IT1294492B1
(en)
*
|
1997-09-16 |
1999-04-12 |
Enel Spa |
METHOD FOR THE REPRESENTATION USING A SEMI-STRUCTURED CALCULATION GRID OF PHYSICAL PHENOMENA EXTENDING IN A SPATIAL DOMAIN
|
GB2352036B
(en)
*
|
1998-05-04 |
2002-11-27 |
Schlumberger Evaluation & Prod |
Near wellbore modelling method and apparatus
|
US6765570B1
(en)
|
1998-07-21 |
2004-07-20 |
Magic Earth, Inc. |
System and method for analyzing and imaging three-dimensional volume data sets using a three-dimensional sampling probe
|
FR2787219B1
(en)
*
|
1998-12-11 |
2001-01-12 |
Inst Francais Du Petrole |
METHOD FOR MODELING FLUID FLOWS IN A CRACKED MULTI-LAYER POROUS MEDIUM AND CORRELATIVE INTERACTIONS IN A PRODUCTION WELL
|
IES991044A2
(en)
*
|
1998-12-16 |
2000-09-06 |
Kepler Res & Dev Ltd |
Hydrocarbon reservoir testing
|
US6421052B1
(en)
*
|
1999-04-09 |
2002-07-16 |
The Procter & Gamble Company |
Method of seaming and expanding amorphous patterns
|
US7509245B2
(en)
*
|
1999-04-29 |
2009-03-24 |
Schlumberger Technology Corporation |
Method system and program storage device for simulating a multilayer reservoir and partially active elements in a hydraulic fracturing simulator
|
US8428923B2
(en)
|
1999-04-29 |
2013-04-23 |
Schlumberger Technology Corporation |
Method system and program storage device for simulating a multilayer reservoir and partially active elements in a hydraulic fracturing simulator
|
US6192316B1
(en)
*
|
1999-05-26 |
2001-02-20 |
Atlantic Richfield Company |
Fracture discrimination using borehole frequency response of stoneley waves
|
US6826520B1
(en)
*
|
1999-06-24 |
2004-11-30 |
Exxonmobil Upstream Research Company |
Method of upscaling permeability for unstructured grids
|
US6208939B1
(en)
*
|
1999-07-13 |
2001-03-27 |
Monolith Co., Ltd. |
Topography information data processing method and apparatus based on manifold corresponding thereto
|
FR2797329B1
(en)
*
|
1999-08-06 |
2002-02-08 |
Elf Exploration Prod |
METHOD FOR DEVELOPING WELL IMPACT POINT POSITION LIKELY CARDS
|
US6633837B1
(en)
*
|
1999-10-14 |
2003-10-14 |
Object Reservoir |
Method and system for generating software code using a symbolic language translator
|
CA2340547C
(en)
*
|
2000-03-13 |
2005-12-13 |
Smith International, Inc. |
Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance
|
AU2002230389A1
(en)
*
|
2000-06-14 |
2002-04-29 |
Vermeer Manufacturing Company |
Utility mapping and data distribution system and method
|
JP2004502999A
(en)
*
|
2000-06-29 |
2004-01-29 |
オブジェクト レザビア, インコーポレイテッド |
Method and system for solving finite element models using polyphase physics
|
US7369973B2
(en)
*
|
2000-06-29 |
2008-05-06 |
Object Reservoir, Inc. |
Method and system for representing reservoir systems
|
GB2376322B
(en)
*
|
2001-06-08 |
2004-07-07 |
Schlumberger Holdings |
Method for representing a volume of earth using a modelling environment
|
US7428476B1
(en)
*
|
2001-08-10 |
2008-09-23 |
Yasumi Capital, Llc |
System and method of simulating with respect to spheroid reference models using local surface coordinates
|
US7248259B2
(en)
*
|
2001-12-12 |
2007-07-24 |
Technoguide As |
Three dimensional geological model construction
|
US7069149B2
(en)
*
|
2001-12-14 |
2006-06-27 |
Chevron U.S.A. Inc. |
Process for interpreting faults from a fault-enhanced 3-dimensional seismic attribute volume
|
US7249009B2
(en)
*
|
2002-03-19 |
2007-07-24 |
Baker Geomark Llc |
Method and apparatus for simulating PVT parameters
|
US20030182093A1
(en)
*
|
2002-03-25 |
2003-09-25 |
Jones Thomas A. |
