998-09-16 | 1999-09-10 | Computer-implemented product development planning method |
Country Status (9)
Country | Link |
---|---|
US (1) | US6233493B1 (en) |
EP (2) | EP1359529A1 (en) |
JP (1) | JP2002525715A (en) |
KR (1) | KR20010079838A (en) |
AU (1) | AU6036899A (en) |
CA (1) | CA2342942A1 (en) |
MX (1) | MXPA01002771A (en) |
TW (1) | TW494327B (en) |
WO (1) | WO2000016228A1 (en) |
Families Citing this family (100)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6487469B1 (en) * | 1998-11-13 | 2002-11-26 | Texas Instruments Incorporated | System and method for integrating schedule and design environments |
JP2002535748A (en) * | 1999-01-15 | 2002-10-22 | ビックネル, コンサルティング, インコーポレイテッド | An integrated product development system that integrates content |
US20030018511A1 (en) * | 1999-01-15 | 2003-01-23 | Bicknell Barbara A. | Adaptable integrated-content product development system |
US6631413B1 (en) * | 1999-01-28 | 2003-10-07 | International Business Machines Corporation | Method for optimizing profits in electronic delivery of digital objects |
US7130809B1 (en) * | 1999-10-08 | 2006-10-31 | I2 Technology Us, Inc. | System for planning a new product portfolio |
US7139719B1 (en) | 1999-10-08 | 2006-11-21 | I2 Technologies Us, Inc. | System for scheduling product planning |
US7668743B2 (en) * | 1999-12-06 | 2010-02-23 | Toyota Jidosha Kabushiki Kaisha | Demand-production scheme planning apparatus, and storage medium |
US6714827B1 (en) * | 1999-12-21 | 2004-03-30 | Daimlerchrysler Corporation | Method for scheduling a project to design and manufacture a multi-component assembly |
JP4529213B2 (en) * | 2000-01-19 | 2010-08-25 | 富士ゼロックス株式会社 | Element organization support apparatus and storage medium on which element organization support program is recorded |
US7206751B2 (en) * | 2000-03-23 | 2007-04-17 | Sap Ag | Value chain optimization system and method |
US7280973B1 (en) * | 2000-03-23 | 2007-10-09 | Sap Ag | Value chain optimization system and method |
US6578004B1 (en) * | 2000-04-27 | 2003-06-10 | Prosight, Ltd. | Method and apparatus for facilitating management of information technology investment |
JP2001312610A (en) * | 2000-04-28 | 2001-11-09 | Nec Corp | System and method for m and a plan development |
US7542948B2 (en) * | 2000-06-16 | 2009-06-02 | Honda Giken Kogyo Kabushiki Kaisha | Genetic design method and apparatus |
MXPA02012644A (en) * | 2000-06-30 | 2003-09-22 | Teijin Ltd | Production planning method and system for production planning. |
US7627493B1 (en) * | 2000-08-25 | 2009-12-01 | SCA Holdings | Production and distribution supply chain optimization software |
US20020082950A1 (en) * | 2000-09-06 | 2002-06-27 | Johnson Controls Technology Company | Product planning, development and program management information system and method |
US7283971B1 (en) * | 2000-09-06 | 2007-10-16 | Masterlink Corporation | System and method for managing mobile workers |
US8190463B2 (en) * | 2000-09-06 | 2012-05-29 | Masterlink Corporation | System and method for managing mobile workers |
US6510547B1 (en) * | 2000-10-20 | 2003-01-21 | Xilinx, Inc. | Method and apparatus for evolving an object using simulated annealing and genetic processing techniques |
US20020095307A1 (en) * | 2000-10-27 | 2002-07-18 | Manugistics, Inc. | System and method for inventory and capacity availability management |
WO2002035437A1 (en) * | 2000-10-27 | 2002-05-02 | Manugistics, Inc. | System and method for ensuring order fulfillment |
US6862585B2 (en) | 2000-12-19 | 2005-03-01 | The Procter & Gamble Company | System and method for managing product development |
US20020099583A1 (en) * | 2001-01-24 | 2002-07-25 | Matusek Lawrence W. | Architecture and techniques for providing product configurations to an enterprise resource planner |
US20020111850A1 (en) * | 2001-02-12 | 2002-08-15 | Chevron Oronite Company Llc | System and method for new product clearance and development |
US8214501B1 (en) | 2001-03-02 | 2012-07-03 | At&T Intellectual Property I, L.P. | Methods and systems for electronic data exchange utilizing centralized management technology |
