CA2038939A1 - Production control system - Google Patents

Production control system

Info

Publication number
CA2038939A1
CA2038939A1 CA2038939A CA2038939A CA2038939A1 CA 2038939 A1 CA2038939 A1 CA 2038939A1 CA 2038939 A CA2038939 A CA 2038939A CA 2038939 A CA2038939 A CA 2038939A CA 2038939 A1 CA2038939 A1 CA 2038939A1
Authority
CA
Canada
Prior art keywords
control system
products
line control
schedule
facilities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CA2038939A
Other languages
French (fr)
Other versions
CA2038939C (en
Inventor
Satomi Furukawa
Shozo Suzuki
Yuuji Seki
Hiroshi Ohide
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CA2038939A1 publication Critical patent/CA2038939A1/en
Application granted granted Critical
Publication of CA2038939C publication Critical patent/CA2038939C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31379Master monitors controllers, updates production progress, allocates resources
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32292Large, medium and fine schedule, with feedback from fine to large
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32297Adaptive scheduling, feedback of actual proces progress to adapt schedule
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32301Simulate production, process stages, determine optimum scheduling rules
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

What is disclosed is a production control system for dealing with the demand of producing many kinds of products in small quantities within a short delivery period by improving productivity of production lines and unmanned operation of the lines. The production control system has a plurality of facilities (1) including parts mounters (14) for processing products through processes, cell controllers (2) for controlling the facilities, a line control system (3) for centrally controlling all the cell controllers, and a transporting unit (4) controlled by the line control system to transport the products between the facilities. The line control system (3) comprises a unit (401) for preparing a detailed execution schedule by considering, in real time, a schedule of a relatively short period extracted from a schedule of a relatively long period, half-finished conditions of the products in a line, and actual events. The line control system controls the cell controllers, parts mounters, and transporting unit according to the prepared execution schedule.
CA002038939A 1989-08-10 1990-08-10 Production control system Expired - Fee Related CA2038939C (en)

Applications Claiming Priority (8)

Application Number Priority Date Filing Date Title
JP20715889 1989-08-10
JP1-207158 1989-08-10
JP31434789 1989-12-05
JP1-314347 1989-12-05
JP1281090 1990-01-23
JP2-012810 1990-01-23
JP2-018055 1990-01-30
JP1805590 1990-01-30

Publications (2)

Publication Number Publication Date
CA2038939A1 true CA2038939A1 (en) 1991-02-11
CA2038939C CA2038939C (en) 1997-06-17

Family

ID=27455872

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002038939A Expired - Fee Related CA2038939C (en) 1989-08-10 1990-08-10 Production control system

Country Status (5)

Country Link
US (1) US5237508A (en)
EP (1) EP0437634B1 (en)
CA (1) CA2038939C (en)
DE (1) DE69029193D1 (en)
WO (1) WO1991001850A1 (en)