Controlling azimuthally varying continuity in geologic models
|
FR2839368B1
(en)
*
|
2002-05-06 |
2004-10-01 |
Total Fina Elf S A |
METHOD OF DECIMATING SEISMIC TRACES PILOTED BY THE SEISMIC PATH
|
US7340385B2
(en)
*
|
2002-06-14 |
2008-03-04 |
Schlumberger Technology Corporation |
Method and program storage device for generating grids representing the architecture of fluvial reservoirs
|
GB2398900A
(en)
*
|
2003-02-27 |
2004-09-01 |
Schlumberger Holdings |
Identification of best production potential oil wells and identification of drilling strategy to maximise production potential
|
US7496488B2
(en)
*
|
2003-03-06 |
2009-02-24 |
Schlumberger Technology Company |
Multi-scale finite-volume method for use in subsurface flow simulation
|
US6823297B2
(en)
|
2003-03-06 |
2004-11-23 |
Chevron U.S.A. Inc. |
Multi-scale finite-volume method for use in subsurface flow simulation
|
US7835893B2
(en)
*
|
2003-04-30 |
2010-11-16 |
Landmark Graphics Corporation |
Method and system for scenario and case decision management
|
US7584086B2
(en)
*
|
2003-09-30 |
2009-09-01 |
Exxonmobil Upstream Research Company |
Characterizing connectivity in reservoir models using paths of least resistance
|
NL1024444C2
(en)
*
|
2003-10-03 |
2005-04-08 |
J O A Beheer B V |
Method, device, computer program and data carrier for modeling a multi-dimensional heterogeneous structure with a digital processing unit.
|
US20050165555A1
(en)
*
|
2004-01-13 |
2005-07-28 |
Baker Hughes Incorporated |
3-D visualized data set for all types of reservoir data
|
GB2426845B
(en)
*
|
2004-01-20 |
2008-08-06 |
Saudi Arabian Oil Co |
Real time earth model for collaborative geosteering
|
WO2005074592A2
(en)
*
|
2004-01-30 |
2005-08-18 |
Exxonmobil Upstream Research Company |
Reservoir model building methods
|
US7783462B2
(en)
*
|
2004-01-30 |
2010-08-24 |
Exxonmobil Upstream Research Co. |
Reservoir evaluation methods
|
US7596481B2
(en)
|
2004-03-16 |
2009-09-29 |
M-I L.L.C. |
Three-dimensional wellbore analysis and visualization
|
US7657414B2
(en)
*
|
2005-02-23 |
2010-02-02 |
M-I L.L.C. |
Three-dimensional wellbore visualization system for hydraulics analyses
|
FR2869116B1
(en)
*
|
2004-04-14 |
2006-06-09 |
Inst Francais Du Petrole |
METHOD FOR CONSTRUCTING A GEOMECHANICAL MODEL OF A SUBTERRANEAN ZONE FOR TORQUE TO A RESERVOIR MODEL
|
US7672818B2
(en)
*
|
2004-06-07 |
2010-03-02 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
EP1766439A2
(en)
*
|
2004-07-01 |
2007-03-28 |
ExxonMobil Upstream Research Company |
Hydrodynamics-based gridding geologic modeling (hydro-gridding)
|
US7079953B2
(en)
*
|
2004-08-20 |
2006-07-18 |
Chevron U.S.A. Inc. |
Method for creating facies probability cubes based upon geologic interpretation
|
BRPI0514934A
(en)
*
|
2004-09-10 |
2008-07-01 |
Exxonmobil Upstream Res Co |
process for building geological models of underground sedimentary volumes
|
US7707018B2
(en)
*
|
2004-12-14 |
2010-04-27 |
Schlumberger Technology Corporation |
Finite volume method system and program storage device for linear elasticity involving coupled stress and flow in a reservoir simulator
|
US7640149B2
(en)
*
|
2004-12-15 |
2009-12-29 |
Schlumberger Technology Corporation |
Method system and program storage device for optimization of valve settings in instrumented wells using adjoint gradient technology and reservoir simulation
|
FR2886742B1
(en)
*
|
2005-06-02 |
2007-07-27 |
Inst Francais Du Petrole |
METHOD OF CHANGING SCALE OF ABSOLUTE PERMEABILITIES TO BUILD A FLOW SIMULATION MODEL
|
US8145463B2
(en)
*
