CA2187644C - Method for fracturing and propping a subterranean formation - Google Patents

Method for fracturing and propping a subterranean formation Download PDF

Info

Publication number
CA2187644C
CA2187644C CA002187644A CA2187644A CA2187644C CA 2187644 C CA2187644 C CA 2187644C CA 002187644 A CA002187644 A CA 002187644A CA 2187644 A CA2187644 A CA 2187644A CA 2187644 C CA2187644 C CA 2187644C
Authority
CA
Canada
Prior art keywords
fracture
workstring
fracturing fluid
annulus
well annulus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CA002187644A
Other languages
French (fr)
Other versions
CA2187644A1 (en
Inventor
Lloyd Garner Jones
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Oil Corp
Original Assignee
Mobil Oil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mobil Oil Corp filed Critical Mobil Oil Corp
Publication of CA2187644A1 publication Critical patent/CA2187644A1/en
Application granted granted Critical
Publication of CA2187644C publication Critical patent/CA2187644C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

A method for fracturing and propping a thick and/or homogeneous fracture interval (12) of a subterranean formation which is traversed by a wellbore (11). A workstring (20) is lowered into the wellbore (11) and a fracturing fluid is flowed into either or both ends of the fracture interval annulus (33a) (i.e. that portion of the well annulus which lies adjacent the fracture interval) to initiate a fracture (A). The flow of fracturing fluid is continued into one end of the annulus (33a) while a slurry containing proppants is flowed into the other end of the fracture interval annulus (33a).
During flow of fracturing fluid and slurry into the annulus (33a), slurry and/or fracturing fluid is also delivered through alternative flowpaths (26) to different levels within said fracture interval (12).
This is continued until all of the levels or zones of the fracture interval (12) have been fractured and propped.

Description

METHOD FOR FRACTURING AND PROPPING A SUBTERRANEAN FORMATION
' The present invention relates to a method for fracturing and propping a subterranean formation. More particularly, the invention relates to a method for completing a fracture interval in a subterranean formation wherein a fracture is first initiated in the formation with a fracturing fluid and then enlarged and propped by continuing to pump the fracturing fluid into one end of the well annulus adjacent the fracture interval while simultaneously pumping a slurry containing proppants (e. g.
gravel) into the other end of the well annulus and, at the same time, delivering the fracturing fluid and/or slurry to different levels within the annulus through alternative flowpaths which extend through the fracture interval.
"Hydraulic fracturing" is a well known technique commonly used to increase the productivity of subterranean formations which produce hydrocarbon fluids or the like. In a typical hydraulic fracturing operation, a fracturing fluid (e. g. gel) is pumped down a wellbore and into the formation at a pressure sufficient to initiate a "fracture". The fracture provides a network of permeable channels into.the formation through which formation fluids can flow into the wellbore.
Fractures have a tendency to close once the fracture pressure is relaxed. Accordingly, it is routine in the art to "prop" the fractures open by mixing proppants (e. g. sand, gravel, or other particular material) with the fracturing fluid or by following the fracturing fluid with a slurry which contains the desired "props" or proppants. The slurry flows into the fractures where the props are deposited to thereby "prop" or hold the fractures open after the pressure is relaxed and the well is put on production.
As will be understood by those skilled in this art, problems remain in adequately fracturing and propping some formations, especially where the formation to be fractured is relatively thick (e.g. 50 feet or more) and/or is comprised of highly non-homogenous strata. For example, in thick formations, it is difficult to initiate or extend a fracture across a second zane of the formation once a substantial fracture has been initiated in a first zone thereof (i.e. the "first" zone being the strata with lowest "break-down" pressure). , Further, it is common to lose liquid from the slurry into the initial fracture which, in turn, causes the props, e.g.
sand, to collect in the well annulus adjacent the initial fracture thereby forming a °'sand bridge" in the annulus. These sand bridges block further flow of fracturing gel and/or slurry through the well annulus thereby preventing the further delivery of the necessary fluids to other levels or zones within the interval to be fractured. This is true even where some of these other zones may have previously experienced some breakdown before a sand bridge was formed.
The formation of sand bridges during the fracturing operation usually results in fractures which extend only across a portion of the desired fracture interval and/or in fractures which are inadequately propped. In either event, the full benefits of the fracturing operation cannot be realized.
Due to the problems associated with the formation of sand bridges in the well annulus, currently it is common to use a series of individual, conventional fracturing operations to fracture and prop thick formations and/or non-homogenous formations. That is, a workstring, packers, and other associated equipment are lowered into the wellbore and the wellbore is packed-off and isolated adjacent a first zone within the fracture interval. Fracturing fluid and slurry is then flowed down the wellbore to fracture and prop the isolated first zone of the fracture interval.
The packers are then released and the equipment is moved within the wellbore to a second zone of the fracture interval which is then is isolated, fractured, and propped as before.
This procedure is repeated until the fractures extend across ' substantially the entire thickness of the fracture interval or until all of the non-homogenous zones within the fracture ' interval have been fractured and propped. Of course, as will be recognized by those skilled in the well completion art, this repetition of individual, conventional fracturing and propping ~WO 95!33915 218 l 6 4 4 PCT/US95/07026 operations in a single well is extremely expensive and time . consuming and is an important consideration in the overall economics of the completion and production of the well.
To overcome the expense and time involved in having to carry out a series of individual fracturing operations to fracture and prop a thick and/or non-homogenous interval, methods have been proposed wherein the fracturing of such an interval can be performed in a single operation; for example see US-A-5161618. The present invention provides still-another method for performing such an operation.
According to the present invention there is provided a method for fracturing and propping a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising:
(a) positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore;
(b) flowing a fracturing fluid into at least one end of that portion of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture in said fracture interval;
(c) flowing a slurry.containing proppants into one~end of the fracture interval annulus while continuing to flow fracturing fluid into the other end of said fracture interval annulus; and (d) delivering said slurry containing proppants though alternative flowpaths to different levels within said fracture interval annulus while continuing to flow said slurry through said one end. of said fracture interval annulus and said -fracturing fluid through said other end of said fracture interval annulus.
The fracturing fluid and slurry are typically flowed from the surface. In step (c) the fracturing fluid is flowed through a first flowpath, while the slurry is flowed through a second flowpath separate from the first flowpath. In step (b) the fracturing fluid may be flowed through both the first and second flowpaths.

