CA2065473C CA002065473A CA2065473A CA2065473C CA 2065473 C CA2065473 C CA 2065473C CA 002065473 A CA002065473 A CA 002065473A CA 2065473 A CA2065473 A CA 2065473A CA 2065473 C CA2065473 C CA 2065473C
Authority
CA
Canada
Prior art keywords
data
section
primary
primary data
updated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA002065473A
Other languages
French (fr)
Other versions
CA2065473A1 (en
Inventor
Kouichi Shibao
Yukinori Osada
Makoto Shimizu
Tadashi Nishimura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AIE RESEARCH Inc
Original Assignee
Mitsui Chemicals Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP03095858A external-priority patent/JP3128257B2/en
Priority claimed from JP09775091A external-priority patent/JP3184551B2/en
Application filed by Mitsui Chemicals Inc filed Critical Mitsui Chemicals Inc
Publication of CA2065473A1 publication Critical patent/CA2065473A1/en
Application granted granted Critical
Publication of CA2065473C publication Critical patent/CA2065473C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N5/00Computing arrangements using knowledge-based models
    • G06N5/02Knowledge representation; Symbolic representation
    • G06N5/022Knowledge engineering; Knowledge acquisition
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general

Abstract

A knowledge base management system for an information reasoning apparatus includes a primary data storage, a change registration section, a data conversion section, a knowledge base section, a reasoning calculation section and a knowledge management section, the knowledge management section monitors accessing from said reasoning calculation section to said knowledge base section, collates an accessed place with information from said change registration section, instructs said conversion section to perform corresponding data conversion processing and to store the converted data in said knowledge base section if it detects accessing to a place in the knowledge base section corresponding to the change data.