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
US20070136042A1
(en)
*
|
2005-12-09 |
2007-06-14 |
Jiun-Der Yu |
Quadrilateral grid extension of central difference scheme for ink-jet simulations
|
AU2007225358B2
(en)
*
|
2006-03-02 |
2012-11-15 |
Exxonmobil Upstream Research Company |
Method for quantifying reservoir connectivity using fluid travel times
|
US7716029B2
(en)
*
|
2006-05-15 |
2010-05-11 |
Schlumberger Technology Corporation |
Method for optimal gridding in reservoir simulation
|
US9646415B2
(en)
*
|
2006-05-16 |
2017-05-09 |
Underground Imaging Technologies, Inc. |
System and method for visualizing multiple-sensor subsurface imaging data
|
US8089390B2
(en)
|
2006-05-16 |
2012-01-03 |
Underground Imaging Technologies, Inc. |
Sensor cart positioning system and method
|
US7716028B2
(en)
*
|
2006-05-24 |
2010-05-11 |
Schlumberger Technology Corporation |
Method for modeling a reservoir using a 3D wettability map generated from a wettability logging tool
|
US7765091B2
(en)
*
|
2006-06-18 |
2010-07-27 |
Chevron U.S.A Inc. |
Method, apparatus and system for reservoir simulation using a multi-scale finite volume method including black oil modeling
|
RU2428739C2
(en)
*
|
2006-07-07 |
2011-09-10 |
Эксонмобил Апстрим Рисерч Компани |
Enlargement of mesh for collector models by means of repeated use of flow calculations produced on basis of geological models
|
CA2660444C
(en)
*
|
2006-08-14 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Enriched multi-point flux approximation
|
US7877246B2
(en)
*
|
2006-09-22 |
2011-01-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US7895241B2
(en)
*
|
2006-10-16 |
2011-02-22 |
Schlumberger Technology Corp. |
Method and apparatus for oilfield data repository
|
US8352227B2
(en)
*
|
2006-10-30 |
2013-01-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US7933758B2
(en)
*
|
2006-12-05 |
2011-04-26 |
Conocophillips Company |
Method and apparatus for geomodel uplayering
|
AU2008205061B2
(en)
*
|
2007-01-05 |
2013-06-06 |
Landmark Graphics Corporation |
Systems and methods for visualizing multiple volumetric data sets in real time
|
WO2008103986A1
(en)
*
|
2007-02-25 |
2008-08-28 |
Chevron U.S.A., Inc. |
Method and system for creating upscaled reservoir models
|
CN101809627A
(en)
*
|
2007-06-01 |
2010-08-18 |
埃克森美孚上游研究公司 |
The generation of constrained voronoi grid in the plane
|
US20080319726A1
(en)
|
2007-06-19 |
2008-12-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8775141B2
(en)
*
|
2007-07-02 |
2014-07-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8046314B2
(en)
*
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
US8244509B2
(en)
*
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
US7900700B2
(en)
*
|
2007-08-02 |
2011-03-08 |
Schlumberger Technology Corporation |
Method and system for cleat characterization in coal bed methane wells for completion optimization
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
CA2690992C
(en)
*
|
2007-08-24 |
2014-07-29 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
CA2690991C
(en)
*
|
2007-08-24 |
2013-12-24 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
US8156131B2
(en)
*
|
2007-08-27 |
2012-04-10 |
Schlumberger Technology Corporation |
Quality measure for a data context service
|
US9070172B2
(en)
*
|
2007-08-27 |
2015-06-30 |
Schlumberger Technology Corporation |
Method and system for data context service
|
CN101896690B
(en)
*
|
2007-12-13 |
2015-02-18 |
埃克森美孚上游研究公司 |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