US6801818B2 (en) * | 2001-03-14 | 2004-10-05 | The Procter & Gamble Company | Distributed product development |
DE10120151A1 (en) * | 2001-04-25 | 2002-11-07 | Mitan Wirtschaftssoftware Ag | Method for processing technical variants of product in PPS-/ERP-systems, involves using parts lists with functional requests carried out in external function-systems |
US7716332B1 (en) | 2001-06-20 | 2010-05-11 | At&T Intellectual Property I, L.P. | System and method for server-based predictive caching of back-end system data |
US8914300B2 (en) | 2001-08-10 | 2014-12-16 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US8417360B2 (en) * | 2001-08-10 | 2013-04-09 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US20090204237A1 (en) * | 2001-08-10 | 2009-08-13 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US9729639B2 (en) * | 2001-08-10 | 2017-08-08 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US7797062B2 (en) * | 2001-08-10 | 2010-09-14 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US20090210081A1 (en) * | 2001-08-10 | 2009-08-20 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US6984198B2 (en) * | 2001-08-14 | 2006-01-10 | Applied Materials, Inc. | Experiment management system, method and medium |
US20030069869A1 (en) * | 2001-10-05 | 2003-04-10 | Jane Gronau | Computer aided strategic planning systems and methods |
US6961732B2 (en) | 2001-12-18 | 2005-11-01 | General Electric Company | Web based process capability data collection and reporting system |
US20030135429A1 (en) * | 2002-01-11 | 2003-07-17 | Jean-Luc Pous | Custom engineered product system and process |
EP1345167A1 (en) * | 2002-03-12 | 2003-09-17 | BRITISH TELECOMMUNICATIONS public limited company | Method of combinatorial multimodal optimisation |
JP3735079B2 (en) * | 2002-03-15 | 2006-01-11 | 株式会社日立製作所 | Device and method for planning the order of introduction of automobile production line |
US7801976B2 (en) * | 2002-05-28 | 2010-09-21 | At&T Intellectual Property I, L.P. | Service-oriented architecture systems and methods |
US20030233268A1 (en) * | 2002-06-17 | 2003-12-18 | Ehsan Taqbeem | Multi-dimensional interdependency based project management |
US20040044555A1 (en) * | 2002-09-04 | 2004-03-04 | Bangs Richard Alan | Systems, apparatus, and methods for facilitating product development |
US7159206B1 (en) * | 2002-11-26 | 2007-01-02 | Unisys Corporation | Automated process execution for project management |
US7469217B2 (en) * | 2002-12-10 | 2008-12-23 | Savvis Communications Corporation | Product toolkit system and method |
US7213007B2 (en) | 2002-12-24 | 2007-05-01 | Caterpillar Inc | Method for forecasting using a genetic algorithm |
US20040243459A1 (en) * | 2003-01-24 | 2004-12-02 | Geritz William F. | System and method for automating business development |
US7664664B2 (en) * | 2003-04-23 | 2010-02-16 | Oracle International Corporation | Methods and systems for portfolio planning |
US7139629B2 (en) * | 2003-04-28 | 2006-11-21 | Palo Alto Research Center Incorporated | Planning and scheduling for failure recovery system and method |
US20050015742A1 (en) * | 2003-05-19 | 2005-01-20 | Eric Wood | Methods and systems for facilitating data processing workflow |
US20050027577A1 (en) * | 2003-07-30 | 2005-02-03 | Saeed Baruch I. | Architecture for general purpose business planning optimization system and methods therefor |
US7426701B2 (en) * | 2003-09-08 | 2008-09-16 | Chrysler Llc | Interactive drill down tool |
US7043320B1 (en) * | 2003-10-16 | 2006-05-09 | Jrg Software, Inc. | Method and apparatus for planning a manufacturing schedule using an adaptive learning process |
US20050246221A1 (en) * | 2004-02-13 | 2005-11-03 | Geritz William F Iii | Automated system and method for determination and reporting of business development opportunities |
NZ533494A (en) * | 2004-06-09 | 2006-12-22 | Total Comm Ltd | Dynamic business enhancement system |