Description

' 2~6~~~~
A KNOWLEDGE BASE MANAGEMENT SYSTEM
FOR AN INFORMATION REASONING APPARATUS
BACKGROUND OF THE INVENTION
This invention relates to a kind of technology which is effective when applied to management of secondary data in a knowledge base for intelligent information processing such as deductive reasoning.
With the recent development of memory technology and high-speed processors, the capacity and computational processing ability of engineering work stations (EWS) or the like have remarkably been improved. Utilization of an intelligent information processing system such as an expert system has therefore been expected. In the present situation, however, such a system cannot always be utilized by a user to obtain a satisfactory result.
This is because it is very difficult to form a large-scale knowledge base) more specifically) a knowledge base on a large amount of fact of actual objects. That is) there is a case of knowledge of a fact being expressed in various forms such as diagrams, flow sheets, figures and the like. Such data can not always be suitably processed by intelligent information processing.
For example, for computer-aided design/drawing of a large-scale plant facilities, it is necessary for conventional design 2os~~~~
systems to check the facilities with respect to safety and operational performance by inputting a large amount of information on elements of the facilities in a form suitable for knowledge processing with a computer separately of drawings prepared by CAD.
With respect to knowledge of rules and reasoning, needs for newly forming and adding knowledge may also arise frequently during in the course of the process of forming a knowledge base and performing knowledge processing. For example, if an accident occurs in a plant facility, it is necessary to search for a dangerous place in other facilities where a similar accident may take place to enable prevention of other similar accidents.
According to conventional methods for facility diagnosis or the like, some kinds of accident are previously assumed and data and reasoning rules are correspondingly determined. It is therefore very difficult to cope with problems found later or newly appeared.
In conventional systems, it is difficult to directly utilize the information obtained by design- and drawing-employing CAD or the like to check, evaluate or search necessary items at a design- or drawing-inputting stage or the object obtained after the design, and drawing and it is basically necessary to manually input data into a computer and to manually instruct the computer, because data obtained by 2ss~~~~
design and drawing emplyoing CAD and a knowledge base on facts of constituent elements expressed on drawings are separate by formed and independent of each other.
For a large-scale design, a system may be arranged in which data on facts is input with respect to each target problem, and corresponding rules and knowledge are combined into a program. However, the development of such a system requires a great deal of labor for inputting data, and this system is therefore impracticable in terms of development time and cost.
The recent development of electronic computer systems has also enabled, for example, employing a computer-aided design (CAD) or the like project process in which information on the constructions and the shapes of component parts of a design object and. the connective relationships between the component parts are input as drawings into a computer, literal/numerical information on design conditions, specifications and the like are accumulated into an engineering data base) and these categories of information are accumulated as primary data in the computer.
However, it is difficult to use such primary data as an object of intelligent information processing such as deductive reasoning, and there is a need to reprocess primary data to produce secondary data.
Secondary data thereby produced is, for example, knowledge ~~ 4~3 .~
data on facts expressed in the form of predicates for deductive reasoning .
For the conversion of primary data into secondary data, primary data must be processed mainly by manual operations in conventional method.
When information is externally added to primary data to change specifications or the like, there is a need to repeat the operation for conversion into secondary data each time such information is supplied. In this type of system, therefore, the majority of the amount of intelligent information processing operation is assigned to this processing for conversion and re-formation into secondary data, resulting in a reduction in the efficiency of the main deductive reasoning processing.
SUMMARY OF THE INVENTION
In view of these problems, an object of the present invention is to provide a technique for effecting secondary data generation/reformation very efficiently.
According to one aspect of the present invention, there is provided a knowledge base management system for managing a knowledge base system, comprising: a primary data storage section storing primary data received from one of an input means and an external data base, said primary data storage section storing added or updated primary data received from one of an input means and an external data base; a change registration section recording change data indicating which of said primary data has been added or updated; a data conversion section converting said primary data into secondary data, said secondary data having a data format compatible with said knowledge base system; a knowledge base section having a secondary data storage section storing said secondary data; a reasoning calculation section accessing said secondary data according to reasoning rules based on a received retrieval inquiry; a knowledge management section controlling said conversion section, said knowledge management section controlling said conversion section to convert said primary data corresponding to said secondary data to be accessed by said reasoning calculating section when said recorded change data indicates that said primary data corresponding to said secondary data to be accessed by said reasoning calculating section has been added or updated.
The knowledge management section monitors accessing from said reasoning calculation section to said knowledge base section, collates an accessed place with information from said change registration section, instructs said conversion section to perform corresponding data conversion processing and to store the converted data in said knowledge base section if it detects accessing to a place in the knowledge base section corresponding to the change data.
A knowledge base in which a very large amount of secondary data is accumulated is required to perform practical intelligent information processing. For example, such a knowledge base for equipment maintenance and safety control can be formed by converting primary data such as data of CAD drawings, an engineering data base or the like. It is necessary to maintain consistency and matching of such primary and secondary data. However, it is ordinarily possible that the primary data input time/place differ from the secondary data input time/place. The burden on the computer at the time of conversion from primary data into secondary data is large and the conversion is impossible if the processing performance is not sufficiently high.
There is also a possibility that a need for re-forming secondary data to maintain matching with primary data in intelligent information processing will arise. However, it is also possible that there is no or only a restricted part of a large amount of secondary data which necessitates such re-formation.
In accordance with the present invention, a conversion means such as that mentioned above for conversion from primary data to secondary data is provided by considering the present circumstances of intelligent information processing using a knowledge base. Also, conversion into secondary data is not immediately effected even in a case where a change occurs in primary data in the primary data storage; primary data is converted at a stage of intelligent information processing according to need or is collectively converted in a batch processing manner by delaying intelligent information processing time through a corresponding length of time.
The present invention therefore enables efficient use of ~~~~3 the system by preventing the whole system from being used exclusively for conversion processing in case of primary data addition/changing.
In accordance with a further embodiment, there is provided a method of managing a knowledge base system, comprising the steps of: (a) storing primary data received from one of an input means and an external data base; (b) converting said primary data into secondary data using a data conversion section, said secondary data having a data format compatible with said knowledge base system;
(c) storing said secondary data; (d) storing added or updated primary date received from one of an input means and an external data base; (e) recording change data indicating which of said primary data has been added or updated; (fj accessing said secondary data based on a received retrieval inquiry; (g) collating said accessing of said secondary data with said recorded change data; and (h) controlling said data conversion section to convert said primary data corresponding to said secondary data to be accessed in said step (fj when said recorded change data indicates that said primary data corresponding to said secondary data to be accessed in said step (f) has been added or updated.
BRIEF DESCRIPTION OF THE DRAWINGS
Fig. 1 is a block diagram of the construction of a system for an information reasoning apparatus in accordance with a first embodiment of the present invention;
Fig. 2 is a diagram of a data base construction in accordance with the first embodiment;