R'O 95!33915 21 r3 7 b 4 4 PCT/U595107026 1 The present invention is particularly applicable to thick and/or non-homogenous fracture intervals of a subterranean formation which is traversed by a wellbore.
The fracturing fluid may be flowed down the well annulus into the top of said fracture interval annulus, or down the a workstring into the bottom end of said fracture interval annulus. Alternatively, the fracturing fluid may flowed into both ends of said fracture interval annulus simultaneously.
Preferably the method includes the step of isolating said portion of said annulus which lies adjacent said fracture interval prior to flowing said fracturing fluid into at least one end of the fracture interval annulus.
The workstring desirably includes a cross-over. In step (b) said fracturing fluid is preferably flowed down said well annulus, through said cross-over in said workstring, and into said bottom end of said isolated fracture interval annulus while said fracturing fluid is also being flowed down said workstring, out of said cross-over, and into the top of said isolated fracture interval annulus to thereby initiate said fracture in said fracture interval.
In step (c) said fracturing fluid is preferably flowed down said well annulus, through said cross-over into said workstring, and into said bottom end of said isolated fracture interval annulus while said slurry with proppants is also being flowed down said workstring, out of said cross-over, and into the top of said isolated fracture interval annulus to thereby prop said initial fracture in said fracture interval.
Advantageously the alternative flowpaths are provided by shunt tubes which are spaced radially around said workstring and which extend through said fracture interval, each of said shunt tubes having inlet and outlet openings spaced along its length.
The fracturing fluid may be a fracturing gel and the proppants may be sand.
The method preferably includes the steps of ceasing flow of both said fracturing fluid and said slurry with proppants when said fracture interval has been fractured and propped; and flowing a wash fluid down said wellbore to unload said 5 PCTlUS95/07026 workstring whereby said workstring can be removed from said wellbore.
The method according to the invention can also be used for gravel packing the formation, in which case the workstring is provided with a gravel pack screen which lies adjacent said fracture interval. In this embodiment it is preferred that the flow of said fracturing fluid is ceased when said fracture interval has been fractured and propped; and the flow of slurry with proppants is continued through at least one end of said isolated fracture interval annulus to deposit proppants in the isolated fracture interval annulus around said gravel pack screen.
The present invention allows thick and/or non-homogenous fracture intervals to be fractured and propped in a single operation thus eliminating the need for the series (commonly called "stages") of individual fracturing operations.
In a specific embodiment, a fracturing workstring is positioned in wellbore substantially adjacent fracture interval.
In deep wells, e.g. 1500 feet (457 m) or more, the workstring will normally include a cross-over. Also, in deep wells, that portion of the well annulus lying adjacent the fracture interval is isolated by a packer carried on the workstring. The workstring has one or more shunts tubes which are radially-spaced around the workstring and which extend through the isolated fracture interval. These shunt tubes each has a plurality of outlet openings spaced along its length to provide "alternative flowpaths" for the delivery of fluids to different levels within the fracture interval. The portion of the workstring below the cross-over may also have a plurality of radial, "unloading" ports spaced along its length.
In operation, the workstring is lowered into the wellbore and forms a well annulus with the wellbore. The packer is then set to isolate that portion of the annulus (in deep wells) which lies adjacent fracture interval. A fracturing fluid (fracturing gel) is flowed down workstring and into the annulus. The fracturing fluid can be flowed into either end of the annulus or it may be simultaneously flowed into both ends. Where WO 95/33915 ~ ~ 8 7 6 4 4 PCTlU595/07026 fracturing fluid is flowed into both ends simultaneously, the fracturing fluid will pass through the respective passages in the cross-over and will flow into both the top and the bottom of the isolated annulus to thereby initiate a fracture in fracture interval. This fracture may be initiated at any level V
within the fracture interval depending as to where the level is having the lowest "break-down" pressure.
Once the fracture has been initiated, the flow of fracturing fluid into one end (preferably the bottom end) of the isolated annulus is continued while the flow of fracturing fluid into the other end (e.g. top end) is replaced with flow of a slurry which is laden with proppants (e. g. gravel and/or sand).
The slurry flows into initial fracture to deposit the proppants and thereby prop the fracture while the fracturing fluid flowing through the other end of the isolated annulus continues to enlarge the initial fracture or initiate fractures in other zones of the interval.
Unfortunately, as the initial fracture is being propped, it is common for a sand bridge to form in the annulus adjacent the initial fracture which, in turn, blocks flow of slurry to other levels in the annulus thereby preventing proppants from reaching the enlarged portion of the fracture. However, with the present invention, the slurry, even if blocked by sand bridge, continues to be delivered to all levels within the fracture interval through the alternative flowpaths provided by the shunt tubes.
The simultaneous injection of fracturing fluid and slurry is continued until the fracture interval is fractured and propped across substantially its entire thickness or length or all of the zones in the interval are .fractured and propped.
Once the operation is complete, the workstring can be "unloaded", if desired, by changing to a reverse circulating mode and flowing a wash fluid (e. g. water) through "unloading"
ports in the workstring to the sand from around the workstring.
The present invention can be used to fracture and prop intervals in vertical, inclined, or horizontal wellbores and can also be used to fracture, prop, and gravel pack a production WO 95133915 218 7 6 ~ ~ PCTJUS95/07026 _ _ 7 formation within a well in a single operation. In fracturing and gravel-packing a well, a gravel.pack screen is included in the workstring and is positioned adjacent the fracture interval.
A plurality of shunt tubes are spaced radially around screen and provide the necessary alternative flowpaths throughout the interval to be fractured and completed. A wash pipe is connected to the cross-over and extends within the screen to near the bottom thereof.
The fracturing and propping operation using a gravel pack screen is basically the same as described above except the workstring is not unloaded and removed but, instead, the gravel pack screen is left in place and is surrounded by proppant as will be understood in the art.
Reference is now made to the accompanying drawings, in which:
FIG. 1 is an elevational view, partly in section, of an apparatus used in carrying out the present invention as shown in an operable position within a wellbore adjacent a fracture interval wherein a fracture has been initiated in said interval;
FIG. 2 is an elevational view, partly in section, similar to that of FIG. 1 wherein the initial fracture is being extended and the initial fracture is being propped with proppants;
FIG. 3 is an elevational view, partly in section, similar to that of FIG. 1 wherein the initial fracture is being extended even further and the resulting fracture is being propped with proppants;
FIG. 4 is an elevational view, partly in section, illustrating the present invention as carried out in a horizontal well;
FIG. 5 is an enlarged, elevational view, partly in section, of a portion of the apparatus used in FIGS. 1 to 4 for carrying out the present invention; and FIG. 6 is an elevational view, partly in section, of a gravel-pack screen which is used to carry out another embodiment of the present invention.
FIG. 1 illustrates the lower end of a producing and/or injection well 10. Well l0 has a wellbore 11 which extends from _ g -the surface (not shown) through fracture zone 12., Wellbore 11 is typically cased with a casing 13 which is cemented 13a (FIGS.
and 6) in place. While the method of the present invention , is illustrated primarily as being carried out in a vertical 5 cased wellbore, it should be recognized that the present , invention can equally be used in open-hole and/or underreamed completions as well as in inclined and horizontal wellbores (FIG. 4) as the situation dictates.
As illustrated, fracture interval 12 is a thick formation having a substantial length which extends vertically along wellbore 11. Casing 13 may have perforations 14 throughout fracture interval 12 or may be perforated at selected levels within the fracture interval. Since the present invention is also applicable for use in horizontal and inclined wellbores, the terms "upper and lower", "top and bottom", as used herein are relative terms and are intended to apply to the respective 'positions within a particular wellbore while the term "levels"
is meant to refer to respective positions lying along the wellbore between the terminals of the fracture interval 12.
A fracturing workstring 20 is positioned in wellbore 11 substantially adjacent fracture interval 12. Fracturing .._ workstring 20 is comprised of a string of tubing 21 or the like Which is open at its lower end 22 and which extends to the _.. surface (not shown). A typical "cross-over" 23 is connected into workstring 20 and is positioned to lie at the top of fracture interval 12 when the workstring 20 is in its operable position within the wellbore 11. -Packer 15 is carried on the exterior of workstring 20 to isolate the fracture interval 12.
The workstring 20 has one or more shunts tubes 25 which are radially-spaced around the workstring 20 and which extend vertically from just below cross-over 23.to the lower end 22 of tubing 21. Each shunt tube 25 has a plurality of openings 26 ' spaced along its length which provide "alternative flowpaths"-for the delivery of fluids to different levels within the fracture interval 12 for a purpose to be discussed in detail below.
Each shunt tube may be open at its ends to allow fluids to S