US8099267B2
(en)
*
|
2008-01-11 |
2012-01-17 |
Schlumberger Technology Corporation |
Input deck migrator for simulators
|
US9074454B2
(en)
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
WO2009099753A1
(en)
*
|
2008-02-05 |
2009-08-13 |
Schlumberger Canada Limited |
Integrating field data
|
US8180578B2
(en)
*
|
2008-02-20 |
2012-05-15 |
Schlumberger Technology Corporation |
Multi-component multi-phase fluid analysis using flash method
|
US8285532B2
(en)
*
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
US8190414B2
(en)
*
|
2008-03-26 |
2012-05-29 |
Exxonmobil Upstream Research Company |
Modeling of hydrocarbon reservoirs containing subsurface features
|
WO2009120409A1
(en)
*
|
2008-03-28 |
2009-10-01 |
Exxonmobil Upstream Research Company |
Computing a consistent velocity vector field from a set of fluxes
|
US7933750B2
(en)
*
|
2008-04-02 |
2011-04-26 |
Schlumberger Technology Corp |
Method for defining regions in reservoir simulation
|
CA2720117C
(en)
*
|
2008-05-05 |
2017-11-28 |
Exxonmobil Upstream Research Company |
Systems, methods, and computer program products for modeling dynamic systems by visualizing a parameter space and narrowing the parameter space
|
US8688425B2
(en)
*
|
2008-05-06 |
2014-04-01 |
Exxonmobil Upstream Research Company |
Transport property data calculated from derivative seismic rock property data for transport modeling
|
US8204726B2
(en)
*
|
2008-05-16 |
2012-06-19 |
Chevron U.S.A. Inc. |
Multi-scale method for multi-phase flow in porous media
|
US8095349B2
(en)
*
|
2008-05-30 |
2012-01-10 |
Kelkar And Associates, Inc. |
Dynamic updating of simulation models
|
CN102047294B
(en)
*
|
2008-06-06 |
2013-10-30 |
兰德马克绘图国际公司,哈里伯顿公司 |
Systems and methods for imaging three-dimensional volume of geometrically irregular grid data representing grid volume
|
US8463457B2
(en)
*
|
2008-06-13 |
2013-06-11 |
Schlumberger Technology Corporation |
Feedback control using a simulator of a subterranean structure
|
EA201170136A1
(en)
*
|
2008-07-03 |
2011-08-30 |
ШЕВРОН Ю. Эс. Эй. ИНК. |
MULTI-SCALE METHOD OF FINAL VOLUMES FOR MODELING A RESERVOIRE
|
US8499829B2
(en)
*
|
2008-08-22 |
2013-08-06 |
Schlumberger Technology Corporation |
Oilfield application framework
|
US20100082724A1
(en)
*
|
2008-09-30 |
2010-04-01 |
Oleg Diyankov |
Method For Solving Reservoir Simulation Matrix Equation Using Parallel Multi-Level Incomplete Factorizations
|
US20100082509A1
(en)
*
|
2008-09-30 |
2010-04-01 |
Ilya Mishev |
Self-Adapting Iterative Solver
|
US8280709B2
(en)
*
|
2008-10-03 |
2012-10-02 |
Schlumberger Technology Corporation |
Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
|
US8706541B2
(en)
*
|
2008-10-06 |
2014-04-22 |
Schlumberger Technology Corporation |
Reservoir management linking
|
US9228415B2
(en)
*
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
CA2759199A1
(en)
*
|
2008-10-09 |
2010-04-15 |
Chevron U.S.A. Inc. |
Iterative multi-scale method for flow in porous media
|
EP2359304B1
(en)
|
2008-11-14 |
2020-04-01 |
Exxonmobil Upstream Research Company |
Forming a model of a subsurface region
|
WO2010065774A2
(en)
*
|
2008-12-03 |
2010-06-10 |
Chevron U.S.A. Inc. |
System and method for predicting fluid flow characteristics within fractured subsurface reservoirs
|
AU2009322303A1
(en)
*
|
2008-12-03 |
2011-06-23 |
Chevron U.S.A. Inc. |
System and method of grid generation for discrete fracture modeling
|
CA2748487C
(en)
|
2008-12-30 |
2018-09-18 |
Occidental Permian Ltd. |
Mobile platform for monitoring a wellsite