Families Citing this family (74)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2884816B2 (en) * 1991-05-10 1999-04-19 神鋼電機株式会社 Control method in mobile robot system
US5584118A (en) * 1991-05-24 1996-12-17 Fujitsu Limited Production control with centralized physical distribution control between storage and production cells
JPH056212A (en) * 1991-06-27 1993-01-14 Mitsubishi Electric Corp Data preparing method for equipment loading machine
JPH05121521A (en) * 1991-10-29 1993-05-18 Komatsu Electron Metals Co Ltd Apparatus and method for manufacture of semiconductor wafer
US5446667A (en) * 1992-06-18 1995-08-29 Pitney Bowes Inc. Just-in-time mail delivery system and method
US5566097A (en) * 1993-03-05 1996-10-15 International Business Machines Corporation System for optimal electronic debugging and verification employing scheduled cutover of alternative logic simulations
JPH0773244A (en) * 1993-06-29 1995-03-17 Hitachi Ltd Method and device for determining input order of working object product to production line, method and device for determining personnel placement to production line
JP3654597B2 (en) 1993-07-15 2005-06-02 株式会社ルネサステクノロジ Manufacturing system and manufacturing method
JP2546159B2 (en) * 1993-08-05 1996-10-23 日本電気株式会社 production management system
JP3334970B2 (en) * 1993-10-29 2002-10-15 松下電器産業株式会社 Production progress management support method and apparatus
US5544350A (en) * 1994-07-05 1996-08-06 Taiwan Semiconductor Manufacturing Co. Ratio of running work in progress
JP2702466B2 (en) * 1995-11-24 1998-01-21 山形日本電気株式会社 Method and apparatus for producing semiconductor wafer
US6480751B1 (en) * 1997-01-16 2002-11-12 Matsushita Electric Industrial Co., Ltd. Component supplying method, component arrangement data forming method and electronic component mounting apparatus using the methods
US5952890A (en) * 1997-02-05 1999-09-14 Fox Enterprises, Inc. Crystal oscillator programmable with frequency-defining parameters
US5960405A (en) * 1997-02-05 1999-09-28 Fox Enterprises, Inc. Worldwide marketing logistics network including strategically located centers for frequency programming crystal oscillators to customer specification
CA2285351A1 (en) 1997-02-07 1998-08-27 Peter G. Brown System and method for simulation and modeling of biopharmaceutical batch process manufacturing facilities
US6662061B1 (en) 1997-02-07 2003-12-09 Peter G. Brown System and method for simulation and modeling of batch process manufacturing facilities using process time lines
US7043414B2 (en) * 1997-06-20 2006-05-09 Brown Peter G System and method for simulating, modeling and scheduling of solution preparation in batch process manufacturing facilities
US6311093B1 (en) 1997-06-20 2001-10-30 Peter G. Brown System and method for simulation, modeling and scheduling of equipment maintenance and calibration in biopharmaceutical batch process manufacturing facilities
US6983229B2 (en) * 1997-06-20 2006-01-03 Brown Peter G Method for scheduling solution preparation in biopharmaceutical batch process manufacturing
JP3319993B2 (en) 1997-09-10 2002-09-03 東京エレクトロン株式会社 Method of determining deadlock of object to be processed, method of avoiding deadlock of object to be processed, and processing apparatus
US6507765B1 (en) * 1998-02-10 2003-01-14 Hm Electronic Systems Limited Computer integrated manufacturing control and information system
JPH11235648A (en) * 1998-02-17 1999-08-31 Toshiba Corp Manufacturing plan control device, manufacturing plan controlling method and storage medium recorded with manufacturing plan control program capable of reading by computer
US6400999B1 (en) * 1998-07-06 2002-06-04 Yokogawa Electric Corporation Production system and manufacturing equipment selecting method on production system
JP2000077289A (en) * 1998-08-27 2000-03-14 Fujitsu Ltd Production predicting control system
US6629007B1 (en) * 1998-12-25 2003-09-30 Matsushita Electric Industrial Co., Ltd. Apparatus and method for notifying lack of component in advance, component mounting apparatus, and article of manufacture comprising computer usable medium
JP4062815B2 (en) * 1999-05-11 2008-03-19 ソニー株式会社 Electronic component mounting equipment
JP2000332488A (en) * 1999-05-18 2000-11-30 Sony Corp Numerical control data forming device and method therefor
JP2001034304A (en) * 1999-07-21 2001-02-09 Fujitsu Ltd Monitor and control supporting device
EP1244995B1 (en) * 1999-08-13 2010-10-20 Peter G. Brown Simulation, modeling and scheduling of batch process manufacturing facilities using process time lines
US6658316B1 (en) * 1999-12-30 2003-12-02 Abb Technology Ag Parametric programming of robots and automated machines for manufacturing electrical enclosures
US6606527B2 (en) * 2000-03-31 2003-08-12 International Business Machines Corporation Methods and systems for planning operations in manufacturing plants
JP4139042B2 (en) * 2000-04-26 2008-08-27 本田技研工業株式会社 Effort management system
US6725115B2 (en) * 2000-05-08 2004-04-20 Teradyne, Inc. Dynamic testing of electronic assemblies
JP3774138B2 (en) * 2000-11-13 2006-05-10 住友重機械工業株式会社 Process planning method and apparatus, and process method and apparatus
US7142939B2 (en) * 2001-01-10 2006-11-28 Matsushita Electric Industrial Co., Ltd. Component mounter, service supplier, and service supplying method
US20020178188A1 (en) * 2001-05-25 2002-11-28 Irizarry, P.E Jose A. Productivity recovery and improvement software
US20030028353A1 (en) * 2001-08-06 2003-02-06 Brian Gventer Production pattern-recognition artificial neural net (ANN) with event-response expert system (ES)--yieldshieldTM
JP3964171B2 (en) * 2001-10-04 2007-08-22 三菱電機株式会社 Material conveying device, material conveying method and material conveying program
JP2003188229A (en) * 2001-12-18 2003-07-04 Hitachi Kasado Eng Co Ltd System and method for manufacturing wafer
US7238550B2 (en) * 2002-02-26 2007-07-03 Tandon Group Ltd. Methods and apparatus for fabricating Chip-on-Board modules
JP3709876B2 (en) * 2002-05-17 2005-10-26 マツダ株式会社 Parts supply system and method for assembly production line
TW200410108A (en) * 2002-12-13 2004-06-16 Hon Hai Prec Ind Co Ltd Main production schedule managing system and method
US7139629B2 (en) * 2003-04-28 2006-11-21 Palo Alto Research Center Incorporated Planning and scheduling for failure recovery system and method
US20050119863A1 (en) * 2003-08-07 2005-06-02 Buikema John T. Manufacturing monitoring system and methods for determining efficiency
US20060031840A1 (en) * 2003-08-20 2006-02-09 Abb Inc. Real time monitoring manufacturing scheduling and control
TWI317909B (en) * 2004-09-10 2009-12-01 Hon Hai Prec Ind Co Ltd System and method for mould production scheduling
US7305278B2 (en) * 2004-11-15 2007-12-04 International Business Machines Corporation Enterprise factory control method and system
JP4444154B2 (en) * 2005-05-02 2010-03-31 大日本スクリーン製造株式会社 Substrate processing equipment
CN1949252A (en) * 2005-10-14 2007-04-18 鸿富锦精密工业(深圳)有限公司 Putting out goods warning messaging system and method
US20070142928A1 (en) * 2005-12-16 2007-06-21 Moughler Eric A Process management system for work machine environments
WO2007122300A1 (en) * 2006-04-24 2007-11-01 Dianoia Control assistance tool for controlling a process
KR100861512B1 (en) * 2007-03-06 2008-10-02 삼성테크윈 주식회사 Total control system of a plurality of chip mounter
EP2017684A1 (en) * 2007-05-24 2009-01-21 Siemens Aktiengesellschaft System and method for handling a production disturbance/opportunity event in a production execution system
JP2008299496A (en) * 2007-05-30 2008-12-11 Nippon Telegr & Teleph Corp <Ntt> Operation simulator and program
JP5276291B2 (en) * 2007-08-28 2013-08-28 富士機械製造株式会社 Operating status display system, operating status display method, and operating status display program
JP2009172722A (en) * 2008-01-25 2009-08-06 Mitsubishi Heavy Ind Ltd Manufacturing equipment
DE102009002432A1 (en) * 2009-04-16 2010-10-28 Airbus Deutschland Gmbh Method for the feedback-based optimization of a measurement data life cycle in joining processes in production
JP2012248072A (en) * 2011-05-30 2012-12-13 Sony Corp Information processing apparatus, information processing method, and program
US9443215B2 (en) * 2011-09-01 2016-09-13 Sap Se Next generation sequencing management
JP5696027B2 (en) * 2011-12-02 2015-04-08 株式会社日立製作所 Work time calculation device and work time calculation method
JP5627625B2 (en) * 2012-03-22 2014-11-19 株式会社東芝 Scheduling apparatus and method
EP2648059B1 (en) * 2012-04-03 2014-12-10 ABB Research Ltd. Investigating the activities being performed by a machine in an industrial process
US8600536B2 (en) * 2012-04-20 2013-12-03 Pipeline Software, Inc. Method and system for virtualized composite project work schedules
CH706470A1 (en) * 2012-05-02 2013-11-15 Ferag Ag Computerized Central to configure product processing plants.
WO2015019500A1 (en) * 2013-08-09 2015-02-12 富士機械製造株式会社 Method and device for management of electronic component mounting system having plurality of manufacturing lines
JP5929949B2 (en) * 2014-03-13 2016-06-08 トヨタ自動車株式会社 Work plan creation system
JP6387707B2 (en) * 2014-07-01 2018-09-12 富士通株式会社 Anomaly detection system, display device, anomaly detection method and anomaly detection program
JP6600819B2 (en) * 2016-09-30 2019-11-06 パナソニックIpマネジメント株式会社 Component mounting line control system
JP7126045B2 (en) * 2018-03-30 2022-08-26 パナソニックIpマネジメント株式会社 Plan management method and plan management device
JP6845204B2 (en) * 2018-10-30 2021-03-17 ファナック株式会社 Know-how creation device, know-how creation method and know-how creation program
TWI696055B (en) * 2019-03-27 2020-06-11 三泰科技股份有限公司 The checking system and the method of the material and smt
EP4124198A4 (en) * 2020-03-16 2023-04-19 Fuji Corporation Management device, mounting system, and management method
WO2022038672A1 (en) * 2020-08-18 2022-02-24 三菱電機株式会社 Scheduling device and learning device