_ g _ enter therein or provide entry of fluids through appropriate openings 26 (e. g. those near the top and bottom of the tube).
Shunts tubes of this type have been used to provide alternative flowpaths for fluids in a variety of different well operations, see US-A-4945991; US-A-5082052; US-A-5113935; US-A-5161613; and US-A-5161618 .
While openings 26 in each of the shunt tubes 25 may be a radial opening extending from the front of the tube, preferably the openings extend from each side of the shunt tube 25, as shown. Further, it is preferred that an exit tube 24a (only four shown in FIG. 5) is provided for each opening 24. The construction and purpose for exit tubes 24a-is.disclosed in PCT
application no PCT/US94J13489.
The portion of tubing string 21 below cross-over 23 has a plurality of radial, "unloading" ports 2~ spaced vertically along its length. As best- seen in FI6. 5, these ports are preferably provided in. couplings 28 which connect the joints 29 of tubing string 21 together. A screen 30 covers each of the ports 2~ which allows fluids to flow through ports 2~ but which prevents particulate material from flowing into workstring 20.
In operation, if wellbore 11 extends for a distance substantially below the bottom of fraetuue interval 12, the wellbore is blocked-off adjacent the lower end of fracture interval 12 by a plug or packer 31, as wilLbe understood in the art. Fracturing workstring 20 is lowered into wellbore 11 which, in turn, forms a well annulus 33-'between workstring 20 and the wellbore 11. In deeper wells, packer 15 is then set to isolate that portion 33a of the annulus which lies adjacent fracture interval 12. In shallower wells, packer 15 would not be necessary and annulus 33 would be open to the surface.
A fracturing fluid (solid arrows in FIGS. 1-3) is then flowed down the wellbore and into the annulus adjacent the fracture interval. In shallow wells wherein packer 15 and cross-over 23 are not used, the fracturing can be flowed into either end of the annulus (ie: (a) into the top of the annulus by closing the top of workstring 20 and flowing the fracturing fluid directly though annulus 33; or (b) into the bottom of the - 10 _.
annulus by closing the top of the annulus 33 and flowing the fracturing f luid down the workstring 20 ) or the fracturing f luid can be flowed down both workstring 20 and annulus 33 into both ends of the annulus simultaneously.
The fracturing fluid used in the present invention can be any well-known fluid commonly used for fracturing formation (e. g. water, muds, etc.) but is preferably one of the many commercially-available substantially particle-free "gels" which are routinely used in conventional fracturing operations (e. g.
Versagel, product of Halliburton Company, Duncan, OK).
As illustrated in the drawings, in deeper wells, the fracturing fluid is shown as simultaneously flowing into both ends of isolated annulus 33a to initiate a fracture. That is, the fracturing fluid flows down the workstring 20, through openings 40 in cross-over 23, and into the top of isolated annulus 33a while additional fracturing fluid flows downward through annulus 33, pipe 41 of cross-over 23, out the lower end of workstring 20, and Into the bottom Of isolated annulus 33a. It should be understood, that the fracturing fluid can be flowed into only one arid ( i . e. either end) Of isolated annulus 33a to initiate a fracture if the situation dictates. This is done by flowing the fracturing fluid down either workstring 20 or annulus 33 while closing the other to flow.
The flowing fracture fluid fills isolated annulus 33a and will initiate a fracture A in fracture interval 12. This is also true in shallow wells. While the fracture is shown in FIG. 1 as being initiated at an upper level of fracture interval 12, it should be understood that this fracture may be initiated at any level within the fracture interval 12, that being the level at which the formation has the lowest "break-down" pressure, depending on the particular formation being fractured.
Once the fracture has been sufficiently initiated, the flow of fracturing fluid is continued to one end of isolated annulus 33a while slurry is flowed to the other end thereof. As illustrated in FIG.2, the flow of fracturing fluid down annulus 33 is continued while the flow of fracturing fluid through the workstring 2p is~
replaced with flow of a slurry (dotted arrows in FIGS. 2 and 3) which is laden with proppants (e.g. gravel and/or sand). The fracturing fluids continue to f low into the lower end of annulus 33a while the slurry flows into the upper end of the annulus.
This is the preferred mode but it should be understood that the flows could be reversed if the situation dictates.
The slurry flows into initial fracture A to deposit the proppants and thereby prop the fracture while the fracturing fluid flowing upward from the bottom of isolated annulus 33a will continue to fracture the formation and enlarge the initial fracture A as indicated by dotted line B in FIG. 2.
Under normal conditions such as those in conventional fracturing techniques, the slurry will lose liquid as it flows into the formation and proppants (i.e. particulate material) will settle out in the isolated annulus 33a at a point adjacent the initial fracture A. This results in the formation.of a sand bridge (S in FIG. 3) in the annulus which, in turn, blocks flow of slurry to the lower portion of isolated annulus 33a. Even though the fracturing fluid through the lower end of the annulus may continue to enlarge the fracture (e. g. C in FIG. 3), no slurry can reach the enlarged portion of the fracture and accordingly, this portion of the fracture remains unpropped.