Fig. 3 shows correspondence tables in accordance with the first embodiment;
Fig. 4 is a diagram of a knowledge base in accordance with the first embodiment;
Fig. 5 is a diagram of the relationship between primary data, a primary data updating registration table and secondary data in accordance with the first embodiment;
Fig. 6 is a diagram of items of a data change registration table in the knowledge control section in accordance with the first embodiment;
Fig. 7 is a flowchart of a conversion process in accordance with the first embodiment;
Fig. 8 is a block diagram of the construction of a system in accordance with a second embodiment of the present invention;
Fig. 9 is a diagram of drawing data in accordance with the 7a a 20654p second embodiment;
Fig. 10 is a diagram of a figure information table in accordance with the second embodiment;
Fig. 11 is a connection information table in accordance with the second embodiment;
Fig. 12 is a table of group information in connection information in accordance with the second embodiment; and Fig. 13 is a table of an attribute table in accordance with the second embodiment.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
[Embodiment 1]
This embodiment relates to a technique which is effective when applied to management of secondary data included in a knowledge base for intelligent information processing such as calculation reasoning in the field of basic design for electric circuit, actual plant piping or the like.
This embodiment of the present invention in which the present invention is applied to a basic design for actual plant piping and instrumentation will be described below.
Fig. 1 shows the construction of a system in accordance with this embodiment.
As shown in Fig. 1, a primary data input section 101 for inputting primary data such as information on figures, numerals and characters, a primary data storage section 102 for storing the primary data, a data conversion section 104) a knowledge ~0~547~
control section 110, a knowledge base section 107, and a reasoning calculation subsection 108 are provided.
The primary data input section 101 includes a change registration section 103 for registerring information on formation, addition, change or the like of primary data in a knowledge control section 110.
For example, primary data is data) such as that shown in Fig. 2, representing drawings formed by CAD and may include symbol identifier numbers, identifier names, sorting codes representing significations, and information on the connective relationship between symbols, as well as information on figures and shapes. The primary data corresponds to transistor or condenser on electric circuit.
The primary data storage 102 stores) as primary data) a drawing data base and an engineering data base such as those shown in Fig. 2. As minimum units of the drawing data base, a symbol identifier, a sorting code, connective relationship information (indicating that the S1023 and S1024 are connected, in Fig. 2)) shape information (image data) and the like are registered as symbol information. As minimum units of the engineering data base, a identifier number) and technical information, such as a form, an inner bore, a length) and a design pressure design temperature are registered.
In the primary data storage 2 are provided tables (Fig. 3) of correspondence with entitles which are actual objects of 2Q~~~'~~
knowledge base intelligent information processing of a knowledge base described later. The entitles are particular equipment units represented by "D-201" (this means number of Dram is 201) and the like in the above mentioned example relating to facility design and facility diagnosis.
Retrieval area limitation items and key items of primary data are not always consistent if a plurality of kinds of primary data base exist. However, the retrieval order is previously set with respect to the hierarchic relationship according to the relation of inclusion of data areas.
That is) as shown in Fig. 2) the drawing data base has a hierarchic structure of "drawing data base" --~ "plant" -"drawing" -~ "symbol identifier" while the engineering data base has a hierarchic structure of "engineering data base"
"plant" -~ "equipment unit" -~ "equipment identifier".
A data conversion section 104 effects processing for converting the above-described primary data into secondary data used as fact data.
The conversion from primary data into secondary data in the data conversion section 104 is effected as described below.
That is, primary data representing the shape, the connective relationship, the signification and the name of symbols or the like which are elements of drawings in a diagram formed by CAD
or the like is converted into secondary data on facts which is described, for example) in a predicate form and which indicates .~ 206~~~~
the correspondence between symbols identifiers and entity identifiers) the correspondence between entity identifiers and sorting codes representing significations, the correspondence between entity identifiers and so no.
In a secondary data storage 105 in a knowledge base section 107 for storing secondary data, data is held in a form such as that shown in Fig. 4 and this data is used as a knowledge base, i.e., the object of intelligent information processing.
Retrieval area limitation items and key items of secondary data are different from those of the above-described primary data. However, the retrieval order is set according to the relation of inclusion of data areas. For example, the hierarchic relationship in fact data (secondary data) in the knowledge base shown in Fig. 4 is as described below (the direction -~ . lower-class direction).
"Knowledge base" ... "plant" --~ "domain" -i "entity identifier"
If the above described primary data or this data is supplied with additional data or is changed (hereinafter referred to simply as "updated"), the updated primary data is immediately reconverted by the data conversion section 104, and the secondary data is also updated so that matching between the primary data and the secondary data is maintained according to the ordinary method. In accordance with this embodiment) 2os~~~~
however, data conversion at the time of each primary data updating is not effected.
That is, in this embodiment) if the primary data is updated) only information on this updating is first registered in the change registration section 103. This primary data update information is registered with respect to data groups having a suitable size. If the primary data has a hierarchic structure) the update information is attached to upper-class data items of the primary data. For example, if the primary data has the following physical hierarchic structure (the direction -~ . lower-class direction):
"Data base" -~ "file" -~ "record" -~ "field", the update information is registered in the upper-classes inclusive of the "record".
For example, if the data is updated on the "record" unit, bits are set as the update status (flag) of the file and the data base in the upper-classes to indicate "update".