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0650442B2 (en) * 1983-03-09 1994-06-29 株式会社日立製作所 Facility group control method and system
US4802094A (en) * 1985-07-10 1989-01-31 Hitachi, Ltd. Process monitoring apparatus for process management in production and assembly lines
JP2621172B2 (en) * 1987-04-22 1997-06-18 トヨタ自動車株式会社 production management system
EP0300456A3 (en) * 1987-07-24 1990-08-08 Bruce H. Faaland Improved scheduling method and system
US4901218A (en) * 1987-08-12 1990-02-13 Renishaw Controls Limited Communications adaptor for automated factory system
JPS6471652A (en) * 1987-09-09 1989-03-16 Fanuc Ltd Automatic work scheduling method based on expert system
DE58909756D1 (en) * 1988-06-17 1997-02-06 Siemens Ag Method and arrangement for executing a program in a heterogeneous multi-computer system
JP2574170B2 (en) * 1988-08-12 1997-01-22 本田技研工業株式会社 production management system
JP2554713B2 (en) * 1988-08-12 1996-11-13 トヨタ自動車株式会社 Production planning method
JPH02185350A (en) * 1989-01-12 1990-07-19 Mitsubishi Electric Corp Work processing device
US5014208A (en) * 1989-01-23 1991-05-07 Siemens Corporate Research, Inc. Workcell controller employing entity-server model for physical objects and logical abstractions
CA1334439C (en) * 1989-07-25 1995-02-14 Yoshimasa Ohta Production management system with simultaneous multiple data transmission