In accordance with the present invention, the flow of.
slurry is continued through the upper end of the annulus 33a while fracturing f luid is f lowed through the lower end thereof .
2 5 The slurry, while blocked by sand bridge S in isolated annulus 33a, is free to flow into the open, upper ends of shunts tubes 25 and down therethrough and out the openings 26 therein. It can be seen that the alternative flowpaths provided by the shunts 25 provide a bypass around bridge S and will deliver the slurry to the different levels within fracture intervals (e. g. those represented by dotted lines B and C) whereby slurry can flow into and prop the enlarged portions of the fractures (see FIG.
3) .
The simultaneous injection of fracturing and slurry is continued until the fracture interval is fractured and propped across substantially its entire thickness or length. It should be recognized that the individual flow rates of the fracturing fluid and the slurry can be varied to adjust the desired direction of f low of the fracturing f luid and slurry through the alternative flowpaths to achieve the desired fracturing and propping across the fracture interval.
As mentioned above, the fracture may be initiated at some level other than at the top of interval 12 as illustrated. For example, the fracture may be initiated at the middle of interval 12. The alternative flowpaths of the present invention will still allow the enlargement and propping of the fracture above and/or below the initial fracture by allowing either the fracturing fluid to flow upward through the shunt tubes to levels above any sand bridges that may be formed and/or the slurry to flow downward through the shunt tubes to levels below the bridge. This is accomplished by adjusting the respective rates of flow for the fracturing fluid and the slurry into isolated annulus 33a as the fracturing operation proceeds.
As will be understood by those skilled in the art, except in unconsolidated formations, it is usually desirable to remove fracturing workstring 20 after the completion of the fracturing operation. This may be difficult in most instances due to the proppants, e.g. sand, which fill and remain in isolated annulus 33a after the fracturing and propping operation is completed. To remove workstring 20, the lower wellbore annulus has to be "unloaded".
One way to accomplish this is to pump a wash fluid (e. g. water) down the annulus 33, through pipe 41 in cross-over 23, down the interior of lower workstring 20, and back to the surface in the reverse circulation mode.
As the wash fluid f lows downward in lower workstring 2 0 under pressure, it will f low out the lower end of the workstring and also through "unloading" ports 27 to churn-up and wash the sand l.n isolated annulus 33a upward through openings 40 in cross-over 23 and on to the surface through the upper portion of the workstring. Any flow of fracturing fluid through ports 27 during the fracturing operation is of no consequence since isolated annulus 33a is already filled with fracturing fluid under pressure. Likewise, there will only be minor amounts of liquid from the slurry flow inward through ports 27 during the fracturing operation. Screens 30 will prevent any proppants from f lowing into and blocking ports 27 during the flow of slurry through isolated annulus 33a so the ports will remain open for the unloading of the workstring.
FIG. 4 illustrates the present invention as it is carried out in a horizontal well. As will be understood in this art, well l0a has a vertical portion 11v which extends from the surface and a horizontal portion 11h which extends outward from the lower end of portion ilv. Basically, fracturing workstring 20 is identical to that described above and the operational steps are the same with the only difference being that the fracture interval 12a in FIG. 4 is comprised of a plurality of zones ZZ, Z2, and Z3 which are horizontally spaced along wellbore llh.
In carrying out the fracturing operation of FIG. 4, fracturing f luid is f lowed down either or both workstring 20 and well annulus 33, through cross-over 23 (if. present) and into either of both the top and bottom of annulus 33h to initiate a first fracture, e.g. fractures D in Z1. This can be encouraged by selective perforating the casing at desired levels. The flow of fracturing fluid is continued through one end of annulus 33h (e.g.._the.bottom) while slurry with proppants is flowed into the other end of the annulus 33h (e. g. the top) to prop the initial fracture D. The fracturing fluid, now instead of enlarging fracture D, will initiate a second fracture (E in Z2). If a sand bridge S2 forms in the annulus, slurry flows through the alternative paths provided by shunts 25 to prop the fracture E
while the continued flow of fracturing fluid through the lower end of annulus 33h will initiate a third fracture (e. e. F in Z3 ) and so on.
The alternative flowpaths provided by shunts 25 allows the slurry to reach and prop all of the fractures along horizontal portion llh even as sand bridges form in annulus 33h. As before, the order in which the fractures are initiated is not critical since the shunt tubes 25 allow either the fracture fluid or the slurry to bypass sand bridges in the annulus in response to the respective flow rates.