US20060085205A1 (en) * | 2004-10-08 | 2006-04-20 | Sampath Kumar | Method, program and system for the implementation of cognitive business processes |
US20060080159A1 (en) * | 2004-10-08 | 2006-04-13 | Sampath Kumar | Method, program and system for the implementation of cognitive business processes in a sales enterprise |
US7793294B2 (en) * | 2005-02-22 | 2010-09-07 | Northrop Grumman Corporation | System for scheduling tasks within an available schedule time period based on an earliest possible end time of the task |
US7958037B2 (en) * | 2005-03-23 | 2011-06-07 | Hewlett-Packard Development Company, L.P. | Method and apparatus for product selection |
US7668788B2 (en) * | 2005-06-06 | 2010-02-23 | Wren William E | Resource assignment optimization using direct encoding and genetic algorithms |
US20070106410A1 (en) * | 2005-11-09 | 2007-05-10 | The Boeing Company | Systems and methods for production planning by visualizing products and resources in a manufacturing process |
US8996151B2 (en) * | 2005-11-09 | 2015-03-31 | The Boeing Company | Visualization of product build using precedence transversal method |
US20070156424A1 (en) * | 2006-01-03 | 2007-07-05 | General Electric Company | Tool and method for quantifying product technical merit to facilitate product selection |
US20070156425A1 (en) * | 2006-01-03 | 2007-07-05 | General Electric Company | Using optimization algorithm for quantifying product technical merit to facilitate product selection |
US20070288300A1 (en) * | 2006-06-13 | 2007-12-13 | Vandenbogart Thomas William | Use of physical and virtual composite prototypes to reduce product development cycle time |
US20080071590A1 (en) * | 2006-09-15 | 2008-03-20 | Bin Zhang | Solving a model to select members of a portfolio |
US20080154808A1 (en) * | 2006-10-20 | 2008-06-26 | Genalytics, Inc. | Use and construction of time series interactions in a predictive model |
US20080154809A1 (en) * | 2006-10-20 | 2008-06-26 | Genalytics, Inc. | Use and construction of categorical interactions using a rule gene in a predictive model |
US20080228544A1 (en) * | 2007-03-15 | 2008-09-18 | Bd Metrics | Method and system for developing an audience of buyers and obtaining their behavioral preferences using event keywords |
US8069127B2 (en) * | 2007-04-26 | 2011-11-29 | 21 Ct, Inc. | Method and system for solving an optimization problem with dynamic constraints |
US20080270151A1 (en) * | 2007-04-26 | 2008-10-30 | Bd Metrics | Method and system for developing an audience of buyers and obtaining their behavioral preferences to promote commerce on a communication network |
US20080294723A1 (en) * | 2007-05-22 | 2008-11-27 | Bank Of America Corporation | Business Process Automation |
US20090216576A1 (en) * | 2008-02-21 | 2009-08-27 | Maxager Technology, Inc. | Method for constrained business plan optimization based on attributes |
US20100063831A1 (en) * | 2008-09-11 | 2010-03-11 | Gm Global Technology Operations, Inc. | Visualizing revenue management trade-offs via a two-dimensional pareto curve showing measures of overall volume or share versus measures of overall profitability or adjusted revenue |
TWI391839B (en) * | 2009-01-17 | 2013-04-01 | Univ Nat Taiwan Science Tech | System and method for assigning resources of semiconductor industry |
US20110167018A1 (en) * | 2010-01-04 | 2011-07-07 | Vicki Hamilton | Prioritizing and Tracking Investments |
US8306943B2 (en) * | 2010-03-04 | 2012-11-06 | NTelx, Inc. | Seasonality-based rules for data anomaly detection |
US20130226660A1 (en) * | 2010-03-04 | 2013-08-29 | Lusine Yepremyan | Cyclicality-Based Rules for Data Anomaly Detection |
US8713525B2 (en) * | 2010-03-25 | 2014-04-29 | International Business Machines Corporation | Software management system for network data processing systems |
US20120185286A1 (en) * | 2011-01-17 | 2012-07-19 | Palo Alto Research Center Incorporated | Online continual automated planning framework based on timelines |
US11676090B2 (en) | 2011-11-29 | 2023-06-13 | Model N, Inc. | Enhanced multi-component object-based design, computation, and evaluation |