|
US8269767B2
(en)
*
|
2009-02-03 |
2012-09-18 |
Autodesk, Inc. |
Multiscale three-dimensional reference grid
|
US8339396B2
(en)
*
|
2009-03-05 |
2012-12-25 |
Schlumberger Technology Corporation |
Coarsening and splitting techniques
|
US8350851B2
(en)
*
|
2009-03-05 |
2013-01-08 |
Schlumberger Technology Corporation |
Right sizing reservoir models
|
US9418182B2
(en)
|
2009-06-01 |
2016-08-16 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
US9536022B1
(en)
|
2009-06-01 |
2017-01-03 |
Paradigm Sciences Ltd. |
Systems and methods for modeling faults in the subsurface
|
US8600708B1
(en)
|
2009-06-01 |
2013-12-03 |
Paradigm Sciences Ltd. |
Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface
|
US8711140B1
(en)
|
2009-06-01 |
2014-04-29 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
US8510049B2
(en)
*
|
2009-09-01 |
2013-08-13 |
Schlumberger Technology Corporation |
Maximum entropy application methods and systems
|
US8655632B2
(en)
*
|
2009-09-03 |
2014-02-18 |
Schlumberger Technology Corporation |
Gridless geological modeling
|
US8774468B2
(en)
*
|
2009-09-08 |
2014-07-08 |
Schlumberger Technology Corporation |
Dynamic shape approximation
|
US9085957B2
(en)
*
|
2009-10-07 |
2015-07-21 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
US8743115B1
(en)
|
2009-10-23 |
2014-06-03 |
Paradigm Sciences Ltd. |
Systems and methods for coordinated editing of seismic data in dual model
|
CN102648425B
(en)
*
|
2009-10-28 |
2014-12-10 |
雪佛龙美国公司 |
Multiscale finite volume method for reservoir simulation
|
CA2776487C
(en)
*
|
2009-11-12 |
2017-02-14 |
Exxonmobil Upstream Research Company |
Method and apparatus for generating a three-dimentional simulation grid for a reservoir model
|
BR112012012817A2
(en)
|
2009-11-30 |
2020-08-11 |
Exxonmobil Upstream Research Company |
adaptive newton method for reservoir simulation
|
US8731872B2
(en)
*
|
2010-03-08 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8731887B2
(en)
*
|
2010-04-12 |
2014-05-20 |
Exxonmobile Upstream Research Company |
System and method for obtaining a model of data describing a physical structure
|
US8727017B2
(en)
|
2010-04-22 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for obtaining data on an unstructured grid
|
US8731873B2
(en)
*
|
2010-04-26 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
CN102870087B
(en)
|
2010-04-30 |
2016-11-09 |
埃克森美孚上游研究公司 |
The method and system of fluid limited bulk emulation
|
CA2801386A1
(en)
|
2010-06-15 |
2011-12-22 |
Exxonmobil Upstream Research Company |
Method and system for stabilizing formulation methods
|
US20110310101A1
(en)
*
|
2010-06-22 |
2011-12-22 |
Schlumberger Technology Corporation |
Pillar grid conversion
|
AU2011283193B2
(en)
|
2010-07-29 |
2014-07-17 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
US9058445B2
(en)
|
2010-07-29 |
2015-06-16 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
CA2803066A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
WO2012018428A1
(en)
|
2010-08-04 |
2012-02-09 |
Exxonmobil Upstream Research Company |
System and method for summarizing data on an unstructured grid
|
EP2603878A1
(en)
*
|
2010-08-09 |
2013-06-19 |
ConocoPhillips Company |
Reservoir upscaling method with preserved transmissibility
|
US8731875B2
(en)
*
|
2010-08-13 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8433551B2
(en)
*
|
2010-11-29 |
2013-04-30 |
Saudi Arabian Oil Company |
Machine, computer program product and method to carry out parallel reservoir simulation
|
EP2614460B1
(en)
*
|