It is also possible to use the present invention to fracture, prop, and gravel pack an injection or production interval within a well, all with ~a single operation. As illustrated in FIG. 6, a gravel pack screen 50 is connected into the lower end of workstring 20a. "Gravel pack screen" or "screen" as used herein, is intended .to be generic and to include screens, slotted pipes, screened pipes, perforated liners, pre-packed screens and/or liners, combinations of same, etc., which are used in well completions of this general type.
Screen 50 may be of a continuous length, as shown, or it may be comprised of a plurality of screen segments connected together by subs or "blanks". A plurality of shunt tubes 25a having opening 26a therein are spaced radially around screen 50 and extending throughout the interval to be fractured and completed.
As illustrated, a wash pipe 51 is connected to pipe 41 of cross-over 23 and, although illustrated, as extending through screen 5o but it should be understood that wash pipe 51 can terminate within the lower portion of -screen 50 wherein the fracturing fluid will enter the lower end of annulus 33p through the screen, itself. Returning now to FIG. 6, the lower end of wash pipe 51 is shown passing through an opening in bottom plate 52 and is sealed therewith by a seal ( e. g. O-ring 53 of the like). As pipe 51 passes through plate 52, a spring-biased flapper valve 54 or the like is pushed downward and is held in an open position by the wash pipe. The underside of plate 52 can be open to annulus 33p or can be in fluid communication with annulus 33b through openings 55 in tattletale 56, as will be understood by those skilled in the art.
A fracturing and propping operation which includes gravel pack screen 50 is basically the same as described above.
Fracturing fluid is flowed down through either or both workstring 20a and annulus 33p,through cross-over 23 and wash pipe 51, and into both the top and the bottom of annulus 33p.
After a fracture is initiated (not shown) , slurry with proppants is flowed down the workstring and into the one end of the annulus 33p while the flow of fracturing fluid is continued into the other end of the annulus.