CN104220943B (en) * | 2012-03-23 | 2016-06-15 | 株式会社日立制作所 | The production schedule formulates determining method and production schedule making device |
US9141581B2 (en) * | 2012-07-25 | 2015-09-22 | Sap Se | Production scheduling management |
US10373066B2 (en) | 2012-12-21 | 2019-08-06 | Model N. Inc. | Simplified product configuration using table-based rules, rule conflict resolution through voting, and efficient model compilation |
US9466026B2 (en) | 2012-12-21 | 2016-10-11 | Model N, Inc. | Rule assignments and templating |
US11074643B1 (en) | 2012-12-21 | 2021-07-27 | Model N, Inc. | Method and systems for efficient product navigation and product configuration |
US20140344007A1 (en) * | 2013-05-20 | 2014-11-20 | Honeywell International Inc. | Plant operating point determination by integrating profit profile and risk profile |
TWI502523B (en) * | 2013-09-11 | 2015-10-01 | Nat Univ Tsing Hua | Multi-objective semiconductor product capacity planning system and method thereof |
US20150112636A1 (en) * | 2013-10-23 | 2015-04-23 | Caterpillar Inc. | Systems and methods for forecasting using cartesian genetic programming |
US10503499B2 (en) * | 2015-12-04 | 2019-12-10 | David Anthony Bishop | Methods and systems for managing agile development |
CN105629927A (en) * | 2015-12-18 | 2016-06-01 | 武汉开目信息技术有限责任公司 | Hybrid genetic algorithm-based MES (Manufacturing Execution System) production planning and scheduling method |
CN106250985A (en) * | 2016-08-01 | 2016-12-21 | 西华大学 | A kind of improvement heredity film method solving distribution network structure multistage programming |
US10692065B2 (en) * | 2017-06-19 | 2020-06-23 | Accenture Global Solutions Limited | Using a mixture model to generate simulated transaction information |
WO2019035097A1 (en) * | 2017-08-18 | 2019-02-21 | The Regents Of The University Of Michigan | Centralized framework for small batch manufacturing |
US10757169B2 (en) | 2018-05-25 | 2020-08-25 | Model N, Inc. | Selective master data transport |
US11315053B1 (en) * | 2020-02-13 | 2022-04-26 | Tensorx, Inc. | Systems and methods for optimizing complex systems |
DE102020203718A1 (en) * | 2020-03-23 | 2021-09-23 | Zf Friedrichshafen Ag | Computer-implemented method for production planning and / or control of a production system and production planning and / or control system for production optimization |
KR102264571B1 (en) * | 2020-10-30 | 2021-06-15 | 주식회사 애자일소다 | Hierarchical decision agent |
CN113987619B (en) * | 2021-12-29 | 2022-04-12 | 广州赛意信息科技股份有限公司 | Industrial design system and method for improving interactive experience |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4752890A (en) * | 1986-07-14 | 1988-06-21 | International Business Machines Corp. | Adaptive mechanisms for execution of sequential decisions |
US5343554A (en) * | 1988-05-20 | 1994-08-30 | John R. Koza | Non-linear genetic process for data encoding and for solving problems using automatically defined functions |
US5148513A (en) * | 1988-05-20 | 1992-09-15 | John R. Koza | Non-linear genetic process for use with plural co-evolving populations |
US5291394A (en) | 1990-06-01 | 1994-03-01 | Motorola, Inc. | Manufacturing control and capacity planning system |
US5063507A (en) * | 1990-09-14 | 1991-11-05 | Plains Cotton Cooperative Association | Goods database employing electronic title or documentary-type title |
US5319781A (en) * | 1991-05-03 | 1994-06-07 | Bolt Beranek And Newman Inc. | Generation of schedules using a genetic procedure |
US5453601A (en) * | 1991-11-15 | 1995-09-26 | Citibank, N.A. | Electronic-monetary system |
US5311438A (en) | 1992-01-31 | 1994-05-10 | Andersen Consulting | Integrated manufacturing system |
US5390282A (en) * | 1992-06-16 | 1995-02-14 | John R. Koza | Process for problem solving using spontaneously emergent self-replicating and self-improving entities |
US5541848A (en) * | 1994-12-15 | 1996-07-30 | Atlantic Richfield Company | Genetic method of scheduling the delivery of non-uniform inventory |