2010-09-07 |
2014-07-09 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
US8386227B2
(en)
*
|
2010-09-07 |
2013-02-26 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
EP2431767A3
(en)
|
2010-09-17 |
2016-11-30 |
Services Pétroliers Schlumberger |
Dynamic subsurface engineering
|
WO2012039811A1
(en)
|
2010-09-20 |
2012-03-29 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
WO2012071090A1
(en)
*
|
2010-11-23 |
2012-05-31 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
US20120136636A1
(en)
*
|
2010-11-26 |
2012-05-31 |
Adrian Kleine |
Finite element adjustment for basin faults
|
CA2815641C
(en)
*
|
2010-12-16 |
2016-04-12 |
Landmark Graphics Corporation |
Method and system of plotting correlated data
|
US8660824B2
(en)
|
2010-12-23 |
2014-02-25 |
Schlumberger Technology Corporation |
Discretely gridding complex fracturing for simulation
|
EP2659424A4
(en)
|
2010-12-30 |
2018-05-23 |
Exxonmobil Upstream Research Company |
Systems and methods for subsurface reservoir simulation
|
US9051825B2
(en)
*
|
2011-01-26 |
2015-06-09 |
Schlumberger Technology Corporation |
Visualizing fluid flow in subsurface reservoirs
|
US9747393B2
(en)
|
2011-02-09 |
2017-08-29 |
Exxonmobil Upstream Research Company |
Methods and systems for upscaling mechanical properties of geomaterials
|
US9164191B2
(en)
|
2011-02-09 |
2015-10-20 |
Saudi Arabian Oil Company |
Sequential fully implicit well model for reservoir simulation
|
US10175386B2
(en)
|
2011-02-09 |
2019-01-08 |
Saudi Arabian Oil Company |
Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
|
US10113400B2
(en)
|
2011-02-09 |
2018-10-30 |
Saudi Arabian Oil Company |
Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
|
US10534871B2
(en)
|
2011-03-09 |
2020-01-14 |
Schlumberger Technology Corporation |
Method and systems for reservoir modeling, evaluation and simulation
|
EP2756382A4
(en)
|
2011-09-15 |
2015-07-29 |
Exxonmobil Upstream Res Co |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
EP2742457A4
(en)
*
|
2011-09-20 |
2015-09-16 |
Landmark Graphics Corp |
System and method for coarsening in reservoir simulation system
|
US10387583B2
(en)
*
|
2011-12-02 |
2019-08-20 |
Schlumberger Technology Corporation |
Rotations from gradient directions
|
US10114134B2
(en)
*
|
2012-03-02 |
2018-10-30 |
Emerson Paradigm Holding Llc |
Systems and methods for generating a geological model honoring horizons and faults
|
WO2013138388A1
(en)
|
2012-03-12 |
2013-09-19 |
Vermeer Corporation |
Offset frequency homodyne ground penetrating radar
|
WO2013148021A1
(en)
|
2012-03-28 |
2013-10-03 |
Exxonmobil Upstream Research Company |
Method for mutiphase flow upscaling
|
CA2868756C
(en)
*
|
2012-03-30 |
2018-01-16 |
Landmark Graphics Corporation |
System and method for automatic local grid refinement in reservoir simulation systems
|
US9759826B2
(en)
|
2012-04-03 |
2017-09-12 |
Paradigm Sciences Ltd. |
System and method for generating an implicit model of geological horizons
|
CA2883169C
(en)
|
2012-09-28 |
2021-06-15 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
BR112015007246A2
(en)
*
|
2012-10-19 |
2017-07-04 |
Conocophillips Co |
method for modeling a reservoir using 3d multi-point simulations with 2d training images
|
US9390555B2
(en)
*
|
2012-11-09 |
2016-07-12 |
International Business Machines Corporation |
Method to assess the impact of existing fractures and faults for reservoir management
|
US20140236559A1
(en)
|
2013-02-18 |
2014-08-21 |
Saudi Arabian Oil Company |