~~ 8~~~~
W O 95!33915 PCTIUS95/07016 If, or as, a sand bridge forms in the annulus, shunts 25a provide alternative flowpaths for delivering the slurry/fracturing fluids to other levels in the fracture intervals in the same manner as described above. After achieving the desire fracture across the fracture interval, the flow of fracturing fluid is halted and the flow of slurry is continued until the annulus 33p around gravel pack screen is filled or packed with gravel. -Since the screen is to be left in the wellbore, there is no need to "unload" the annulus to surrounding the screen.
As the cross-over 23 and wash pipe 51 is removed to the surface, if flapper valve 54 is-used, it will be biased shut to prevent any production of particulates through screen 50. The use of flapper valve 54 or its equivalent allows the flow of slurry to the lower end of screen 50 without getting sand in the interior of the screen so that a "bottom up" gravel packing operation can be carried out, if desired.
In the present invention, the alternative flowpaths continue to deliver the slurry and/or fracturing fluid to the different levels or zones of the fracture interval so that thick and/or non-homogenous intervals can be fractured and propped and gravel packed during a single operation regardless of which level or zone fractures first or whether or not sand bridges form in the wellbore during the fracturing operation.
',

Claims (17)

CLAIMS:
1. A method for fracturing and propping a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising:
(a) positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore;
(b) flowing a fracturing fluid from the surface through a first flowpath into at least one end of that portion of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture in said fracture interval;
(c) flowing a slurry containing proppants from the surface through a separate second flowpath into one end of the said portion of the well annulus while continuing to flow fracturing fluid through said first flowpath into the other end of the said portion of the well annulus; and (d) delivering said slurry containing proppants though alternative flowpaths to different levels within said portion of the well annulus while continuing to flow said slurry through said one end of said portion of the well annulus and said fracturing fluid through said other end of said portion of the well annulus.
2. A method according to claim 1 wherein said first flowpath through which said fracturing fluid flows down said well annulus into a top end of said portion of the well annulus.
3. A method according to claim 1 wherein said first flowpath through which said fracturing fluid flows down said workstring extends into a bottom end of said portion of the well annulus.
4. A method according to claim 1 wherein said fracturing fluid is flowed into both ends of said portion of the well annulus simultaneously.
5. A method according to claim 1, including the step of isolating said portion of the well annulus which lies adjacent said fracture interval prior to flowing said fracturing fluid into at least one end of the said portion of the well annulus.
6. ~A method according to claim 5 wherein said workstring includes a cross-over and wherein in step (b) said fracturing fluid is flowed down said well annulus, through said cross-over in said workstring, and into a bottom end of said isolated portion of the well annulus while said fracturing fluid is also being flowed down said workstring, out of said cross-over, and into a top of said isolated portion of the well annulus to thereby initiate said fracture in said fracture interval.
7. A method according to claim 6 wherein in step (c) said fracturing fluid is flowed down said well annulus, through said cross-over into said workstring, and into said bottom end of said isolated portion of the well annulus while said slurry with proppants is also being flowed down said workstring, out of said cross-over, and into the top of said isolated portion of the well annulus to thereby prop said initial fracture in said fracture interval.
8. A method according to any one of claims 1 to 4 wherein said alternative flowpaths are provided by shunt tubes which are spaced radially around said workstring and which extend through said fracture interval, each of said shunt tubes having inlet and outlet openings spaced along the length of said shunt tubes.
9. A method according to any one of claims 5, 6 or 7 wherein said alternative flowpaths are provided by shunt tubes which are spaced radially around said workstring and which extend through said fracture interval, each of said shunt tubes having inlet and outlet openings spaced along the length of said shunt tubes.
10. A method according to any one of claims 1 to 4 and 8 wherein said fracturing fluid is a fracturing gel and said proppants are sand.
11. A method according one any one of claims 5, 6, 7 and 9 wherein said fracturing fluid is a fracturing gel and said proppants are sand.
12. A method according to any one of claims 1 to 4, 8 and 10, including the steps of ceasing flow of both said fracturing fluid and said slurry with proppants when said fracture interval has been fractured and propped; and flowing a wash fluid down said wellbore to unload said workstring whereby said workstring can be removed from said wellbore.
13. A method according to any one of claims 5, 6, 7, 9 and 11, including the steps of ceasing flow of both said fracturing fluid and said slurry with proppants when said fracture interval has been fractured and propped; and flowing a wash fluid down said wellbore to unload said workstring whereby said workstring can be removed from said wellbore.
14. A method according to any one of claims 1 to 4, 8, 10 and 12, wherein the formation can be gravel packed by providing said workstring with a gravel pack screen which lies adjacent said fracture interval.
15. A method according to any one of claims 5, 6, 7, 9, 11 and 13, wherein the formation can be gravel packed by providing said workstring with a gravel pack screen which lies adjacent said fracture interval.
16. A method according to claim 14, including the steps of ceasing flow of said fracturing fluid when said fracture interval has been fractured and propped; and continuing to flow slurry with proppants through at least one end of said portion of the well annulus to deposit proppants in said fracture interval around said gravel pack screen.
17. A method according to claim 15, including the steps of ceasing flow of said fracturing fluid when said fracture interval has been fractured and propped; and continuing to flow slurry with proppants through at least one end of said isolated portion of the well annulus to deposit proppants in said isolated fracture interval around said gravel pack screen.
CA002187644A 1994-06-06 1995-06-01 Method for fracturing and propping a subterranean formation Expired - Lifetime CA2187644C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US08/254,623 US5417284A (en) 1994-06-06 1994-06-06 Method for fracturing and propping a formation
US08/254,623 1994-06-06
PCT/US1995/007026 WO1995033915A1 (en) 1994-06-06 1995-06-01 Method for fracturing and propping a subterranean formation

Publications (2)

Publication Number Publication Date
CA2187644A1 CA2187644A1 (en) 1995-12-14
CA2187644C true CA2187644C (en) 2005-08-23

Family

ID=22964985

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002187644A Expired - Lifetime CA2187644C (en) 1994-06-06 1995-06-01 Method for fracturing and propping a subterranean formation

Country Status (9)

Country Link
US (1) US5417284A (en)
EP (1) EP0764235B1 (en)
AT (1) ATE234416T1 (en)
AU (1) AU681297B2 (en)
CA (1) CA2187644C (en)
DE (1) DE69529898T2 (en)
NO (1) NO320992B1 (en)
RU (1) RU2138632C1 (en)
WO (1) WO1995033915A1 (en)