Fig. 5 shows the relationship between the primary data, the update information and the secondary data described above.
Fig. 6 shows examples of items of a data change registration table prepared in the knowledge management section 110.
A conversion process in accordance with this embodiment will now be described below with reference to Fig. 7. When a reasoning calculation subsection 108 is supplied with a retrieval inquiry formula, it accesses the knowledge data base in the secondary data storage 105 by referring to reasoning rules in a reasoning rule storage 106 in the data base section.
Collation required for reasoning (intelligent information processing) by determining whether fact data (secondary data) corresponds to changed data is performed in such a manner that the update status of the updating information stored in the knowledge management section 110 is collated successively from the upper-class data item to the lower-class data item to which this data belongs and, if a non-updated state is confirmed at the stage of the upper-class data item, collation of the updating status is with respect to lower-class data items is stopped. Thus, if the secondary data is not updated, accessing to the knowledge base by the reasoning calculation subsection 108 is continued.
If in this process it is determined that the accessed place corresponds to the changed part of the data, the knowledge management section 110 reads out the changed primary data corresponding to this part from the primary data storage 102, and outputs a conversion instruction to the data conversion section 104. The data conversion section 104 then converts this primary data into new secondary data, and stores this data in the secondary data storage 105 of the knowledge base section 107, thereby updating the corresponding part of the secondary data.
In this process) processing for converting the changed primary data is performed by being successively collated with the update status by the knowledge management section 110.
However, the arrangement may be such that when in the knowledge management section 110 the reasoning calculation subsection 108 is informed of the accessed place, intelligent information processing is delayed to effect conversion/storage of a data area including the changed data in a batch processing manner.
Such batch processing may be performed collectively in accordance with an instruction from the operator. This arrangement is specifically effective in a case where a large amount of primary data is added or updated or in a case where there is a need to perform processing while the designer confirms the design content in the design process) i.e.) step-by-step checking.
Further, a timer may be provided for conversion in a certain cycle in a batch processing manner. If a timer is provided for this purpose, a statistical result of the frequency of accessing to the knowledge base 107 may be recorded and the period of time for batch processing may be set to a period in which the accessing frequency is small. It is thereby possible to efficiently use the whole system.
If primary data of other data bases is converted into fact data, additional data may be externally supplied.
In the above-described embodiment, one secondary data storage 105 is connected with respect to one primary data 2~fi~~~~
storage 102. However, the present invention is not limited to this, and includes a system in which a plurality of knowledge base section 107 are distributed, i.e., a distributed data base system. In such a distributed data base system, when data in a first secondary data storage 105 is changed, the operation of other secondary data storages 105 unrelated to the first data storage is not stopped by conversion processing. It is therefore possible to use the system at an improved efficiency.
Thus, the information processing system for performing intelligent information processing such as deductive reasoning in accordance with the present invention is capable of forming and controlling fact data constituting a knowledge base at a very high efficiency.
[Embodiment 2]
This embodiment of the present invention in which the present invention is applied to a basic design for actual plant piping and instrumentation will be described below.
Fig. 8 is a diagram of the construction of a processor in accordance with the second embodiment. The description for the same blocks as those shown in Fig. 1 will not be repeated.
Fig. 9 shows a portion of an equipment-piping system which is represented by data stored in figure/connection data storage section 1 of a primary data storage 102. In Fig.. 9) a tower 13 and a drum 14 is connected by a piping 15. A design figure such as that shown in Fig. 9 can be drawn by a figure input ' 2~65~7~
means which is known per se through a primary data input section 101 having an input means such as a mouse, a digitizer or the like.
A CRT or the like is ordinarily used as a display unit for a display section. A display unit such as a CRT can also be used as output section 12 as in the case of the display section.
Fig. 10 shows a figure information table which may be provided in any form but which has at least a particular identifier such as a node number for discriminating a symbol in it, a identifier such as a classification code for discriminating the signification of the symbol, and information on primitives such as a straight line and a circular-arc. A
portion code representing the signification of each primitive and a group number for discriminating a group of symbols may be added according to need.
Figs. 11 and 13 show a connective relationship information table and a table of group information in the connective relationship information and clarify the connective relationship between symbols. The position at which a symbol is connected may be indicated as a primitive according to need.
Fig. 13 shows an example of an attribute table stored in the attribute table storage. In Fig. 13) a design pressure of and a set temperature of a drum indicated as attribute data by a identifier (number) "D-201" are 10.3 kg/cm2G and 200~C, 2U6~4~3 respectively. Such attribute data can be registered in a well-known data form such as a table or a field or a relational data base.
In the data conversion section 104, fact data items such as those shown below are generated based on figure/connection data such as that shown in Fig. 9 formed by design-, drawing-inputting and attribute data 2.
KEY (n102346, D-201) (data 1) node(n102346, c101) (data 2) node(n102345, c201) (data 3) node(n102347 c300) (data 4) joint (n102346, (data 5) n102347) joint (data 6) (n102347) n102345) corm(n102346, b2, n102347) bl) (data 7) corm(n102347, bl, n102345, b2) (data 8) attr(D0201') dp) ty0, un141) 10.3) (data 9) attr(D0201', op, ty0) un141) l2.7) (data 10) attr(D0201') dt, ty0, unll,200) (data 11) Significations of these data items are as shown below.