Systems, methods, and computer-readable media for modeling complex wellbores in field-scale reservoir simulation
|
US9739133B2
(en)
|
2013-03-15 |
2017-08-22 |
Vermeer Corporation |
Imaging underground objects using spatial sampling customization
|
US9477010B2
(en)
|
2013-03-15 |
2016-10-25 |
Paradigm Sciences Ltd. |
Systems and methods to build sedimentary attributes
|
GB2512372B
(en)
*
|
2013-03-28 |
2020-07-29 |
Total Sa |
Method of modelling a subsurface volume
|
US10087729B2
(en)
|
2013-06-28 |
2018-10-02 |
Schlumberger Technology Corporatio |
Methods utilizing solutal-convection regimes in a porous medium
|
US20150032420A1
(en)
*
|
2013-07-25 |
2015-01-29 |
Ansys, Inc. |
Systems and Methods for Creating Engineering Models
|
CN103913773B
(en)
*
|
2013-08-13 |
2016-09-28 |
中国石油化工股份有限公司 |
Three-dimensional exploration utilizes the abnormal method encrypting micro logging of residual error method
|
CN105684047A
(en)
*
|
2013-08-16 |
2016-06-15 |
界标制图有限公司 |
Dynamically updating compartments representing one or more geological structures
|
US9410422B2
(en)
|
2013-09-13 |
2016-08-09 |
Chevron U.S.A. Inc. |
Alternative gauging system for production well testing and related methods
|
US10795053B2
(en)
|
2013-10-29 |
2020-10-06 |
Emerson Paradigm Holding Llc |
Systems and methods of multi-scale meshing for geologic time modeling
|
US9311720B2
(en)
|
2013-11-26 |
2016-04-12 |
Saudi Arabian Oil Company |
Automated saw cut correction for 3D core digital modeling from computerized tomography scanner (CTS) images
|
US10054712B2
(en)
|
2013-12-30 |
2018-08-21 |
Saudi Arabian Oil Company |
Computer-implemented methods for reservoir simulation with automated well completions and reservoir grid data quality assurance
|
US10808501B2
(en)
|
2014-03-17 |
2020-10-20 |
Saudi Arabian Oil Company |
Modeling intersecting faults and complex wellbores in reservoir simulation
|
US10677960B2
(en)
|
2014-03-17 |
2020-06-09 |
Saudi Arabian Oil Company |
Generating unconstrained voronoi grids in a domain containing complex internal boundaries
|
US10422923B2
(en)
|
2014-03-28 |
2019-09-24 |
Emerson Paradigm Holding Llc |
Systems and methods for modeling fracture networks in reservoir volumes from microseismic events
|
US10319143B2
(en)
|
2014-07-30 |
2019-06-11 |
Exxonmobil Upstream Research Company |
Volumetric grid generation in a domain with heterogeneous material properties
|
US10359523B2
(en)
|
2014-08-05 |
2019-07-23 |
Exxonmobil Upstream Research Company |
Exploration and extraction method and system for hydrocarbons
|
WO2016028564A1
(en)
|
2014-08-22 |
2016-02-25 |
Schlumberger Canada Limited |
Methods for monitoring fluid flow and transport in shale gas reservoirs
|
US9951601B2
(en)
|
2014-08-22 |
2018-04-24 |
Schlumberger Technology Corporation |
Distributed real-time processing for gas lift optimization
|
US10443358B2
(en)
|
2014-08-22 |
2019-10-15 |
Schlumberger Technology Corporation |
Oilfield-wide production optimization
|
US10101498B2
(en)
*
|
2014-09-05 |
2018-10-16 |
Schlumberger Technology Corporation |
Well survivability in multidimensional geomechanical space
|
US10288766B2
(en)
|
2014-10-09 |
2019-05-14 |
Chevron U.S.A. Inc. |
Conditioning of object or event based reservior models using local multiple-point statistics simulations
|
CA2963416A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
EP3213127A1
(en)
|
2014-10-31 |
2017-09-06 |
Exxonmobil Upstream Research Company |
Managing discontinuities in geologic models
|
CA2963092C
(en)
|
2014-10-31 |