Also Published As

Publication number Publication date
EP0437634B1 (en) 1996-11-20
DE69029193D1 (en) 1997-01-02
EP0437634A1 (en) 1991-07-24
CA2038939C (en) 1997-06-17
EP0437634A4 (en) 1992-03-18
US5237508A (en) 1993-08-17
WO1991001850A1 (en) 1991-02-21

Similar Documents

Publication Publication Date Title
CA2038939A1 (en) Production control system
AU4752090A (en) Apparatus and method for controlling a system, such as a nutrient control system for feeding plants, based on actual and projected data and according to predefined rules
AU634226B2 (en) Batch process control using expert systems
EP0182382A3 (en) Centralized control method for looms and device thereof
CA2033223A1 (en) Compound control method for controlling a system
CA2222818A1 (en) Generation of lehr loader motion profile in an individual section glassware forming system
CA2114544A1 (en) Commercial-size, automatic industrial plant having several parts
AU629052B2 (en) Machine for automatically feeding warp threads
Eisenbrown Programmable controllers move to systems solutions.
Rix Getting ready for in-plant automation.
Zeleney Flexible Sheet-Metal Working With Integrated Store
EP0347467A4 (en) Cnc control system
Bleckmann Structural Control Technique for Rolling Mills--From Driving Control Technique to Plant Automation Technique
Rovetto From the Closed Ring to the Robot. Automation in the Polyurethane Systems
Moser Simulation procedure in process control technology
Gray Automated factory: An emphasis on controls.
Miller Real-time information access and control through programmable controller based automation.
Grinfel'd Automation of Projecting the Technology and Rigging in Die-Stamping Production
CA2161733A1 (en) Method of controlling an exchange, as well as control facilities and pr ogram modules therefor, and exchange and switching system therewith
Lenze et al. Lot Size and Capacity Oriented Coupling of Production Processes in Cold Mills
Scalia The cell controller in a PLC environment.
Lehtimäki A method for solving the decision problems of master scheduling.
Kohno Factory automation system for a feed-mixing plant.
Georgette Automation of the New Sollac Cold Tandem Mill Coupled With a Pickling Line(Sainte Agathe Works, Florange, France)
Smol'nikov The experience in computer facilities application for automation of production process at Sameko Joint-Stock Company

Legal Events

Date Code Title Description
EEER Examination request
MKLA Lapsed
MKLA Lapsed

Effective date: 20010810