Data 1: the equipment number of symbol n102346 on the diagram is D-201.
Data 2: the classification code of symbol n102346 is c101 (drum 14).
Data 3: symbol nI02345 is c201 (tower 13).
Data 4: symbol n102347 is c300 (piping 15).

2UG~~'~~
Data 5: n102346 and n102347 are connected.
Data 6: n102347 and n102345 are connected.
Data 7: n102346 and n102347 are connected at positions 2 and 1.
Data 8: n102347 and n102345 are connected at positions 1 and 2.
Data 9: the design pressure of D-201 is 10.3 kg/cm2G.
Data 10: the design temperature of D-201 is 200~ C.
Data 11: the operating pressure of D-201 is 12.7 kg/cm2G.
nXXXXXX (X: a numeral) represents a node number and is a identifier number peculiar to each symbol in CAD diagrams.
Predicate rules in the reasoning rule storage 106 are registered in the form of declaration words in the knowledge base section 108.
That is, an expression "if A is established) then B is established" is shown as "A: -B", and an expression "if A and B
are established, then C is established" is shown as "C: -A, B".
Examples of these expression are shown below.
drum(X): -node (X) c101). (rule 1) equipment(X): -drum (X). (rule 2) un-safe-equipment(X) Y): -equipment (X), key (X, Y), attr (Y) dp) z) un141, pd), attr (Y, op, z, un141, Po)) Po < Po.

(rule 3) Each of these rules signifies as described below.
Rule 1: Symbol (node) of sorting code c101 represents a drum.
Rule 2: Drum is an equipment unit.
Rule 3: An equipment unit having an operating pressure higher than the design pressure is dangerous.
Such predicate rules may be previously registered as ordinary rules in the reasoning rule storage l06 or may be input as additional rules when a retrieval inquiry formula is input. Predicate rules externally given in a text from are translated into a form suitable for high-speed retrieval by a deductive data base method to be stored (registered) in the reasoning rule storage 106.
An example of retrieval inquiry supplied to the reasoning calculation subsection 108 is shown below. By the following inquiry) the node number and the equipment number of an unsafe equipment unit are retrieved.
.-un-safe-equipment(X, Y) (inquiry 1) Inquiry 1 input in the predicate form is compiled and translated into a form suitable for high-speed retrieval in a compilation section 16, and is thereafter supplied to the reasoning calculation subsection 108. The reasoning calculation subsection 108 retrieves a corresponding fact based on fact data and predicate rules in response to the inquiry and 206e73 forms a retrieval result as fact data.
The calculation processing in the reasoning calculation subsection 108 will be schematically described below. First, deductive reasoning is effected by referring to each predicate rule in the reasoning rule storage 106.
In this case, rule 3 is referred to in response to inquiry 1. According to rule 3, it can be understood that to retrieve a "dangerous equipment unit", an "equipment unit having an operating pressure higher than the design pressure" may be extracted.
Next, a drum node corresponding to the equipment unit is retrieved according to rule 2. At this time, it is understood from rule 3 that the corresponding node is a node defined with sorting code "c101", and it is found from data 2 that node "n102346" is a drum. Further) it is found from data 1 that this equipment number of this drum is "D-201".
Attribute data with respect to drum "D-201" is retrieved and the design pressure and the operating pressure are compared based on data 9 and data 11, thereby determining that the drum "D-201" corresponds to the dangerous equipment. By this retrieval, the reasoning calculation subsection 108 outputs the following retrieval result:
.-un-safe-equipment(n102346, D-201') (output 1) This output indicates that the node number of the unsafe equipment unit is "n102346" and the corresponding equipment 206e73 number is "D-201" (drum 14).
The reasoning calculation subsection 108 may display a diagram on the CRT in which the corresponding portion is distinctively shown by coloring. In this case, display information from the knowledge base section may be output by an instruction from the deductive reasoning control section 10.
In this case, color code can be added as bundle information to the node number. For example, display data is output with respect to node numbers and color codes, "(n102346,7)., (n102345,1).)". In this example, "n102346" is an unsafe node and the symbol of this node is displayed in red (color code:
7), and "n102345" is a safe node and the symbols of this node is displayed in green (color code: 1).
In the above description) an unsafe portion of piping 15 is indicated based on fact data found by retrieving. There are other kinds of executable retrieving) e.g.) retrieving for displaying only the same types of valves distinctively by coloring, retrieving with respect to a same-pressure possible area for finding a group of equipment units and piping 15 connected without valves, retrieving with respect to an area including equipment units and piping 15 having a low design pressure in a same-pressure possible area, and safety device for finding safety valves connected to equipment units.
In the above-described embodiment, the present invention is applied to a piping plant. However, the present invention ~os~~~~
is not limited to this and can also be utilized for electric (electronic) circuit design, air-conditioning equipment piping design and the like.
The knowledge control section 110 has a change registration section l03 which has a function of registerring, if the content of primary data such as flow sheet CAD data or a drawing data base registered in the fundamental data section 4 is changed) only information which indicates the data has been changed in a log.
The most distinctive feature of this embodiment resides in a method of controlling data in the knowledge base section 107.
That is, in this embodiment, if a part of primary data is changed by a specification change, the conversion section 104 registers only the fact of this change as a log in the change registration section 103 in the conversion knowledge control section 110, and does not update the fact data in the knowledge base section 107 at this stage.
When a retrieval inquiry formula is supplied to the reasoning calculation subsection 108 to start retrieval processing, the knowledge control section 110 always refers to the knowledge base section 107 to collate an access from the reasoning calculation subsection 108 to the secondary data storage 105 with change information in its change information registration section. If with respect to accessed fact data, primary data which is the basis of this fact data has been 20~~~7~
changed, the knowledge control section 110 temporarily stops accessing from the deductive reasoning control section 1, outputs a conversion instruction to the data conversion section 104 to convert the corresponding primary data, and registers the converted data in the secondary data storage 105 of the knowledge base section 107, thereby updating this storage.
Fig. 7 is a flowchart of this process. Thus, in this embodiment, if primary data in the primary data storage 102 has been changed, conversion processing is executed at the retrieval stage according to need without immediately converting the primary data into fact data.
That is, although a very large amount of data is stored in the knowledge base) the fact data accessed by actual retrieval processing is only a small part of the data in the knowledge base.
Accordingly) if the conversion in the data conversion section 104 is executed each time primary data is changed, which data is changed comparatively frequently, the burden on the processor is increased by conversion processing alone and there is a possibility of a considerable reduction in retrieval processing speed.
In accordance with this embodiment, by considering this problem, the conversion processing in the conversion section 5 is executed only when it is required during retrieval processing, thereby achieving a very high processing efficiency.
Specifically) in the case of a distributed data base in which a plurality of knowledge base section 107 are distributed, when primary data in a first knowledge base is changed, the operation of a second knowledge base unrelated to the first data base is not stopped by conversion processing.
It is therefore possible to use the system at an improved efficiency.
In the above-described second embodiment, each time a data change place in the knowledge base section 107 is accessed, changed data is read out from the primary data storage 102 to be converted into fact data. However, the arrangement may be such that when the knowledge control section 110 is informed that an accessed part of fact data corresponds to the changed part) a changed area including the changed data is collectively processed in a batch processing manner.
Also, conversion storing may be performed collectively by an external instruction or timer control.