Families Citing this family (67)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5560427A (en) * 1995-07-24 1996-10-01 Mobil Oil Corporation Fracturing and propping a formation using a downhole slurry splitter
US5722490A (en) * 1995-12-20 1998-03-03 Ely And Associates, Inc. Method of completing and hydraulic fracturing of a well
US5690175A (en) * 1996-03-04 1997-11-25 Mobil Oil Corporation Well tool for gravel packing a well using low viscosity fluids
US5848645A (en) * 1996-09-05 1998-12-15 Mobil Oil Corporation Method for fracturing and gravel-packing a well
US5868200A (en) 1997-04-17 1999-02-09 Mobil Oil Corporation Alternate-path well screen having protected shunt connection
US5890533A (en) * 1997-07-29 1999-04-06 Mobil Oil Corporation Alternate path well tool having an internal shunt tube
US6427775B1 (en) 1997-10-16 2002-08-06 Halliburton Energy Services, Inc. Methods and apparatus for completing wells in unconsolidated subterranean zones
US6481494B1 (en) 1997-10-16 2002-11-19 Halliburton Energy Services, Inc. Method and apparatus for frac/gravel packs
US6003600A (en) * 1997-10-16 1999-12-21 Halliburton Energy Services, Inc. Methods of completing wells in unconsolidated subterranean zones
EP0909875A3 (en) 1997-10-16 1999-10-27 Halliburton Energy Services, Inc. Method of completing well in unconsolidated subterranean zone
US6446727B1 (en) * 1998-11-12 2002-09-10 Sclumberger Technology Corporation Process for hydraulically fracturing oil and gas wells
US6230803B1 (en) 1998-12-03 2001-05-15 Baker Hughes Incorporated Apparatus and method for treating and gravel-packing closely spaced zones
US6140277A (en) 1998-12-31 2000-10-31 Schlumberger Technology Corporation Fluids and techniques for hydrocarbon well completion
US6230805B1 (en) * 1999-01-29 2001-05-15 Schlumberger Technology Corporation Methods of hydraulic fracturing
US6227303B1 (en) * 1999-04-13 2001-05-08 Mobil Oil Corporation Well screen having an internal alternate flowpath
US6220345B1 (en) 1999-08-19 2001-04-24 Mobil Oil Corporation Well screen having an internal alternate flowpath
US6253851B1 (en) * 1999-09-20 2001-07-03 Marathon Oil Company Method of completing a well
US6409219B1 (en) 1999-11-12 2002-06-25 Baker Hughes Incorporated Downhole screen with tubular bypass
US6460619B1 (en) * 1999-11-29 2002-10-08 Shell Oil Company Method and apparatus for creation and isolation of multiple fracture zones in an earth formation
CA2355104A1 (en) 2000-01-05 2001-07-12 Baker Hughes Incorporated Apparatus and method for treating and gravel-packing closely spaced zones
US6644406B1 (en) * 2000-07-31 2003-11-11 Mobil Oil Corporation Fracturing different levels within a completion interval of a well
US6464007B1 (en) 2000-08-22 2002-10-15 Exxonmobil Oil Corporation Method and well tool for gravel packing a long well interval using low viscosity fluids
US6520254B2 (en) 2000-12-22 2003-02-18 Schlumberger Technology Corporation Apparatus and method providing alternate fluid flowpath for gravel pack completion
US6557634B2 (en) * 2001-03-06 2003-05-06 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6789624B2 (en) 2002-05-31 2004-09-14 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6588506B2 (en) 2001-05-25 2003-07-08 Exxonmobil Corporation Method and apparatus for gravel packing a well
US6752207B2 (en) 2001-08-07 2004-06-22 Schlumberger Technology Corporation Apparatus and method for alternate path system
US6830104B2 (en) * 2001-08-14 2004-12-14 Halliburton Energy Services, Inc. Well shroud and sand control screen apparatus and completion method
US6932156B2 (en) * 2002-06-21 2005-08-23 Baker Hughes Incorporated Method for selectively treating two producing intervals in a single trip
US6863131B2 (en) 2002-07-25 2005-03-08 Baker Hughes Incorporated Expandable screen with auxiliary conduit
US6776236B1 (en) 2002-10-16 2004-08-17 Halliburton Energy Services, Inc. Methods of completing wells in unconsolidated formations
US6923262B2 (en) * 2002-11-07 2005-08-02 Baker Hughes Incorporated Alternate path auger screen
US6814144B2 (en) 2002-11-18 2004-11-09 Exxonmobil Upstream Research Company Well treating process and system
US20040140089A1 (en) * 2003-01-21 2004-07-22 Terje Gunneroed Well screen with internal shunt tubes, exit nozzles and connectors with manifold
US6978840B2 (en) * 2003-02-05 2005-12-27 Halliburton Energy Services, Inc. Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production
US7870898B2 (en) * 2003-03-31 2011-01-18 Exxonmobil Upstream Research Company Well flow control systems and methods
EP1608845B1 (en) * 2003-03-31 2016-11-23 Exxonmobil Upstream Research Company A wellbore apparatus and method for completion, production and injection
US20050028977A1 (en) * 2003-08-06 2005-02-10 Ward Stephen L. Alternate path gravel packing with enclosed shunt tubes
US20050061501A1 (en) * 2003-09-23 2005-03-24 Ward Stephen L. Alternate path gravel packing with enclosed shunt tubes
US20050082060A1 (en) * 2003-10-21 2005-04-21 Ward Stephen L. Well screen primary tube gravel pack method
US7866708B2 (en) * 2004-03-09 2011-01-11 Schlumberger Technology Corporation Joining tubular members
US7185703B2 (en) * 2004-06-18 2007-03-06 Halliburton Energy Services, Inc. Downhole completion system and method for completing a well
US7243723B2 (en) * 2004-06-18 2007-07-17 Halliburton Energy Services, Inc. System and method for fracturing and gravel packing a borehole
US20060037752A1 (en) * 2004-08-20 2006-02-23 Penno Andrew D Rat hole bypass for gravel packing assembly
CA2530995C (en) * 2004-12-21 2008-07-15 Schlumberger Canada Limited System and method for gas shut off in a subterranean well
US7905284B2 (en) * 2005-09-07 2011-03-15 Halliburton Energy Services, Inc. Fracturing/gravel packing tool system with dual flow capabilities
US7997344B2 (en) * 2007-09-11 2011-08-16 Baker Hughes Incorporated Multi-function indicating tool
US7748459B2 (en) * 2007-09-18 2010-07-06 Baker Hughes Incorporated Annular pressure monitoring during hydraulic fracturing
US9194227B2 (en) 2008-03-07 2015-11-24 Marathon Oil Company Systems, assemblies and processes for controlling tools in a wellbore
US10119377B2 (en) * 2008-03-07 2018-11-06 Weatherford Technology Holdings, Llc Systems, assemblies and processes for controlling tools in a well bore
WO2009126057A1 (en) * 2008-04-09 2009-10-15 Schlumberger Canada Limited Method of producing high permeability hydraulic fractures (variants) and system used for method implementation
CN102203375B (en) * 2008-11-03 2014-05-14 埃克森美孚上游研究公司 Well flow control systems and methods
US7798227B2 (en) * 2008-12-22 2010-09-21 Bj Services Company Llc Methods for placing multiple stage fractures in wellbores
US8839861B2 (en) 2009-04-14 2014-09-23 Exxonmobil Upstream Research Company Systems and methods for providing zonal isolation in wells
WO2012074614A1 (en) 2010-12-03 2012-06-07 Exxonmobil Upstream Research Company Double hydraulic fracturing methods
RU2472926C1 (en) * 2011-07-20 2013-01-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for multiple hydraulic fracturing of formation in horizontal shaft of well
EA025464B1 (en) 2011-10-12 2016-12-30 Эксонмобил Апстрим Рисерч Компани Fluid filtering device for a wellbore and method for completing a wellbore
CN104755695B (en) 2012-10-26 2018-07-03 埃克森美孚上游研究公司 Method for the underground adapter assembly of flow control and for completing pit shaft
US9638013B2 (en) 2013-03-15 2017-05-02 Exxonmobil Upstream Research Company Apparatus and methods for well control
WO2014149395A2 (en) 2013-03-15 2014-09-25 Exxonmobil Upstream Research Company Sand control screen having improved reliability
RU2541693C1 (en) * 2014-01-09 2015-02-20 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method for formation hydraulic fracturing in horizontal open well shaft
RU2547892C1 (en) * 2014-03-26 2015-04-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Multiple hydraulic fracturing of formation in well horizontal shaft
WO2015168690A1 (en) 2014-05-02 2015-11-05 Baker Hughes Incorporated Use of ultra lightweight particulates in multi-path gravel packing operations
US20170198550A1 (en) * 2014-07-01 2017-07-13 Shell Oil Company Injector fill displacement tubes
WO2016085451A1 (en) * 2014-11-24 2016-06-02 Halliburton Energy Services, Inc. Fracturing and in-situ proppant injection using a formation testing tool
RU2571964C1 (en) * 2014-12-30 2015-12-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Hydrofracturing method for formation in well
WO2019182706A1 (en) 2018-03-19 2019-09-26 Halliburton Energy Services, Inc. Systems and methods for gravel packing wells