US5819244A (en) * | 1995-10-02 | 1998-10-06 | Apple Computer, Inc. | Adaptive computing systems, computer readable memories and processes employing hyperlinear chromosomes |
US5867397A (en) * | 1996-02-20 | 1999-02-02 | John R. Koza | Method and apparatus for automated design of complex structures using genetic programming |
-
1998
- 1998-09-16 US US09/154,373 patent/US6233493B1/en not_active Expired - Lifetime
-
1999
- 1999-09-10 KR KR1020017003383A patent/KR20010079838A/en not_active Application Discontinuation
- 1999-09-10 WO PCT/US1999/020983 patent/WO2000016228A1/en not_active Application Discontinuation
- 1999-09-10 JP JP2000570695A patent/JP2002525715A/en active Pending
- 1999-09-10 MX MXPA01002771A patent/MXPA01002771A/en not_active Application Discontinuation
- 1999-09-10 EP EP03017363A patent/EP1359529A1/en not_active Withdrawn
- 1999-09-10 CA CA002342942A patent/CA2342942A1/en not_active Abandoned
- 1999-09-10 EP EP99969163A patent/EP1114385A1/en not_active Withdrawn
- 1999-09-10 AU AU60368/99A patent/AU6036899A/en not_active Abandoned
- 1999-11-01 TW TW088115914A patent/TW494327B/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
MXPA01002771A (en) | 2002-08-12 |
WO2000016228A1 (en) | 2000-03-23 |
KR20010079838A (en) | 2001-08-22 |
AU6036899A (en) | 2000-04-03 |
EP1359529A1 (en) | 2003-11-05 |
US6233493B1 (en) | 2001-05-15 |
TW494327B (en) | 2002-07-11 |
EP1114385A1 (en) | 2001-07-11 |
JP2002525715A (en) | 2002-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6233493B1 (en) | Computer-implemented product development planning method | |
US5594639A (en) | Order processing control module | |
US7283971B1 (en) | System and method for managing mobile workers | |
Frantzén et al. | A simulation-based scheduling system for real-time optimization and decision making support | |
Singh | Resource constrained multi-project scheduling with priority rules & analytic hierarchy process | |
US7139719B1 (en) | System for scheduling product planning | |
Kumanan et al. | Multi-project scheduling using an heuristic and a genetic algorithm | |
US8190463B2 (en) | System and method for managing mobile workers | |
US8306841B2 (en) | Enterprise project management system and method therefor | |
Novas et al. | Reactive scheduling framework based on domain knowledge and constraint programming | |
De Boer | Resource-constrained multi-project management | |
US7130809B1 (en) | System for planning a new product portfolio | |
CN101118624A (en) | Work allocation model | |
Dehghanimohammadabadi et al. | A novel Iterative Optimization-based Simulation (IOS) framework: An effective tool to optimize system’s performance | |
Skobelev et al. | Ontology-based Open Multi-agent Systems for Adaptive Resource Management. | |
Giebels | EtoPlan: a concept for concurrent manufacturing planning and control | |
Braune et al. | Applying genetic algorithms to the optimization of production planning in a real-world manufacturing environment | |
Ancveire et al. | Application of Genetic Algorithms for Decision-Making in Project Management: A Literature Review. | |
Villarraga et al. | Agent-based modeling and simulation for an order-to-cash process using netlogo | |
Ganji et al. | A new model for optimising simultaneously projects selection and resource-constrained project scheduling problem | |
Jamal | Managing complex projects in agile way of working | |
Terrada et al. | Conceptualization and Configuration of a Generic SCM 4.0 Business Process Model Using BPMN Based on SCOR | |
Sokolov et al. | Methodology support and algorithms for dynamic synthesis of technologies and programs for proactive management of information processes in the industrial internet under a crisis | |
Snyman | Design and development of a real-time scheduling system in a sensorised job shop using cloud-based simulation with mobile device access | |
Lazarova-Molnar | Simulation-based feature selection for software requirements baseline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FZDE | Discontinued |