Claims (14)

1. A method of managing a knowledge base system, comprising the steps of:
(a) storing primary data received from one of an input means and an external data base;
(b) converting said primary data into secondary data using a data conversion section, said secondary data having a data format compatible with said knowledge base system;
(c) storing said secondary data;
(d) storing added or updated primary date received from one of an input means and an external data base;
(e) recording change data indicating which of said primary data has been added or updated;
(f) accessing said secondary data based on a received retrieval inquiry;
(g) collating said accessing of said secondary data with said recorded change data; and (h) controlling said data conversion section to convert said primary data corresponding to said secondary data to be accessed in said step (f) when said recorded change data indicates that said primary data corresponding to said secondary data to be accessed in said step (f) has been added or updated.
2. The method of claim 1, further comprising the step of (i) delaying said step (f) until said data conversion section completes conversion according to said steps (g) and (h).
3. The method of claim 1, further comprising the step of (i) controlling said data conversion section to convert said primary data which said recorded change data indicates has been added or updated when a timer indicates expiration of a predetermined time period.
4. The method of claim 1, further comprising the step of (i) periodically controlling said data conversion section to convert said primary data which said recorded change data indicates has been added or updated.
5. The method of claim 1, wherein said step (e) comprises the steps of:
(e1) forming a data change registration table corresponding to a hierarchical structure of said primary data based on said recorded change data; and (e2) registering an update status for said primary data of upper hierarchy when said recorded change data indicates that said primary data of lower hierarchy belonging to said primary data of said upper hierarchy has been changed.
6. The method of claim 1, wherein said step (h) interrupts performance of said step (f).
7. The method of claim 1, wherein said step (f) accesses said secondary data according to predicate rules based on said received retrieval inquiry, said predicate rules defining concepts and rules for retrieval reasoning, said received retrieval inquiry including an inquiry formula.
8. A knowledge base management system for managing a knowledge base system, comprising:
a primary data storage section storing primary data received from one of an input means and an external data base, said primary data storage section storing added or updated primary data received from one of an input means and an external data base;
a change registration section recording change data indicating which of said primary data has been added or updated;
a data conversion section converting said primary data into secondary data, said secondary data having a data format compatible with said knowledge base system;
a knowledge base section having a secondary data storage section storing said secondary data;
a reasoning calculation section accessing said secondary data according to reasoning rules based on a received retrieval inquiry;
a knowledge management section controlling said conversion section, said knowledge management section controlling said conversion section to convert said primary data corresponding to said secondary data to be accessed by said reasoning calculating section when said recorded change data indicates that said primary data corresponding to said secondary data to be accessed by said reasoning calculating section has been added or updated.
9. The system of claim 8, wherein said knowledge management section delays accessing performed by said reasoning calculating section until said data conversion section completes conversion.
10. The system of claim 8, wherein said knowledge management section controls said data conversion section to convert said primary data which said recorded change data indicates has been added or updated when a timer indicates expiration of a predetermined time period.
11. The system of claim 8, wherein said knowledge management section periodically controls said data conversion section to convert said primary data which said recorded change data indicates has been added or updated.
12. The system of claim 8, wherein said knowledge management section forms a data change registration table corresponding to a hierarchical structure of said primary data based on said recorded change data, registers an update status for said primary data of upper hierarchy when said recorded change data indicates that said primary data of lower hierarchy belonging to said primary data of said upper hierarchy has been added or updated, and controls said data conversion section based on said update statuses.
13. The system of claim 8, wherein said primary data storage section stores primary data on design diagrams, said primary data including connection data and attribute data, said connection data including data on connections between equipment as represented by symbols in said design diagrams, said attribute data including design specifications on said equipment; and further comprising a display displaying said secondary data as design diagrams.
14. The system of claim 8, wherein said reasoning calculating section accesses said secondary data according to predicate rules based on said received retrieval inquiry, said predicate rules defining concepts and rules for retrieval reasoning, said received retrieval inquiry including an inquiry formula.
CA002065473A 1991-04-25 1992-04-07 Knowledge base management system for an information reasoning apparatus Expired - Fee Related CA2065473C (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP3-95858 1991-04-25
JP03095858A JP3128257B2 (en) 1991-04-25 1991-04-25 Graphic information processing device
JP09775091A JP3184551B2 (en) 1991-04-26 1991-04-26 Knowledge-based management method for information inference equipment
JP3-97750 1991-04-26