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3151678A (en) * 1958-09-02 1964-10-06 Dow Chemical Co Method of fracturing formations
US3664422A (en) * 1970-08-17 1972-05-23 Dresser Ind Well fracturing method employing a liquified gas and propping agents entrained in a fluid
US3868998A (en) * 1974-05-15 1975-03-04 Shell Oil Co Self-acidifying treating fluid positioning process
US4397353A (en) * 1982-06-11 1983-08-09 Lacy James P Method for vertical fracture growth control
US4685519A (en) * 1985-05-02 1987-08-11 Mobil Oil Corporation Hydraulic fracturing and gravel packing method employing special sand control technique
US4945991A (en) * 1989-08-23 1990-08-07 Mobile Oil Corporation Method for gravel packing wells
US5005649A (en) * 1990-02-28 1991-04-09 Union Oil Company Of California Multiple fracture production device and method
US5036920A (en) * 1990-05-04 1991-08-06 Atlantic Richfield Company Gravel pack well completion with auger-screen
US5027899A (en) * 1990-06-28 1991-07-02 Union Oil Company Of California Method of gravel packing a well
US5082052A (en) * 1991-01-31 1992-01-21 Mobil Oil Corporation Apparatus for gravel packing wells
US5113935A (en) * 1991-05-01 1992-05-19 Mobil Oil Corporation Gravel packing of wells
US5161613A (en) * 1991-08-16 1992-11-10 Mobil Oil Corporation Apparatus for treating formations using alternate flowpaths
US5161618A (en) * 1991-08-16 1992-11-10 Mobil Oil Corporation Multiple fractures from a single workstring

Also Published As

Publication number Publication date
CA2187644A1 (en) 1995-12-14
NO320992B1 (en) 2006-02-20
EP0764235A4 (en) 2000-07-05
EP0764235A1 (en) 1997-03-26
DE69529898D1 (en) 2003-04-17
RU2138632C1 (en) 1999-09-27
ATE234416T1 (en) 2003-03-15
AU2696195A (en) 1996-01-04
EP0764235B1 (en) 2003-03-12
WO1995033915A1 (en) 1995-12-14
NO964911D0 (en) 1996-11-19
AU681297B2 (en) 1997-08-21
DE69529898T2 (en) 2003-10-09
NO964911L (en) 1996-11-19
US5417284A (en) 1995-05-23

Similar Documents

Publication Publication Date Title
CA2187644C (en) Method for fracturing and propping a subterranean formation
CA2195966C (en) Method of fracturing and propping a formation
US5848645A (en) Method for fracturing and gravel-packing a well
US5560427A (en) Fracturing and propping a formation using a downhole slurry splitter
US7108060B2 (en) Fracturing different levels within a completion interval of a well
US6749023B2 (en) Methods and apparatus for gravel packing, fracturing or frac packing wells
EP0729543B1 (en) Well tool
US7100691B2 (en) Methods and apparatus for completing wells
AU662557B2 (en) Treating formations using alternate flowpaths
US6540022B2 (en) Method and apparatus for frac/gravel packs
US5161618A (en) Multiple fractures from a single workstring
US20020189808A1 (en) Methods and apparatus for gravel packing or frac packing wells
CA2420050C (en) Method and well tool for gravel packing a well using low viscosity fluids
AU2001278984A1 (en) Fracturing different levels within a completion interval of a well

Legal Events

Date Code Title Description
EEER Examination request
MKEX Expiry

Effective date: 20150601