2021-07-06 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
US10767475B2
(en)
|
2015-03-23 |
2020-09-08 |
Schlumberger Technology Corporation |
Extended isenthalpic and/or isothermal flash calculation for hydrocarbon components that are soluble in oil, gas and water
|
FR3036210B1
(en)
|
2015-05-12 |
2018-07-06 |
Services Petroliers Schlumberger |
GEOLOGICAL STRATIGRAPHY BY IMPLICIT AND JUMPING FUNCTIONS
|
US9690002B2
(en)
|
2015-06-18 |
2017-06-27 |
Paradigm Sciences Ltd. |
Device, system and method for geological-time refinement
|
US20170184760A1
(en)
*
|
2015-12-23 |
2017-06-29 |
Paradigm Sciences Ltd. |
Device, system and method for a structure and stratigraphy preserving transformation of a geological model
|
US10466388B2
(en)
|
2016-09-07 |
2019-11-05 |
Emerson Paradigm Holding Llc |
System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles
|
CN106383972B
(en)
*
|
2016-11-04 |
2023-05-12 |
北京航天动力研究所 |
Collector for rocket engine thrust chamber and radial hole flow equalization design method thereof
|
EP3559401B1
(en)
|
2016-12-23 |
2023-10-18 |
ExxonMobil Technology and Engineering Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
US11041976B2
(en)
*
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
CN107507179B
(en)
*
|
2017-08-31 |
2020-11-10 |
中国电建集团成都勘测设计研究院有限公司 |
Rock-soil mass quantitative analysis method based on GOCAD
|
US10913901B2
(en)
|
2017-09-12 |
2021-02-09 |
Saudi Arabian Oil Company |
Integrated process for mesophase pitch and petrochemical production
|
US11662501B2
(en)
|
2018-04-03 |
2023-05-30 |
ExxonMobil Technology and Engineering Company |
Geologic modeling methods and systems having constrained restoration of depositional space
|
WO2019245644A1
(en)
|
2018-06-22 |
2019-12-26 |
Exxonmobil Upstream Research Company |
Methods and systems for simulation gridding with partial faults
|
US11409024B2
(en)
|
2018-06-22 |
2022-08-09 |
Exxonmobil Upstream Research Company |
Methods and systems for generating simulation grids via zone by zone mapping from design space
|
US10753736B2
(en)
*
|
2018-07-26 |
2020-08-25 |
Cisco Technology, Inc. |
Three-dimensional computer vision based on projected pattern of laser dots and geometric pattern matching
|
CN109063324B
(en)
*
|
2018-07-30 |
2021-07-09 |
北京大学 |
Finite element ground stress simulation technical method based on angular point grid
|
US10342110B1
(en)
*
|
2018-09-14 |
2019-07-02 |
Serendipity Technologies LLC. |
Plasma power generator (z-box and z-tower)
|
US10615869B1
(en)
*
|
2019-01-10 |
2020-04-07 |
X Development Llc |
Physical electromagnetics simulator for design optimization of photonic devices
|
US10520644B1
(en)
|
2019-01-10 |
2019-12-31 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
US11156744B2
(en)
|
2019-01-10 |
2021-10-26 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
CN112085820A
(en)
*
|
2019-06-12 |
2020-12-15 |
中国石油天然气集团有限公司 |
Horizontal well interactive editing method and device
|
US11754745B2
(en)
|
2020-06-30 |
2023-09-12 |
Saudi Arabian Oil Company |
Methods and systems for flow-based coarsening of reservoir grid models
|
CN112650579B
(en)
*
|
2020-10-30 |
2023-03-10 |
西北大学 |
Cloud resource distribution scheduling method based on gridding
|
CN113255196B
(en)
*
|
2021-07-05 |
2021-11-19 |
广州中望龙腾软件股份有限公司 |
Grid optimization method, grid generator and storage medium
|
CN114549793B
(en)
*
|
2022-04-28 |
2022-07-29 |
中国空气动力研究与发展中心计算空气动力研究所 |
Method, medium, and apparatus for reconstructing a structured grid from a two-dimensional unstructured grid
|