Publications (2)

Publication Number Publication Date
CA2065473A1 CA2065473A1 (en) 1992-10-26
CA2065473C true CA2065473C (en) 1999-08-10

Family

ID=26437021

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002065473A Expired - Fee Related CA2065473C (en) 1991-04-25 1992-04-07 Knowledge base management system for an information reasoning apparatus

Country Status (5)

Country Link
US (1) US5355445A (en)
EP (1) EP0510452B1 (en)
KR (1) KR100245742B1 (en)
CA (1) CA2065473C (en)
DE (1) DE69226673T2 (en)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5615112A (en) * 1993-01-29 1997-03-25 Arizona Board Of Regents Synthesized object-oriented entity-relationship (SOOER) model for coupled knowledge-base/database of image retrieval expert system (IRES)
US5989835A (en) 1997-02-27 1999-11-23 Cellomics, Inc. System for cell-based screening
JPH10320205A (en) * 1997-05-20 1998-12-04 Fujitsu Ltd Information processor
US6282531B1 (en) * 1998-06-12 2001-08-28 Cognimed, Llc System for managing applied knowledge and workflow in multiple dimensions and contexts
ATE292822T1 (en) 1998-11-13 2005-04-15 Cellomics Inc METHOD AND SYSTEM FOR EFFICIENTLY OBTAINING AND STORING EXPERIMENTAL DATA
US6499024B1 (en) * 1999-08-24 2002-12-24 Stream International, Inc. Method and system for development of a knowledge base system
US6560589B1 (en) * 1999-08-24 2003-05-06 Stream International, Inc. Method and system for use and maintenance of a knowledge base system
US6591258B1 (en) * 1999-08-24 2003-07-08 Stream International, Inc. Method of incorporating knowledge into a knowledge base system
CA2396495A1 (en) 2000-01-25 2001-08-02 Cellomics, Inc. Method and system for automated inference creation of physico-chemical interaction knowledge from databases of co-occurrence data
US6813615B1 (en) 2000-09-06 2004-11-02 Cellomics, Inc. Method and system for interpreting and validating experimental data with automated reasoning
US7254605B1 (en) * 2000-10-26 2007-08-07 Austen Services Llc Method of modulating the transmission frequency in a real time opinion research network
TW511011B (en) * 2001-05-18 2002-11-21 Mitac Int Corp Control method of data life cycle applied to knowledge management
US6834274B2 (en) 2002-01-07 2004-12-21 Dennis W. Tafoya Building a learning organization using knowledge management
US7469242B2 (en) * 2002-05-23 2008-12-23 The Boeing Company Central based computer network of solid models and associated data with search capability
US20050071136A1 (en) * 2003-09-30 2005-03-31 Vredenburgh David W. Knowledge management system with interactive rule changes for computer-aided design modeling
US20050071135A1 (en) * 2003-09-30 2005-03-31 Vredenburgh David W. Knowledge management system for computer-aided design modeling
US20050120010A1 (en) * 2003-11-20 2005-06-02 Apriori Technologies, Inc. System and method for determining costs within an enterprise
US20050203718A1 (en) * 2004-03-12 2005-09-15 Carek Rick A. Knowledge management system with integrated product document management for computer-aided design modeling
JP4808524B2 (en) * 2006-03-17 2011-11-02 株式会社日立製作所 Data processing method, data processing system, and data processing program
KR100823289B1 (en) * 2006-08-28 2008-04-17 한국과학기술정보연구원 Apparatus and method for managing outcomes based on URI
US7970587B2 (en) * 2007-03-23 2011-06-28 Siemens Industry, Inc. System and method for defining part interfaces
US10002324B1 (en) 2008-10-31 2018-06-19 Emergent Systems Corporation Method for determining data quality in a knowledge management system
US8347236B1 (en) 2009-02-24 2013-01-01 Emergent Systems Corporation Client server interface for a knowledge management system
US8204902B1 (en) 2009-02-27 2012-06-19 Emergent Systems Corporation Dynamic ranking of experts in a knowledge management system
WO2010134319A1 (en) * 2009-05-18 2010-11-25 Yanase Takatoshi Knowledge base system, logical operation method, program, and storage medium
US8914141B2 (en) 2009-10-02 2014-12-16 Apriori Technologies, Inc. Template framework for automated process routing
US9275333B2 (en) 2012-05-10 2016-03-01 Eugene S. Santos Augmented knowledge base and reasoning with uncertainties and/or incompleteness
US9600770B1 (en) 2014-02-13 2017-03-21 Emergent Systems Corporation Method for determining expertise of users in a knowledge management system
CN106776635A (en) * 2015-11-24 2017-05-31 北京国双科技有限公司 The update method and device of knowledge database data
US10482088B2 (en) 2016-05-04 2019-11-19 Eugene S. Santos Augmented exploration for big data and beyond

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4930071A (en) * 1987-06-19 1990-05-29 Intellicorp, Inc. Method for integrating a knowledge-based system with an arbitrary database system
JPH01134628A (en) * 1987-11-20 1989-05-26 Hitachi Ltd Knowledge using system for data base
US5136523A (en) * 1988-06-30 1992-08-04 Digital Equipment Corporation System for automatically and transparently mapping rules and objects from a stable storage database management system within a forward chaining or backward chaining inference cycle
US5228116A (en) * 1988-07-15 1993-07-13 Aicorp., Inc. Knowledge base management system
JPH0484333A (en) * 1990-07-27 1992-03-17 Hitachi Ltd System for managing knowledge base of maintenance work supporting system

Also Published As

Publication number Publication date
CA2065473A1 (en) 1992-10-26
US5355445A (en) 1994-10-11
KR920020335A (en) 1992-11-21
DE69226673T2 (en) 1999-02-11
EP0510452B1 (en) 1998-08-19
KR100245742B1 (en) 2000-03-02
EP0510452A2 (en) 1992-10-28
DE69226673D1 (en) 1998-09-24
EP0510452A3 (en) 1993-08-25

Similar Documents

Publication Publication Date Title
CA2065473C (en) Knowledge base management system for an information reasoning apparatus
CN101479697B (en) Systems and methods for data storage and retrieval
Engles A tutorial on data base organization
US5459860A (en) Computerized system and process for managing a distributed database system
US4933848A (en) Method for enforcing referential constraints in a database management system
Bilodeau et al. PDQ: An IBM-704 Code to Solve the Two-dimensional Few-group Neutron-diffusion Equations
JPH05307096A (en) Apparatus for monitoring and controlling operation of equipment and method of monitoring operation of equipment
Uhrowczik Data dictionary/directories
US8015178B2 (en) System and method to determine a single SQL BOM solve
Fikes Deductive retrieval mechanisms for state description models
Vanthienen et al. Integration of the decision table formalism with a relational database environment
US20100318343A1 (en) Smart data access layer for supervisory information system
CN115544254A (en) Intelligent data processing method, device and equipment based on enterprise-level administrative organization tree
JP3184551B2 (en) Knowledge-based management method for information inference equipment
Jaro UNIMATCH: a computer system for generalized record linkage under conditions of uncertainty
JP3128257B2 (en) Graphic information processing device
Sneed Reverse Engineering as a Bridge to CASE
van Bommel Implementation Selection for Object-Role Models.
Dileva et al. Information system dynamics representation in production environments
Ding et al. Research on Data Synchronization Consistency Comparison System Based on Computer Heterogeneous Database
JP2571492B2 (en) How to detect correction points in multiple programs
JP2650406B2 (en) Plan creation support apparatus and method
Bleier Data definition standardization
CN115687316A (en) Data standard management method and device
Feng et al. Enhancing data warehousing with fuzzy technology

Legal Events

Date Code Title Description
EEER Examination request
MKLA Lapsed